Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Backup Documents 09/28/2010 Item #16E12
16E12 MEMORANDUM Date: October 5, 2010 To: Lyn Wood, Contract Specialist Purchasing Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Contract #10 -5510 "Annual Contract for General Contracting Services" Contractor: Wright Construction Group, Inc. Attached is an original contract, as referenced above, (Item #16E12) approved by the Board of County Commissioners on September 28, 2010. The second original will be held on file in the Minutes and Record's Department as part of the Board's Official Record. If you should have any questions, please contact me at 252 -8406. Thank you. Attachment MEMORANDUM TO: Ray Carter Risk Management Department FROM: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department DATE: September 28, 2010 RE: Review Insurance for Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 Please review the Insurance Certificates for the above referenced contract. If everything is acceptable, please forward to the County Attorney for further review and approval. Also, will you advise me when it has been forwarded. Thank you. If you have any questions, please contact me at extension 2667. SEP 2 9 MCI Ll • �L ,( dod /LMW C: Hank Jones, Facilities Mgmt. 16E12 16E12 mausen_g From: RaymondCarter Sent: Thursday, September 30, 2010 2:10 PM To: LynWood Cc: JonesHank; mausen_g; HerreraSandra Subject: Contract 10 -5510 "Annual Contract for General Contractor Services" All, I have approved the certificate(s) of insurance for the following vendors under contract 10 -5510: I. PBS Constructors 2. Wright Construction I Vanderbilt Bay 4. Surety Construction 5. Bradanna These contracts will now be forwarded to the county attorney's office for their review. Thank you, �� Manager Risk Finance Collier County Board of County Commissioners 3301 East Tamiami Trail Naples, FL 34112 Office 239 - 252 -8839 Mobile 239 - 821 -9370 Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 1 ITEM NO.: s FILE NO.: (/ ROUTED TO: [) fl� �� - P / 7, ? /-/ 16E 12 ,,DATE RECEIVED: ia"OUN I Y ATTORNEY 1019 07 -1 AM 11 02 P L DO NOT WRITE ABOVE THIS LINE V 1 V� 4 REQUEST FOR LEGAL SERVICES Date: September 28, 2010 To: Office of the County Attorney W2f° <� AIld Scott R. Teach From: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department, Extension 2667 Re: Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: /PBS Constructors V Wright Construction Vanderbilt Bay Surety Construction Bradanna BACKGROUND OF REQUEST: This Contract was approved by the BCC on September 28, 2010 Agenda Item 16.E.12 This item has not been previously submitted. ACTION REQUESTED: Contract review and approval. OTHER COMMENTS: Please forward to BCC for signature after approval. If there are any questions concerning the document, please contact me. Purchasing would appreciate notification when the documents exit your office. Thank you. C: Hank Jones, Facilities Mgmt. r b I Vt' IN 16E12 RLS # lu w . r) ► � CHECKLIST FOR REVIEWING CONTRACTS Entity Name: Entity name correct on contract? No Entity registered with FL Sec. of State? Yes No Insurance Insurance Certificate attached? Insured registered in Florida? Contract # & /or Project referenced on Certificate? Certificate Holder name correct (BCC)? Commercial General Liability General Aggregate Required $ Products /Compl/Op Required $ Personal & Advert Required $ Each Occurrence Required $ l Fire/Prop Damage Required $ Automobile Liability Bodily Inj & Prop Required $}L Workers Compensation Each accident Required $ Disease Aggregate Required $ ;1 Disease Each Empl Required $ Umbrella Liability Each Occurrence Provided $ 41 m;,' Aggregate Provided $�\ 1 Does Umbrella sufficiently cover any underinsured portion? Professional Liability Each Occurrence Required $ Provided $ Per Aggregate Required $ Provided $_ Other Insurance Each Occur Type:_tY� Required $ County required to be named as additional insured? County named as additional insured? Provided $2 1 Provided $ ti .r Provided $ � m 11 Provided $ 19 1 t Provided $_=5CO K Provided $ATY-1 � N I Provided $A)M� \I Provided $ Provided $ Exp Date 1 1 Exp Date it • / es No es No es No Yes No Exp. Date 1 1 l ( Exp. Date Exp. Date Exp. Date Exp. Date Exp Date k ► ( f Exp Date ► t 1 1 Exp Date Exp Date Indemnification Does indemnification meet County standards? Is County indemnifying other party? Performance Bond Bond requirement referenced in contract? If attached, expiration date of bond Does dollar amount match contract? Agent registered in Florida? Yes > No Exp. Date Exp. Date Provided Exp Date < < 1 Yes No Yes No Yes No Yes Z Yes No Yes No Yes No Signature Blocks Correct executor name in signature block? a�,,'Ire_s' No Correct title of executor? No Exec utor authorized to sign for entity? No Proper number of witnesses /notary? No Authorization for executor to sign, if necessary: Chairman's signature block? es No Clerk's attestation signature block? s No County Attorney's signature block? Yes No Attachments Are all required attachments included? Yes No Reviewer Initials: Date: 04 -COA -01MOM www.sunbiz.org - Department of State Home Contact Us E- Filing Services Previous on List Next on List Return To List No Events No Name History Detail by Entity Name Florida Profit Corporation WRIGHT CONSTRUCTION GROUP, INC. V/ Filing Information Document Number P05000013433 FEI /EIN Number 202246559 Date Filed 01/26/2005 State FL Status ACTIVE Principal Address 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Mailing Address 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Registered Agent Name & Address KNOTT, GEORGE H. ESQ. 1625 HENDRY STREET, STE. 301 FORT MYERS FL 33901 US Officer /Director Detail Name & Address Title PRES EDMAN, FRED M. 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Title VP MOYER, KEITH A 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Title VP POWELL, GEORGE A 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Title SECY EDMAN, FRED M 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Document Searches 16'�rl °2 Forms Help Entity Name Search Submit http: / /www. sunbiz.org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= PO50000134... 8/24/2010 www.sunbiz.org - Department of State Title TREA b BUELTEL, MITCHEL G 5811 YOUNGQUIST ROAD FORT MYERS FL 33912 Annual Reports Report Year Filed Date 2008 01/11/2008 2009 01/16/2009 2010 01/14/2010 Document Images 01/14/2010 --ANNUAL REPORT View image in PDF format 01/16/2009 --ANNUAL REPORT View image in PDF format 01/11/2008 -- ANNUAL REPORT View image in PDF format 02/15/2007 -- ANNUAL REPORT View 'image in PDF format 04/28/2006 -- ANNUAL REPORT View image in PDF format 01/26/2005 -- Domestic Profit 'View image in PDF format 16E'$awe 2 of 2 Note: This is not official record. See documents if question or conflict. Previous on List Next on List Return To List Entity Name Search No Events No Name History Submifi Home I Contact us I Document Searches I E- Filing Services I Forms I Help Coovriaht© and Privacv Policies State of Florida, Department of State http: / /www. sunbiz.org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= P050000l 34... 8/24/2010 A G R E E M E N T 10-5510 16E12 for Annual Contract for General Contractor Services THIS AGREEMENT is made and entered into this day of &,ph.,L btu— , 2010, by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "County" or "Owner ") and Wright Construction Group, Inc., authorized to do business in the State of Florida, whose business address is 5811 Youngquist Road, Fort Myers, Florida 33912 (hereinafter referred to as the "Contractor "). WITNESSETH: 1. COMMENCEMENT: The contract shall be for a one (1) year period, commencing on September 28, 2010 and terminating September 27, 2011, or until such time as all outstanding Work Orders issued prior to the expiration of the Agreement period have been completed. This contract shall have three (3) one (1) year renewals, renewable annually. The County Manager, or his designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK: The Board of County Commissioners deemed five (5) firms to be pre - qualified and awarded a Contract to each firm. Each awardee will enter into an Agreement to provide complete general contractor services on an as- needed basis as may be required by the Owner in accordance with the terms and conditions of RFP #10 -5510 and the Contractor's proposal, which is incorporated by reference and made an integral part of this Agreement. The execution of this Agreement shall not be a commitment to the Contractor that any work will be awarded to the Contractor. Rather, this Agreement governs the rights and obligation of the Quotation procedure outlined in the next paragraphs and all Work undertaken by Contractor for Owner pursuant to this Agreement and that procedure during the term and any extension of the term of this Agreement. This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Contractor and the County project manager or his designee, in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. Prior to the issuance of a Work Order, the Owner shall provide a summary of Work to be performed which will afford the Contractor the opportunity to submit a formal quotation for the Work; the Contractor shall respond with the information sought within seven (7) working days. For projects with an estimated cost of Fifty Thousand Dollars ($50,000) or less, the Owner shall obtain a proposal from one (1) or more of the selected firms, negotiate favorable project terms and conditions, and issue a numbered Work Order, signed by the Department Director to initiate the projects. For projects with an estimated cost over Fifty Thousand Dollars ($50,000) up to Two Hundred Fifty Thousand Dollars ($250,000), competitive quotes shall be solicited from all of the selected firms. The Contractor shall respond with the information sought within ten (10) working days. The County will negotiate favorable project terms and conditions, and issue a numbered Work Order to initiate the projects. Division Administrator approval is required at this level. Page -1- 16E12 If Payment and Performance Bonds are required, Contractor shall provide within seven (7) working days after notification of award. In each Request for Quotation, the Owner reserves the right to specify the period of completion and the collection of liquidated damages in the event of late completion. 3. THE CONTRACT SUM: The Owner shall pay the Contractor for the performance of the Work pursuant to the quoted price offered by the Contractor in his response to a specific Request for Quotation. Any County agency may utilize the services offered under this contract, provided sufficient funds are included in its budget(s). 4. NOTICES: All notices required or made pursuant to this Agreement to be given by the County to the Contractor shall be made in writing and shall be delivered by hand, by fax, e-mail, or by the United States Postal Service Department, first class mail service, postage prepaid, addressed to the following Contractor's address of record: Keith Moyer, Vice President Wright Construction Group, Inc. 5811 Youngquist Road, Ft. Myers, FL 33912 Phone: 239 - 481 -5000 Fax: 239 - 481 -2448 Email: KeithM @WrightG.com All notices required or made pursuant to this Agreement to be given by the Contractor to the County shall be in writing and shall be delivered by hand, by fax, e-mail, or by United States Postal Service Department, first class mail service, postage prepaid, addressed to the following County's address of record: Collier County Government Complex Purchasing Department 3301 East Tamiami Trail Purchasing Building G Naples, Florida 34112 Attention: Stephen Y. Carnell Purchasing /General Services Director Phone: 239 - 252 -8371 Fax: 239 - 252 -6584 Email: SteveCarnell @colliergov.net The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Service Agreement must be in writing. 5. NO PARTNERSHIP: Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. 6. PERMITS: LICENSES: TAXES: In compliance with Section 218.80, Florida Statutes, all permits necessary for the prosecution of the Work shall be obtained by the Contractor. Payment for all such permits issued by the County shall be processed internally by the County. Contractor is not responsible for paying for permits issued by Collier County, but is responsible for acquiring all Page -2- 16E12 permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier county agencies when the Contractor is acquiring permits. All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 7. NO IMPROPER USE: The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, county facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Contract of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty -four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 8. TERMINATION: Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County and requirements of this Agreement, the County may terminate said Agreement for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non - performance. 9. NO DISCRIMINATION: The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 10. INSURANCE: The Contractor shall provide insurance as follows: A. Commercial General Liability: Coverage shall have minimum limits of $1,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent contractors; Products and Completed Operations and Contractual Liability. B. Business Auto Liability: Coverage shall have minimum limits of $500,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Owned Vehicles, Hired and Non -Owned Vehicles and Employee Non - Ownership. C. Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of $1,000,000 for each accident. Special Requirements: Collier County Board of County Commissioners shall be listed as the Certificate Holder and included as an Additional Insured on the Comprehensive General Liability. Current, valid insurance policies meeting the requirement herein identified shall be maintained by Contractor during the duration of this Agreement. Renewal certificates shall be sent to the Page -3- 16E12 County ten (10) days prior to any expiration date. There shall be a thirty (30) day notification to the County in the event of cancellation or modification of any stipulated insurance coverage. Contractor shall insure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Contractor shall provide County with certificates of insurance meeting the required insurance provisions. 11. INDEMNIFICATION: To the maximum extent permitted by Florida law, the Contractor shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 12. BONDS. A. When a construction project is in excess of $200,000, the Contractor(s) shall be required to provide Payment and Performance Bonds. B. When required by Owner, the Contractor shall furnish a Performance and /or Payment Bond prior to commencing performance, for the full amount of the Work, which shall act as a security guaranteeing the performance of the Contractor's work and the payment by the Contractor to any other party (ies) providing labor and /or materials in connection with each construction or renovation project performed by the Contractor. The bonds shall be furnished using the forms prescribed in Exhibit "A ". C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the Owner's approval. 13. PAYMENTS. Generally, the Contractor will be paid upon completion; however, for Work in excess of thirty (30) days, the Contractor may receive Progress Payments. Subsequent to the first payment, Contractor must provide Owner with a fully executed Release and Affidavit in the form attached hereto as Exhibit "B as a condition precedent to release of each progress payment. All applications for payment, whether for full payment or a progress payment shall be in writing, and in substantially the form attached hereto as Exhibit "C ". 14. PAYMENTS WITHHELD. Owner may decline to approve any Application for Payment, or portions thereof, because of defective or incomplete work, outstanding punchlist items, subsequently discovered evidence or subsequent inspections. The Owner may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work Page -4- I6F1? will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 15. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products /materials from specifications shall be approved in writing by Owner in advance. 16. CONTRACT TIME AND TIME EXTENSIONS. A. Time is of the essence in the performance of any Work under this Agreement and Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and materialmen, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's supplies and contractors. B. Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of Government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty -eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of his duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 17. CHANGES IN THE WORK. Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any modifications to this Contract shall be in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. A Change Order in the form attached as Exhibit "D" to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the Page -5- 16E12 requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change order in the manner as Owner and Contractor shall mutually agree. If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 38 of this Agreement or else be deemed to have waived any claim on this matter it might otherwise have had. In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10 %) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10 %) markup for all overhead and profit for all Subcontractors' and sub - subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5 %) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15 %). All compensation due Contractor and any Subcontractor or sub - subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub - Contractor's bond costs associated with any change order shall be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 18. COMPLIANCE WITH LAWS. Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, workers' compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Owner in writing. 19. CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 20. ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 21. WARRANTY. Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any materialmen supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Page -6- 16E17 Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 22. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on County projects who are neat, clean, well - groomed and courteous. Subject to the American with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The County may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Collier County projects is not in the best interest of the County. 23. TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish to the Owner the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Owner. 24. PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the Owner with respect to the Project. If Contractor, or its subcontractors, agents or anyone, for whom Contractor is legally liable, disturbs the Owner's benchmarks, Contractor shall immediately notify Owner. The Owner shall re- establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 25. EMERGENCIES. In the event of any emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner is obligated to act to prevent threatened damage, injury or loss. Contractor shall give the Owner written notice within forty -eight (48) hours after the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. Page -7- 16E1? If the Owner determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty -eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 26. COMPLETION. When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Owner in writing that the entire Work (or such designated portion) is substantially complete. Within a reasonable time thereafter, Owner and Contractor shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner does not consider the Work (or designated portion) substantially complete, the Owner shall notify Contractor in writing giving the reasons therefor. If Owner considers the Work (or designated portion) substantially complete, Owner shall notify the Contractor in writing of the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punchlist of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portions thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punchlist. Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Owner will make such inspection and, if Owner finds the Work acceptable and fully performed under the Contract Documents, he shall promptly notify the Contractor in writing, recommending that on the basis of his observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Final payment shall not become due and payable until Contractor submits: (1) The Release and Affidavit in the form attached as Exhibit "B ". (2) Consent of Surety (if applicable) to final payment. (3) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipt, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the acceptability of the Work. Unless and until the Owner is completely satisfied, the final payment shall not become due and payable. 27. LIQUIDATED DAMAGES. The "Commencement Date" shall be established in the Notice to Proceed to be issued by the Owner. Contractor shall commence the work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Page -8- Yd i +r ,pf y Qn„z„ The Work shall be substantially completed within the time specified in the Request for Quotation. The date of substantial completion of the Work (or designated portions thereof) is the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. The Work shall reach final completion and be ready for final acceptance by Owner within the time specified in the Request for Quotation. Owner and Contractor recognize that since time is of the essence for any work under this Agreement, Owner will suffer financial loss if the Work is not substantially completed within the time specified in the Request for Quotation. Should Contractor fail to substantially complete the Work within the specified time period, Owner shall be entitled to assess as liquidated damages, but not as a penalty, the amount specified in the Request for Quotation for each calendar day thereafter until substantial completion is achieved. The Project shall be deemed to be substantially completed on the date the Owner notifies the Contractor in writing of the Substantial Completion date pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to substantially complete the Work in a timely manner. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 28. CONTRACT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Facilities Management Department. 29. COMPONENT PARTS OF THIS CONTRACT. This Contract consists of the attached or referenced component parts, all of which are as fully a part of the Agreement as if herein set out verbatim, including: Contractor's Proposal, Insurance Certificate, RFP No. 10 -5510, Exhibits A, B, C, and D, any addenda, any Quotation/Work Order made or issued pursuant to this Agreement, and any related plans or specifications for any such Quotations or Work Orders. 30. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004 -05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and /or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and /or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and /or quotes; and, c. immediate termination of any contract held by the individual and /or firm for cause. 31. SUBJECT TO APPROPRIATION. It is further understood and agreed, by and between the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. Page -9- 32. SALES TAX. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. 33. IMMIGRATION LAW COMPLIANCE: By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 34.OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES: Collier County encourages and agrees to the successful proposer extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful proposer. 35. AGREEMENT TERMS: If any portion of this Agreement is held to be void, invalid, or otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall remain in effect. 36. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached during negotiations to County for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached at mediation to County's board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. Page -10- 16E12 IN WITNESS WHEREOF, the Contractor and the County, have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date and year first above written. ATTEST: Dwight E. Brock, Clerk of Courts . p�4� �;,, BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA By: W. Fred W. Coyle, Chairman By First Witness M � 'r'CJ.-i C L- f3 y E L i C '--- Type /Print Witness Name econd ess G+t�S VJN% .ZNVt Type /Print Witness Name Approved as to form and legal iciency: Scott Teach Deputy County Attorney Wright Construction Group, Inc. Contractor I V0 to", NMX" %=Pfulaw Typed Signature Page -11- Title Item # lfjaa Agenda q le" ID Date Date Rec'd Deputy rk EXHIBIT A PUBLIC PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: That Principal, and 16f 17, Bond No. Contract No. 10 -5510 as Surety, located at as (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 20 , with Oblige for in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.0592. In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of body. 20_, the name of under - signed representative, pursuant to authority of its governing Page -12- Signed, sealed and delivered in the presence of: PRINCIPAL: C Witnesses as to Principal STATE OF _ COUNTY OF By: _ Name: Its: The foregoing instrument was acknowledged before me this of 20_, by as of a corporation, on behalf of the corporation. He /she is personally known to me OR has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) ATTEST: Witness as to Surety (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: SURETY: (Printed Name) (Business Address) (Authorized Signature) (Printed Name) m Page -13- Witnesses STATE OF _ COUNTY OF As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) The foregoing instrument was acknowledged before me this day of 20_, by as of Surety, on behalf of Surety. to me OR has produced as identification and oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -14- 16E12 He /She is personally known who did (did not) take an EXHIBIT A -2 16F 1. PUBLIC PERFORMANCE BOND Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That , as Principal, and as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bond executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 20 Oblige for ourselves, our heirs, in accordance with drawings and specifications, which contractor is incorporated by reference and made a pat hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract, and 2. Pays Oblige any and all losses, damages, costs and attorneys' fees that Oblige sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Oblige; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications. Page -15- 16E12 This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Oblige for more than the penal sum of this Performance bond regardless of the number of suits that may be filed by Oblige. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Signed, sealed and delivered in the presence of : Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: The foregoing instrument was acknowledged before me this 20_, by , as a He /She is personally known to me OR has produced did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) day of corporation, (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -16- of on behalf of the corporation. as identification and ATTEST: Witness as to Surety Witnesses STATE OF _ COUNTY OF SURETY: (Printed Name) (Business Address) (Authorized Signature) (Printed Name) OR As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) 16E12 The foregoing instrument was acknowledged before me this day of 20_, by as of Surety, on behalf of Surety. He /She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -17- EXHIBIT B RELEASE AND AFFIDAVIT FORM COUNTY OF COLLIER STATE OF FLORIDA ) 16E12 Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ paid, ( "Contractor ") releases and waives for itself and it's subcontractors, material -men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated 20_ for the period from I to (2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly /final] Application for Payment No. _3'1 ITS: DATE: Witnesses STATE OF _ COUNTY OF CONTRACTOR The foregoing instrument was acknowledged before me this , 20_, by of a President [Corporate Seal] day of , as corporation, on behalf of the corporation. He /she is personally known to me or has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) NAME: (Signature of Notary) (Legibly Printed) Notary Public, State of Commissioner No.: Page -18- 16E12 EXHIBIT C FORM OF CONTRACT APPLICATION FOR PAYMENT (County Project Manager) (County Department) Collier County Board of County Commissioners (the OWNER) or Collier County Water -Sewer District (the OWNER) FROM: (Contractor's Representative) (Contractor's Name) (Contractor's Address) Bid No. 10 -5510 Project No. Application Date Payment Application No. for Work accomplished through the Date: RE: (Project Name) Original Contract Time: Original Contract Amount: $ Revised Contract Time: Total Change Orders to Date $ Revised Contract Amount $ Total value of Work Completed Retainage @ 10% thru[insert date] $ and stored to Date $ Retainage @ _% after [insert date] $ Less previous payment (s) $ Percent Work completed to Date: % AMOUNT DUE THIS Percent Contract Time completed to Date % APPLICATION: $ Liquidated Damages to be Accrued $ ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; (4) and CONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: (Contractor's Name) (Signature) DATE: (Type Name & Title) (shall be signed by a duly authorized representative of CONTRACTOR) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional : (DP's Name) (Signature) DATE: _ (Type Name & Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved: By OWNER'S Project Manager: Page -19- (Signature) DATE: _ (Type Name and Title) EXHIBIT D 16E12 CHANGE ORDER CHANGE ORDER NO. CONTRACT NO. 10 -5510 TO: DATE: PROJECT NAME: PROJECT NO.: Under our AGREEMENT dated 20_ You hereby are authorized and directed to make the following change(s) in accordance with terms and conditions of the Agreement: FOR THE (Additive) (Deductive) Sum of: $ Original Agreement Amount Sum of Previous Changes This Change Order (Add) (Deduct) Present Agreement Amount $ The time for completion shall be (increased /decreased) by calendar days due to this Change Order. Accordingly, the Contract Time is now calendar days. The substantial completion date is and the final completion date is Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted: 20 CONTRACTOR: By: By: DESIGN PROFESSIONAL: By: OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA Page -20- 1 CERTIFICATE OF LIABILITY INSURANCE OP ID MN WRIGH -A Dawson of Florida; Naples 6609 Willow Park Drive Naples FL 34109 Phone:239- 261 -6116 Fax:239- 261 -2803 Wright Construction Group, Inc 5811 Youngquist Road Fort Myers -FL 33912 COVERAGES ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURER A. Cincinnati Inaurance Company 10677 INSURER B: Bridgefield Employers INSURER c Crum & Forster Insurance 42471 INSURER D. Chubb Group of mauranco Co. INSURER E THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INOM LTR Zu NS TYPE OF INSURANCE POLICY NUMBER POLICY EFFE DATE (MMIDDIYYYY) POLICY EXPIRATION DATE (MWDDIYYYY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY CLAIMS MADE Fx] OCCUR CPP0891576 01/01/10 01/01/11 PREMISES(Eaoccurence) $500,000 VIED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 82079512 01/01/10 01/01/11 X D &O GENERAL AGGREGATE $2,000,000 GENL AGGREGATE LIMIT APPLIES PER PRODUCTS- COMP /OP AGG s2,000,000 POLICY X JEC LOC T Emp Ben. 1,000,000 A AUTOMOBILE LIABILITY ANY AUTO CPP0891576 01/01/10 01/01/11 c a accident) D SINGLE LIMIT (Ea accident) $1,000,000 X ALL OWNED AUTOS SCHEDULED AUTOS BODILY INJURY (Per person) $ X X HIRED AUTOS NON -OWNED AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC AUTO ONLY AGG $ $ C EXCESS I UMBRELLA LIABILITY X OCCUR ❑ CLAIMS MADE 553- 091997 -5 01/01/10 01/01/11 EACH OCCURRENCE $ 8,000,000 AGGREGATE $16,000,000 DEDUCTIBLE RETENTION $ $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILrY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ OFFICER/MEMBER EXCLUDED? (Mandatory In NH) If yes, describe under 0830 -30920 01/01/10 01/01/11 X TORY LIMITS ER E.L.EACHACCIDENT $ 1,000,000 E. L. DISEASE - EA EMPLOYEE $ 1 , 000 , 000 E . DISEASE - POLICY LIMIT $1,000,000 SPECIAL PROVISIONS below OTHER A Installation Float CPP0891576 01/01/10 01/01/11 500,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Contract 10 -5510 "Annual Contract for General Contractor Services" Collier County Board of County Commissioners are named as additional insured in regard to general liability, but only when required by written contract * 30 days cancellation Notice, except 10 days for non - payment � n 111nWN I c nvL.ucnc CANCELLATION Collier County Board of Commissioners 2800 N Horseshoe Dr Naples FL 34104 ACORD 25 (2009101 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION COLLI29 DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. 1988 -2009 ACORD CORPORATION. All rights rreswrvwd The ACORD name and logo are registered marks of ACORD 16£12 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER This Certificate of Insurance does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2009101) 16E12 MEMORANDUM Date: October 5, 2010 To: Lyn Wood, Contract Specialist Purchasing Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Contract #10 -5510 "Annual Contract for General Contracting Services" Contractor: Vanderbilt Bay Construction, Inc. Attached is an original contract, as referenced above, (Item #16E12) approved by the Board of County Commissioners on September 28, 2010. The second original will be held on file in the Minutes and Record's Department as part of the Board's Official Record. If you should have any questions, please contact me at 252 -8406. Thank you. Attachment MEMORANDUM TO: Ray Carter Risk Management Department FROM: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department DATE: September 28, 2010 RE: Review Insurance for Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 Please review the Insurance Certificates for the above referenced contract. If everything is acceptable, please forward to the County Attorney for further review and approval. Also, will you advise me when it has been forwarded. Thank you. If you have any questions, please contact me at extension 2667. eMrE aMvM SEP 2 9 2010 RISK M OSEMENT, dod /LMW C: Hank Jones, Facilities Mgmt. 16E12 16E12 mausen_g From: RaymondCarter Sent: Thursday, September 30, 2010 2:10 PM To: LynWood Cc: JonesHank; mausen _g; HerreraSandra Subject: Contract 10 -5510 "Annual Contract for General Contractor Services" All, I have approved the certificate(s) of insurance for the following vendors under contract 10 -5510: 1. PBS Constructors 2. Wright Construction 3. Vanderbilt Bay 4. Surety Construction 5. Bradanna These contracts will now be forwarded to the county attorney's office for their review. Thank you, Wa Manager Risk Finance Collier County Board of County Commissioners 3301 East Tamiami Trail Naples, FL 34112 Office 239 - 252 -8839 Mobile 239 - 821 -9370 Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 1 ...16E 12 ITEM NO.: DATEf- iRECi IY�P: / :!23 !A I TORNE', FILE NO.: /� tQio OCT - AM ROUTED TO: t_ �l1 DO NOT WRITE ABOVE THIS LINE V" REQUEST FOR LEGAL SERVICES Date: September 28, 2010 To: Office of the County Attorney Scott R. Teach V (, wl From: Lyn M. Wood, C.P.M., Contract Specialist "S I,— Purchasing Department, Extension 2667 Re: Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna BACKGROUND OF REQUEST: This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 This item has not been previously submitted. ACTION REQUESTED: Contract review and approval. OTHER COMMENTS: Please forward to BCC for signature after approval. If there are any questions concerning the document, please contact me. Purchasing would appreciate notification when the documents exit your office. Thank you. C: Hank Jones, Facilities Mgmt. 16`6( to RLS # CHECKLIST FOR REVIEWING CONTRACTS Entity Name: i 1'C' `�n i i 3n4cuAt =E�P, Entity name correct on contract ?� Yye No • Entity registered with FL Sec. of State? Yes No Insurance Insurance Certificate attached? �es Insured registered in Florida? es Contract # & /or Project referenced on Certificate? s Certificate Holder name correct (BCC)? Yes Commercial General Liability General Aggregate Required $ Provided $ � \ t Products /Compl/Op Required $ \ m rr( Provided $ i c t Personal & Advert Required $ Provided $�� Each Occurrence Required $ ('tl� �� Provided $ it )I Fire/Prop Damage Required $ Provided $ Automobile Liability Bodily Inj & Prop Required $ C� Provided $ \Mi 1 Workers Compensation Each accident Required $ Provided $ t ' `1 • 1J Disease Aggregate Required $ . ,[f,D� Disease Each Empl Required $ Provided $ Provided $�/ Umbrella Liability Each Occurrence Provided $ VDM t Aggregate Provided $ Ir Does Umbrella sufficiently cover any underinsured portion? Professional Liability Each Occurrence Required $ Provided $ Per Aggregate Required $ Provided $ Other Insurance Each Occur Type: Required $ County required to be named as additional insured? County named as additional insured? Indemnification Does indemnification meet County standards? Is County indemnifying other party? Performance Bond Bond requirement referenced in contract? If attached, expiration date of bond Does dollar amount match contract? Agent registered in Florida? No No No No Exp. Date 1 fl Exp. Date Exp. Date Exp. Date Exp. Date Exp Date 1 Exp Date Exp Date Exp Date Exp Date I 1 Exp Date 'r i Yes No Exp. Date Exp. Date Provided $ Exp Date es No �es No Yes No Yes "v Yes No Yes No Yes No Signature Blocks Correct executor name in signature block? es No Correct title of executor? s No Executor authorized to sign for entity? s No Proper number of witnesses /notary? Yes No Authorization for executor to sign, if necessary: Chairman's signature block? es No Clerk's attestation signature block? Y No County Attorney's signature block? es No Attachments Are all required attachments included? Yes No Reviewer Initials: 1� Date: 04 -COA -01030 22 www.sunbiz.org - Department of State Home Contact Us Previous on List Next on List E- Filing Services Events No Name History Detail by Entity Name Return To List Florida Profit Corporation VANDERBILT BAY CONSTRUCTION, INC. Filing Information Document Number K58820 FEI /EIN Number 650103359 Date Filed 01/18/1989 State FL Status ACTIVE Last Event AMENDMENT Event Date Filed 09/11/2006 Event Effective Date NONE Principal Address 2224 TRADE CENTER WAY NAPLES FL 34109 US Changed 01/07/2004 Mailing Address 2224 TRADE CENTER WAY NAPLES FL 34109 US Changed 01/07/2004 Registered Aaent Name & Address BUHS, DANIEL J. 2224 TRADE CENTER WAY NAPLES FL 34109 US Address Changed: 04/28/2008 Officer /Director Detail Name & Address Title P BUHS, DANIEL J 2224 TRADE CENTER WAY NAPLES FL 34109 Title VO BUHS, TROY D 2224 TRADE CENTER WAY NAPLES FL 34109 Title STVF Document Searches 16 Ed, 2= Forms Help Entity Name Search Submit http://www.sunbiz.org/scripts/cordet.exe?action=DETFIL&inq_doc number=K58820&in... 8/24/2010 www.sunbiz.org - Department of State 16 EPT� f 2 SMITH, BRADLY W 2224 TRADE CENTER WAY NAPLES FL 34109 US Title D BUHS, DANIEL J 2224 TRADE CENTER WAY NAPLES FL 34109 US Annual Reports Report Year Filed Date 2008 04/28/2008 2009 04/13/2009 2010 02/16/2010 Document Images 02/16/2010 -- ANNUAL REPORT View image in PDF format 01/30/2006-- 04/13/2009 -- ANNUAL REPORT View image in PDF format 04/28/2008 -- ANNUAL REPORT View image in PDF format 01/30/2007 -- ANNUAL REPORT View imager iri PDF format 09/11/2006 -- Amendment View image in PDF format 05/18/2006 -- Amendment View image in PDF format 01/30/2006-- ANNUAL REPORT View image in PDF format 02/22/2005 -- ANNUAL REPORT View image in PDF format ' 01/07/2004 -- ANNUAL REPORT View image in PDF format 03/28/2003 -- ANNUAL REPORT View image in PDF format , 05/21/2002 -- ANNUAL REPORT View image in PDF format 03/1512001 --ANNUAL REPORT view image ,in PDF format 02/09/2000 -- ANNUAL REPORT View image in PDF format 03/12/1999 -- ANNUAL REPORT View image in PDF format 05/08/1998 -- ANNUAL REPORT View image in PDF format 07/23/1997 -- AMENDMENT view image in PDF format 05/13/1997 -- ANNUAL REPORT View image in PDF format 04/19/1996 -- ANNUAL REPORT view image in PDF format 04/18/1995 -- ANNUAL REPORT view image in PDF format Note: This is not official record. See documents if question or conflict. Previous on List Next on List Return To List Entity Name Search Events No Name History Submit Home I Contact us I Document Searches I E- Filinq Services Forms Help Copyright© and Privacy Policies State of Florida, Department of State http://www.sunbiz.org/scripts/cordet.exe?action--DETFIL&inq_doc number=K5 8820 &in... 8/24/2010 AGREE MEN T10 -5510 16E 12 for Annual Contract for General Contractor Services THIS AGREEMENT is made and entered into this � day of S e 6Z.,_ , 2010, by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "County" or "Owner ") and Vanderbilt Bay Construction, Inc., authorized to do business in the State of Florida, whose business address is 2224 Trade Center Way, Naples, Florida 34109 (hereinafter referred to as the "Contractor "). WITNESSETH: 1. COMMENCEMENT: The contract shall be for a one (1) year period, commencing on September 28, 2010 and terminating September 27, 2011, or until such time as all outstanding Work Orders issued prior to the expiration of the Agreement period have been completed. This contract shall have three (3) one (1) year renewals, renewable annually. The County Manager, or his designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK: The Board of County Commissioners deemed five (5) firms to be pre - qualified and awarded a Contract to each firm. Each awardee will enter into an Agreement to provide complete general contractor services on an as- needed basis as may be required by the Owner in accordance with the terms and conditions of RFP #10 -5510 and the Contractor's proposal, which is incorporated by reference and made an integral part of this Agreement. The execution of this Agreement shall not be a commitment to the Contractor that any work will be awarded to the Contractor. Rather, this Agreement governs the rights and obligation of the Quotation procedure outlined in the next paragraphs and all Work undertaken by Contractor for Owner pursuant to this Agreement and that procedure during the term and any extension of the term of this Agreement. This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Contractor and the County project manager or his designee, in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. Prior to the issuance of a Work Order, the Owner shall provide a summary of Work to be performed which will afford the Contractor the opportunity to submit a formal quotation for the Work; the Contractor shall respond with the information sought within seven (7) working days. For projects with an estimated cost of Fifty Thousand Dollars ($50,000) or less, the Owner shall obtain a proposal from one (1) or more of the selected firms, negotiate favorable project terms and conditions, and issue a numbered Work Order, signed by the Department Director to initiate the projects. For projects with an estimated cost over Fifty Thousand Dollars ($50,000) up to Two Hundred Fifty Thousand Dollars ($250,000), competitive quotes shall be solicited from all of the selected firms. The Contractor shall respond with the information sought within ten (10) working days. The County will negotiate favorable project terms and conditions, and issue a numbered Work Order to initiate the projects. Division Administrator approval is required at this level. Page -1- 16E12 If Payment and Performance Bonds are required, Contractor shall provide within seven (7) working days after notification of award. In each Request for Quotation, the Owner reserves the right to specify the period of completion and the collection of liquidated damages in the event of late completion. 3. THE CONTRACT SUM: The Owner shall pay the Contractor for the performance of the Work pursuant to the quoted price offered by the Contractor in his response to a specific Request for Quotation. Any County agency may utilize the services offered under this contract, provided sufficient funds are included in its budget(s). 4. NOTICES: All notices required or made pursuant to this Agreement to be given by the County to the Contractor shall be made in writing and shall be delivered by hand, by fax, e-mail, or by the United States Postal Service Department, first class mail service, postage prepaid, addressed to the following Contractor's address of record: Troy D. Buhs, Vice President of Operations Vanderbilt Bay Construction, Inc. 2224 Trade Center Way, Naples, FL 34109 Phone: 239 - 591 -0900 Fax: 239 - 591 -8181 Email: TBuhs @vbcnaples.com All notices required or made pursuant to this Agreement to be given by the Contractor to the County shall be in writing and shall be delivered by hand, by fax, e-mail, or by United States Postal Service Department, first class mail service, postage prepaid, addressed to the following County's address of record: Collier County Government Complex Purchasing Department 3301 East Tamiami Trail Purchasing Building G Naples, Florida 34112 Attention: Stephen Y. Carnell Purchasing /General Services Director Phone: 239 - 252 -8371 Fax: 239 - 252 -6584 Email: SteveCarnell @colliergov.net The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Service Agreement must be in writing. 5. NO PARTNERSHIP: Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. 6. PERMITS: LICENSES: TAXES: In compliance with Section 218.80, Florida Statutes, all permits necessary for the prosecution of the Work shall be obtained by the Contractor. Payment for all such permits issued by the County shall be processed internally by the County. Contractor is not responsible for paying for permits issued by Collier County, but is responsible for acquiring all Page -2- 16E12 permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier county agencies when the Contractor is acquiring permits. All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 7. NO IMPROPER USE: The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, county facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Contract of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty -four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 8. TERMINATION: Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County and requirements of this Agreement, the County may terminate said Agreement for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non - performance. 9. NO DISCRIMINATION: The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 10. INSURANCE: The Contractor shall provide insurance as follows: A. Commercial General Liability: Coverage shall have minimum limits of $1,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent contractors; Products and Completed Operations and Contractual Liability. B. Business Auto Liability: Coverage shall have minimum limits of $500,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Owned Vehicles, Hired and Non -Owned Vehicles and Employee Non - Ownership. C. Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of $1,000,000 for each accident. Special Requirements: Collier County Board of County Commissioners shall be listed as the Certificate Holder and included as an Additional Insured on the Comprehensive General Liability. Current, valid insurance policies meeting the requirement herein identified shall be maintained by Contractor during the duration of this Agreement. Renewal certificates shall be sent to the Page -3- 16E12 County ten (10) days prior to any expiration date. There shall be a thirty (30) day notification to the County in the event of cancellation or modification of any stipulated insurance coverage. Contractor shall insure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Contractor shall provide County with certificates of insurance meeting the required insurance provisions. 11. INDEMNIFICATION: To the maximum extent permitted by Florida law, the Contractor shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 12. BONDS. A. When a construction project is in excess of $200,0.00, the Contractor(s) shall be required to provide Payment and Performance Bonds. B. When required by Owner, the Contractor shall furnish a Performance and /or Payment Bond prior to commencing performance, for the full amount of the Work, which shall act as a security guaranteeing the performance of the Contractor's work and the payment by the Contractor to any other party (ies) providing labor and /or materials in connection with each construction or renovation project performed by the Contractor. The bonds shall be furnished using the forms prescribed in Exhibit "A ". C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the Owner's approval. 13. PAYMENTS. Generally, the Contractor will be paid upon completion; however, for Work in excess of thirty (30) days, the Contractor may receive'' Progress Payments. Subsequent to the first payment, Contractor must provide Owner with a fully executed Release and Affidavit in the form attached hereto as Exhibit "B" as a condition precedent to release of each progress payment. All applications for payment, whether for full payment or a progress payment shall be in writing, and in substantially the form attached hereto as 'Exhibit "C ". 14. PAYMENTS WITHHELD. Owner may decline to approve any Application for Payment, or portions thereof, because of defective or incomplete work, outstanding punchlist items, subsequently discovered evidence or subsequent inspections. The Owner may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work Page -4- 16E12 will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 15. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products /materials from specifications shall be approved in writing by Owner in advance. 16. CONTRACT TIME AND TIME EXTENSIONS. A. Time is of the essence in the performance of any Work under this Agreement and Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and materialmen, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's supplies and contractors. B. Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of Government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty -eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of his duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 17. CHANGES IN THE WORK. Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any modifications to this Contract shall be in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. A Change Order in the form attached as Exhibit "D" to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the Page -5- 16E12 requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change order in the manner as Owner and Contractor shall mutually agree. If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 38 of this Agreement or else be deemed to have waived any claim on this matter it might otherwise have had. In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10 %) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10 %) markup for all overhead and profit for all Subcontractors' and sub - subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5 %) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15 %). All compensation due Contractor and any Subcontractor or sub - subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub- Contractor's bond costs associated with any change order shall 'be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 18. COMPLIANCE WITH LAWS. Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, workers' compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Owner in writing. 19. CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 20.ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 21. WARRANTY. Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any materialmen supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Page -6- 16E12 Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 22. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on County projects who are neat, clean, well - groomed and courteous. Subject to the American with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The County may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Collier County projects is not in the best interest of the County. 23. TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish to the Owner the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Owner. 24. PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the Owner with respect to the Project. If Contractor, or its subcontractors, agents: or anyone, for whom Contractor is legally liable, disturbs the Owner's benchmarks, Contractor shall immediately notify Owner. The Owner shall re- establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 25. EMERGENCIES. In the event of any emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner is obligated to act to prevent threatened damage, injury or loss. Contractor shall give the Owner written notice within forty -eight (48) hours after the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. Page -7- 16E12 If the Owner determines that a change in the Contract Documents is required because of the action taken in response to an emergency,, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty -eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 26. COMPLETION. When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Owner in writing that the entire Work (or such designated portion) is substantially complete. Within a reasonable time thereafter, Owner and Contractor shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner does not consider the Work (or designated portion) substantially complete, the Owner shall notify Contractor in writing giving the reasons therefor. If Owner considers the Work (or designated portion) substantially complete, Owner shall notify the Contractor in writing of the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punchlist of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portions thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punchlist. Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Owner will make such inspection and, if Owner finds the Work acceptable and fully performed under the Contract Documents, he shall promptly notify the Contractor in writing, recommending that on the basis of his observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Final payment shall not become due and payable until Contractor submits: (1) The Release and Affidavit in the form attached as Exhibit "B ". (2) Consent of Surety (if applicable) to final payment. (3) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipt, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the acceptability of the Work. Unless and until the Owner is completely satisfied, the final payment shall not become due and payable. 27. LIQUIDATED DAMAGES. The "Commencement Date" shall be established in the Notice to Proceed to be issued by the Owner. Contractor shall commence the work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Page -8- The Work shall be substantial) completed within the times specified in tl FZe ueft Quotation. Y p p q Q The date of substantial completion of the Work (or designated portions thereof) is the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. The Work shall reach final completion and be ready for final acceptance by Owner within the time specified in the Request for Quotation. Owner and Contractor recognize that since time is of the essence for any work under this Agreement, Owner will suffer financial loss if the Work is not substantially completed within the time specified in the Request for Quotation. Should Contractor fail to substantially complete the Work within the specified time period, Owner shall be entitled to assess as liquidated damages, but not as a penalty, the amount specified in the Request for Quotation for each calendar day thereafter until substantial completion is achieved. The Project shall be deemed to be substantially completed on the date the Owner notifies the Contractor in writing of the Substantial Completion date pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to substantially complete the Work in a timely manner. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 28. CONTRACT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Facilities Management Department. 29. COMPONENT PARTS OF THIS CONTRACT. This Contract consists of the attached or referenced component parts, all of which are as fully a part of the Agreement as if herein set out verbatim, including: Contractor's Proposal, Insurance Certificate, RFP No. 10 -5510, Exhibits A, B, C, and D, any addenda, any Quotation/Work Order made or issued pursuant to this Agreement, and any related plans or specifications for any such Quotations or Work Orders. 30. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004 -05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and /or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and /or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and /or quotes; and, c. immediate termination of any contract held by the individual and /or firm for cause. 31. SUBJECT TO APPROPRIATION. It is further understood and agreed, by and between the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. Page -9- 2 .16E 12 3 . SALES TAX. Contractor shall a all sales consumer, use and other sii4Tflar taxes associated pay > with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. 33. IMMIGRATION LAW COMPLIANCE: By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 34.OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES: Collier County encourages and agrees to the successful proposer extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful proposer. 35.AGREEMENT TERMS: If any portion of this Agreement is held to be void, invalid, or otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall remain in effect. 36. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision- making authority and by County's staff person who would make the presentation of any settlement reached during negotiations to County for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached at mediation to County's board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. Page -10- 16E12 IN WITNESS WHEREOF, the Contractor and the County, have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date and year first above written. ATTEST: Dwight E. Brock, Clerk of Courts Y Dated y. lea. First Witness A"a to. sr� i Ufa Tvp2tPrint Witness Name ess - p L.®� nt Witness Name Approved as to form and leg fficiency Scott Teach Deputy County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA B t�L4 bi - C, , Y Fred W. Coyle, Chairman kJ Vanderbilt Bay Construction, Inc. Contractor By: Signature Daniie/ ,7: ecmS Typed Signature Pre4m1we°n-r, lCEp Title Page -11- Item # �Z Dare q---Mo Date Recd EXHIBIT A PUBLIC PAYMENT BOND Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That , as Principal, and , as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the , 20 , with Oblige for day of in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.0592. In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of under - signed representative, pursuant to authority of its governing body. Page -12- Signed, sealed and delivered in the presence of: Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: 16E12 The foregoing instrument was acknowledged before me this of 20_, by as of a corporation, on behalf of the corporation. He /she is personally known to me OR has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) ATTEST: (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: SURETY: (Printed Name) (Business Address) (Authorized Signature) Witness as to Surety (Printed Name) ME Page -13- Witnesses STATE OF _ COUNTY OF As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) The foregoing instrument was acknowledged before me this day of 20_, by , as of , Surety, on behalf of Surety. to me OR has produced as identification and oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name (Legibly Printed) Notary Public, State of Commission No.: Page -14- 16E12 He /She is personally known who did (did not) take an EXHIBIT A -2 PUBLIC PERFORMANCE BOND 16E12 Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That , as Principal, and as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bond executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the 20 Oblige for day of ourselves, our heirs, in accordance with drawings and specifications, which contractor is incorporated by reference and made a pat hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract, and 2. Pays Oblige any and all losses, damages, costs and attorneys' fees that Oblige sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Oblige; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications. Page -15- 16E12 This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Oblige for more than the penal sum of this Performance bond regardless of the number of suits that may be filed by Oblige. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Signed, sealed and delivered in the presence of : Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: The foregoing instrument was acknowledged before me thiE 20_, by , as ,a He /She is personally known to me OR has produced did (did not) take an oath. My Commission Expires: day of corporation, (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commission No.: Page -16- _ of on behalf of the corporation. as identification and ATTEST: Witness as to Surety Witnesses STATE OF _ COUNTY OF SURETY: 16E 1 2 (Printed Name) (Business Address) (Authorized Signature) (Printed Name) OR As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) The foregoing instrument was acknowledged before me this day of 20 , by , as of , Surety, on behalf of Surety. He /She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of _ Commission No.: Page -17- EXHIBIT B 1 6 E 1 2 RELEASE AND AFFIDAVIT FORM 1 1 COUNTY OF COLLIER STATE OF FLORIDA ) Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ paid, ( "Contractor ") releases and waives for itself and it's subcontractors, material -men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated , 20 for the period from to (2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly /final] Application for Payment No. M ITS: DATE: Witnesses STATE OF _ COUNTY OF CONTRACTOR The foregoing instrument was acknowledged before me this , 20_, by of a President [Corporate Seal] day of , as corporation, on behalf of the corporation. He /she is personally known to me or has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) NAME: (Signature of Notary) (Legibly Printed) Notary Public, State of Commissioner No.: Page -18- 16E12 EXHIBIT C FORM OF CONTRACT APPLICATION FOR PAYMENT (County Project Manager) (County Department) Collier County Board of County Commissioners (the OWNER) or Collier County Water -Sewer District (the OWNER) FROM: (Contractor's Representative) (Contractor's Name) (Contractor's Address) T4 Original Contract Time: Revised Contract Time: Retainage @ 10% thru[insert date] Retainage @ _% after [insert date] Percent Work completed to Date: Percent Contract Time completed to Date Liquidated Damages to be Accrued Bid No. 10 -5510 Project No. Application Date Payment Application No. for Work accomplished through the Date: Original Contract Amount: Total Change Orders to Date Revised Contract Amount Total value of Work Completed and stored to Date Less previous payment (s) AMOUNT DUE THIS APPLICATION: Project Name) ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; (4) and CONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: (Contractor's Name) (Signature) DATE:_ (Type Name & Title) (shall be signed by a duly authorized representative of CONTRACTOR) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional : (DP's Name) (Signature) DATE: (Type Name & Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved: By OWNER'S Project Manager: Page -19- (Signature) DATE: (Type Name and Title) EXHIBIT D 16E 1 CHANGE ORDER CHANGE ORDER NO. CONTRACT NO. 10 -5510 TO: DATE: PROJECT NAME: PROJECT NO.: Under our AGREEMENT dated 20_ You hereby are authorized and directed to make the following change(s) in accordance with terms and conditions of the Agreement: FOR THE (Additive) (Deductive) Sum of: $ Original Agreement Amount $ Sum of Previous Changes $ This Change Order (Add) (Deduct) $ Present Agreement Amount $ The time for completion shall be (increased /decreased) by calendar days due to this Change Order. Accordingly, the Contract Time is now calendar days. The substantial completion date is and the final completion date is Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted: , 20_ CONTRACTOR: By: By: DESIGN PROFESSIONAL: By: OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA Page -20- r-Her.fil. r-gRR7 VANRAA 16E12 �,.o...m. ���� • ACORD. CERTIFICATE OF LIABILITY INSURANCE DATE (MMA7ONYM 9129/2010 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, ANDTHE CERTIFICATE HOLDER. IMPORTANT. If the certificate holder Is an ADDITIONAL NS RED, the po oy es must be endorsed. SUBROGATION IS WAIVED, subject to the terms and condlllons of the policy, certain pollcfeB may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER Gulfshore Insurance, Inc. 4100 Goodlette Road North Naples, FL 34103 -3303 239 261 -3648 ME• 1PAc ..ExII: 239 261 -3646 1 rX, No, 239 435 -0598 'M MSS: CUSTOMER ID 1: INSURER (S) AFFORDING COVERAGE NAICr INSURED Vanderbilt Bay Construction, Inc. 2224 Trade Center Way Naples, FL 34109 -2019 INSURERA: Cincinnati Insurance Company CAP589i055 INSURER B: The Travelers Insurance Company INSURER O: $1,000,000 INSURER D $500,000 INSURER E: _ $10,000 INSURER F $1000000 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, LUL TYPE OF INSURANCE O POLICY NUMBER OL CY EF M L[CD EXP LIMITS A GENERAL LIABILITY COMMERCIAL GENERAL LIABILITY CLAIMS-MACE FA OCCUR X PDDed:3,000 CAP589i055 0/01/201010/01/2011 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTtV PREMISES Me occwrence _ $500,000 MED EXP (Anyone pemon) _ $10,000 PERSONAL aADVINJURY $1000000 GENERAL AGGREGATE s2,000,000 GEN'LAGGREGATELIMITAPPLIESPEP, POLICY PRO' LOG PRODUCTS - COMP/OPAGG s2000000 $ B AUTOMOBILE LIABILITY X ANY AUTO ALL OWNED AUTOS 3CH EOULEO AUTOS X HIREDAVTOS X NON- OWNEDAUTOS BA471SRS4110SEL 0/01/2010 10/01/2011 COMBINED SINGLE LIMIT (Eaacddenl) $ 11000,000 BODILY INJURY(Perpsrson) _ S BODILY INJURY (Per accldeal) It PROPERTY DAMAGE (PereccidenQ s $ S A UMBRELLA LIAe EXCESS LIAS X OC R CLJUMS -MADE 1 CAPS691055 0/01 12010 10/01/2011 EACH OCCURRENCE $6,000,000 AGGREGATE $6,000,000 X DEDUCTIBLE RETENTION S O $ S WORKER B COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRETORIPARTNERIEXECUT1w OFFICERA EMBER EXCLUDED? (Mandatory In NH) 119yos doscnbo undo OESGtRIp ION OF OPERATIONS below WA I I TWO 1,1,T.AX k. I JOTH • E.L. EACH ACCIDENT $ E.L. DISEASE -EA EMPLOYEE S EL. DISEASE - POLICY UM0` I S DESCRIPTION OF OPERATIONS /LOCATIONS /VEHICLES (Attach ACORD 101, Additlonal Remarks Schedule, It more apace Is required) Re: Contract #10 -5510 "Annual Contract for General Contractor Services" Certificate Holder Is Named as an Additional Insured on a primary basis as respects to General Liability (See Attached Descrlptlons) Collier County Board of County Commissioners 3301 Tamfami Trail East Naples, FL 34112 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE 01988.2009 ACORD CORPORATION. All rights reserved ACORD 26 (2009109) 1 of 2 The ACORD name and logo are registered marks of ACORD #S444084/M443979 NSA AMS 25,3 (2009/09) 2 of 2 H8444094/M443979 16E12 '`',E°,W ='� CERTIFICATE OF LIABILITY INSURANCE f�'' DATE(MMIDDIYYfY) 8/31/2010 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Lutgert Insurance - Naples PO BOX 112500 Naples FL 34108 NAME: Sondra McCaskill PHONE FAX A/C No Ext: - - AC, No: - - ADDRIESS:smccas ski 11@lut ertinsurance.com GENERAL LIABILITY PRODUCER CUSTOMER ID #: INSURER(S) AFFORDING COVERAGE NAIC # EACH OCCURRENCE INSURED INSURERA:Association Insurance Company $ Vanderbilt Bay Construction, Inc. 2224 Trade Center Way INSURERS: INSURER C: Naples FL 34109 INSURER D: MED EXP (Anyone person) $ INSURER E: $ INSURER F: COVERAGES CERTIFICATE NUMBER:1718172927 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE POLICY NUMBER MM /DDYfYYYY MMIDD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ PREMISES Ea occurrence $ COMMERCIAL GENERAL LIABILITY CLAIMS -MADE 1-1 OCCUR MED EXP (Anyone person) $ PERSONAL &ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS- COMP /OP AGG $ POLICY PRO- jECT F-1 LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ ALL OWNED AUTOS BODILY INJURY (Per accident) $ SCHEDULED AUTOS HIRED AUTOS PROPERTY DAMAGE (Per accident) $ $ NON-OWNED AUTOS $ _F� UMBRELLA LIAR OCCUR EACH OCCURRENCE $ AGGREGATE $ EXCESS LIAB CLAIMS -MADE DEDUCTIBLE $ $ RETENTION $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? F N/A WCV002568807 8/27/2010 8/27/2011 X I WC STATU- I JOTH - E.L. EACH ACCIDENT $1,000,000 E.L. DISEASE - EA EMPLOYE $1,000,000 (Mandatory In NH) If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE- POLICY LIMIT $1, 000, 000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) RE: Contract #10 -5510 _. _ IIMINII-MLLA 1 lU1Y SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Collier County Board of County Comissioners Contractors Licensing - Purchasing Department 3301 Tamiami Trail East AUTHORIZED REPRESENTATIVE Naples FL 34112 U 1958 -2009 ACORD CORPORATION. All rights reserved. ACORD 25 (2009109) The ACORD name and logo are registered marks of ACORD 16E12 MEMORANDUM Date: October 5, 2010 To: Lyn Wood, Contract Specialist Purchasing Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Contract #10 -5510 "Annual Contract for General Contracting Services" Contractor: Bradanna Construction, Inc. Attached is an original contract, as referenced above, (Item #16E12) approved by the Board of County Commissioners on September 28, 2010. The second original will be held on file in the Minutes and Record's Department as part of the Board's Official Record. If you should have any questions, please contact me at 252 -8406. Thank you. Attachment 16E12 MEMORANDUM TO: Ray Carter Risk Management Department FROM: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department DATE: September 28, 2010 RE: Review Insurance for Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 Please review the Insurance Certificates for the above referenced contract. If everything is acceptable, please forward to the County Attorney for further review and approval. Also, will you advise me when it has been forwarded. Thank you. If you have any questions, please contact me at extension 2667. dod /LMW C: Hank Jones, Facilities Mgmt. SEP 2 9 2010 R.tsu nvN�Ir 16E12 mausen_g From: RaymonclCarter Sent: Thursday, September 30, 2010 2:10 PM To: LynWood Cc: JonesHank; mausen_g; HerreraSandra Subject: Contract 10 -5510 "Annual Contract for General Contractor Services" All, I have approved the certificate(s) of insurance for the following vendors under contract 10 -5510: 1. PBS Constructors 2. Wright Construction 3. Vanderbilt Bay 4. Surety Construction 5. Bradanna These contracts will now be forwarded to the county attorney's office for their review. Thank you, a Manager Risk Finance Collier County Board of County Commissioners 3301 East Tamiami Trail Naples, FL 34112 Office 239 - 252 -8839 Mobile 239 - 821 -9370 Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 1 RLS # \()B CHECKLIST FOR REVIEWING CONTRACTS Entity Name: Entity name correct on contract? Entity registered with FL Sec. of State? Insurance Insurance Certificate attached? Insured registered in Florida? Contract # & /or Project referenced on Certificate? Certificate Holder name correct (BCC)? Commercial General Liability General Aggregate Required $ Products /Compl /Op Required $ Personal & Advert Required $1 � _ . Each Occurrence Required $ Fire /Prop Damage Required $ A L.17- L' b'l' '1) 0 L -�c.16 E 12 y No Yes No Yes No �es No No Yes No Provided $ 2,VY�i Exp. Date Provided $ at Exp. Date Provided $� Exp. Date tit ► t Provided $ s < , , Exp. Date Provided $ 100 Exp. Date utomo i e ca " ity I Bodily Inj & Prop Required $ �, Provided $ I ,;\ t Workers Compensation Q," vAp Each accident Required $ "� ' Provided $ �TVNA Disease Aggregate Required $ Provided $ t Disease Each Empl Required $ Provided $ Exp Date 1 I Exp Date Exp Date I Exp Date Umbrella LiabMty t Each Occurrence Provided $ 5M% i Exp Date l Aggregate Provided $ s ► Exp Date OV Does Umbrella sufficiently cover any underinsured portion? Yes---)e'-_No Professional Liability Each Occurrence Required $ Provided $ Per Aggregate Required $ Provided $ Other Insurance Each Occur Type: Required $ County required to be named as additional insured? County named as additional insured? Indemnification Does indemnification meet County standards? Is County indemnifying other party? Performance Bond Bond requirement referenced in contract? If attached, expiration date of bond Does dollar amount match contract? Agent registered in Florida? Exp. Date Exp. Date Provided $ Exp Date Yes No es No 4ZYes No Yes Yes No Yes No Yes No Signature Blocks Correct executor name in signature block? s No Correct title of executor? Oes s No Executor authorized to sign for entity? No Proper number of witnesses /notary? s No Authorization for executor to sign, if necessary: Chairman's signature block? es No Clerk's attestation signature block? Y No County Attorney's signature block? es No Attachments -7, Are all required attachments included? Yes No Reviewer Initial4-30/ Dat U 04 -C ITEM NO.: �' 170 FILE NO.: � J -� V ROUTED TO: :.I� E 2 ,0Ui 1 `QA IVE Z9 DO NOT WRITE ABOVE THIS LINE REQUEST FOR LEGAL SERVICES Date: September 28, 2010 To: Office of the County Attorney Scott R. Teach From: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department, Extension 2667 �vs LL � 6 Re: Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna BACKGROUND OF REQUEST: This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 This item has not been previously submitted. ACTION REQUESTED: Contract review and approval. OTHER COMMENTS: Please forward to BCC for signature after approval. If there are any questions concerning the document, please contact me. Purchasing would appreciate notification when the documents exit your office. Thank you. 0 C: Hank Jones, Facilities Mgmt. t,lk www.sunbiz.org - Department of State Home Contact Us E- Filing Services Previous on List Next on List Return To List No Events No Name History Detail by Entity Name Florida Profit Corporation BRADANNA CONSTRUCTION, INC. Filing Information Document Number P02000042428 FEI /EIN Number 300079756 Date Filed 04/18/2002 State FL Status ACTIVE Principal Address 2805 SOUTH HORSESHOE DRIVE UNIT 12 NAPLES FL 34104 Changed 04/22/2008 Mailing Address 2805 SOUTH HORSESHOE DRIVE UNIT 12 NAPLES FL 34104 Changed 04/22/2008 Registered Agent Name & Address STEINMANN, BRAD W 2805 SOUTH HORSESHOE DRIVE #12 NAPLES FL 34104 US Name Changed: 04/30/2003 Address Changed: 01/06/2010 Officer /Director Detail Name & Address Title PD STEINMANN, BRADFORD W 2805 SOUTH HORSESHOE DRIVE, UNIT 12 NAPLES FL 34104 Title VD STEINMANN, JOSEPH E 2805 SOUTH HORSESHOE DRIVE, UNIT 12 NAPLES FL 34104 Title D Document Searches 16 E"T Z f2 Forms Help Entity Name Search Submit http: / /www. sunbiz.org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= PO20000424... 8/24/2010 www.sunbiz.org - Department of State Page 2 of 2 16.1 E I '2 STEINMANN, BRADFORD E 2805 SOUTH HORSESHOE DRIVE, UNIT 12 NAPLES FL 34104 Annual Reports Report Year Filed Date 2008 04/22/2008 2009 01/21/2009 2010 01/06/2010 Document Images 01/06/2010 --ANNUAL REPORT View image in PDF format 01/21/2009 --ANNUAL REPORT View image in PDF format 04/22/2008 -- ANNUAL REPORT., View image in PDF format 1 01/29/2007 -- ANNUAL REPORT View image in PDF format j 02/06/2006 -- ANNUAL REPORT View image in PDF format I 04/15/2005 -- ANNUAL REPORT View image in PDF format 04/16/2004 -- ANNUAL REPORT View image in PDF format 04/30/2003 -- ANNUAL REPORT View image in PDF format 04/18/2002 -- Domestic Profit View image in PDF format Note: This is not official record. See documents if question or conflict. Previous on List Next on List Return To List No Events No Name History i Home I Contact us ( Document Searches i E- Filinq Services i Forms i Help i Copvriaht© and Privacy Policies State of Florida, Department of State Entity Name Search Submit http: / /www. sunbiz. org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= P020000424... 8/24/2010 A G R E E M E N T 10-5510 16E 12 for Annual Contract for General Contractor Services THIS AGREEMENT is made and entered into this X� day of :Sea*e, -A k4y. , 2010, by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "County" or "Owner ") and Bradanna Construction, Inc., authorized to do business in the State of Florida, whose business address is 2805 South Horseshoe Drive, Unit 12, Naples, Florida 34104 (hereinafter referred to as the "Contractor "). WITNESSETH: 1. COMMENCEMENT: The contract shall be for a one (1) year period, commencing on September 28, 2010 and terminating September 27, 2011, or until such time as all outstanding Work Orders issued prior to the expiration of the Agreement period have been completed. This contract shall have three (3) one (1) year renewals, renewable annually. The County Manager, or his designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK: The Board of County Commissioners deemed five (5) firms to be pre - qualified and awarded a Contract to each firm. Each awardee will enter into an Agreement to provide complete general contractor services on an as- needed basis as may be required by the Owner in accordance with the terms and conditions of RFP #10 -5510 and the Contractor's proposal, which is incorporated by reference and made an integral part of this Agreement. The execution of this Agreement shall not be a commitment to the Contractor that any work will be awarded to the Contractor. Rather, this Agreement governs the rights and obligation of the Quotation procedure outlined in the next paragraphs and all Work undertaken by Contractor for Owner pursuant to this Agreement and that procedure during the term and any extension of the term of this Agreement. This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Contractor and the County project manager or his designee, in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. Prior to the issuance of a Work Order, the Owner shall provide a summary of Work to be performed which will afford the Contractor the opportunity to submit a formal quotation for the Work; the Contractor shall respond with the information sought within seven (7) working days. For projects with an estimated cost of Fifty Thousand Dollars ($50,000) or less, the Owner shall obtain a proposal from one (1) or more of the selected firms, negotiate favorable project terms and conditions, and issue a numbered Work Order, signed by the Department Director to initiate the projects. For projects with an estimated cost over Fifty Thousand Dollars ($50,000) up to Two Hundred Fifty Thousand Dollars ($250,000), competitive quotes shall be solicited from all of the selected firms. The Contractor shall respond with the information sought within ten (10) working days. The County will negotiate favorable project terms and conditions, and issue a numbered Work Order to initiate the projects. Division Administrator approval is required at this level. Page -1- 16E12 If Payment and Performance Bonds are required, Contractor shall provide within seven (7) working days after notification of award. In each Request for Quotation, the Owner reserves the right to specify the period of completion and the collection of liquidated damages in the event of late completion. 3. THE CONTRACT SUM: The Owner shall pay the Contractor for the performance of the Work pursuant to the quoted price offered by the Contractor in his response to a specific Request for Quotation. Any County agency may utilize the services offered under this contract, provided sufficient funds are included in its budget(s). 4. NOTICES: All notices required or made pursuant to this Agreement to be given by the County to the Contractor shall be made in writing and shall be delivered by hand, by fax, e-mail, or by the United States Postal Service Department, first class mail service, postage prepaid, addressed to the following Contractor's address of record: Joe Steinmann, President Bradanna Construction, Inc. 2805 South Horseshoe Drive, Unit 12 Naples, Florida 34104 Phone: 239 - 455 -8891 Fax: 239 - 417 -1249 Email: joe @bradanna.com All notices required or made pursuant to this Agreement to be given by the Contractor to the County shall be in writing and shall be delivered by hand, by fax, e-mail, or by United States Postal Service Department, first class mail service, postage prepaid, addressed to the following County's address of record: Collier County Government Complex Purchasing Department 3301 East Tamiami Trail Purchasing Building G Naples, Florida 34112 Attention: Stephen Y. Carnell Purchasing /General Services Director Phone: 239 - 252 -8371 Fax: 239 - 252 -6584 Email: SteveCarnell @colliergov.net The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Service Agreement must be in writing. 5. NO PARTNERSHIP: Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. 6. PERMITS: LICENSES: TAXES: In compliance with Section 218.80, Florida Statutes, all permits necessary for the prosecution of the Work shall be obtained by the Contractor. Payment for all such permits issued by the County shall be processed internally by the County. Contractor is not Page -2- 16E12 responsible for paying for permits issued by Collier County, but is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier county agencies when the Contractor is acquiring permits. All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 7. NO IMPROPER USE: The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, county facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Contract of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty -four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 8. TERMINATION: Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County and requirements of this Agreement, the County may terminate said Agreement for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non - performance. 9. NO DISCRIMINATION: The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 10. INSURANCE: The Contractor shall provide insurance as follows: A. Commercial General Liability: Coverage shall have minimum limits of $1,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent contractors; Products and Completed Operations and Contractual Liability. B. Business Auto Liability: Coverage shall have minimum limits of $500,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Owned Vehicles, Hired and Non -Owned Vehicles and Employee Non - Ownership. C. Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of $1,000,000 for each accident. Special Requirements: Collier County Board of County Commissioners shall be listed as the Certificate Holder and included as an Additional Insured on the Comprehensive General Liability. Current, valid insurance policies meeting the requirement herein identified shall be maintained by Contractor during the duration of this Agreement. Renewal certificates shall be sent to the Page -3- 16E 12 County ten (10) days prior to any expiration date. There shall be a thirty (30) day notification to the County in the event of cancellation or modification of any stipulated insurance coverage. Contractor shall insure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Contractor shall provide County with certificates of insurance meeting the required insurance provisions. 11. INDEMNIFICATION: To the maximum extent permitted by Florida law, the Contractor shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 12. BONDS. A. When a construction project is in excess of $200,000, the Contractor(s) shall be required to provide Payment and Performance Bonds. B. When required by Owner, the Contractor shall furnish a Performance and /or Payment Bond prior to commencing performance, for the full amount of the Work, which shall act as a security guaranteeing the performance of the Contractor's work and the payment by the Contractor to any other party (ies) providing labor and /or materials in connection with each construction or renovation project performed by the Contractor. The bonds shall be furnished using the forms prescribed in Exhibit "A ". C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the Owner's approval. 13. PAYMENTS. Generally, the Contractor will be paid upon completion; however, for Work in excess of thirty (30) days, the Contractor may receive Progress Payments. Subsequent to the first payment, Contractor must provide Owner with a fully executed Release and Affidavit in the form attached hereto as Exhibit "B" as a condition precedent to release of each progress payment. All applications for payment, whether for full payment or a progress payment shall be in writing, and in substantially the form attached hereto as Exhibit "C ". 14. PAYMENTS WITHHELD. Owner may decline to approve any Application for Payment, or portions thereof, because of defective or incomplete work, outstanding punchlist items, subsequently discovered evidence or subsequent inspections. The Owner may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work Page -4- 16E12 will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 15. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products /materials from specifications shall be approved in writing by Owner in advance. 16. CONTRACT TIME AND TIME EXTENSIONS. A. Time is of the essence in the performance of any Work under this Agreement and Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and materialmen, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's supplies and contractors. B. Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of Government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty -eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of his duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 17. CHANGES IN THE WORK. Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any modifications to this Contract shall be in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. A Change Order in the form attached as Exhibit "D" to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the Page -5- 16E12 requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change order in the manner as Owner and Contractor shall mutually agree. If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 38 of this Agreement or else be deemed to have waived any claim on this matter it might otherwise have had. In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10 %) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10 %) markup for all overhead and profit for all Subcontractors' and sub - subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5 %) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15 %). All compensation due Contractor and any Subcontractor or sub - subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub - Contractor's bond costs associated with any change order shall be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 18. COMPLIANCE WITH LAWS. Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, workers' compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Owner in writing. 19. CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 20.ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 21. WARRANTY. Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any materialmen supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Page -6- 1.6E 2 Contractor further warrants to Owner that all materials and equipment furnished un er the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 22. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on County projects who are neat, clean, well - groomed and courteous. Subject to the American with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The County may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Collier County projects is not in the best interest of the County. 23. TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish to the Owner the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Owner. 24. PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the Owner with respect to the Project. If Contractor, or its subcontractors, agents or anyone, for whom Contractor is legally liable, disturbs the Owner's benchmarks, Contractor shall immediately notify Owner. The Owner shall re- establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 25. EMERGENCIES. In the event of any emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner is obligated to act to prevent threatened damage, injury or loss. Contractor shall give the Owner written notice within forty -eight (48) hours after the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. Page -7- 16E12 If the Owner determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty -eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 26. COMPLETION. When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Owner in writing that the entire Work (or such designated portion) is substantially complete. Within a reasonable time thereafter, Owner and Contractor shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner does not consider the Work (or designated portion) substantially complete, the Owner shall notify Contractor in writing giving the reasons therefor. If Owner considers the Work (or designated portion) substantially complete, Owner shall notify the Contractor in writing of the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punchlist of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portions thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punchlist. Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Owner will make such inspection and, if Owner finds the Work acceptable and fully performed under the Contract Documents, he shall promptly notify the Contractor in writing, recommending that on the basis of his observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Final payment shall not become due and payable until Contractor submits: (1) The Release and Affidavit in the form attached as Exhibit "B ". (2) Consent of Surety (if applicable) to final payment. (3) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipt, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the acceptability of the Work. Unless and until the Owner is completely satisfied, the final payment shall not become due and payable. 27. LIQUIDATED DAMAGES. The "Commencement Date" shall be established in the Notice to Proceed to be issued by the Owner. Contractor shall commence the work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Page -8- 16E12 The Work shall be substantially completed within the time specified in the Request for Quotation. The date of substantial completion of the Work (or designated portions thereof) is the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. The Work shall reach final completion and be ready for final acceptance by Owner within the time specified in the Request for Quotation. Owner and Contractor recognize that since time is of the essence for any work under this Agreement, Owner will suffer financial loss if the Work is not substantially completed within the time specified in the Request for Quotation. Should Contractor fail to substantially complete the Work within the specified time period, Owner shall be entitled to assess as liquidated damages, but not as a penalty, the amount specified in the Request for Quotation for each calendar day thereafter until substantial completion is achieved. The Project shall be deemed to be substantially completed on the date the Owner notifies the Contractor in writing of the Substantial Completion date pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek characterize the above noted liquidated damages as a penalty, which. the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to substantially complete the Work in a timely manner. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 28. CONTRACT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Facilities Management Department. 29. COMPONENT PARTS OF THIS CONTRACT. This Contract consists of the attached or referenced component parts, all of which are as fully a part of the Agreement as if herein set out verbatim, including: Contractor's Proposal, Insurance Certificate, RFP No. 10 -5510, Exhibits A, B, C, and D, any addenda, any Quotation/Work Order made or issued pursuant to this Agreement, and any related plans or specifications for any such Quotations or Work Orders. 30. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004 -05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and /or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and /or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and /or quotes; and, c. immediate termination of any contract held by the individual and /or firm for cause. 31. SUBJECT TO APPROPRIATION. It is further understood and agreed, by and between the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. Page -9- 16E12. 32. SALES TAX. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. 33. IMMIGRATION LAW COMPLIANCE: By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 34. OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES: Collier County encourages and agrees to the successful proposer extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful proposer. 35.AGREEMENT TERMS: If any portion of this Agreement is held to be void, invalid, or otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall remain in effect. 36. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision- making authority and by County's staff person who would make the presentation of any settlement reached during negotiations to County for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached at mediation to County's board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. Page -10- 16E12 IN WITNESS WHEREOF, the Contractor and the County, have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date and year first above written. ATTEST: Dwight E. Brock; Clerk of Courts dt� Fit � Dated�� V. "4 t First Witness T /Print fitness Name y e Second Witness C Ohc%x i -� '0,4d6 Type /Print Witrfess Narr(e Approved as to form and le ufficienc Scott Teach Deputy County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA By:- L'J Fred W. Coyle, Chairman Br anna Construction, Inc. Contractor By: Signature Jo is -e Typed Signature Title Page -11- Item # ��' Agenda Dale Date Recd l (u, ..0 16E12 EXHIBIT A PUBLIC PAYMENT BOND Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That as Principal, and , as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the , 20 , with Oblige for day of in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to as the Contract. THE CONDITION OF THIS-BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.0592. In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of under - signed representative, pursuant to authority of its governing body. Page -12- Signed, sealed and delivered in the presence of: Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: 16E12 The foregoing instrument was acknowledged before me this of 20_, by as of a corporation, on behalf of the corporation. He /she is personally known to me OR has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) ATTEST: Witness as to Surety (Signature of Notary) Name: (Legibly Printed) Notary Public, State of _ Commission No.: SURETY: (Printed Name) (Business Address) (Authorized Signature) (Printed Name) •m Page -13- As Attorney in Fact (Attach Power of Attorney) Witnesses (Business Address) (Printed Name) (Telephone Number) STATE OF _ COUNTY OF The foregoing instrument was acknowledged before me this day of 20_, by as of Surety, on behalf of Surety. to me OR has produced as identification and oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -14- He /She is personally known who did (did not) take an EXHIBIT A -2 PUBLIC PERFORMANCE BOND 16E12 Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That , as Principal, and as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bond executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 20 Oblige for ourselves, our heirs, in accordance with drawings and specifications, which contractor is incorporated by reference and made a pat hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract, and 2. Pays Oblige any and all losses, damages, costs and attorneys' fees that Oblige sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Oblige; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications. Page -15- 16E12 This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Oblige for more than the penal sum of this Performance bond regardless of the number of suits that may be filed by Oblige. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Signed, sealed and delivered in the presence of : Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: The foregoing instrument was acknowledged before me this 20_, by , as ,a He /She is personally known to me OR has produced did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) day of corporation, (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -16- _ of on behalf of the corporation. as identification and ATTEST: Witness as to Surety Witnesses STATE OF _ COUNTY OF SURETY: (Printed Name) (Business Address) (Authorized Signature) (Printed Name) OR As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) 16E12 The foregoing instrument was acknowledged before me this day of 20_, by , as of , Surety, on behalf of Surety. He /She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -17- EXHIBIT B RELEASE AND AFFIDAVIT FORM COUNTY OF COLLIER STATE OF FLORIDA ) 16E12 Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ paid, ( "Contractor ") releases and waives for itself and it's subcontractors, material -men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated , 20_ for the period from to (2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly /final] Application for Payment No. MN ITS: DATE: Witnesses STATE OF _ COUNTY OF CONTRACTOR The foregoing instrument was acknowledged before me this , 20_, by of a President [Corporate Seal] day of , as corporation, on behalf of the corporation. He /she is personally known to me or has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) NAME: (Signature of Notary) (Legibly Printed) Notary Public, State of Commissioner No.: Page -18- 16E12 EXHIBIT C FORM OF CONTRACT APPLICATION FOR PAYMENT (County Project Manager) (County Department) Collier County Board of County Commissioners (the OWNER) or Collier County Water -Sewer District (the OWNER) FROM (Contractor's Representative) (Contractor's Name) (Contractor's Address) Bid No. 10 -5510 Project No. Application Date Payment Application No. for Work accomplished through the Date: RE: (Project Name) Original Contract Time: Original Contract Amount: $ Revised Contract Time: Total Change Orders to Date $ Revised Contract Amount $ Total value of Work Completed Retainage @ 10% thru[insert date] $ and stored to Date $ Retainage @ _% after [insert date] $ Less previous payment (s) $ Percent Work completed to Date: % AMOUNT DUE THIS Percent Contract Time completed to Date % APPLICATION: $ Liquidated Damages to be Accrued $ ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; (4) and CONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: (Contractor's Name) (Signature) DATE:_ (Type Name & Title) (shall be signed by a duly authorized representative of CONTRACTOR) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional : (DP's Name) (Signature) DATE: _ (Type Name & Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved: By OWNER'S Project Manager: Page -19- (Signature) DATE: _ (Type Name and Title) EXHIBIT D 16E 2 CHANGE ORDER CHANGE ORDER NO. CONTRACT NO. 10 -5510 TO: DATE: PROJECT NAME: PROJECT NO.: Under our AGREEMENT dated 20_ You hereby are authorized and directed to make the following change(s) in accordance with terms and conditions of the Agreement: FOR THE (Additive) (Deductive) Sum of: $ Original Agreement Amount Sum of Previous Changes This Change Order (Add) (Deduct) $ Present Agreement Amount $ The time for completion shall be (increased /decreased) by calendar days due to this Change Order. Accordingly, the Contract Time is now calendar days. The substantial completion date is and the final completion date is Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted: 20_ CONTRACTOR: By: By: DESIGN PROFESSIONAL: By: OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA Page -20- 16E1? CERTIFICATE OF LIABILITY INSURANCE OPID SHST DATE(M""DDM'Y) 07/15/10 FTHIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. NPORTANT. It e certificalo holder Is an ADDITIONAL IRGRED, the p c es musl be endorsed. , subject o the terms and condlNons of the policy, certain pollcles may require an endorsement. A statement on this certIlicate does not confer rights to the certMeale holder In Hsu of such endorsement(s). PRODUCER Dick, Johnson 6 Jefferson, Inc NAME: Stacey Shankle ARC NqF n: 941 -758 -3861 (A,C,No): 941- 756 -578 Suite 200 ADDRESS: staceys @djjine.com 1429 60Th Avenue W Bradenton FL 34207 Fhone:941- 758 -3861 Fax:941- 758 -5947 cusTome Rmr BRADA -2 INSURER(S) AFFORDING COVERAGE NAIL INSURED Bradanna Inc 2805 S Horseshoe Or #12 INSURERA: National Trust rnsuranes Co 20141 INSURERS: FCCI Insurance Company 10178 INSURERC Naples FL 34104 -6159 GENERAL AGGREGATE INSURER D : GENL AGGREGATE LIMIT A -PLIES PER PRO- POLICY X LOC PRODUCTS - COMP /OP AGG INSURER E: $ INSURER F : AUTOMOBILE GUVERAOIC5 CERTIFICATE NUMBER: REVISION NUMRFR- THIS IS TO CERTIFY THAT TEE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAN ID ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REOUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS MW LTR TYPE T of INSURANCE NOR POLICY NUMBER rvLNT W-1. (rAA mopnYY) ian l YYY) LIMITS A 6134 ERAL LIABILRY X COMMERCWLGENEWY LIABILITY CLAIMS -MADE X OCCUR X GL00089301 09/01/10 09/01/11 EACH OCCURRENCE $1000000 PREMISES(Eaoccurema) _...�_ $ 100000 MM EXP (Arty one pa50n) $5000 PERSON L d ADV INJURY $ 1000000 GENERAL AGGREGATE _ $2000000 GENL AGGREGATE LIMIT A -PLIES PER PRO- POLICY X LOC PRODUCTS - COMP /OP AGG i 2 0 0 0 00 0 $ A AUTOMOBILE LIAB6I7Y ANY AUTO ALL OW SCHEDULED AUTOS HIRED AUTOS n10NOWNEDAUTOS CAQQ140361 0$/01/10 09/01/11 COMBINED SINGLE LIMIT (Eeaccident) t 1000000 X X X BODILYW&AY(P- aperson) -$ BODILY BODILY INJURY (Per eccidam) $ (per 'E $ - i L A UMSRELLALLas EXCESS LAS X OCCUR CLAMS-MACE UMS00092341 08 /01 /10 09/01/11 EACH OCCURRENCE $ 5000000 A-GREGATE $5000000 X DEDUCTIBLE RETENTION $ 10000 -. $ $ B RKERS COMPENSATION AND EMPLOYERS' LIABRITY YIN ANY PROPRIE70RlPARTNER(EXECUTIVE OFF1 ER/MEMSEREXCLJRED? (Mandatory In NH) it yes. 0=ibe unoar DESCPIPTIONOF OPERATIONS below /A WR--7C-1UA-- 6 14 0 0 02/14/10 02/14/11 X TORY LIMBS ER E.L. EACH PiCCIDENT. $1000000 EL DISEASE- EAEMPLRYEE $ 1000000 EL DISEASE -POLICYLIMIT $ 1000000 DESCRIPTION OF OPERATIONS 1 LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Soho". P rwe space b requlred) 30 days notice 4f cancellation for oth4pr than noa ayment,af ppremium. Collier County is named as additional insured for commercial Deneral Liability. i cr%r rria m r c nvwcrc CANCELLATION COLLI O 8 I SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Collier County Board of County Commissioners 3301 Tamiami Trl E Naples FL 34112 U- lyws -ZWV AcVKbk- QsavT: VION. A01 rights reserved. ACORD 25 (2009[09) The ACORD name and logo are registered marks of ACORD 16E12 MEMORANDUM Date: October 5, 2010 To: Lyn Wood, Contract Specialist Purchasing Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Contract #10 -5510 "Annual Contract for General Contracting Services" Contractor: PBS Construction, Inc. Attached is an original contract, as referenced above, (Item #16E12) approved by the Board of County Commissioners on September 28, 2010. The second original will be held on file in the Minutes and Record's Department as part of the Board's Official Record. If you should have any questions, please contact me at 252 -8406. Thank you. Attachment 16E 12 MEMORANDUM TO: Ray Carter Risk Management Department FROM: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department DATE: September 28, 2010 RE: Review Insurance for Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: 4BS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 Please review the Insurance Certificates for the above referenced contract. If everything is acceptable, please forward to the County Attorney for further review and approval. Also, will you advise me when it has been forwarded. Thank you. If you have any questions, please contact me at extension 2667. dod /LMW C: Hank Jones, Facilities Mgmt. 1 k �1 SEP 2 9 2010 atsrc wvr CF4/ 16E12 mausen g From: RaymondCarter Sent: Thursday, September 30, 2010 2:10 PM To: LynWood Cc: JonesHank; mausen_g; HerreraSandra Subject: Contract 10 -5510 "Annual Contract for General Contractor Services" All, I have approved the certificate(s) of insurance for the following vendors under contract 10 -5510: 1. PBS Constructors 2. Wright Construction 3. Vanderbilt Bay 4. Surety Construction 5. Bradanna These contracts will now be forwarded to the county attorney's office for their review. Thank you, m Manager Risk Finance Collier County Board of County Commissioners 3301 East Tamiami Trail Naples, FL 34112 Office 239 - 252 -8839 Mobile 239 - 821 -9370 Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 1 16E12 ITEM NO.: U" !bATL RftCEIVED: ( 6;0I NIA WTORNEY FILE NO.:� l ROUTED TO: 2 OCT -I AM 1'- � LAY 1 A4t4 DO NOT WRITE ABOVE THIS LINE V REQUEST FOR LEGAL SERVICES Date: September 28, 2010 To: Office of the County Attorney )� Scott R. Teach G (� From: Lyn M. Wood, C.P.M., Contract Specialist I Purchasing Department, Extension 2667 Re: Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: 4 PBS Constructors Wright Construction Vanderbilt Bay Surety Construction Bradanna BACKGROUND OF REQUEST: This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 This item has not been previously submitted. ACTION REQUESTED: Contract review and approval. OTHER COMMENTS: Please forward to BCC for signature after approval. If there are any questions concerning the document, please contact me. Purchasing would appreciate notification when the documents exit your office. Thank you. C: Hank Jones, Facilities Mgmt. 1 6 1 N Entity Name: Entity name correct on UU11uaLA: Entity registered with FL Sec. of State? )AE 1 RLS # 2,a CHECKLIST FOR REVIEWING CONTRACTS Yes No Insurance Insurance Certificate attached? No Insured registered in Florida? V- es No Contract # & /or Project referenced on Certificate? No Certificate Holder name correct (BCC)? e No Commercial General Liability General Aggregate Required $ Provided $ Exp. Date t \ Products /Compl /Op Required $y� Provided $ is 9 J Exp. Date Personal & Advert Required $� Provided $ rn � \ Exp. Date 1 / Each Occurrence Required $ Provided $ c -# / Exp. Date Fire/Prop Damage Required $ Provided $��4_ Exp. Date Automobile Liability Bodily Inj & Prop Required $ -�- Provided $� Exp Date l Workers Compensation Each accident Required $ Provided $ Exp Date t l Disease Aggregate Required $ rovided $ Exp Dat t Disease Each Empl Required $ �? rovided $� Exp Date Umbrella Liability Each Occurrence Provided $ `Dfn-% �l Aggregate Provided $ < < c Does Umbrella sufficiently cover any underinsured portion? Professional Liability Each Occurrence Required $ Provided $ Per Aggregate Required $ Provided $ Other Insurance Each Occur Type: Required $ Exp Date l � t Exp Date �� t Yes Exp. Date Exp. Date Provided $ Exp Date If Attachments Are all required attachments included? es No Reviewer Initials: 71 Date: 04 -COA -0 T3422 County required to be named as additional insured? <es No County named as additional insured? No Indemnification Does indemnification meet County standards? Yes Is County indemnifying other party? Yes No Performance Bond Bond requirement referenced in contract? Yes No If attached, expiration date of bond Does dollar amount match contract? Yes No Agent registered in Florida? Yes No Signature Blocks Correct executor name in signature block? es No Correct title of executor? es No Executor authorized to sign for entity? es No Proper number of witnesses /notary? Yes No Authorization for executor to sign, if necessary: Chairman's signature block? e No Clerk's attestation signature block? es No County Attorney's signature block? Yes No If Attachments Are all required attachments included? es No Reviewer Initials: 71 Date: 04 -COA -0 T3422 www.sunbiz.org - Department of State Home Contact Us E- Filing Services Previous on List Next on List Return To List No Events No Name History Detail by Entity Na Florida Profit Cor orati PBS CONSTRUCTION, INC. Filing Information Document Number P08000012280 FEI /EIN Number 770712973 Date Filed 02/01/2008 State FL Status ACTIVE Principal Address 4395 CORPORATE SQUARE NAPLES FL 34104 Mailing Address 4395 CORPORATE SQUARE NAPLES FL 34104 Registered Agent Name & Address NAPLES- LAWDOCK, INC. 1395 PANTHER LANE SUITE 300 NAPLES FL 34109 US Officer /Director Detail Name & Address Title P ZINO, BART P 4395 CORPORATE SQUARE NAPLES FL 34104 Title ST ORTEGON, KIMBERLY A 4395 CORPORATE SQUARE NAPLES FL 34104 Annual Reports Report Year Filed Date 2009 04/10/2009 2010 02/22/2010 Document Images 16 19V Document Searches Forms Help Entity Name Search Submit http: / /www. sunbiz. org/ scripts /eordet.exe? action= DETFIL &inq_doc_ number= PO80000122... 8/24/2010 www.sunbiz.org - Department of State 02/22/2010 --ANNUAL REPORT View image in PDF format 04/10/2009 -- ANNUAL REPORT View image in PDF format 02/01/2008 -- Domestic Profit View image in PDF format Note: This is not official record. See documents if question or. conflict. Previous on List Next on List Return To List No Events No Name History Home I Contact us I Document Searches I E- Filing Services I Forms I Help Copvriaht© and Privacv Policies State of Florida, Department of State 16 �g1'�' Entity Name Search Submit http: / /www. sunbiz. org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= P080000122... 8/24/2010 16E12 A G R E E M E N T 10-5510 for Annual Contract for General Contractor Services THIS AGREEMENT is made and entered into this day of Sk,Ae k" Lee - , 2010, by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "County" or "Owner ") and PBS Construction, Inc., authorized to do business in the State of Florida, whose business address is 4395 Corporate Square, Naples, Florida 34104 -4754 (hereinafter referred to as the "Contractor "). WITNESSETH: 1. COMMENCEMENT: The contract shall be for a one (1) year period, commencing on September 28, 2010 and terminating September 27, 2011, or until such time as all outstanding Work Orders issued prior to the expiration of the Agreement period have been completed. This contract shall have three (3) one (1) year renewals, renewable annually. The County Manager, or his designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK: The Board of County Commissioners deemed five (5) firms to be pre - qualified and awarded a Contract to each firm. Each awardee will enter into an Agreement to provide complete general contractor services on an as- needed basis as may be required by the Owner in accordance with the terms and conditions of RFP #10 -5510 and the Contractor's proposal, which is incorporated by reference and made an integral part of this Agreement. The execution of this Agreement shall not be a commitment to the Contractor that any work will be awarded to the Contractor. Rather, this Agreement governs the rights and obligation of the Quotation procedure outlined in the next paragraphs and all Work undertaken by Contractor for Owner pursuant to this Agreement and that procedure during the term and any extension of the term of this Agreement. This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Contractor and the County project manager or his designee, in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. Prior to the issuance of a Work Order, the Owner shall provide a summary of Work to be performed which will afford the Contractor the opportunity to submit a formal quotation for the Work; the Contractor shall respond with the information sought within seven (7) working days. For projects with an estimated cost of Fifty Thousand Dollars ($50,000) or less, the Owner shall obtain a proposal from one (1) or more of the selected firms, negotiate favorable project terms and conditions, and issue a numbered Work Order, signed by the Department Director to initiate the projects. For projects with an estimated cost over Fifty Thousand Dollars ($50,000) up to Two Hundred Fifty Thousand Dollars ($250,000), competitive quotes shall be solicited from all of the selected firms. The Contractor shall respond with the information sought within ten (10) working days. The County will negotiate favorable project terms and conditions, and issue a numbered Work Order to initiate the projects. Division Administrator approval is required at this level. Page -1- 16E12 If Payment and Performance Bonds are required, Contractor shall provide within seven (7) working days after notification of award. In each Request for Quotation, the Owner reserves the right to specify the period of completion and the collection of liquidated damages in the event of late completion. 3. THE CONTRACT SUM: The Owner shall pay the Contractor for the performance of the Work pursuant to the quoted price offered by the Contractor in his response to a specific Request for Quotation. Any County agency may utilize the services offered under this contract, provided sufficient funds are included in its budget(s). 4. NOTICES: All notices required or made pursuant to this Agreement to be given by the County to the Contractor shall be made in writing and shall be delivered by hand, by fax, e-mail, or by the United States Postal Service Department, first class mail service, postage prepaid, addressed to the following Contractor's address of record: Bart Zino, President PBS Construction, Inc. 4395 Corporate Square Naples, Florida 34104 -4754 Phone: 239 - 643 -6527 Fax: 239 - 825 -3137 Email: BZ @pbscontractors.com All notices required or made pursuant to this Agreement to be given by the Contractor to the County shall be in writing and shall be delivered by hand, by fax, e-mail, or by United States Postal Service Department, first class mail service, postage prepaid, addressed to the following County's address of record: Collier County Government Complex Purchasing Department 3301 East Tamiami Trail Purchasing Building G Naples, Florida 34112 Attention: Stephen Y. Carnell Purchasing /General Services Director Phone: 239 - 252 -8371 Fax: 239 - 252 -6584 Email: SteveCarnell @colliergov.net The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Service Agreement must be in writing. 5. NO PARTNERSHIP: Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. 6. PERMITS: LICENSES: TAXES: In compliance with Section 218.80, Florida Statutes, all permits necessary for the prosecution of the Work shall be obtained by the Contractor. Payment for all such permits issued by the County shall be processed internally by the County. Contractor is not Page -2- 16E12 responsible for paying for permits issued by Collier County, but is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier county agencies when the Contractor is acquiring permits. All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 7. NO IMPROPER USE: The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, county facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Contract of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty -four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 8. TERMINATION: Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County and requirements of this Agreement, the County may terminate said Agreement for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non - performance. 9. NO DISCRIMINATION: The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 10. INSURANCE: The Contractor shall provide insurance as follows: A. Commercial General Liability: Coverage shall have minimum limits of $1,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent contractors; Products and Completed Operations and Contractual Liability. B. Business Auto Liability: Coverage shall have minimum limits of $500,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Owned Vehicles, Hired and Non -Owned Vehicles and Employee Non - Ownership. C. Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of $1,000,000 for each accident. Special Requirements: Collier County Board of County Commissioners shall be listed as the Certificate Holder and included as an Additional Insured on the Comprehensive General Liability. Current, valid insurance policies meeting the requirement herein identified shall be maintained by Contractor during the duration of this Agreement. Renewal certificates shall be sent to the Page -3- 16E 12 County ten (10) days prior to any expiration date. There shall be a thirty (30) day notification to the County in the event of cancellation or modification of any stipulated insurance coverage. Contractor shall insure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Contractor shall provide County with certificates of insurance meeting the required insurance provisions. 11. INDEMNIFICATION: To the maximum extent permitted by Florida law, the Contractor shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 12. BONDS. A. When a construction project is in excess of $200,000, the Contractor(s) shall be required tc provide Payment and Performance Bonds. B. When required by Owner, the Contractor shall_ furnish a Performance and/or Payment Bond prior to commencing performance, for the full amount of the Work, which shall act as a security guaranteeing the performance of the Contractor's work and the payment by the Contractor to any other party (ies) providing labor and /or materials in connection with each construction or renovation project performed by the Contractor. The bonds shall be furnished using the forms prescribed in Exhibit "A ". C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the Owner's approval. 13. PAYMENTS. Generally, the Contractor will be paid upon completion; however, for Work in excess of thirty (30) days, the Contractor may receive Progress Payments. Subsequent to the first payment, Contractor must provide Owner with a fully executed Release and Affidavit in the form attached hereto as Exhibit "B" as a condition precedent to release of each progress payment. All applications for payment, whether for full payment or a progress payment shall be in writing, and in substantially the form attached hereto as Exhibit "C ". 14. PAYMENTS WITHHELD. Owner may decline to approve any Application for Payment, or portions thereof, because of defective or incomplete work, outstanding punchlist items, subsequently discovered evidence or subsequent inspections. The Owner may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work Page -4- 16E'.2 will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 15. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products /materials from specifications shall be approved in writing by Owner in advance. 16. CONTRACT TIME AND TIME EXTENSIONS. A. Time is of the essence in the performance of any Work under this Agreement and Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and materialmen, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's supplies and contractors. B. Should Contractor.. be- obstructed or delayed in the prosecution -of. or completion.of the_ Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of Government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty -eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of his duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 17. CHANGES IN THE WORK. Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any modifications to this Contract shall be in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. A Change Order in the form attached as Exhibit "D" to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the Page -5- re 16E quested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change order in the manner as Owner and Contractor shall mutually agree. If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 38 of this Agreement or else be deemed to have waived any claim on this matter it might otherwise have had. In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10 %) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10 %) markup for all overhead and profit for all Subcontractors' and sub - subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5 %) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15 %). All compensation due Contractor and any Subcontractor or sub - subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub - Contractor's bond costs associated with any change order shall be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 18. COMPLIANCE WITH LAWS. Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, workers' compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Owner in writing. 19. CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 20.ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 21. WARRANTY. Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any materialmen supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Page -6- 16E12 Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 22. STANDARDS OF CONDUCT: PROJECT MANAGER SUPERVISOR EMPLOYEES. The Contractor shall employ people to work on County projects who are neat, clean, well - groomed and courteous. Subject to the American with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The County may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Collier County projects is not in the best interest of the County. 23. TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws, ordinances, rules or regulations of any.p.ublic authority having jurisdiction over the Project requires: any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish to the Owner the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Owner. 24. PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the Owner with respect to the Project. If Contractor, or its subcontractors, agents or anyone, for whom Contractor is legally liable, disturbs the Owner's benchmarks, Contractor shall immediately notify Owner. The Owner shall re- establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 25. EMERGENCIES. In the event of any emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner is obligated to act to prevent threatened damage, injury or loss. Contractor shall give the Owner written notice within forty -eight (48) hours after the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. Page -7- 16E12 If the Owner determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty -eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 26. COMPLETION. When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Owner in writing that the entire Work (or such designated portion) is substantially complete. Within a reasonable time thereafter, Owner and Contractor shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner does not consider the Work (or designated portion) substantially complete, the Owner shall notify Contractor in writing giving the reasons therefor. If Owner considers the Work (or designated portion) substantially complete, Owner shall notify the Contractor in writing of the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punchlist of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated _portions thereof) after the date of . Substantial Completion, but_ Owner shall allow Contractor reasonable access to complete or correct items on the tentative punchlist. Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Owner will make such inspection and, if Owner finds the Work acceptable and fully performed under the Contract Documents, he shall promptly notify the Contractor in writing, recommending that on the basis of his observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Final payment shall not become due and payable until Contractor submits: (1) The Release and Affidavit in the form attached as Exhibit "B ". (2) Consent of Surety (if applicable) to final payment. (3) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipt, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the acceptability of the Work. Unless and until the Owner is completely satisfied, the final payment shall not become due and payable. 27. LIQUIDATED DAMAGES. The "Commencement Date" shall be established in the Notice to Proceed to be issued by the Owner. Contractor shall commence the work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Page -8- The Work shall be substantially completed within the time specified in the Rjdkk 12ation. The date of substantial completion of the Work (or designated portions thereof) is the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. The Work shall reach final completion and be ready for final acceptance by Owner within the time specified in the Request for Quotation. Owner and Contractor recognize that since time is of the essence for any work under this Agreement, Owner will suffer financial loss if the Work is not substantially completed within the time specified in the Request for Quotation. Should Contractor fail to substantially complete the Work within the specified time period, Owner shall be entitled to assess as liquidated damages, but not as a penalty, the amount specified in the Request for Quotation for each calendar day thereafter until substantial completion is achieved. The Project shall be deemed to be substantially completed on the date the Owner notifies the Contractor in writing of the Substantial Completion date pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to substantially complete the Work in a timely manner. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last. day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 28. CONTRACT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Facilities Management Department. 29. COMPONENT PARTS OF THIS CONTRACT. This Contract consists of the attached or referenced component parts, all of which are as fully a part of the Agreement as if herein set out verbatim, including: Contractor's Proposal, Insurance Certificate, RFP No. 10 -5510, Exhibits A, B, C, and D, any addenda, any Quotation/Work Order made or issued pursuant to this Agreement, and any related plans or specifications for any such Quotations or Work Orders. 30. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004 -05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and /or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and /or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and /or quotes; and, c. immediate termination of any contract held by the individual and /or firm for cause. 31. SUBJECT TO APPROPRIATION. It is further understood and agreed, by and between the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. Page -9- 16E 12 32. SALES TAX. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. 33. IMMIGRATION LAW COMPLIANCE: By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 34.OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES: Collier County encourages and agrees to the successful proposer extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful proposer. 35. AGREEMENT TERMS: If any portion of this Agreement is held to be void, invalid, or otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall remain in effect. 36. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision- making authority and by County's staff person who would make the presentation of any settlement reached during negotiations to County for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached at mediation to County's board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. Page -10- 16E12 IN WITNESS WHEREOF, the Contractor and the County, have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date and year first above written. ATTEST: Dwight E. Brock, _Clerk of Courts L' wax" Dated: r r First itness Kimberly Ortegon Type/Print Witn s N me Second itness Carmel Whooley Type /Print Witness Name Approved as to form and leg fficiency: S Teach Deputy County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA e "IL4 W. By: Fred W. Coyle, Chairman PBS Co struction, Inc. Co By. i re Bart Zino Typed Signature President Title Page -11- Item # Agenda Date Date �Ulpl( l/ � R d Deputy CI k ` 16E12 EXHIBIT A PUBLIC PAYMENT BOND Bond No. _ Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That Principal, and � as as Surety, located at are held and firmly bound to (Business Address) Oblige in the sum of as for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 20 , with Oblige for drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.0592. In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of under - signed representative urs t t body Page -12- , p uan o authority of its governing Signed, sealed and delivered in the presence of: PRINCIPAL: 1 b E 12 Witnesses as to Principal STATE OF _ COUNTY OF By: _ Name: Its: The foregoing instrument was acknowledged before me this of 20_, by as of a corporation, on behalf of the corporation. He /she is personally known to me OR has produced not) take an oath. as identification and did (did My Commission Expires: (AFFIX OFFICIAL SEAL) ATTEST: Witness as to Surety (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: SURETY: (Printed Name) (Business Address) (Auth)rized Signature) (Printed Name) •- Page -13- Witnesses STATE OF _ COUNTY OF 16E12 As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) The foregoing instrument was acknowledged before me this day of 20 —, by , as of , Surety, on behalf of Surety. to me OR has produced as identification and oath. My Commission Expires: (Signature of Notary) Name: (AFFIX OFFICIAL SEAL) (Legibly Printed) Notary Public, State of Commission No.: Page -14- He /She is personally known who did (did not) take an EXHIBIT A -2 PUBLIC PERFORMANCE BOND 16E12 Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That as Principal, and as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bond executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 20_, with Oblige for ourselves, our heirs, in accordance with drawings and specifications, which contractor is incorporated by reference and made a pat hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract, and 2. Pays Oblige any and all losses, damages, costs and attorneys' fees that Oblige sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Oblige; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications. Page -15- 16F! 7) This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Oblige for more than the penal sum of this Performance bond regardless of the number of suits that may be filed by Oblige. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20 , the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Signed, sealed and delivered in the presence of : Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: The foregoing instrument was acknowledged before me this day of 20_ by as o f on behalf of the corporation. as identification and ,a He /She is personally known to me OR has produced did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) corporation, (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -16- ATTEST: SURETY: (Printed Name) (Business Address) (Authorized Signature) Witness as to Surety (Printed Name) OR As Attorney in Fact Witnesses (Attach Power of Attorney) (Business Address) (Printed Name) STATE OF (Telephone Number) COUNTY OF 16E12 The foregoing instrument was acknowledged before me this day of 20 , by , as . of , Surety, on behalf of Surety. He /She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -17- 16E12 EXHIBIT B COUNTY OF COLLIER RELEASE AND AFFIDAVIT FORM ) STATE OF FLORIDA ) Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ paid, ( "Contractor ") releases and waives for itself and it's subcontractors, material -men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated 20_ for the period from to ' (2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly /final] Application for Payment No. Witnesses STATE OF _ COUNTY OF W ITS: DATE: CONTRACTOR The foregoing instrument was acknowledged before me this , 20_, by of a President [Corporate Seal] day of as 1 corporation, on behalf of the corporation. He /she is personally known to me or has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) NAME: (Signature of Notary) (Legibly Printed) Notary Public, State of Commissioner No.: Page -18- EXHIBIT C FORM OF CONTRACT APPLICATION FOR PAYMENT (County Project Manager) Bid No. 10 -5510 (County Department) Project No. Collier County Board of County Commissioners (the OWNER) or Collier County Water -Sewer District (the OWNER) Application Date FROM: RE: Original Contract Time: Revised Contract Time: (Contractor's Representative) (Contractor's Name) (Contractor's Address) Retainage @ 10% thru[insert date] Retainage @ _% after [insert date] Percent Work completed to Date: Percent Contract Time completed to Date Liquidated Damages to be Accrued 16E12 Payment Application No. for Work accomplished through the Date. Original Contract Amount: Total Change Orders to Date Revised Contract Amount Total value of Work Completed and stored to Date Less previous payment (s) AMOUNT DUE THIS APPLICATION: (Project Name) ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; (4) and CONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: (Contractor's Name) (Signature) DATE: (Type Name (shall be signed by a duly authorized representative of CONTRACTOR) Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional : (DP's Name) (Signature) DATE: _ (Type Name & Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved: By OWNER'S Project Manager: Page -19- (Signature) DATE: _ (Type Name and Title) EXHIBIT D 16E 1 CHANGE ORDER v 1 CHANGE ORDER NO. CONTRACT NO. 10 -5510 DATE: PROJECT NAME: PROJECT NO.: Under our AGREEMENT dated You hereby are authorized and directed to make the following change(s) in accordance with terms and conditions of the Agreement: FOR THE (Additive) (Deductive) Sum of. $ ($ Original Agreement Amount Sum of Previous Changes $ This Change Order (Add) (Deduct) Present Agreement Amount The time for completion shall be (increased /decreased) by calendar days due to this Change Order. Accordingly, the Contract Time is now calendar days. The substantial completion date is and the final completion date is Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted: 20_ CONTRACTOR: By: By: DESIGN PROFESSIONAL: By: OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA Page -20- From: G Insurance, Inc. !lent #: 32938 To: Attn: Carmel Page: 2/4 Date: 5/26/2010 3:29:07 P4 6 E 12 Tent WALSY ACORDTN CERTIFICATE OF LIABILITY INSURANCE DATE o1omYy) PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Gulfshore Insurance, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE `00 Goodlette Road North HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR .aples, FL 34103 -3303 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 239 261 -3646 INSURED PBS Construction, Inc. 4395 Corporate Square Naples, FL 34104 INSURERS AFFORDING COVERAGE INSURERA: Am @rlSUfe Ir1SUranCe C( INSURER B: INSURER C INSURER D: INSURER E: NAIC N COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS A GENERAL LIABILITY GL2025942 01/01/10 01/01/11 EACH OCCURRENCE $1 000 000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $3OO OOO CLAIMS MADE OCCUR MED EXP (Any one person) $10,000 PERSONAL d ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000, QQQ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP /0P AGG $2.000.000 POLICY X PRO- LOC A AUTOMOBILE LIABILITY CA2025944 01/01/10 01/01/11 X ANYAUTO COMBINED SINGLE LIMB $1,000,000 (Ea eocident) ALL OWNED AUTOS SCHEDULED AUTOS BODILY INJURY (Per person) $ X HIRED AUTOS X NON -OWNED AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY R ANY AUTO AUTO ONLY - EA ACCIDENT $ OTHER THAN EAACC $ AUTO ONLY: AGG $ A EXCESSIUMBRELLA LIABILITY i CU202594506 01101/10 01/01/11 EACH OCCURRENCE X OCCUR ❑ s5,000 .00o MADE AGGREGATE s5,000,000 DEDUCTIBLE X RETENTION $ O A WORKERS COMPENSATION AND WC202523705 W YSTATU- 0TH- § EMPLOYERS' LIABILITY 01/01/10 01/01/11 X ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $5OQ QQQ OFFICERMIEMBER EXCLUDED? Alyea, desc' under E.L. DISEASE • EA EMPLOYEE $500 OOO SPECIAL PROVISIONS below OTHER E.L. DISEASE - POLICY LIMIT $500,000 DESCRIPTION OF OPERATIONS / LOCATIONS /VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT /SPECIAL PRO VISIONS Certificate Holder is Named as Additional Insured on a primary and non contributory basis in regards to General Liability Only as needed by contract, per form CG 70 48 03 04 (Contractor's Blanket Additional Insured Endorsement) which includes "ongoing operations" and "your work - (See Attached Descriptions) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION Collier County Board of DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL County Commissioners -�� DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL 3301 Tamiami Trail, East IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Naples, FL 34112 REPRESENTATIVES. AUTHO ED R PRESENTAT E ACORD 25 (2001108) 1 of 3 #S4253561M396196 NSA © ACORD CORPORATION 1988 From: Gulfshore Insurance, Inc. To: Attn: Carmel Page: 3/4 Date: 5/26/2010 3:29:07 PM 16E12 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WANED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 -S (2001108) 2 of 3 NS425356IM396196 From: Gulfshore Insurance, Inc. To: Attn: Carmel Page: 4/4 Date: 5/26/2010 3:29:07 PM 6 E 12 ....................... completed operations ". AMS 25.3 (2001108) 3 of 3 #S425356/ M396196 ......._.' .............. -.. 16E12 MEMORANDUM Date: October 5, 2010 To: Lyn Wood, Contract Specialist Purchasing Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Contract #10 -5510 "Annual Contract for General Contracting Services" Contractor: Surety ConstructionCompany Attached is an original contract, as referenced above, (Item #16E12) approved by the Board of County Commissioners on September 28, 2010. The second original will be held on file in the Minutes and Record's Department as part of the Board's Official Record. If you should have any questions, please contact me at 252 -8406. Thank you. Attachment 16EI? ITEM NO.:i.Ji - R- ECCED: v Jf 1 i TORND FILE NO.:��' ROUTED TO: 1011OU -1 AMI; :51 ' D DO NOT WRITE ABOVE THIS LINE REQUEST FOR LEGAL SERVICES Date: September 28, 2010 To: Office of the County Attorney Scott R. Teach From: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department, Extension 2667 Re: Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay y Surety Construction Bradanna BACKGROUND OF REQUEST: This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 This item has not been previously submitted. ACTION REQUESTED: Contract review and approval. OTHER COMMENTS: kl& 10 (, 1(o Please forward to BCC for signature after approval. If there are any questions concerning the document, please contact me. Purchasing would appreciate notification when the documents exit your office. Thank you. C: Hank Jones, Facilities Mgmt. RECEIVED OCT 05 2010 Boar,! of Ccunry Ccmmissioncrs 16E12 MEMORANDUM TO: Ray Carter Risk Management Department FROM: Lyn M. Wood, C.P.M., Contract Specialist Purchasing Department DATE: September 28, 2010 RE: Review Insurance for Contract: #10 -5510 "Annual Contract for General Contractor Services" Contractors: PBS Constructors Wright Construction Vanderbilt Bay ►/Surety Construction Bradanna This Contract was approved by the BCC on September 28, 2010; Agenda Item 16.E.12 Please review the Insurance Certificates for the above referenced contract. If everything is acceptable, please forward to the County Attorney for further review and approval. Also, will you advise me when it has been forwarded. Thank you. If you have any questions, please contact me at extension 2667. dod /LMW C: Hank Jones, Facilities Mgmt. 1 _Z i SEP 2 9 2010 WK W&WENT Are 171qwllvl�� 16E12 mausen_g From: RaymondCarter Sent: Thursday, September 30, 2010 2:10 PM To: LynWood Cc: JonesHank; mausen _g; HerreraSandra Subject: Contract 10 -5510 "Annual Contract for General Contractor Services" All, I have approved the certificate(s) of insurance for the following vendors under contract 10 -5510: 1. PBS Constructors 2. Wright Construction 3. Vanderbilt Bay 4. Surety Construction 5. Bradanna These contracts will now be forwarded to the county attorney's office for their review. Thank you, = Manager Risk Finance Collier County Board of County Commissioners 3301 East Tamiami Trail Naples, FL 34112 Office 239 - 252 -8839 Mobile 239 - 821 -9370 Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 1 www.sunbiz.org - Department of State Home Contact Us E- Filing Services Previous on List Next on List Return To List Events Name History Detail by Entity Name Florida Profit Corporation SURETY CONSTRUCTION COMPANY Filing Information Document Number 647519 FEI /EIN Number 591951304 Date Filed 12/07/1979 State FL Status ACTIVE Last Event NAME CHANGE AMENDMENT Event Date Filed 04/22/1980 Event Effective Date NONE Principal Address 28441 S TAMIAMI TRAIL SUITE 109 BONITA SPRINGS FL 34134 US Changed 01/31/1997 Mailing Address 28441 S TAMIAMI TRAIL SUITE 109 BONITA SPRINGS FL 34134 US Changed 01/31/1997 Registered Agent Name & Address FLOYD, CYNTHIA L S/T 28441 S TAMIAMI TRAIL SUITE 109 BONITA SPRINGS FL 34134 US Address Changed: 05/03/2010 Officer /Director Detail Name & Address Title P KELLY, TERRY L 4961 TEAKWOOD DR NAPLES FL 34119 Title EVP TILL, JR. HERBERT H. 9039 EVERGREEN S.E. Document Searches 16 E lag2l of 2 Forms Help Entity Name Search Submit http: / /www. sunbiz.org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= 647519 &inq... 8/24/2010 www.sunbiz.org - Department of State FT.MYERS FL 33967 Title VP TURNER, JEFFERY L. 28042 E BROOKE DR. BONITA SPRINGS FL 34135 Title ST FLOYD,CYNTHIA L. 119011TH ST S.W. NAPLES FL 34117 Annual Reports Report Year Filed Date 2008 01/17/2008 2009 01/13/2009 2010 01/06/2010 Document Images 05/03/2010 -- Rea. Agent Change View image in PDF format 01/06/2010 -- ANNUAL REPORT View image in PDF format' 01/13/2009 -- ANNUAL REPORT View image in PDF format 01/17/2008 -- ANNUAL REPORT View image in PDF 'format ' I 01/10/2007 --ANNUAL REPORT View image in PDF format' 01/27/2006 -- ANNUAL REPORT View image in PDF format I 01/06/2005 -- ANNUAL REPORT View image' in PDF format I 02/16/2004 -- ANNUAL REPORT View image in PDF format 01/13/2003 -- ANNUAL REPORT View image, in PDF format ; 01/10/2002 -- ANNUAL REPORT View image, in PDF format 03/29/2001 --ANNUAL REPORT View image in PDF format 02/20/2000 -- ANNUAL REPORT View image in PDF format 02/01/1999 -- ANNUAL REPORT View image in PDF format I 01/27/1998 -- ANNUAL REPORT View, image 'in PDF format 01/31/1997 --ANNUAL REPORT View image in PDF format '' I 01/29/1996 -- ANNUAL REPORT View image in PDF format 01/30 /1995 -- ANNUAL REPORT View image in PDF format : I ve ?80 Note: This is not official record. See documents if question or conflict. Previous on List Next on List Return To List Entity Name Search Events Name History Submit Home i Contact us I Document Searches I E- Filinq Services I Forms I Helo CoDvrlght© and Privacv Policies State of Florida, Department of State http: / /www. sunbiz.org/ scripts /cordet.exe? action= DETFIL &inq_doc_ number= 647519 &inq... 8/24/2010 16E1? RLS # JD pecv1~7 ca CHECKLIST FOR REVIEWING CONTRACTS Entity Name: �PCA� �t Entity name correct On contract? ✓ Yes— No v Entity registered with FL Sec. of State? vYes No Insurance � /� Insurance Certificate attached? Y No Insured registered in Florida? No Contract # & /or Project referenced on Certificate? No Certificate Holder name correct (BCC)? Yes No Commercial General Liability General Aggregate Required $ Provided $ ��1 Exp. Date Products /Compl/Op Required $Aiila Provided $ i r Exp. Date —��— Personal & Advert Required $ Provided $�rY i \t Exp. Date t Each Occurrence Required $ 1(Yl 1 Provided $ to ') Exp. Date Fire/Prop Damage Required $ Provided $ Exp. Date Automobile Liability Bodily Inj & Prop Required $�� Provided $�, Exp Date Workers Compensation \ I Each accident Required $ Provided $1 l I Exp Date ' 1 Disease Aggregate Required $ 1 Provided $ l Exp Date �l Disease Each Empl Required $ Provided $ Exp Date Umbrella Liability Each Occurrence Provided $ �m� �' Exp Date 2 1 t1 b Aggregate Provided $ i t t l Exp Date Does Umbrella sufficiently cover any underinsured portion? Yes Professional Liability Each Occurrence Required $ Provided $ Exp. Da e Per Aggregate Required $ Provided $ Exp. Date l� t � i �D I� Other Insurance Each Occur Type: _ Required $ Provided $ Exp Date County required to be named as additional insured? County named as additional insured? Indemnification Does indemnification meet County standards? Is County indemnifying other party? Performance Bond Bond requirement referenced in contract? If attached, expiration date of bond Does dollar amount match contract? Agent registered in Florida? Signature Blocks Correct executor name in signature block? Correct title of executor? Executor authorized to sign for entity? Proper number of witnesses /notary? Authorization for executor to sign, if necessary: Chairman's signature block? Clerk's attestation signature block? County Attorney's signature block? Attachments Are all required attachments included? %Yes t,,I!res No No ZNo Yes No Yes No Yes No s s s Yes T ✓Ye es No No No No No No No s No Reviewer Initials: Date: / 04 -COA -0 030/ 2 AGREE MEN T10 -5510 16E 12 for Annual Contract for General Contractor Services THIS AGREEMENT is made and entered into this day of S¢. 4e-.,,, 6,- , 2010, by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "County" or "Owner ") and Surety Construction Company, authorized to do business in the State of Florida, whose business address is 28441 South Tamiami Trail, Suite 109, Bonita Springs, Florida 34134 (hereinafter referred to as the "Contractor "). WITNESSETH: 1. COMMENCEMENT: The contract shall be for a one (1) year period, commencing on September 28, 2010 and terminating September 27, 2011, or until such time as all outstanding Work Orders issued prior to the expiration of the Agreement period have been completed. This contract shall have three (3) one (1) year renewals, renewable annually. The County Manager, or his designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK: The Board of County Commissioners deemed five (5) firms to be pre - qualified and awarded a Contract to each firm. Each awardee will enter into an Agreement to provide complete general contractor services on an as- needed basis as may be required by the Owner in accordance with the terms and conditions of RFP #10 -5510 and the Contractor's proposal, which is incorporated by reference and made an integral part of this Agreement. The execution of this Agreement shall not be a commitment to the Contractor that any work will be awarded to the Contractor. Rather, this Agreement governs the rights and obligation of the Quotation procedure outlined in the next paragraphs and all Work undertaken by Contractor for Owner pursuant to this Agreement and that procedure during the term and any extension of the term of this Agreement. This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Contractor and the County project manager or his designee, in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. Prior to the issuance of a Work Order, the Owner shall provide a summary of Work to be performed which will afford the Contractor the opportunity to submit a formal quotation for the Work; the Contractor shall respond with the information sought within seven (7) working days. For projects with an estimated cost of Fifty Thousand Dollars ($50,000) or less, the Owner shall obtain a proposal from one (1) or more of the selected firms, negotiate favorable project terms and conditions, and issue a numbered Work Order, signed by the Department Director to initiate the projects. For projects with an estimated cost over Fifty Thousand Dollars ($50,000) up to Two Hundred Fifty Thousand Dollars ($250,000), competitive quotes shall be solicited from all of the selected firms. The Contractor shall respond with the information sought within ten (10) working days. The Page -1- Count will negotiate favorable project terms and conditions and issue a nl rT Jor?Order Y 9 p J � to initiate the projects. Division Administrator approval is required at this level. If Payment and Performance Bonds are required, Contractor shall provide within seven (7) working days after notification of award. In each Request for Quotation, the Owner reserves the right to specify the period of completion and the collection of liquidated damages in the event of late completion. 3. THE CONTRACT SUM: The Owner shall pay the Contractor for the performance of the Work pursuant to the quoted price offered by the Contractor in his response to a specific Request for Quotation. Any County agency may utilize the services offered under this contract, provided sufficient funds are included in its budget(s). 4. NOTICES: All notices required or made pursuant to this Agreement to be given by the County to the Contractor shall be made in writing and shall be delivered by hand, by fax, e-mail, or by the United States Postal Service Department, first class mail service, postage prepaid, addressed to the following Contractor's address of record: Terry L. Kelly, President Surety Construction Company 28441 Tamiami Trail South, Suite 109 Bonita Springs, FL 34134 Phone: 239 - 992 -6030 Fax: 239 - 253 -7677 Email: TKelly @SuretyConst.com All notices required or made pursuant to this Agreement to be given by the Contractor to the County shall be in writing and shall be delivered by hand, by fax, e-mail, or by United States Postal Service Department, first class mail service, postage prepaid, addressed to the following County's address of record: Collier County Government Complex Purchasing Department 3301 East Tamiami Trail Purchasing Building G Naples, Florida 34112 Attention: Stephen Y. Carnell Purchasing /General Services Director Phone: 239 - 252 -8371 Fax: 239 - 252 -6584 Email: SteveCarnell @colliergov.net The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Service Agreement must be in writing. 5. NO PARTNERSHIP: Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. Page -2- IuL 1G 6. PERMITS: LICENSES: TAXES: In compliance with Section 218.80, Florida Statutes, all permits necessary for the prosecution of the Work shall be obtained by the Contractor. Payment for all such permits issued by the County shall be processed internally by the County. Contractor is not responsible for paying for permits issued by Collier County, but is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier county agencies when the Contractor is acquiring permits. All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 7. NO IMPROPER USE: The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, county facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Contract of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty -four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 8. TERMINATION: Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County and requirements of this Agreement, the County may terminate said Agreement for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non - performance. 9. NO DISCRIMINATION: The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 10. INSURANCE: The Contractor shall provide insurance as follows: A. Commercial General Liability: Coverage shall have minimum limits of $1,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent contractors; Products and Completed Operations and Contractual Liability. B. Business Auto Liability: Coverage shall have minimum limits of $500,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Owned Vehicles, Hired and Non -Owned Vehicles and Employee Non - Ownership. C. Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of $1,000,000 for each accident. Special Requirements: Collier County Board of County Commissioners shall be listed as the Certificate Holder and included as an Additional Insured on the Comprehensive General Liability. Page -3- k ' Current, valid insurance policies meeting the requirement herein identified shall be maintained by Contractor during the duration of this Agreement. Renewal certificates shall be sent to the County ten (10) days prior to any expiration date. There shall be a thirty (30) day notification to the County in the event of cancellation or modification of any stipulated insurance coverage. Contractor shall insure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Contractor shall provide County with certificates of insurance meeting the required insurance provisions. 11. INDEMNIFICATION: To the maximum extent permitted by Florida law, the Contractor shall indemnify and hold harmless Collier County, its officers and employees frorn any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 12. BONDS. A. When a construction project is in excess of $200,000, the Contractor(s) shall be required to provide Payment and Performance Bonds. B. When required by Owner, the Contractor shall furnish a Performance and /or Payment Bond prior to commencing performance, for the full amount of the Work, which shall act as a security guaranteeing the performance of the Contractor's work and the payment by the Contractor to any other party (ies) providing labor and /or materials in connection with each construction or renovation project performed by the Contractor. The bonds shall be furnished using the forms prescribed in Exhibit "A ". C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the Owner's approval. 13. PAYMENTS. Generally, the Contractor will be paid upon completion; however, for Work in excess of thirty (30) days, the Contractor may receive Progress Payments. Subsequent to the first payment, Contractor must provide Owner with a fully executed Release and Affidavit in the form attached hereto as Exhibit "B" as a condition precedent to release of each progress payment. All applications for payment, whether for full payment or a progress payment shall be in writing, and in substantially the form attached hereto as Exhibit "C ". 14. PAYMENTS WITHHELD. Owner may decline to approve any Application for Payment, or portions thereof, because of defective or incomplete work, outstanding punchlist items, subsequently discovered evidence or subsequent inspections. The Owner may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence Page -4- 16E indicatin g p robable flin 9 of such claims (c ) f ilure of C ontractor to map a m el p r erl Y to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 15. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products /materials from specifications shall be approved in writing by Owner in advance. 16. CONTRACT TIME AND TIME EXTENSIONS. A. Time is of the essence in the performance of any Work under this Agreement and Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and materialmen, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's supplies and contractors. B. Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of Government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty -eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of his duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 17. CHANGES IN THE WORK. Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any modifications to this Contract shall be in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. Page -5- 16E12 A Change Order in the form attached as Exhibit "D" to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change order in the manner as Owner and Contractor shall mutually agree. If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 38 of this Agreement or else be deemed to have waived any claim on this matter it might otherwise have had. In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10 %) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10 %) markup for all overhead and profit for all Subcontractors' and sub - subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5 %) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15 %). All compensation due Contractor and any Subcontractor or sub - subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub- Contractor's bond costs associated with any change order shall be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 18. COMPLIANCE WITH LAWS. Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, workers' compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Owner in writing. 19. CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 20.ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 21. WARRANTY. Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any materialmen supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and Page -6- that all Work shall be of good quality, free from all defects and in conformal&E tlj Zntract Documents. Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 22. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on County projects who are neat, clean, well - groomed and courteous. Subject to the American with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The County may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Collier County projects is not in the best interest of the County. 23. TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish to the Owner the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Owner. 24. PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the Owner with respect to the Project. If Contractor, or its subcontractors, agents or anyone, for whom Contractor is legally liable, disturbs the Owner's benchmarks, Contractor shall immediately notify Owner. The Owner shall re- establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 25. EMERGENCIES. In the event of any emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner is obligated to act to prevent threatened damage, injury or loss. Page -7- Contractor shall give the Owner written notice within forty-eight 48 hours Jt6tE er he og 1c ?rence of ( ) the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Owner determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty -eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 26. COMPLETION. When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Owner in writing that the entire Work (or such designated portion) is substantially complete. Within a reasonable time thereafter, Owner and Contractor shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner does not consider the Work (or designated portion) substantially complete, the Owner shall notify Contractor in writing giving the reasons therefor. If Owner considers the Work (or designated portion) substantially complete, Owner shall notify the Contractor in writing of the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punchlist of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portions thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punchlist. Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Owner will make such inspection and, if Owner finds the Work acceptable and fully performed under the Contract Documents, he shall promptly notify the Contractor in writing, recommending that on the basis of his observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Final payment shall not become due and payable until Contractor submits: (1) The Release and Affidavit in the form attached as Exhibit "B ". (2) Consent of Surety (if applicable) to final payment. (3) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipt, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the acceptability of the Work. Unless and until the Owner is completely satisfied, the final payment shall not become due and payable. 27. LIQUIDATED DAMAGES. The "Commencement Date" shall be established in the Notice to Proceed to be issued by the Owner. Contractor shall commence the work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the IAUZ Date shall be at the sole risk of Contractor. The Work shall be substantially completed within the time specified in the Request for Quotation. The date of substantial completion of the Work (or designated portions thereof) is the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. The Work shall reach final completion and be ready for final acceptance by Owner within the time specified in the Request for Quotation. Owner and Contractor recognize that since time is of the essence for any work under this Agreement, Owner will suffer financial loss if the Work is not substantially completed within the time specified in the Request for Quotation. Should Contractor fail to substantially complete the Work within the specified time period, Owner shall be entitled to assess as liquidated damages, but not as a penalty, the amount specified in the Request for Quotation for each calendar day thereafter until substantial completion is achieved. The Project shall be deemed to be substantially completed on the date the Owner notifies the Contractor in writing of the Substantial Completion date pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to substantially complete the Work in a timely manner. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 28. CONTRACT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Facilities Management Department. 29. COMPONENT PARTS OF THIS CONTRACT. This Contract consists of the attached or referenced component parts, all of which are as fully a part of the Agreement as if herein set out verbatim, including: Contractor's Proposal, Insurance Certificate, RFP No. 10 -5510, Exhibits A, B, C, and D, any addenda, any Quotation/Work Order made or issued pursuant to this Agreement, and any related plans or specifications for any such Quotations or Work Orders. 30. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004 -05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and /or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and /or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and /or quotes; and, c. immediate termination of any contract held by the individual and /or firm for cause. Page -9- 31. SUBJECT TO APPROPRIATION. It is further understood and a reet� anJe�ween g y the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. 32. SALES TAX. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. 33. IMMIGRATION LAW COMPLIANCE: By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 34. OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES: Collier County encourages and agrees to the successful proposer extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful proposer. 35.AGREEMENT TERMS: If any portion of this Agreement is held to be void, invalid, or otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall remain in effect. 36. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached during negotiations to County for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed -upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision - making authority and by County's staff person who would make the presentation of any settlement reached at mediation to County's board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. Page -10- 16E12 IN WITNESS WHEREOF, the Contractor and the County, have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date and year first above written. ATTEST: Dwight•E..Brock .Cle&of Courts - By: _ I Dated: and ness Type /Print Witness Name Approved as to form and le iciency: .GG. mot/1 8-c-6-ft Teach Deputy County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA ')"a ('J. c� By: Fred W. Coyle, Chairman Surety Construction Company Contractor , atu re G � Typ SigQAre- (�j %f t jvn+ Page -11- Title gdo/ Item # Agenda Date Date EXHIBIT A PUBLIC PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: That Principal, 16E12 Bond No. Contract No. 10 -5510 as as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the , 20 , with Oblige for day of in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.0592. In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20_, the name of under - signed representative, pursuant to authority of its governing body. Page -12- Signed, sealed and delivered 16E in the presence of: PRINCIPAL: Witnesses as to Principal STATE OF _ COUNTY OF By: Name: Its: The foregoing instrument was acknowledged before me this of 20_, by as of a corporation, on behalf of the corporation. He /she is personally known to me OR has produced as identification and did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) ATTEST: Witness as to Surety (Signature of Notary) Name: (Legibly Printed) Notary Public, State of _ Commission No.: SURETY: (Printed Name) (Business Address) (Authorized Signature) (Printed Name) •E Page -13- Witnesses STATE OF _ COUNTY OF 16E12 As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) The foregoing instrument was acknowledged before me this day of 20_, by , as of Surety, on behalf of Surety. to me OR has produced as identification and oath. My Commission Expires: (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commission No.: Page -14- He /She is personally known who did (did not) take an EXHIBIT A -2 16F 1 PUBLIC PERFORMANCE BOND Bond No. Contract No. 10 -5510 KNOW ALL MEN BY THESE PRESENTS: That , as Principal, and as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bond executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 20 Oblige for ourselves, our heirs, in accordance with drawings and specifications, which contractor is incorporated by reference and made a pat hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract, and 2. Pays Oblige any and all losses, damages, costs and attorneys' fees that Oblige sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Oblige; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications. Page -15- 16E12 This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Oblige for more than the penal sum of this Performance bond regardless of the number of suits that may be filed by Oblige. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20 , the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Signed, sealed and delivered in the presence of : Witnesses as to Principal STATE OF _ COUNTY OF PRINCIPAL: By: _ Name: Its: The foregoing instrument was acknowledged before me this 20_, by , as ,a He /She is personally known to me OR has produced did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) day of corporation, (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -16- _ of on behalf of the corporation. as identification and ATTEST: Witness as to Surety Witnesses STATE OF _ COUNTY OF SURETY: (Printed Name) (Business Address) (Authorized Signature) (Printed Name) OR As Attorney in Fact (Attach Power of Attorney) (Business Address) (Printed Name) (Telephone Number) 16E12 The foregoing instrument was acknowledged before me this day of 20_, by as of Surety, on behalf of Surety. He /She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (AFFIX OFFICIAL SEAL) (Signature of Notary) Name: (Legibly Printed) Notary Public, State of Commission No.: Page -17- RELEASE AND EXHIBIT AFFIDAVIT FORM 16E 12 COUNTY OF COLLIER STATE OF FLORIDA ) Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the raid. subcontractors, material -mer whether in contract or in tort, any way to the performance 20 for the period from _ contract Documents and in consideration of $ ( "Contractor ") releases and waives for itself and it's successors and assigns, all claims demands, damages, costs and expenses, against the Board of County Commissioners of Collier County, Florida, relating in of the Agreement between Contractor and Owner, dated to (2) Contractor certifies for itself and its subcontractors, material -men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly /final] Application for Payment No. MV ITS: DATE: Witnesses STATE OF _ COUNTY OF CONTRACTOR The foregoing instrument was acknowledged before me this , 20_, by of a corporation. He /she is personally known to me or has produced My Commission Expires: (AFFIX OFFICIAL SEAL) President [Corporate Seal] day of as corporation, on behalf of the as identification and did (did not) take an oath. NAME: (Signature of Notary) (Legibly Printed) Notary Public, State of Commissioner No.: Page -18- EXHIBIT C FORM OF CONTRACT APPLICATION FOR PAYMENT (County Project Manager) Bid No. 10 -5510 (County Department) Project No. Collier County Board of County Commissioners (the OWNER) or Collier County Water -Sewer District (the OWNER) Application Date FROM: (Contractor's Representative) (Contractor's Name) (Contractor's Address) 16E12 Payment Application No. for Work accomplished through the Date: RE: (Project Name) Original Contract Time: Original Contract Amount: $ Revised Contract Time: Total Change Orders to Date $ Revised Contract Amount $ Total value of Work Completed Retainage @ 10% thru[insert date] $ and stored to Date $ Retainage @ _% after [insert date] $ Less previous payment (s) $ Percent Work completed to Date: % AMOUNT DUE THIS Percent Contract Time completed to Date % APPLICATION: $ Liquidated Damages to be Accrued ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; (4) and CONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: (Contractor's Name) (Signature) DATE:_ (Type Name & Title) (shall be signed by a duly authorized representative of CONTRACTOR) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional : (DP's Name) (Signature) DATE: (Type Name & Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved: By OWNER'S Project Manager: Page -19- (Signature) DATE: _ (Type Name and Title) EXHIBIT D CHANGE ORDER CHANGE ORDER NO. CONTRACT NO. 10 -5510 DATE: PROJECT NAME: PROJECT NO.: Under our AGREEMENT dated , 20_ 16E12 You hereby are authorized and directed to make the following change(s) in accordance with terms and conditions of the Agreement: FOR THE (Additive) (Deductive) Sum of: $ Original Agreement Amount $ Sum of Previous Changes $ This Change Order (Add) (Deduct) $ Present Agreement Amount The time for completion shall be (increased /decreased) by calendar days due to this Change Order. Accordingly, the Contract Time is now calendar days. The substantial completion date is and the final completion date is Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted: 20_ CONTRACTOR: By: DESIGN PROFESSIONAL: By: By: OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY. FLORIDA Page -20- rlianffi- 59944 sl jornz 16 F 12 ACORD., CERTIFICATE OF LIABILITY INSURANCE D01/2010) INSRE TYPE OF INSURANCE PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Gulfshore Insurance, Inc. 4100 Goodlette Road North ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Naples, FL 34103 -3303 GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE Fx� OCCUR 239 261 -3646 INSURERS AFFORDING COVERAGE NAIC # INSURED Surety Construction Company 28441 Tamiami Trail S, #109 Bonita Springs, FL 34134 -3213 INSURERA: Amerisure Insurance Company DAMAGE TO RENTED INSURER B: MED EXP (Any one person) INSURER C: PERSONAL & ADV INJURY INSURER D: INSURER E: GENERAL AGGREGATE $2 000 000 WOITA =1 C7e[e14. THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR INSRE TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM /DD/YY POLICY EXPIRATION DATE (MM/DD/YY1 LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE Fx� OCCUR GL2015714 12110/09 12/10/10 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED $300,000 MED EXP (Any one person) $10,000 PERSONAL & ADV INJURY $1,000,000 GENERAL AGGREGATE $2 000 000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PR CO LOC JET PRODUCTS - COMP /OP AGG s2,000,000 A AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS CA2015712 12110/09 12/10110 COMBINED SINGLE LIMIT (Ea accident) $1,000,000 X BODILY INJURY (Per person) $ X BODILY INJURY (Per accident) $ X PROPERTY DAMAGE (Per accident) $ - GARAGE LIABILITY ANY AUTO R AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC AUTO ONLY: AGG $ $ A EXCESS /UMBRELLA LIABILITY X OCCUR FI CLAIMS MADE DEDUCTIBLE X RETENTION $ 0 CU2015715 12/10/09 12/10/10 EACH OCCURRENCE s2,000,000 AGGREGATE $2 000 000 $ $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICERIMEMBER EXCLUDED? If yes, describe under SPECIAL PROVISIONS below WC201571605 01/01/10 01/01/11 X TWO CRYS TATU- O R E.L. EACH ACCIDENT $1,000,000 E.L. DISEASE - EA EMPLOYEE $1,000,000 E.L. DISEASE - POLICY LIMIT $1,000,000 OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS Contract #10 -5510 "Annual Contract for General Contractor Services" Collier County Board of County Commissioners is Named as Additional Insured on a primary basis with respect to General Liability as needed by contract per CG7048 0304. Collier County Board of County Commissioners 3301 Tamiami Trail E Naples, FL 34112 %,PAFVL r_LL.AI IUN Iv Uays for non- ravmem SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL . n DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVE HVUKU LJ (LUU "I /Vtf) 1 of 2 #S439826/M386366 SAO © ACORD CORPORATION 1988 AI;UKU L5 -5 (YUU1 /US) 2 of 2 #S439826/M386366 16E12 (2) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. 2. The limits of insurance applicable to the additional insured are the least of those specified in the written contract or agreement, or in the certificate of insurance or in the Declarations for this policy. If you also carry an Umbrella policy, and the written contract or agreement or certificate of insurance requires that the additional insured status also apply to such Umbrella policy, the limits of insurance applicable to the additional insured under this policy shall be those specified in the Declarations of -this policy. The limits of insurance applicable to the additional insured are inclusive of and not in addition to the limits of insurance shown in the Declarations. 3. The additional insured status provided by this endorsement does not extend beyond the expiration or termination of a premises lease or rental agreement nor beyond the term of this policy. 4. Any person or organization who is an insured under the terms of this endorsement and who Is also an insured under the terms of the GENERAL LIABILITY EXTENSION ENDORSEMENT, if attached to this policy, shall have the benefit of the terms of this endorsement if the terms of this endorsement are broader. 5. If a written contract or agreement or a certificate of insurance as outlined above requires that additional insured status be provided by the use of CG 20 10 11 85, then the terms of that endorsement, which are shown below, .are incorporated into this endorsement as respects such additional insured, to the extent that such terms do not restrict coverage otherwise provided by this endorsement: ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS (FORM B) This endorsement modifies Insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART. SCHEDULE Name of Person or Organization: Blanket Where Required by Written Contract, Agreement, or Certificate of Insurance that the terms of CG 20 10 1185 apply (if no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work" for that insured by or for you. Copyright, Insurance Services Office, Inc., 1984 CG 20 10 1185 The insurance provided to the additional insured does not apply to "bodily injury", "property damage ", "personal injury", or "advertising injury" arising out of an architect's, engineer's, or surveyor's rendering of or. failure to render any professional services including but not limited to: 1. The preparing, approving, or failing to prepare or approve maps, drawings, opinions, reports, surveys, change orders, design specifications; and 2. Supervisory, inspection, or engineering services. Any coverage provided in this endorsement is excess over any other valid and collectible insurance available to the additional Insured whether primary, excess, contingent, or on any other basis unless the written contract, agreement, or certificate of insurance requires that this insurance be primary, in which case this insurance will be primary without contribution from such other insurance available to the additional insured. Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 2 of 2 Copyright Insurance Services Office, Inc. 2003 CG 70 48 03 04