Backup Documents 12/14/2010 Item #16D13ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLID 6 ..�
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO .�
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
3r
ROUTING SLIP
Complete routing lines #1 through #4 as appropriate for additional signatures, dates, and/or information needed. If the document is
already complete with the exception of the Chairman's signature, draw a line through routing lines #1 through #4, complete the
checklist, and forward to Sue Filson (line #5).
Route to Addressee(s)
List in routing order)
Office
Initials
Date
1.
appropriate.
(Initial)
Applicable)
2.Heidi Ashton
County Attorney's Office
Agenda Item Number
3.
�--� aA' ^ 2
0 l t� �-
Number of Original
Documents
4.
by the Office of the County Attorney. This includes signature pages from ordinances,
Attached
5, pq iWi6aw- Exeunt
— li;�� PAM�
Board of County Commissioners
PRIMARY CONTACT INFORMATION
(The primary contact is the holder of the original document pending BCC approval. Normally the primary contact is the person who created/prepared the executive
summary. Primary contact information is needed in the event one of the addressees above, including Sue Filson, need to contact stafffor additional or missing
information. All original documents needing the BCC Chairman's signature are to be delivered to the BCC office only after the BCC has acted to approve the
item.)
Name of Primary Staff
Contact
Initial the Yes column or mark "N /A" in the Not Applicable column, whichever is
Phone Number
N/A (Not
appropriate.
(Initial)
Applicable)
Agenda Date Item was
Approved by the BCC
Original document has been signed/initialed for legal sufficiency. (All documents to be
Agenda Item Number
Type of Document
Attached
�--� aA' ^ 2
0 l t� �-
Number of Original
Documents
by the Office of the County Attorney. This includes signature pages from ordinances,
Attached
INSTRUCTIONS & CHECKLIST
I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip
WWS Original 9.03.04
Initial the Yes column or mark "N /A" in the Not Applicable column, whichever is
Yes
N/A (Not
appropriate.
(Initial)
Applicable)
1.
Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney. This includes signature pages from ordinances,
resolutions, etc. signed by the County Attorney's Office and signature pages from
contracts, agreements, etc. that have been fully executed by all parties except the BCC
Chairman and Clerk to the Board and possibly State Officials.)
2.
All handwritten strike- through and revisions have been initialed by the County Attorney's
Office and all other parties except the BCC Chairman and the Clerk to the Board
3.
The Chairman's signature line date has been entered as the date of BCC approval of the
document or the final negotiated contract date whichever is applicable.
4.
"Sign here" tabs are placed on the appropriate pages indicating where the Chairman's
signature and initials are required.
5.
In most cases (some contracts are an exception), the original document and this routing slip
should be provided to Sue Filson in the BCC office within 24 hours of BCC approval.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip
WWS Original 9.03.04
MEMORANDUM 16013
Date: December 14, 2010
To: Gail Hambright
Coastal Zone Management
From: Teresa Polaski, Deputy Clerk
Minutes & Records Department
Re: Resolution 2010 -230
Attached, find please find one original and one copy of the document referenced above,
(Item #16D13) approved by the Board of County Commissioners on December 14,
2010.
The Minutes and Records Department has held an original resolution for the Official
Record of the Board of County Commissioners.
If you have any questions, please call 252 -8411.
Thank you.
Attachments (3)
16D13
RESOLUTION NO. 10 - 2 3 0
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA SUPPORTING THE COUNTY'S FOUR
GRANT APPLICATIONS TO THE FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION FOR LONG RANGE GRANT
FUNDING REQUESTS FOR FISCAL YEARS 2011 -2012.
WHEREAS, the Coastal Zone Management Department, acting on behalf of the
Collier County Board of County Commissioners, has prepared four grant applications to
the Florida Department of Environmental Protection (FDEP) for long range grant funding
for Fiscal Years 2011 -2012; and
WHEREAS, the grant applications are requests to fund the following Collier
County projects: (1) Wiggins Pass Inlet Management Plan, (2) Barefoot Beach
Restoration Project, (3) South Marco Island Beach Renourishment, and (4) Collier
County Beach Renourishment.
WHEREAS, the Board of County Commissioners supports these four grant
applications and requests approval from the FDEP for each grant funding request for
Fiscal Years 2011 -2012.
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that the Board supports the four
grant applications prepared for submittal to the Florida Department of Environmental
Protection for long range grant funding for Fiscal Years 2011 -2012 and requests
approval from the FDEP for each funding request.
I
16D
13
PASSED AND DULY ADOPTED by the Board of County Commissioners of
Collier County, Florida, this day of 1� -P—cryv, 2010.
:.. ' ATfi ST. BOARD OF COUNTY COMMISSIONERS
DWIGF#T . BROCK, CLERK COLLI R OUNTY, FLORIDA
1.
C g r
F By:
s +`
tJ°�'` :5 Gfwa ira��ln FRED W. COYLE, CHAIRMAN
Approved as to form and
legal sufficiency:
Colleen M. Greene
Assistant County Attorney
10 -CZM- 00070/3
2
Item # U P D 13
Agenda i ll 0
Cate
Cate I I l0
Reed 1
Agenda Item No. 16D13
December 14, 2010
Page 5 of 39
1 FY 2011 -12 Local Government Funding Request 16D
Project Name: Barefoot Beach Restoration Project
Project Description:
The Barefoot Beach project area, which is located between R14 and R16.3, will be restored using
sand from an offshore borrow area, T1. The level of restoration will be determined during final
design and compliment sand bypassed from the Wiggins Pass dredging project. The restoration
project will used approximately 250,000 cubic yards to restore the shoreline and the adjacent ebb
shoal. Based on modeling, beach placement closer to the inlet will have the greatest impact
toward restoring Barefoot Beach. The disposal shape will be determined by modeling and
complimentary engineering and design studies. Past disposal practices placed dredged material
where it creates a sediment deficit within a'A mile north of the inlet's vicinity.
Project Location: The Barefoot Beach Restoration Project is located on the southwest Florida
coastline in Collier County between Florida Department of Environmental Protection
monuments R -14 and R -16.3, downdrift and adjacent to Wiggins Pass. The project consists of
approximately 0.45 miles of critically eroded Gulf shoreline.
Use of Requested Program Funds: Funds requested for FY11 /12 will be used for final design
and construction.
Local Government Support
Does this sponsor have dedicated support staff whose sole priority is to manage beach erosion
control activities? Yes
Name
Title
Email
Percent
Qtr 1 (Sept)
Sept. 30
Commitment
Gary McAlpin
Director, Coastal Zone
GaryMcAlpin @colliergov.
100%
Qtr 3 (Mar)
Management
net
Address 1:
3301 East Tamiami Trail
Phone:
239 -252 -2966
W. Harmon Turner Bldg., Suite
103
Address 2:
1 Naples, Florida 34112
Fax:
239 - 252 -2950
Quarterly Report Compliance:
This is an initial funding request for this project.
2008 -2009
End Date
Report Sent
Compliant
Qtr 1 (Sept)
Sept. 30
Qtr 2 (Dec )
Dec. 31
Qtr 3 (Mar)
Mar. 31
Qtr4 June
June 30
Collier County
Long Range Budget Plan
FY 11 /12 —Barefoot Beach Restoration Project
Agenda Item No. 16D13
December 14, 2010
Page 6 TbD 1
Revenue for the local cost share will be provided by: Local funding for the project will be
obtained by Collier County through a Tourist Development Tax. This provides a dedicated long
term funding source through a `bed tax'. Collier County levies a four (4 %) percent Tourist
Development Tax on all rental income received from accommodations rented for six months or
less.
Is the funding from a dedicated long term source for this project? Yes
Collier County has dedicated the majority of the Tourist Taxes to coastal projects, including
funding inlet projects that benefit adjacent beaches. Collier County has a dedicated staff.
In order to acquire funding, a resolution from the local governmental entity must be
provided by the application deadline which declares:
• Support from the Sponsor for the Proposed Project
• Willingness to serve as the Local Sponsor
• Ability to provide the full Local Cost Share
• Funding Source
Has the local sponsor resolution been attached to the application fulfilling all of these
requirements? Yes, it will be provided
This project is detailed in Collier County's 10 -year Capital Plan for Beach Projects which has
been approved by Collier County Board of County Commissioners.
Previous State cost -share for a feasibility or designlpermitting phase of this project:
Initial request
Previous State Cost Share percentage
Initial request
10 -Year Proiect Schedule and 5 -Year Estimated Budget
Does this project have Congressional Authorization? No
Does this project have a Federal Project Cooperative Agreement? No
What is the end date of the Federal Authorization? n/a
Federal cost share available for this erosion control project: 0%
16013
Agenda Item No. 16D13
December 14, 2010
Page 7 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Barefoot Beach Restoration Project
Schedule and Budget (Include estimated phases for 10 years and estimated project costs for
5 years.):
Year
Proposed Method
Description
Total
Estimated Cost
Federal Cost
Share
State Cost
Share
Local Cost
Share
2011/2012
easy i
Nourishment
2012/ 2013
Design & Permitting
Nourishment
$100,000 $0
$50,000 $50,000
Construction
ours ent
$10,000,000
5, , $5,000,0 0
2
014 15
onitoring
Physical
Monitoring
Physical
2017/2018
2018/2019
201912020
2
Length of Project Boundary in Feet:
2,363 ft
Length of commercial or recreational property fronting the project shoreline:
Barefoot Beach Park 2,363 ft
Percentage of project shoreline designated as commercial or recreational property
100%
Eligibility: Access Points and Public Lodging Establishments:
See Attachment 1 for detailed listing and attached maps.
No occupational licenses or Florida Department of Businesses and Professional Regulation
licenses are included since the project area is a state and county owned, county operated
recreational area.
Additional Rankine Criteria
Will this project enhance or increase the longevity of a previously- constructed project?
Yes
Will this project nourish a previously restored shoreline? No
Rate of Erosion as determined by the Bureau based on long term data (ft/yr) 6.16.1 ft/yr
Severity of erosion:
The entire portion of the project area has been designated by FDEP as critically eroded. The area
near R16 is currently experiencing the most severe erosion rate in the project area, losing an
average of 13.9 ft/yr or 418 feet since 1978. The second largest erosion within the project area
occurred directly north at R15. This area has lost 143 feet of shoreline at a rate of -4.8 feet per
year since 1978. The erosion rate for the total project area is approximately 6.1 feet per year
16D 13
Agenda Item No. 16D13
December 14, 2010
Page 8 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Barefoot Beach Restoration Project
over a 30 year time period. The stable condition of R14 to the north has helped to reduce the
shoreline erosion rate within the project area.
Project Benefits:
Shoreline development within the project area consists of approximately 2,360 linear feet of
publicly accessible beach. The entire portion of the project area is recreational and habitat. The
attached maps identify public beach access points with associated parking spaces within the
project area.
Gopher tortoises utilize the entire project area for nesting purposes although none of the areas
within the project area have been designated as a turtle refuge. The nourishment will initiate
restoration of lost habitat.
Periodic dredging and bypassing has taken place at Wiggins Pass in recent decades. The total
volume of sand bypassed to adjacent beaches from maintenance dredging has been 498,650
cubic yards since 1984. Approximately 260,937 cubic yards of that fill has been placed to the
north, with the remaining 237,713 cubic yards being placed to the south of the inlet. This project
will fill the gap where sand is not spreading naturally and supplement the bypassing operations
and will replace deficits started in the 1980s, which will mitigate for past inlet impacts.
Use of Innovative Applications of existing technologies:
Geographic computer modeling will be utilized to identify the most beneficial region to place the
restoration fill. A multi -stage recovery will be implemented in order to restore the eroding
shoreline along with restoring the ebb shoal in order to alleviate erosion at Barefoot Beach,
without severe impacts to navigation.
Nourishment Interval (years):
Project Performance:
6
The shorelines near Wiggins Pass have been eroding at an accelerated rate since the 1990s,
which directly affects the amount of recreational area available to the public. During the period
from 1992 to 2009, the largest shoreline retreat was observed at R -16 with over 400 feet of
shoreline lost. Approximately 10 acres has been lost from the Gulf beaches since 1992. The
shoreline recession on South Barefoot Beach has caused vegetation to be lost, and it has also
created a dangerous scarp along the shoreline that is hazardous to park users. Along with the
loss of vegetation, walking paths that were present in 1973 at Barefoot Beach have been eroded
away and are no longer present in several areas to the west and south.
In comparison to the shoreline changes, the volumetric changes also indicate that the shoreline
north of Wiggins Pass is trending to become highly erosional. From 1885 to 1979, the shoreline
north of Wiggins Pass was overall accreational for approximately 100 years. After 1979 to
present, the shoreline shifted and is now in a state of erosion. The worst of the erosion is seen at
R -16 where approximately 201,000 cubic yards have been lost. This erosion has caused the
southern tip of South Barefoot Beach to nearly shear off, which in return has lost valuable
recreational area and habitat within the park.
Agenda IterfTl h X1313
December 14, 2010
Page 9 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Barefoot Beach Restoration Project
The restoration is scheduled for FY 2012/2013, but may need to be flexible to agency desires and
the schedule for Wiggins Pass. As such, it is not tied to one of these projects.
Is this project being planned or constructed in cooperation with another local government?
Explain? Yes
This project will be built to compliment the Wiggins Pass Inlet Management Plan and the Collier
County Nourishment Project, where feasible. Monitoring of all Collier County Coastal projects
is consolidated for economy — including both physical and biological monitoring and the sea
turtle nesting program. The two coastal cities and county share this effort.
Collier County
Long Range Budget Plan
FY 11 /12 —Barefoot Beach Restoration Project
ATTACHMENT 1
FUNDING ELIGIBILITY
COLLIER COUNTY BEACH RENOURIS
Project Boundary: R14 to 300' south of R16
Approximate Shoreline Length: 2,360'
On -site
Public Access Spaces
Barefoot Beach Preserve* 100+
Delnor Wiggins State Recreation Area* 340
Agenda lm�0.06cl
December 14, 2010
Page 10 of 39
HMENT PROJECT
Adjacent Total
Spaces Spaces
100+ 200+
0 340
Area determined to be publicly accessible Total Length
R14 to 300' south of R16 2,360'
Area determined to be critically eroded
R14 to R16.3
Total eligible shoreline length: 2,360'
Total project shoreline length: 2,360'
State owned shoreline length: 2,260'
County owned shoreline length: 100'
Percent eligible for State funding; 100.0%
State eligibility incorporates the total project length (critical and non - critical) and eligibility only recognizes publicly
accessible critically eroded shoreline.
*Primary beach access contains a minimum of 100 parking spaces and public restrooms.
160
Agenda Item No. 16C 13
December 14, 2 10
Page 11 of 39
13
Agenda Item No. 16D13
December 14, 2010
Page 12 of 39
16013
FY 2011 -12 Local Government Funding Request
Project Name: Collier County Beach Nourishment Project
Project Description: This project includes the yearly physical beach monitoring, biological
monitoring for the artificial reef and nearshore hardbottom, and design will lead to
renourishment in 2012/13.
The 2005/06 re- nourishment project consisted of the restoration, using approximately 665,000
cubic yards of hydraulic fill, and maintenance of up to eight miles of Gulf of Mexico shoreline
along unincorporated Collier County and the City of Naples. This project was completed in May
2006 with the main goal to avoid environmental impacts such as hard -bottom coverage and a
design project life of six to eight years. The borrow area was located just over 33 miles north -
northwest of Vanderbilt Beach and was chosen due to the coarser sand availability which will
generally avoid near -shore hard -bottom coverage. A one acre artificial reef was constructed to
satisfy mitigation permit requirements.
In 1995/1996 much of the same project area was hydraulically re- nourished. Approximately
240,000 cubic yards of upland sand was placed for maintenance and another 160,000 cubic yards
of sand was bypassed since this major re- nourishment project.
The renourishment in 2012 -2013 will be approximately 500,000 cubic yards and will include a
new area, Clam Bay Park within the Park Shore Segment. The project will reach its six year
design life in 2012/13 and hot spot nourishment in required.
Project Location: The City of Naples /Collier County Beach Renourishment Project is located
on the southwest Florida coastline in Collier County between Florida Department of
Environmental Protection monuments R -22 and R -79. The project consists of approximately 5
miles of critically eroded Gulf shoreline.
Use of Requested Program Funds: Funds requested for FYI 1/12 will be used for annual
physical monitoring, biological monitoring, and turtle monitoring activities associated with the
2006 construction and design and permitting tasks in preparation of the upcoming renourishment
in FY 12/13. The renourishment in FY 12/13 will be approximately 500,000 cubic yards.
1
Agenda Item No. 16D1
December 14, 2010
Page 13 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
Local Government Suonort
Does this sponsor have dedicated support staff whose sole priority is to manage beach erosion
control activities? Yes
Name
Title
Email
Percent
Qtr 1 (Sept)
Sept. 30
Commitment
Gary McAlpin
Director, Coastal Zone
GaryMcAlpin @colliergov.
100° /o
Qtr 3 Mar
Management
net
N
Address 1:
3301 East Tamiami Trail
Phone:
239 -252 -2966
W. Harmon Turner Bldg., Suite
103
Address 2:
Naples, Florida 34112
Fax:
239- 252 -2950
Quarterly Report Compliance:
2008 -2009
End Date
Report Sent
Compliant
Qtr 1 (Sept)
Sept. 30
N
Qtr 2 Dec
Dec. 31
N
Qtr 3 Mar
Mar. 31
N
Qtr4 June
June 30
N
How will revenue for the local funding cost share be established?
Local funding for the project will be obtained by Collier County through a Tourist Development
Tax. This provides a dedicated long term funding source through a `bed tax'. Collier County
levies a four (4 %) percent Tourist Development Tax on all rental income received from
accommodations rented for six months or less.
Is the funding from a dedicated long term source for this project? Yes
Collier County has dedicated the majority of the Tourist Taxes to beach maintenance, including
funding projects within the City of Naples. Collier County has a dedicated staff.
In order to acquire funding, a resolution from the local governmental entity must be
provided by the application deadline which declares:
• Support from the Sponsor for the Proposed Project
• Willingness to serve as the Local Sponsor
• Ability to provide the full Local Cost Share
• Funding Source
Has the local sponsor resolution been attached to the application fulfilling all of these
requirements? Yes, it will be provided.
The Collier County Board of County Commissioners adopted resolution dated September 2005
and again in 2006 is on file at FDEP offices.
This project is detailed in Collier County's 10 -year Capital Plan for Beach Projects which has
been approved by Collier County Board of County Commissioners.
16013
Agenda Item No. 16D13
December 14, 2010
Page 14 of 39
Collier County
Long Range Budget Plan
FY 11/12— Collier County Beach Renourishment
Has the State cost - shared in a feasibility or design phase of this project? Yes
Previous State Cost Share percentage 32.2%
10 -Year Proiect Schedule and 5 -Year Estimated Budeet
Does this project have Congressional Authorization? Yes
Does this project have a Federal Project Cooperative Agreement? No
What is the end date of the Federal Authorization? n/a
Federal cost share available for this erosion control project: 75%
Vanderbilt, Park Shore, and Naples have FEMA Category G funds due to damage as a result of
Tropical Storm Fay. This has been included within the 5 -year estimated budget under the
Federal Cost Share column at 75% of eligible cost. It is essential that construction be funded by
the State, so that Federal (FEMA) funds will be available.
Schedule and Budget (Include estimated phases for 10 years and estimated project costs for
5 years.):
Year
Proposed
Method
Description
Total
Estimated Cost
Federal Cost
Share
State Cost
Share
Local Cost
Share
2011/2012
Design
Renourishment
$345,000
$258,750
$31,188
$55,062
Monitoring
Phys, Turtles
8 , 4
0
U2—,5 TO—
1 , ZT-
2012/2013
Monitoring
Phys, Biological
$589,857
$131,632
$165,694
$292,531
Desie
Renourishment
$200,000 $150,000
$18,080
$31,920
onstruchon
enouns ent
1,
4,
onitonng
Phys, 3io,ogicar
,
onrtormg
ys, io ogi
Monitoring
Phys, Biological
$600,000
$0
$216,960
$383,040
omtonng
ys, urt es
Phys, BiologiMr
PhysTurtles
PhysTurtles
2017/2018
onrtormg
2018/20
onitonng
Monitoring
2020/2021
1 Monitoring
PhysTurtles
Length of Project Boundary in Feet:
40,620 ft
Length of commercial or recreational property fronting the project shoreline:
29,375 ft
Percentage of project shoreline designated as commercial or recreational property
36.16%
Collier County
Long Range Budget Plan
FY 11/12 —Collier County Beach Renourishment
Eligibility:
Access Points and Public Lodging Establishments:
Cost Sharing Summary
Reach
Vanderbilt Beach
Park Shore/Clam Pass Park
Naples Beach
Total
Eligible Shoreline %
State Cost Share %
Length (ft) Eligible Length (ft)
8,480
7,230
12,765
3,735
19,375
18,410
40,620 29,375
72.32%
36.16%
16D13
Agenda Item No. 16D13
December 14, 2010
Page 15 of 39
See Attachment 1 for detailed listing and maps.
The Collier County occupational licenses and the Florida Department of Businesses and
Professional Regulation licenses for the following hotels are on file and can be provided if
required.
Additional Rankine Criteria
Will this project enhance or increase the longevity of a previously- constructed project?
Yes
Will this project nourish a previously restored shoreline? Yes
Rate of Erosion as determined by the Bureau based on long term data (ft /yr) 4.5 ft/vr
Severity of Erosion:
A majority of the project area has been designated by FDEP as critically eroded. The Naples
Beach area is currently experiencing the most severe erosion rate in the project area, losing an
average of 6.4 ft/yr since June 2006. The Vanderbilt Beach and Pelican Bay project areas have
been eroding at a rate of 5.0 feet per year since construction of the 2006 project. The Park Shore
project area has eroded 5.4 feet since June 2006. Erosion within the total project area has
averaged 4.5 ft/yr since 1996.
Threat to Upland Structures:
Based upon a similar modeling study within the region, 41 structures are threatened due to
recession from the 25 -year storm.
16013
Agenda Item No. 16D13
December 14, 2010
Page 16 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
Project Benefits:
Shoreline development within the project area consists of over 29,000 linear feet of publicly
accessible beach. 7,230 linear feet (85 %) of the Vanderbilt Beach property is commercial or
recreational. This includes four hotels, Delnor - Wiggins State Park and Collier County's
Vanderbilt Beach Road Park. 3,725 linear feet (29.26 %) of the Park Shore property is zoned
commercial or recreational and eligible. Another 2,300 feet is Clam Pass Park, but although this
area is erosional, it is not designated as critically eroded. This includes three public access streets
(City of Naples). 18,410 linear feet (95.02 %) of the Naples Beach property is zoned commercial
or recreational. This includes the City of Naples' Lowdermilk Park, two hotels and numerous
public access streets and walkways. The attached maps identify public beach access points,
hotels, and other commercial facilities within the project area. Threatened and endangered
marine turtles utilize the entire project area for nesting purposes although none of the areas
within the project area have been designated as a seaturtle refuge.
Periodic dredging and bypassing has taken place at Wiggins Pass, Clam Pass, Doctors Pass and
Gordon Pass in recent decades. The total volume of sand bypassed to adjacent beaches from the
four inlets since completion of the 1996 project is estimated at approximately 600,000 cubic
yards.
Use of Innovative Applications of Existing Technologies:
Current technologies in practice will be used for the upcoming renourishment project and
subsequent monitorings. In addition, an investigation to improve hot spot performance and tune
structures using modeling is planned. Sand performance has met expectations, and beach
widening is feasible without significant threat to nearshore hardbottom.
Nourishment Interval (years): 6 -8
Project Performance:
The project was built between January 23, 2006 to May 23, 2006, with dredging starting on
February 21, 2006. Collier County's 8.5 miles of renourished shorelines include Vanderbilt
Beach, Pelican Bay, North Park Shore, Park Shore, and Naples Beach. These beaches were
renourished with an as -built sand volume of approximately 667,562 cubic yards of sand during
construction. The project was constructed by Great Lakes Dredge & Dock Company (GLDD)
with two hopper dredges, the Sugar Island and the Manhattan Island. Dredge and fill operations
lasted a total of 92 days. All of the project areas were renourished with sand from the Borrow
Area T -1, which is located approximately 33 miles northwest of Delnor- Wiggins State Park.
Volumetric changes measured from the pre - construction November 2005 survey to the three year
post- construction July 2009 survey measured 529,278 cubic yards remaining in the project area
or 80% of the design volume. It appears that the shorelines are still recovering from the active
2004 -5 and 2008 storm season where Tropical Storm Fay affected the project area.
The next full nourishment is scheduled for FY 2012/2013 at the planned 6 -year renourishment
interval.
Agenda ItAN44, D131 3
Dece 2010
Page 17 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
Is this project being planned or constructed in cooperation with another local government?
Explain? Yes
Collier County and the City of Naples are jointly sponsoring this project, and monitoring for all
of Collier County projects is combined for economy.
16D 13
Agenda Item No. 16D13
December 14, 2010
Page 18 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
ATTACHMENT 1
FUNDING ELIGIBILITY
COLLIER COUNTY BEACH RENOURISHMENT PROJECT
Vanderbilt Beach Seement
Project Boundary: 350' south of R22 to 500' south of R30
Approximate Shoreline Length: 8,480'
On -site Adjacent Total
Public Access Spaces Spaces Spaces
Delnor Wiggins State Recreation Area* 340 0 340
Vanderbilt Beach Road* 149 18 167
Oualifyine Hotels
La Playa
Ritz Carlton'
Area determined to be publicly accessible
350' south of R22 to 150' north of T25
30' south of R26 to R31 It
Area determined to be critically eroded
R22.3 to R30.5
Total eligible shoreline length: 7,230'
Total project shoreline length: 8,480'
Oualifyine Shoreline
360'
750'
Total Length
2,640'
4,590'
Percent eligible for State funding: 85.26%
State eligibility incorporates the total project length (critical and non - critical) and eligibility only recognizes publicly
accessible critically eroded shoreline.
*Primary beach access contains a minimum of 100 parking spaces and public restrooms.
'Overlap
16013
Agenda Item No. 16D13
December 14, 2010
Page 19 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
FUNDING ELIGIBILITY
COLLIER COUNTY BEACH RENOURISHMENT PROJECT
Park Shore & Clam Bay Park Segment
Project Boundary: 200' south of R42 to 390' south of R54
Approximate Shoreline Length: 12,765'
Area determined to be publicly accessible Total Length
870' south of R50 to 290' south of R54 3,735'
Area determined to be critically eroded
R50.5 to 390' south of R54
Total eligible shoreline length: 3,735'
Total project shoreline length: 12,765'
Percent eligible for State funding: 29.26%
State eligibility incorporates the total project length (critical and non - critical) and eligibility only recognizes publicly
accessible critically eroded shoreline.
*Permit spaces are available to residents and the general public for the same price.
On -site Parking Spaces
Adjacent
Total
Public Access
Metered Permit*
Spaces
Spaces
Horizon Way
24 14
15
53
Vedado Way
27 10
0
37
Seagate Drive
0 0
50
50
Clam Pass Park
0 180
0
180
Area determined to be publicly accessible Total Length
870' south of R50 to 290' south of R54 3,735'
Area determined to be critically eroded
R50.5 to 390' south of R54
Total eligible shoreline length: 3,735'
Total project shoreline length: 12,765'
Percent eligible for State funding: 29.26%
State eligibility incorporates the total project length (critical and non - critical) and eligibility only recognizes publicly
accessible critically eroded shoreline.
*Permit spaces are available to residents and the general public for the same price.
AgendakrT oQ613
December 14, 2010
Page 20 of 39.
Collier County.
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
FUNDING ELIGIBILITY
COLLIER COUNTY BEACH RENOURISHMENT PROJECT
Naples Sesment
Project Boundary: 1,050' north of R58 to R79
Approximate Shoreline Length: 19,375'
*Primary beach access contains a minimum of 100 parking spaces and public restrooms
* *Permit spaces are available to residents and the general public for the same price
On -site Spaces
Adjacent Spaces
Total
Public Access
Public
Permit **
Public
Permit **
Spaces
Lowdermilk Park*
52
162
0
0
214
8t` Avenue North
21
0
0
0
21
7d' Avenue North
10
2
0
0
12
North Lake Avenue
19
19
0
0
38
6th Avenue North
6
4
0
0
10
5th Avenue North
0
0
0
0
0
4d' Avenue North
11
4
0
0
15
3rd Avenue North
10
4
0
0
14
2nd Avenue North
12
4
0
0
16
1 " Avenue North
11
6
0
0
17
Central Drive
8
4
0
0
12
1" Avenue South
5
11
0
0
16
2nd Avenue South
7
4
0
0
11
3`d Avenue South
8
6
0
0
14
4d' Avenue South
10
5
0
0
15
5th Avenue South
21
0
20
15
56
6th Avenue South
4
8
0
0
12
7th Avenue South
10
6
0
0
16
8d' Avenue South
6
5
0
0
11
9t' Avenue South
11
4
0
0
15
l Od' Avenue South
15
6
0
0
21
l lt' Avenue South
8
5
0
0
13
Broad Avenue
20
0
28
0
48
12th Avenue South*
4
0
103
0
107
13th Avenue South
22
0
9
0
31
14th Avenue South
16
14
0
0
30
15th Avenue South
10
8
0
0
18
16th Avenue South
16
14
0
0
30
17th Avenue South
7
3
0
0
10
18th Avenue South
12
13
14
0
39
19th Avenue South
0
0
0
0
0
21" Avenue South
0
0
0
20
20
*Primary beach access contains a minimum of 100 parking spaces and public restrooms
* *Permit spaces are available to residents and the general public for the same price
Collier County
Long Range Budget Plan
FY 11/12 — Collier County Beach Renourishment
QuallfVfna Hotels
Edgewater Hotel
Area determined to be publicly accessible
85' north of R58 to R79
Area determined to be critically eroded
R57.8 to R79
Total eligible shoreline length: 18,410'
Total project shoreline length: 19,375'
Agenda Item No11 �1
December l' 1
Page 21 of 39
Oualifyina Shoreline
265'
Total Length
18,410'
Percent eligible for State funding: 95.02%
State eligibility incorporates the total project length (critical and non - critical) and eligibility only recognizes publicly
accessible critically eroded shoreline.
*Primary beach access contains a minimum of 100 parking spaces and public restrooms.
13'
7{ � f _ ♦ J�` ��- v`
i�
Project floundarms
Land
Beach Hotft &M Resort Condoe
v CrdkW Erosion Am
CO--Wdt-- -M kl feat based M the Florida
Nth American Datum of 1983. (NAD53).
5 by the
4 Y1
4 -
S
`pr » @flfl1w RE1w ®NN �teQyia�y �rli�t ar p)Yy;.H
Aq
y x yx.. b,L Hd+~ S �11rrw i �141
:t
.a �.a t j ai
A ps �9Y�
>`n � �� Y+ '{ •'ia it, t{y'C�Ci�'y546�t1
�yU 9
s to
LPL
CtAller County Beach
Long � e�.,, M 'kE+j�. � .� � ♦ ire
.K � `}�ia,^i •8P' ; J ". �p (V a -_
Range
r- :.
1 �'
? �,l
_ sf ?„�•^
V
1. Coordinates .. in feet b.-d on the HOW.
MAN Pig- COMinate Sydinri. East Z—,
ra r h
h� 2. .
Pi
5.
h: � \� � �, ) 1 ��� ��.ws'.O t7 7yf{tl.�l i}W�l .r■
I I
t�f
if
� �77� � f ", r d >� ,� •;•tom
CPE
t
s�
Road B..dlb.
^1
pub"-Owrod Property (Beach Access)
OOV CrIUMI Erosion Am
I- COOnOW" are in OW bleW On the Florida
North Armarim DK= of IM. (NAM).
2. Dab of Aerial Photography: 2DO9.
3. PubkkOmod Property and Be" Hotels
ey
Ik
ri a
`✓1n`�z
r,•
M 1 •� 1 ' lF
- ��� 5 i,l•, it 1 �T ` fi �j�.
1.
` p '1yA N
MI
:r
wv{
{�•{ r , ,� tlC� ii 1'� �yq,lj�yl .Rif r, yy�,jil
T
y tY. ;Y 4 ii
�14-01Y,
„i 3`� 41 Sry�y ➢a sr
v;` ri .vac' tf is.�' �_•a, wrx -ri.�i l�,�� ; =�'
'r a 1 >- ~� �✓` &w v:�T ice'; a
.UWh.
�i
at i r. eS_
LPt
Lwv Ranon Beach Plan
Jr ! a
�� Kim
16D 13
Agenda Item No. 16D13
December 14, 2010
Page 25 of 39
FY 2011 -12 Local Government Funding Request
Project Name: South Marco Island Beach Renourishment
Project Description: This project includes the yearly physical beach monitoring, beach tilling,
and turtle /shorebird monitoring leading to beach nourishment and improved structures in
2012/2013. All the monitoring activities are required by the FDEP permit.
Marco Beach was restored in early winter 2007 using approximately 180,000 cubic yards of
hydraulic fill along with the maintenance of 4,500 feet of Gulf of Mexico shoreline along the
City of Marco Island. The project area was previously renourished in 1997. The same borrow
area from the 1997 project was used for the 2007 project, which was completed in March 2007.
The design project life for the recent nourishment is between six to eight years.
Project Location: The South Marco Island Beach Renourishment Project is located on the
southwest Florida coastline of Collier County between Florida Department of Environmental
Protection monuments R -142 and beyond R -148 to the terminal groin. The project is being
designed for the next nourishment with consideration for improving the existing structures.
Use of Requested Program Funds: Funds requested for FYI 1/12 will be used for annual
physical monitoring and turtle monitoring activities associated with the 2007 construction, and
design for the next nourishment.
Local Government Support
Does this sponsor have dedicated support staff whose sole priority is to manage beach erosion
control activities? vPQ
Name
Title
Email
Percent
Qtr 1 (Sept)
Sept. 30
Commitment
Gary McAlpin
Director, Coastal Zone
GaryMcAlpin @colliergov.
100%
Qtr 3 (Mar)
Management
net
N
Address 1:
3301 East Tamiami Trail
Phone:
239 -252 -2966
W. Harmon Turner Bldg., Suite
103
Address 2:
Naples, Florida 34112
Fax:
239- 252 -2950
Quarterly Report Compliance:
2008 -2009
End Date
Report Sent
Compliant
Qtr 1 (Sept)
Sept. 30
N
Qtr 2 Dec
Dec. 31
N
Qtr 3 (Mar)
Mar. 31
N
Qtr4 (June) 1
June 30
N
16D 13
Agenda Item No. 16D13
December 14, 2010
Collier County Page 26 of 39
Long Range Budget Plan
FY 11/12 — South Marco Island Beach Renourishment
How will revenue for the local funding cost share be established?
Local funding for the project will be obtained by Collier County through a Tourist Development
Tax. This provides a dedicated long term funding source through a `bed tax'. Collier County
levies a four (4 %) percent Tourist Development Tax on all rental income received from
accommodations rented for six months or less.
Is the funding from a dedicated long term source for this project? Yes
Collier County has dedicated the majority of the Tourist Taxes to beach maintenance, including
funding projects within Marco Island. Collier County has a dedicated staff.
In order to acquire funding, a resolution from the local governmental entity must be
provided by the application deadline which declares:
Support from the Sponsor for the Proposed Project
Willingness to serve as the Local Sponsor
• Ability to provide the full Local Cost Share
• Funding Source
Has the local sponsor resolution been attached to the application fulfilling all of these
requirements? Yes, it will be provided.
This project is detailed in Collier County's 10 -year Capital Plan for Beach Projects which has
been approved by Collier County Board of County Commissioners.
A County Commission resolution specifically in support of this individual project is on file at
DEP offices.
Has the State cost - shared in a feasibility or design phase of this project? Yes
Previous State Cost Share percentage 41.76%
10 -Year Project Schedule and 5 -Year Estimated Budget
Does this project have Congressional Authorization? No
Does this project have a Federal Project Cooperative Agreement? No
What is the end date of the Federal Authorization? n/a
Federal cost share available for this erosion control project: 75%
Marco Island Beach has FEMA Category G funds due to damage as a result of Tropical Storm
Fay. This has been included within the 5 -year estimated budget under the Federal Cost Share
column at 75% of eligible cost.
16013 Agenda Item No. 16D13
December 14, 2010
Page 27 of 39
Collier County
Long Range Budget Plan
FY 11/12 — South Marco Island Beach Renourishment
Schedule and Budget (Include estimated phases for 10 years and estimated project costs for
5 years.):
Year
Proposed
Method
Description
Total
Estimated Cost
Federal Cost
Share
State Cost
Share
Local Cost
Share
2011/2012
Monitoring
Phys, Turtle
$76,555
$57,416
$3,996
$15,142
Design
Renourishment
$100,000
$75,000
$5,220
$19,780
Breakwater
$350,000
$0
$73,080
$276,920
2012/2013
Monitoring
Phys, Turtle
$77,386
$58,039
$4,040
$15,307
Construction
Renourishment
$2,700,000 $1,832,843
$181,062 $686,095
B
$1,500,000 0
$313,200 $1,186,800
2013/2014
Monitoring
ys, urt e
,
2014/2015
Monitoring
Phys, Turtle
$79,098 0
$16,516 $62,582
2015/2016
Monitoring
Phys, Turtle
$79,980 so
$16,700 $63,280
2016/2017
2017/2018
2018/2019
2019/2020
2020 2021
Monitoring
onitormg
Monitoring
Monitoring
Monitoring
Phys, Turtle
ys, Turtle
Phys, Turtle
ys, urt e
Length of Project Boundary in Feet: 6.560 ft
Length of commercial or recreational property fronting the project shoreline:
2,740 ft
Percentage of project shoreline designated as commercial or recreational property
41.76%
Eligibility:
Access Points and Public Lodging Establishments:
Project Boundary: 330' south of R142 to 600' south of R148
Approximate Shoreline Length: 6,560'
Public Access
Swallow Avenue
Qualifying Hotels
Hilton Hotel
Radisson Hotel
Parking Spaces
70 (on site)
Qualifying Shoreline
510'
350'
Area determined to be publicly accessible Total Length
330' north of R144 to 500' north of R145 860'
20' north of R146 to R148 1,880'
Collier County
Long Range Budget Plan
FY 11/12 — South Marco Island Beach Renourishment
Area determined to be critically eroded
R142 +330 to R148 +600
Total eligible shoreline length: 2,740'
Total project shoreline length: 6,560'
Agenda IteAOU3 1 3
December 14, 2010
Page 28 of 39
Percent eligible for State funding: 41.76%
State eligibility incorporates the total project length (critical and non - critical) and eligibility only recognizes publicly
accessible critically eroded shoreline.
See attached map of eligible shorelines.
The Collier County occupational licenses and the Florida Department of Businesses and
Professional Regulation licenses for the following hotels are on file and can be provided if
required.
Additional Rankine Criteria
Will this project enhance or increase the longevity of a previously- constructed project?
Yes
Will this project nourish a previously restored shoreline? Yes
Rate of Erosion as determined by the Bureau based on long term data (ftlyr) 3.1 ft/vr
Severity of Erosion:
A majority of the project area has been designated by FDEP as critically eroded. Marco Beach is
currently eroding at a rate of -11.7 feet per year since January 2007.
Project Benefits:
2,740 linear feet (41.76 %) of the Marco Island Beach property is zoned commercial or
recreational. This includes two hotels /resort condos and a public access point with parking
across the street.
Periodic dredging has taken place at Caxambas Pass. The total volume of sand dredged and
hydraulically pumped to the adjacent beach from Caxambas Pass since 1990 is estimated at
800,000 cubic yards.
Though Collier County has no federally designated sea turtle refuges, loggerhead sea turtles nest
throughout the county, and this project will enhance those opportunities. Beach tilling will
directly support turtle nesting by decreasing beach sand compaction.
Collier County
Long Range Budget Plan
FY 11/12 — South Marco Island Beach Renourishment
4I'dtil I.P
Agenda Item No. 1�3D13
December 14, 2013
Page 29 of 39
Use of Innovative Applications of Existing Technologies:
Improvements to the combined breakwater and groin system at the south end of the project area
is being investigated for improvements to control sand being lost off the south end of the island.
Nourishment Interval (years): 6 -8
Project Performance:
Beach fill material was dredged from Caxambas Pass and placed between FDEP R- monuments
R -145 to R -148. Overall, approximately 176,000 cubic yards of sand were placed onto the
beaches of South Marco Island.
The project area has about 109 feet, or 75 %, of beach width remaining since construction. Since
construction, the shoreline has lost approximately 36 feet of shoreline, which is equivalent to a
rate of -11.9 feet per year. The project area has retained its construction volume; however, the
profiles at the southern end of the project area have eroded while the profiles in the northern
section of the project area have accreted.
Is this project being planned or constructed in cooperation with another local government?
Explain? Yes
Collier County and the City of Marco Island are jointly sponsoring this project. The project
combines beach nourishment with inlet dredging. All county monitoring, including the two
cities, is combined for economy.
YY
f
H .a
�� CC
� F f,brtil4r,.,°
.47 a r
p a
. tl It . �,,� •�.
pp
1} 1' ■
f'F'F
ey
Agenda Item t
December 1 1 1 0 13
Page 31 of 39
FY 2011 -12 Local Government Funding Request
Project Name: Wiggins Pass Inlet Management Inlet Management Plan Implementation
Project Description: The project goal is to improve inlet navigation conditions without the use
of structures, and reduce erosion on adjacent beaches at Wiggins Pass, Collier County, FL. This
will be accomplished by straightening the inlet channel layout and modifying bypassing. The
designated dredge disposal locations and quantities will be modified and relocated to increase
management flexibility, reduce sediment loss to the system and impacts to Barefoot Beach
shoreline. A dynamic design will be incorporated into the maintenance plan for the inlet so that
long -term dredging can be reduced. Impacts to natural resources will be avoided or minimized.
The goals for the Wiggins Pass navigation improvement study as developed by Collier County
and the Wiggins Pass Modeling Evaluation Work Group are:
1. To provide a safe channel for boating
2. To address erosion at Barefoot Beach
3. To lengthen the dredge cycle and accomplish it with the least effect on the
environment
4. To provide a solution that is economically effective
The project will be implemented in four phases. The phases include initial construction (Figure
1), major maintenance dredging, intermediate ebb channel dredging and monitoring, mitigation
and contingency plans. A Barefoot Beach restoration project is separate and will not be included
in this request. It will supplement bypassing proposed in this project.
Figure 1. Phase I of Construction
Agenda Item No. 16D13
December 14, 2010
Page 32 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
There are five game changing facts recognized since the current plan for Wiggins Pass was
formulated in the 1990's that will be connected by the new plan:
1. The flood channel is migrating north significantly
2. Net alongshore transport is to the north
3. Insufficient bypassing is occurring to the north
4. The inlet and flood shoal are infilling from the south by a reoccurring sand wave
5. The rock ledge/ hard substrate extends to both sides of the channel
These facts are the basis for the new design proposed in Wiggins Pass Engineering Reports (Feb
2010), submitted as Attachment 33a of the JCP permit. An inlet management plan with
modeling and permit application is currently in progress.
The modeling studies (CPE 2009) indicate that improved navigation conditions and mitigation of
erosion on adjacent beaches can be achieved by redesigning the navigation channel and
modifying the placement location and quantity of the dredged material. The total initial cut
volume estimate is 80,000 CY (Figure 1) and it will provide a prolonged maintenance interval.
The maintenance will include major maintenance dredging of approximately 45,000 CY each 4
years along with intermediate ebb (surgical) channel dredging of approximately 6,000 CY as
needed. This restoration will provide additional sand for bypassing to Barefoot Beach,
mitigating the historic erosion problem in this area. Periodic bypassing to Delnor Wiggins State
Park will be part of the plan.
A nourishment of Barefoot Beach is being considered as a separate project to restore the
shoreline and adjacent ebb shoal with a one time nourishment of 250,000 CY, supplementing this
plan. This project will help restore the sediment deficit to the north.
Project Location: The Wiggins Pass Project is located on the southwest Florida coastline in
Collier County between Florida Department of Environmental Protection monuments R16 and
R17 and the project is adjacent to approximately 2300 feet of critically eroded Gulf shoreline.
Use of Reauested Program Funds: Funds requested for FYI 1 /12 will be used for final design
and initial construction of the project.
Local Government Sunnort
Does this sponsor have dedicated support staff whose sole priority is to manage beach erosion
control activities? Vi-.-.
Name
Title
Email
Percent
Commitment
Gary McAlpin
Director, Coastal Zone
GaryMcAlpin @colliergov.
100%
Management
net
Address 1:
3301 East Tamiami Trail
Phone:
239 - 252 -2966
W. Harmon Turner Bldg., Suite
103
Address 2: 1
Naples, Florida 34112 1
Fax:
239- 252 -2950
Agenda Ite ;N61 A 313
December 14, 2010
Page 33 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
Quarterly Report Compliance:
None, this is an initial request.
Revenue for the local cost share will be provided by: Local funding for the project will be
obtained by Collier County through a Tourist Development Tax. This provides a dedicated long
term funding source through a `bed tax'. Collier County levies a four (4 %) percent Tourist
Development Tax on all rental income received from accommodations rented for six months or
less.
Is the funding from a dedicated long term source for this project? Yes
Collier County has dedicated the majority of the Tourist Taxes to beach maintenance, including
funding projects for inlet dredging that benefits adjacent shorelines. Collier County has a
dedicated staff.
In order to acquire funding, a resolution from the local governmental entity must be
provided by the application deadline which declares:
• Support from the Sponsor for the Proposed Project
• Willingness to serve as the Local Sponsor
• Ability to provide the full Local Cost Share
• Funding Source
Has the local sponsor resolution been attached to the application fulfilling all of these
requirements? Yes, it will be provided
Previous State cost -share for a feasibility or desioulvermittine phase of this project:
The 1995 Inlet Management Plan was cost shared 50 %. 50%
10 -Year Project Schedule and 5 -Year Estimated Budget
Does this project have Congressional Authorization? No
Does this project have a Federal Project Cooperative Agreement? No
What is the end date of the Federal Authorization? NA
Federal cost share available for this maintenance dredging project: NA
16-D I ?; Item No. 16D13
December 14, 2010
Page 34 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
Schedule and Budget (Include estimated phases for 10 years and estimated project costs for
5 years.):
Year
Proposed
Method
Description
Total
Total
Cost
Federal Cost
Share
State Cost
Shan
Local Cost
Share
2011/2012
Design
Model/Plan
$250,000
$0
$187,500
$62,500
Construction
Drcdgmg
$1,800,000
$600,000
2012/2013
Design
Plans/Specs
$100,000
$0
$75,000 •
$25,000
omtonng
P ys
,5
,
2013/2014
Construction
Dredging
$300,000
$0
$200,000
$100,000
Monitoring
Phys
$38,000
$0
$28,500
$9,500
2014/ 2015
Design
Plans/Specs
$100,000
$0
$75,000
$25,000
omtonng
Phys
0
$23,5uo
$9,500
2015/2016
Construction
Dredging
$1,200,600
$0
$900,000
$300,000
omtonng
Phys
$38,000
$28,500
,50
1
Monitoring
Phys.
,
201712018
omtonng
Phys
18/ 9
oMrtonng
Phys
201912020
omtonng
Phys
Mapping- Maas are provided as attachments along with ownership
Length of Project Boundary in Feet: This is an Inlet Management Project, but public parks
stretch over a mile in either direction.
Length of commercial or recreational property fronting the project shoreline:
All adjacent shoreline is public park.
Percentage of project shoreline designated as commercial or recreational property
100%
Eligibility: Access Points and Public Lodging Establishments:
Adjacent beaches are Parks
Inlet/Additional Ranking Criteria
Will this project enhance or increase the longevity of a previously- constructed project?
Yes
Beach Quality Sand
An estimate of the annual quantity of beach - quality sand reaching the updrift boundary of the
improved inlet channel. Estimated volume receiving 1 point per 10,000 CY with maximum of
10 points.
20,000 CY based on dredging records 2 Points
tAZ13.13
December 14, 2010
Page 35 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
Severity of Erosion
The severity of the erosion to the adjacent beaches caused by the inlet and the extent to which the
proposed project mitigates the erosive effects of the inlet. Severity of erosion for down drift area
of erosion calculated on average rate of erosion since 1972 at 2 points per foot with maximum of
10 points.
Down drift (RI 4 -Rl6) erosion has averaged 6.1 ft/yr since 1978. 10 Points
Overall Significance and Anticipated Success
The overall significance and anticipated success of the proposed project in balancing the
sediment budget of the inlet and adjacent beaches and addressing the sand deficit along the inlet -
affected shoreline. Balancing the sediment budget: Divide the average shoreline recession since
1972 of adversely impacted beach by the average design width to be restored and maintained
multiplied by 10, for a maximum of 10 points.
Average shoreline recession of 6.1 feet and an average design width to be restored of
15.6 feet. 3.9 Points
Bypassing Activities
The extent to which existing bypassing activities at an inlet would benefit from modest, cost -
effective improvements when considering the volumetric increases from the proposed project,
the availability of beach - quality sand currently not being bypassed to adjacent eroding beaches,
and the ease with which such beach - quality sand may be obtained. Cost effective alternatives:
Cost per CY to bypass before project improvements divided by cost per CY after multiplied by 5
for maximum of 10 points.
Increase 4,400 cy /yr 5 Points
Interest and Commitment of Local Governments
The interest and commitment of local governments as demonstrated by their willingness to
coordinate the planning, design, construction, and maintenance of an inlet management project
and their financial plan for funding the local cost -share for initial construction, ongoing sand
bypassing, channel dredging, and maintenance. Dedicated long term funding source for inlet
management: 5 points. Dedicated staff for beach and inlet management: 2 points. 75% or better
compliance and correct billings: 3 points.
8.5 Points
Previous Completion or Approval
The previous . completion or approval of a state - sponsored inlet management plan or local -
government- sponsored inlet study concerning the inlet addressed by the proposed project, the
ease of updating and revising any such or study, and the adequacy and specificity of the plan's or
study's recommendations concerning the mitigation of an inlet's erosive effects on adjacent
beaches. The 1995 and Strategic Management Plan are the basis for current practices.
A new plan is in progress. 5 Points
AgendAemINA 6133
December 14, 2010
Page 36 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
Performance Enhancement
The degree to which the proposed project will enhance the performance and longevity of
proximate beach nourishment projects, thereby reducing the frequency of such periodic
nourishment projects. Increased nourishment interval estimated for down drift beach: 1 point per
year with maximum of 5 points.
2.0 Points
Project Benefits:
The project will attempt to reestablish the historic shoreline and the ebb shoal size. Also, Gopher
tortoises utilize Barefoot Beach for nesting purposes although none of the areas within the
project area have been designated as a turtle refuge.
Periodic dredging and bypassing has taken place at Wiggins Pass in recent decades. The total
volume of sand bypassed to adjacent beaches from maintenance dredging has been 498,650
cubic yards since 1984. Approximately 260,937 cubic yards of that fill has been placed to the
north, with the remaining 237,713 cubic yards being placed to the south of the inlet. The ratio
needs to be shifted to approximately 2.6:1 in favor of the north.
Use of Innovative Applications of existing technologies:
Maintain natural alignment after implementation and use of intermediate (surgical) dredge events
to delay major dredge events.
Dredging Interval (years): 4
Project Performance: ,
Wiggins Pass was designed to be dredged at regular intervals of approximately 3 to 4 years but is
currently dredged at regular intervals of approximately 2 years or less to maintain navigable
depths for recreational boaters. The dredge channel extends from the inlet throat to about 1,200
feet offshore. Periodic dredging has occurred at the intersection of the interior channels. The
inlet has been dredged since 1984 under two previous permits, secured by the County with a
local consultant.
Since maintenance dredging began in 1984, the overall erosion has increased along with the
magnitude of erosion experienced at beaches to the north. Intially, the beaches to the south were
erosional through the early 1990s. Since 1992, the shoreline north of the inlet at Barefoot Beach
has retreated on average approximately 87 feet. The worst area of erosion is occurring at R16,
where, since 1992, it has lost approximately 437 feet of shoreline.
Overall, it appears that the current maintenance dredging practices are not properly addressing
the northern losses at Barefoot Beach nor the stability of the dredged channel. Historic reports
indicated that sediment transport was from north to south, and erosion was higher south of the
inlet between 1957 and 1979. However, the recent volumetric data contrasts with that belief.
From 1979 to 2009, the area north of Wiggins Pass (R11 to R 16) eroded 252,926 cubic yards,
while the area south of the inlet has accreted 49,603 cubic yards. Prior to 1979, before
maintenance dredging, the erosion accretion pattern was reversed, with the north accretional.
Agend;.0 1 13
December 14, 2010
Page 37 of 39
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
Using these values along with the historic shoreline changes, it appears that more sand needs to
be disposed of.at the north during maintenance dredging to reduce erosion on Barefoot Beach.
The amount of dredge disposal north and south of the inlet has been nearly equal since dredging
began in 1984. Lately, the trend is towards north disposal since 2001. An analysis was made to
calculate the disposal balance needed to make each area have an equal erosion rate. As an
example, the areas south of the inlet (R17 to R21) showed a gain of almost 50,000 CY since
1979, while the area north of the inlet (RI l to R16) lost 253,000 CY. To equalize the rate of
volumetric change in these areas since 1979, disposal volumes should have been 2.7 times
greater to the north (Barefoot Beach Park) than the south (Delnor Wiggins Park). This is a major
shift over past practices. Ultimately, this bypassing ratio should equalize stability of the
shoreline north and south of the inlet.
Navigation will be improved by straightening the channel through the flood and ebb shoal,
reducing the need for dredging. Boaters have difficulty finding the channel in the S -shape
natural alignment. The S -shape is caused by a long term natural process. Human engineering
factors are needed for improved channel design.
Is this project being planned or constructed in cooperation with another local government?
Explain? No
Collier County
Long Range Budget Plan
FY 11/12 — Wiggins Pass Inlet Management Plan Implementation
ATTACHMENT A
FUNDING ELIGIBILITY
Wiggins Pass Inlet Management Plan Implementation
2009 Project Boundaries:
Project Boundary: R16 south of R17
Public Access
Delnor Wiggins State Recreation Area*
Barefoot Beach
Area determined to be publicly accessible
Both adjacent shorelines
Area determined to be critically eroded
R14 to R16.3
Funding Rate: 75% for IMP
16fli
Agenda item No. 16
December 14, 2010
Page 38 of 39
On -site
Adjacent Total
Spaces
Spaces Spaces
340
0 340
100+
100+
1
.0013
6£ 10 6E 96ed
060Z '17L aagwaoaa
CL09L 'ON WGII epu96y