Loading...
Agenda 12/11/2018 Item # 9B12/11/2018 EXECUTIVE SUMMARY This item requires that all participants be sworn in and ex-parte disclosure be provided by Commission members. Recommendation to deny an Ordinance amending Ordinance No. 07-40, the Grey Oaks MPUD, by relocating unbuilt access locations on Airport Road and Golden Gate Parkway to Livingston Road for access only to the areas of the PUD identified as FP&L easement located south of Grey Oaks Drive East, and by providing an effective date. [PL20170001548] (This is a companion to Agenda Item 9.A - Development Order Amendment Petition DOA- PL20170001729) OBJECTIVE: To have the Board of County Commissioners (Board) review staff’s findings and recommendations along with the recommendations of the Collier County Planning Commission (CCPC) regarding the above referenced petition and to render a decision regarding the petition; and to ensure the project is in harmony with all the applicable codes and regulations in order to ensure that the community's interests are maintained. CONSIDERATIONS: The Grey Oaks Planned Unit Development (PUD) was originally approved in Ordinance Number 75-34 on August 19, 1975. There have been several subsequent ordinances which have been repealed: Ordinance Numbers 90-48, 96-82, 97-45, 98-94 and 00-46. The current ordinance is Ordinance Number 07-40 approved by the Board on April 24, 2007. The PUD is currently approved for 1,775 dwelling units, 1,303,091 square feet of commercial and office and four golf courses. The Grey Oaks MPUD is mostly developed with residences, a golf course, and a clubhouse. There is an FPL easement located along the entire eastern boundary of the PUD. The petitioner is proposing to modify the Master Plan, Map H-1, attached to Ordinance 2007-40 to shift two previously approved, but unimproved project access points, from Golden Gate Parkway and Airport Road to Livingston Road. According to the petitioner, these two project access points shown on Map H have never been constructed; they were intended to serve as general access points to the Grey Oaks community. The two access points proposed to be shifted to Livingston Road are not intended for general access to the Grey Oaks community, but rather are intended for the sole use of a proposed 32± acre landscape nursery located under a Florida Power and Light (FPL) easement. The petitioner stated the intended use was a landscape nursery and then modified the intended uses to include other uses. Please see attached Exhibit - Aerials. The section that allows the nursery is found in Section IV of the PUD entitled “GOLF COURSE/RECREATION/PARK/RIGHT -OF-WAY.” The permitted use reads: “6) Storage, maintenance yards, and landscaping nurseries within FP&L easements, rights-of-way, and open space. Subject to approval of the persons or entities in whose favor the easement or right-of-way runs.” Staff’s original recommendation of approval was for two access points for a landscape nursery. The most recent TIS, received by staff shortly before the CCPC hearing, to justify the requested access points included two principal uses: wholesale landscape nursery and landscape contracting. The TIS shows that the proposed wholesale landscape nursery only generates 12 total PM peak hour trips, warranting only one access point on Livingston Road. (Livingston Road is a limited-access facility as referenced in Section 5.01, Access Management, Resolution 13-257. The purpose of a limited-access facility is to preserve the roadway capacity and safety, and general welfare of the traveling public.) At the CCPC hearing, the Petitioner presented testimony to try to justify a landscape contracting land use as part of a wholesale nursery operation based upon Institute of Transportation Engineers (ITE) Trip Generation Manual. However, land uses are not determined by a transportation code such as the ITE Trip 9.B Packet Pg. 204 12/11/2018 Generation Manual. Land uses are dictated by the Collier County Land Development Code (LDC) which references Standard Industrial Classification (SIC) Codes. (See Attachment-SIC Codes 5193 and 1799.) A wholesale nursery is SIC 5193. It is a noncommercial land use, and it is consistent with the landscape nursery referenced as a permitted use within the FPL easement of the Grey Oaks PUD. The zoning manager has opined that landscape contracting land uses (SIC 1799), which are a commercial and industrial land use per the LDC, is not a permitted principal or accessory use within the FPL easement in the Grey Oaks PUD. Furthermore, the Growth Managment Plan (GMP) does not allow a commercial or industrial land use such as landscape contracting at this location. A PUD amendment to add landscape contracting land uses (SIC 1799), a use requiring commercial zoning, would also require a GMP amendment as the subject site does not qualify for commercial zoning under any existing FLU E provisions. REZONE FINDINGS: Staff completed a comprehensive evaluation of this land use petition including the criteria noted in LDC Subsection 10.02.13 B.5., Planning Commission Recommendation (commonly referred to as the “PUD Findings”), and Subsection 10.02.08 F., Nature of Requirements of Planning Commission Report (referred to as “Rezone Findings”). Staff offers the following analysis: 1. Whether the proposed change will be consistent with the goals, objectives, and policies and future land use map and the elements of the GMP. The Comprehensive Planning staff has indicated that the original proposed PUD Amendment for two reallocated access points is consistent with the FLUE of the GMP. See Attachment B - Flue Consistency Review. However, the recent introduction of the landscape contracting land use is not consistent with the GMP. The petitioner would need to seek a GMP Amendment to permit a commercial land use such as this at this location. 2. The existing land use pattern. The neighborhood’s existing land use pattern can be characterized as residential, golf course, and essential service lands. 3. The possible creation of an isolated district unrelated to adjacent and nearby districts. The proposed access points will solely serve the proposed nursery south of Grey Oaks Drive East. The proposed landscape contracting land use results in an isolated district unrelated to adjacent and nearby residential and golf course districts. Landscape contracting is a commercial and industrial land use according to the Collier County Land Development Code (LDC). As previously stated, landscape contracting land use is not consistent with the GMP. Furthermore, the BCC at its June 5, 1990 hearing removed commercial land uses such as landscape contracting from the Livingston Road corridor. 4. Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. The district boundaries are logically drawn. 5. Whether changed or changing conditions make the passage of the proposed amendment necessary. The proposed reallocation of two access points, and the addition of a landscape contracting land use is not necessary. As previously stated, the proposed landscape contracting land use is identified as a commercial and industrial land use in the LDC and is inconsistent with the GMP. 6. Whether the proposed change will adversely influence living conditions in the neighborhood. The proposed change consisting of the reallocation of two access points, a landscape nursery and landscape contracting will adversely influence living conditions in the neighborhood. Livingston Road is a designated limited access road and the permitted wholesale landscape nursery use only warrants one 9.B Packet Pg. 205 12/11/2018 access point. 7. Whether the proposed change will create or excessively increase traffic congestion or create types of traffic deemed incompatible with surrounding land uses, because of peak volumes or projected types of vehicular traffic, including activity during construction phases of the development, or otherwise affect public safety. Livingston Road is a Limited-Access facility as referenced in Section 5.01, Access Management, Resolution 13-257. While the access management connection spacing standards may indicate that multiple access points for the subject property may be allowable, the ultimate goal is to exceed the standards to preserve capacity, safety and general welfare of the traveling public. Based on the allowable land-use of wholesale nursery, which is limited to 12 PM peak hour trips, not including lawn contracting services, reasonable access can be attained with one access point. 8. Whether the proposed change will create a drainage problem. The proposed PUD Amendment will not create a drainage problem. Furthermore, the project is subject to the requirements of Collier County and the South Florida Water Management District. 9. Whether the proposed change will seriously reduce light and air to adjacent areas. The proposed PUD Amendment will not reduce light and air to adjacent areas inside or outside the PUD. Furthermore, the PUD Document provides adequate property development regulations to ensure light and air should not be seriously reduced to adjacent areas. The Master Plan further demonstrates that the locations of proposed preserve and open space areas should further ensure light and air should not be seriously reduced to adjacent areas. 10. Whether the proposed change would adversely affect property values in the adjacent area. Staff is of the opinion this PUD Amendment will not adversely impact property values. Zoning by itself however may or may not affect values, since value determination is driven by market demand. 11. Whether the proposed change will be a deterrent to the improvement or development of adjacent property in accordance with existing regulations. Properties around the Grey Oaks PUD are mostly developed. The basic premise underlying all of the development standards in the LDC is that their sound application, when combined with the site development plan approval process and/or subdivision process, gives reasonable assurance that a change in zoning will not result in deterrence to improvement or development of adjacent property. Therefore, the proposed change should not be a deterrent to the development of adjacent properties. 12. Whether the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public welfare. The proposed change of reallocating two access points when only one access point is justified for a wholesale landscape nursery use could constitute a grant of special privilege. 13. Whether there are substantial reasons why the property cannot be used in accordance with existing zoning. The subject property could be developed within the parameters of the existing zoning designations. However, the petitioner is seeking this PUD Amendment to relocate two previously approved access points from Golden Gate Parkway and Airport Road to Livingston Road. 14. Whether the change suggested is out of scale with the needs of the neighborhood or the county. Staff is of the opinion that the proposed PUD Amendment is out of scale with the needs of the neighborhood or County. 9.B Packet Pg. 206 12/11/2018 15. Whether it is impossible to find other adequate sites in the county for the proposed use in districts already permitting such use. There may be other sites in the County that could accommodate the uses proposed; however, this is not the determining factor when evaluating the appropriateness of a zoning decision. The petition was reviewed on its own merit for compliance with the GMP and the LDC, and staff does not review other sites in conjunction with a specific petition. 16. The physical characteristics of the property and the degree of site altera tion which would be required to make the property usable for any of the range of potential uses under the proposed zoning classification. Any development anticipated by the PUD Document would require site alteration, and this project will undergo evaluation relative to all federal, state, and local development regulations during the site development plan approval process and again later as part of the building permit process. 17. The impact of development on the availability of adequate public facilities and services consistent with the levels of service adopted in the Collier County GMP and as defined and implemented through the Collier County adequate public facilities ordinance. The development will have to meet all applicable criteria set forth in the LDC regarding Adequate Public Facilities. The project must also be consistent with all applicable goals and objectives of the GMP regarding adequate public facilities. This petition has been reviewed by County staff that is responsible for jurisdictional elements of the GMP as part of the rezoning process. Transportation staff has concluded that the wholesale landscape nursery is limited to 12 PM peak hour trips, justifying one access point. 18. Such other factors, standards, or criteria that the Board of County Commissioners shall deem important in the protection of the public health, safety, and welfare. To be determined by the BCC during its advertised public hearing. PUD FINDINGS: 1. The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. The Grey Oaks PUD is an established project which has been developed primarily with residential, and golf course uses. The subject site fronts on Livingston Road, a limited access road . Water distribution and wastewater collection/transmission mains are readily available within these rights -of-way, and there is adequate water and wastewater treatment capacity to serve the proposed PUD. However, the site is not suitable for the proposed development of two access points and landscape contracting land use. 2. Adequacy of evidence of unified control and suitability of any proposed agreements, contract, or other instruments, or for amendments in those proposed, particularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense. Documents submitted with the application provided satisfactory evidence of unified control of the property located under an FPL easement south of Grey Oaks Drive East. Additionally, the development will be required to gain PPL and SDP approval. These processes will ensure that appropriate stipulations for the provision of, continuing operation of, and maintenance of infrastructure will be provided by the developer. 3. Conformity of the proposed Planned Unit Development with the goals, objectives, and policies of 9.B Packet Pg. 207 12/11/2018 the GMP. County staff has reviewed this petition and has offered an analysis of the relevant goals, objectives, and policies of the GMP within the GMP discussion of this staff report. However, an additional landscape contracting land use has been added since the publication of the GMP Consistency Review. The LDC identifies this use as permitted in certain commercial zoning districts and the industrial zoning district. Since the subject site is not designated for commercial (or industrial) land uses on the Future Land Use Map or in the Future Land Use Element, staff finds that use to be not consistent with the GMP. 4. The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. The currently approved development, landscaping, and buffering standards were determined to be compatible with the adjacent uses and with the use mixture within the project itself at the time the PUD was approved. As previously stated, the proposed landscape contracting land use is not consistent with the GMP. Furthermore, neighbors expressed concerns at the recent CCPC hearing that issues such as buffering and screening, lighting and building height have not been addressed. Staff has concluded that this amendment will change the project’s external compatibility. 5. The adequacy of usable open space areas in existence and as proposed to serve the development. The amount of open space set aside for this project meets the minimum requirement of the LDC. 6. The timing or sequence of development for the purpose of assuring the adequacy of available improvements and facilities, both public and private. The roadway infrastructure is sufficient to serve the proposed project, as noted in the Transportation Element consistency review. Operational impacts will be addressed at time of first development order (SDP or PPL), at which time, a new TIS will be required to demonstrate turning movements for one site access point. Finally, the project’s development must comply with all other applicable concurrency management regulations when development approvals, including but not limited to any plats and or site development plans, are sought. 7. The ability of the subject property and of surrounding areas to accommodate expansion. The area has adequate supporting infrastructure, including Collier County Water-Sewer District potable water and wastewater mains, to accommodate this project. Furthermor e, adequate public facilities requirements will be addressed when development approvals are sought. 8. Conformity with PUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications are justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. This criterion essentially requires an evaluation of the extent to which development standards and deviations proposed for this PUD depart from development standards that would be required for the most similar conventional zoning district. The petitioner is not seeking any deviations. FISCAL IMPACT: The PUD Amendment by and of itself will have no fiscal impact on Collier County. There is no guarantee that the project, at build-out, will maximize its authorized level of development. If the PUD is approved, a portion of the land could be developed, and the new development will result in an impact on Collier County public facilities. The County collects impact fees prior to the issuance of building permits to help offset the impacts of each new development on public facilities. These impact fees are used to fund projects identified in the Capital Improvement Element (CIE) of the Growth Management Plan (GMP) as needed to maintain adopted Level of Service (LOS) for public facilities. Additionally, in order to meet the requirements of 9.B Packet Pg. 208 12/11/2018 concurrency management, the developer of every local development order approved by Collier County is required to pay a portion of the estimated Transportation Impact Fees associated with the project in accordance with Chapter 74 of the Collier County Code of Laws and Ordinances. Other fees collected prior to issuance of a building permit include building permit review fees. Finally, additional revenue is generated by application of ad valorem tax rates, and that revenue is directly related to the value of the improvements. Please, note that impact fees and taxes collected were not included in the criteria used by staff and the Collier County Planning Commission (CCPC) to analyze this petition. GROWTH MANAGEMENT PLAN (GMP) IMPACT: Future Land Use Element (FLUE): Comprehensive Planning staff had originally found the proposed amendment to reallocated two access points to Livingston Road to be consistent with the FLUE. However, the proposed landscape contracting use is not consistent with the GMP. Subsequently, Comprehensive Planning staff finds the proposed amendment to be inconsistent with the FLUE. COLLIER COUNTY PLANNING COMMISSION (CCPC) RECOMMENDATION: The CCPC continued petition PUD-PL20170001548, Grey Oaks PUDA from the September 6, 2018, CCPC hearing to the October 4, 2018, CCPC hearing and heard the petition on November 1, 2018. During the continuance period, a revised Transportation Impact Statement (TIS) was submitted by the Applicant. The revised TIS removed the commercial land uses and added a landscape contracting land use. Much discussion was held at the CCPC hearing related to what the permissible land uses are and the number of access points. The petitioner requested and presented testimony for an additional landscape contracting land use which was not part of the original Application request. The CCPC voted 4-2 to recommend denial. Various reasons for denial were stated including the following reasons: - PUD Section 2.10, which allows a “nursery” land use, pertains to internal amenities related to the Grey Oaks PUD: - There is no evidence of public use of the nursery within the PUD Document. - There is no commercial designation within the FPL easement on the Master Plan. - The Board of Collier County Commissioners (BCC) prohibited commercial land uses in the subject location in 1990. See Attachment: BCC Minutes. - The Application was submitted inappropriately. The request was for access points, and it should also have requested additional land uses. The reviewing bodies need to have a site plan to review and assess lighting, height, fencing and parking. - The case had not been made for two access points. - There was concern over the landscape contracting land use and that approving the petition would mean they approved the use. LEGAL CONSIDERATIONS: This is a PUD amendment to move two access points on the master plan. The burden falls upon the applicant to prove that the proposed amendment is consistent with all the criteria set forth below. The burden then shifts to the Board of County Commissioners, should it consider denying the rezone, to determine that such denial would not be arbitrary, discriminatory or unreasonable. This would be accomplished by finding that the proposal does not meet one or more of the listed criteria below. Criteria for PUD Amendments Ask yourself the following questions. The answers assist you in making a determination for approval or not. 9.B Packet Pg. 209 12/11/2018 1. Consider: The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. 2. Is there an adequacy of evidence of unified control and suitability of agreements, contract, or other instruments or for amendments in those proposed, particularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense? Findings and recommendations of this type shall be made only after consultation with the County Attorney. 3. Consider: Conformity of the proposed PUD with the goals, objectives and policies of the Growth Management Plan. 4. Consider: The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. 5. Is there an adequacy of usable open space areas in existence and as proposed to serve the development? 6. Consider: The timing or sequence of development (as proposed) for the purpose of assuring the adequacy of available improvements and facilities, both public and private. 7. Consider: The ability of the subject property and of surrounding areas to accommodate expansion. 8. Consider: Conformity with PUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications are justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. 9. Will the proposed change be consistent with the goals, objectives, and policies and future land use map and the elements of the Growth Management Plan? 10. Will the proposed PUD Amendment be appropriate considering the existing land use pattern? 11. Would the requested PUD Amendment result in the possible creation of an isolated district unrelated to adjacent and nearby districts? 12. Consider: Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. 13. Consider: Whether changed or changing conditions make the passage of the proposed amendment necessary. 14. Will the proposed change adversely influence living conditions in the neighborhood? 15. Will the proposed change create or excessively increase traffic congestion or create types of traffic deemed incompatible with surrounding land uses, because of peak volumes or projected types of vehicular traffic, including activity during construction phases of the development, or otherwise affect public safety? 16. Will the proposed change create a drainage problem? 17. Will the proposed change seriously reduce light and air to adjacent areas? 18. Will the proposed change adversely affect property values in the adjacent area? 19. Will the proposed change be a deterrent to the improvement or developme nt of adjacent property in accordance with existing regulations? 20. Consider: Whether the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public welfare. 21. Are there substantial reasons why the property cannot (“reasonably”) be used in accordance with existing zoning? (a “core” question…) 22. Is the change suggested out of scale with the needs of the neighborhood or the county? 23. Consider: Whether it is impossible to find other adequate sites in the county for the proposed use in districts already permitting such use. 24. Consider: The physical characteristics of the property and the degree of site alteration which would be required to make the property usable for any of the range of potential uses under the 9.B Packet Pg. 210 12/11/2018 proposed zoning classification. 25. Consider: The impact of development resulting from the proposed PUD amendment on the availability of adequate public facilities and services consistent with the levels of service adopted in the Collier County Growth Management Plan and as defined and implemented through the Collier County Adequate Public Facilities Ordinance [Code ch.106, art.II], as amended. 26. Are there other factors, standards, or criteria relating to the PUD amendment request that the Board of County Commissioners shall deem important in the protection of the public health, safety, and welfare? The Board must base its decision upon the competent, substantial evidence presented by the written materials supplied to it, including but not limited to the Staff Report, Executive Summary, maps, studies, letters from interested persons and the oral testimony presented at the BCC hearing as these items relate to these criteria. The proposed Ordinance was prepared by the County Attorney’s Office. This item has been approved as to form and legality, and it requires an affirmative vote of four for Board approval. (HFAC) RECOMMENDATION: Staff recommends that the Board of County Commissioners denies petition PUD-PL20170001548, Grey Oaks PUDA. Prepared by: Nancy Gundlach, AICP, PLA, Principal Planner, Zoning Division ATTACHMENT(S) 1. Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (PDF) 2. Attachment B- Proposed PUD Ordinance - 071818 (PDF) 3. Attachment C-Site Location Map (PDF) 4. Attachment D-Master Plan w Access Relocation Exhibit.pdf 5-14-18 (PDF) 5. Attachment E- FLUE Consistency Review 7-11-18 (PDF) 6. Attachment F-Aerials Depicting Removed and Relocated Access Locations 8-10-18 (PDF) 7. Attachment G-Revised TIS - 09-27-2018R1--certified (PDF) 8. Attachment H-MEMO to CCPC 10-9-18 (DOC) 9. Attachment I-MEMO to CCPC 10-19-18-bosi (DOC) 10. Attachment J-June 6 1990 BCC Hearing Minutes (PDF) 11. Attachment J-1 SIC Codes 5193 and 1799 (PDF) 12. Attachment K-Transcript of NIM 06-25-2018 (PDF) 13. Attachment L-Letter of Support 07-12-2017 (PDF) 14. [Linked] Attachment K-Application PL20170001548 Grey Oaks PUD (PDF) 15. Legal Ad - Agenda #7309 (PDF) 9.B Packet Pg. 211 12/11/2018 COLLIER COUNTY Board of County Commissioners Item Number: 9.B Doc ID: 7309 Item Summary: This item requires that all participants be sworn in and ex-parte disclosure be provided by Commission members. Recommendation to deny an Ordinance amending Ordinance No. 07-40, the Grey Oaks MPUD, by relocating unbuilt access locations on Airport Road and Golden Gate Parkway to Livingston Road for access only to the areas of the PUD identified as FP&L easement located south of Grey Oaks Drive East, and by providing an effective date. The subject MPUD consisting of 1,601+/- acres is located at the northeast, northwest, and southeast quadrants of the inte rsection of Airport Road (S.R. 31) and Golden Gate Parkway (C.R. 886), in Sections 24, 25, and 26, Township 49 South, Range 25 East, Collier County, Florida. [PL20170001548] (This is a companion to Agenda Item 9.A - Development Order Amendment Petition DOA-PL20170001729) Meeting Date: 12/11/2018 Prepared by: Title: Planner, Principal – Zoning Name: Nancy Gundlach 11/14/2018 10:58 AM Submitted by: Title: Division Director - Planning and Zoning – Zoning Name: Michael Bosi 11/14/2018 10:58 AM Approved By: Review: Growth Management Department Thaddeus Cohen Level 1 Reviewer Completed 11/16/2018 11:15 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 11/16/2018 11:16 AM Zoning Michael Bosi Additional Reviewer Completed 11/16/2018 1:39 PM Zoning Ray Bellows Additional Reviewer Completed 11/16/2018 2:56 PM County Attorney's Office Heidi Ashton-Cicko Level 2 Attorney of Record Review Completed 11/19/2018 9:24 AM Growth Management Department James C French Deputy Department Head Review Completed 11/19/2018 5:27 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 11/20/2018 8:57 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/20/2018 8:58 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 11/20/2018 9:15 AM County Attorney's Office Emily Pepin CAO Preview Completed 11/20/2018 11:24 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 11/26/2018 11:09 AM Board of County Commissioners MaryJo Brock Meeting Pending 12/11/2018 9:00 AM 9.B Packet Pg. 212 9.B.1 Packet Pg. 213 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 214 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 215 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 216 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 217 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 218 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 219 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 220 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 221 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 222 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 223 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 224 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 225 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.1 Packet Pg. 226 Attachment: Attachment A-Staff Report Grey Oaks PUDA 9-7-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 227 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 228 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 229 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 230 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 231 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 232 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.2 Packet Pg. 233 Attachment: Attachment B- Proposed PUD Ordinance - 071818 (7309 : Grey Oaks PUDA. PL20170001548) Golden Gate PKWY 5th AVE S Bayshore DR9thST SCounty Barn RDAIRPORTPULLINGRD STamiami TRL NDavis BLVD GOODLETTE-FRANKRD STa mia mi TRL E9TH ST NLogan BLVD SAIRPORT PULLING RD NVanderbilt Beach RD LIVINGSTON RDLogan BLVD NGreen BLVD R ad i o R D Santa Barbara BLVDPine Ridge RD GOODLETTE-FRANK RD NI75À68 À32À69 À70À71 X9.1À33 À17 À16À19À31À7.1 À10À30À7À15À20 À72 À39 À45À43À40À38À41À42 À1 À1 À1À4À1X13 À1 À12 À34 X9.10 À35 À36 À44À37À32 À7À1À14À2À21 À11 À10 À9 À4À1À8À6À5À7 À2À3 À1 À73 À35 À11À3À26 À1.1 À1 À5 X5.1 X5.3 À1À1X5.2 À13 À14À1X5 À74 X9 À1 À6À23À22À33À6À4À12 À75 X9.2À76 À1X17À1 À15X2X11.1 À16À1.1 À1À17 À1À1 À74 À73À1À72 À71 À65 À70À50À51À52À53À54 À13À25À27À26 À36 À18 À13À12X2 À3 X3X6.10 À19X6.12 À14 À1 X14.2À55À60À64À56À58À57À61À63À62À59 À69 À68 À24À34À5 À37À22À77 X14.3À1 À11X6.3 X14.4X10.2X10.3X14.5 À20À1X6.1 À1 À1 À28À18À13À11 X6.4 X14.6X10.4X9.5 À15X6.2X10.5X14.7 À21X10.6 X14.1 À10 À12À10À24 À25 À16À18 X10.7 X14.8 À22À1X6X10.8 X14.9 À16À1 X14.22X10.9 X14.23À22 À38À78À79À21 X10.1 À2X14.21X14.10 À23 À9X10.10 X14.20X14.11X14.24 À1X14.19X41 X35 À21 À15 X10.11 X14.18X14.25 X10.15X10.14À17X14.12X10.12 À1X12.1 À24X14.13X42X43 X23 À1À20À29À17 X14.17 X10.13 X14.16X14.26X14.27 À25X14.15X12 X14.34X14.14 À18X14.28 À80À17 À39 À2 À2À9À19 À26X6.6 X14.29 X14 À2À1À7X14.30 X14.31 À27X14.32X14.33À81À17À20 À14 X11À30À3À1À18À8 À19X11 À6À28X6.5 X21 À20À29 À5X7.3 À30 À1 À14 X11 À16 À3 À31 X12.2 À1À21À1À1À1X6.8 À31 À4 À1X7.9 À3À32À1À2À22 À2À2À3À33X6.7 À24À2À23 À17 À4À15À32À7 À2X7.11 À1.1À34X7À23À1À35À22À24À1À1 À15À16 À36 À21X10À31À1 À1À25À1À30X15.1 À20À37 À5À4À16À15 À12X11X6.11 À32 À19 À66 À1À67À68X7.8 À69À70 À6 X22 À72 À38À71X6.9 À26 À65À11 À13 À19 À18À29 À14 À33 À6 À20À39 À64 À17À18À14À27À73À28À10À40 À63 À5 À34À17 À16 À15 À41À74 À1À15À9À17À21X11 À62 À14 À5 À7À13 À16 À42À75À8 À23 À13 À88 À22À87À17 À66À24X7.3 À67À61À12À16À43À13À76À86À12À7À1 À35À6À18 À44 À11À18À85À89À1À77À60À6À11À25À5 À36 X9.2À4À8À12 À2 À10À15À27À3À14À26À6À19À4À28À90À9À78À59À5À84À10À1À1À29X7.6 À8X16.1 À7 À20À79À91À58À4 À7 À7À30À9À83À1À2 À19 À9À3À37 À21 À6À2À57À3X9.1 X35À92À31À82À3À81 À11 À38 À10 À80 À7À5À6À4 À5À6À8À5À7À22À6.1 À21 À8À2 À39À40À10 À1 À6À2À56À8 À93 À4À32À7À4À1À23 À11 À9 À3 À97 À55À1À98À99À94À100 À6 À17À7 À22 À96 À15À16À8À10À9 À18À11À13À12À14 À2 À9 À10 À33À5 À3 À95 À24 À2À54À19À4 À2 À1 À1 À41 À12À9 À11À1X9.3 À1 À1À1 À1À34À3À20À1À12À28À25À29À24À2À27À26À25À53À23À1À30À10À42À13 À2 À21 À13À3À22X7.1X9.7 À1X7.3 À26 À1 À1 À8 À14À52À4X11 À1À1À1À22À18À9 À2À15 À43À19 À14À44À11 À27À1 À5À51À2X7.3 À21 À3À8À17À16À1X23À45À46À44À47À6À43À49À48À50À2À28 À7 À15 À4À49À3À20À7À16 À1À17 X206À7À5À4À6À19À15À29À3À1À8À42 À39 À38 À18 À37 À35.3À20À12 À41 À36À40 À35 À6À48 À34 À32À33 À30X9.8 À31 À119À6 À16 À2À47À5À5À18À14À9 À1À7X9.11À19 À4 À46À6À4À17À10 À8À13X9.9 À20 À1X7.2 À45 À21 À7 X127 X129 À3X150X148 À16X140X142X132À12X134 À45À13 À17À5À46 À11 À5 À9À11X156X144X146X138X136X131X130À21 X9.4 X152 À10 X126 X128 À10X157À8À12À2À43 À18À47À14À22À4À19À48À49 X9.6À15À23À3À20À50À51À35.3 À16 À21À2À52À35.1 À22À17À53À54À23À1À55À56À18À24 X36 À57 À25À19 À58 À59 À26 X32 X26 X45 À20 À60À61 À27 À85 X13.1À10À11À12À15 À62 À28 À16 À17À14À13À5À6À9À8À7À4 À18 À84 À1 À83 À82 X13.2À1À81 À80 À79 À63 À64 À29 À19À20 X13.3À21À22À23 À65À66 À30 À24À26À25À30À29À28À27 À78À31À34À33À32 À67 À31 À77 À76À48À44À47À46À45À43À41À42À40À39À36À37À35À38 À33 À49 À75 X13 À4À62À5À42À2À46À43À44À1 À606 À9 À45À47À48À49 À7 À178À605À1À50À608À4À108À5À3À5À6À29À8À61À8À3À13À12À11 À29 À20 À189À2À10À1À16À15À609À41À74À107À75 À7À22À18À23À28À24À25À8À17 À14 À4À73À76 À604À51 À1À72À28À1À9À7 À15 À44À9X154À6À22 À11À1 À26À27 À9À16 À10À3À15À8 À6À9À4À17 À603 À1À610À13À60À177À40À1 À13À14X135X141X143X133 X160X158 X149 À27 À1 À12 À19 À5À14À106 À611À27À52À77À71À10À23À12 À23X145X121À26X147X139X137 À42X153À14À13X151 À11 À12À14À13À12.7 À8 À2À3 À612À7 À190À1À18À1À403À5À2 À7X119X159X125À28 X161À63À62 X113X111 X105X103 À509 À602À105À6À59À39À510À26 À402À18À11À4 À64 À25X155 À13X123À61ÀAÀ26À1À24À60À16 À12.4 À2 À13 À22À10À9À53À19 À508À3À8À70À9À7 X115 X109X107X117À59 À12À58À23 À14À29À41À57 À78 À104 À404À25À511 À176À1À38À21À20À58À507 À27À56À45 À8À17 X102X98X2À54 X101X97À55 À12.5 À13 À12À6À17 À401À10À54À601À8À4À5À20 À191 À46 À53À52À51 À11À50À49À48 À15À47À30À22 À1À69À24À19À11À103À79À8À1À512À20 À405 À28 X100 À18 X96 X95 X99 X26 X22 À40À118 À16À31 À28 À9 À506À2À37À16À9À5À19À7À57 À409À6 X7.5 À21 À10À114 À29X35 À9À19À113X31 X24 X28 À14 À27 À29À15 À16 À1À11À55À18À23À102À19À21À12À80À7 À175 À1X59X53 À17X37À32X51À110X61 X90 X94X43 À35À34À17À33À30 À68 À15 À3 À406À6À10À408À10À36À505À8À18 À30X45À9X55X67À109X69X33X49X77X75À20 À26 À32À31À21À22À18À23 À192À56À17À7À1À307À22À56À101À18À407À22 X47 À39X57À20X39X41À117X63 À18X65À115X73 À20À19 À24 À25À94 À301À4À14À81 À2À13À501À6À7À11À174À67 X71À106À95 X92 X86 À19 À31À92À33À101À21À105 À93 À40À18À82 À1À1À1À11À1À100À9À23À35À16À17À13 À18À100À96À116 À1À10À112À8À111X30À1À19 À12.14 À72À92À73À74 À16 À19À13 À504À11.1 À302À2À17À5À55À8À503À8À13 À193 X226 X34 À1À17 À38À108À32À22X32À34À7X36À107 À75À76À77À78À79À80 À66 À57 À21 À502À99À24À12À5À14À82À66À15 À306 X38 X40 X46X48 X56X54À102 X62 X64 X72X70 À20 À81À90À82À83À84À85À86À87À88À89 À41À19À83À15À18À35.3 À1À12À34À6À3À12À12À25À16À98 À303 À206 À12.13 À91 À97 X80X78À93 À11À104X42À23X44À99X52X50 À84 À85À12 À10 À16 À305À9À58 À304 À194À54À11À9À14À1 À23 À16X58X60À94X66X68X74X76X84X82 À33 À37 À20À15À65À13À4À11À83À97À7À4À26 À195 À16.1À15 À42À20À14À86 À6À35X7.3 À21À103À12À98À24À34À15À36À22 À207 À1À33À13À2À10À208À15À1À24À13À59 À15.3 À45 À17 À87 À43À11 À5 À13À36À35À14À25X1 À6 À13 À36 À14 À35 À15À10À96À10 À205À5À53À13À27À19À64À23 À16 À45.1 À15.1 À4 À26À37À3À40À41À39À38X1.1 À12 À15 À34 À14À16À3À84À8À3 À22À12À32À28À95 À204 À44.3 À17 À44.1 À44À21À13À16 À37À3À27À42À6.6 À16 À33À4À38À11À28À39 À12.12 À12.6 À31 À9À30 À14 À1À29À11À14À14À60À1À11 À44 À17.1 À88À10À22 À90 À43 À32À2À10À17À6.4 À8À7 À10 À31À44À1 À18À4À12À6À63À15À2À85À94À9À17À52 À14.1 À44.2 À12 À89 À9À6 À18À1À6.10 À3À1À30À1X217À2À5 À120À15 À11 À21 À201À8À7 À2À202À203À93À17À15À5 À19À1 À29À6.3 À4À1 X205À6.5 À6.8 X204À6.11 À20 À9 À8 À13 À13À61À12 À20À16À7À12À10À11À1 À43.1À18.1À13.1X203À1À3 X9.1 X202 À28X201X166X209À21À6.2 À2 À23 À91 À9 À10 À1À6À62À92À18À87À88À91À89 À1 À43 À13 À18 À18.2X167X168À6.9 À27À1À1X169À1 X213 À22X170X171 À11 À14 À90À86À51 À19 À3À1À105 À1 À101À18 À1À50 À43.3 À42À12.1 À19.1 À24 À26À23X172 À1À2À3X173À25À24 À1X174À1 À104À11À12À1À6À13À2À14À5À15À16À10 À12 À1 X225 À8 À3 X175 X200À6.1 À2X176X199X1X9X177X198 À1 À17 À8À18 À4À9 À3À19À20À7 À1.1 À17 À4 À65À1 À10 À25 À42.1À19 X197À3X196X178X179X195 À1X180À2X194X9.2 X181 À1À1 À102À49À21À31À34À22À23À24À26À27 À64À2.1 À13À7À35.1 À9 À1 À9 X182À2 X193 À1À1X183X192À8À2X184 À25À28À44À48À33À32À35À30À29À36À45À37 X185 À2 À14 À2À4À13À12À3À5À6À10À11 À1.1À1.1 À63 À62 À47 À42À43 À38À40À41 À103À39À16 À1À1 X34.16 À26 À12 À41.1 À7 À3À8À9X186À1À4À15X191À1 X187X210 À1 À2 À61À3À1 X34.14X34.15 À5 X34.17 À15 À1X34.13À9À1 À21À1À14 À11.1 À20.1 À41.2 À6À8 À11 À1 À1X190X188À7 À1X189 À1À5À1À1À83 À8X34.12 À1 À6À10 X34.20 À13X53X34.11X52 À20 X34.19 À60À4À1.1 À59 À48À49 À20 À41À11À20.2À82À80À81À79À78 À84À77À40À57À56À43À42 À27À5 À2X34.18X34.10 À5À6 À4À12 À7 X34.22 X34.21 À3À7 À50À5À58À51À52À53À57À54À36À55À56 À10 À40À21.1 À40.2 À3X34.9 À19À2X34.23 À11 À11 À1 À4X34.8X7X55 À41 À92 À93 À173À55À39À58À85À69À86À70 À85 À6 À1 À2 À21.2À10.1 À21 X25 À8X49X41À18À10X30X50X43X34.24 À5X29 À76 À172À108À54À45À59À38À71À72À94À91À73 À35 À1 À7À16 À84 À171À106À86À87À1À74À75À53À46À109À60 X219 X40 X34.7 À22À12 À23À21 À24À9 À6 X34X34.25 X34.6 À7 À10 À4 À28 À21À20À19À18À17À16À15À11À14 À70À37 À170À87À69À95À67À90À52À47À68À67 À39.2 À25 À9À7À8X34.26 À26X34.5 À1 À20À13X42X34.27 À9À6 À3 À22.1À9.2À9.1 À39.1 À83À66À61 À105 À130 À131À88À89À36 À169À88À72 À12.16À12.1 À12 À13À34À8À10À9À15 X51 À7X34.4 À2 À8 À10X34.28 X34.2 À1.1 X34.1 À6X34.3 À29 À8À5 À9.3 À39À22À9 À110À51À48À96 À168À62À35À1À89À1À82À66 À33 À14À1 À32 À1X34.29 À9À19 À11À1À14À5À10À1À4À11 À8.1À7.1À23.1À65 À104 À129À1À50 À167À63À49À34À97À1À111 À13 À31 À30 À22À1 À18À15À3À14 À12 À1À21 À1À2À13 À2 À93 À90À64 À73À1 À166À98À81À133À65À128À92 À12 À53À13 À2 À1 À1 À20 À16 À17X58 À96À14X32À19 À30À4 À7 À99À1 À103À33 À165À91À1À32À1À28À112À74 À12 À3 À1 À7À1À8 À15À1À6 À95À18X38 À37À134 À164À1À127À64À94À31À75À29À1À27À102 À29 À5.2À5.1À11 À1 X23.1 À11X23 À9À4X24.1 À2 X45 X24X28X27 À12.9 À3 À1 À20 À30 À163À1À76À113À63À77À26À135À162À1 À5.3À4.3À4.2 À6À28 X227 À12.10 À12.15 X26X54X39 À16 À17X44À3À5À2 À1 À4À10 À6 À35.3 À78À62À2 À1À79À19À21À3À25 À101 À161À61 À4.1 À5 À6.1À10 À6.2 À10À5À1À1À1 À11À1À1 À1À17À1À3 À2 À5 À114À22À23À24À80 À136À1À60À125À4À1À2 À4À27 À6.3À3À9À6.4À26À8 X32.1 X35 À9 À6 À1 À27 À26À12 À1À1À1À1 À3À1 À28 À160 À1À1À1À59À1À100À10À58À115À17 À3.3À1À3.2 À3À7À3.1À6 X220 À25À7À1.1À16À4À8À1 À13 À24À7 À15À1 À11 À1 À15 À14 À12 À57À13À29À1À16À5 À159 À12.17 À25À5À4 À2À3 À7.1À2 À9 À15.2À5À18À14À11À10À2À23X174À9À6 À1 À124 À137À8À7À9À6À56À30 À158À116X210 À24 À1À23 À15À10À10X216À14À6 À22À5À12À16 À17À9 À2 À35.10 À138X18À31 À157À1 À27 À55 À123X11 À1À32À156 À11À13À8À1À11 À21À7À1À17À4À18À17 À22À21À20 À1.4 À18.1À19 À1 X12 À1 À1À54X16.1 À122 À155À146 À2 À33 À147À139 À12 À16À13À12À20À2À18À8À8À1À19À7 À18À18À1.3 À18.2À17À1.2 À18.3 À35.9 À34 À1 À1À53X31X17À35X13À154À140À148X16 À12 À19 À16X2À9 À15À3À1À11À1À13À1 À35.11 À1 À18.4À1.1 À36 À121 À1 À37À25 À38 À149 À150À52À1À141À120 À1À14À10À7 À13 À6 À20 À15À2 À1 À14 À14 À35.13 X56X57 À21X36 À151À20À49À39À19 À1À22À18 À15 À11 À6À5 À10À14À9À1 À12À1À8À1 À12.11 À153À152À17À51À1À47À23À119À24À40À142 À50 À13À16À10À7À5À15À4À9À1 À1À17À2 À12.2 À45 À16À1À1À15 À118À14À44À16À1 À143À41 À1 À6À11 À1 À1 À8À4À3À16 À5À12 À1À18 À2 À15 À1 À1À13À1À1À43À1À1À49À3 À2 À7 À1À9À8À3À2À17À4À13À10À7À6 À17 À117À16À14À12À1À42À3À18À4 À144À1 À1 À2À19 À3 À5À14À11À2À1À18À6 À1 À1 À15À1 À183À42À41À1À14À13À11À5À4X14 À2 À4À12 À1 À20 À1À15 À5 À13 À1 À4 À1 À2À19 À184À48X6À2À13À40À4.1 À1 À145À6 À5 À2 À1 À3À1 À1À1À1 À14 À16 À2 À10À1 À3 À10À3 À1À12À12À182À20À5À39À9À4À11 À1 À1 À1 À15 À39 À1 À1 À1 À11À1 À16À1À38 À17 À16 À7 À1À8À1À6À43À5 À2À21À7À6 À185 À1 À35 À2À36 À3À33 À38 À47À11 À1À22 À1À6 À181À1À37À7À33 À1 À1À31 À4 À34À32 À20 À5À30 À26 À25À34 À1À23À7À10À5À27À36À32À10 À1 À9 À1 À2 À37 À2À18 À36 À1À1 À3À1 À12.3 À12 À6À19À21 À24 À186À28À31À29À30À44À35À1À8À46À8.1 À36À2 À12À1À19 À8 À35À2 À2 À4 À35 À1 À9À8 À180À9.1 À9 À1 À187À1À1À4À2À1.1 À15 À1À34À3 À1 À20À34À5 À1 À13 À7À3 À3À4À5À6À15À7À8 À45À17À9À10À11 À33 À1 À4 À33 À6 À21À14 À1 À1 À32 À14À5 À12À13À14À16 À1À30À31À32À21À33À22À29À23À24À25À26À27À18À28À76À77À75À74À71 À32 À6À7À31À22À6À4À15À31À8À30À13 À73À70À72À65À69À66À68À67 À20À64 À10 À179 À7 À23 À1 À3À30À9À1 À5À16À29À8À4 X210 À63 À8 À11À19 À2À188À1À3À1À2À3À4 À5 À24À29À10À12À28À9 À2À28À11 X3À25 À5À6À1À7À6À2À2À3 À4 À9À1 À1 À2 À17À27À10À27À12À6À26À11 À1À26À18 À607À3À2 À13À25À12 À25À14À24À13 À1 À1 À7 À10 À24 X11 À15À23À14 À23À16 À2 À22À15À8 À22À9À17 À21À16 À21 À5 X39 À5X24.2 X135 X37X31 À26 À27À25À5X304X237À24À10À33À34 X248 À4X117À9À25À1 X116.1 À32À30À29À27À28 À3X117.1 X252X59.1X59 À1X117.12 À26 X8À7 À2À1 X11X81X5X4X140X117.s9 X117.s2 X197 X117.s8 X117.s1 À1X117.3 À4 À5À3 À97.1 À23 À59 À9 À16À17À3 À13 À14À18 À3 À49À2À19 À1À2.1 À9.1 À22 À58 À1 À13À12À1 À48À1 À9.2 À2 À21 À57 À11 À12À10À9 À2 À6 À8.6 À20 À10 À47À8 À8À8.2 À53 À50À54À56À52À51 À7 À11À9 À1 X6À10 À8.5À8.4 À55À1 À46 À8 X187 À19 À3 À18 À10 À45À6À7 À1 À7.3 À7.4 À18À20À17 X13 À20À19À19À18 À1 X4 À5 À40À44À9 À9À1 À9.1 À7.7À1 X192 X156 X179 X2 X6 X181 X177X186 X176X189 X180 X182 À17 À11 À9À12À14À10 À6 À1.1 À1 À7 X178 À14 À37 À26.1À33À36À35À27À26À32À34À31 À15 À13À16 À41À42À11À43À8 À7 X184 À28À24À23 À29À25 À23.1À30À22À18À20À21À13 À7À5À6À5À4À2À10À1À3 À8X170 À6.1 À1 À1 À19À15À12À17À16À11À8À9À7À10À1À6 À1À4À3À2 À1À12 À97À6 À4À3 À5À2 X184 X197 X185X183X189X181À14.1 X177 À4À9À1À1 X185 X208 X182 X199X217X169X168X152X167X162X86X149X154 À13 À11À10À9À8À5À6À7À4À3À2 X128.1 X151X153X203X139X139.1 X133 X128X117X132X158X116 À1À22À3À5À4À24.1À8À24À7À37.1 X85À38À39À41À27.1À40À65À51À43À63À64 À3 À56 À12À1À8À23À25À42À66À49À67À50À44À56À68À46À52À47À45 X183 À57À20À21 À14 À21À2À6À3À7À1 À55À48À58À60À55À54 X70À59À61À70À62À57À71 À58À55À22À19 À15 À122 À124À123À20À7À2À5 À36À35À6À26À69 À53À72À73À74À75 X188X121.1 X119 X118 X126.1X121 X188 À121 À46À26.1À26.2X126X122X123 X163X120.1 X130 X192X242 X190 X17X178X186 À54 À59À18À23 À47À42À43À45À44À41À40À39À38À37À36À25.1X187X159 X220X243X191X233X244X105X1.3 X1.5 À112 À113 À1 À34 À35À1À16À19À8 À105 À106 À107 À111À108À110 À78.1À104À102À109À103À94 À1.3 À1.2À52À60À24 À34.1À4À27.1 À120À6À5À4À3 À99À96À95À97À93 À100À98À86À87À88À91À92 À17 X2 À34 À119À9À39À18À17À2À118 À76 À101À89À90À77À78À85À84À79À81À83À82 À25À16 À4.1 À27 À34.2 À38 À24À26À25À27À28À29 À801.6 X1.4 X193X148X198X108X215.1X166X194 À62À51 À30À17À31À32À33À10À117 À3 À33.1À28 X125X129 X176 X171 X207X172 X212X173X147X127X103X143 À26À15 À18 À33.2 X156 X150X70.1X1 À126À127 À125 À124 À79.1À80.1À114À130 À63À50À27 À37 À16À28 À116À29À1À30À11À1 À126 À3.1 À28.1 À33 À123À128À129 À116À131 À115 À79.2À117À132À133À134À118 À3.1À3 À14 À1.1 À125À19À31 À32.2À29.1À2 À120 À119À137À121À135À122À136À142À139À138À140À141 À64À28À13 À115À36À15À12 À32 À65À48À12 À143À147À150À146À144À145À149À151À148 À3 X251X97 À127À20À114 À32.3À29.2À2.1 À32.1 X205 X246X7.2X234X233X7.1X232X229X224X230X225X231 À29 À1 À14À27À13À32À35 À1 X228X227X226X223X222X220X221X219X218X211X215X216 À2.2 À2.1 À66À47À30À11 À1 À31À30.1 À128 X217X212X210X213X214X208X209À6X206X205X207À7 À46 À30 X201 X202 X204À5X203À4À3 X104.2 X76.2X82.1À2X82 À113À21À26 À97 À67À31À10 X76.1X285X107X68X83.1X95X83X88X95.2 X265 X271 X99.1 À129À33À34 À3 À2À4À5 À1À2À45À3À4 À1 À40À39À38À37À23À36À35À24À31À25À32 À112À1À22 À1À6 À5À68À6À7À8À32À9 À14À3À13 À16À15 À22 À33À29À21 À34À30À27À26À28À20À19À13 À130À25 À7 À12À6À4À10À9À5À7 À69 À41AÀ44À33À8 À18À11À10À9À12À17À8À16À14À15 X89X99 À111À12À34À33 À35À38À39À41À44 À11À8À2 À43 À36AÀ34À71 X104.1 X76X262X230À41À42À43À44À45À46À47À48 À11 À131À23À24À110 À7 À16 À49À51À50À55À54À56À52À58À53À60À61À57 À13 À10À32 À132 À2 À8 À1 À15À14À13À42À12À11À10À35À6 À59À66À62À64À65À63À69À68À67À72À70À71 À35 À109 À14À13À12 À9 À5A À9 À133À14 À73À74À75À76À77À79À78À80À81 À1X104X106 À8 À6À6À7À15À9À10À11 À33 À41 À3 À2 À4 À1À108À31À9 À1 X94 X175X95.3X279 X95.1 X211X67 X270X98X67.1 À4 À5 À16 À5 À10À31À26À30 À5À3 À40 À134À107 À3X94.1 À1À121À115À119À120À116À117À118X137À114 À4À17À4À1 À29À27À25À24 À34 À38 À39À36À37 À107 À111 À113À110À108À112À106À109À104À103À105À97 À18 À3À3À1 À36 À15À38 À1 À11 À101À99À100 À102À98À95À90À93À96À94À92À89 À2À19À2 À37 À30À39 À135À40À8 À1À3À4À5À6 À85À82 À91À88À87À86À84À83 À1 À1.A X256X216 À1À20À1 À106 À7À9À10À11À12À13 À1 X259 X100.1 X102.5 X102.2X102.3X245X45X124X142X174X170X65 À1 À1 À136À16À105 À12 À43 X261À42.1 À24À21À20À18À17À16.1 X257À5.1 X102.4 À41 À29 À7 X93X51.2 X260X56X241X258X60À42X51X48X102.1X102 À1 À2À42À37 À13 À104 À137 X161X267X45.1 X77À14X40.1 X100 X114X263À11X49X204 À1À7 À1 À47 À17À42À46 À6À28 X286À9X206.1 À7.1À8 À5À12 À1À1À1À1À10 À1À36À38À2À39À41À40À6 À7À2À3 À8À4À5À1À6 X7 À45 À103 À138À44À43 À56 À13 À3 X247X47X209X50 X295 X293 X287X301X282 À1À35 À14 À18 X294X46.1X266X63X46.3X46.2 À57 X47.2X50.1X224À34.1 X101 À3À5 À34 À33À4 À15 À102 À139À5 À2.1À2À1À40À2À3 X46.4 X250 X307 À4 X64 À33.1 À32À4 À29À30À31 À40 À27 À101 À1 X226 X225 X222 X223X58X275X296X300À39.1 À31 À29 À5À3 À1 À28 À91 À6 À16 À140À19À48À26À4 X84X46 X57X62X136X19X273X26 X47.1 À1 À1 À51 À2 À27 À90 À1 À7 À89 À10 À1 À100À49 À141 À55À54À53X47.3À34À35À26À28À27 À8À7À6 À26À25À8À24À23 À88À22 À9À15À16À14À12À10.1À11 À25À50 À5 À50X284X138X214.2 X214X291X35X196X218X134X165 À9 À21À1 À1 X6.1 À17 À99 À142À3À2À52 À74 À73À75À77À76À79À78À87À80 X111X201 X111.1X268 À49X79X18X25X255X215 X239X214.1 À18 À81À29À82À83À84À85À28À10À30À20 X36X2X200X29 À48X66 X229X75À1X42X226.1X10 À53À54 À51 À24À1 À98À62 À1 À1 X234X14.1 X281 X164X90X92X15X44 À16X228 À38X36.2 À86À27À31À11À19 À21 À143À2À54 À15X157X53X53.2 X75.1X14X210X117.5 À37À14À17X236 À19 À1À26À25À18À32À12 À61 À23 À97 À20 À57 À59À58À56 À61À55À60À24 À60 À144À96À55 X202X3.1 X21X292 À36X28X78X235X146X74X73X117.15 X12 X8 X5X3X5.1 À22 À1À59À2À58 À1 À21 À20À22À33À23 X20 À18À13 À1À1X115À35X221X117.9 X69 À19À1 X6 À2À1À56À57À95 À13 À17 À54À19À34 X113 À12X91X113.1 À1 À34X227À11À20À33X33X276 À94 À14 À18 X54X30 X27X43 X71 X52X3X213X264 X32 À10À1 À1À1 À1 À53À15À35À1 À17 X224 À32À21 À31À22À1 À2À8 X117.8X117.22 À30X38 À86À87À88À89À93À1.1 À52À1 À1 À92 À91 À90X23X24À17À14À20À19À22À21À2À23À7X24.3 À36À6 À16 À1X24.4 X72X80 X249 À29X117.10X117.14 X110 À3X24.5 À6X117.7À1 À51 À36 À37À31À35À34À33À32 À24À13 À28X16X24.1X117.6X22X303X302 À4 À12X55 À5 À15À37 À30À1À29 À6À23À40À36À38À35 À4 À15 À50 À1À14 À28 À27 À65À64 À66À1 À67 À68À63 À69 À26 À62 À25 À61À1 À1À24À60X165 À45 À46 À47 À48 À49 À50 À51 À52 À53 À54 À27À28À29À30À31À32À33À34À35À36 À37 À38 À39 À1 À1 À1 À1 À1 À1 À1 À1 À1 X11 À3 À4 À5 À6 À1 À2 À3 À4 À5 À6 À7 À7 À8 À9 À10 À8 À9 À10 À11 À12 À13 À14 À15 À16 À17 À18 À19 À11 À12 À20 À21 À22 À23 À24 À25 À26 À27À28 À29 À30 À31 À32À33À34À35À36 À1À2À3À4 À5 À6 À7 À8À9 À10 À11 À12 À13À14À15À16 À17 À18 À19 À20 À21 À22À23À24 À25 À26 À27 À28 À29 À30À31 À26 À32À33 À34 À35 À36 À37À38 À39À40 À41 À42 À43 À79 À80À81À82 À27À28À29À30 À44 À31À32À33À34 À83À84À85À86 À35 À2 À3 À4 À87À88 À1 À1 À1 À1 À1 À5 À6 À7 À8 À1 À1 À1 À1 À1 À12 À13 À14 À15 À9 À10 À11 À12 À50 À51 À52 À16 À17 À18 À19 À13 À53 À54 À55 À56 À20 À21 À22 À23 À57 À58 À59 À60 À24 À25 À26 À28 À61À62 À63 À64 À29 À30 À31 À32 À65 À66 À33 À34 À35 À1 À1 À1 X308 À238 À7À8À9À10À11À12À13À14À15À16À17À18 À19 À20 À21 À22 À2 À23 À24 À25 À26 À2 À1 À2 À27 À28 À29 À30 À67.2 À7 À3 À4 À6 À31 À32 À33 À34 À30À10 À1.1 À35 À36 À37 À38 À4 À39 À40 À41 À42 À299 À43 À44 À45 À46 À47 À48 À49 À50 À51 À52 À53 À54 À55 À56 À57 À58 X9 À59 À60 À61 À62 À1 À2 À3 À4 À5 À6 À7 À8 À9 À10 À11 À12 À13 À14 À15 À16 À17 À18 À19 À20 À21 À22 À23 À24 À25 À26 À27 À28 À29 À30À31À32À33À34À35À36À37À38À39À40À41 À98 À42À43 À44 À45 À99À100À101À102 À46 À47 À48 À49 À103 À104 À105 À106 À50 À51 À52 À53 À107 À108 À54 À55 À56 À57 À58 À59 À60 À61 À117À118 À62 À63 À64 À65 À119À120À121À122À123À124 À125 À126 À66 À67 À68 À69 À127À128 À129 À130 À70À71À72À73 À131 À132 À133 À134 X10 À135À136 À137À138 À74À75À76 À77 À139 À140 À141 À142 À78 À10 À11 À143 À144 À145 À146 À147 À148À149À150À151 À152 À153 À154 À155 À156 À157 À158 À159 À160À161 À162À163 À164 À165À166 À1 À1 À1 À1 À1À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 X54 X55 X56 X306 X46.5 À23 X9.4 X214 X9.3 X53 À198À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À1 À21 À22 À23 À24 À25 À26 À27 À28 À29 À30 À31 À32 À33 À34 À35 X117.24 À1À2À3À4À5À6À7À8À9À10À11À12À13À14À15À16À17À18À19À20À63À64À65À66À67À68À69À70À71À72À73À74À75 À76 À77 À78 À79 À80 À81 À82 À83 À84 À85 À86 À87 À88 À89 À90 À91 À92 À93 À94 À95 À1 À1 À1 À1 À96 À97 À98À99 À100À101À102À103À104À105À106À107À108À109À110 À36 À37 À38 À39 À40 À41 À42À43À44À45À46À47À48À49À50À51À52À53À54À55À56À57À58À59À60À61À62 X117.19 X117.20 X117.21 X117.25 X30 X37 X61.1 X218 X61 À1 À1 À2 À16.2 X117.26 À1 À2 X12 À199 X117.27 À13.1 À234À235 À236 À237 À238 À239 À240 À1.1 X13 X1 À41À42 À43 À44 À45 À46 À47 À273 À48 À49 À50 À51 À274À275À276À277 À52 À53 À54 À55 À278À279À280À281 À56 À57 À58 À59 À60 À61 À62 À1 À282 À1 À1 À1 À1À1 À1 À2.1 À1 À1 À1 À1 À1 À1 À1 À1 À31.1 À1 À2 À3 À4 À5 À6 À7 À8 À9 À10 À11 À12 À13 À14 À26.1 À15 À16 À17 À18 À1 À1 À1 À19 À20 À21 À22 À1 À1 À1 À1 À1 À23 À24 À25 À26 À27 À28 À29 À30 À31 À32 À33 À34 X216 X1.7 À35À36À37À38À39À40 À1 À2 À3 À1 À2À1 À3 À4 À5 À6 À7 À8 À9 À10 À11 À12 À13 À14 À15 À16 À17 À18 À19 À20 À21 À22 À23 À1 À1 À1 À1 À1 À1 X11 À1 X65.1 X1.11 X1.10 X1.12 X1.13 A 41815820107711232262114TRACT D 12C13 D 2426272825A 29 1B302332 Golf Course31TRACT C 4 5B6C333474835 836 9 3837 103940114741 12 13A42 14 4443 15TRACT A46 16 174546 1847 194948 20455051 FOREST LAKES IVCONDO2122452225453 2315655 2444 57 255958266160B27ABIG CY PRESS 2862COUNTRY646329CLUB43 FORES T LAK ES6665II30 3167 FORES T LAK ES6968II32 71 70 3342 347222742135732076 FORES T LAK ES75A3619PH AB77372216381841787921153917818017 20 TRACT TRACTC-2 1C-1Golf Course 8 TRACT ELANCASTER SQUARE CONDOATRACT A1 BLDG 1 BLDG 3BLDG 2TRACT I5 BLDG 4 BLDG 5TRACT R BLDG 6TRACT RRECREATIONALTURTLE LAKE TRACT HFOREST LAK ES FACILITIESGOLF COLONY FORES T LAK ESG & T Club TRACT GC1BLDG. A TRACT BG & T ClubFAIRWAY FORESTCONDO COND O #2 COND O #1GARDEN VILLASCONDO TRACT D TRACT GC1TRACT C BLDG 7LANCASTER SQUARE III215TRACT E AT KENSINGTONTURTLE LAKETURTLE LAKE GOLF CO LONYPARCEL A GOLF CO LONY CONDOTURTLE LAKE BLDG. 12BLDG. 11 TRACT FTURTLE LAKER-5 R-4 BLDG 8GOLF COLONY Recreation GOLF COLONY TRACT BBLDG. 1 TRACT DParcelBLDG. 101 TRACT A2R-6 101102103 TRACT GC1104TURTLE LAKETRACT A GOLF COLONY BLDG 91053106 TRACT GBLDG. 954 TRACT GC1TRACT F6VILLAS atQUAIL RUN 107TURTLE LAKE7 BLDG 10108WOODSHIREBLDG 11GOLF COLONY VILLAS I1098 BLDG. 2 B TheCARLTONatPARKFOREST 11011114 13 209 112LANCASTERSQUARE IICONDO2102082072069205211TRACT G21210204PH 62038213214TRACT E1112202201 TRACT G215WOODSHIRE PH 7 PH 8VILLAS II216 TRACT FTURTLE LAKE 217PARCEL C218219220GOLF COLONYTRACTBLDG. 8 PH XIVTURTLE LAKEB PH IIGOLF COLONY PH 10PH III PH IPH IVBLDG. 3 TRACT HGolf Course BPH V TRACT GC1 TheDORALatPARKFOREST COMMON AR EA PARCEL P TRACT 8TRACT GC1 PH 9TRACT J TRACT GC1 TRACT RUNIT JTURTLE LAKE THE HAMLETAT KENSINGTON CONDO PH 8GOLF COLONY PH VI UNIT G THE RESERVE ATBLDG. 7TURTLE LAKE PH 5 PH 1PH 4PH 7GOLF COLONY BANYAN WOODS PH 3PH 6 PH 2BLDG. 4 CONDO TheVERANDASatQUAIL RUNCONDO 24EMERALD GREENS TRA CT R 23PH VII TRACT LS-2 22UNIT HUNIT ITURTLE LAKE TRACT GC1TRACT GC1GOLF COLONY TR D21TRACT C BLDG. 5 TURTLE LAKEGOLF COLONY 20PHTRACT A12 19BLDG. 6 IX PH VIII H 1920 TRACT 8Golf Course 1311 18726768UNIT F 69 18667071PH X 65 14UNIT J 17TRACT GC173 TR10642116C1517741563TRACT L-19 23Common Area 22 1416A1387PH XI 62TRACT I H75Golf Course TRACT GC18 12 F16 13248614H17881276617TRACT A 1115TRACT GC18918851177606 10CPH XII TRACT GC1TRACT 1 25 9TRACT R19789059584 H2627 10 828209158834UNIT E 729799(SEE TR G C1 )PH XIII 6UNIT J 82 6218081925DTRACT GC3 30573 78 5TRACT GC3 MIRAVISTACONDO PH I 22UNIT A 31 H562 493H491291110141513768PH I 16 3172332PH IX 551 10TRACT185 F22 Naples Bath & Tennis Club H979441998 Clubhouse & Recreation Parcel 99100 24 TRACT 33 311 TRACT GC15496SEE MAP 1 1R-2 TRACT B FORES T LAK ES 95 H4A/14N 20UNIT A 3TRACT CThe FAIRWAYSat E MER ALD GRE ENSCONDOIII 212234251(SEE TR GC 1)TR R-1531 TRACT R212FOREST LAK ES TRACT A28 25 232924262730 13II32211 TRACT GC3TRACT L-1 15226PH IILease Parcel COMMON AR EA PARCEL P TRACT LS-1 144PH III TRACT B 151 I PH V I 2Common Area 45 46 47 15BLOCK E50444948 52743Golf Course GTRACT I 3BLOCK CPH V TRACT 7166FOREST LAK ES 492 4V2817TRACT L-2 7 5VIPH A C 48 473UNIT APH V II 8 18 I 6PH B 29 469 7TRACT B 42 19PH B 4414030393837UNIT D 36 3135343332 810PH IV 20BLOCK E45 9115TENNISBLOCK C21SEWAGE TRACT APRESERVE AREA 10 TRACT A TRACT RCONSERVATION AREA P - 1TRACT B 14 8218 TRACT D4016 Golf Course19131941158583184284128643201440441787112113 TRACT C88161090228912I159TRACT1123B8 91141039II247III2591312 266 118 5 27 107 4 382896 3 82952 7430 1 63 3752413 2 1 BIG CYPRESS CO UNTRY CLUB 36 35 34 ROYAL POINCIANA GOLF CLUB 33 32 31 HOLE-IN-THE-WALL 30 GOLF CLUB 29 28 27 26 HOLE-IN-THE-WALL 25 GOLF COURSE 24 RO YAL POINCIANA G OLF CO URSE 23 GOLF COURSE22WILDERNESS WILDERNESS CO UNTRY CLUB VCONDO 21 AB B WILDERNESS CO UNTRYCLUB IIICLUB IV CONDOWILDERNESS COUNTRY20 CONDO BI A WILDERNESS COUNTRY CLUB II CONDO CH 19 D WILDERNESSC.C.#1WILDERNESS18C.C.#9 PO OL AREA 17 16 WILDERNESSGOLF COURSE C.C.PARCEL #8 15 WILDERNESS WILDERNESSC.C.C.C.#11 #7 14 WILDERNESSC.C.#10 13POOL AREA WILDERNESSC.C.#6 GOLF COURSE 12PARCEL 11 MITIGATION AREA 12COURTSPH V III TREATM ENT 446PLANT22 114313PH 3 SITE 1223TRACT42147E1363PH X PH 1 2662641661 TRACT GC260 1459412785817UNIT C POOLB57 15565554TIMBERWOOD OF NAPLES45 28461853515250494748 1640929PH X I118 19114 (SEE TR GC 1)TRACT R17PH 2113UNIT B B BLOCK EBLOCK C3020UNIT B110 TRACT GC2COMMON AREA PARCEL P3910UNIT B109 18312111711596951161061059211210110011119A3211II22PH 1104108 38UNIT A 20107123323102939734211394103379924 TRACT B98 35 14 222541215363TRACT R7 6 58 BEAU CHENE III PH IV 36BEAU CHENE II PH II PH ITRACT F 269 PH II16TRACT O TRACT D 3510 WELLINGTON PLACE AT27TRACT J 17 KENSINGTON I CONDOI3437PHI2811PH IIIVBEAU333818TRACT GTRACT L-1PH IIICHENE 39 (SEE TR GC 1)33 32132I1412 PH IV3435A31MISTY PINESPINE WOODS CONDO TRACT GC4 1913CONDO31UNIT 4 Ph 2 BLDG 12 TRACT E30MISTY PINES 411314III Ph ITRACT C2 Ph I3015 40 PH V PHWTC PHASE I ASSN INC CONDO 39 2920BLDG 1 381213 XIII1TRACT 4TRACT A-2TRACT F29 37WINDWOOD II TRACT A3 BEAU16 214MISTYCHENE 21 PH VI328PARCELPRESERVE AREAPINES CONDO12 II11 PH I4PARCELBPh II28 BLDG 4 BLDG 19 PH I A 517 TRACT GC276541122I151027PARCELWINDWOOD III PARCE L BLDG 186TRACT CCTRACT P PH V IID279BLDG 2071018 TRACT DTRACT R TRACT F816 PINE WOODS CONDO TRACT N 26TRACT GC4 23 BLDG 3089BLDG 1126 PH V III1998PH II BLDG 219 BLDG 17UNIT 11112510 PH V II BLDG 31PH V I10 2524178 WELLINGTON PLACE II WORLD TENNIS CENTER II 36PINE WOODS CONDO 1125UNIT 4 Ph 1 AT KENSINGTON CONDO TRACT H 357206 BLDG 2912PINEWOODS LAKES TRACT C4 BLDG 16BLDG 27 34 BLDG 22 PH IXCONDO Ph I 1313 PH V18BLDG 3 BLDG 3224 TRACT RPH V III33213BLDG 1014BLDG 16 32 TRACT RBLDG 2815TRACT GC5PINE WOODS CONDO14 BLDG 15TENNIS CLUB FACILITY2319 PH IVUNIT 2 BLDG 23516TRACT A 2 31 PH X22BLDG 9 BLDG 33TRACT I4321 17 30TRACT O TRAC T15202218TRACTPH IIIBLDG 6 GC7TRACT B1 29 BLDG 27 BLDG 24BLDG 8 GC6CENTER IIIPINE WOODS CONDO BLDG 1423BLDG 342128BLDG 2TRACT M 24 25 26 27 543 PH X IWORLD TENNIS13PH II 62UNIT 5 PH I 1217 14118920101716BLDG7191821PH IXBLDG 4BLDG 26281520WORLD TENNIS CENTER 19 BLDG 25BLDG 3 BLDG 13BLDG 7 202622 TR PWESTCHESTER1927 PH X II21BLDG 515161817 BLDG 35BLDG 6 AT KENSINGTON CONDO1222 TRACT B33TRACT G 26465TRACT A798 PINE WOODS CONDO2510 TRACT B223111612151413PINE W OODS CONDO UNIT 1 25 TRACT F24BLDG 5UNIT 3 Ph 1 TRACT RTRACT EPINE WOODS CONDO TRACT L2324UNIT 3 Ph 2 TRACT F5756434241408382787980813984 17377445855107RTRACTTRACT7671C721088573172 TRACT C595445 74C3875 1066886 171466053TRACT3710917013087TRACT A 13170524761676910536 169668868110514862168351321296589935010416749TRACT GC-463 1113464 TRACT GC-490TRACT C 166921339112833103TRACT D 165TR BTHE COLONY AT TRACT R TR 112HAWKSRIDGEGC-8PH V PH III 94 32 164CONDOTRACT R134127PH IV 28 102TRACT L20 16331292730113PH V 135126 TRACT F 16221192526PH VI 101222423PH VI 3 TRACT ATRACT D1612181TRACT RTRACT B 114TRACT RPH IV 136TRACT1254TRACT C 100 160PH II APH VII 9PH I TR GC-278 56 159115ROYAL POINC IAN A G OLF COU RSE 137PH VIII 124 TRACT RPH VII 101711121314PH IX 16 15 158 157TRACT P 123 138116 156 TRACT E155122 TRACT B TRACT GC-9 146 TRAC T R 147121 139 154TRACT GC-10 148 TRACT G 140 149TRACT L1 120 150 151141 119TRACT GC-3 152 (See TRACT GC -1)153TRACT GC-5TRACT R 142118TRACT GC-6 (See TRACT GC -4)TRACT GC-3TRACT P (See TRACT GC -4)TRACT A TRACT GC-116 (See TRACT GC -1)12 15 117TRACT L2 1433TRACT A 183TRACT C 3 414 184TRACT R 2 14413451 TRACT D 18212614557 TRACT611TR ACT B 185RTRACT B TRACTTRACT A 1C181TRACT RTRACT R 10 PH IILERMITAGE ATGREY OAKSCONDOPH I TRACT R RECAREA 186789 180TRACT B 123456789101112 TRA CT A 1314151617B1821 187222324252627302831293233777675B74737271706968676665646320TRACT C TRACT GC-510C 1791911(See TRA CT GC -4)TRACT GC-3 8 188(See TRA CT GC -1)62 60747 TRA CT R 12 93456751 60626 TRACT E123215024342431784745484946443360860513TRACT R11211106D5861168108329 189741514734560975476TRACT GC-1 6047220419179603J TRAC T A 7 1351 64510728 1776077401417110510121861019524038625509 TRACT D 106 61172723113950859 19013123940270612404378531057176602181942622TRACT A 507810 511 40169103855820410412171825215469 40579K 175103512866012205119 1912411102F3791619506E201957 A 7 A55 1743409682161080TRACT A7231215182193610101TRACT A 505G18 5018 AK 4087564301TRACT A406117 TRACT100568114 17 18671 11221363522 1922M3075302940713TRACT R89917816552357131712 504H2166823141256 TRACT E 50398 TRA CT R 241011N 12 915 12 50216341658954 30613249725 208654207 19320837206153034305304141123196131052620519415135964151022532143319I8138416103951952763L204A-114 TRACT GC-6 TRACT A1211114948111460217 TRACT17 12 181528329K29293152304638511 TRACT G(See TRA CT GC -4)93 TRACT GC-9 TRACT GC-561TRACT D201151811926290179158789168886131262013127203101098120251 (See TRA CT GC -4)19PARK5018 Tract AC49 21222423272633252837383236392935304031423441434844474546 TRA CT R17123467589101112C1314151617181920 PH VII PH VIII TRACT GC-109161415161713TERRA VERDE AT GREY OAKSCONDO 58TR B15TRACT R 21PH VI1412 6 5201910187 204113113PH IX TRACT R210 19212PH XII 1TRACT APH V239 18113118PH X212210 4247 591225PH IV6 PH XIIICOACHHOUSECONDO 6222123826524PH XI 7 TRACT A25277413 1026820 TRACT R28 PH III6 TRACT RTRACT GC-729 9PH I53 TRACT R2 (See TRA CT GC -4)1 14 10419TR APH II3 11212151822113TRACT A21TRA CT RCAPITAL CENTERLAND CONDOMINIUMA COMMERCIAL LANDCONDO 7 142081617 9616LOT 1 TRACT GC-8 211953 1594 9518TRACT R 162TRACT GC-8 1710TRACT GC-11 TRACT GC-1117TRACT R 94TR H 113(SEE TRACT GC-10)TRACT GC-15TRACT GC-10 (SEE TRACT GC-10)2712TRACT GC-10TRACT GC-12 TRACT E2616TRACT R(SEE TRACT G C-10)4 25TRACT D 13 15TR H 24151451110239 TRACT GC-12 TRACT GC-10 151014 TRACT GC-156 221216139TRACT R811 2171217TRA CT R13 TRACT R8 20712 14818 TRACT R 19 14 11TRACT R9 7136 10TRACT GC-815TRACT 1TRACT 1 6514 13 16 TRACT GC-8 415 5 TRACT BTRACT RTRACT GC-13TRACT GC-1417 4316 TRACT 1 TRACT R TRACT C18 12TRACT R2 317 TRACT GC-11 TRACT R 19 2118 TR GTR F 20 TR A 1 11TRACT ETR A TR A TR BTR A TR B TRACTA10 TRACT RTRACT GC-16 TRB TR A TRACT R TRACT RTRACT 2 9 TR B 7 TRACT B TRACT A TRACT GC-12 65 64 63 62 61 6012 59 4849350515852535457455565366 3516 7 212034191817161515121413118109331432 13 31 12 30 29 TR1151028TR9427 TR8TR67365426 52323TR 225 224 12322TR21 TR 18201191817 COMMON S OF WYNDM ERE COND OPHASE I COURTSIDECOMMONSOF WYNDEMERECONDOPHASE III 1 PHASE II 2 OUTLOT 1 COURTSIDE COMMONS 1OF WYNDEMERE3 35CONDO 2PHASE IV 336AMBLEWOODTR4AMBLEWOODB33CONDO 4CONDO31 5PHASE I TR A 343230 20 6 6 19 729212218 8282372425172726169OUTLOT 38 1015911 121413 11 12 13 2814 27 2915 16 35 36341733303226223118212324201925 93 727374757677787980818283928485868788899091 464516 474417 484318 494219 504120 514021 523922 8 53232437 10 8 PreserveArea The VILLAGE atBEARS PAW CONDO7TRACTCSTONEYS PLAZA Lake Parcel6#2 975 LAKEVIEW ONECONDO LakeParcel#1 Rec 4 BEARS PAW VILLASVII CONDO 1011 97 6 3 245 1 7 3536373839404142434445 8 9343332313029282726252410 11 34567891011 121213 13 14OUTLOT B86475321 15 OUTLOT A16 179OUTLOT C10111213151614 18 19 20THE COLONIALBUILDING 1 OFNAPLESCONDO BLOCK D 2 PH III36 54 COLO NIAL SQUARE CONDO 1 10 2 9 3 8 4 7 UNIT 5 & 6COLONIAL SQUAREBLOCK B CONDO PH I 43 5 6TRACT R 10 TRACT K 9 7COLLIER ATHLETICCLUB8 56 572021 58552219 CHARLES C. ANTHONY5923PARK5418 60532417 61522516 BLOCK V26156251BLOCK IV BLOCK IV 635027146428136548291266473011 674631106845329 69 12348756A443387043347714263516151413111210A41409383936375324BBLOCK VI 5 BEAR PAWLake Parcel VILLAS CONDO Rec#4 II BEAR PAWVILLAS CONDOIC BEAR PAWVILLAS CONDO TRACT CIII BEAR PAWVILLAS CONDOLakeIVParcel RecBEAR PAW#3 VILLAS CONDO BEARS PAW CONDO BEARS PAW CONDOVIPHASE II PHASE I AA WetlandsParcels(A, B, & C) RecBBB LakeCC A BEAR PAWVILLAS CONDOV 35 363432 372933282631253024272122182320151914119121713168510647 VOSS-BLIVEN 312 HDAINDUSTRIALBLDGCONDO26252422232191719201218101611311151486145723 COMMBLDGCONDO 2 381316415693141081141275228127335293031363432335523739403841424347464445485049516 2023 1921252432222927347332826307731MANATEE POINT 78706869767473757271536765CONDO666263616460595856575455 398 9 798280848581838786889189909698979294931049510210010110399 65 743 3221 4028393638313730322635272933201916342122178152391425181024121311 312 4TRACT 8 14142525143534544464849505856475755596154606263676564727071666968737475 CLASSIC768078817779&ANTIQUERESTORERSSQUAREKRAFTCONDO121120115119114113111112110109108106105118102107104101100951038294909992969383888991879885978486116117 SECURITY BARN CONDOWAREHOUSESCOLLIERELECTRICTRACT 3 GRAVESBROS PH I 43 PH II J.K.R.INVESTMENTS15 2423212220181917 1068INDUSTRIALBLVD CONDOWHITEELEPHANT WALKERS BUILDERSSUPPLY42 PH I14PH 2 10 9 4 3 8 567TRACT 10 12 11 13 PH IIPH IVPH I41 HORSESHOE 56PARCELPARCELPARCELSQUAREPARCELEDHGCONDOGOLD KEY 57240 35.1 ENTERPRISE30TRACT 9 31323334HORSESHOE39 AVENUE COMMERCIAL1JACKSONH & A EVERGLADESWINDOWPROFESSIONAL243 PARCEL CONDOPARK CONDO I 552953525154LPARCEL2826278765 50 HYD RAULICHOSE 49 TRACT A 48 EXCHANGEPLACEFIBBERFIBBER 47CONDOMCGEEFIBBERMCGEEMCGEE FIBBERFIBBER 16MCGEE15 38MCGEE 37 KITCHENEXCHANGE CENTER 1714KONCEPTSCONDOFIBBER 36TRACT A METROMCGEEPARK WEST TRACT B 13CONDO 18TRACT B 3512 19 34 11 20 33TRACT C 10 21 32 9 3122 17 16 15 8201418192221 233023CRAIG HANG ARS MICHLEBOBSCONDO 7 29BELCHEROIL24 28 TRACT B136 23 403839363735 12NAPLES EXECUTIVECONDOMINIUMHANGAR NUMBER 11ONE CONDO 24MERCANTILE PLAZA 26 27255CONDO103334 4259TRACT A 3229302827STOW AWAYSTOW AWAY 31MINI STORAGEMINI STORAGE 38 TRACT A26TRACT B FOR TNAPLESSECURITYSALVAGE 7 2 154263FIRST UNION ABBOTT1 55363526256 5734427 5833283 5932292 TRACT A 30 311 1 B14313 16151264210957118 1 15 6A141312867910111655 4174 C18 33TRACT D 2192TRACTA1201 TR CTRACT B TR BTRACT B TRACT C 2374238D174039TRACTC12A41636 3535 C3444 2933325C3E312830C 91 6 TRACT B2 B2725 90 1 7 892624238C8822TRACT A 9 21 BB872010CA291928302711TRACT A31182612322517C13C BA335416TRACT L3414 531518A35TRACT52C17365116637TRACT A TRACT B1415501617C5B1513184TRACT C 49C1914A348TRACT D 2 12 13 4711211910468101179 TRACT B645C108445942741764354328141A236BC 40 TRACT RB 51211TRACT L-4 TRACT A10B4 TRACT R913 12322548BB2A11109A87361454212161371512220712A12412312165416319A8120ATRACT R 12 1191817939B11817117103818 12512611616113719115TRACT292830R313615114127122027TRACT R32 35 113 128131421A261123334 12912111112213034 TRACT D33110251310(D.E.)1311092332B35A24132 TRACT R TRACT L-3 10814 133319363738394013415301068 135105411629136710413717281036474213810246271845A4443513948101TRACT C261949 1404100TR D-150 25525153B 99 141203C.U.E.24 14298232129754621439661TRACT R 2260 1 144955559585756TRACT D-2173.01 DOVER PARC 9428.91CONDO 93PH I 92PH II 91PH 10 9030.83189.62 255.87 PH 8220.4594.41125.3449.79TRACT P TRACT D-1 PH 966.90 3635 37(RECREATION)343332313094.51104.7929TRACT92.5742.20A PH 7 2884.40TRACT 148.48TRACT L-2 54.07C 27PH III 63 26TRACT R67 68626665 6964PH 6 25 61 PH IV 24 60 TRACT L-12359LAKE2258PH 1PH 5 21 57PH V 525553 50515420TRACTB56DOVER PLACE 19CONDOTRACT A PH 2PH 4 18 PH 3 91011121315141617TRACT RTRACT L-1 TRACT B-2 C PHASE II PARCEL MM-3Alot 1 lot 5lot 2 lot 8 lot 3 lot 6 lot 9 lot 4 PARCEL GC-2 PARCEL C PARCEL C PARCEL MM-1 PHASE IIIPARCELMM-3 PARCEL CC PARCEL GC-1 PARCEL GC-1 PARC EL CPARCEL CCPARCEL BB PARCEL BB PARCEL PARCEL AA PARCEL GG-3 PARCEL GG-3 PARCEL GC OUTPARCELC OUTPARCEL BOUTPARCEL A TRAC T A RO YAL POINCIANA GOLF COURSE MARBELLA CONDOPHASE A BLDG B BLDG CBLDG ABERMUDA ROYALE CONDOGOODLETTE ARMS CO NSERVANCYNATURE CENTER POST OFFICE TRACT E TRAC T BTRACT A TRACT C TRACT ATRACTR-1TRACT R-1 TRACT G TRACT B TRACT R-2 TRACT R-2TR R-2TR R-2TR R-2TRACT DTRACT ETRACT JTR F M M M M M MT T TRACT DTRACT C LOT 2 D B B AA LOT 1 BLDG 1 BLDG 2 BLDG 3 BLDGPH4 BLDGPH5 BLDGPH6BLDGPH7 BLDG 8 BLDG9 BLDG BLDGPH11 BLDGPH12 BLDGPH13 BLDGPH14 THE RESERVE IIAT BANYAN W OODSCONDO 11 AUTO SPA/STEAK 'N SHAKELAND CONDO TRACTL-2 TRACTL-1TRACTC TRACTDTRE TRACT A TRACT A TRACT B B B A A BTR C-1TRACT P-3 TRACT R TRACT P-1 TRACT L-1TRACT C-2TR P-5 TRACT P-2TRACT P-2 TRACT C-2 TR C-1 TRACT FD-1 TRACT L-2 TRACT P-1 TRACTE TRACT P-2 TRACT RTRACT R TRACT L-1 TRACT L-1 TRACT F TRACT D Tract P-3 Tract L-2 TRACT E TRACT D TRACT B TRACT CTRACT RTRACT A TRACT P-1TRACT P-2TRACT P-3 TRACT P-4 TR W-3 TR F GOLF COURSETRACT 3 TRA CT R TR A 3435 ENTERPRISECONDO3573 ENTERPRISECONDOCONSERVATIONEASEMENTOR 4049 PG 2808 PO SITANO PLACE BLDG 100 BL DG 200BLDG 1400BLDG 1500PGD A PH 15 PH 15 PH 15 PHPH PH10 PH PH PH NAPLES BUSINESS &STORAGE PARK CONDO CRAIG HANG ARSII CO NDO BLD G 130 0BLDG 1200AT NAPLES I CO NDO PO SITANO PLACE AT NAPLES II CO NDO PGD B BLDG 1100BLDG 1000 BLD G 800BLDG 600BLDG 900BLDG 700PO SITANOPLACEAT NAPLESIII CONDO PGD D BLDG 300 BLDG 400 BLD G 500 POSITANO PLACE AT NAPLES IV CONDO PGD C HORSESHOEVILLAGECOMMERCIAL CONDOMINIUM TRACT GC-12 (LAKE D.E.) (LAKE D.E.)1430' ROW (OR 2836 PGS 464-466)TRACT A-1 TRACT A-2 TRACT A-3A TRACT E TRACT J TRACT J TR OS-2 TRACT L-1 TRACT L-2 TRACT J-1 TRACT J-1 TRACT J-1 TRACT M TRACT M TRACT P-1TRACT P-2 TRACT P-3 TR DTRACT GC-17 TRACT GC-18 TRACT GC-19 TRACTRBLDG 1 BLDG 2 BLDG 9BLDG 10BLDG 11 AVIANOCARRIAG EHOME 1CONDO BLDG 1 BLDG 2 BLDG 3 BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8AVIANO COACH HOM ES CO NDO BELVEDERE ATQUAIL RUN CONDO BLDG 3 BLDG 4 BLDG 7BLDG 8 AVIANOCARRIAG EHOMES IICONDO PH 1 PR OPOSEDFUTUREPH III & IV PR OPOSEDFUTURE PH V PELICAN PALMSCONDOMINIUM A COMMERCIALCONDOMINIUM TREASURY BUILDING CONDO PH 1 (ALSO PART OF CAPITAL CENTER LAND CONDO) 71 CLOCK TOWERBUSINESS PARKCOMMERCIALCONDO 27 COMMONS ATHORSESHOE CONDOMINIUM 39 53.1 2A 2B FIRST NATIONALBANK CENTERCOMMERCIALCONDO TRADITIONS THE GOLF RESIDENCESAT GREY OAKS CONDO PHR PH22F1 PHB6 PHB27 PH B1 PHA1 PHA2 PHA3 PH22E1 PH22D1 PH A20 PHB2 PHA5 LOT 1 LOT 2 9A 7A 4375ENTERPRISEAVENUECOMMERCIALCONDO SUNCOASTCOMMERCIALCONDOMINIUM SFWMDCONSRV ESMTOR 4423 PG 2018.55 AC TR C 16-A 16-B TRACT B 46 48 MARBELLALAKESCONDO CONSVAREA #1 CONSVAREA #1 CONSVAREA #1 CONSVAREA #1 CONSVAREA #1TOTAL 32.35AC) CONSVAREA #2(1.93AC) CONSVAREA #3(3.83AC) CONSVAREA #4(10.33AC) CONSVAREA #6(.1.02AC) BLDG 1 GOLF COURSETRACT 3 5 TRACT RTRACT RTR A TR B OR 2408 PG 3243 OR 2408 PG 3243 OR 2408 PG 3250 OR 2408 PG 3255 OR 1637 PG 280OR 1632 PG 1735 OR 4619 PG 89 TRACT C TR BTRACT R TR K TRACT D TRACT M TRACT C 41 42 43 40 46 49 485051 44 47 45 76 737475 72 71696870 67 66 65 61626364 60 595556575854 53 52 82 83 8481 80 79 78 77 9285 86 91 9087 8988 93 34 26 35 25 3637 243938 283327 32 30 2931 910 811 712 613 514 415 1322019182122171623 EAST NAPLESFIRE STATION #24 FIRE STATION#46 NORTH NAPLESFIRE STATION #47SHARED FACILITY: 26 PHA7 PHA9 B5 B4 B3 OR 2841 PG 1948 OR 2854 PG 1408TRACT RTRACT L1TRACT A TRACT D TRACT L2TRACT BTRACT COR 4740-2331 ACCESS ESMTW1/4CNR 107 TRACT 7 TRACT 6 TRACT 5 TRACT 4 TRACT 3 TRACT 2 TRACT 1 TRACT R MIRAVISTACONDO PH II The FAIRWAYSat E MER ALD GRE ENSCONDO 23 2 9 T T T T TRACT 4 TRACT 3 TRACT 2 TRACT 1 PHA6PHA8 PHA4 TRACT B TRACT G TRACT G TRACT C TRACT E TRACT F TRACT A PH 2 TRACT D BURNING TREE DR CAME LIA BOXW OO D LA NELA NENORTHGATE DR CARR ING TON CIR CARR ING TON CIR RESIDENCE CIRCLE RESIDENCE CIRCLEABER DEEN COUR T RESIDENCE CIRCLE RESIDENCE CIRCLETRADITIONS COURTHALSTATT DRIVE NORT H H ORSE SHOE S D RIV E COUR D E JASM IN COUR D E PAR C RUE DE LA G RAND PLA CE RUE DE JARDIN RUE DE JARDINRUE DE JARDINCOUR D U R OYAL ECORPORATE FLIGHT DR FREEDOM WAYPATRIOT WAY PATRIOT WAY CO RP OR AT E FL IG H T D R RIVER RE AC H DR AVIATION DRIVEVINLAN D W AYVINLAND WAY TORINO WAYASTI COURTMODENA COURTRIVOLI COURTMIRAMONTEWAYMIRAMONTEWAY G R E Y OAKS DRIVE GREYOAKSDRIVE TIVOLI DRIVE TIVOLI COURT BISCAYNE COURT BISCAYNECO URTAVIANO DRI VEAVIANO DRIVE 14TH ST13TH STPORT AVE AVION PL NORTH ROADESTUARYGOLDEN GATE PARKWAY GOLDEN GATE PARKWAY AIRPORT PULLING ROADLONGBOAT DRIVE ARNOLD AVENUE DEAN STREETCLIPPER WAY MERCHANTILE AVENUE OUTRIGGER LANE RIVER WAYRIVER REACH DRIVE INDUSTRIAL BOULEVARDDRPROGRESS AVENUERIVER REACHNORTH HORSESHOE DRIVE LIVINGSTON ROADAI RPORT ROADAIRPORT ROADSTREETCOLLIER WAY WESTPOWERDO MESTIC AVENUECOLLIER WAY EASTBLVD.SOUTH HORSESHOE DRIVE SOUTH HORSESHOE CT COMMERCIALENTERPRISE AVEENTERPRISE AVE.ENTERPRISE AVE.ENTERPRISE AVE. EXCHANGE AVE.EXCHANGE AVE.EXCHANGE AVE.INDUSTRIAL BLVD.CITATION POINTPRODUCTION BLVD.PROSPECT AVE.AIRPORT ROADOR 884 PG 1331AIRPORT RD.CO RPORATE SQUARE NORTH MARKET AVE.COMMERCIAL BLVD.CORPORATESQUAREAIRPORT RD.68th ST SW70th ST SWTIVOLI DRIVE BRI ARWOOD CT. TIVOLI COURT TIVOLI LANEBRIARWOODLA N E TERRAZZO LANE TERRAZZOBL VD M ARBL E D RIV E CO URT BRIAR WO O D BLV D MT. H O OD COLDSTREAMVINTAGE LANE CIRCLECT.CROSSFIELDTETON COURTCOLDSTREAM TETON COURTCOLDSTREAM COURTLANE BRIA RWOOD BLVDCR OS SFIELD CIR CLESUNBURY COURT DUNDEE COURTBR IX TON COU RT SKELL Y ROADSTANHOPE CIRCLE BRIA RWOOD BLVDSTANHOPE CIRCLE GO RDON RIVER TRAIL SERRANO CIRCLE SERRANO CIRCLESERRANO CIRCLE ANDALUCIA WAY RAFFIN A C OURT MARBELL A LAKES DR MARBELLA LANE HERMOSA WAYDEL MAR TERRACE DEL MAR TERRACE MARBELLADRIVE KENSING TON HIGH STREET HARLANS RUNBROADWINGCT THI STL E WAY COURTRU N LANEGOSHAWKTARFLOWER WAYHARRIER RUNHARLANSHAWKSDRIVE LO OPRIDGE BUCKTHORNE WAY HAWKSHAWKSRIDGE RIDGE DRIVE SEDGE PLACESILVERLEAFBELLFLOWER LANESWAINSONS RUN CO URTMERLIN NORTHDAY LILY PLACE GR EYDRIVE COCO LAKES OA KS INDIGOBUSH WAY INDIGOBUSH WAY WAY OAKSDRIV E SPICEBUSH LANE NO RTHGREYAIRPORT PULLING ROADAIRPORT-PULLING ROAD (CR 31)COCO LAKES DRI VEINDIGOBUSH WAYBU LRUSH LA NE BAILEY LANEBAILEY LANE L'ERMITAGE LANE CHIC ORY L ANECOCO LAKES IN DIAN PIPE WAY COURT DAH LI A WAYCOTTAGECLUBLANECOCO LA KES PLACE CH I CO R Y LA NE GR EY OAKS DRI VEL'ERMITAGE LN POINCIANA DRIVEPOINCIANA STREETPOINCIANA STREET EDGEMERE WAYSANTIA GO WAYGREY OAKS BLVD WEST N ORTHMALAGA WAY VISTA LANEPOINCIANA STREET G REYAVILA LANEBUENA SACRAMENTO WAYTORTUGA WAY CO RANA WAYBOLERO WAYTRILLIU M WAY DO RADO WAY O AKSDAHLIA WAYBALBOA CI RCLEBALBOA CI RCLETWINFLO WER LA AVILA LATWINFLOWER LAAVILA LASORRELL WAYTOLEDO WAY DRI VESANTIAG O WAYPO INCIANA DRIVEFIREBUSH LACLADIUM WAY NORTHPONCE DE LEON DRIVEPOINCIANA DRIVE FIREBUSH LN.G RE Y O A K S D RIVEEASTCHINABERRY CT CAPISTRANO WAY CHINABERRY WAYAIRPORT-PULLING ROAD (CR 31)EDGEMERE WAYSILVER PALM PLACEG R EY OAKSDRIVESOUTH CO ACH HOUSE LANE GREY O AK S DRIV E KING PAL M W AYVENEZIA COURT AL EX A NDERCOACH HOUSE WAYVE N E ZI A WA Y PAL MTRACT RDRI VEGREY OAKS DRIV E SO UTHALEXANDERWAYCANNA CTPLU MBA GO WAYVENEZIAPALMDR CANNA WAYOSPREY TRAILLI VIN GSTON ROADPLUMBAGO LANENIGHTHAWK PTGREY OAKSPLUMBAGO WAYANHINGA POINTEDRI VE SOUTHDRIVE AIRPORT PULLING ROADES TUARY DRIV E ISL A VI S TA LANE ESTUARY COCOPLUM WAYCOCOPLUM CT TRAILNOBLE HERON WAYEGRETGREATDRIVE SOUTHGREY OAKSMARSH WREN LANEBOULEVARDLI VIN GSTON ROADFLORESTA DR FLORESTA CT WATER OAKSEDGEMERE WAY NORTH WAYOAKSWATERCO URTSID E DR WYNDEMERE WAY EDGEMERE WAYCOURTSIDE DRDR GLENDEVON STONE HEDGE PTEDGEMERE WAY SOUTH 68th ST SW70th ST SWROYAL POINAIANA DRIVE MARBELL A LAKES DR PROGRESS AVENUE FLORESTA WILDERNESS DRCLUBHOUSE DR WILDERNESS DR WILDERNESS DRTALL PINE LNCLUBHOUSE DR CLUBH OUSE DRCLUBH OU SE DR CLU BH OUSE LN WILDER NESS DRWILDERN ESS DR WILD ERNESS DRHAWKSRIDGE DR HAW KSRIDGE DRHAWKSRIDGE DRGAM E H AWK CTTALON CTBALD EAGLE DR WILDER RDWO ODSH IRE LN WOODSHIRE LN BALD EAGLE DR BALD EAGLE DRWO ODSHIRE LN OYSTE R CATCHER PTTURTLE LAKE CTGOLDEN GATE PKWY VAC OR 825 PG 1754 15TH STREET NORTHFOURTEENTH AVENUE NORTH THIRTEENTH AVENUE NORTH GORDON RIVER LANEBEMBURY DRIVEBEMBURY DRIVE DAISYLANE EUC ALYPTUSLANE FORES T LAK ES BOULE VA RDFIGMEL-JEN DRLANE BURNING TREE DRGARDENIALANE HAPPO LO LA NE IVY GATE LA NE JIMP SON LA NE KELPLANE LY ONIALANE MILK WO RTLANE NARITALANE CYP RESSKENSINGTON HIGH STREET AZALEA LA NE BOULEVARDKENSINGTONFOREST WOODSHIRE LANEBOULEVARD LAKES LEWIS LANEO LD GALLOWS WAYKENSINGTON HIGH STREETAIRPORT PULLING ROADLIVINGSTON ROADAI RPORT-PULLI NG ROADMAXW ELL CIRCLE KENSI NGTONHUMMINGBIRD LANELA NEFO RES T HI GHFINCHLEYSTREETBLVD GOLDFINCH C.R. 31CASTALAIN CTGARDENS BOULEVARD KENSINGTON HIGH STREETCTWOODSHIRE LANEGAINESBORO UG HPOST OAK LANERUSTIC OAKS CIRCLEORIOLE DRIVE HEND O N C T EUROPA DRIVE EATO NWOOD LANE WAYCORINTHIANBLVDEATO NWOOD LANE LIVINGSTON ROADWOODSHIRE LANERUSTIC OAKS CIRCLE GARDENSSWAL LOW POINT ST. BARNABASCORINTHIAN WAYCT GOODEARTH DRIVEBRYNWO OD PRESERVE LANE BRYNWOOD WAYOPUNTIA LANE DRIVEPYXIEMO SS LANE POINTTREEDRIV EBURNINGC B A D FE MIDAS PLACEWID GEON DRIV E KENSINGTON HIGH STREETWIS TERI ALA NEVINC ALA NEROSE PETAL FOREST LAKES BOULEVARD UNI CALA NEJACANA DRIVELA NE AIRPORT PULLING ROADTUPPEN CE SALVIA KENSINGTON HIGH STLA NE LA NE EUROPA DRIVEGANYMEDECT LIVINGSTON ROADBALD EAGLE DRIVE HIGHCOURT GAR DE N S B O UL EV AR D PINE WOODS CIRCLE AIRPORT PULLING ROADOBERONCT PINE WOODS CIRCLEMAYFIELD CT S.R. C-31CAM DEN CTWILD ER R O AD CTPINE WOODS CIRCLE KESWIC K WAYINGLEWOODKENSINGTON HIGH STREET TU V V VVV PUCUPU BD CU V PU PU TU P.U. NUCP.U.NUC CU V V CUV V V P.U."b" V V V V P.U. V OSP,SPA PU P.U. P.U. V DRI DRI DRI CU VA VA DR PM C DR DR GC PUD RSF-4 A RSF-3 PUD A RPUD E PUD E ARSF-4 E RSF-3 E C-3 C-3CON PUD IRMF-6(3)RMF-16 P A C-1 C-3A C-3 CITY OFNAPLES CITY OFNAPLES MPUD PCPUD PUD PUDC-5 A A PUD RSF-3 GC CPUD PUD A PUD BALDRIDGE HAWK'SRIDGE BAILEYLANE,THE WORLD TENNIS CENTER RELATEDGROUP WYNDEMERE BALMORAL PINEVIEWCARILLON GREYOAKS KENSINGTONPARK HIWASSE MOORINGSPARK FALLS OFNAPLES NAPLESBATH ANDTENNIS CLUB RIVER REACH WILDERNESS C.C. LANE PARK NAPLES CHURCHOF CHRIST AVOWHOSPICE BRYNWOOD CENTER THE LANDINGSAT BEARS PAW GREY OAKS GREY OAKS Go ld en Ga te PK WY LIVINGSTONRDAIRPORTPULLINGRD NLocation Map Zoning Map Petition Number: PL20170001548 PROJEC TLOCATION SITELOCATION ¹Sabal Bay 9.B.3 Packet Pg. 234 Attachment: Attachment C-Site Location Map (7309 : Grey Oaks PUDA. PL20170001548) 9.B.4Packet Pg. 235Attachment: Attachment D-Master Plan w Access Relocation Exhibit.pdf 5-14-18 (7309 : Grey Oaks PUDA. PL20170001548) 2800 North Horseshoe Drive · Naples, FL 34104, 239-252-2400 Page - 1 - of 2 Growth Management Department Zoning Division Comprehensive Planning Section MEMORANDUM To: Nancy Gundlach, AICP, PLA # 1244, Principal Planner, Zoning Services Section From: Sue Faulkner, Principal Planner, Zoning Division, Comprehensive Planning Section Date: July 10, 2018 Subject: Future Land Use Element (FLUE) Consistency Review APPLICATION NUMBER: PUDA-20170001548 Review 3 APPLICATION NAME: Grey Oaks Mixed Use Planned Unit Development (MPUD) Amendment REQUEST: To amend Grey Oaks MPUD, approved via Ordinance #07-40, to modify the Master Plan Exhibit ‘H- 1’ to shift two previously approved access points for Grey Oaks (one shown on Airport-Pulling Road and the other shown on Golden Gate Parkway to two access points on Livingston Road). These two access points are not intended to serve as access points to the Grey Oaks community, but rather for the sole use by the owner (O’Donnell Landscaping) of approximately 32 acres adjacent to Livingston Road. This portion of the Grey Oaks MPUD is encumbered by a Florida Power and Light (FPL) easement. The second petition submission included additional minor changes to the PUD Master Plan to add street names and show a 12’ wide easement adjacent to Livingston Road right-of-way for a future pathway; revisions to TIS; and a letter of ‘no objection’ from the president of the HOA. The third submittal revises the PUD Master Plan Map H-1 to be more legible; and revises the Grey Oaks MPUD Ordinance “List of Maps and Tables” to include F-1 Future Pathway Easement Exhibit and add #14 to Section 7.05 Transportation. Submittal 3 includes an email letter of ‘no objection’ from Grey Oaks General Manager for this revised access request. LOCATION: The ±1,601.39-acres Grey Oaks PUD property is located in the northeast, southeast, and northwest quadrants of Airport-Pulling Road and Golden Gate Parkway, in Sections 24, 25 and 26, Township 49 South, Range 25 East. The northwest quadrant consisting of 354 acres is within the City of Naples. The northeast and southeast quadrants, consisting of 1,247 acres (including the 32 acres adjacent to Livingston Road), are located in unincorporated Collier County. COMPREHENSIVE PLANNING COMMENTS: The subject property, containing approximately ±1,601 acres, is partially designated Urban, Urban Mixed-Use District, Urban Residential Subdistrict, partially designated Commercial District, Mixed Use Activity Center Subdistrict #8, and partially designated Incorporated Areas (City of Naples), as depicted on the Future Land Use Map of the Growth Management Plan. According to the Future Land Use Element (FLUE), the Urban designation areas will accommodate a variety of residential and non- residential uses, including recreational uses (such as golf courses). Section 2.05 Permitted Variations of Dwelling Units in Ordinance #07-40 stated, “All properties designated for residential uses may be developed at the maximum number of dwelling units allocated, provided that the total 9.B.5 Packet Pg. 236 Attachment: Attachment E- FLUE Consistency Review 7-11-18 (7309 : Grey Oaks PUDA. PL20170001548) 2800 North Horseshoe Drive · Naples, FL 34104, 239-252-2400 Page 2 of 2 number of dwelling units shall not exceed 1,775. Table 1: Development Parcel Program identifies the maximum units by project quadrant.” This equates to a density of approximately 1.11 dwelling units per gross acre (1,775 dwelling units /1,601.39 acres = 1.108 DU/A). The MPUD is eligible for 5 DU/A (base of 4 DU/A plus 1 DU/A for direct access to two or more arterial or collector roads). Since this PUDA does not increase or decrease the number of total acres or the number of requested dwelling units, no change is proposed to the Grey Oaks PUD density. Approximately 1,159 residential dwelling units and 176 assisted living units have been built to date. Grey Oaks is a mixed use development that allows both residential (as discussed above) and commercial development via Ordinance #07-40. A total of 1,203,091 square feet of commercial development is allowed in the northeast and southeast quadrants. An additional 100,000 square feet of commercial development is allowed in the northwest quadrant. No changes are proposed to the allowable commercial development. According to Ordinance #07-40, Section IV.A., other uses that are permitted include golf course(s), open space for recreation facilities and community parks, community center/clubhouse(s), storage, maintenance yards, and landscaping nurseries within FP&L easements. No changes are proposed. Select FLUE Policies are given below, followed with [bracketed staff analysis]. FLUE Policy 5.6 “New developments shall be compatible with, and complementary to, the surrounding land uses, as set forth in the Land Development Code (Ordinance 04-41, adopted June 22, 2004 and effective October 18, 2004, as amended).” [It is the responsibility of the Zoning and Land Development Review staff, as part of their review of the petition in its entirety, to perform the compatibility analysis.]- FLUE Objective 7 and Relevant Policies Due to the minor changes proposed (no changes in permitted uses, densities, or intensities) beyond the currently approved Grey Oaks MPUD, and because the MPUD is significantly built-out, staff is of the opinion that only a re- evaluation of FLUE Policy 7.1 (pertaining to access) is necessary due to amendments to the Grey Oaks access points. FLUE Policy 7.1 “The County shall encourage developers and property owners to connect their properties to fronting collector and arterial roads, except where no such connection can be made without violating intersection spacing requirements of the Land Development Code.” [The PUDA petition is requesting the elimination of two commercial access locations (previously approved within the Grey Oaks DRI Master Plan – Resolution 2000-190, DO 00-04 and the PUD Master Plan - Ordinance #07-40); one accessing Golden Gate Parkway and the other accessing Airport Road. The commercial access points proposed to be eliminated are not currently constructed, but are shown on the approved Master Plans. The petition is also requesting two new driveway access points be added on Livingston Road, which is identified as a minor arterial road in the Collier County Transportation Element Map 3.4 of the Growth Management Plan. The new access points will serve the future O ’Donnell Nursery project only – not Grey Oaks residents.] CONCLUSION Based upon the above analysis, staff concludes the proposed Mixed Use Planned Unit Development Amendment may be deemed consistent with the Future Land Use Element (FLUE). PETITION ON CITYVIEW cc: Michael Bosi, AICP, Director, Zoning Division David Weeks, AICP, Growth Management Manager, Comprehensive Planning Section Raymond Bellows, Planning Manager, Zoning Services Section PUDA-PL2017-1548 Grey Oaks R3.docx 9.B.5 Packet Pg. 237 Attachment: Attachment E- FLUE Consistency Review 7-11-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.6 Packet Pg. 238 Attachment: Attachment F-Aerials Depicting Removed and Relocated Access Locations 8-10-18 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.6 Packet Pg. 239 Attachment: Attachment F-Aerials Depicting Removed and Relocated Access Locations 8-10-18 (7309 : Grey Oaks PUDA. PL20170001548) Traffic Impact Statement O’Donnell Nursery Planned Unit Development Amendment (PUDA) Collier County, Florida 09/27/2018 Prepared for: Prepared by: Peninsula Engineering 2600 Golden Gate Parkway Bonita Springs, FL 34105 Phone: 239-403-6700 Trebilcock Consulting Solutions, PA 1205 Piper Boulevard, Suite 202 Naples, FL 34110 Phone: 239-566-9551 Email: ntrebilcock@trebilcock.biz Collier County Transportation Methodology Fee – $500.00 Fee Collier County Transportation Review Fee – Major Study – $1,500.00 Fee 9.B.7 Packet Pg. 240 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 2 Statement of Certification I certify that this Traffic Impact Statement has been prepared by me or under my immediate supervision and that I have experience and training in the field of Traffic and Transportation Engineering. Norman J. Trebilcock, AICP, P.E. FL Registration No. 47116 Trebilcock Consulting Solutions, PA 1205 Piper Boulevard, Suite 202 Naples, FL 34110 Company Cert. of Auth. No. 27796 9.B.7 Packet Pg. 241 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 3 Table of Contents Project Description ................................................................................................ 4 Trip Generation – Traffic Analysis .......................................................................... 6 Trip Distribution and Assignment........................................................................... 8 Background Traffic ................................................................................................11 Existing and Future Roadway Network .................................................................12 Project Impacts to Area Roadway Network-Link Analysis .....................................12 Site Access Turn Lane Analysis ..............................................................................13 Improvement Analysis ..........................................................................................15 Mitigation of Impact .............................................................................................15 Appendices Appendix A: Project Master Site Plan ...................................................................16 Appendix B: Initial Meeting Checklist (Methodology Meeting) ............................18 Appendix C: Collier County Ordinance 2007-40 – Excerpt ....................................25 Appendix D: Collier County PUD Monitoring Report – Excerpt.............................27 Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan ..........................29 Appendix F: Trip Generation Calculations ITE 10th Edition ..................................31 Appendix G: Halstatt DRI Trip Generation Summary - Excerpt .............................36 Appendix H: Turning Movements Exhibit .............................................................38 9.B.7 Packet Pg. 242 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 4 Project Description The O’Donnell Nursey project is a proposed wholesale nursery development located on the west side of Livingston Road approximately 1,400 feet north of the intersection of Livingston Road and Golden Gate Parkway and directly south of the intersection of Livingston Road and Grey Oaks Drive East, and is generally located within Section 24/25, Township 49 South, Range 25 East, in Collier County, Florida. Refer to Figure 1 – Project Location Map, which follows and Appendix A: Project Master Site Plan. Figure 1 – Project Location Map The subject site consists of 2 parcels totaling approximately 31 acres in size and is currently zoned Planned Unit Development (PUD) as part of the Grey Oaks Development of Regional Impact (DRI). As allowed by the PUD commercial permitted uses, the project proposes 27 acres of wholesale nursery and landscape contracting. Neither the nursery nor landscaping uses are available to the general public and the only traffic accessing the site will be employees and their respective commercial vehicles entering and exiting the site. 9.B.7 Packet Pg. 243 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 5 A methodology meeting was held with the Collier County Transportation Planning staff on August 24, 2016, via email (refer to Appendix B: Initial Meeting Checklist (Methodology Meeting)). It should be noted that the information included in the methodology was based on preliminary information which has been updated and is reflected in this analysis. For purposes of this evaluation, the project build-out year is assumed to be consistent with the Collier County 2023 planning horizon. Consistent with the approved Collier County Ordinance #2007-40, the Grey Oaks DRI site is currently allowed to be developed with up to 1,775 residential dwelling units, 1,303,091 sf of office/retail/commercial and 72 golf course holes. The approved development program associated with these land uses is shown in Table 1A, Existing Approved and Built Development Program. For details, see Appendix C: Collier County Ordinance 2007-40 – Excerpts and Appendix D: Collier County PUD Monitoring Report – Excerpts. Table 1A Existing Approved and Built Development Program ITE Land Use (Zoning Designation) ITE Land Use Code Approved Size Built to Date Size Single-Family Detached 210 1,775 du 1,341 du General Office Bldg. 710 653,453 sf 0 sf Shopping Center 820 649,638 sf 0 sf Golf Course 430 72 holes 72 holes The project plans to eliminate 2 commercial access locations (approved within the Grey Oaks DRI Master Plan); one from Golden Gate Parkway and one from Airport Road, and proposes a new driveway access location from Livingston Road to serve the proposed O’Donnell Nursery project with a directional left-in/right-in/right-out access onto southbound Livingston Road (north access). There is an existing right-in/right-out access onto southbound Livingston Road (south access). The project would like to reconfigure this driveway to a right-out only access with an option to maintain the existing access as is. For details, see Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan. The Developer elected to construct none of the commercial square footage. T he analysis will show that, from a traffic standpoint, this project is much less intensive than the approved commercial and retail uses currently allowed in the PUD/DRI. The project provides a highest and best use scenario with respect to the project’s proposed trip generation. The proposed development program is illustrated in Table 1B. 9.B.7 Packet Pg. 244 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 6 Table 1B Proposed Development Program Development ITE Land Use ITE Land Use Code Total Size O’Donnell Nursery Nursery – Wholesale 818 27 acres Trip Generation – Traffic Analysis The project’s site trip generation is based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition. The software program OTISS – Online Traffic Impact Study Software (most current version) is used to create the raw unadjusted trip generation for the project. The ITE rates or equations are used for the trip generation calculations as applicable. The climate and demographic makeup of Collier County and the surrounding area create a large year-round demand for landscape contracting services. In order to account for this unique demand, a supplemental calculation was performed for anticipated additional traffic from the landscape contracting activities. Based on client provided data, trip generation was calculated to include employees arriving on site in the morning in personal vehicles, then departing in company trucks (a total of 50) to their respective landscape contracting projects. Similarly, the company trucks would return to the project site in the afternoon and the employees would leave the site in their personal vehicles. It is assumed there are 5-man crews per truck and that some carpooling will occur between employees, for an average of 3 personal vehicle trips per truck. The majority of trips are assumed to occur during the AM and PM peak hour time periods as applicable, however, it is understood that some trips will fall outside of the peak hour time periods. As such, for this analysis, 80% of the landscape contracting trips are assumed to occur during the peak hour time periods. Based on ITE recommendations, no internal capture or pass-by reductions have been taken into consideration for this development. The proposed PUDA development trip generation is illustrated in Table 2A. Detailed calculations can be found in Appendix F: Trip Generation Calculations ITE 10th Edition. 9.B.7 Packet Pg. 245 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 7 Table 2A Trip Generation (Proposed PUDA Development) - Average Weekday Development AM Peak Hour PM Peak Hour Land Use Size Enter Exit Total Enter Exit Total Nursery - Wholesale 27 acres 5 2 7 3 9 12 Landscape Contracting* N/A 120 40 160 40 120 160 Total External 125 42 167 43 129 172 *Manually calculated based on client supplied data. In agreement with the Collier County Traffic Impact Study (TIS) guidelines, significantly impacted roadways are identified based on the proposed project highest peak hour trip generation (net new total) and consistent with the peak hour of the adjacent street traffic. Based on the information contained in Collier County 2017 Annual Update and Inventory Report (AUIR), the peak hour for the adjacent roadway network is PM peak hour. A purpose of this analysis is to generate a traffic comparison between the proposed project and the undeveloped retail land use within the Grey Oaks DRI. The projects total external PM peak hour 2-way trip generation is used to determine the potential traffic of the project and provides guidance as to the equivalent amount of retail square footage that would be required to produce the same traffic impact. The ITE LUC 820, shopping center, was used to model the trip generation for the commercial portion of the DRI. As illustrated in the Halstatt DRI – Development of Regional Impact Application for Development Approval dated May 26, 1989, Trip Generation Summary, trip generation rates were developed and internal capture and pass-by reductions were calculated for the various land uses comprising the DRI. The resulting reduction factors for commercial land use at Livingston Road are 18% for internal capture and 50% for pass-by reductions (for details see Appendix G: Halstatt DRI Trip Generation Summary – Excerpt). Table 2B Trip Generation Comparison – Shopping Center – PM Peak Hour Development PM Peak Hour Size (Rate) Enter Exit Total Total Traffic 70,500 sf 202 218 420 Internal Capture (18%) 38 38 76 Total External 164 180 344 Pass-by (50%) 86 86 172 Net External 78 94 172 9.B.7 Packet Pg. 246 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 8 Based on the results of the trip generation illustrated in Table 2B, 70,500 sf of shopping center is required to produce the same traffic impact as the proposed project, as illustrated in Table 2C. Table 2C Trip Generation Comparison – PM Peak Hour Development PM Peak Hour Size Enter Exit Total Proposed PUDA Development Per Table 2A 43 129 172 Proposed Retail Comparison 70,500 sf 78 94 172 Net Difference (35) 35 0 For the purpose of this TIS, the surrounding roadway network link concurrency analysis is analyzed based on projected PM peak hour Total External traffic generated by the proposed PUDA project. The site access turn lane analysis is calculated based on the Total External traffic during the weekday AM and PM peak hour (as shown in Table 2A). Trip Distribution and Assignment The new traffic generated by the O’Donnell Nursery project is assigned to the adjacent roadways using the knowledge of the area and as coordinated with Collier County Transportation Planning Staff. The site-generated trip distribution is shown in Table 3, Project Traffic Distribution for Peak Hour and is graphically depicted in Figure 2 – Project Distribution by Percentage and By PM Peak Hour. 9.B.7 Packet Pg. 247 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 9 Table 3 Project Traffic Distribution for PM Peak Hour Roadway Link Collier County Link No. Roadway Link Location Distribution of Project Traffic Enter/(Exit) PM Peak Hour Project Vol.* Enter Exit Livingston Road 54.0 South of project to Golden Gate Parkway 50%/(100%) NB – 22 SB – 129 Livingston Road 54.0 North of project to Pine Ridge Road 50%/(N/A) SB – 21 N/A Livingston Road 55.0 Golden Gate Parkway to Radio Road 15%/(30%) NB – 6 SB – 39 Golden Gate Parkway 20.2 Livingston Road to I-75 20%/(40%) WB – 9 EB – 52 Golden Gate Parkway 20.1 Livingston Road to Airport Road 15%/(30%) EB – 6 WB – 39 Note(s): *Peak hour, peak direction traffic volumes are underlined and bold to be used in Roadway Link Level of Service calculations. 9.B.7 Packet Pg. 248 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 10 Figure 2 – Project Distribution by Percentage and By PM Peak Hour 9.B.7 Packet Pg. 249 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 11 Background Traffic Average background traffic growth rates were estimated for the segments of the roadway network in the study area using the Collier County Transportation Planning Staff guidance of a minimum 2% growth rate, or the historical growth rate from annual traffic counts (estimated from 2008 through 2017), whichever is greater. Another way to derive the background traffic is to use the 2017 AUIR volume plus the trip bank volume. Table 4, Background Traffic without Project illustrates the application of projected growth rates to generate the projected background (without project) peak hour peak direction traffic volume for the build-out year 2023. Table 4 Background Traffic without Project (2017 - 2023) Roadway Link CC AUIR Link ID # Roadway Link Location 2017 AUIR Pk Hr, Pk Dir Background Traffic Volume (trips/hr) Projected Traffic Annual Growth Rate (%/yr)* Growth Factor 2023 Projected Pk Hr, Peak Dir Background Traffic Volume w/out Project (trips/hr) Growth Factor** Trip Bank 2023 Projected Pk Hr, Peak Dir Background Traffic Volume w/out Project (trips/hr) Trip Bank*** Livingston Road 54.0 South of project to Golden Gate Parkway 1,470 2.0% 1.1262 1,656 34 1,504 Livingston Road 54.0 North of project to Pine Ridge Road 1,470 2.0% 1.1262 1,656 34 1,504 Livingston Road 55.0 Golden Gate Parkway to Radio Road 1,270 2.0% 1.1262 1,431 39 1,309 Golden Gate Parkway 20.2 Livingston Road to I-75 2,770 2.0% 1.1262 3,120 1 2,771 Golden Gate Parkway 20.1 Livingston Road to Airport Road 2,200 2.0% 1.1262 2,478 0 2,200 Note(s): *Annual Growth Rate - from 2017 AUIR, 2% minimum. **Growth Factor = (1+Annual Growth Rate) 6. 2023 Projected Volume= 2017 AUIR Volume x Growth Factor. ***2023 Projected Volume= 2017 AUIR Volume + Trip Bank. The projected 2023 Peak Hour – Peak Direction Background Traffic is the greater of the Growth Factor or Trip Bank calculation, which is underlined and bold as applicable. 9.B.7 Packet Pg. 250 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 12 Existing and Future Roadway Network The existing roadway conditions are extracted from the 2017 Annual Update and Inventory Report (AUIR) and the project roadway conditions are based on the current Collier County 5-Year Work Program. Roadway improvements that are currently under construction or are scheduled to be constructed within the five-year Transportation Improvement Plan (TIP) or Capital Improvement program (CIP) are considered to be committed improvements. As no such improvements were identified in the Collier County 201 7 AUIR, the evaluated roadways are anticipated to remain as such through project build-out. The existing and future roadway conditions are illustrated in Table 5, Existing and Future Roadway Conditions. Table 5 Existing and Future Roadway Conditions Roadway Link CC AUIR Link ID # Roadway Link Location Exist Roadway Min. Standard LOS Exist Peak Dir, Peak Hr Capacity Volume Future Project Build out Roadway Livingston Road 54.0 South of project to Golden Gate Parkway 6D E 3,100 (NB) 6D Livingston Road 54.0 North of project to Pine Ridge Road 6D E 3,100 (NB) 6D Livingston Road 55.0 Golden Gate Parkway to Radio Road 6D E 3,000 (NB) 6D Golden Gate Parkway 20.2 Livingston Road to I-75 6D E 3,300 (EB) 6D Golden Gate Parkway 20.1 Livingston Road to Airport Road 6D E 3,300 (EB) 6D Note(s): 2U = 2-lane undivided roadway; 4D, 6D, 8D =4-lane, 6-lane, 8-lane divided roadway, respectively; LOS = Level of Service. Project Impacts to Area Roadway Network-Link Analysis The Collier County Transportation Planning Services developed Level of Service (LOS) volumes for the roadway links impacted by the project, which were evaluated to determine the project impacts to the area roadway network in the future horizon (2023). The Collier County Transportation Planning Services guidelines have determined that a project will be considered to have a significant and adverse impact if both the percentage volume capacity exceeds 2% of the capacity for the link directly accessed by the project and for the link adjacent to the link directly accessed by the project; 3% for other subsequent links and if the roadway is projected to operate below the adopted LOS standard. 9.B.7 Packet Pg. 251 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 13 Based on these criteria, this project does not create a significant impact on any of the analyzed. All links analyzed are projected to operate above the adopted LOS standard with or without the project at 2023 future build-out conditions. Table 6, Roadway Link Level of Service illustrates the LOS impacts of the project on the roadway network closest to the project. Table 6 Roadway Link Level of Service (LOS) – With Project in the Year 2023 Roadway Link CC AUIR Link ID # Roadway Link Location 2017 Peak Dir, Peak Hr Capacity Volume Roadway Link, Peak Dir, Peak Hr (Project Vol Added)* 2023 Peak Dir, Peak Hr Volume w/Project ** % Vol Capacity Impact by Project Min LOS exceeded without Project? Yes/No Min LOS exceeded with Project? Yes/No Livingston Road 54.0 South of project to Golden Gate Parkway 3,100 (NB) NB – 22 1,678 0.71% No No Livingston Road 54.0 North of project to Pine Ridge Road 3,100 (NB) N/A 1,656 N/A No No Livingston Road 55.0 Golden Gate Parkway to Radio Road 3,000 (NB) NB – 6 1,437 0.20% No No Golden Gate Parkway 20.2 Livingston Road to I-75 3,300 (EB) EB – 52 3,172 1.58% No No Golden Gate Parkway 20.1 Livingston Road to Airport Road 3,300 (EB) EB – 6 2,484 0.18% No No Note(s): *Refer to Table 3 from this report. **2023 Projected Volume = 2023 background (refer to Table 4) + Project Volume added. Site Access Turn Lane Analysis The project plans to eliminate 2 commercial access locations (approved within the Grey Oaks DRI Master Plan); one from Golden Gate Parkway and one from Airport Road, and proposes a new driveway access location from Livingston Road to serve the proposed O’Donnell Nursery project with a directional left-in/right-in/right-out access onto southbound Livingston Road (north access). There is an existing right-in/right-out access onto southbound Livingston Road (south access). The project would like to reconfigure this driveway to a right-out only access with an option to maintain the existing southern access as is. For details, refer to Appendix A: Project Master Site Plan and Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan. 9.B.7 Packet Pg. 252 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 14 Livingston Road is a 6-lane urban divided arterial roadway under Collier County jurisdiction, and has a posted legal speed of 45 mph in the vicinity of the project . Based on FDOT Index 301, design speed of 45 mph – urban conditions – the minimum turn lane length is 185 feet (which includes a 50 foot taper) plus required queue. Project access is evaluated for turn lane warrants based on Collier County Right -of-way Manual: (a) two-lane roadways – 40vph for right-turn lane/20vph for left-turn lane; (b) multi-lane divided roadways – right turn lanes shall always be provided; and c) when new median openings are permitted, they shall always include left turn lanes. Turn lane lengths required at build-out conditions are analyzed based on the number of turning vehicles in an average one-minute period for right-turning movements, and two-minute period for left-turning movements, within the peak hour traffic. The minimum queue length is 25 f eet and the queue/vehicle is 25 feet. Projected turning traffic movements are illustrated in Appendix G: Turning Movements Exhibits. Left-in/Right-in/Right-out North Access and Right-out only South Access A dedicated southbound right-turn lane is warranted as the project meets the multi-lane criteria. The proposed project is expected to generate 63vph and 22vph right-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 2 35 feet long (which includes a minimum of 50 feet of storage). As such, a 235 foot right-turn lane is recommended to accommodate projected traffic at this location. A dedicated northbound left-turn lane is warranted as the project meets the multi-lane criteria. There is an existing northbound left-turn lane approximately 550 feet long. The proposed project is expected to generate 62vph and 21vph left-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 260 feet long (which includes a minimum of 75 feet of storage). As such, the existing 550 foot left-turn lane is adequate to accommodate projected traffic at this location. Left-in/Right-in/Right-out North Access and Optional Right-in/Right-out South Access A dedicated southbound right-turn lane at the proposed north access is warranted as the project meets the multi-lane criteria. The proposed project is expected to generate 38vph and 13vph right-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 210 feet long (which includes a minimum of 25 feet of storage). As such, a 210 foot right-turn lane is recommended to accommodate projected traffic at this location. A dedicated northbound left-turn lane is warranted as the project meets the multi-lane criteria. There is an existing northbound left-turn lane approximately 550 feet long. The proposed project is expected to generate 62vph and 21vph left-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 260 feet long (which i ncludes a 9.B.7 Packet Pg. 253 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 15 minimum of 75 feet of storage). As such, the existing 550 foot left -turn lane is adequate to accommodate projected traffic at this location. A dedicated southbound right-turn lane at the proposed optional south access is warranted as the project meets the multi-lane criteria. The proposed project is expected to generate 25vph and 9vph right-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 210 feet long (which includes a minimum of 25 feet of storage). As such, a 210 foot right-turn lane is recommended to accommodate projected traffic at this location. A detailed evaluation of applicable access points will be performed at the time of site development permitting/platting to determine turn lane requirements as more accurate parameters become available, as applicable. Improvement Analysis Based on the results of the comparison analysis included in this report, this project’s traffic impact does not exceed the traffic generated by the approved PUD ordinance. As illustrated in the link analysis and trip distribution, the projected traffic does not create any significant impacts on the analyzed roadway segments of the study network. None of the analyzed links are projected to exceed the adopted LOS standard with or without the project at 2023 future build-out conditions. There is adequate and sufficient roadway capacity to accommodate the proposed development without adversely affecting adjacent roadway network level of service. Consistent with the site access turn lane analysis results, southbound right-turn lanes are recommended to accommodate traffic at build-out conditions. The existing northbound left-turn lane is adequate to accommodate projected traffic at this location. Mitigation of Impact From a zoning perspective, given that access is eliminated on Golden Gate Parkway and Airport Road due to less intensive established land uses there and this proposal does not create a net increase in development external trips as compared to the original development parameters, the prior established DRI mitigation should be deemed satisfactory. 9.B.7 Packet Pg. 254 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 16 Appendix A: Project Master Site Plan 9.B.7 Packet Pg. 255 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 17 9.B.7 Packet Pg. 256 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 18 Appendix B: Initial Meeting Checklist (Methodology Meeting) 9.B.7 Packet Pg. 257 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 19 9.B.7 Packet Pg. 258 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 20 9.B.7 Packet Pg. 259 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 21 9.B.7 Packet Pg. 260 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 22 9.B.7 Packet Pg. 261 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 23 9.B.7 Packet Pg. 262 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 24 9.B.7 Packet Pg. 263 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 25 Appendix C: Collier County Ordinance 2007-40 – Excerpt 9.B.7 Packet Pg. 264 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 26 9.B.7 Packet Pg. 265 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 27 Appendix D: Collier County PUD Monitoring Report – Excerpt 9.B.7 Packet Pg. 266 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 28 9.B.7 Packet Pg. 267 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 29 Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan 9.B.7 Packet Pg. 268 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 30 9.B.7 Packet Pg. 269 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 31 Appendix F: Trip Generation Calculations ITE 10th Edition 9.B.7 Packet Pg. 270 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 32 9.B.7 Packet Pg. 271 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 33 9.B.7 Packet Pg. 272 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 34 9.B.7 Packet Pg. 273 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 35 9.B.7 Packet Pg. 274 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 36 Appendix G: Halstatt DRI Trip Generation Summary - Excerpt 9.B.7 Packet Pg. 275 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 37 9.B.7 Packet Pg. 276 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 38 Appendix H: Turning Movements Exhibit 9.B.7 Packet Pg. 277 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 39 9.B.7 Packet Pg. 278 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 40 9.B.7 Packet Pg. 279 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 41 9.B.7 Packet Pg. 280 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 42 9.B.7 Packet Pg. 281 Attachment: Attachment G-Revised TIS - 09-27-2018R1--certified (7309 : Grey Oaks PUDA. PL20170001548) Page 1 of 3 MEMORANDUM TO: COLLIER COUNTY PLANNING COMMISSION FROM: ZONING DIVISION – ZONING SERVICES SECTION HEARING DATE: NOVEMBER 1, 2018 SUBJECT: PUDA-PL20170001548, GREY OAKS PLANNED UNIT DEVELOPMENT (PUD) AND DOA-PL20170001729, GREY OAKS DEVELOPMENT OF REGIONAL IMPACT (DRI) The petitions PUDA-PL20170001548, Grey Oaks PUD, and DOA-PL20170001729, Grey Oaks DRI were continued from the September 6, 2018, CCPC hearing to the October 4, 2018, CCPC hearing and then to the November 1, 2018, CCPC hearing. Staff has received a revised Traffic Impact Statement (TIS). (Please see Attachment F-Revised TIS.) The revised TIS clarifies that the proposed 31-acre site will have a wholesale nursery and landscape contracting land uses. The previously proposed land uses of commercial landscaping, retail nursery comprised of outdoor sales and display area, and farmer’s market has been removed from the revised TIS. The Transportation Element contained in the September 6th CCPC Staff Report has been revised to state: Transportation Element: In evaluating this project, staff reviewed the applicant’s Traffic Impact Statement (TIS) for consistency with Policy 5.1 of the Transportation Element of the GMP using the 2017 Annual Update and Inventory Reports (AUIR). Policy 5.1 of the Transportation Element of the GMP states: “The County Commission shall review all rezone petitions, SRA designation applications, conditional use petitions, and proposed amendments to the Future Land Use Element (FLUE) affecting the overall countywide density or intensity of permissible development, with consideration of their impact on the overall County transportation system, and shall not approve any petition or application that would directly access a deficient roadway segment as identified in the current AUIR or if it impacts an adjacent roadway segment that is deficient as identified in the current 9.B.8 Packet Pg. 282 Attachment: Attachment H-MEMO to CCPC 10-9-18 (7309 : Grey Oaks PUDA. PL20170001548) Page 2 of 3 AUIR, or which significantly impacts a roadway segment or adjacent roadway segment that is currently operating and/or is projected to operate below an adopted Level of Service Standard within the five year AUIR planning period, unless specific mitigating stipulations are also approved. A petition or application has significant impacts if the traffic impact statement reveals that any of the following occur: a. For links (roadway segments) directly accessed by the project where project traffic is equal to or exceeds 2% of the adopted LOS standard service volume; b. For links adjacent to links directly accessed by the project where project traffic is equal to or exceeds 2% of the adopted LOS standard service volume; and c. For all other links the project traffic is considered to be significant up to the point where it is equal to or exceeds 3% of the adopted LOS standard service volume. Mitigating stipulations shall be based upon a mitigation plan prepared by the applicant and submitted as part of the traffic impact statement that addresses the project’s significant impacts on all roadways.” The proposed PUD Amendment on the subject property was reviewed based on the applicable 2017 AUIR Inventory Report. The TIS submitted in the application indicates that the proposed wholesale nursery and landscape contracting development will generate approximately 173 PM peak hour two-way trips, which according to the TIS, represents the same number of PM peak hour two-way trips remaining for retail use allowed by the existing PUD. The proposed development will impact the following roadway segments with the listed capacities: Roadway Link 2017 AUIR Existing LOS Current Peak Hour Peak Direction Service Volume/Peak Direction 2017 AUIR Remaining Capacity Livingston Road Pine Ridge Road to Golden Gate Parkway B 3,100/North 1,596 Livingston Road Golden Gate Parkway to Radio Road B 3,000/North 1,691 Golden Gate Parkway Airport Pulling Road to Livingston Road C 3,300/East 1,100 9.B.8 Packet Pg. 283 Attachment: Attachment H-MEMO to CCPC 10-9-18 (7309 : Grey Oaks PUDA. PL20170001548) Page 3 of 3 Golden Gate Parkway Livingston Road to I-75 D 3,300/East 529 Based on the 2017 AUIR, the adjacent roadway network has sufficient capacity to accommodate the proposed trips for the amended project within the 5-year planning period. Therefore, the subject rezoning can be found consistent with Policy 5.1 of the Transportation Element of the GMP. Operational impacts will be addressed at the time of first development order ((Site Development Plan (SDP) or Plans and Plat(PPL)). Attachment: Revised TIS, dated September 27, 2018 END OF MEMORANDUM 9.B.8 Packet Pg. 284 Attachment: Attachment H-MEMO to CCPC 10-9-18 (7309 : Grey Oaks PUDA. PL20170001548) Supplemental Memo October 19, 2018 SUPPLEMENTAL MEMORANDUM TO: COLLIER COUNTY PLANNING COMMISSION FROM: ZONING DIVISION – ZONING SERVICES SECTION HEARING DATE: NOVEMBER 1, 2018 SUBJECT: PUDA-PL20170001548, GREY OAKS PLANNED UNIT DEVELOPMENT (PUD) AND DOA-PL20170001729, GREY OAKS DEVELOPMENT OF REGIONAL IMPACT (DRI) Through further discussions with the Transportation Planning Division and review of the most recent Traffic Impact Statement (TIS) submitted for the application (dated 9/27/2018), the proposed landscape nursery for which two access points are requested by the petitioner only generates 12 total PM peak hour trips. This volume only warrants one access point onto Livingston Road. Based upon this recognition, Staff is recommending the amendment be limited to a single access point off of Livingston Road. For further information, please see page 7 of the revised Traffic Impact Statement (TIS). (Please see Attachment G-Revised TIS.) END OF MEMORANDUM 9.B.9 Packet Pg. 285 Attachment: Attachment I-MEMO to CCPC 10-19-18-bosi (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 286 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 287 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 288 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 289 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 290 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 291 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 292 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 293 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 294 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 295 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 296 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 297 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 298 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 299 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 300 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 301 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 302 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 303 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 304 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 305 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.10 Packet Pg. 306 Attachment: Attachment J-June 6 1990 BCC Hearing Minutes (7309 : Grey Oaks PUDA. PL20170001548) 9.B.11 Packet Pg. 307 Attachment: Attachment J-1 SIC Codes 5193 and 1799 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.11 Packet Pg. 308 Attachment: Attachment J-1 SIC Codes 5193 and 1799 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.11 Packet Pg. 309 Attachment: Attachment J-1 SIC Codes 5193 and 1799 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 1 of 10 Wayne Arnold: Okay, let’s get the meeting started I guess. I’m Wayne Arnold. I’m with Grady Minor and Associates. This is Sharon Umpenhour from our office. She’ll be recording the meeting tonight. Uh, The County requires that we record these meetings and then create a – a verbatim transcript of the meeting in support of the planning commission members and the County Commissioners to review. Uh, with us tonight, Al O’Donnell is the property owner of the subject property tonight. And, Norm Trebilcock is Tranportation Engineer. John English behind him is with Barron Collier Companies Peninsula Engineering, he’s the engineering record. And, um, this is Nancy Gundlach. Nancy is with Collier County Government. – Nancy Gundlach: – Hello. Wayne Arnold: – She’s principal planner and she’s here to monitor and answer any County related questions but, technically it’s our meeting to explain to the members of the public what it is that we’re attempting to do. So, we’ll try to do that. I have a brief presentation and then turn it over to anybody who might have a question. So, what we’re doing is amending the zoning document that’s required of the Grey Oaks Development of Regional Impact and the Planned Unit Development zoning. They had one common master plan for both of those documents. And, what we’re proposing to do is to eliminate two unused access points. One on Airport Road and one on Golden Gate Parkway, and then create two new access points on Livingston Road that would only serve Mr. O’Donnell’s property. He’s got about 32 acres that is encumbered entirely under the FP&L easement south of the Grey Oaks entrance on the west side of Livingston Road. And, The County requires us to go through this process. So, we’ll be going through the process of creating a new Master Plan exhibit. The County has asked us to create a couple of cleanup items in the PUD document itself, one of which is to allow them to build a multi- use path someday across a portion of Mr. O’Donnell’s property. So, we’ll have a commitment that allows them to do that. That’ll be added. But, um, it’s related to the request for the access point. That’s an overall aerial exhibit outline of all of Grey Oaks. You can see that it’s almost entirely built out. It’s about 1600 acres and about 1600 dwelling units with commercial components and senior housing. That’s, uh, the approved Master Concept Plan. It’s hard to 9.B.12 Packet Pg. 310 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 2 of 10 see but the access points there for instance, there for instance, main entrance here, main entrance over here, those are shown on the Master Plan, and that’s what we’re attempting to revise. You can see it – it’s really hard to read on – here, let me go to the different exhibit to show that more clearly. This is an excerpt of the Master Plan but the two clouded areas on the south and west, that’s an unused access point that was going to serve as a commercial tract at the Grey Oaks project. And then, the other one is on Golden Gate Parkway, where the arrow is, and it – it’s labelled, “Relocate access point” up here. And then, if you look to the right of the page we’re showing the two proposed relocated access points that would only serve – thank you whoever has them – the pointer, they uh, that would only serve Mr. O’Donnell’s property within the – FP&L ea – FP&L easement. Those would not be access points that would service a – any of the residential component of the Grey Oaks PUD. This is a little bit of a, aerial exhibit that shows more of the FP&L easement and you can see the relationship of the proposed access points that we’re showing. There’s a directional left turn made right now and we’re proposing that that would continue to be a directional left into this parcel, and then, on the south end where the construction road was just north of the FP&L facility, that would be a right and right of access point servicing Mr. O’Donnell’s operation. The PUD is – been approved. All the uses are permitted. We’re not proposing any new uses for the PUD. So, it allows for storage that FP&L easement allows for maintenance yard, landscape nurseries , et cetera, and we will be doing everything that’s permitted under the PUD. And, that in a nutshell was – say, I’m gonna put this other exhibit back up, just to show you again on the Master Plan. But, that’s really in essence the – the amendments that we’re proposing to the PUD. I’d be happy to answer any questions. I know we’ve had a few emails from, probably some of your neighbors, but, um, anything we can answer we’ll certainly try. Jean Foster: Just, uh, to clarify – Wayne Arnold: – Okay, if I could, one – just for one second. We’re – The County’s been very particular about, uh, getting things on the record so, if I could have anybody who wants to speak just speak into the microphone – 9.B.12 Packet Pg. 311 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 3 of 10 Jean Foster: – Okay. Wayne Arnold: – so we make sure that it’s recorded, and if you don’t mind giving your name. Jean Foster: Sure, sure. Not my social security – Wayne Arnold: – Correct. Jean Foster: Okay. Jean Foster: Um, my name is Jean Foster, and I live in Wyndemere Country Club, which is directly opposite the, uh, the property. Uh, one of the questions I have is, just so that I – I’m clear about it, uh, to enter the property heading northbound on Livingston from Golden Gate, you would be able to turn left in that turn lane and cut across traffic? Wayne Arnold: Yes, this is Wayne Arnold again. And yes, there is an existing left turn lane, and you’re familiar with it I’m sure. – Jean Foster: – Right. Wayne Arnold: – It’s south of your entrance and south of the signalized intersection with y – with Grey Oaks and Wyndemere. So yes, the idea would be that that turn lane would then create a drive entrance into Mr. O’Donnell’s property and that would be his northern most entrance. And then, we have the southern entrance that’s much closer to the FP&L facility. Ron Coleman: Um, Ronald Coleman and I also live in Wyndemere. Regarding the same entrance, we see a problem, um, at the northern end of Livingston Road where people cut across and go in the reverse on those left turn lanes, so they can go – in – in this case they would be going south, uh – when you’re leaving the, um, for instance, um, the shopping center where, um, Starbucks is and so forth. They would come back by the tire store and then they’ll be watching. And so, then they’ll sneak across in or what is a turn lane into the shopping center, but they’ll do the reverse and then go south. Uh, that’s a problem. Also, I’m sure everyone aware – is aware here that, people will go down Livingston at approximately 55 and 60 miles an hour. We witnessed that this afternoon. We were doing, you know, five miles over the speed limit, but these, a BMW and a Lexus went speeding by in – significantly faster. And, you can check with the, uh, Police Department, they’ll verify that. Uh, I’m concerned about trucks cutting across at that entrance, uh, the proposed entrance there 9.B.12 Packet Pg. 312 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 4 of 10 across Livingston, because I think that that’s going to be a real [inaudible] [00:07:22], and as Jean mentioned earlier, also in the morning, traffic going south on Livingston there is already backed up, uh, 15 minutes to try to get from – Jean Foster: – Sometimes. Ron Coleman: – you know, sometimes in season. To try to get from the, um, Wyndemere grounds traffic signal, down to the, uh, Golden Gate. And, if you have trucks going across there, it’s not going to be manageable. Wayne Arnold: Thank you. Again, this is Wayne Arnold. The – The reason that Mr. O’Donnell likes the left end rather than having to use the main entrance gate at Grey Oaks is it’s convenient directly into his site and it doesn’t then have to use the gated access at Grey Oaks. But, having the signal there creates a gap for his trucks to make that turning movement so, when cars are stopped at the light you get a safe passage across and, Norm I don’t know if you want to add anything else but, that’s kind of the reason that it makes a very good break – natural break for the traffic flow. Al O’Donnell: Let me just – you can save a lot of money – Wayne Arnold: – S – S – Introduce yourself too. Al O’Donnell: Al O’Donnell. I can save a lot of money by not doing any of this, but, – Al O’Donnell: we thought that the Grey Oaks and the Wyndemere people would object strongly to us using the other intersection. – Jean Foster: – Well, that’s correct, yes – Male Speaker: – Absolutely. Al O’Donnell: – So that’s – that’s we – we’re making our own entry at significant expense and hassle – Ron Coleman: – Yeah. Jean Foster: Yeah. Al O’Donnell: – because we had to go through all this to change the entries and the DRI. 9.B.12 Packet Pg. 313 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 5 of 10 Ron Coleman: We’re not arguing against you – Al O’Donnell: – NO. Ron Coleman: – we’re just concerned about – about the speed and – Al O’Donnell: – Hmm, hmm. Ron Coleman: – you know, the access it causes. Al O’Donnell: Right. Okay. Ron Coleman: So much for that. Wayne Arnold: Okay, thanks. Any other questions? Comments? Male Speaker: [Inaudible] [00:09:01]. Wayne Arnold: Yes sir. Let me get you the microphone. Mike Donaghue: Mike Donaghue with Grey Oaks. Uh, I agree with the, uh, people previously. Uh, the traffic is a major problem and a while back in the newspaper it talked about Naples, that everybody was 20 miles over the speed limit so, – [Laughter] Mike Donaghue: – uh, it just, sort of the, uh, article that was in the paper. That will be a major problem. Uh, I’m concerned about laden trucks, noise, no retailer’s gonna be there I understand. It’s gonna be a wholesale. There’re gonna be lights on the property for nightlights. Wayne Arnold: Thank you for your questions. Well, the PUD and the DRI set up some landscape nurseries, and I think that at the – probably initially Mr. O’Donnell’s gonna operate that as wholesale operation but it doesn’t preclude there from being retails operations there at some point in the future. Mike Donaghue: It doesn’t preclude it? Wayne Arnold: It does not preclude it. With regard to lighting, Al or John, I don’t know if you can address that question. I don’t know the answer to that if you need… 9.B.12 Packet Pg. 314 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 6 of 10 Al O’Donnell: We had envisioned possible – possibly some security lightings in some areas. Um, there’s a huge berm between, you know, Grey Oaks and this property, it’s, you know, 10 foot plus, plus plants on top. I mean, certainly if we do lighting it would, you know, attempt to, you know, direct it towards the river wide of it, not towards Grey Oaks. Wayne Arnold: I think too, just so it’s clear, all of his property encumbered under the Florida Power and Light easement area, which means there are restrictions and you have to get approvals from Florida Power and Light. For instance, you can’t put things that are taller than 14 feet under their powerline easement et cetera. So, – Male Speaker: – No taller than 14 feet would be? Wayne Arnold: – Is that the planted material height or is that any high [inaudible] [00:11:00] – Male Speaker: – Everything. Wayne Arnold: Everything. Male Speaker: Yeah, the recent Condo was – Male Speaker: – No structures at all. Wayne Arnold: Right. No permanent structures permitted by FP&L there. Ron Coleman: One other question please. Uh, Ron Coleman again from Wyndemere. Would you define where you’ve got a, uh, area of weeds and grass and then you have a line of trees and then you have another area of weeds and grass and then you have Grey Oaks. What – what’s planned with the line of trees there? Wayne Arnold: This is Wayne again. The existing vegetation that makes up the berm and landscape buffer that was planted by Grey Oaks will be untouched. It remains heavily – Wayne Arnold: – as Mr. O’Donnell mentioned, as a earth and berm and then it’s got the – extensive mature vegetation on it. And, Mr. O’Donnell probably will be installing some more container plants in areas where The County in our, at least preliminary converstations have talked about if there were going to be storage areas or vehicles stored that they would look for landscape materials to be placed there, um, in addition to the landscape buffer that was already there. Al O’Donnell: Al O’Donnell again. I think what you’re asking is about all the trees 9.B.12 Packet Pg. 315 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 7 of 10 down the center. Ron Coleman: Yes, yes. Al O’Donnell: Well, it’s absolutely illegal for me to have a big tree but, FP&L can do they want. – [Laugh] Al O’Donnell: – They have 50 foot trees in there, which, – Ron Coleman: – Do you plan on leaving [inaudible] [00:12:23] – Al O’Donnell: – you know, I would be shot for but, you know… Ron Coleman: Are those coming down or are you planning on leaving them? Al O’Donnell: Um, I think as I develop a bit more and more, uh, most of them will come down. I made though within a north half south half, so they get cut. Now, I will be required by The County to take away all the invasive – invasive exotics in that area. There’s a lot of – like, over half of those plants are not ones that The County wants to see there. Um, one other caveat – there’s not structures allowed there now. Their people have said to me, “Well in the future, when we all get solar in our houses, do you think we’ll need three sets of powerlines?” So, – [Laugh] Al O’Donnell: – I – I hope that my grandkids will – will be able to get this property without powerlines [inaudible]. But, we’ll see. [Laughter] Wayne Arnold: Thanks Al. Yes sir. Mike Donaghue: Mike Donaghue again. What are the days and hours of operation that we would see somebody on that property? Wayne Arnold: Al, do you want to take a shot at this one? Al O’Donnell: Sure, I’d love to. Um, historically my company works from seven in the morning to, you know, five, six, seven at night. Um, people get there in the 06:30 range occasionally. Um, people might get there a little earlier and just wait for things to start. Uh, we don’t have night operations. I recently, for the first time in my life did a job on 9.B.12 Packet Pg. 316 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 8 of 10 41 – US 41 east and all of the work was required to be done at night so… Wayne Arnold: – I – I think it’s – Al O’Donnell: – In 30 years I did three night works, so… Ron Coleman: And days, if I may [Inaudible] [00:14:16] – Wayne Arnold: – My name is Wayne Arnold I just want to verify that there’s an exception to the rule and, Al is subject to as growing plants that the whims of nature and freeze protection so there may be activities related to that. You know, – Al O’Donnell: – Hurricanes. Wayne Arnold: – preparations for hurricanes et cetera. So… Ron Coleman: Days of operation? Al O’Donnell: Um, my company works six days a week. We hardly ever work Sundays, but if – in, a place like this once the nursery was – was farther along and we had, you know, five, 10 acres of plants you would probably have one or two people stopping by to check the water on a Sunday where, if – not in the rainy season. Male Speaker: [Inaudible] Wayne Arnold: Yes sir. Michael Stoll: Michael Stoll, Grey Oaks. Uh, question. Uh, on the maintenance of material that is on the bluff currently is maintained by a combination of FPL, uh, on behalf [inaudible] closer to their powerlines, which are adjacent to the fence. And, then there’s parts of that that we maintain. When I say “we” I mean Grey Oaks. Um, are we gonna have access to that area? Uh, is it gonna be a maintenance bluff. We’re never gonna reach and access and, part two, where’s the water gonna get – come from? Wayne Arnold: Thank you. Al, with the answer to the question about maintenance, I assume of their berm from your side. If they’re currently using the FP&L easement for maintenance I’m assuming that you will allow that to continue. Al O’Donnell: Yeah. I – I – I don’t have any problem with – with maintaining an 9.B.12 Packet Pg. 317 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 9 of 10 access – maintenance access and, you guys might want to get to – to my side of your fences from my property. Um, it’s – there’s gonna be keys on the locks of course. When I fence and – and block those roads, we’ll have to have locks for [inaudible] FP&L and I have no problem with you guys also having any access along there. Wayne Arnold: Are you gonna answer the question about the water too? Michael Stoll: Where you’re getting your water? Al O’Donnell: W – I [inaudible] to put wells down. They, um, I wanted to dig a lake but FP&L said no. Um, so, um, maybe John can speak from an engineering point. Uh, the only place we could get water – we’re planning to have at least two wells. Male Speaker: Is that…? Male Speaker: [Inaudible]. Wayne Arnold: Thank you. Yes ma’am. Jean Foster: Jean Foster. Uh, one question. Uh, I was kind of surprised by this multi-use path that The County is asking to set aside to get some land for. When is that gonna be building? What if – where do the plans – does it go? How far north does it go? Where does it go? [Laugh] Wayne Arnold: This is Wayne. I – I wish we had an answer for you but The County doesn’t have the money to construct it. That’s why they’re asking Mr. O’Donnell to provide an easement for it so when they decide to go ahead and move forward on construction of it, they could do that within, uh, – an easement across his property. It’s my understanding that this plan, uh, would link all the way into Lee County up to, um, Livingston Road and to the Imperial Parkway area in Lee County. It’s on a long range transportation pathway plan. But, I don’t believe there’s any timeframe or monies dedicated to it. Jean Foster: So who – so, who owns the p – it – it’s on your – it – it’s on his property. Wayne Arnold: Correct. Jean Foster: Okay. Oh, interesting. [Laugh] Wayne Arnold: So, The County – 9.B.12 Packet Pg. 318 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) PL20170001548, Grey Oaks Planned Unit Development (PUD) and PL20170001729, Grey Oaks Development of Regional Impact (DRI) 06-25-2018 NIM Page 10 of 10 Jean Foster: – Kind of like a rental lease. Wayne Arnold: – The County is – well The County is asking for there to be that easement so they could construct it when necessary. So, Al would be cooperating with them regarding the location on his property. The County has some other easements and hopefully we can comingle their easements over his property. Male Speaker: Um, Wayne. Wayne Arnold: You don’t want to? Norm Trebilcock: Uh, Norm Trebi – Trebilcock for the record. Just to, uh, maybe in answer to that. The Honda dealership that was recently developed right there at Pine Ridge in Livingston, there – there was a sidewalk against, um, Livingston Road there, and they ended up widening that sidewalk to – to 10 foot width – Norm Trebilcock: – and, that kinda took care of that pathway aspect of things, so, they’re trying to give access to folks who kinda go heading north and south, so… Wayne Arnold: Thank you, Norm. Norm Trebilcock: Mm-hmm. Wayne Arnold: Anybody else? Questions, comments? Everybody wanna go home? Female Speaker: Cocktail. Wayne Arnold: [Laughs] Well, if there are no other questions, I’m, uh, go ahead and adjourn the meeting. Thanks everybody for coming out. Male Speaker: Thanks. Female Speaker: Thank you, Wayne. [End of Audio] Duration: 19 minutes 9.B.12 Packet Pg. 319 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. PL20170001548) Grey Oaks DRI/PUD June 25, 2018 Neighborhood Information Meeting 9.B.12 Packet Pg. 320 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Project Team 2 •Albert O’Donnell –O'Donnell Landscapes, Inc. •D. Wayne Arnold, AICP, Professional Planner –Q. Grady Minor & Associates, P.A. •John C. English, P.E., Engineer –Barron Collier Companies, Peninsula Engineering 9.B.12 Packet Pg. 321 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Project Information 3 Existing Zoning:Grey Oaks Development of Regional Impact (DRI)and Planned Unit Development (PUD) Proposed DRI/PUD amendment Request: Modify Master Plan to relocate two previously approved,but unimproved,project access points from Golden Gate Parkway and Airport Road,to Livingston Road. 9.B.12 Packet Pg. 322 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Overall DRI/PUD 4 LIVINGSTON ROADAIRPORT-PULLING ROADGOLDEN GATE PKWY 9.B.12 Packet Pg. 323 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Approved Map H 59.B.12 Packet Pg. 324 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Proposed Map H 69.B.12 Packet Pg. 325 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Access Exhibit 7 9.B.12 Packet Pg. 326 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Proposed Access Locations 8 Northern Access: Proposed right-in/right-out from the south bound lane of Livingston Road and a left-in from the north bound lane of Livingston Road Southern Access: right-in/right-out from the south bound lane of Livingston Road and no left-in from the north bound lane of Livingston Road Grey Oaks Wyndemere Golden Gate Estates 9.B.12 Packet Pg. 327 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Ordinance 2007-40, Section 4.02.A.6 99.B.12 Packet Pg. 328 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. Questions? 10 9.B.12 Packet Pg. 329 Attachment: Attachment K-Transcript of NIM 06-25-2018 (7309 : Grey Oaks PUDA. 1 Sharon Umpenhour From:Jim Butler <JButler@greyoakscc.com> Sent:Wednesday, July 12, 2017 12:28 PM To:Wayne Arnold Cc:Rafael Silva; John English (JEnglish@barroncollier.com); Jeannie Manos Subject:FW: Grey Oaks Access for O'Donnell Nursery Attachments:JimButler 06-2017L.PDF; Access Relocation Exhibit.pdf Wayne, Grey Oaks has no objection to this proposal. Both the Country Club and the Property Owner’s Chairmen, and myself, the General Manager has approved. Please let this email serve as official notice if possible. Thanks Jim Jim Butler General Manager 2400 Grey Oaks Drive North Naples, FL 34105 (239) 262-5550 (Club) (239) 262-3593 (Fax) Email: JButler@GreyOaksCC.com www.GreyOaksCC.com Note: If you have received this communication in error please delete all copies of the original message and attachments. From: Jim Butler Sent: Tuesday, July 11, 2017 1:03 PM To: Jim Butler Subject: FW: Grey Oaks Access for O'Donnell Nursery Jim Butler General Manager 2400 Grey Oaks Drive North Naples, FL 34105 (239) 262-5550 (Club) (239) 262-3593 (Fax) Email: JButler@GreyOaksCC.com www.GreyOaksCC.com Note: If you have received this communication in error please delete all copies of the original message and attachments. From: Wayne Arnold [mailto:WArnold@gradyminor.com] Sent: Thursday, July 06, 2017 8:27 AM To: Jim Butler 9.B.13 Packet Pg. 330 Attachment: Attachment L-Letter of Support 07-12-2017 (7309 : Grey Oaks PUDA. PL20170001548) 2 Cc: 'John English'; Sharon Umpenhour Subject: Grey Oaks Access for O'Donnell Nursery Hello Jim, I am assisting Al O’Donnell with his landscape nursery improvements within the FP&L easement adjacent to Livingston Road. Al is trying to obtain dedicated access for his nursery operations from Livingston Road. We are proposing to amend the Grey Oaks PUD and DRI master plans to eliminate two previously approved but unused access points and add the two proposed access points on Livingston Road. We would appreciate it if you could review the attached information and provide us with a letter of no objection. If you have any questions, please feel free to contact John English or me. Thank you, Wayne D. Wayne Arnold, AICP Planning Director 3800 Via Del Rey Bonita Springs, FL 34134 Phone - 239.947.1144 Fax - 239.947.0375 Web - http://www.gradyminor.com DISCLAIMER: This communication from Q. Grady Minor & Associates, P.A., along with any attachments or electronic data is intended only for the addressee(s) named above and may contain information that is confidential, legally privileged or otherwise exempt from disclosure. The recipient agrees and accepts the following conditions: The electronic file/data is for informational purposes only and is the responsibility of the recipient to reconcile this electronic file/data with the approved and certified "plan of record" along with actual project site conditions. Q. Grady Minor & Associates, P.A. reserves the right to revise, update and improve its electronically stored data without notice and assumes no responsibility due to a virus or damages caused by receiving this email. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 9.B.13 Packet Pg. 331 Attachment: Attachment L-Letter of Support 07-12-2017 (7309 : Grey Oaks PUDA. PL20170001548) 9.B.15 Packet Pg. 332 Attachment: Legal Ad - Agenda #7309 (7309 : Grey Oaks PUDA. PL20170001548) Page 1 of 3 MEMORANDUM TO: COLLIER COUNTY PLANNING COMMISSION FROM: ZONING DIVISION – ZONING SERVICES SECTION HEARING DATE: NOVEMBER 1, 2018 SUBJECT: PUDA-PL20170001548, GREY OAKS PLANNED UNIT DEVELOPMENT (PUD) AND DOA-PL20170001729, GREY OAKS DEVELOPMENT OF REGIONAL IMPACT (DRI) The petitions PUDA-PL20170001548, Grey Oaks PUD, and DOA-PL20170001729, Grey Oaks DRI were continued from the September 6, 2018, CCPC hearing to the October 4, 2018, CCPC hearing and then to the November 1, 2018, CCPC hearing. Staff has received a revised Traffic Impact Statement (TIS). (Please see Attachment F-Revised TIS.) The revised TIS clarifies that the proposed 31-acre site will have a wholesale nursery and landscape contracting land uses. The previously proposed land uses of commercial landscaping, retail nursery comprised of outdoor sales and display area, and farmer’s market have been removed from the revised TIS. The Transportation Element contained in the September 6, 2018 CCPC Staff Report has been revised to state: Transportation Element: In evaluating this project, staff reviewed the applicant’s Traffic Impact Statement (TIS) for consistency with Policy 5.1 of the Transportation Element of the GMP using the 2017 Annual Update and Inventory Reports (AUIR). Policy 5.1 of the Transportation Element of the GMP states: “The County Commission shall review all rezone petitions, SRA designation applications, conditional use petitions, and proposed amendments to the Future Land Use Element (FLUE) affecting the overall countywide density or intensity of permissible development, with consideration of their impact on the overall County transportation system, and shall not approve any petition or application that would directly access a deficient roadway segment as identified in the current AUIR or if it impacts an adjacent roadway segment that is deficient as identified in the current Page 2 of 3 AUIR, or which significantly impacts a roadway segment or adjacent roadway segment that is currently operating and/or is projected to operate below an adopted Level of Service Standard within the five year AUIR planning period, unless specific mitigating stipulations are also approved. A petition or application has significant impacts if the traffic impact statement reveals that any of the following occur: a. For links (roadway segments) directly accessed by the project where project traffic is equal to or exceeds 2% of the adopted LOS standard service volume; b. For links adjacent to links directly accessed by the project where project traffic is equal to or exceeds 2% of the adopted LOS standard service volume; and c. For all other links the project traffic is considered to be significant up to the point where it is equal to or exceeds 3% of the adopted LOS standard service volume. Mitigating stipulations shall be based upon a mitigation plan prepared by the applicant and submitted as part of the traffic impact statement that addresses the project’s significant impacts on all roadways.” The proposed PUD Amendment on the subject property was reviewed based on the applicable 2017 AUIR Inventory Report. The TIS submitted in the application indicates that the proposed wholesale nursery and landscape contracting development will generate approximately 173 PM peak hour two-way trips, which according to the TIS, represents the same number of PM peak hour two-way trips remaining for retail use allowed by the existing PUD. The proposed development will impact the following roadway segments with the listed capacities: Roadway Link 2017 AUIR Existing LOS Current Peak Hour Peak Direction Service Volume/Peak Direction 2017 AUIR Remaining Capacity Livingston Road Pine Ridge Road to Golden Gate Parkway B 3,100/North 1,596 Livingston Road Golden Gate Parkway to Radio Road B 3,000/North 1,691 Golden Gate Parkway Airport Pulling Road to Livingston Road C 3,300/East 1,100 Page 3 of 3 Golden Gate Parkway Livingston Road to I-75 D 3,300/East 529 Based on the 2017 AUIR, the adjacent roadway network has sufficient capacity to accommodate the proposed trips for the amended project within the 5-year planning period. Therefore, the subject rezoning can be found consistent with Policy 5.1 of the Transportation Element of the GMP. Operational impacts will be addressed at the time of first development order ((Site Development Plan (SDP) or Plans and Plat(PPL)). Attachment: Revised TIS, dated September 27, 2018 END OF MEMORANDUM Supplemental Memo October 19, 2018 SUPPLEMENTAL MEMORANDUM TO: COLLIER COUNTY PLANNING COMMISSION FROM: ZONING DIVISION – ZONING SERVICES SECTION HEARING DATE: NOVEMBER 1, 2018 SUBJECT: PUDA-PL20170001548, GREY OAKS PLANNED UNIT DEVELOPMENT (PUD) AND DOA-PL20170001729, GREY OAKS DEVELOPMENT OF REGIONAL IMPACT (DRI) Through further discussions with the Transportation Planning Division and review of the most recent Traffic Impact Statement (TIS) submitted for the application (dated 9/27/2018), the proposed landscape nursery for which two access points are requested by the petitioner only generates 12 total PM peak hour trips. This volume only warrants one access point onto Livingston Road. Based upon this recognition, Staff is recommending the amendment be limited to a single access point off of Livingston Road. For further information, please see page 7 of the revised Traffic Impact Statement (TIS). (Please see Attachment G-Revised TIS.) END OF MEMORANDUM Traffic Impact Statement O’Donnell Nursery Planned Unit Development Amendment (PUDA) Collier County, Florida 09/27/2018 Prepared for: Prepared by: Peninsula Engineering 2600 Golden Gate Parkway Bonita Springs, FL 34105 Phone: 239-403-6700 Trebilcock Consulting Solutions, PA 1205 Piper Boulevard, Suite 202 Naples, FL 34110 Phone: 239-566-9551 Email: ntrebilcock@trebilcock.biz Collier County Transportation Methodology Fee – $500.00 Fee Collier County Transportation Review Fee – Major Study – $1,500.00 Fee O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 2 Statement of Certification I certify that this Traffic Impact Statement has been prepared by me or under my immediate supervision and that I have experience and training in the field of Traffic and Transportation Engineering. Norman J. Trebilcock, AICP, P.E. FL Registration No. 47116 Trebilcock Consulting Solutions, PA 1205 Piper Boulevard, Suite 202 Naples, FL 34110 Company Cert. of Auth. No. 27796 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 3 Table of Contents Project Description ................................................................................................ 4 Trip Generation – Traffic Analysis .......................................................................... 6 Trip Distribution and Assignment........................................................................... 8 Background Traffic ................................................................................................11 Existing and Future Roadway Network .................................................................12 Project Impacts to Area Roadway Network-Link Analysis .....................................12 Site Access Turn Lane Analysis ..............................................................................13 Improvement Analysis ..........................................................................................15 Mitigation of Impact .............................................................................................15 Appendices Appendix A: Project Master Site Plan ...................................................................16 Appendix B: Initial Meeting Checklist (Methodology Meeting) ............................18 Appendix C: Collier County Ordinance 2007-40 – Excerpt ....................................25 Appendix D: Collier County PUD Monitoring Report – Excerpt.............................27 Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan ..........................29 Appendix F: Trip Generation Calculations ITE 10th Edition ..................................31 Appendix G: Halstatt DRI Trip Generation Summary - Excerpt .............................36 Appendix H: Turning Movements Exhibit .............................................................38 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 4 Project Description The O’Donnell Nursey project is a proposed wholesale nursery development located on the west side of Livingston Road approximately 1,400 feet north of the intersection of Livingston Road and Golden Gate Parkway and directly south of the intersection of Livingston Road and Grey Oaks Drive East, and is generally located within Section 24/25, Township 49 South, Range 25 East, in Collier County, Florida. Refer to Figure 1 – Project Location Map, which follows and Appendix A: Project Master Site Plan. Figure 1 – Project Location Map The subject site consists of 2 parcels totaling approximately 31 acres in size and is currently zoned Planned Unit Development (PUD) as part of the Grey Oaks Development of Regional Impact (DRI). As allowed by the PUD commercial permitted uses, the project proposes 27 acres of wholesale nursery and landscape contracting. Neither the nursery nor landscaping uses are available to the general public and the only traffic accessing the site will be employees and their respective commercial vehicles entering and exiting the site. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 5 A methodology meeting was held with the Collier County Transportation Planning staff on August 24, 2016, via email (refer to Appendix B: Initial Meeting Checklist (Methodology Meeting)). It should be noted that the information included in the methodology was based on preliminary information which has been updated and is reflected in this analysis. For purposes of this evaluation, the project build-out year is assumed to be consistent with the Collier County 2023 planning horizon. Consistent with the approved Collier County Ordinance #2007-40, the Grey Oaks DRI site is currently allowed to be developed with up to 1,775 residential dwelling units, 1,303,091 sf of office/retail/commercial and 72 golf course holes. The approved development program associated with these land uses is shown in Table 1A, Existing Approved and Built Development Program. For details, see Appendix C: Collier County Ordinance 2007-40 – Excerpts and Appendix D: Collier County PUD Monitoring Report – Excerpts. Table 1A Existing Approved and Built Development Program ITE Land Use (Zoning Designation) ITE Land Use Code Approved Size Built to Date Size Single-Family Detached 210 1,775 du 1,341 du General Office Bldg. 710 653,453 sf 0 sf Shopping Center 820 649,638 sf 0 sf Golf Course 430 72 holes 72 holes The project plans to eliminate 2 commercial access locations (approved within the Grey Oaks DRI Master Plan); one from Golden Gate Parkway and one from Airport Road, and proposes a new driveway access location from Livingston Road to serve the proposed O’Donnell Nursery project with a directional left-in/right-in/right-out access onto southbound Livingston Road (north access). There is an existing right-in/right-out access onto southbound Livingston Road (south access). The project would like to reconfigure this driveway to a right-out only access with an option to maintain the existing access as is. For details, see Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan. The Developer elected to construct none of the commercial square footage. T he analysis will show that, from a traffic standpoint, this project is much less intensive than the approved commercial and retail uses currently allowed in the PUD/DRI. The project provides a highest and best use scenario with respect to the project’s proposed trip generation. The proposed development program is illustrated in Table 1B. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 6 Table 1B Proposed Development Program Development ITE Land Use ITE Land Use Code Total Size O’Donnell Nursery Nursery – Wholesale 818 27 acres Trip Generation – Traffic Analysis The project’s site trip generation is based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition. The software program OTISS – Online Traffic Impact Study Software (most current version) is used to create the raw unadjusted trip generation for the project. The ITE rates or equations are used for the trip generation calculations as applicable. The climate and demographic makeup of Collier County and the surrounding area create a large year-round demand for landscape contracting services. In order to account for this unique demand, a supplemental calculation was performed for anticipated additional traffic from the landscape contracting activities. Based on client provided data, trip generation was calculated to include employees arriving on site in the morning in personal vehicles, then departing in company trucks (a total of 50) to their respective landscape contracting projects. Similarly, the company trucks would return to the project site in the afternoon and the employees would leave the site in their personal vehicles. It is assumed there are 5-man crews per truck and that some carpooling will occur between employees, for an average of 3 personal vehicle trips per truck. The majority of trips are assumed to occur during the AM and PM peak hour time periods as applicable, however, it is understood that some trips will fall outside of the peak hour time periods. As such, for this analysis, 80% of the landscape contracting trips are assumed to occur during the peak hour time periods. Based on ITE recommendations, no internal capture or pass-by reductions have been taken into consideration for this development. The proposed PUDA development trip generation is illustrated in Table 2A. Detailed calculations can be found in Appendix F: Trip Generation Calculations ITE 10th Edition. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 7 Table 2A Trip Generation (Proposed PUDA Development) - Average Weekday Development AM Peak Hour PM Peak Hour Land Use Size Enter Exit Total Enter Exit Total Nursery - Wholesale 27 acres 5 2 7 3 9 12 Landscape Contracting* N/A 120 40 160 40 120 160 Total External 125 42 167 43 129 172 *Manually calculated based on client supplied data. In agreement with the Collier County Traffic Impact Study (TIS) guidelines, significantly impacted roadways are identified based on the proposed project highest peak hour trip generation (net new total) and consistent with the peak hour of the adjacent street traffic. Based on the information contained in Collier County 2017 Annual Update and Inventory Report (AUIR), the peak hour for the adjacent roadway network is PM peak hour. A purpose of this analysis is to generate a traffic comparison between the proposed project and the undeveloped retail land use within the Grey Oaks DRI. The projects total external PM peak hour 2-way trip generation is used to determine the potential traffic of the project and provides guidance as to the equivalent amount of retail square footage that would be required to produce the same traffic impact. The ITE LUC 820, shopping center, was used to model the trip generation for the commercial portion of the DRI. As illustrated in the Halstatt DRI – Development of Regional Impact Application for Development Approval dated May 26, 1989, Trip Generation Summary, trip generation rates were developed and internal capture and pass-by reductions were calculated for the various land uses comprising the DRI. The resulting reduction factors for commercial land use at Livingston Road are 18% for internal capture and 50% for pass-by reductions (for details see Appendix G: Halstatt DRI Trip Generation Summary – Excerpt). Table 2B Trip Generation Comparison – Shopping Center – PM Peak Hour Development PM Peak Hour Size (Rate) Enter Exit Total Total Traffic 70,500 sf 202 218 420 Internal Capture (18%) 38 38 76 Total External 164 180 344 Pass-by (50%) 86 86 172 Net External 78 94 172 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 8 Based on the results of the trip generation illustrated in Table 2B, 70,500 sf of shopping center is required to produce the same traffic impact as the proposed project, as illustrated in Table 2C. Table 2C Trip Generation Comparison – PM Peak Hour Development PM Peak Hour Size Enter Exit Total Proposed PUDA Development Per Table 2A 43 129 172 Proposed Retail Comparison 70,500 sf 78 94 172 Net Difference (35) 35 0 For the purpose of this TIS, the surrounding roadway network link concurrency analysis is analyzed based on projected PM peak hour Total External traffic generated by the proposed PUDA project. The site access turn lane analysis is calculated based on the Total External traffic during the weekday AM and PM peak hour (as shown in Table 2A). Trip Distribution and Assignment The new traffic generated by the O’Donnell Nursery project is assigned to the adjacent roadways using the knowledge of the area and as coordinated with Collier County Transportation Planning Staff. The site-generated trip distribution is shown in Table 3, Project Traffic Distribution for Peak Hour and is graphically depicted in Figure 2 – Project Distribution by Percentage and By PM Peak Hour. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 9 Table 3 Project Traffic Distribution for PM Peak Hour Roadway Link Collier County Link No. Roadway Link Location Distribution of Project Traffic Enter/(Exit) PM Peak Hour Project Vol.* Enter Exit Livingston Road 54.0 South of project to Golden Gate Parkway 50%/(100%) NB – 22 SB – 129 Livingston Road 54.0 North of project to Pine Ridge Road 50%/(N/A) SB – 21 N/A Livingston Road 55.0 Golden Gate Parkway to Radio Road 15%/(30%) NB – 6 SB – 39 Golden Gate Parkway 20.2 Livingston Road to I-75 20%/(40%) WB – 9 EB – 52 Golden Gate Parkway 20.1 Livingston Road to Airport Road 15%/(30%) EB – 6 WB – 39 Note(s): *Peak hour, peak direction traffic volumes are underlined and bold to be used in Roadway Link Level of Service calculations. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 10 Figure 2 – Project Distribution by Percentage and By PM Peak Hour O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 11 Background Traffic Average background traffic growth rates were estimated for the segments of the roadway network in the study area using the Collier County Transportation Planning Staff guidance of a minimum 2% growth rate, or the historical growth rate from annual traffic counts (estimated from 2008 through 2017), whichever is greater. Another way to derive the background traffic is to use the 2017 AUIR volume plus the trip bank volume. Table 4, Background Traffic without Project illustrates the application of projected growth rates to generate the projected background (without project) peak hour peak direction traffic volume for the build-out year 2023. Table 4 Background Traffic without Project (2017 - 2023) Roadway Link CC AUIR Link ID # Roadway Link Location 2017 AUIR Pk Hr, Pk Dir Background Traffic Volume (trips/hr) Projected Traffic Annual Growth Rate (%/yr)* Growth Factor 2023 Projected Pk Hr, Peak Dir Background Traffic Volume w/out Project (trips/hr) Growth Factor** Trip Bank 2023 Projected Pk Hr, Peak Dir Background Traffic Volume w/out Project (trips/hr) Trip Bank*** Livingston Road 54.0 South of project to Golden Gate Parkway 1,470 2.0% 1.1262 1,656 34 1,504 Livingston Road 54.0 North of project to Pine Ridge Road 1,470 2.0% 1.1262 1,656 34 1,504 Livingston Road 55.0 Golden Gate Parkway to Radio Road 1,270 2.0% 1.1262 1,431 39 1,309 Golden Gate Parkway 20.2 Livingston Road to I-75 2,770 2.0% 1.1262 3,120 1 2,771 Golden Gate Parkway 20.1 Livingston Road to Airport Road 2,200 2.0% 1.1262 2,478 0 2,200 Note(s): *Annual Growth Rate - from 2017 AUIR, 2% minimum. **Growth Factor = (1+Annual Growth Rate) 6. 2023 Projected Volume= 2017 AUIR Volume x Growth Factor. ***2023 Projected Volume= 2017 AUIR Volume + Trip Bank. The projected 2023 Peak Hour – Peak Direction Background Traffic is the greater of the Growth Factor or Trip Bank calculation, which is underlined and bold as applicable. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 12 Existing and Future Roadway Network The existing roadway conditions are extracted from the 2017 Annual Update and Inventory Report (AUIR) and the project roadway conditions are based on the current Collier County 5-Year Work Program. Roadway improvements that are currently under construction or are scheduled to be constructed within the five-year Transportation Improvement Plan (TIP) or Capital Improvement program (CIP) are considered to be committed improvements. As no such improvements were identified in the Collier County 201 7 AUIR, the evaluated roadways are anticipated to remain as such through project build-out. The existing and future roadway conditions are illustrated in Table 5, Existing and Future Roadway Conditions. Table 5 Existing and Future Roadway Conditions Roadway Link CC AUIR Link ID # Roadway Link Location Exist Roadway Min. Standard LOS Exist Peak Dir, Peak Hr Capacity Volume Future Project Build out Roadway Livingston Road 54.0 South of project to Golden Gate Parkway 6D E 3,100 (NB) 6D Livingston Road 54.0 North of project to Pine Ridge Road 6D E 3,100 (NB) 6D Livingston Road 55.0 Golden Gate Parkway to Radio Road 6D E 3,000 (NB) 6D Golden Gate Parkway 20.2 Livingston Road to I-75 6D E 3,300 (EB) 6D Golden Gate Parkway 20.1 Livingston Road to Airport Road 6D E 3,300 (EB) 6D Note(s): 2U = 2-lane undivided roadway; 4D, 6D, 8D =4-lane, 6-lane, 8-lane divided roadway, respectively; LOS = Level of Service. Project Impacts to Area Roadway Network-Link Analysis The Collier County Transportation Planning Services developed Level of Service (LOS) volumes for the roadway links impacted by the project, which were evaluated to determine the project impacts to the area roadway network in the future horizon (2023). The Collier County Transportation Planning Services guidelines have determined that a project will be considered to have a significant and adverse impact if both the percentage volume capacity exceeds 2% of the capacity for the link directly accessed by the project and for the link adjacent to the link directly accessed by the project; 3% for other subsequent links and if the roadway is projected to operate below the adopted LOS standard. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 13 Based on these criteria, this project does not create a significant impact on any of the analyzed. All links analyzed are projected to operate above the adopted LOS standard with or without the project at 2023 future build-out conditions. Table 6, Roadway Link Level of Service illustrates the LOS impacts of the project on the roadway network closest to the project. Table 6 Roadway Link Level of Service (LOS) – With Project in the Year 2023 Roadway Link CC AUIR Link ID # Roadway Link Location 2017 Peak Dir, Peak Hr Capacity Volume Roadway Link, Peak Dir, Peak Hr (Project Vol Added)* 2023 Peak Dir, Peak Hr Volume w/Project ** % Vol Capacity Impact by Project Min LOS exceeded without Project? Yes/No Min LOS exceeded with Project? Yes/No Livingston Road 54.0 South of project to Golden Gate Parkway 3,100 (NB) NB – 22 1,678 0.71% No No Livingston Road 54.0 North of project to Pine Ridge Road 3,100 (NB) N/A 1,656 N/A No No Livingston Road 55.0 Golden Gate Parkway to Radio Road 3,000 (NB) NB – 6 1,437 0.20% No No Golden Gate Parkway 20.2 Livingston Road to I-75 3,300 (EB) EB – 52 3,172 1.58% No No Golden Gate Parkway 20.1 Livingston Road to Airport Road 3,300 (EB) EB – 6 2,484 0.18% No No Note(s): *Refer to Table 3 from this report. **2023 Projected Volume = 2023 background (refer to Table 4) + Project Volume added. Site Access Turn Lane Analysis The project plans to eliminate 2 commercial access locations (approved within the Grey Oaks DRI Master Plan); one from Golden Gate Parkway and one from Airport Road, and proposes a new driveway access location from Livingston Road to serve the proposed O’Donnell Nursery project with a directional left-in/right-in/right-out access onto southbound Livingston Road (north access). There is an existing right-in/right-out access onto southbound Livingston Road (south access). The project would like to reconfigure this driveway to a right-out only access with an option to maintain the existing southern access as is. For details, refer to Appendix A: Project Master Site Plan and Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 14 Livingston Road is a 6-lane urban divided arterial roadway under Collier County jurisdiction, and has a posted legal speed of 45 mph in the vicinity of the project . Based on FDOT Index 301, design speed of 45 mph – urban conditions – the minimum turn lane length is 185 feet (which includes a 50 foot taper) plus required queue. Project access is evaluated for turn lane warrants based on Collier County Right -of-way Manual: (a) two-lane roadways – 40vph for right-turn lane/20vph for left-turn lane; (b) multi-lane divided roadways – right turn lanes shall always be provided; and c) when new median openings are permitted, they shall always include left turn lanes. Turn lane lengths required at build-out conditions are analyzed based on the number of turning vehicles in an average one-minute period for right-turning movements, and two-minute period for left-turning movements, within the peak hour traffic. The minimum queue length is 25 f eet and the queue/vehicle is 25 feet. Projected turning traffic movements are illustrated in Appendix G: Turning Movements Exhibits. Left-in/Right-in/Right-out North Access and Right-out only South Access A dedicated southbound right-turn lane is warranted as the project meets the multi-lane criteria. The proposed project is expected to generate 63vph and 22vph right-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 2 35 feet long (which includes a minimum of 50 feet of storage). As such, a 235 foot right-turn lane is recommended to accommodate projected traffic at this location. A dedicated northbound left-turn lane is warranted as the project meets the multi-lane criteria. There is an existing northbound left-turn lane approximately 550 feet long. The proposed project is expected to generate 62vph and 21vph left-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 260 feet long (which includes a minimum of 75 feet of storage). As such, the existing 550 foot left-turn lane is adequate to accommodate projected traffic at this location. Left-in/Right-in/Right-out North Access and Optional Right-in/Right-out South Access A dedicated southbound right-turn lane at the proposed north access is warranted as the project meets the multi-lane criteria. The proposed project is expected to generate 38vph and 13vph right-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 210 feet long (which includes a minimum of 25 feet of storage). As such, a 210 foot right-turn lane is recommended to accommodate projected traffic at this location. A dedicated northbound left-turn lane is warranted as the project meets the multi-lane criteria. There is an existing northbound left-turn lane approximately 550 feet long. The proposed project is expected to generate 62vph and 21vph left-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 260 feet long (which i ncludes a O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 15 minimum of 75 feet of storage). As such, the existing 550 foot left -turn lane is adequate to accommodate projected traffic at this location. A dedicated southbound right-turn lane at the proposed optional south access is warranted as the project meets the multi-lane criteria. The proposed project is expected to generate 25vph and 9vph right-turning movements during the AM and PM peak hour, respectively. At the minimum, the turn lane should be 210 feet long (which includes a minimum of 25 feet of storage). As such, a 210 foot right-turn lane is recommended to accommodate projected traffic at this location. A detailed evaluation of applicable access points will be performed at the time of site development permitting/platting to determine turn lane requirements as more accurate parameters become available, as applicable. Improvement Analysis Based on the results of the comparison analysis included in this report, this project’s traffic impact does not exceed the traffic generated by the approved PUD ordinance. As illustrated in the link analysis and trip distribution, the projected traffic does not create any significant impacts on the analyzed roadway segments of the study network. None of the analyzed links are projected to exceed the adopted LOS standard with or without the project at 2023 future build-out conditions. There is adequate and sufficient roadway capacity to accommodate the proposed development without adversely affecting adjacent roadway network level of service. Consistent with the site access turn lane analysis results, southbound right-turn lanes are recommended to accommodate traffic at build-out conditions. The existing northbound left-turn lane is adequate to accommodate projected traffic at this location. Mitigation of Impact From a zoning perspective, given that access is eliminated on Golden Gate Parkway and Airport Road due to less intensive established land uses there and this proposal does not create a net increase in development external trips as compared to the original development parameters, the prior established DRI mitigation should be deemed satisfactory. O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 16 Appendix A: Project Master Site Plan O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 17 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 18 Appendix B: Initial Meeting Checklist (Methodology Meeting) O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 19 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 20 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 21 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 22 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 23 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 24 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 25 Appendix C: Collier County Ordinance 2007-40 – Excerpt O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 26 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 27 Appendix D: Collier County PUD Monitoring Report – Excerpt O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 28 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 29 Appendix E: Grey Oaks DRI – Conceptual Roadway Master Plan O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 30 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 31 Appendix F: Trip Generation Calculations ITE 10th Edition O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 32 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 33 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 34 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 35 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 36 Appendix G: Halstatt DRI Trip Generation Summary - Excerpt O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 37 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 38 Appendix H: Turning Movements Exhibit O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 39 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 40 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 41 O’Donnell Nursery – PUDA TIS – September 2018 Trebilcock Consulting Solutions, PA P a g e | 42