Loading...
Backup Documents 06/26/2018 Item #16A 2 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 A 2 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date . 2. 3. County Attorney Office County Attorney Office 4. BCC Office Board of County ` \'S‘t>tk It 11\1% Commissioners IWV 5. Minutes and Records Clerk of Court's Office AT- \\ 1711 :o1/0 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Jodi Hughes Phone Number x-5744 Contact/ Department Agenda Date Item was 6/26/18 Agenda Item Number 16A2 fr/' Approved by the BCC Type of Document Plat _ Number of Original 1 Attached ��'�J' Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? itRis 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency; Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. JH 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JR document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 6/26/18 and all changes made during the meeting have been incorporated in the attached document. The County 777 Attorney's Office has reviewed the changes,if applicable. —9. Initials of attorney verifying that the attached document is the version approved by the ' BCC,all changes directed by the BCC have been made,and the document is ready f•, the Chairman's signature. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed roofing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must he received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through 112,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office 4. BCC Office Board of County P••S Commissioners , 1 5. Minutes and Records Clerk of Court's Office • 47.D1pri-x, PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Jodi Hughes Phone Number x-5744 Contact/ Department / Agenda Date Item was 6/26/18 - / Agenda Item Number 16A2 Approved by the BCC v Type of Document Bond,Maintenance Agreement Number of Original 2 Attached � Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Ap licable) 1. Does the document require the chairman's original signature? "771' 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone) on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. JH 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 6/26/18 and all changes made during p.:**4 the meeting have been incorporated in the attached document. The County A ption far Attorney's Office has reviewed the changes,if applicable. - 4$1 9. Initials of attorney verifying that the attached document is the version approved by the • '400.:"",P, BCC,all changes directed by the BCC have been made,and the document is ready for the o.:r r fo Chairman's signature. taw : I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16 A2 MEMORANDUM Date: November 7, 2018 To: Jodi Hughes, Project Manager Growth Management Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Plat/Letter of Credit FGAC - 18391 and the Construction and Maintenance Agreement related to Bent Creek Preserve Phase 2A Attached for your records are copies of the documents referenced above, (Item #16A2) approved by the Board of County Commissioners on Tuesday, June 26, 2018. The original documents will be held in the Minutes and Records Department for the Board's Official Record. If you have any questions, please contact me at 252-8406. Thank you. Attachment 1 6 A 2 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this 21'day of August 2018,between Standard Pacific of Florida hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board". RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of a certain plat of a subdivision to be known as: Bent Creek Preserve Phase 2A. B. Chapters 4 and 10 of the Collier County Land Development Code requires the Developer to post appropriate guarantees for the construction of the improvements required by said subdivision regulations; said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: Site improvements including but not limited to installation of storm drainage, potable water, sanitary sewer, and roadway construction associated with Bent Creek Preserve Phase 2A (PL20180000294) within 12 months from the date of approval said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit"A"and by reference made a part hereof)in the amount of$1,387,696.48. which amount represents 10% of the total contract cost to complete construction plus 100% of the estimate cost of to complete the required improvements at the date of this Agreement. 3. In the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier County may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been 16A2 furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. 5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or his designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manager or his designee. After the one year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or his designee to inspect the required improvements. The County Manager or his designee shall inspect the improvements and, if found to be still in compliance with the Collier County Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or his designee to reduce the dollar amount of the subdivision performance security on the basis of work complete. Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or his designee. The County Manager or his designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or his designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to 16 A2 be constructed or maintained,pursuant to public advertisement and recei t and acceptance of bids, the improvements required herein. The Developer,as principal under: e subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the Board thereof, including, but not li ited to, engineering, legal and contingent costs, together with any damages, either direct or c• sequential, which the Board may sustain on account of the failure of the Developer to fulfill all 'if the provisions of this Agreement. 9. All of the terms,covenants and conditions her:in contained are and shall be binding upon the Developer and the respective successors and assign. of the Developer. IN WITNESS WHEREOF, the Board and the Deveper have caused this Agreement to be executed by their duly authorized representatives this 21st o ay of August, 2018. SIGNED IN THE PRESENCE OF: (Name of . ity) By: int Name: cco ti\ no Darin McMurray,VP Standard Pacific of Florida GP, Inc.the General Partner of Standard Pacific of Florida • , Pr n :me: figINNIM ATTEST: BOARD OF C► • TY COMMI ONERS CRYSTAL K. KINZEL, CLERK OF COLLI. CO . TY, Fie: '. .. By: 41 t(:) ` By: Atte as to Coal' lc9 <".puty Clerk Andy Solis, Chairman sign tureonly: -� Approved as to form <44 I cis. •4" L(J-2-62. It�n# Agenda '? Soctt A. Stone Date Assistant County Attorney Date 42. Approved Form—JAK—February 2006 Rec d • 'ep"ty , , 1 6 A 2 FIDELITY GUARANTY AND ACCEPTANCE CORP 111 700 NW 107 AVENUE - SUI 1 E 204 MIAMI FLORIDA 33 172 PHONE ( 30 5 ) 5 5 3 -8 7 2 4 IRREVOCABLE STANDBY LETTER OF CREDIT NO. FGAC-I 8391 ISSUER: FIDELITY GUARANTY AM)ACCEPTANCE CORP.(HEREIN 1f I I 14..' 700 NW 107TH AVENUE,SUITE 204 MIAMI,FLORIDA 331 72 PHONE(305)553-8724 DATE OF ISSUE: AUGUST 22,2018 PLACE OF EXPIRY: AT ISSUER'S COUNTERS LOCATED AT 700 NW 107 AVE,MIRE 204 MIAMI,FLORIDA 33172 DATE OF EXPIRN: THIS CREDIT SHALL BE MAD EN I IL At GT ST 22.2019,AND SHALL THEREAFTER BE it TOMATIC ALLY RENEW ED FOR SC(CESSIN E ONE-N EAR PERIODS ON THE ANN R FRSARY OF THE ISSUE I NI FSS 1 T I.EAS I SINT'S (60)DAYS PRIOR TO 1,N SUCH ANNIVERSARY DA FE, THE ISSUER NOTIFIES THE BENEFICRRY IN WRITING BY REGISTERED MAIL THAT THE ISSUER ELECTS NOT TO RENEW THIS CREDIT. APPLICANT: STANDARD PACIFIC OF FLORIDA GP,INC(HEREINAFTER-DEVELOPER") 1Q481 SIX MI1.1:CYPRESS PARK FORT MYERS,FLORIDA 33966 BENEFICIARY: THE BOARD OF COUNTY COMMISSIONERS,COLLIER COUNTY,FLORIDA (HEREINAFTER"BENEFICIARY") C/0 DEVELOPMENT REVIEW DIVISION 2860 NORTH HORSESHOE DRIVE NAPLES,FL 34104 AMOUNT: UP TO AN AGGREGATE AMOUNT OF$1,387,396,48(ONE MILLION THREE HUNDRED EIGHTS' SEVEN THOUSAND THREE HUNDRED NINETY SIX AND 48/00 US DOLLARS) RE: INFRASTRUCTURE CONSTRUCTION PROJECT NAME:BENT CREEK PRESERVE PHASE 2A CREDIT AVAILABLE WITH: ISSUER BY: PAYMENT AGAINST DOCUMENTS DETAILED HEREIN AND BENEFICIARY'S DRAFTS AT SIGHT DRAWN ON THE ISSUER. DOCUMENTS REQUIRED: AVAILABLE BY BENEFICIARY'S DRAFT(S) AT SIGHT DRAW N ON THE ISSUER AND PRESENTED AT PLACE OF EXPIRY ACCOMPANIED BY BENEFICIARY'S STAI EM EN I PURPORTEDLY MANUALLY SIGNED AND DATED BY THE COUNTY MANAGER.,OR HIS DESIGNEE,CERTIFYING THAT: A. "(I) DEVELOPER HAS FAILED TO CONSTRUCT AND/OR MAINTAIN THE IMPROVEMENTS ASSOCIATED WITH THAT CERTAIN PLAT OF A SUBDIVISION KNOWN AS BENT CREEK PRESERVE PHASE 2A AS REQUIRED BY COLLIER COUNTY ORDINANCES AND RESOLUTIONS (THE -LAND DEVE,LOPMENT REGULATIONS"); (II) DEVELOPER HAS BEEN GIVEN 11!OTT EN NOTICE DESCRIBING THE EVENT OR CONDITION OF SUCH DEE tIN REASON 1131 E DE I AIL BS CERTIFIED MAIL,RETURN RECEIPT REQUESTED;AND(III)THE DEFAULT HAS NOT BEEN CURED WITHIN THE CURE PERIOD PROVIDED FOR THEREIN,IF ANY.": OR B. "A FINAL INSPECTION OF THE IMPROVEMENTS FOR BENT CREEK PRESERVE PHASE 2A AS REQUIRED BY COLLIER COUNTS ORDINANCES AND RESOLU TIONS(THE -LAND DEVELOPMENT RE( t LAIIONS") SATISFACTORY TO COLLIER COUNTS HAS NOF BEEN PERFORMED PRIOR TO THE DATE OF EXPIRY,AND A SATISFACTORY ALTERNATIVE PERFORMANCE SECURITY HAS NOT BEEN PROVIDED TO AND ACCEPTED BY THE BENEFICIARY." 1 6 A 2 FIDELITY GUARANTY AND ACCEPTANCE CORP . 700 NW 107 AVENUE - SUITE 204 MIAMI , FLORIDA 331 7 2 PHONE ( 305 ) 553 -8724 THIS IS AN INTEGRAL PART OF LETTER OF CREDIT NO.ECAC-18391 PAGE 2 DRAFT(S) DRAW N UNDER THIS LETTER OF CREDIT SHALL BE MARKED: -DRAWN UNDER FIDELITY GUARANT AND ACCEPTANCE CORP. CREDIT NO. FGAC-I8391, DTE[) At GT ST 22, 2018 AND MUST BE ACCOMPANIED B\ THIS ORIGINAL LETTER OF CREDIT AND ALL ORIGIN AL AMENDMENTS, IF ANY, FOR PROPER ENDORSEMENT. THIS LETTER OF CREDIT SETS FORTH IN FILL THE TERMS OF THE ISSUER'S UNDERTAKING,AND SUCH UNDERTAKING SHALL NOT IN AN I AN AV BE MODIFIED, AMENDED, OR ANIPLIE IED BY REFERENCE TO ANY DOCUMENT,INSTRUMENT,OR AGREEMENT REFERENCED TO HEREIN OR IN WHICH THIS LETTER OF CREDIT RELATES,AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY REFERENCE ANY DOCUMENT,INSTRUMINI OR AGREEMENT. ISSUER HEREBY ENGAGES WITH BENEFICIARY THAT DRAFT(S) DRAWN UNDER AND IN COMPLIANCE WITH THE TERMS AND CONDITIONS OF THIS CREDIT WIEL BE MIN HONORED BY ISSUER IF PRESENTED WITHIN THE VALIDITY OF THIS CREDIT TOGETHER WITI I THE DOCUMENTS REQUIRED HEREIN AT THE PLACE OF EXPIRY PRIOR TO 4:00 PA.EST.ON OR PRIOR TO THE DATE OF EXPIRY.PRESENTATIONS MAN BE MADE B\ CERTIFIED OR REGISTE.RED MAIL,RETURN RECEIPT REQI ESTED OR BY FEDLICkLEXPRESS OR ANY OTHER NATIONALLY RECOGNIZED COURIER COMPANY. THIS CREDIT IS SUBJECT TO THE UNIFORM CUSTOMS AND PRACTICE FOR DOCUMENTARY CREDITS(2007 REVISION)INTERNATIONAL CHAMBER OF COMMERCE PUBLICATION NO.600, FIDELI FY GUARANTY AND ACCEPTANCE CORP. TA v NE VE SOUZA,V CE PRESIDENT 1 6 A 2 ENGINEERING State of Florida Business Certificate No,EB-0007663 Bent Creek Preserve Phase 2A Engineer's Opinion of Probable Costs SUMMARY (S) SANITARY SEWER SUB-TOTAL $290,816.50 (W) POTABLE WATER SUB-TOTAL $208,683.00 (D) STORM DRAINAGE SUB-TOTAL $376,569.00 (P) PAVING AND GRADING SUB-TOTAL $366,930.79 (T) IMMOKALEE ROAD TURN LANE IMPROVEMENTS SUB-TOTAL $12,178.44 (L) LANDSCAPING SUB-TOTAL' $6,091.80 TOTAL. $1,261,269.53 110% BONDING AMOUNT $1,387,396.48 Note: 1, This Engineer's Opinion of Probable Cost represents the estimated cost for constructing the above listed infrastructure for Bent Creek Preserve Phase 2A(RWA,Inc.File No,030008.11.04,REV 5 dated February 15,2018). 2. Landscaping cost provided by Chuck Yanette,signed and sealed 9/1/2017, i,,,,, E 0/1/4A, Doptalls sipneck by Michael C.Pappas F.E. • 60910 State of Flonda „Aks. es DA,cn4P4ehael F.Pappas P.F.&MO State CS' .o -; of Florida.cmPrinted copies of the Tif2.4.17. document are not considered signed and ek • t coaled ande rwa 11=-,12:ityt eenct,',Aoant co rsz dr, oi • and sealml using aH '" beSenhelaeck7tatiohne'n"tilclysiognned 0 R kc) S codes And,ernail=topoppasefaconsuln sez. es,.••-kek s•.11 rwecorn,cssiSS <lb:AL 05-', Date 2019 02.22 09003.34 0405 Illif 110 t%° Michael C.Pappas,P.E.#60910 RWA, Inc. 6610 Willow Park Drive,Ste 200 Naples, Florida 34109 4983 Royal Gulf Circle Fort Myers, Florida 33966 Phone:(239)597-0575 7/27/2018 Fax:(239)597-0578 9:45 AM 1 6 A 2 • r ENGINEERING Certificate of Business Certificate No,EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2A Date:February 22,2018 Estimated By:David Poteete Checked By: Michael Pappas 1 SANITARY SEWER DESCRIPTION UNIT - QUANTITY UNIT TOTAL COST Si 8"PVC Sanitary Sewer Main(0'-6'cut) LF 705 $33.00 $23,265.00 5-2 8"PVC Sanitary Sewer Main(6'-8'cut) LF 1,014 $44.00 $44,616.00 S-3 8"PVC Sanitary Sewer Main(8.-10cut) LF 481 554.00 $25,974.00 5-4 8"PVC Sanitary Sewer Main(10'-12'cut) LF 550 $64.00 $35,200.00 S-5 8"PVC Sanitary Sewer Main(12'-18'cut) LF 193 $78.00 $15,054.00 I i 5-6 4'Diameter Manhole(0'-6'depth) EA 4 $4,800.00 $19,200.00 S-7 4"Diameter Manhole(6.-8'depth) EA 3 55,500.00 516,500.00 5-8 4'Diameter Manhole(8'-10'depth) EA 2 $6,300.00 $12,600.00 5-9 4'Diameter Manhole(10'-12'depth) EA 3 $7,200.00 $21,600.00 5-10 4'Diameter Manhole(1248'depth) EA 1 511,800,00 511,800.00 5-11 Drop Manhole Connection EA 0 $2,000.00 $0,00 5-12 Single Sewer Lateral EA 9 5850.00 $7,650.00 S-13 Double Sewer Lateral EA 45 $980.00 $44,100.00 S-14 Television Inspection IF 2,943 52.50 $7,357.50 S-15 Connect to Existing Manhole EA 1 $3,400,00 $3,400.00 5-16 Connect to Existing 8"PVC Sanitary Main EA 1 $2,500,00 $2,500.00 Sanitary Sewer Sub-Total $290,816.50 2018-02-14 Phase 2A OPC 7/27/2018 1 6 A2 fiWk ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2A Date:February 22,2018 Estimated By:David Poteete Checked By: Michael Pappas POTABLE WATER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST W-1 6"PVC Water Main(C-900, DR 18,PC150) LF 104 $20.00 $2,080.00 W-2 8"PVC Water Main(C-900, DR 18,PC150) LF 3,129 $25.00 $78,225.00 W-3 8"PVC Water Main(C-900,DR 14,PC200) LF 76 $28.00 $2,128.00 W-4 18"Steel Casing LF 10 $50.00 $500.00 W-5 6"Gate Valve w/Box EA 1 $1,200.00 $1,200.00 W-6 8"Gate Valve w/Box EA 8 $1,400.00 $11,200.00 W-7 Air Release Valve)AFD-TSP-BOV) EA 1 $4,200.00 $4,200.00 W-8 Fire Hydrant Assembly w/Valve EA 7 $4,500.00 $31,500.00 W-9 Permanent Sample Point EA 2 $1,500.00 $3,000.00 W-10 Hot-Tap(Includes 12"x8"Tapping Sleeve and Valve) LS 1 54,500.00 54,500.00 W-11 Single Water Service EA 39 $750.00 $29,250.00 W-12 Double Water Service EA 30 $900.00 $27,000.00 W-13 Temporary Gap Configuration EA 3 $3,800.00 $11,400.00 W-14 Testing LS 1 $2,500.00 $2.500.00 Potable Water Sub-Total $208,683.00 2018-02-14 Phase 2A OPC 7/27/2018 1 6 A2 W ENGINEERING Certificate of Business Certificate No.ES-0007653 • Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2A Date:February 22,2018 Estimated By:David Poteete Checked By: Michael Pappas STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST D-1 15"RCP LF 464 $28.00 512,992.00 D-2 18"RCP LF 326 $36,00 $11,736.00 D-3 24"RCP LF 911 $55.00 $50,105.00 D-4 30"RCP LF 295 $72.00 $21,240.00 D-5 42"RCP LF 1,367 $98.00 $133,966.00 D-6 3'x 4Valley Gutter Inlet EA 14 53,300.00 $46,200.00 D-7 5'x 5'Valley Gutter Inlet EA 2 $4,500.00 $9,000.00 D-8 Type'C'Inlet EA 7 $2,400.00 $16,800.00 D-9 Type'G'Inlet EA 4 $3,700.00 $14,800.00 D-10 5'X 5'Junction Box EA 2 54,200.00 $8,400.00 D-11 24"FES EA 3 $1,400.00 $4,200.00 D-12 42"FES EA 1 $2,800.00 $2,800.00 D-13 Yard Drain EA 9 51,100.00 $9,900.00 D-14 10"Yard Drain Pipe IF 811 514.00 $11,354.00 D-15 12"Yard Drain Pipe LF 457 518,00 $8,226.00 D-16 Rock Excavation LF 990 $15.00 $14,850.00 Storm Drainage Sub-Total $376,569,00 7/27/2018 2018-02-14 Phase 2A OPC i 1 6 A 2 . 11-1-1 ki ENGINEERING Certificate of Business Certificate No,EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2A Date:February 22,2018 Estimated By:David Poteete Checked By: Michael Pappas PAVING AND GRADING DESCRIPTION UNIT QUANTITY UNIT TOTAL COST P-1 Mobilization LS 1 512,000.00 512,000.00 P-2 Staked Silt Fence LF 1,872 51.25 $2,340.00 P-3 Double Silt Fence LF 3,104 $2.50 $7,760.00 P-4 12"Stabilized Subgrade(LBR 40) SY 9,329. $2.80 $26,121.20 P-5 8"Limerock Base(LBR 100) SY 7,198 $8.50 $61,183.00 P-6 3/4"Type S-III ACSC(1st Lift) SY 7,198 $4,70 533,830.60 P-7 3/4"Type S-III ACSC(2nd Lift) SY 7,198 $6.00 $43,188.00 P-8 Concrete Valley Gutter LF 6,405 $8.00 $51,240.00 P-9 Remove Existing Valley Gutter LF 108 $8.00 $864.00 P-10 24"Ribbon Curb LF 48 $28.00 $1,344.00 P-11 5'Sidewalk LF 6,296 $12.00 $75,552.00 P-12 ADA Curb Ramps EA 4 $500.00 52,000.00 P-13 Sod(4'strip between curb and sidewalk) SY 2,847 $1.72 54,907.99 P-14 Signing and Striping LS 1 $5,000.00 $5,000.00 P-15 Street Lights EA 18 52,200.00 $39,600.00 Paving and Grading Sub-Total $366,930,79 2018-02-14 Phase 2A OPC 7/27/2018 1 6 A 2 ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2A Date:February 22,2018 Estimated By:David Poteete Checked By: Michael Pappas IMMOKALEE ROAD TURN LANE IMPROVEMENTS DESCRIPTION UNIT QUANTITY UNIT TOTAL COST P-1 Remove and Dispose Type'FCurb LF 124 $2.50 $310.00 P-2 12"Stabilized Subgrade(LBR 40) SY 103 $5.00 $515.00 P-3 10"Limerock Base(LBR 100) SY 89 $10.00 $890.00 P-4 3.5"Type SP-12.5 ACSC SY 89 $11.00 $979.00 P-5 1.5"Type FC-12.5 Friction Course SY 89 $800 $712.00 P-6 Type'F'Curb LF 124 $14.00 $1,736.00 P-7 8'Concrete Sidewalk LF 124 $31.81 $3,944.44 P-8 Concrete Sidewalk Removal LF 124 $8.00 $992.00 P-9 Adjust Manhole Rim/Top LS 1 $500.00 $500.00 P-10 Signing and Striping LS 1 $1,600.00 $1,600.00 Immokalee Road Turn Lane Improvements Sub-Total $12,178.44 2018-02-14 Phase 2A OPC 7/27/2018 1 16A2 BENT CREEK PRESERVE-PHASE 2A PROJECT NO.: 11-060 ,9 An Iltgithp DATE: 09/0111? OPINION OF LANDSCAPE COST PARKER-YANNE1TF, deign group,inc. Item No, Item Quantity Unit Price Subtotal Description B. Trees i. Quercus vir iniana J Live Oak 5 $225.00 $1.125.00 10'x 5'.2"cal..full cans• Subtotal $1,125-00 D. Miscellaneous 2 SOD 8810 $0.28 $2:466.80 3. IRRIGATION 1 $2,500.00 $2,500.00 Subtotal $4,066.80 IGRANO TOTAL T $6,051.80 II. Digitally signed by Charles Charles Yannette Date:2017.°9.01 Yannette 14:16:42 -04'00'