Backup Documents 06/26/2018 Item #16A 2 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 A 2
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
.
2.
3. County Attorney Office County Attorney Office
4. BCC Office Board of County ` \'S‘t>tk It 11\1%
Commissioners IWV
5. Minutes and Records Clerk of Court's Office
AT- \\ 1711 :o1/0
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Jodi Hughes Phone Number x-5744
Contact/ Department
Agenda Date Item was 6/26/18 Agenda Item Number 16A2 fr/'
Approved by the BCC
Type of Document Plat _ Number of Original 1
Attached ��'�J' Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? itRis
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency; Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney. JH
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JR
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 6/26/18 and all changes made
during the meeting have been incorporated in the attached document. The County 777 Attorney's Office has reviewed the changes,if applicable. —9. Initials of attorney verifying that the attached document is the version approved by the '
BCC,all changes directed by the BCC have been made,and the document is ready f•, the
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed roofing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must he received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through 112,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office
4. BCC Office Board of County P••S
Commissioners ,
1
5. Minutes and Records Clerk of Court's Office
• 47.D1pri-x,
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Jodi Hughes Phone Number x-5744
Contact/ Department /
Agenda Date Item was 6/26/18 - / Agenda Item Number 16A2
Approved by the BCC v
Type of Document Bond,Maintenance Agreement Number of Original 2
Attached � Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Ap licable)
1. Does the document require the chairman's original signature? "771'
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address;Phone) on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney. JH
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 6/26/18 and all changes made during p.:**4
the meeting have been incorporated in the attached document. The County A ption far
Attorney's Office has reviewed the changes,if applicable. - 4$1
9. Initials of attorney verifying that the attached document is the version approved by the • '400.:"",P,
BCC,all changes directed by the BCC have been made,and the document is ready for the o.:r r fo
Chairman's signature. taw :
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
16 A2
MEMORANDUM
Date: November 7, 2018
To: Jodi Hughes, Project Manager
Growth Management Department
From: Ann Jennejohn, Deputy Clerk
Minutes & Records Department
Re: Plat/Letter of Credit FGAC - 18391 and the Construction and
Maintenance Agreement related to Bent Creek Preserve Phase 2A
Attached for your records are copies of the documents referenced above, (Item #16A2)
approved by the Board of County Commissioners on Tuesday, June 26, 2018.
The original documents will be held in the Minutes and Records Department for the
Board's Official Record.
If you have any questions, please contact me at 252-8406.
Thank you.
Attachment
1 6 A 2
CONSTRUCTION AND MAINTENANCE AGREEMENT
FOR SUBDIVISION IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS entered into this 21'day of August 2018,between Standard Pacific of Florida
hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County,
Florida, hereinafter referred to as the "Board".
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the
approval by the Board of a certain plat of a subdivision to be known as: Bent Creek Preserve Phase
2A.
B. Chapters 4 and 10 of the Collier County Land Development Code requires the Developer
to post appropriate guarantees for the construction of the improvements required by said
subdivision regulations; said guarantees to be incorporated in a bonded agreement for the
construction of the required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants
hereinafter set forth, Developer and the Board do hereby covenant and agree as follows:
1. Developer will cause to be constructed: Site improvements including but not
limited to installation of storm drainage, potable water, sanitary sewer, and roadway construction
associated with Bent Creek Preserve Phase 2A (PL20180000294) within 12 months from the date
of approval said subdivision plat, said improvements hereinafter referred to as the required
improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto
as Exhibit"A"and by reference made a part hereof)in the amount of$1,387,696.48. which amount
represents 10% of the total contract cost to complete construction plus 100% of the estimate cost
of to complete the required improvements at the date of this Agreement.
3. In the event of default by the Developer or failure of the Developer to complete
such improvements within the time required by the Land Development Code, Collier County may
call upon the subdivision performance security to insure satisfactory completion of the required
improvements.
4. The required improvements shall not be considered complete until a statement of
substantial completion by Developer's engineer along with the final project records have been
16A2
furnished to be reviewed and approved by the County Manager or his designee for compliance
with the Collier County Land Development Code.
5. The County Manager or his designee shall, within sixty (60) days of receipt of the
statement of substantial completion, either: a) notify the Developer in writing of his preliminary
approval of the improvements; or b) notify the Developer in writing of his refusal to approve
improvements, therewith specifying those conditions which the Developer must fulfill in order to
obtain the County Manager's approval of the improvements. However, in no event shall the
County Manager or his designee refuse preliminary approval of the improvements if they are in
fact constructed and submitted for approval in accordance with the requirements of this
Agreement.
6. The Developer shall maintain all required improvements for a minimum period of
one year after preliminary approval by the County Manager or his designee. After the one year
maintenance period by the Developer has terminated, the Developer shall petition the County
Manager or his designee to inspect the required improvements. The County Manager or his
designee shall inspect the improvements and, if found to be still in compliance with the Collier
County Land Development Code as reflected by final approval by the Board, the Board shall
release the remaining 10% of the subdivision performance security. The Developer's
responsibility for maintenance of the required improvements shall continue unless or until the
Board accepts maintenance responsibility for and by the County.
7. Six (6) months after the execution of this Agreement and once within every six (6)
months thereafter the Developer may request the County Manager or his designee to reduce the
dollar amount of the subdivision performance security on the basis of work complete. Each request
for a reduction in the dollar amount of the subdivision performance security shall be accompanied
by a statement of substantial completion by the Developer's engineer together with the project
records necessary for review by the County Manager or his designee. The County Manager or his
designee may grant the request for a reduction in the amount of the subdivision performance
security for the improvements completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this
Agreement, upon certification of such failure, the County Manager or his designee may call upon
the subdivision performance security to secure satisfactory completion, repair and maintenance of
the required improvements. The Board shall have the right to construct and maintain, or cause to
16 A2
be constructed or maintained,pursuant to public advertisement and recei t and acceptance of bids,
the improvements required herein. The Developer,as principal under: e subdivision performance
security, shall be liable to pay and to indemnify the Board, upon completion of such construction,
the final total cost to the Board thereof, including, but not li ited to, engineering, legal and
contingent costs, together with any damages, either direct or c• sequential, which the Board may
sustain on account of the failure of the Developer to fulfill all 'if the provisions of this Agreement.
9. All of the terms,covenants and conditions her:in contained are and shall be binding
upon the Developer and the respective successors and assign. of the Developer.
IN WITNESS WHEREOF, the Board and the Deveper have caused this Agreement to
be executed by their duly authorized representatives this 21st o ay of August, 2018.
SIGNED IN THE PRESENCE OF: (Name of . ity)
By:
int Name: cco ti\ no Darin McMurray,VP
Standard Pacific of Florida GP, Inc.the
General Partner of Standard Pacific of
Florida
• ,
Pr n :me: figINNIM
ATTEST: BOARD OF C► • TY COMMI ONERS
CRYSTAL K. KINZEL, CLERK OF COLLI. CO . TY, Fie: '.
..
By: 41 t(:) ` By:
Atte as to Coal' lc9 <".puty Clerk Andy Solis, Chairman
sign tureonly: -�
Approved as to form <44 I cis. •4"
L(J-2-62.
It�n#
Agenda '?
Soctt A. Stone Date
Assistant County Attorney
Date 42.
Approved Form—JAK—February 2006 Rec d
•
'ep"ty , ,
1 6 A 2
FIDELITY GUARANTY AND ACCEPTANCE CORP 111
700 NW 107 AVENUE - SUI 1 E 204
MIAMI FLORIDA 33 172
PHONE ( 30 5 ) 5 5 3 -8 7 2 4
IRREVOCABLE STANDBY LETTER OF CREDIT NO. FGAC-I 8391
ISSUER: FIDELITY GUARANTY AM)ACCEPTANCE CORP.(HEREIN 1f I I 14..'
700 NW 107TH AVENUE,SUITE 204
MIAMI,FLORIDA 331 72
PHONE(305)553-8724
DATE OF ISSUE: AUGUST 22,2018
PLACE OF EXPIRY: AT ISSUER'S COUNTERS LOCATED AT 700 NW 107 AVE,MIRE 204
MIAMI,FLORIDA 33172
DATE OF EXPIRN: THIS CREDIT SHALL BE MAD EN I IL At GT ST 22.2019,AND SHALL THEREAFTER
BE it TOMATIC ALLY RENEW ED FOR SC(CESSIN E ONE-N EAR PERIODS ON THE
ANN R FRSARY OF THE ISSUE I NI FSS 1 T I.EAS I SINT'S (60)DAYS PRIOR TO 1,N
SUCH ANNIVERSARY DA FE, THE ISSUER NOTIFIES THE BENEFICRRY IN
WRITING BY REGISTERED MAIL THAT THE ISSUER ELECTS NOT TO RENEW THIS
CREDIT.
APPLICANT: STANDARD PACIFIC OF FLORIDA GP,INC(HEREINAFTER-DEVELOPER")
1Q481 SIX MI1.1:CYPRESS PARK
FORT MYERS,FLORIDA 33966
BENEFICIARY: THE BOARD OF COUNTY COMMISSIONERS,COLLIER COUNTY,FLORIDA
(HEREINAFTER"BENEFICIARY")
C/0 DEVELOPMENT REVIEW DIVISION
2860 NORTH HORSESHOE DRIVE
NAPLES,FL 34104
AMOUNT: UP TO AN AGGREGATE AMOUNT OF$1,387,396,48(ONE MILLION THREE HUNDRED
EIGHTS' SEVEN THOUSAND THREE HUNDRED NINETY SIX AND 48/00 US
DOLLARS)
RE: INFRASTRUCTURE CONSTRUCTION
PROJECT NAME:BENT CREEK PRESERVE PHASE 2A
CREDIT AVAILABLE
WITH: ISSUER
BY: PAYMENT AGAINST DOCUMENTS DETAILED HEREIN AND BENEFICIARY'S
DRAFTS AT SIGHT DRAWN ON THE ISSUER.
DOCUMENTS REQUIRED: AVAILABLE BY BENEFICIARY'S DRAFT(S) AT SIGHT DRAW N ON THE ISSUER
AND PRESENTED AT PLACE OF EXPIRY ACCOMPANIED BY BENEFICIARY'S STAI EM EN I PURPORTEDLY
MANUALLY SIGNED AND DATED BY THE COUNTY MANAGER.,OR HIS DESIGNEE,CERTIFYING THAT:
A. "(I) DEVELOPER HAS FAILED TO CONSTRUCT AND/OR MAINTAIN THE IMPROVEMENTS
ASSOCIATED WITH THAT CERTAIN PLAT OF A SUBDIVISION KNOWN AS BENT CREEK PRESERVE
PHASE 2A AS REQUIRED BY COLLIER COUNTY ORDINANCES AND RESOLUTIONS (THE -LAND
DEVE,LOPMENT REGULATIONS"); (II) DEVELOPER HAS BEEN GIVEN 11!OTT EN NOTICE
DESCRIBING THE EVENT OR CONDITION OF SUCH DEE tIN REASON 1131 E DE I AIL BS
CERTIFIED MAIL,RETURN RECEIPT REQUESTED;AND(III)THE DEFAULT HAS NOT BEEN CURED
WITHIN THE CURE PERIOD PROVIDED FOR THEREIN,IF ANY.":
OR
B. "A FINAL INSPECTION OF THE IMPROVEMENTS FOR BENT CREEK PRESERVE PHASE 2A AS
REQUIRED BY COLLIER COUNTS ORDINANCES AND RESOLU TIONS(THE -LAND DEVELOPMENT
RE( t LAIIONS") SATISFACTORY TO COLLIER COUNTS HAS NOF BEEN PERFORMED PRIOR TO
THE DATE OF EXPIRY,AND A SATISFACTORY ALTERNATIVE PERFORMANCE SECURITY HAS NOT
BEEN PROVIDED TO AND ACCEPTED BY THE BENEFICIARY."
1 6 A 2
FIDELITY GUARANTY AND ACCEPTANCE CORP .
700 NW 107 AVENUE - SUITE 204
MIAMI , FLORIDA 331 7 2
PHONE ( 305 ) 553 -8724
THIS IS AN INTEGRAL PART OF LETTER OF CREDIT NO.ECAC-18391 PAGE 2
DRAFT(S) DRAW N UNDER THIS LETTER OF CREDIT SHALL BE MARKED: -DRAWN UNDER FIDELITY
GUARANT AND ACCEPTANCE CORP. CREDIT NO. FGAC-I8391, DTE[) At GT ST 22, 2018 AND MUST BE
ACCOMPANIED B\ THIS ORIGINAL LETTER OF CREDIT AND ALL ORIGIN AL AMENDMENTS, IF ANY, FOR
PROPER ENDORSEMENT.
THIS LETTER OF CREDIT SETS FORTH IN FILL THE TERMS OF THE ISSUER'S UNDERTAKING,AND SUCH
UNDERTAKING SHALL NOT IN AN I AN AV BE MODIFIED, AMENDED, OR ANIPLIE IED BY REFERENCE TO
ANY DOCUMENT,INSTRUMENT,OR AGREEMENT REFERENCED TO HEREIN OR IN WHICH THIS LETTER
OF CREDIT RELATES,AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY
REFERENCE ANY DOCUMENT,INSTRUMINI OR AGREEMENT.
ISSUER HEREBY ENGAGES WITH BENEFICIARY THAT DRAFT(S) DRAWN UNDER AND IN COMPLIANCE
WITH THE TERMS AND CONDITIONS OF THIS CREDIT WIEL BE MIN HONORED BY ISSUER IF PRESENTED
WITHIN THE VALIDITY OF THIS CREDIT TOGETHER WITI I THE DOCUMENTS REQUIRED HEREIN AT THE
PLACE OF EXPIRY PRIOR TO 4:00 PA.EST.ON OR PRIOR TO THE DATE OF EXPIRY.PRESENTATIONS MAN
BE MADE B\ CERTIFIED OR REGISTE.RED MAIL,RETURN RECEIPT REQI ESTED OR BY FEDLICkLEXPRESS
OR ANY OTHER NATIONALLY RECOGNIZED COURIER COMPANY.
THIS CREDIT IS SUBJECT TO THE UNIFORM CUSTOMS AND PRACTICE FOR DOCUMENTARY CREDITS(2007
REVISION)INTERNATIONAL CHAMBER OF COMMERCE PUBLICATION NO.600,
FIDELI FY GUARANTY AND ACCEPTANCE CORP.
TA v NE VE SOUZA,V CE PRESIDENT
1 6 A 2
ENGINEERING
State of Florida Business Certificate No,EB-0007663
Bent Creek Preserve Phase 2A
Engineer's Opinion of Probable Costs
SUMMARY
(S) SANITARY SEWER SUB-TOTAL $290,816.50
(W) POTABLE WATER SUB-TOTAL $208,683.00
(D) STORM DRAINAGE SUB-TOTAL $376,569.00
(P) PAVING AND GRADING SUB-TOTAL $366,930.79
(T) IMMOKALEE ROAD TURN LANE IMPROVEMENTS SUB-TOTAL $12,178.44
(L) LANDSCAPING SUB-TOTAL' $6,091.80
TOTAL. $1,261,269.53
110% BONDING AMOUNT $1,387,396.48
Note:
1, This Engineer's Opinion of Probable Cost represents the estimated cost for constructing the above
listed infrastructure for Bent Creek Preserve Phase 2A(RWA,Inc.File No,030008.11.04,REV 5 dated
February 15,2018).
2. Landscaping cost provided by Chuck Yanette,signed and sealed 9/1/2017,
i,,,,,
E 0/1/4A, Doptalls sipneck by Michael C.Pappas F.E.
• 60910 State of Flonda
„Aks. es DA,cn4P4ehael F.Pappas P.F.&MO State
CS' .o -; of Florida.cmPrinted copies of the
Tif2.4.17. document are not considered signed and
ek • t coaled
ande rwa 11=-,12:ityt eenct,',Aoant co rsz dr,
oi •
and sealml using aH
'" beSenhelaeck7tatiohne'n"tilclysiognned
0 R kc) S codes And,ernail=topoppasefaconsuln
sez. es,.••-kek s•.11 rwecorn,cssiSS
<lb:AL 05-', Date 2019 02.22 09003.34 0405
Illif 110 t%°
Michael C.Pappas,P.E.#60910
RWA, Inc.
6610 Willow Park Drive,Ste 200
Naples, Florida 34109
4983 Royal Gulf Circle
Fort Myers, Florida 33966
Phone:(239)597-0575 7/27/2018
Fax:(239)597-0578 9:45 AM
1 6 A 2 • r
ENGINEERING
Certificate of Business Certificate No,EB-0007663
Engineer's Opinion of Probable Construction Costs
Project: Bent Creek Preserve Phase 2A
Date:February 22,2018
Estimated By:David Poteete
Checked By: Michael Pappas
1
SANITARY SEWER
DESCRIPTION UNIT - QUANTITY UNIT TOTAL
COST
Si 8"PVC Sanitary Sewer Main(0'-6'cut) LF 705 $33.00 $23,265.00
5-2 8"PVC Sanitary Sewer Main(6'-8'cut) LF 1,014 $44.00 $44,616.00
S-3 8"PVC Sanitary Sewer Main(8.-10cut) LF 481 554.00 $25,974.00
5-4 8"PVC Sanitary Sewer Main(10'-12'cut) LF 550 $64.00 $35,200.00
S-5 8"PVC Sanitary Sewer Main(12'-18'cut) LF 193 $78.00 $15,054.00 I
i
5-6 4'Diameter Manhole(0'-6'depth) EA 4 $4,800.00 $19,200.00
S-7 4"Diameter Manhole(6.-8'depth) EA 3 55,500.00 516,500.00
5-8 4'Diameter Manhole(8'-10'depth) EA 2 $6,300.00 $12,600.00
5-9 4'Diameter Manhole(10'-12'depth) EA 3 $7,200.00 $21,600.00
5-10 4'Diameter Manhole(1248'depth) EA 1 511,800,00 511,800.00
5-11 Drop Manhole Connection EA 0 $2,000.00 $0,00
5-12 Single Sewer Lateral EA 9 5850.00 $7,650.00
S-13 Double Sewer Lateral EA 45 $980.00 $44,100.00
S-14 Television Inspection IF 2,943 52.50 $7,357.50
S-15 Connect to Existing Manhole EA 1 $3,400,00 $3,400.00
5-16 Connect to Existing 8"PVC Sanitary Main EA 1 $2,500,00 $2,500.00
Sanitary Sewer Sub-Total $290,816.50
2018-02-14 Phase 2A OPC 7/27/2018
1 6 A2
fiWk
ENGINEERING
Certificate of Business Certificate No.EB-0007663
Engineer's Opinion of Probable Construction Costs
Project: Bent Creek Preserve Phase 2A
Date:February 22,2018
Estimated By:David Poteete
Checked By: Michael Pappas
POTABLE WATER
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
W-1 6"PVC Water Main(C-900, DR 18,PC150) LF 104 $20.00 $2,080.00
W-2 8"PVC Water Main(C-900, DR 18,PC150) LF 3,129 $25.00 $78,225.00
W-3 8"PVC Water Main(C-900,DR 14,PC200) LF 76 $28.00 $2,128.00
W-4 18"Steel Casing LF 10 $50.00 $500.00
W-5 6"Gate Valve w/Box EA 1 $1,200.00 $1,200.00
W-6 8"Gate Valve w/Box EA 8 $1,400.00 $11,200.00
W-7 Air Release Valve)AFD-TSP-BOV) EA 1 $4,200.00 $4,200.00
W-8 Fire Hydrant Assembly w/Valve EA 7 $4,500.00 $31,500.00
W-9 Permanent Sample Point EA 2 $1,500.00 $3,000.00
W-10 Hot-Tap(Includes 12"x8"Tapping Sleeve and Valve) LS 1 54,500.00 54,500.00
W-11 Single Water Service EA 39 $750.00 $29,250.00
W-12 Double Water Service EA 30 $900.00 $27,000.00
W-13 Temporary Gap Configuration EA 3 $3,800.00 $11,400.00
W-14 Testing LS 1 $2,500.00 $2.500.00
Potable Water Sub-Total $208,683.00
2018-02-14 Phase 2A OPC 7/27/2018
1 6 A2
W
ENGINEERING
Certificate of Business Certificate No.ES-0007653 •
Engineer's Opinion of Probable Construction Costs
Project: Bent Creek Preserve Phase 2A
Date:February 22,2018
Estimated By:David Poteete
Checked By: Michael Pappas
STORM DRAINAGE
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
D-1 15"RCP LF 464 $28.00 512,992.00
D-2 18"RCP LF 326 $36,00 $11,736.00
D-3 24"RCP LF 911 $55.00 $50,105.00
D-4 30"RCP LF 295 $72.00 $21,240.00
D-5 42"RCP LF 1,367 $98.00 $133,966.00
D-6 3'x 4Valley Gutter Inlet EA 14 53,300.00 $46,200.00
D-7 5'x 5'Valley Gutter Inlet EA 2 $4,500.00 $9,000.00
D-8 Type'C'Inlet EA 7 $2,400.00 $16,800.00
D-9 Type'G'Inlet EA 4 $3,700.00 $14,800.00
D-10 5'X 5'Junction Box EA 2 54,200.00 $8,400.00
D-11 24"FES EA 3 $1,400.00 $4,200.00
D-12 42"FES EA 1 $2,800.00 $2,800.00
D-13 Yard Drain EA 9 51,100.00 $9,900.00
D-14 10"Yard Drain Pipe IF 811 514.00 $11,354.00
D-15 12"Yard Drain Pipe LF 457 518,00 $8,226.00
D-16 Rock Excavation LF 990 $15.00 $14,850.00
Storm Drainage Sub-Total $376,569,00
7/27/2018
2018-02-14 Phase 2A OPC
i
1 6 A 2 .
11-1-1 ki
ENGINEERING
Certificate of Business Certificate No,EB-0007663
Engineer's Opinion of Probable Construction Costs
Project: Bent Creek Preserve Phase 2A
Date:February 22,2018
Estimated By:David Poteete
Checked By: Michael Pappas
PAVING AND GRADING
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
P-1 Mobilization LS 1 512,000.00 512,000.00
P-2 Staked Silt Fence LF 1,872 51.25 $2,340.00
P-3 Double Silt Fence LF 3,104 $2.50 $7,760.00
P-4 12"Stabilized Subgrade(LBR 40) SY 9,329. $2.80 $26,121.20
P-5 8"Limerock Base(LBR 100) SY 7,198 $8.50 $61,183.00
P-6 3/4"Type S-III ACSC(1st Lift) SY 7,198 $4,70 533,830.60
P-7 3/4"Type S-III ACSC(2nd Lift) SY 7,198 $6.00 $43,188.00
P-8 Concrete Valley Gutter LF 6,405 $8.00 $51,240.00
P-9 Remove Existing Valley Gutter LF 108 $8.00 $864.00
P-10 24"Ribbon Curb LF 48 $28.00 $1,344.00
P-11 5'Sidewalk LF 6,296 $12.00 $75,552.00
P-12 ADA Curb Ramps EA 4 $500.00 52,000.00
P-13 Sod(4'strip between curb and sidewalk) SY 2,847 $1.72 54,907.99
P-14 Signing and Striping LS 1 $5,000.00 $5,000.00
P-15 Street Lights EA 18 52,200.00 $39,600.00
Paving and Grading Sub-Total $366,930,79
2018-02-14 Phase 2A OPC 7/27/2018
1 6 A 2
ENGINEERING
Certificate of Business Certificate No.EB-0007663
Engineer's Opinion of Probable Construction Costs
Project: Bent Creek Preserve Phase 2A
Date:February 22,2018
Estimated By:David Poteete
Checked By: Michael Pappas
IMMOKALEE ROAD TURN LANE IMPROVEMENTS
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
P-1 Remove and Dispose Type'FCurb LF 124 $2.50 $310.00
P-2 12"Stabilized Subgrade(LBR 40) SY 103 $5.00 $515.00
P-3 10"Limerock Base(LBR 100) SY 89 $10.00 $890.00
P-4 3.5"Type SP-12.5 ACSC SY 89 $11.00 $979.00
P-5 1.5"Type FC-12.5 Friction Course SY 89 $800 $712.00
P-6 Type'F'Curb LF 124 $14.00 $1,736.00
P-7 8'Concrete Sidewalk LF 124 $31.81 $3,944.44
P-8 Concrete Sidewalk Removal LF 124 $8.00 $992.00
P-9 Adjust Manhole Rim/Top LS 1 $500.00 $500.00
P-10 Signing and Striping LS 1 $1,600.00 $1,600.00
Immokalee Road Turn Lane Improvements Sub-Total $12,178.44
2018-02-14 Phase 2A OPC 7/27/2018
1
16A2
BENT CREEK PRESERVE-PHASE 2A
PROJECT NO.: 11-060 ,9 An Iltgithp
DATE: 09/0111?
OPINION OF LANDSCAPE COST PARKER-YANNE1TF,
deign group,inc.
Item No, Item Quantity Unit Price Subtotal Description
B. Trees
i. Quercus vir iniana J Live Oak 5 $225.00 $1.125.00 10'x 5'.2"cal..full cans•
Subtotal $1,125-00
D. Miscellaneous
2 SOD 8810 $0.28 $2:466.80
3. IRRIGATION 1 $2,500.00 $2,500.00
Subtotal $4,066.80
IGRANO TOTAL T $6,051.80
II.
Digitally signed by
Charles
Charles Yannette
Date:2017.°9.01
Yannette
14:16:42 -04'00'