Loading...
Agenda 12/11/2018 Item #16C 912/11/2018 EXECUTIVE SUMMARY Recommendation to approve a $529,692 Work Order under Request for Quotation No. 15-6469-4 to Wells & Water System, Inc., under Project Number 70085, “Acidification of Eight Production Wells - Phase 2 Golden Gate Wellfield,” and authorize the necessary budget amendment. OBJECTIVE: To complete well rehabilitation by performing well treatment (acidification) on existing Tamiami wells in the Collier County Water-Sewer District (CCWSD) Golden Gate Wellfield. CONSIDERATIONS: The proposed scope of work under Project No. 70085, “Acidification/Conditioning of Eight Production Wells - Phase 2 Golden Gate Wellfield” is consistent with the FY2019 Budget approved by the Board of County Commissioners on September 20, 2018. The proposed project consists of injecting an acid solution into selected Tamiami production wells to provide well bore rehabilitation and well yield improvements. The acid solution dissolves existing mineral deposits within the well thereby improving well pumping efficiencies, reducing drawdowns, and providing for higher water production rates. The proposed well treatment (acidification) will provide needed rehabilitation of the existing wells, thereby increasing the water pumping rate from each well to the North County Regional Water Treatment Plant (NCRWTP) and South County Regional Water Treatment Plant (SCRWTP). Completing this well rehabilitation will extend the useful life of these existing wells in lieu of constructing new wells. The County issued Request for Quotation No. 15-6469-4, “Acidification of Eight Production Wells - Phase 2,” on October 3, 2018 and distributed it to all vendors on the County’s Fixed-Term Well Testing, Drilling, and Maintenance Contract No. 15-6469. Of the five vendors notified, two submitted quotations by the October 16, 2018 deadline as summarized in the below table. VENDOR QUOTE Wells & Water Systems, Inc. $529,692.00 All Webbs Enterprises, Inc. $563,100.00 No quotes were received from Layne Christensen Company, Naples Well Drilling, Inc., or Youngquist Brothers, Inc. The quote specifications informed the respondents there may be unforeseen conditions associated with the project. The quote amount incorporates $10,000 per well for owner-directed allowance for work related to unforeseen conditions including, but not limited to, conflicts with existing facilities not reflected in record drawings and modifications or repairs resulting from unforeseen utility work associated with this project. The price for any needed additional work will be negotiated prior to commencement in accordance with the County’s Procurement Ordinance and the terms of the agreement. County staff determined the lowest bid to be fair and reasonable and recommends awarding the project to Wells & Water Systems, Inc., the lowest responsive and qualified vendor. The bid received was 24 percent less than the engineer’s cost opinion. In its October 22, 2018 recommendation letter, the design professional, Water Science Associates, recommends awarding the project to Wells & Water Systems, Inc., who has a satisfactory performance and warranty record on previous, similar, utility-related projects. FISCAL IMPACT: The source of funding is Water User Fees, Fund (412). A budget amendment in the amount of $580,000 is required to reallocate funding from projects within Fund 412 to Project 70085. The budget amendment is necessary to cover the construction cost ($529,692) and construction administration 16.C.9 Packet Pg. 1807 12/11/2018 services ($47,090). The project is expected to be completed in 2019. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities and to remain in compliance with all regulatory programs. RECOMMENDATION: To approve a $529,692 Work Order under Request for Quotation No. 15- 6469-4 to Wells & Water Systems, Inc.; authorize the necessary budget amendment; and, authorize the Chairman to sign the attached Work Order. Prepared By: Benjamin N. Bullert, P.E., Senior Project Manager, Engineering and Project Management Division ATTACHMENT(S) 1. Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (PDF) 2. Attachment No 2 - RFQ 15-6469-4 Quote Analysis (PDF) 3. Attachment No 3 - RFQ 15-6469-4 Request for Quotation (PDF) 4. Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (PDF) 5. Attachment No 5 - RFQ 15-6469-4 Work Order (PDF) 16.C.9 Packet Pg. 1808 12/11/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.9 Doc ID: 7333 Item Summary: Recommendation to approve a $529,692 Work Order under Request for Quotation No. 15-6469-4 to Wells & Water System, Inc., under Project Number 70085, “Acidification of Eight Production Wells – Phase 2 Golden Gate Wellfield,” and authorize the necessary budget amendment. Meeting Date: 12/11/2018 Prepared by: Title: – Public Utilities Planning and Project Management Name: Benjamin Bullert 11/13/2018 12:02 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 11/13/2018 12:02 PM Approved By: Review: Public Utilities Planning and Project Management Oscar Martinez Additional Reviewer Completed 11/13/2018 12:18 PM Public Utilities Planning and Project Management Oscar Martinez Additional Reviewer Completed 11/13/2018 12:18 PM Wastewater Beth Johnssen Additional Reviewer Completed 11/13/2018 12:44 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 11/13/2018 12:56 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 11/13/2018 1:31 PM Water Pamela Libby Additional Reviewer Completed 11/14/2018 1:15 PM Procurement Services Swainson Hall Additional Reviewer Completed 11/15/2018 9:52 AM Procurement Services Ted Coyman Additional Reviewer Completed 11/15/2018 6:15 PM Public Utilities Department Sarah Hamilton Level 1 Division Reviewer Completed 11/16/2018 12:23 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 11/16/2018 4:15 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 11/19/2018 2:07 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 11/19/2018 2:55 PM County Attorney's Office Emily Pepin CAO Preview Completed 11/19/2018 4:20 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/20/2018 7:58 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 11/21/2018 1:23 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 11/27/2018 10:18 AM 16.C.9 Packet Pg. 1809 12/11/2018 Board of County Commissioners MaryJo Brock Meeting Pending 12/11/2018 9:00 AM 16.C.9 Packet Pg. 1810 COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 No quotes were received from the following vendors on contract: Layne Christensen Naples Well Drilling Youngquist Brothers Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total A.1 Mobilize/Demobilize. Prepare preconstruction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 A.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 A.3 Remove above-ground piping/wellhead manifold and install a backflow preventer between the raw main and the well. 1 Lump Sum $1,200.00 $1,200.00 $3,500.00 $3,500.00 A.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 A.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing.1 Lump Sum $2,000.00 $2,000.00 $2,500.00 $2,500.00 A.8 Inject 32% HCl into the raw water feed line at a rate of approximately 4 gallons per hour until 600 gallons of HCl has been used. Monitor as required during injection. Water feed rate is to be 100 gallons per minute and the pH of the injectate should be maintained between 2 and 4 units. 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 A.9 After completion of acid injection, inject chase water for 30 minutes at 100 gpm, close all valves and allow well to remain undisturbed for up to 24-hour duration. Monitor the well for excess pressure build-up and release as needed. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 A.10 Remove the acid header or packer and the spent acid from the well. Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or to a location approved by the Engineer. 1 Lump Sum $3,000.00 $3,000.00 $3,500.00 $3,500.00 A.11 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at about 100 feet below pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 A.12 Disinfect the well and pump via chlorination. 1 Lump Sum $1,500.00 $1,500.00 $5,000.00 $5,000.00 A.13 Re-install pump, wellhead, and original equipment.1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 A.14 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000).1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 A.15 Conduct post-treatment three-rate step-drawdown test 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 A.16 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 A.17 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $51,700.00 $47,500.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total A.18 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 A.19 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 A.20 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 A.21 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 A.22 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total A.1 - A.17 HCl ACIDIFCIATION $51,700 $47,500 A.18 - A.22 HCl ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $63,224 $64,700TOTAL: SUBTOTAL - HCl ACIDIFICATION: SUBTOTAL - HCl ACIDIFICATION - ADDITIONAL WORK: Wells & Water All Webbs SECTION 1: HCl ACIDIFICATION OF TAMIAMI WELL NO. 31 HCl ACIDIFCIATION HCl ACIDIFICATION - ADDITIONAL WORK TOTAL - HCl ACIDIFICATION OF TAMIAMI WELL NO. 31 16.C.9.a Packet Pg. 1811 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total A.1 Mobilize/Demobilize. Prepare preconstruction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 A.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 A.3 Remove above-ground piping/wellhead manifold and install a backflow preventer between the raw main and the well. 1 Lump Sum $1,200.00 $1,200.00 $3,500.00 $3,500.00 A.4 Conduct Flow Logging using existing pump or a test pump at a rate between 300 and 600 gpm and Fluid Resistivity Log, if directed by the Engineer. 1 Lump Sum $5,000.00 $5,000.00 $6,500.00 $6,500.00 A.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 A.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing.1 Lump Sum $2,000.00 $2,000.00 $3,000.00 $3,000.00 A.7 Install a packer at a depth if directed by the Engineer.1 Lump Sum $3,000.00 $3,000.00 $10,000.00 $10,000.00 A.8 Inject 32% HCl into the raw water feed line at a rate of approximately 4 gallons per hour until 600 gallons of HCl has been used. Monitor as required during injection. Water feed rate is to be 100 gallons per minute and the pH of the injectate should be maintained between 2 and 4 units. 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 A.9 After completion of acid injection, inject chase water for 30 minutes at 100 gpm, close all valves and allow well to remain undisturbed for up to 24-hour duration. Monitor the well for excess pressure build-up and release as needed. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 A.10 Remove the acid header or packer and the spent acid from the well. Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or to a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $3,500.00 $3,500.00 A.11 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at about 100 feet below pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 A.12 Disinfect the well and pump via chlorination. 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 A.13 Re-install pump, wellhead, and original equipment.1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 A.14 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000).1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 A.15 Conduct post-treatment three-rate step-drawdown test 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 A.16 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 A.17 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $59,200.00 $64,500.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total A.18 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 A.19 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 A.20 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 A.21 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 A.22 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total A.1 - A.17 HCl ACIDIFCIATION $59,200 $64,500 A.18 - A.22 HCl ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $70,724 $81,700 Wells & Water All Webbs SUBTOTAL - HCl ACIDIFICATION: SUBTOTAL - HCl ACIDIFICATION - ADDITIONAL WORK: TOTAL: SECTION 2: HCl ACIDIFICATION OF TAMIAMI WELL NO. 33 HCl ACIDIFCIATION HCl ACIDIFICATION - ADDITIONAL WORK TOTAL - HCl ACIDIFICATION OF TAMIAMI WELL NO. 33 16.C.9.a Packet Pg. 1812 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total B.1 Mobilization/Demobilize equipment and materials to the site. Prepare pre-construction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 B.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 B.3 Remove above-ground piping/wellhead manifold and install a backflow prevented between the raw main and the well.1 Lump Sum $1,200.00 $1,200.00 $3,500.00 $3,500.00 B.4 Conduct Flow Logging using existing pump or a test pump at a rate between 300 and 600 gpm and Fluid Resistivity Log, if directed by the Engineer. 1 Lump Sum $5,000.00 $5,000.00 $6,500.00 $6,500.00 B.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 B.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing. 1 Lump Sum $2,500.00 $2,500.00 $2,500.00 $2,500.00 B.7 Install a packer at a depth directed by the Engineer. 1 Lump Sum $3,000.00 $3,000.00 $10,000.00 $10,000.00 B.8 Inject C02 into the raw water feed line at a rate of approximately 5 pounds per 1000 gallons of water until 4000 lbs.of carbon dioxide gas has been used.Monitor as required during injection.Water feed rate is to be 100 gpm.After completion of acid injection,inject chase water for 30 minutes at 100 gpm 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 B.9 After well has remained static for 24 hours,remove the acid line or packer and the spent acid from the well.Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or at a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.10 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at a depth approximately 100 feet below the pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 B.11 Reinstall pump, wellhead, and original equipment. 1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 B.12 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000)1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 B.13 Perform step-drawdown testing at 3 different steps of at least 30 minutes each 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.14 Disinfect the well and pump via chlorination 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 B.15 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 B.16 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $58,700.00 $60,500.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total B.17 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 B.18 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 B.19 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 B.20 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 B.21 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total B.1 - B.16 CO2 ACIDIFCIATION $58,700 $60,500 B.17 - B.21 CO2 ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $70,224 $77,700 SUBTOTAL - CO2 ACIDIFICATION: SUBTOTAL - CO2 ACIDIFICATION - ADDITIONAL WORK: TOTAL: Wells & Water All Webbs SECTION 3: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 3 CO2 ACIDIFCIATION CO2 ACIDIFICATION – ADDITIONAL WORK TOTAL - CO2 ACIDIFICATION OF TAMIAMI WELL NO. 3 16.C.9.a Packet Pg. 1813 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total B.1 Mobilization/Demobilize equipment and materials to the site. Prepare pre-construction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 B.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 B.3 Remove above-ground piping/wellhead manifold and install a backflow prevented between the raw main and the well.1 Lump Sum $1,500.00 $1,500.00 $3,500.00 $3,500.00 B.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 B.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing. 1 Lump Sum $1,800.00 $1,800.00 $2,500.00 $2,500.00 B.8 Inject C02 into the raw water feed line at a rate of approximately 5 pounds per 1000 gallons of water until 4000 lbs.of carbon dioxide gas has been used.Monitor as required during injection.Water feed rate is to be 100 gpm.After completion of acid injection,inject chase water for 30 minutes at 100 gpm 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 B.9 After well has remained static for 24 hours,remove the acid line or packer and the spent acid from the well.Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or at a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.10 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at a depth approximately 100 feet below the pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 B.11 Reinstall pump, wellhead, and original equipment. 1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 B.12 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000)1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 B.13 Perform step-drawdown testing at 3 different steps of at least 30 minutes each 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.14 Disinfect the well and pump via chlorination 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 B.15 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 B.16 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $50,300.00 $44,000.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total B.17 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 B.18 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 B.19 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 B.20 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 B.21 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total B.1 - B.16 CO2 ACIDIFCIATION $50,300 $44,000 B.17 - B.21 CO2 ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $61,824 $61,200 SUBTOTAL - CO2 ACIDIFICATION: SUBTOTAL - CO2 ACIDIFICATION - ADDITIONAL WORK: CO2 ACIDIFCIATION All Webbs CO2 ACIDIFICATION – ADDITIONAL WORK TOTAL - CO2 ACIDIFICATION OF TAMIAMI WELL NO. 10 Wells & Water TOTAL: SECTION 4: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 10 16.C.9.a Packet Pg. 1814 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total B.1 Mobilization/Demobilize equipment and materials to the site. Prepare pre-construction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 B.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 B.3 Remove above-ground piping/wellhead manifold and install a backflow prevented between the raw main and the well.1 Lump Sum $1,500.00 $1,500.00 $3,500.00 $3,500.00 B.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 B.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing. 1 Lump Sum $1,800.00 $1,800.00 $2,500.00 $2,500.00 B.8 Inject C02 into the raw water feed line at a rate of approximately 5 pounds per 1000 gallons of water until 4000 lbs.of carbon dioxide gas has been used.Monitor as required during injection.Water feed rate is to be 100 gpm.After completion of acid injection,inject chase water for 30 minutes at 100 gpm 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 B.9 After well has remained static for 24 hours,remove the acid line or packer and the spent acid from the well.Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or at a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.10 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at a depth approximately 100 feet below the pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 B.11 Reinstall pump, wellhead, and original equipment. 1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 B.12 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000)1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 B.13 Perform step-drawdown testing at 3 different steps of at least 30 minutes each 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.14 Disinfect the well and pump via chlorination 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 B.15 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 B.16 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $50,300.00 $44,000.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total B.17 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 B.18 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 B.19 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 B.20 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 B.21 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total B.1 - B.16 CO2 ACIDIFCIATION $50,300 $44,000 B.17 - B.21 CO2 ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $61,824 $61,200 SUBTOTAL - CO2 ACIDIFICATION - ADDITIONAL WORK: TOTAL: Wells & Water All Webbs SECTION 5: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 21 CO2 ACIDIFCIATION CO2 ACIDIFICATION – ADDITIONAL WORK TOTAL - CO2 ACIDIFICATION OF TAMIAMI WELL NO. 21 SUBTOTAL - CO2 ACIDIFICATION: 16.C.9.a Packet Pg. 1815 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total B.1 Mobilization/Demobilize equipment and materials to the site. Prepare pre-construction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 B.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 B.3 Remove above-ground piping/wellhead manifold and install a backflow prevented between the raw main and the well.1 Lump Sum $1,200.00 $1,200.00 $3,500.00 $3,500.00 B.4 Conduct Flow Logging using existing pump or a test pump at a rate between 300 and 600 gpm and Fluid Resistivity Log, if directed by the Engineer. 1 Lump Sum $5,000.00 $5,000.00 $6,500.00 $6,500.00 B.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 B.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing. 1 Lump Sum $1,800.00 $1,800.00 $2,500.00 $2,500.00 B.7 Install a packer at a depth directed by the Engineer. 1 Lump Sum $4,000.00 $4,000.00 $10,000.00 $10,000.00 B.8 Inject C02 into the raw water feed line at a rate of approximately 5 pounds per 1000 gallons of water until 4000 lbs.of carbon dioxide gas has been used.Monitor as required during injection.Water feed rate is to be 100 gpm.After completion of acid injection,inject chase water for 30 minutes at 100 gpm 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 B.9 After well has remained static for 24 hours,remove the acid line or packer and the spent acid from the well.Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or at a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.10 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at a depth approximately 100 feet below the pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 B.11 Reinstall pump, wellhead, and original equipment. 1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 B.12 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000)1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 B.13 Perform step-drawdown testing at 3 different steps of at least 30 minutes each 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.14 Disinfect the well and pump via chlorination 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 B.15 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 B.16 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $59,000.00 $60,500.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total B.17 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 B.18 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 B.19 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 B.20 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 B.21 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total B.1 - B.16 CO2 ACIDIFCIATION $59,000 $60,500 B.17 - B.21 CO2 ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $70,524 $77,700 SUBTOTAL - CO2 ACIDIFICATION - ADDITIONAL WORK: CO2 ACIDIFICATION – ADDITIONAL WORK TOTAL - CO2 ACIDIFICATION OF TAMIAMI WELL NO. 28 TOTAL: SUBTOTAL - CO2 ACIDIFICATION: Wells & Water All Webbs SECTION 6: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 28 CO2 ACIDIFCIATION 16.C.9.a Packet Pg. 1816 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total B.1 Mobilization/Demobilize equipment and materials to the site. Prepare pre-construction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 B.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 B.3 Remove above-ground piping/wellhead manifold and install a backflow prevented between the raw main and the well.1 Lump Sum $1,500.00 $1,500.00 $3,500.00 $3,500.00 B.4 Conduct Flow Logging using existing pump or a test pump at a rate between 300 and 600 gpm and Fluid Resistivity Log, if directed by the Engineer. 1 Lump Sum $5,000.00 $5,000.00 $6,500.00 $6,500.00 B.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 B.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing. 1 Lump Sum $1,800.00 $1,800.00 $2,500.00 $2,500.00 B.7 Install a packer at a depth directed by the Engineer. 1 Lump Sum $3,000.00 $3,000.00 $10,000.00 $10,000.00 B.8 Inject C02 into the raw water feed line at a rate of approximately 5 pounds per 1000 gallons of water until 4000 lbs.of carbon dioxide gas has been used.Monitor as required during injection.Water feed rate is to be 100 gpm.After completion of acid injection,inject chase water for 30 minutes at 100 gpm 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 B.9 After well has remained static for 24 hours,remove the acid line or packer and the spent acid from the well.Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or at a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.10 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at a depth approximately 100 feet below the pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 B.11 Reinstall pump, wellhead, and original equipment. 1 Lump Sum $2,500.00 $2,500.00 $5,000.00 $5,000.00 B.12 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000)1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 B.13 Perform step-drawdown testing at 3 different steps of at least 30 minutes each 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.14 Disinfect the well and pump via chlorination 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 B.15 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 B.16 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $58,300.00 $60,500.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total B.17 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 B.18 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 B.19 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 B.20 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 B.21 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total B.1 - B.16 CO2 ACIDIFCIATION $58,300 $60,500 B.17 - B.21 CO2 ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $69,824 $77,700 SUBTOTAL - CO2 ACIDIFICATION - ADDITIONAL WORK: TOTAL: SUBTOTAL - CO2 ACIDIFICATION: Wells & Water SECTION 7: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 29 CO2 ACIDIFCIATION CO2 ACIDIFICATION – ADDITIONAL WORK TOTAL - CO2 ACIDIFICATION OF TAMIAMI WELL NO. 29 All Webbs 16.C.9.a Packet Pg. 1817 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) COLLIER COUNTY Public Utilities Department Engineering and Project Management Acidification of Eight Production Wells Golden Gate Wellfield - Phase 2 Bid Item Contract Description Quantity Unit Unit Price Total Unit Price Total B.1 Mobilization/Demobilize equipment and materials to the site. Prepare pre-construction video. 1 Lump Sum $7,000.00 $7,000.00 $500.00 $500.00 B.2 Conduct a three-rate pre-treatment step-drawdown test with the existing pump.1 Lump Sum $1,800.00 $1,800.00 $1,000.00 $1,000.00 B.3 Remove above-ground piping/wellhead manifold and install a backflow prevented between the raw main and the well.1 Lump Sum $1,500.00 $1,500.00 $3,500.00 $3,500.00 B.5 Remove submersible pump and store as directed by County 1 Lump Sum $1,800.00 $1,800.00 $3,500.00 $3,500.00 B.6 Install acidification wellhead and piping with a solution feed line set to a depth of 5 feet from the base of the casing. 1 Lump Sum $1,800.00 $1,800.00 $2,500.00 $2,500.00 B.8 Inject C02 into the raw water feed line at a rate of approximately 5 pounds per 1000 gallons of water until 4000 lbs.of carbon dioxide gas has been used.Monitor as required during injection.Water feed rate is to be 100 gpm.After completion of acid injection,inject chase water for 30 minutes at 100 gpm 1 Lump Sum $22,000.00 $22,000.00 $10,000.00 $10,000.00 B.9 After well has remained static for 24 hours,remove the acid line or packer and the spent acid from the well.Neutralize any recovered water to a pH above 6 and truck to discharge the water to the NCWRF reject ponds or at a location approved by the Engineer. 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.10 Conduct airlift development for a period of 8 hours using rigid tremie pipe airline installed at a depth approximately 100 feet below the pad level.1 Lump Sum $2,400.00 $2,400.00 $3,500.00 $3,500.00 B.11 Reinstall pump, wellhead, and original equipment. 1 Lump Sum $2,200.00 $2,200.00 $5,000.00 $5,000.00 B.12 Make minor improvements to wellhead as needed (owner’s allowance for this task is up to $2,000)1 Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 B.13 Perform step-drawdown testing at 3 different steps of at least 30 minutes each 1 Lump Sum $2,000.00 $2,000.00 $1,500.00 $1,500.00 B.14 Disinfect the well and pump via chlorination 1 Lump Sum $2,000.00 $2,000.00 $5,000.00 $5,000.00 B.15 Perform bacteriological clearance. County will pull samples and perform testing with Contractor's assistance. 1 Lump Sum $1,000.00 $1,000.00 $1,500.00 $1,500.00 B.16 Clean and restore site and demobilize 1 Lump Sum $500.00 $500.00 $3,000.00 $3,000.00 $50,000.00 $44,000.00 Bid Item Description Quantity Unit Unit Price Total Unit Price Total B.17 Extra Work – Drilling Crew with Pump Hoist Equipment 12 Hours $100.00 $1,200.00 $200.00 $2,400.00 B.18 Extra Work – Drilling or other Crews 12 Hours $25.00 $300.00 $100.00 $1,200.00 B.19 Standby Time – Pump Hoist and Drilling Crew On Site 12 Hours $1.00 $12.00 $200.00 $2,400.00 B.20 Standby Time – Pump Hoist on Site and Crew Off Site 12 Hours $1.00 $12.00 $100.00 $1,200.00 B.21 Owner's Allowance for Unforeseen Events (Approval at Owner's Discretion)1 LS/NTE/Unit Price $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,524.00 $17,200.00 Bid Item #Description Total Total B.1 - B.16 CO2 ACIDIFCIATION $50,000 $44,000 B.17 - B.21 CO2 ACIDIFICATION - ADDITIONAL WORK $11,524 $17,200 $61,524 $61,200 Wells & Water All Webbs SECTION 1: HCl ACIDIFICATION OF TAMIAMI WELL NO. 31 $63,224 $64,700 SECTION 2: HCl ACIDIFICATION OF TAMIAMI WELL NO. 33 $70,724 $81,700 SECTION 3: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 3 $70,224 $77,700 SECTION 4: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 10 $61,824 $61,200 SECTION 5: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 21 $61,824 $61,200 SECTION 6: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 28 $70,524 $77,700 SECTION 7: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 29 $69,824 $77,700 SECTION 8: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 34 $61,524 $61,200 TOTAL $529,692 $563,100 QUOTE SUMMARY SUBTOTAL - CO2 ACIDIFICATION: SUBTOTAL - CO2 ACIDIFICATION - ADDITIONAL WORK: TOTAL: SECTION 8: CO2 ACIDIFICATION OF TAMIAMI WELL NO. 34 CO2 ACIDIFCIATION CO2 ACIDIFICATION – ADDITIONAL WORK TOTAL - CO2 ACIDIFICATION OF TAMIAMI WELL NO. 34 Wells & Water All Webbs 16.C.9.a Packet Pg. 1818 Attachment: Attachment No 1 - RFQ 15-6469-4 Quote Tabulation (7333 : Acidification of Eight Production Wells) $0.00 $100,000.00 $200,000.00 $300,000.00 $400,000.00 $500,000.00 $600,000.00 $700,000.00 $800,000.00 Eng Est Wells & Water System All Webbs Results for RFQ 15-6469-4 Acidification of Eight Production Wells -Phase 2 Golden Gate Wellfield KEY: Dashed Green- AVERAGE BID Dashed black- +/-1 std dev of avg bid 16.C.9.b Packet Pg. 1819 Attachment: Attachment No 2 - RFQ 15-6469-4 Quote Analysis (7333 : Acidification of Eight Production 16.C.9.c Packet Pg. 1820 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1821 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1822 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1823 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1824 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1825 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1826 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1827 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1828 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1829 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) 16.C.9.c Packet Pg. 1830 Attachment: Attachment No 3 - RFQ 15-6469-4 Request for Quotation (7333 : Acidification of Eight Production Wells) Associates   October 22, 2018 Benjamin N. Bullert, P.E. Senior Project Manager Collier County Public Utilities 3339 Tamiami Trail East, Suite 303 Naples, FL 34112-5361 RE: Recommendation for Contractor Selection Acidification of Eight Production Wells, Golden Gate Wellfield, RFQ 15-6469-4 Dear Mr. Bullert: Water Science Associates, Inc. has reviewed the contractor bids for the Lower Tamiami well acidifications (Collier County RFQ 15-6469-4). Two contractors, Wells and Water Systems and All Webb’s Enterprises, submitted their quotes for the project. The Contractors’ cost breakdown for each of the eight wells is provided in the table below. Wells Wells and Water Systems All Webb Section 1/Well 31 $63,224 $64,700 Section 2/Well 33 $70,724 $81,700 Section 3/Well 3 $70,224 $77,700 Section 4/Well 10 $61,824 $61,200 Section 5/Well 21 $61,824 $61,200 Section 6/Well 28 $70,524 $77,700 Section 7/Well 29 $69,824 $77,700 Section 8/Well 34 $61,524 $61,200 Total $529,692 $563,100 As noted in the table, Wells and Water Systems provided the lower of the two quotes received. The Wells and Water Systems overall total was lower than All Webb’s overall total by about $33,000. Both the bidders are qualified to perform the work elements described in the technical specifications that was part of the referenced RFQ. Based on their qualifications, past successful work for the county on similar projects, and apparent low bid, we recommend that the project be awarded to Wells and Water Systems. Note that the Engineer’s Estimate to complete the scope of work was $694,400 for 8 wells, which was a conservative estimate. The Contractor’s bids were within 6% of each other and the low bid was over 20% below the engineer’s estimate suggesting consistent bidding between the contractors and specifications that were understood and appropriately descriptive of the work. 16.C.9.d Packet Pg. 1831 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) The RFQ Form submitted by the lowest bidder is attached to this letter. Should you have any comments or questions, or require additional information, please do not hesitate to contact Kirk Martin or Rahul John via phone or email. Sincerely, W. Kirk Martin, P.G. Principal Hydrogeologist Water Science Associates, Inc. Office: 239.204.5302 Mobile: 239.240.6035 Email: kirk@wsaconsult.com Rahul John, P.G. Senior Hydrogeologist Water Science Associates, Inc. Office: 239.529.4399 Mobile: 239.246.1934 Email: rahul@wsaconsult.com       16.C.9.d Packet Pg. 1832 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1833 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1834 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1835 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1836 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1837 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1838 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1839 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1840 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1841 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1842 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) 16.C.9.d Packet Pg. 1843 Attachment: Attachment No 4 - RFQ 15-6469-4 Recommendation Letter (7333 : Acidification of Eight Production Wells) WORK YRDER/PlJRCHASE ORDER Contract l 5-646<1''Well Testing, Dr.ill.ing and Mai,ntenance·· Contract Expiration Date: November 13, QOl 9 This Work Order is for professional well construction services for work known as: Project Name: Acidification of Eight Production Wells -Phase 2 -Golden Gal{ Well Field Project No: 70085.19.2 / The work is specified in R.FQ 15-6469-4 from Wells & Water Systems, Inc., dated October 15, 2018 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Wells & Water System, Inc. Scope of Work: As detailed in the attached proposal and the following: * * * * * * * * * * * * * * * * Task I Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Task 11 Task 12 Task 13 Task 14 Task 15 Task 16 Acidification of Tamiarni Well No. 3 l Construction Acidification ofTamiami Well No. 31 Construction Allowance Acidification of Tamiami Well No. 33 Construction Acidification of Tamiami Well No. 33 Construction Allo\vance Acidification of Tamiami Well No. 3 Construction Acidification of Tamiami Well No. 3 Construction Allowance Acidification of Tamiami Well No. 10 Construction Acidification of Tamiami Well No. 10 Construction Allowance Acidification of Tamiami Well No. 2 I Construction Acidification of Tamiami Well No. 21 Construction Allowance Acidification of Tamiami Well No. 28 Construction Acidification ofTarniami Well No. 28 Construction Allowance Acidification of ·ramiarni Well No. 19 Construction Acidification of Tamiami Well No. 29 Construction ALiowance Acidification of'famiami Well No. 34 Construction Acidification ofTm11iami Well No. 34 Construction Allowance \. Schedule o: Wm�: Complete work withjJ/120 days from the date of the Notice to Proceed which is accompanymg this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement# 15-6469 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. dt,\8, t j ,.· Page 1 of 4 16.C.9.e Packet Pg. 1844 Attachment: Attachment No 5 - RFQ 15-6469-4 Work Order (7333 : Acidification of Eight Production Wells) Compensation: ln accordance with the Agreement referenced above. the County will compensate the Firm in accordance with following method(s): [Z!Negotiated Lump Sum (NLS) 0Lump Sum Plus Reimbursable Costs (LS+RC) [Z!Time & Material (T&M) (established hourly rate -Schedule A) 0Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task 1 $ 53,224.0Qt'NLS Task 2 $ 10,000.00/ Task 3 $ 60,724.00 NLS Task 4 $ 10,000.0(V Task 5 $ 60.224.00 NLS Task 6 $ 10,000.00 Task 7 $ 51,824.00"NLS Task 8 $ 10,000.00/ Task 9 $ 51,824.00 NLS Task I 0 $ l 0,000.00. Task 11 $ 60.524.00NLS Task 12 $ 10,000.00 ,, Task 13 s 59.824.00'NLS Task 14 $ 10,000.00 Task 15 $ 51,524.00'NLS Task 16 $ 10,000.00 TOTAL FEE $ ·29,692.0CJ PREPARED BY: 10/22/2018 Benjamin N. Bullert P.E .. Senior Project Manager Date \:,'\1 ',' \; \ Page 2 of 4 0 16.C.9.e Packet Pg. 1845 Attachment: Attachment No 5 - RFQ 15-6469-4 Work Order (7333 : Acidification of Eight Production Wells) APPROVED BY: -�..__.__ _ _.,_ ____ """'",�-�"-----Oscar P. Mart·inez, Princi}2 · Projec,t Manager APPROVED BY: .lone, Operations Support Director A PPR OV ED BY: _ _.::;;;,:;..;;...._:...::::::,.-,1...:.::::.---l..l<.,. :g._\:,.__ ___ _ Dr. G , Public U ilities Administrator t:t'J,/?-vj'j 8' Date' J Date Date !1-)-/f? Date Date By the signature below, the Firm (including employees, ofiicers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned .interest or activity (financial, contractual. organizational, or othenvise) which relates to the proposed work; and bear on whether the Firm has a potential conf lict have been fully disclosed. Additionally, the Finn agrees to notify the Procurement Director, in writing within 48 hours ofleaming of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Wells & Water System lnc. ROBERT j KOHLMEIER �-' Robert J. Kohlmeier, President 10/23/18 Date Page 3 of 4 16.C.9.e Packet Pg. 1846 Attachment: Attachment No 5 - RFQ 15-6469-4 Work Order (7333 : Acidification of Eight Production Wells) IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first ,,vrinen below. AITEST: Crystal K. Kinzel, Clerk of Courts By: ----------- Dated: ___ _ (SEAL) First Witn�ss Carmen Kohlmeier tType/prin� _ _:11ness / t ,_/�--Second Witness Robert J Kohlmeier Ill iType/print witness namet Approved as to Form and Legality: Assistant County Attorney ----------·---···------------------Print Name BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA By:-·-······· ········-···-·------·-·-----Andy Solis, Chair Name of Finn Wells & Water System, Jnc. �/.�_ p 'd t By: �--:.z......,,._.,_ res1 en Signature Robert J Kohlmeier II President iT ype/print signature and title i Page 4 of 16.C.9.e Packet Pg. 1847 Attachment: Attachment No 5 - RFQ 15-6469-4 Work Order (7333 : Acidification of Eight Production Wells)