Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Backup Documents 10/09/2018 Item #16A14 (Florida Land Maintenence, Inc.)
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SUP� v� b A14 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO DCr /7/?,/ THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATU E O 9 Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the Uif40, Attorneys 0/8 Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Teigney Office no later than Monday preceding the Board meeting. r/7 **NEW** ROUTING SLIP e/lt Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. Risk Risk Management 2. County Attorney Office County Attorney Office 4(14 w>111 l 4. BCC Office Board of County 1L\f Commissioners �N )C P- 6 4. Minutes and Records Clerk of Court's Office 011t i7 Wtttial4 5. Procurement Services Procurement Services PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Ana Reynoso/ PURCHASING Contact Information 239-252-8950 Contact/ Department _ Agenda Date Item was October 9,2018 e, /. Agenda Item Number 16.A.14. / Approved by the BCC Type of Document CONTRACT Number of Original 4 C Attached Documents Attached CLIV-S'"'l-S.jil"- PO number or account N/A 18-7430 1. Superior number if document is 1. Superior Landscaping and Lawn to be recorded Landscaping and Lawn Service, Inc. Service, Inc. 2.Florida Land 2. Florida Land Maintenance, Inc. dba Maintenance, Inc. dba Commercial Land Commercial Land Maintenance Maintenance INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column, whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature STAMP OK 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be AR signed by the Chairman, with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the AR document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's AR signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 10/09/2018 and all changes made during N/A is not the meeting have been incorporated in the attached document. The County S (y- an option for Attorney's Office has reviewed the changes,if applicable. " this line. 9. Initials of attorney verifying that the attached document is the version approved by the /�'— N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the ,] 1 ' an option for Chairman's signature. ` this line. 1 6 A 1 4 MEMORANDUM Date: October 11, 2018 To: Ana Reynoso, Procurement Services From: Martha Vergara, Sr. Deputy Clerk Minutes & Records Department Re: Contract #18-7430 "Landscape Maintenance Vendors" Contractor: Florida Land Maintenance, Inc. d/b/a Commercial Land Maintenance Attached for your records is an original of each referenced document above, (Item #16A14) adopted by the Board of County Commissioners on Tuesday, September 25, 2018. The Board's Minutes & Records Department has kept an original as part of the Board's Official Records. If you have any questions, please feel free to contact me at 252-7240. Thank you. Attachment 1 6 A 1 4 FIXED TERM SERVICE MULTI-CONTRACTOR AWARD AGREEMENT # 18-7430 for Landscape Maintenance Vendors THIS AGREEMENT, made and entered into on this 94" day of O A-14) x 20 ( , by and between Florida Land Maintenance, Inc., d/b/a Commerical Land Maintenance authorized to do business in the State of Florida, whose business address is 3980 Exchange Avenue, Naples, Florida 34104 , (the "Contractor") and Collier County, a political subdivision of the State of Florida, (the "County"): WITNESSETH: 1. AGREEMENT TERM. The Agreement shall be for a three (3 ) year period, commencing III upon the date of Board approval I on and terminating on three (3 ) year(s) from that date or until all outstanding Purchase Order(s) issued prior to the expiration of the Agreement period have been completed or terminated. The County may, at its discretion and with the consent of the Contractor, renew the Agreement under all of the terms and conditions contained in this Agreement for two (2 ) additional one ( 1 ) year(s) periods. The County shall give the Contractor written notice of the County's intention to renew the Agreement term prior to the end of the Agreement term then in effect. The County Manager, or his designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred and eighty (180) days. The County Manager, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term prior to the end of the Agreement term then in effect. 2. COMMENCEMENT OF SERVICES. The Contractor shall commence the work upon issuance of a Purchase Order ❑ . 3. STATEMENT OF WORK. The Contractor shall provide services in accordance with the terms and conditions of I I Request for Proposal (RFP) I■I Invitation to Bid (ITB) Other ( }# 18-7430 , including all Attachment(s), Exhibit(s) and Addenda and the Contractor's proposal referred to herein and made an integral part of this Agreement. ■ The Contractor shall also provide services in accordance with Exhibit A — Scope of Services attached hereto. Page 1 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) , A14 3.1 This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Parties, in compliance with the County's Procurement Ordinance, as amended, and Procurement Procedures in effect at the time such services are authorized. 3.21E1 The procedure for obtaining Work under this Agreement is outlined in Exhibit A— Scope of Services attached hereto. 3.3 I I The procedure for obtaining Work under this Agreement is outlined in n Other Exhibit/Attachment: 3-.4 The County reserves the right to specify in each Request for Quotations: the period of completion; collection of liquidated damages in the event of late completion; and tho Price Methodology selected in 4.1. 4. THE AGREEMENT SUM. The County shall pay the Contractor for the performance of this Agreement based on Exhibit B- Fee Schedule, attached hereto and the price methodology as defined in Section 4.1. Payment will be made upon receipt of a proper invoice and upon approval by the County's Contract Administrative Agent/Project Manager, and in compliance with Chapter 218, Fla. Stats., otherwise known as the "Local Government Prompt Payment Act". 4.1 Price Methodology (as selected below): I "..w., -",".. "e _ : A w. -e e -_..e -- e.- .w._ . w - _. - - transferred from the County to the contractor; and, as a business practice there are no is authorized. I■I Time and Materials: The County agrees to pay the contractor for the amount of labor time spent by the contractor's employees and subcontractors to perform the work(number of hours times hourly rate), and for materials and equipment used in the project (cost of materials plus the contractor's markup). This methodology is generally used in projects in which it is not possible to accurately estimate the size of the project, or when it is expected that the project requirements would most likely change. As a general business practice, these contracts include back-up documentation of costs; invoices would include number of hours worked and billing rate by position (and not company (or subcontractor) timekeeping or payroll records), material or equipment invoices, and other reimbursable documentation for the project. • Unit Price: The County agrees to pay a firm total fixed price (inclusive of all costs, including labor, materials, equipment, overhead, etc.) for a repetitive product or service delivered (i.e. installation price per ton, delivery price per package or carton, etc.). The invoice must identify the unit price and the number of units received (no contractor inventory or cost verification). Page 2 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 4.2 Any County agency may obtain services under this Agreement, provided sufficient funds are included in their budget(s). 4.3 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of the Agreement. Any untimely submission of invoices beyond the specified deadline period is subject to non-payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this Agreement. 4.4 (check if applicable) _ . - - : ., . - - - , , Travel and Reimbursable Expenses must be approved in advance in writing by the County. Travel Reimbursements shall be at the following rates: 1'1ilaagc $0.44.5 per mile breakfast $9-90 Lunch $4.4.90 $4-9.00 Airfare e l-Gar Actual rental cost limited to compact -e standard size vehicles ....... ..... . .. . - h a cap of no more than $150.00 per night PafkiRg Actual cost of parking Taxi or Airport Limousine Actual cost of either taxi or airport limousine --- - . - _ ... . .. - - undertaken pursuant to this Agreement. 5. SALES TAX. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. Collier County, Florida as a political subdivision of the State of Florida, is exempt from the payment of Florida sales tax to its vendors under Chapter 212, Florida Statutes, Certificate of Exemption # 85-8015966531C. 6. NOTICES. All notices from the County to the Contractor shall be deemed duly served if mailed or emailed to the Contractor at the following: Page 3 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 Company Name: Florida Land Maintenance, Inc., d/b/a Commerical Land Maintenance Address: 3980 Exchange Avenue Naples, Florida 34104 Authorized Agent: Robert Kindelan Attention Name & Title: President Telephone: 239-643-6205 E-Mail(s): rkindelanncommlandmaint.net All Notices from the Contractor to the County shall be deemed duly served if mailed or emailed to the County to: Board of County Commissioners for Collier County, Florida Division Director: Travis Gossard Division Name: Road Maintenance Address: 4800 Davis Boulevard Naples, Florida 34104 Administrative Agent/PM: Melissa Pearson Telephone: 239-252-5591 E-Mail(s): melissa.pearsonAcolliecountyfl.gov The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Agreement must be in writing. 7. NO PARTNERSHIP. Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. 8. PERMITS: LICENSES: TAXES. In compliance with Section 218.80, F.S., all permits necessary for the prosecution of the Work shall be obtained by the Contractor. The County will not be obligated to pay for any permits obtained by Subcontractors. Payment for all such permits issued by the County shall be processed internally by the County. All non-County permits necessary for the prosecution of the Work shall be procured and paid for by the Contractor. The Contractor shall also be solely responsible for payment of any and all taxes levied on the Contractor. In addition, the Contractor shall comply with all rules, regulations and laws of Collier County, the State of Florida, or the U. S. Government now in force or hereafter adopted. The Contractor agrees to comply with all laws governing the responsibility of an employer with respect to persons employed by the Contractor. Page 4 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 9. NO IMPROPER USE. The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, County facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Agreement of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty-four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 10. TERMINATION. Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County as per this Agreement, the County may terminate said Agreement for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be the sole judge of non-performance. In the event that the County terminates this Agreement, Contractor's recovery against the County shall be limited to that portion of the Agreement Amount earned through the date of termination. The Contractor shall not be entitled to any other or further recovery against the County, including, but not limited to, any damages or any anticipated profit on portions of the services not performed. 11. NO DISCRIMINATION. The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 12. INSURANCE. The Contractor shall provide insurance as follows: A. IN Commercial General Liability: Coverage shall have minimum limits of $ 1,000,000.00 Per Occurrence, $2,000,000.00 aggregate for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. B. ■ Business Auto Liability: Coverage shall have minimum limits of $ 1,000,000.00 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include: Owned Vehicles, Hired and Non-Owned Vehicles and Employee Non-Ownership. C. ❑■ Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of $ 1,000,000 for each accident. Page 5 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 this insurance. Such insurance shall have limits of net less than $ oaeh - - -Pe 111 claim. Special Requirements: Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR, Collier County Government shall be listed as the Certificate Holder and included as an "Additional Insured" on the Insurance Certificate for Commercial General Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Contractor's policy shall be endorsed accordingly. Current, valid insurance policies meeting the requirement herein identified shall be maintained by Contractor during the duration of this Agreement. The Contractor shall provide County with certificates of insurance meeting the required insurance provisions. Renewal certificates shall be sent to the County thirty (30) days prior to any expiration date. Coverage afforded under the policies will not be canceled or allowed to expire until the greater of: thirty (30) days prior written notice, or in accordance with policy provisions. Contractor shall also notify County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non-renewal or material change in coverage or limits received by Contractor from its insurer, and nothing contained herein shall relieve Contractor of this requirement to provide notice. Contractor shall ensure that all subcontractors comply with the same insurance requirements that the Contractor is required to meet. 13. INDEMNIFICATION. To the maximum extent permitted by Florida law, the Contractor shall defend, indemnify and hold harmless Collier,County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, whether resulting from any claimed breach of this Agreement by Contractor, any statutory or regulatory violations, or from personal injury, property damage, direct or consequential damages, or economic loss, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. Page 6 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 13.1 The duty to defend under this Article 13 is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, County and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to Contractor. Contractor's obligation to indemnify and defend under this Article 13 will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the County or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 14. AGREEMENT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Road Maintenance Division 15. CONFLICT OF INTEREST. Contractor represents that it presently has no interest and shall acquire no interest, either direct or indirect, which would conflict in any manner with the performance of services required hereunder. Contractor further represents that no persons having any such interest shall be employed to perform those services. 16. COMPONENT PARTS OF THIS AGREEMENT. This Agreement consists of the following component parts, all of which are as fully a part of the Agreement as if herein set out verbatim: Contractor's Proposal, Insurance Certificate(s), ■❑ Exhibit A Scope of Services, Exhibit B Fee Schedule, ❑ RFP/ ❑ ITB/1141 Other #18-7430 , including Exhibits, Attachments and Addenda/Addendum, subsequent quotes, and U Other Exhibit/Attachment: 17. APPLICABILITY. Sections corresponding to any checked box ( ■ ) expressly apply to the terms of this Agreement. 18. SUBJECT TO APPROPRIATION. It is further understood and agreed by and between the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. 19. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004-05, as amended, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any Agreement held by the individual and/or firm for cause. 20. COMPLIANCE WITH LAWS. By executing and entering into this Agreement, the Contractor is formally acknowledging without exception or stipulation that it agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to this Agreement, including but not limited to those dealing with the Immigration Reform and Control Act of 1986 as Page 7 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended; taxation, workers' compensation, equal employment and safety including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes, and the Florida Public Records Law Chapter 119, including specifically those contractual requirements at F.S. § 119.0701(2)(a)-(b) as stated as follows: IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: Communication and Customer Relations Division 3299 Tamiami Trail East, Suite 102 Naples, FL 34112-5746 Telephone: (239) 252-8383 The Contractor must specifically comply with the Florida Public Records Law to: 1. Keep and maintain public records required by the public agency to perform the service. 2. Upon request from the public agency's custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the public agency. 4. Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the Contractor or keep and maintain public records required by the public agency to perform the service. If the Contractor transfers all public records to the public agency upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency's custodian of public records, in a format that is compatible with the information technology systems of the public agency. If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify the County in writing. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this Agreement and the County shall have the discretion to unilaterally terminate this Agreement immediately. Page 8 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 16A14 6 A1 21. OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES. Collier County encourages and agrees to the successful Contractor extending the pricing, terms and conditions of this solicitation or resultant Agreement to other governmental entities at the discretion of the successful Contractor. 22. PAYMENTS WITHHELD. The County may decline to approve any application for payment, or portions thereof, because of defective or incomplete work, subsequently discovered evidence or subsequent inspections. The County may nullify the whole or any part of any approval for payment previously issued and the County may withhold any payments otherwise due to Contractor under this Agreement or any other Agreement between the County and Contractor, to such extent as may be necessary in the County's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, the County may, after three (3) days written notice, rectify the same at Contractor's expense. The County also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to the County, whether relating to or arising out of this Agreement or any other Agreement between Contractor and the County. 23. ■ CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean. 24. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on County projects who are neat, clean, well-groomed and courteous. Subject to the American with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The County may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Collier County projects is not in the best interest of the County. 25. Ilk WARRANTY. Contractor expressly warrants that the goods, materials and/or equipment covered by this Agreement will conform to the requirements as specified, and will be of satisfactory material and quality production, free from defects, and sufficient for the purpose intended. Goods shall be delivered free from any security interest or other lien, encumbrance or claim of any third party. Any services provided under this Agreement shall be provided in accordance with generally accepted professional standards for the Page 9 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 16A14 particular service. These warranties shall survive inspection, acceptance, passage of title and payment by the County. Contractor further warrants to the County that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from the County. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which the County is entitled as a matter of law. 26. , . ,� , _W� .- __e . •-. -._ �.- requires any portion of the Work to be specifically inspected, tested or approved, - 27. I PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of the County or County's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due to Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the County with respect to the Project. If Contractor, or its subcontractors, agents or anyone, for whom Contractor is legally liable, disturbs the County's benchmarks, Contractor shall immediately notify the County. The County shall re-establish the benchmarks and Contractor shall be liable for all costs incurred by the County associated therewith. 28. SUBMITTALS AND SUBSTITUTIONS. Any substitution of products/materials form specifications shall be approved in writing by the County in advance. 29. CHANGES IN THE WORK. The County shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an estimate of any cost or time increases or savings it Page 10 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A1 4 foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon modification of the Purchase Order by the County, and the County shall not be liable to the Contractor for any increased compensation without such modification. No officer, employee or agent of the County is authorized to direct any extra or changed work orally. Any modifications to this Agreement shall be in compliance with the County Procurement Ordinance and Procedures in effect at the time such modifications are authorized. 30. AGREEMENT TERMS. If any portion of this Agreement is held to be void, invalid, or otherwise unenforceable, in whole or in part, the remaining portion of this Agreement shall remain in effect. 31. ADDITIONAL ITEMS/SERVICES. Additional items and/or services may be added to this Agreement in compliance with the Procurement Ordinance, as amended, and Procurement Procedures. 32. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision-making authority and by County's staff person who would make the presentation of any settlement reached during negotiations to County for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed-upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision-making authority and by County's staff person who would make the presentation of any settlement reached at mediation to County's board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. 33. VENUE. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 34. I l - - a e- ..+_ .. ... ........ e e -e . w personnel. Page 11 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.]) 16A14 I.] AGREEMENT STAFFING. The Contractor's personnel and management to be utilized for this Agreement shall be knowledgeable in their areas of expertise. The County reserves the right to perform investigations as may be deemed necessary to ensure that competent persons will be utilized in the performance of the Agreement. The Contractor shall assign as many people as necessary to complete required services on a timely basis, and each person assigned shall be available for an amount of time adequate to meet required services. 35. 11 ORDER OF PRECEDENCE. In the event of any conflict between or among the terms of any of the Contract Documents, the terms of solicitation the Contractor's Proposal, and/or the County's Board approved Executive Summary, the Contract Documents shall take precedence. nor ! P. ,.._e - e . _- - __ . . . _ea . :- •.. --. _ ..... ,__ - .._ . . - x . „ . ••- . .. .- _._. - mss_ _ _ __ _ . -e . - w • �.._. •......... "e e- - e _• e e e a... _ .r.. e e -•• ... r -_ e e _ _ _ •-...Le -.••_.. ._ �.. . e- -.. e �.e e . �....... .-_w• .,, • _ _ _ __ i e e e, _• •....... •- .. ......2 - G._ 36. ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of the County. Any attempt to assign or otherwise transfer this Agreement, or any part herein, without the County's consent, shall be void. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward the County. 37. SECURITY. The Contractor is required to comply with County Ordinance 2004-52, as amended. Background checks are valid for five (5) years and the Contractor shall be responsible for all associated costs. If required, Contractor shall be responsible for the costs of providing background checks by the Collier County Facilities Management Division for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four(4) years. All of Contractor's employees and subcontractors must wear Collier County Government Identification badges at all times while performing services on County facilities and properties. Contractor ID badges are valid for one (1) year from the date of issuance and can be renewed each year at no cost to the Contractor during the time period in which their background check is valid, as discussed below. All technicians shall have on their shirts the name of the contractor's business. The Contractor shall immediately notify the Collier County Facilities Management Division via e-mail (DL-FMOPS@colliergov.net) whenever an employee assigned to Collier Page 12 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 1 6 A 1 4 County separates from their employment. This notification is critical to ensure the continued security of Collier County facilities and systems. Failure to notify within four (4) hours of separation may result in a deduction of$500 per incident. 38. [ SAFETY. All Contractors and subcontractors performing service for Collier County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Also, all Contractors and subcontractors shall be responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site. Collier County Government has authorized the Occupational Safety and Health Administration (OSHA) to enter any Collier County Facility, property and/or right-of-way for the purpose of inspection of any Contractor's work operations. This provision is non- negotiable by any division/department and/or Contractor. All applicable OSHA inspection criteria apply as well as all Contractor rights, with one exception. Contractors do not have the right to refuse to allow OSHA onto a project that is being performed on Collier County Property. Collier County, as the owner of the property where the project is taking place shall be the only entity allowed to refuse access to the project. However, this decision shall only be made by Collier County's Risk Management Division Safety Manager and/or Safety Engineer. (Intentionally left blank-signature page to follow) Page 13 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 16A14 IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or agent, have executed this Agreement on the date and year first written above. ATTEST: BOARD OF '' NT. COMMI IP RS C tal K. Kinz-. G,erk;c7f Courts COLLIER SUN FLORI j By: By: Attest as to Chairman s Y Andy Solis, Esq. , Chairman signature only., Dated. LzAr ur 7 )icyv Florida Land Maintenance, Inc. Contractor's Witnesses: Contractor Commercial Land Maintenance DBA *G/�7l✓" BY: Cf1 rac First WitnessSi nature 2(� 4-0`8 TType/print signature and titlet TType/print witness nam L4421&t.Q.--1\‘\CtiN Wle,eA/Li Contractor's Secon itness (?()SiZi\Na.(‘‘Ne_,Cbi/4- TType/print witness nameT A ..ro ed a to '•rm ,,nd egality: III AM 11! ._ Coun Attorney a , Print Name Page 14 of 17 Fixed Term Service Multi-Contractor Agreement 2017 008(Ver.1 tifyf 16A14 Exhibit A Scope of Services ■ following this page (pages 1 through 20 ) n this exhibit is not applicable Page 15 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 16A14 LANDSCAPE MAINTENANCE VENDOR Agreement# 18-7430 Contractor: Florida Land Maintenance,Inc. DETAILED SCOPE OF SERVICES Work Areas 4&22: Collier Blvd "Port Au Prince to one median North of Hammock Bay & Mc Llevane Bridge to Jolley Bridge,"approximately 3.40 miles Collier Blvd South(Port Au Prince to one median North of Mainsail Drive)and(McLlevane Bridge to Jolley Bridge) A:Collier Blvd Mc Llevane Bridge to Jolley Bridge o Improved medians 1-6,mowing around the pump station and irrigation controller up to the road side. o All side right-of-way areas on at the around the Jolley Bridge and embankments and at the pump station on Capri Blvd. B:Collier Blvd Fiddler's Creek to North of Mainsail Drive o Collier Blvd at Fiddler's Creek to one median north of Mainsail Drive:one(1)unimproved median,one(1)paver median and three and half(3-1/2)improved medians,median numbers 8—12. o All sides right-of-way areas by the water meters and backflow preventer Work Area 6: Immokalee Road Phases 2&3 "Tarpon Bay Boulevard to Collier Boulevard,"approximately 3.50 miles Phase 2: Strand Blvd to Preserve Lane o Improved medians 22-34 o All side right-of-way areas from Strand Blvd to Preserve Lane Phase 3: Preserve Lane to Collier Blvd o Improved Medians 35-40 o All side Right of Way areas from Preserve Lane to Collier Blvd Work Area 10: "Golden Gate Overpass&Parkway," approximately 7.0 miles Golden Gate Overpass from Bears Paw to Livingston Road,5.50 miles o Improved medians 1-4 o All sides right-of-way areas on Golden Gate Parkway from Bear's Paw to Livingston Road,including all retention areas. Golden Gate Parkway from Livingston Road to Santa Barbara Blvd, 1.50 miles o Improved medians 1-26 o All sides right-of-way areas on Golden Gate Blvd from Collier Blvd to 151 St. o 13th St Chicane medians and side ROW mowing Work Area 11 &18: "Golden Gate Parkway&Collier Boulevard(Phases A& B),approximately 4.40 miles" Golden Gate Parkway from Santa Barbara Boulevard to Collier Boulevard o Improved medians o All side right-of-way areas on Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard) Collier Blvd,Phase A(588 feet north of City Gate Boulevard to Golden Gate Parkway) o Improved medians o All side right-of-way areas on Collier Boulevard(588 feet north of City Gate Boulevard to Golden Gate Parkway) Collier Blvd,Phase B(Golden Gate Parkway to Green Boulevard) o Improved medians o All side right-of-way areas on Collier Boulevard(Golden Gate Parkway to Green Boulevard) Work Area 12: "Davis Boulevard Phases 1 &2,"approximately 4.60 miles Phase 1: US 41 East/Sandpiper Blvd to Airport Pulling Road, 1.60 miles Page 1 of 20 16A14 Phase 2: Airport Pulling Road to County Barn Road,3.00 miles o Improved medians 1-27 o On Davis Blvd from US 41East/Sandpiper Blvd to County Barn Road,all sides right-of-way Work Area 13: "US 41 North,Phases I -5," approximately 8.90 miles US 41 North Locations Phases 1 &2: Seagate Dr./PRR to Vanderbilt Beach Road, includes medians on Seagate Dr.and Vanderbilt Beach Rd,3.40 miles, Trail Blvd from Ridge Drive to Myrtle Road, 1.3 miles Phase 3: Vanderbilt Beach Road to Immokalee Road, 1.50 miles Vanderbilt Beach Road(US 41 North to Hammock Oak Drive/Gulf Pavilion Dr.),medians 1-3 Phase 4: Immokalee Road to Wiggins Pass Road,2.00 miles Phase 5: Wiggins Pass Road to the County line,2.00 miles o US 41 North,Phases 1-3, improved medians 1-28 o Seagate Drive from US 41 North to Crayton Road,improved medians 1-6 o US 41 North,Phases 4-5,improved medians 29-50 o US 41 North from Wiggins Pass Road to the County Line,all sides right-of-way Work Area 16: "Livingston Road Phase I & 2," approximately 4.30 miles Livingston Road,Phases 1 &2,from Golden Gate Parkway to Pine Ridge Road o Improved medians 1-14 o All side right-of-way areas indicated from Radio Road to Pine Ridge Road o Two Wet Retention Ponds:one at Golden Gate Parkway and the other at Pine Ridge Road. Fork Area 17: "Livingston Road Phases 3,4,and 5," approximately 7.50 miles Livingston Road,Phases 3 -5 Phase 3: Pine Ridge Road to Vanderbilt Beach Road;approximately 2.00 miles • Improved medians 15-19 • All side right-of-way areas indicated from Pine Ridge Road to Vanderbilt Beach Road • Swale retention area throughout the entire segment on the east side. Phase 4: Vanderbilt Beach Road to Immokalee Road;approximately 2.00 miles • Improved medians 20-24 • All side right-of-way areas indicated from Vanderbilt Beach Road to Immokalee Road Phase 5: Immokalee Road to the County Line;approximately 3.50 miles • Improved medians 24-32 • All side right-of-way areas indicated from Immokalee Road to the Collier/Lee/Bonita County Line Work Areas 19&20: "lmmokalee Road Phase l & 1-75 Interchange," approximately 5.50 miles Immokalee Road,Phase 1, 111`h Avenue to Strand Blvd o Improved medians 1—22 o All side right-of-way areas on Immokalee Road from 111`h Avenue to Strand Blvd. Immokalee Road and 1-75 Interchange,Strand Blvd to Tarpon Bay Blvd o Improved medians 23—25 o All side right-of-way areas on Immokalee Road from Strand Blvd to Tarpon Bay Blvd. o All quadrants areas including ramp areas on o Pond site on the SW quadrant Page 2 of 20 16A14 Work Area 24: Collier Blvd "US 41 East to Marino Circle including the pond site at US 41 East &951," approximately 4.95 miles Collier Boulevard A. US 41 East to Marino Circle B. Pond site on Collier Blvd at US 41 East Work Areas(Collier Blvd referred to as 951) o Improved medians 28A to 52 o West right-of-way areas and sod along County trail on 951from US 41 East to Marino Circle(Mowing only) o Pond Site at US 41 East and Collier Blvd Work Area 25: "Santa Barbara Blvd "David Blvd to 1-75 Bridge," approximately 1.64 miles Work Areas(Santa Barbara Blvd from Davis to I-75 Bridge), o Improved medians 15 to 25 o West and East right-of-way areas and sod on Santa Barbara from Davis to I-75 bridge Scope of Services The Contractor /subcontractor shall be responsible for landscape maintenance services. Attachment B "Site Specifications" of Solicitation #18-7430 has detailed descriptions of each work area. The work areas are awarded in "as is" conditions, and the contractors/subcontractors are highly encouraged to visit each work area for a full assessment before bidding. Services for landscape maintenance may require services weekly,monthly,quarterly,or on an"as needed"basis.Division determines the schedules to sustain the quality and health of plant materials within the medians and sides of ROW improved areas. The services include, but are not limited to, medians and sides ROW mowing; weeding; edging; trimming; pruning; general site trimming; trash removal; hardscapes pressure washing; blowing, irrigation checks and repairs; ornamental & turf applications of herbicide, pesticide, fungicide, and growth regulator; mulching; fertilization applications; tree trimming; palm pruning, palm frond bungee cord restraints; tree and palm re-staking, re-standing; plant replacements; emergency services; crane services; water truck services;hand watering;sod replacements;Maintenance of Traffic(MOT);and all other services as they relate to landscape maintenance. 1. Specifications These services are inclusive of furnishing labor,supervision,equipment,tools,materials,and MOT to perform the work,and they shall be included in the unit prices bid. Use current techniques and standards approved by University of Florida, Institute of Food and Agriculture Services(UF/IFAS). Collier County expects the Contractor to comply with all terms of this Agreement and Soliciation#18-7430.Every item and schedule is an important element of this agreement,and the contractor/subcontractor shall adhere to them. The bid tabulation quantities are approximate,and the frequencies for services are suggestions for bidding purposes. These services or service frequencies may increase or decrease at the discretion of the Division. Contractors shall perform services at their bid prices;refusal to perform any services at bid prices may be subject to contract termination. 1.1 Section I.Routine Basic Landscape Maintenance&Irrigation Services Specifications for routine services include,but not limited to,median mowing and edging,side of the right-of-way(ROW) mowing and edging,street cleaning,median weeding,side right-of-way weeding,general site trimming,trash removal,and irrigation system maintenance and repair. There are two(2)mowing schedules during the calendar year consisting of a Winter Schedule that starts on November 1"through April 30th with biweekly services,and the Summer Schedule starts May 1"through October 31"with weekly services. However, the Division shall set the service frequencies on the monthly schedule issued to the contractor before the commencement of services. 1.1.1 Mowing The number of mowing services may be modified by the Division depending upon conditions or extenuating circumstances. Mowing includes,but not limited to: swale areas,sod within medians,and sod on sides of ROW(both sides of the roadway). a. Before mowing,the contractor shall remove palm fronds,horticultural and non-horticultural debris,leaves,rocks,paper, tree branches and limbs,and various types trash from the turf areas,plant beds,and hardscapes. Page 3 of 20 16A14 b. Mow in a manner consistent with landscape maintenance industry standards that ensures smooth surface appearance without scalping or leaving uncut grass. c. Use alternate mowing practices,patterns,or equipment within narrow turf areas to prevent wheel ruts or worn areas in the turf. d. All ROW mowing is from the back of curb or sidewalk to the right-of-way line(in most cases the wooden or concrete power poles). e. Mow at the highest recommended height for species in the table below recommended by the University of Florida's Institute of Food and Agriculture Sciences(UF/IFAS). Do not remove more than one third(1/3)of the leaf blade at each mowing. Species Mowing Height(inches) Grass Height Not to Exceed(inches) Bahiagrass 3.0—4.0 4.5—6.0 St.Augustine 3.5—4.0 5.5—6.0 f. On the same day that Contractor mows,remove grass clippings and debris from hardscapes such as,but not limited to: sidewalks,streets,driveways,curbs,and gutters. ➢ Remove grass clippings and debris in the vicinity of a stormwater inlet or catch basin. D. Do not allow grass clippings or debris to enter into any inlet,catch basin,or body of water. ➢ Deposit grass clippings into existing turf areas. g. Mow turfgrass with a mulching type mower eliminating the need to bag and transport grass clippings.Leaf clippings in the turf area will add nutrients and organic matter back into the lawn.Should bagging be necessary,the bagged clippings shall be collected and removed at no additional cost to the County. h. Swale mowing is throughout the entire year.During rainy season conditions,address these areas at each service.Water in swales with vegetation and weeds protruding above the water,reduce the height to 12"above the water line or as directed by the Division.Mowed vegetation should be directed away from the water and not allowed to remain piled up around the pond. i. Dry retention mowing is throughout the year,the height of grass must not exceed eighteen inches(18").Areas holding water restrict mowing to ten feet(10')buffer from the water's edge.Mowed vegetation should be directed away from the water and not allowed to remain piled up around the pond. j. Wet retention areas(ponds)mowing of vegetation within ten feet(10')from the water's edge at the time of mowing must be greater than 6 inches in height.Mowed vegetation should be directed away from the water and not allowed to remain piled up around the pond. k. Turf areas that are water-soaked require a hand walk behind mower,twenty-one-inch(21"+/-)diameter,to prevent wheel ruts in the turf caused by heavier,self-propelled,riding mowers.Damage to the turf caused by the Contractor's equipment shall be repaired immediately following the service at no additional cost to the County. I. Turfgrass showing visible signs of heat stress,disease,and irrigation malfunctions must be reported the Division immediately. 1.1.2 Edging Mechanical turf edging shall be done with each mowing service or as directed by the Division. No herbicides are authorized for edging. a. Metal blade edging is not permitted along plant bed and turf edges where an underground irrigation system is present. b. Mechanical metal blade edging is permitted along the back of curbs. c. Grass root runners extending into the mulched,concrete,asphalt,and brick paved areas shall be cut and removed with the edging service. d. Edging is required in all turf areas such as,but not limited to: sprinkler heads,valve boxes,timer pedestals,posts,utility service boxes,shrubs,signposts,manholes,guardrails,along sidewalk edges,back of concrete curbs,around plant beds, street light bases,headwalls,and trees. e. Edging debris on streets,sidewalks,or other areas shall be removed the same day as the service,including but not limited to:sidewalks,curbing,gutters including a four foot(4')area from the face of the curb and sidewalk.No clippings or other debris shall be blown into or deposited onto adjacent property or accumulated in ROW areas. f. Edging with herbicides is not authorized,and if Contractor used them,they are responsible for bringing the site back to full restoration at their expense. 1.1.3 Weeding Weed control is within the medians and the sides of ROW to include bedding plants,perennials,shrubs,trees,sidewalks (asphalt,concrete or paver),guardrail bases,tree grates,curb joints,and mulched areas. Perform services weekly,or as necessary,to provide a reasonably weed-free and a visually well-maintained area approved by the Landscape Operations Manager and Landscape Supervisor.The contractor must control weeds in landscape plantings using a combination of non- chemical(manually)and chemical methods. Post-emergent products must contain Glyphosate herbicide to control weeds, Page 4 of 20 16A14 and it will require the contractor to add a blue tracker,tracer dye,to the product before treatments.Incomplete weeding will cause invoice rejection for this line item.Additionally,the contractor may have deductions for non-performance. 1.1.4 General Site Trimming Contractor shall disinfect pruning tools before performing services to prevent disease transmission. Pruning is on a weekly basis,"as needed,"or at the Division's discretion for plant foliage below ten feet(10'). Notify Division Landscape Supervisor via email within twenty-four(24)hours with signs of dying trees,shrubs,and plant materials. a. Regular service includes trimming plant foliage to heights below ten feet(10');including but not limited to: groundcovers,shrubs,canopy trees(except Magnolias)and palms. Also,removal of water sprouts,suckers,dead or diseased foliage,and branches. b. Maintain groundcovers to eighteen inches(18")from the curb. c. Trim the plants eighteen inches(18")from the irrigation heads to maintain uniform irrigation distribution patterns. d. Maintain vehicular sight line visibility at maximum requirements of eighteen through twenty-four inches(18"—24") measured within the travel lane;trim them to the plant material shape or form. e. Corrective pruning services performed to keep the natural shape and characteristics of the species. f. Prune groundcovers and shrubs to eighteen inches(18")in height by October Pt each year before cooler temperatures,to ensure blooming plants are at the proper elevation during the heavy traffic season. g. Groundcovers and shrubs maintain a thirty-six inch(36")maximum height or as designated by the Division. h. Prune selectively to improve the plant structure health and to enhance fruiting,flowering,or appearance. i. Shrub pruning should be done consistently throughout each median for all shrub types,so the landscape appearance has continuity throughout that median. j. Shrubs within the turn lanes maintain twenty-four(24")measured from the travel lane. k. Bougainvillea's and Green Island Ficus maintain twenty-four inches(24")throughout the year. 1. Asian Jasmine and Perennial Peanut are to be top sheered with side edging/sheering. m. Prune ornamental grasses once a year,only after the blooming season,at the plant base to remove old growth.Do not cut grasses in a flat top method. Varieties include,but are not limited to Fountain,Muhly,Florida Gama,and Fakahatchee. n. Do not prune Liriope muscari without Division approval and guidance. o. Remove old leaves and dead flowering growth on the Blueberry Flax,Agapanthus,Bird of Paradise,Iris,and other similar varieties. p. Maintain tree canopies over pathways or sidewalks at a minimum height of ten feet(10'). q. Shrubs and groundcovers adjacent to pathways or sidewalks prune to maintain one-foot(1')clearance from the edge of the pathway.It is recommended that adjacent shrubs and groundcovers are maintained at an angle or rounded away from the pathway. r. Groundcovers require minimal pruning.Groundcovers are not allowed to grow over curbs or onto paved areas. s. Landscaping requires an esthetically clean appearance,so remove pruning and trimming debris following each service. 1.1.5 Street Cleaning Sidewalks,curbs,and gutters,including four feet(4')area from the face of gutters,curbs,turn lanes,medians,and sidewalks must be cleaned immediately following each service to prevent accumulation of debris and to keep areas neatly maintained with safe conditions. a. No debris shall be blown or deposited on adjacent property,accumulated on right-of-way areas,or blown into roadways or travel lanes. b. Payment for this item is dependent on no debris and clippings removed from sidewalks,curbs,gutters,or roadways. 1.1.6 Trash Removal li At each service, site areas require removal of trash or debris including, but not be limited to paper, bottles, cans, trash, horticultural and non-horticultural debris, leaves,rocks,tree branches and limbs, and various types other trash from the turf areas,plant beds,and hardscapes. a. Trash and debris disposal must be at a landfill or disposal site.Include disposal fees,tipping,and other disposal charges in the bid schedule unit price. b. To receive payment,remove trash from the medians,within planting beds,sidewalks,and side ROW areas. 1.1.7 Irrigation System Maintenance&Repair The contractor is authorized to subcontract irrigation services;however,the right to subcontract does not relieve Contractor from responsibility or liability assumed under contract. Contractor shall remain liable for work performance by a subcontractor,and ensures subcontractor completes the work and meets timelines requested by Division Representative per contract documents.Satisfactory performance is a requirement of contract by contractor/subcontractor;unsatisfactory work may cause deductions for non-performance. Work consists of weekly irrigation systems visual inspections to determine if systems are functioning normally,but may Page 5 of 20 16A14 change at the Division's discretion. Complete work areas before moving to the next roadway area.Any minor repairs discovered during the weekly services,repair immediately.Minor repairs consist of,but not limited to,cuts,lateral/funny leaking pipes,replacing irrigation heads,clogged heads,damaged pipes,and flooded areas. Any damaged caused by the Contractor's or subcontractor's personnel while performing services shall be repaired immediately at no cost to the County. 1.1.7.1.Valves Valves can be operated manually at the valve box,and the surge board toggle,or at the controller.Return the operation switch to the"automatic"position following service.Failure to do so may create hazardous road conditions because of uncontrolled irrigation water running outside of the programmed schedule area. At Division's discretion,they may change the operating procedure,so valves turn on virtually using a laptop or Smart device. 1.1.7.1.1.Automatic Control Valve assemblies and Quick Coupling Valves service requirements: a. Open zone control valve assemblies'boxes and inspect valves for leaks and proper settings. b. Clean valve boxes ensuring they are clean and free of debris,leaves,and mulch. c. Check quick coupling boxes ensuring they are free of debris and foreign objects. d. Keep grass and mulch out of valve boxes. e. Valve boxes in sod areas to be kept at sod level. f. Valve boxes in plant beds to be kept two inches(2")above finished mulch level,and any encroaching vegetation shall be trimmed to ensure valve boxes are accessible. Upon approval,County will supply the valve boxes to reach the specified height. 1.1.7.2. Minor Repairs Field repairs not completed on the same day must continue the next day. Each day repairs are incomplete; contractor/subcontractor must notify Division Representative and provide them with the work status.The division shall supply irrigation parts requested by contractor/subcontractor,and if parts are unavailable at the Division's warehouse,they shall notify Division Representative so they can record those parts and work areas affected. Division Representative may authorize contractor/subcontractor to move to the next roadway. Contractor/subcontractor is responsible for returning damaged and replacement parts to Division's warehouse located at 4800 Davis Blvd,Naples,FL;Monday—Friday,from 8:00 a.m.—3:30 p.m. Failure to return parts as required for Division warehouse accountability,may cause contractor/subcontractor to pay parts costs. 1.1.7.2.1.Minor repairs include,but not limited to:replacement of heads,decoders,nozzles,solenoids,installation or replacement of risers,repairs of lateral PVC pipe or funny pipe breaks,and clear any restricted sprinkler lines. a. Clear obstructions from or around irrigation heads that prohibit them from being able to rise to their full extent(i.e.,sod runners,plant material,grass). b. Review system and repair any blown-off heads,broken lines,or leaks around heads or valves. c. Clean and adjust sprinkler heads and nozzles to ensure that landscaped areas receive one hundred percent(100%)irrigation coverage and heads are not spraying onto roadways or walkways. Irrigation heads obstructed by the planting beds,it is the responsibility of the contractor to trim the plant material back to ensure that an 18"separation is always maintained. d. If a longer nozzle is required contractor shall change nozzle using County supply parts. e. Replace defective and broken heads or nozzles,install or replace defective and/or broken risers and repair minor breaks or restricted sprinkler lines. f. Inspect,clean,and replace,if necessary,screen/filters within the sprinkler heads. g. Minor repairs include replacement of heads,bubblers,nozzles,decoders,and solenoids;installation or replacement of risers;repair of minor/lateral PVC piping breaks or subsurface piping or restricted sprinkler lines,replacement of damaged valve boxes/lids,necessary for the proper and safe operation of the systems. h. Flag problems and provide a written record to the Road Maintenance Irrigation Supervisor. Unit price includes flags,primer,and glue. 1.1.7.3.Contractor/Subcontractor Responsibility Contractor/subcontractor has the sole responsibility to notify Division Representative of irrigation problems or additional irrigation maintenance needs they discover during weekly checks. It's their responsibility to ensure that the plant material is flourishing and does not suffer from insufficient irrigation. They must correct any minor irrigation issues.When discovering a major issue,the contractor must bring it to the Division Representative's attention immediately.The contractor/subcontractor may suffer damages for failure to notify Division. Page 6 of 20 1 6 A 1 4 1.1.7.4. Irrigation Crew Size and Communication Device Contractor/subcontractor irrigation service crew shall consist of two(2)on-site personnel. Crew shall have field communication devices while performing services,so Division Representatives may contact them in the field. Additionally,a laptop or Smart device will be required for virtual connection to the irrigation system. 1.1.7.5. Irrigation Crew Scheduled Work Segment work shall be completed in one(1)visit;if necessary,a consecutive day visit may follow. The purpose is to have the entire segments under contract completed at the same time. 1.1.7.6. Irrigation General Maintenance Report Sheets(GMRS) Contractor/subcontractor must complete one(1)GMRS sheet per controller. It must be completed in its entirety identifying the controller that was inspected;GMRS must be emailed to Division Landscape and Irrigation Supervisors no later than 6:30 a.m.the next day to complete final inspections. Contractor/subcontractor must be compliant as written,so Division inspections are scheduled confirming work was completed. Failure to comply with these directives may result in invoice rejection for non-payment or non-performance deductions. 1.1.7.7. Contractor's Schedule Email work schedules to Division's Landscape&Irrigation Supervisors by Monday at 6:30 a.m.Schedules must list crew member names,service dates,times,and locations. Irrigation services are weekly;however,dependent upon various situations that may occur,the schedule may be decreased or increased at the Division's discretion. a. Work schedules are Monday through Friday when County offices are open. b. Any work schedule changes require notification via email to Division Supervisors and Inspector. This is a mandatory requirement to be compliant with the contract. 1.2 Section II.Site Specific Maintenance Functions Use current techniques and standards approved by the University of Florida,Institute of Food and Agriculture Services (UF/IFAS)and the International Society of Arboriculture(ISA)for these services. a. Must have knowledge and experience in the hard wood canopy,palm pruning,fertilization,support systems,and other aspects of tree care with the ability to recognize,diagnose and report tree defects caused by pest,tree and root structure,and diseases. b. Must adhere to ANSI accredited Standards A300 policies and standards,current edition, c. Florida Certified Arborist on staff to supervise and direct field personnel to ensure that work is completed per specifications to include,but not limited to,palm and tree maintenance services,tree and palm planting and staking,stump,and root grinding. d. ISA Best Management Practices e. Seven main objectives for pruning services are: 1)reduce the risk of failure;2)provide clearance;3)reduce shade and wind resistance;4)maintain health;5)influence flower and fruit production;6)improve views;and 7)improve aesthetics. 1.2.1.Tree and Palm Maintenance is divided into four(4)categories: 1.Basic Tree Pruning;2. Structural Tree Pruning;3.Palm Pruning;4. Stump and Root Grinding. 1.2.1.1. Category 1.Basic Tree Pruning In accordance with ISA Best Management Practices,this category is divided into four(4)primary pruning methods which include:a.Cleaning,b.Thinning,c.Raising,and d.Reducing. a. Cleaning Cleaning trees is the selective removal of dead,diseased,cracked,stubbed,hanging,and broken branches. This service can be performed on trees of any age but is most common on middle-aged and mature trees. This is the preferred method for mature trees because it does not remove live branches unnecessarily.The removal location of branches requires review and approval with Division's Landscape Supervisor. b. Thinning Pruning is the selective removal of small live branches to reduce crown density.Proper thinning retains the crown shape and size and should provide an even distribution of foliage throughout the crown. i. Thinning includes removing dead or broken limbs one-inch(1")in diameter or larger;if two(2)limbs are crowning or touching each other,shorten or remove one of them;originate within twelve inches (12")of each other on the trunk,shorten or remove one of them. ii. Use directional pruning,so future growth is directed away from the roadway,sidewalk,building,street lights,or possible obstruction. Page 7 of 20 16A14 iii. Thinning increases the sunlight penetration and air movement throughout the crown and with increased light and air stimulate,it aids in maintaining interior foliage. iv. No excessive branch removal on the lower two-thirds(2/3)of a branch or stem(lion tailing). This may cause adverse effects on the tree and is not an acceptable practice. v. Thinning crown requires approval by Division Landscape Supervisor,and the percentage of foliage must be specified. The removal percentage is between ten-fifteen percent(10%-15%)percent,and should not exceed 25 percent(25%)of the foliage when using pruning to thin methods. c. Raising Pruning to raise,elevate,or lift tree canopy by selective removal of branches to provide vertical clearance. i. Crown raising shortens or removes lower branches of a tree to provide clearance for buildings,signs, vehicles,pedestrians,and vistas.Live crown to clear trunk ratio should be no less than 50 percent when raising is completed. ii. Structural pruning should be considered with raising according to ANSI standards.When raising,the desired clearance should be specified by Division Landscape Supervisor. iii. Branches over paved areas should be shortened or removed to allow approximately ten feet(10')over sidewalks,sixteen feet(16')over travel lanes,or clearances specified by Division Landscape Supervisor. iv. Over landscape areas and sidewalks,limbs should be shortened or removed to allow for pedestrian and utility use. v. Trees within planting beds,an eight-foot(8')clearance are required or as directed by the Division Landscape Supervisor. vi. Shortening of branching is the desired method of attaining adequate clearance. vii. When pruning is completed,approximately one-half(1/3)of the foliage should originate from branches on the lower two-thirds(2/3)of each tree. d. Reducing Pruning to reduce is the selective removal of branches and stems to decrease the height and/or spread of a tree or shrub. i. This type of pruning is done to minimize the risk of failure,to reduce height or spread,for utility line clearance,to clear vegetation from buildings,or structures,or to improve the appearance of the plant. Portions of the crown,such as individual limbs,can be reduced to balance the canopy,provide clearance,or reduce the likelihood of breakage on limbs with defects.Occasionally,the entire crown is reduced. ii. Reducing or thinning should be considered if cabling would be performed.Crown reduction should be accomplished with reduction cuts,not heading cuts. 1.2.1.2. Category 2. Structural Tree Pruning Structural tree pruning is the removal of live branches and stems to influence orientation,spacing,growth rate,the strength of attachment,and ultimate size of branches and stems. The removal percentage is between 25—50 percent depending on the tree type. Structural pruning includes basic tree pruning techniques listed below. Note: Refer to Best Management Practices"Tree Pruning"(Revised 2008)Companion Publication to ANSI A300 Part I:Tree,Shrub,and Other Woody Plant Maintenance-Standard Practices,Pruning:page 12 Figure 7."Structural Pruning of a Small Tree"and Figure 8."Structural Pruning to be done to ensure more sustainable growth patterns." a. It is used on young and medium-aged trees to help engineer a sustainable trunk and branch arrangement.Pruning large-maturing trees such as oaks reduce certain defects and spaces main branching along one dominant trunk. b. One goal is to reduce the number of trunks so that a tree has a dominant leader extending well up into the crown creating a strong crown and durable form. c. Subordination can reduce branches,so they remain smaller than about half the trunk diameter,which helps prevent structural failure later.The subordinate or co-dominant stems are removed with structural pruning. d. The primary objective insubordination(shortening using a drop-crotch cut)is the removal of one side of a codominant leader. i. Branches,trunks,or leaders not considered the main leader,two inches(2")diameter or as determined by the Project Manager or designee should be subordinated or removed. Page 8 of 20 1 6 A14 ii. The main leader shall not be subordinated or removed.Codominant leaders are considered to be two or more branches,trunks,or leaders of approximately the same size,originating near one another. iii. If there is no stem considerably larger than others,then this would be appropriate to subordinate all but one of them.Division Landscape Supervisor approval where there is an included bark as part of the condition,preference should be given to the removal of one side. 1.2.1.3. Category 3. Palm Pruning Remove fronds,flowers,fruit,stems,or loose petioles that may create hazardous conditions. Palms may be pruned for aesthetic reasons to eliminate sprouts and stems or dead fronds and seed pods. a. Live healthy fronds should not be removed.If they must be removed avoid removing those that initiate above horizontal.Fronds removed should be severed close to the petiole base without damaging living trunk tissue. b. Only those fronds with petiole drooping below horizontal 9:00-3:00 position should be removed. Remove seed pods including those originating among remaining fronds.When removing fronds and seedpods,care should be taken,so those fronds that are to remain are not nicked or wounded. c. Climbing spikes shall not be used to climb palms for pruning. 1.2.1.4. Category 4. Stump and Root Grinding The contractor must have technical knowledge,ability,and experience in grinding of stumps and roots to remove the root system and stump. 1.2.1.5. Root Management Must possess a thorough knowledge and experience in root management,to include but not limited to air spade,structural pruning,diagnosis,and root management program. 1.2.1.6. Palm Management Contractor shall have the knowledge and ability to treat palm diseases through drenches,foliar sprays, injection methods,and provide a fertilization program for palms. 1.2.1.7. Tree Relocation Periodically,the County must relocate palms and trees within Collier County limits. Contractor must have the knowledge and ability to root prune the tree(s)before relocation. In most cases,Maintenance of Traffic (MOT)will be required in order to perform this work safely. Most in-depth information will be provided at the time that services are needed. 1.2.2.Fertilization Follow OF/IFAS guidelines for turfgrass fertilization.Contractor/subcontractor must have valid licenses issued by Florida Department of Agriculture and Consumer Services for Limited Urban Commercial Fertilizer Applicator Certification (FDACS LUFAC). a. Provide fertilization services four(4)times a year in March,June,September,and December. Only twice(2)a year if using six(6)month application rate. b. Contractor shall ensure that fertilization scheduling does not exceed the fertilizer label rate prescribed and complies with state and local ordinances.It is important to note that local fertilizer regulations may prohibit the use of nitrogen fertilizers during the summer months. c. Division Representative may request additional fertilizer applications at any time. d. Applied at a rate of 1.5 lbs.per 100 square feet. e. Broadcasted throughout the median planting beds and turf areas. f. All tree pit areas should be fertilized evenly. g. No fertilizer ring around trees under any circumstances.If a ring is formed,contractor/subcontractor is required to return to the site and spread the fertilizer correcting the situation at their expense. This may include contractor/subcontractor purchasing additional fertilizer because applied fertilizer may not be able to spread. h. Fertilizer is purchased by Collier County under an Annual Contract and coordinated with the Contractor for delivery purposes. i. Immediately remove fertilizers from curbs and sidewalk areas to avoid staining. 1.2.2.1.Fertilization Applications Contractor/subcontractor shall use deflector shields on all application equipment to minimize the inadvertent application of fertilizer on non-plant areas.Contractor shall blow,sweep,or wash back into the landscape any fertilizer deposited on paved or impervious surfaces. Page 9 of 20 16A14 a. Use"Ring of Responsibility"around or along the shoreline of canals,lakes,or waterways. b. Ensure fertilizers and other lawn chemicals do not come into direct contact with the water. c. Apply fertilizer only when plants are actively growing. d. Clean up spilled fertilizer materials immediately as per University of Florida IFAS recommendations. e. Store nitrate-based fertilizers separately from solvents,fuels,and pesticides,because nitrate fertilizers are oxidants and can accelerate a fire. f. After fertilizing(other than when watering restrictions apply),irrigate with at least a quarter inch (1/4")of water following fertilization to avoid the loss of nitrogen and increase uptake efficiency.If water restrictions apply,the contractor may irrigate as permitted but no more than one-half inch(1/2") following fertilization. g. Do not exceed the annual nitrogen recommendations in the Fertilizer Guidelines for Established Turfgrass Lawns in Three Regions of Florida as provided on the label. 1.2.2.2. Bed,Tree,Shrub,Palm,Flower,Groundcover Fertilization If landscape plants show nutrient deficient symptoms,the Division Landscape Supervisor shall be notified within forty-eight(48)hours for appropriate action and approval to treat the materials to maintain plant health. a. Broadcast fertilizer uniformly over all the landscaped areas,and consider root location,fertilization objectives,and plant species when applying fertilizer. b. In areas where tree or shrub fertilization zones overlap with lawn fertilization zones,contractor shall fertilize one or the other of the plant types,but not both. 1.2.2.3. Palm Fertilization Palms have different nutritional requirements from other landscape plants.They suffer quickly and conspicuously from inadequate mineral nutrition,whether due to insufficient or incorrect fertilization. Division's Landscape Supervisor will provide the fertilization schedule. Note: Fertilize palms with a granular slow-release fertilizer three to four times per year.An acceptable formulation is 8-0-12-4(N,P,K,Mg plus micro-elements). 1.2.2.4. Turf Fertilization Notify Division Landscape Supervisor of any plant or turfgrass nutrient deficiency symptoms and provide the recommended measures for correction. a. Treat deficiencies of specific nutrients with applications of the lacking nutrient in accordance with University of Florida IFAS recommendations until deficiencies are corrected,or as directed from Division Landscape Supervisor. Must have prior approval. b. The number of applications of fertilizer depends on the type of plant material.Apply the minimal amount of fertilizer needed,or as directed from Division Landscape Supervisor. c. Adjust fertilizer rates according to health,maturity,and desired growth patterns. 1.2.2.5. Fertilization for Establishment During the establishment phase for shrubs,trees,and ground covers,fertilize landscape plants with a slow- release fertilizer as per University of Florida IFAS recommendations. Shrubs and groundcovers shall have the fertilizer blown or fan raked off following the broadcast application.Immediately after the fertilizer is applied,the areas shall be watered. 1.2.3.Pest Control It is required that the contractor/subcontractor performing services have the following licenses and certifications: State of Florida Pesticide License,State of Florida Certified Pest Control Operator and Collier County Pest Control License. Pest Control Firm shall make on-site inspections and provide written reports to the Division Landscape Supervisor monthly. 1.2.3.1.Contractor shall provide an overall written pest and spray program that shall incorporate ant control and shall meet or exceed the following minimum standards: a. Describe procedures,methods,and techniques that will enhance the environment. b. Provide the maximum protection for the health,safety,and welfare of the public and environment. c. Provide MSDS Sheets for chemicals upon request. Page 10 of 20 16A14 d. Provide signage where applicable. 1.2.3.2.Contractor shall make on-site inspections and provide written reports to Division's Landscape Supervisor. 1.2.3.3.Methods of Application One hundred percent(100%)coverage and penetration shall be provided.Insecticides and Fungicides shall be applied at the proper pressure to provide maximum coverage. a. Insecticides should be alternated from time to time to prevent an insect resistance to the application. b. Herbicides used in turf areas shall be applied at the proper pressure. c. Turf herbicides shall not be applied when the daily temperature exceeds eighty-five(85)degrees. d. Spreader sticker(Nu-Film 17 or equal)shall be incorporated in all spraying of groundcovers,shrubs,trees, palms,and turf areas when recommended by the label. e. Spray applications shall be applied during times of"No-Wind"conditions. f. No trucks or tractors with bar type tires or a gross weight greater than three thousand(3,000)pounds will be allowed within or on the median areas. g. At the time of application,provide and place,traffic control meeting Florida Department of Transportation, M.U.T.C.D and Indexes and the County MOT. h. All spray applications shall contain a wetting agent within the mix when recommended by the label or the Division Landscape Supervisor. i. The pH of water used in the mix must be adjusted to meet pesticides manufacture recommendation,and water pH and method must be documented and provided to the Division Landscape Supervisor. 1.2.3.4.Rate of Application All chemicals shall be applied at the rates recommended on the manufacturer's labels. 1.2.3.5.Materials List All insecticides,fungicides and herbicides chemicals to be used on turf areas and on plant materials shall be submitted in writing to Division Landscape Supervisor for review and approval. All chemicals used shall be approved for use by the Environmental Protection Agency for its intended use and area of use. 1.2.3.6.Application Schedule Division's Landscape Supervisor shall provide approval before applications occur. Contractor/subcontractor that apply chemicals without schedules and prior approval may have invoices rejected by the Division and services not paid. 1.2.3.6.1.Turf Areas:Insecticides&Fungicides-Applications on an as needed basis;Herbicides-Application on an as needed basis,Post-emergent in November,January and March or on an as-needed basis with approval. 1.2.3.6.2.Groundcovers,Shrubs,and Trees:Insecticides&Fungicides-Applications on an as needed basis with approval 1.2.3.6.3.Bed Areas:Herbicides—Applications on an as needed basis,Pre-emergent in February and September, Post-emergent in November,January and March or on an as-needed basis,prior approval by the Division's Landscape Supervisor. 1.2.3.6.4.Ornamental&Turf Spraying Overall Ornamental&Turf Spraying of plants,shrubs,and grassed areas within areas included in the contract. a. Applications on shrubs and groundcovers shall have the fertilizer blown or fan raked off following the broadcast application.Immediately after the fertilizer is applied,the areas shall be watered. b. Applications shall be made to turf the day following irrigation or a rain event when grass blades are dry.In areas where applicable,immediately after the fertilizer is applied,the sprinklers shall be activated to provide 1/4"of water to the soil's surface and to dissolve water-soluble particles. c. In areas where applicable,immediately after the fertilizer is applied,the sprinklers shall be activated for thirty(30)minutes to bring organic fertilizers to the soil's surface and to dissolve water-soluble particles. d. After watering,controls shall be returned to automatic mode. e. Remove fertilizers from curbs and sidewalks to avoid staining. Page 11 of 20 1.2.4. Pests Management Contractor shall use pesticide applications in accordance with the rules and regulations governing the use of pesticides in Florida,and follow all provisions of Florida Statutes. 1.2.4.1. Contractor Responsibilities a. Use Integrated Pest Management(I.P.M.)principles and methods. b. Use a pest-control strategy only when the pest is causing damage or is expected to cause additional damage than can be reasonably and economically tolerated. c. Implement a control strategy that reduces the pest numbers to an acceptable level while minimizing harm to non- targeted organisms. d. Post appropriate application signs with each treatment. e. Keep records of pest problems identified and control treatment applied. f. Record in the records whether the"corrective actions"actually reduced or prevented pest populations,was economical and minimized risks. g. Provide a copy of the records to Division. h. Refer to past corrective actions when making similar decisions in the future. i. Dispose of used containers in compliance with label directions to prevent water contamination. j. Follow current University of Florida IFAS pest management recommendations as per IFAS Publication ENY- ENY-298,Landscape Integrated Pest Management,at http://edis.ifas.ufl.edu/in109. 1.2.4.2.Pest and Spray Program Pest Control Firm shall provide an overall written pest and spray program that shall incorporate ant and rodent control and shall meet or exceed the following minimum standards: a. Describe procedures,methods,and techniques that will enhance the environment. b. Provide the maximum protection for the health,safety,and welfare of the public and environment. c. List of all chemicals. d. List application methods. 1.2.4.3.Documentation Records must be kept of all pesticide applications.Documentation shall include but not limited to:date and time of application,weather conditions at the time of application,chemicals applied and the name of the applicator.This shall be included with the monthly invoice for payment. Note: Failure to submit pesticide documentation may deem invoice rejection and non-payment for applications. 1.2.4.4.Turf Areas Insecticides&Fungicides-Applications on an as-needed basis,with prior approval by the Division Landscape Supervisor. Once approved and sprayed,contractor/subcontractor must submit documentation that states: 1.Date and time of application,2.Weather conditions at the time of application,3.Chemical applied,quantity,4.Applicator name. a. Herbicides—Applications on an as needed basis with prior approval by the Division Landscape Supervisor,to include: 1. Pre-emergent are to be applied in February and September 2. Post-emergent are to be applied in November,January,and March. b. Insecticides&Fungicides-Applications on an as-needed basis,with pre-approval by the Division's Landscape Supervisor. c. Groundcover Bed Areas:For example,Lantana,Asiatic jasmine,any perennial or ground cover bed areas that are more prone to being infested by weeds. 1.2.5. Weed management Contractor shall use IPM methods to reduce weeds in turf area.If significant and continuing weed problems occur, Contractor shall notify Division Landscape Supervisor and request authorization for the use of a pre-emergence herbicide. After Division Landscape Supervisor authorizes the use of the herbicide,the contractor shall apply the herbicide per label instructions and in accordance with local and state ordinances. a. Optimal insect pest control is most likely achieved in landscapes following IFAS recommended cultural practices to promote healthy plants and conserve natural biological control organisms. b. Contractor shall use IPM practices to manage insects in the landscape,which include: 1. Proper insect identification. 2. Active monitoring of insect activity and abundance. Page 12 of 20 16114 3. Utilizing mechanical and cultural practices first,when available. 4. Preserving natural,biological control organisms. 5. Spot-treating insect pest-infested areas when possible,rather than cover spraying the landscape. c. When possible,the contractor shall use selective,reduced-risk insecticides rather than broad-spectrum,non-selective products.This conserves natural predators and parasitoids in the landscape that are attacking other plant pests. d. Contractor shall treat fire-ant mounds individually as they occur with bait formulas.Place fresh bait surrounding the mound without disturbing the mound itself e. Contractor must broadcast baiting at the beginning of spring and broadcast treatment in recreation and common areas only as needed. f. As needed,the contractor shall treat sap-feeding pests like southern chinch bug,mealybugs,and scale insects using systemic or translaminar products that get into plant material to be ingested by the insect. g. Contractor shall utilize up-to-date OF/IFAS management recommendations for specific landscape insect pests. 1.2.6.Plant Disease Correct cultural practices are the key to control of plant diseases,especially proper irrigation.Root rots and foliar leaf spots in turfgrass and plant beds often occur when excessive moisture is present for extended periods.Contractor/subcontractor shall notify Division Landscape Supervisor of any outbreaks that occur and may recommend reducing the frequency of irrigation.If the disease is significant and persistent,contractor/subcontractor may apply a fungicide that is approved by Division Landscape Supervisor. 1.2.7.Crew Size and Man Hours Contractor shall provide with each site visit a minimum of at least a two(2)personnel work crew. 1.2.8.Growth Regulator Trimtect®or Equivalent to be used for Shrubs,Groundcovers,and Bedding Plants. Follow manufacturer's recommendations for application and amount of water needed. 1.2.8.1.Application Timing: a. Natural Appearance:Apply when shrubs reach desired appearance.Slow growth will start two weeks later. b. Manicured Look:Prune back shrub,allow re-growth then tip back.Apply Growth Regulator. c. Sheared Look:Dormant Shrub Trimming:Apply Growth Regulator just after bud break and leaf expansion. Growing Season Shearing:Shear shrub to a formal look.Apply Growth Regulator within one week after trimming. 1.2.8.2. Foliar Application: a. Apply to dry foliage,just after bud break and leaf expansion during the growing season. b. Before applying Growth Regulator,remove any dead leaves,trash,and any other debris that could prohibit spray. c. Apply within 1-2 weeks after pruning for best results. d. Apply as a spray-to-drip application,ensuring the foliage,canopy,and all woody stems are thoroughly covered. e. Completely spray the entire plant. f. Avoid application if rain is imminent. g. Spray to drip on leaves,green twigs,and shoots. 1.2.9.Chemical Records Documentation Records of all applications shall be kept according to state or federal regulations.According to the Department of Environmental Protection,the Records may include,but are not limited to,the following information: a. Application date and time b. Applicator's name c. Personnel that is directing or authorizing the application d. Application weather conditions at the time of application e. Target Pest f. Chemical used(trade name,active ingredient,amount of formulation,amount of water) g. Adjuvant/surfactant and amount applied if used h. Area treated(acres or square feet)and location i. Quantity of pesticide used j. Application equipment k. Any Additional remarks,such as the severity of the infestation or life stage of the pest I. Follow-up date to check the effectiveness of the application. Page 13 of 20 16A14 1.2.10. Pressure Cleaning&Paver Services Division Landscape Supervisor shall request services for pressure cleaning hardscapes such as bricks,curbing,pavers, sidewalks,and paved areas to remove tire marks and other deposited dirt. No work shall start unless requested by Division. Any hardscapes damage discovered by the contractor while providing services,they shall immediately notify Division's Landscape Supervisor. Unit price is lump sum inclusive of all costs to complete the work. a. Sealing of paving areas may be at the direction of the Division's Supervisor on a time and material basis. b. Pressure cleaning equipment must have adequate power to remove pavement markings without destabilizing the pavers.Contractor may be required to re-sand paver joints if destabilized. c. Upon finding damage to the brick curbing or paving,immediate notification to the Division's Supervisor is required. Following the notification,and with approval from the Division's Supervisor,the contractor shall clean-up debris if present,and flag off the areas with protective barriers and high visibility hazard tape.An hourly labor rate shall apply all-inclusive of equipment,materials,and disposal fees. d. It is at the Division Landscape Supervisor's discretion to utilize the contractor,use in-house labor,or quote work for the removal,replacement,and repairing of brick curbing and pavers. 1.3. Section III.Additional Services Contractors bidding roadway(s)are required to submit prices for this section. These services may be requested from the division throughout the contract term.Contractor's refusal to provide services in this category may result in contract termination. 1.3.1. Plant Materials&Services Plant materials replacements and services unit price shall include: a. Provide Florida Grades and Standards#1 plant material,deliver,and labor to install. b. Site preparation for new planting includes planting soil. c. Installation of 2 bubblers for trees and palms d. Staking,if needed,includes labor and staking and guy materials e. County specialty mulch and labor to install two inches(2")in replacement area(s). f. Hand watering or water truck when irrigation is non-functional or if it does not exist. g. Hand watering at planting for stabilization h. A written watering schedule recommendation of installed materials through establishment that includes the irrigation controller and zone number. i. Modify existing irrigation and adjust for 100%water coverage on plant materials. j. Existing plant material and debris removal,hauling,disposal,and disposal fees. k. Provide one(1)year warranty on materials. 1. Maintenance of Traffic(MOT)and mobilization. 1.3.2. Landscape Personnel Labor Hours Line items shall be used for miscellaneous landscape maintenance work as directed by the Division's Landscape Supervisor. 1.3.3. Irrigation Personnel Labor Hours&Irrigation Equipment These line items shall be used for major repairs as outline below or other irrigation work as directed by the Division's Irrigation Supervisor. a. Major irrigation repairs may include,but not limited to Valve cleaning and repairs,controllers,electrical wiring, and main lines. b. Major repairs are more extensive work,and they are not included in weekly irrigation services. c. Major repairs line items include Irrigation Supervisor hourly rate,Irrigation Technician hourly rate,and Irrigation Equipment usage rate. d. Irrigation Equipment hourly usage rate shall only be invoiced when the equipment is being used during work. 1.3.4. Mulch Division may request contractor supplied mulch with labor to install or labor only to install County supplied mulch. Division reserves the right to utilize other contracts for these services. Forestry Resources is the supplier for this organic Premium Grade A mulch,that is color enhanced and named"Collier County Brown or Old Florida Blend Mulch"(Formula:40 Rojo,7 Ib, 100%Pine). An approved equivalent may be bid that meets or exceeds the specifications;a sample must be submitted for color verification and consistency along with specification documentation. Page 14 of 20 16A14 a. 100%Pine from commercial logging or harvesting derived from recycled materials such as land clearing. It must contain only natural wood fibers,contaminate free,and cured to eliminate seed germination of invasive plants or weeds. b. Shredded to a size no larger than three and one-half inches(3-1/2"),and not too thin that it degrades rapidly. Mulch pieces exceeding 3-1/2 inches must be removed immediately by the contractor/subcontractor. c. Use organic mulch in areas where there is no mulch or new planting requires four inches(4")of non-compacted or unsettled depth that is measured from the existing soil grade.Before mulch placement,remove all weeds and rake level to establish the correct finished grade. d. Non-organic mulch such as,but not limited to,washed shell or gravel place in landscape areas,so there is a three inch(3")non-compacted depth.Re-mulch or top dress non-organic mulch areas to ensure a three-inch(3")depth is maintained. e. Re-mulching of plant beds and individual plant mulch rings applications shall have a two inch(2")non-compacted mulch layer applied once a year during March or April and November or December. f. Leave two inches(2")of space between the mulch and the trunks of plants. g. Leave twelve inches(12")to eighteen inches(18")of space from tree trunks. h. Apply new mulch in a level profile consistent with pre-existing grades,so that the final depth of both existing and new layers will be a minimum of two inches(2")but will not exceed 3 inches(3"). i. Do not apply mulch material against trunks,plant bases,on plants,or plant stems;taper mulch down to the soil at these locations. j. Locations where the existing mulch bed is in contact with paved surfaces(i.e.,sidewalks,roadway edges,or curbing and driveways),the contractor shall lightly trench the mulch-hard surface bed line to better contain the existing and applied mulch. k. Rake or sweep mulch off paved areas and turfgrass into beds each day as the mulch application progresses,and break up existing mulch that is matted. 1. Rake smooth mounded areas so that depth does not exceed three inches(3"). m. Do not pile mulch against any plant branches or trunks. n. Maintain mulch areas one foot(1')from the edge of curbs. o. Maintain median planting beds,as a pathway for maintenance workers. This will aid in keeping plant material from encroaching into roadways. p. Do not place mulch on or over valves or valve boxes. q. Division notifying contractor/subcontractor that the mulch was improperly installed must be corrected immediately,at no additional charge to the County. r. Mulching services to be completed by the Division's established timelines. 1.3.5 Tree and Palm Maintenance Services Work may require re-planting,re-standing,and stake for fallen or leaning plant material,trees,and palms.Unit price includes materials to complete the work,equipment,machinery,cranes,fuel,labor,equipment operators,Maintenance of Traffic(MOT)and its equipment(i.e.arrow board,cones,etc..),water wagon or truck,and white spray paint to mark and identify irrigation lines that are visibly broken. If County's irrigation system is not functioning while performing services,the contractor/subcontractor is responsible to water the trees or palms that are being replanted and staked to eliminate air pockets and to allow the soil to settle. Contractor shall provide the watering equipment and the services. 1.3.5.1. Reconstructive/Restoration or Reduction Pruning Refer to IFAS Storm Publication,by Dr.Ed Gilman;American National Standards Institute.2001. American National Standard for tree care operations—Tree,Shrub,and Other Woody Plant Maintenance— Standards practices(Pruning).ANSI A300(part 1).New York:American National Standards Institute. a. Restoration Pruning is a pruning method that can be applied to trees that can develop and regrow into viable,productive trees. This may include root pruning. b. Reduction Pruning decreases height and spread on an entire tree,or one section only,using reduction cuts 1.3.5.2. Hazard Pruning Refer to IFAS Storm Publication,by Dr.Ed Gilman;American National Standards Institute.2001. American National Standard for tree care operations—Tree,Shrub,and Other Woody Plant Maintenance— Standards practices(Pruning).ANSI A300(part 1).New York:American National Standards Institute. a. Hazard pruning is eliminating the hazard limbs such as a broken limb.There is no other pruning other than removal of the hazard. Page 15 of 20 1 6 A1 4 1.3.5.3. Root Pruning,Replanting,and Staking of Palms and Trees Refer to IFAS Storm Publication,by Dr.Ed Gilman;American National Standards Institute.2001. American National Standard for tree care operations—Tree,Shrub,and Other Woody Plant Maintenance— Standards practices(Pruning).ANSI A300(part 1).New York:American National Standards Institute. a. Includes root pruning to cut,remove circling roots,and or defective roots. b. Root Pruning removes root defects near the trunk base,then replanting or standing the plant material, and staking as appropriate with 2x4,4x4,or lodge poles. 1.3.5.4. Removal(Trees&Palms) Removing trees and palms that no longer have viable life,that pose risks to a public right-of-way,damaged trees that cannot be pruned or developed into a safe,viable crown with restoration pruning,and crown reduction may cause property damage or personal injury in the near future. All-inclusive costs include labor,equipment,machinery,rootball and stump removal,soil replacement,loading and hauling debris to a disposal site,and disposal fees. 1.3.5.6. Stump Tip Over's Tree and palm stump tip over work consists of removing rootballs and stumps that were damaged by accidents,weather events,disease,or damage. Cost inclusive of labor,equipment,machinery,removal of rootball and stump,loading and hauling debris to a disposal site,and disposal fees. 1.3.5.7. Soil Replacements Cost inclusive of providing soil,equipment,materials,and labor to deliver and install. 1.3.5.8. Debris Removal Cost includes labor,equipment,materials,debris loading and hauling to a disposal site,and disposal fees. 1.3.6. Equipment&Labor Contractor's hourly unit price shall be all inclusive of equipment,equipment operator,fuel,labor,supplies,and portal to portal. The equipment hourly usage rate shall only be invoiced when the equipment is being used during work. 1.3.7. Emergency Response Labor Hours The contractor shall have the capability to receive and to respond immediately to call of an emergency after 5:00 p.m., Monday through Friday,and 24 hours during weekends and holidays. Examples emergency calls received by the County may be referred to the contractor for immediate response. a. Contractor shall respond to emergency calls within two(2)hours from time of notification and shall notify the Landscape Operations Manager or Landscape Supervisor upon completion of the call out and the work performed. b. Contractor shall designate a person(s)who shall be available to respond to emergency calls 24 hours per day. c. Contractor shall submit telephone numbers(s)to the Landscape Operations Manager and Landscape Supervisor that can be used to obtain emergency service on a 24-hour basis. d. Upon arriving at an emergency,it shall be the responsibility of the Contractor to eliminate all unsafe conditions which would adversely affect the health,safety or welfare of the public or notify the Landscape Operations Manager or Landscape Supervisor if that is not possible. e. Failure to respond within two(2)hours of an attempt to contact may result in a$100 penalty per incident at the Division's discretion. 1.3.8.Traffic Accident Cleanup Work consists of hourly labor for removal of damaged plant materials and accident debris,equipment to cleanup site from traffic accident,hauling disposed debris and materials to a disposal site,blowing mulch from roadway and hardscapes surfaces,re-installing non-damaged plant materials that have a viable life,and arranging the other disturbed materials to the correct landscape design. 1.3.9. Pavers Replacements An hourly labor rate for removing damaged pavers and installing new pavers. Cost inclusive of labor,equipment,to remove and dispose of damaged pavers,install new pavers,and haul disposed materials to a disposal site and disposal fees included,and worksite cleanup. Page 16 of 20 16A14 The county may supply pavers,or Contractor/subcontractor will be requested to purchase pavers using Materials Markup Percentage bid line item.Reimbursement for pavers will require invoice with contractors bid percentage markup and receipts of items purchase showing actual costs to verify the cost invoiced to County. Failure to submit backup receipts for non-bid line items,invoices will be rejected. 1.3.10. Materials Markup Percentage Contractor must input a markup percentage for non-bid line items not to exceed fifteen percent(15%). Percentage amount is not factored into the award.However,the bid will not be awarded to contractors if omitted or exceeds the allowable limit. Post-award reimbursement of non-bid line items purchases shall require the contractor to submit the receipts showing the cost of goods to verify markup cost(s).Failure to provide receipts backup may result in invoice(s)rejection. 1.4. Section IV. General Information 1.4.1. Work Area Conditions Contractor/subcontractor agrees and accepts awarded work areas are in an"as is"condition. It is their sole responsibility to complete a site visit and inspection of these areas before bid submission. 1.4.2. Crew Size Crew size for routine,basic landscape maintenance services is a minimum six(6)employees.Work shall be completed within one(1)visit,so the entire segment is completed at the same time.Additional days may be authorized by the Division's Landscape Supervisor.The purpose of this statement is to have the entire segments under this contract completed at the same time. Note: Crew sizes for other services such as irrigation and pest control are listed in the bid specifications. 1.4.3. Contractor's Employees Employees shall be fully trained,licensed and certified,insured,effectively communicate with County staff,and capable of safely operating equipment and vehicles. 1.4.4. Safety Data Sheets(SDSs)formerly known as Material Safety Data Sheets(MSDSs)) The division may request contractor/subcontractor to supply chemicals, so they will need to furnish the Division with SDSs for all herbicides or chemicals that will be used to the Division Landscape Supervisor. As required by Hazard Communication Standard (HCS) for chemical manufacturers, distributors, or importers to provide communication of hazardous chemical products documentation for all products and chemicals utilized in the performance of the contract. 1.4.5. Safety Contractor shall use caution while working in County Right-of-Ways and roadways. Contractor/subcontractor shall use extra caution when spraying chemicals to avoid harm to others and avoid damage to non-targeted plant materials. Chemicals spills shall be reported by contractor/subcontractor employees to the Division and Florida Department of Environmental Protection(FEDP)if required. Any damages that require repairs or replacement shall be the contractor/subcontractor responsibility,and no cost to the County. 1.4.6. Maintenance of Traffic(MOT) MOT Intermediate Level Certification will be required for services in the ROW and medians. Contractor/subcontractor shall have MOT devices for adequate traffic control,and depending on the roadway,it may include:signage,arrow boards,message boards,warning devices,barriers and flagmen. a. MOT is required for the safety and protection of Contractor's employees and motorists during the performance of services in the ROW and medians. b. Contractor's sole responsibility for safety in the work zone. c. MOT shall conform to the latest edition of the FDOT,Design Standards,600 series and The Manual on Uniform Traffic Control Devices(MUTCD) d. Contractor or sub-contractor will be required to have current FDOT approved MOT Intermediate Level Certification for FDOT,Design Standards,600 series for work in ROW medians and roadways. e. Contractor's employee responsible for the setup and maintenance of the traffic control plan shall possess FDOT approved certification in their name,and they must be readily available within twenty(20)minutes of the initial contact for work zone safety issues. 1.4.7.Lane Closure No lane closures are permitted between the hours of 7:00 AM through 9:00 AM and 3:30 PM through 6:30 PM on weekdays.Lane closures Page 17 of 20 16A14 require Maintenance of Traffic (MOT)with the proper placement of lane closed signs, pre-warning signs, arrow boards, traffic cones,etc. It is mandatory that your company notifies Growth Management Department,Customer Service Specialist or designee,on Wednesday before lane closure(s)so it can be announced in Collier County's public Road Alert Notification. Notification is completed by filling out the ROAD ALERT form and submitting it by e-mail or fax. The form is self-explanatory;please fill out in its entirety. If you e-mail the form,please send to all e-mails listed on the form: growthmanagementAcolliergov.net, Caroline Blevins at caroline.blevins@colliercountyfl.gov Connie Deane connie.deane(u colliercountvfl.gov,or by fax: 239- 252-2726. If you have any ROAD ALERT questions,please call 239-252-8192 or 239-252-8365. 1.4.8.Damages Contractor negligence in the performance of services causing damages shall be repaired or replaced at the Contractor's expense within seventy-two(72)hours. Some examples of negligence resulting in damages are dying plants,shrubs,trees,grass or foliage because of contract performance neglect by the contractor,contractor's employees,or subcontractors.Failure of the contractor to provide ramps or other devices to gain access over the curbs into medians causing curb or turf areas damages requires replacement at the contractor's expense. 1.4.9.Accident Reporting Contractor shall be responsible each week to contact the County personnel to report any accidents or thefts involving or occurring within the areas covered by this Contract. Should accidents or thefts occur,the contractor shall photograph the damage or loss and provide that photo the Division Supervisor,at no additional cost. If assistance is requested by law enforcement,emergency personnel or others,the cost shall be included in the bid. 1.4.10. Key Personnel Contractor/subcontractor shall provide the Division with key personnel,and an assign a Project Manager, Supervisor,and Crew Leader. a. Contact information must be provided to Division at the contract kick-off meeting. It must include emails, business,and cell phone numbers. b. Contact employees must be English speaking and effectively communicate with Division staff. c. Work issued to the Project Manager and Supervisor/Crew Leader must have their full attention ensuring the schedule progresses daily,work remains constant,and they bid specifications. d. For key personnel absence,contractor/subcontractor shall immediately notify Division with substitution personnel providing their names and contact information via email. e. Division reserves the right to remove key personnel from a contract that fails to communicate and ensure services are performing per contract specifications effectively. 1.4.11. Meetings Either party may request meetings throughout the contract term,and it may require mandatory attendance. There are no additional costs to the County for these meetings. 1.4.12. Notice to Begin Work(NTBW) The issuance of a Notice to Begin Work,or an email from the Landscape Division Representative(only in the absence of the Contract Administration Specialist),is a requirement for work to commence.The notification shall have a commencement and completion date. No work shall commence without an NTBW or email authorization from the Landscape Division Representative. 1.4.13. Work Delays/Time Extensions Inclement weather, Acts of Force Majeure, or unforeseen circumstances at no fault of the contractor/subcontractor causing work delays that may result in exceeding completion date timelines assigned by Division. One(1)example of an inexcusable delay is the contractor not having sufficient equipment to complete services. a. Contractor/subcontractor shall immediately notify the Division Supervisor of any work delays,and within twenty- four (24) hours they must follow-up in writing via email with an explanation of the delay to request a time extension. b. Division Supervisor will review the request to determine if the delay is at no fault of the contractor/subcontractor. c. Granting of time extensions requires a revision to the Notice to Begin Work or an email from the Landscape Division Representative(only in the absence of the Contract Administration Specialist). 1.4.14. Turfgrass Sod Specifications Page 18 of 20 16A14 4 Turfgrasses shall be Number 1 Quality/Premium grade and meet the requirements in the specifications.Sod ordered shall be well-established,well rooted,healthy,nursery or field grown on 90%natural sand. Sod grown in peat bedded soil will not be accepted. a. Sod shall be of the specific grass type ordered and in uniform green color with healthy blades.No dead turf, bare spots,or dormant sod. b. Completed areas where sod has been laid are healthy,even in color,level,and viable turf is being established. c. Sod shall be free of diseases,trees or shrubs,stones,thatch,and pests such as insects,nematodes,chinch bugs, spittlebugs,mites,billbugs and white grubs,webworms and other lawn caterpillars.It shall have less than one percent(1%)of invasive weeds. d. Top growth(grass blades or foliage)shall have no more than ten percent(10%)chlorosis and contain no thatch or dead vegetation layer between each pad. e. Sod must be mowed at the height of two inches(2"),or at the recommended height of the sod grower,before harvesting to ensure uniform heights when transplanted. f. There shall be sufficient density,so no surface soil is visible when mowed to a height of two inches(2"). g. Individual sod pad size shall be cut to industry standard widths and lengths with a deviation no greater than+/- 5%.Broken or uneven-ended pads will not be accepted. h. Sod pad thickness for the following: St.Augustine and Bahia shall be no less than one inch(1")in depth and Bermuda shall be no less than one-half inch(1/2")in depth.This requirement allows for rapid rooting to occur after installation due to a thinner soil layer.All other sod variations will be cut according to industry best practices. i. Pad strength for standard size pads shall be mature,well rooted,and contain a soil layer thick enough to provide a strength that will support the pad's weight and maintain its size and shape when the pad is suspended vertically by hand on the upper ten percent(10%)of the pad section without tearing apart. j. Moisture Content for the soil side of the sod should be damp to moist,and it must contain enough moisture so that the soil is not excessively dry or wet.Sod will not be accepted if it does not contain the proper amount of moisture and the soil layer has become hardened or loose. 1.4.15. Schedules Contractor/subcontractor shall provide work schedules before starting work issued under this contract. Services for this contract require inspections,so schedules are mandated. Failure to provide work schedule(s)may result in invoice rejection and services not paid. a. Work schedules must be sent via email to Division's Landscape&Irrigation Supervisors by Monday at 6:30 a.m. Schedules must list crew member names,service dates,times,and locations. Irrigation services are weekly;however,dependent upon various situations that may occur,the schedule may be decreased or increased at the Division's discretion. c. Work schedules are Monday through Friday when County offices are open. d. Any work schedule changes require notification via email to Division Supervisors and Inspector. This is a mandatory requirement for contract compliance. Note: Division reserves the right to change schedules as needed for seasonal,weather,or work conditions,or if it is in the best interest of the County. 1.4.16. General Maintenance Report Sheets(GMRS) GMRS shall be completed on a weekly basis,signed by contractor/subcontractor,and it must be submitted via email to Division's Landscape or Irrigation Supervisor the next day following completion of services. Additionally,it must be submitted with the invoice on a monthly. Contractor's Supervisor or Project Manager is required to conduct on-site inspections with Division's Supervisor, weekly or monthly,to verify services are being performed satisfactorily per the contract specifications. 1.4.17. Inspections Contractor shall provide work schedules for services in writing to Division Supervisors before work commencement so that inspections can be performed on-site during work. a. Any work deficiencies noted during an inspection shall be corrected before final acceptance at the Contractor's expense;such deficiencies will be corrected within 48 hours after receipt of notification. Page 19 of 20 16A14 1.4.18. Utilities Contractor shall be responsible for exercising caution while near utilities.Before digging,they shall call Sunshine 811 at 811 or 800-432-4770,Monday—Friday from 7:00 a.m.—5:00 p.m.Sunshine 811 requires two(2)full business days' notice.Any damage to utilities is the Contractor's sole responsibility,and at no cost to the County. 1.4.19. Non-Performance Deficiency Notification The division will issue the contractor/subcontractor with a Performance Deficiency Notification form following inspections showing a record of deficiencies noted from the inspection,and the Inspector shall email to the contractor/subcontractor the same day. The notification has three(3)markings,I=Incomplete(Complete in 7 calendar days),N=Needs Improvement(Correct in 7 calendar days),and U=Unacceptable(Correct in 72 hours). The corrective action requires completion within the specified time frames,and the contractor/subcontractor shall notify the Inspector upon completion of deficient work. Upon re-inspection,the Inspector will update the Performance Deficiency Notification form next to the deficient items with UN=Uncorrected or C=Corrected. The Inspector will sign and date the form and email the contractor/subcontractor the re-inspection findings the same day as the re-inspection.Invoices may be subject to payment deductions or delays if deficiencies are not corrected. 1.4.20. Non-Performance Deductions The County intends to have all tasks performed satisfactorily and completed in accordance with the specifications and time parameters. Tasks/line items omitted or not performed fully completed to the Division Landscape or Irrigation Supervisor's satisfaction,or at the frequencies listed in work-issued requests. These items may be subject to non-payment of the line item,a deduction,or a deduction plus non-payment of the line item. a. The County reserves the right to deduct a portion of any invoice for goods not delivered,any deficiencies not corrected,or services not performed in accordance with the contract requirements including the required timeframe.Non-performance deductions may be assessed for the following: i. Fails to complete the scheduled work within the time parameters as outlined in the Notice to Begin Work. ii. Fails to perform services to bid specifications. iii. Fails to complete work schedule line items per contract specifications. b. The contractor/subcontractor failing to meet completion dates,work-issued line items,or work requirements within the bid specifications may be liable,and they agree to a one hundred-dollar($100.00)deduction from the invoice for each item. c. If,the contractor/subcontract informs the Division that they are unable to complete services,the County may choose to utilize County labor,quote work per the County's Purchasing Ordinance,or request services using another County approved contract. d. For work that the contractor informs the County that they are unable to complete,the contractor/subcontractor may be subject to reimburse costs to the County to complete the services. Cost reimbursement for County staff to perform the work is the actual cost of labor,materials,fuel,and equipment. If the County uses another contract,the contractor agrees to reimburse the County with those contracted rates. The County will not suffer damages resulting from any additional expense to complete services. The County shall select the option that meets the needs of the County to complete the work. 1.4.21. Compensation Invoices submission for payment approval must be accurate and complete with details of services performed or commodities purchased. a. Payment shall be made for schedule line items or work completed that is approved as satisfactory by Division Supervisors. b. Non-bid line item purchases having a markup percentage must have receipts submitted for costs verification. Invoices will be rejected if they are not accurate and the proper documentation is not submitted. c. At a minimum,invoices shall include: Division Name,Contract Number,Purchase Order Number,Work Order Number(if applicable),Details of Services Performed or Commodities Purchased,and if there are Non-Bid Line Items,the contractor's cost for each item and the bid percentage markup. Page 20 of 20 16A14 Exhibit B Fee Schedule following this page (pages 1 through 32 ) Page 16 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 16A14 4 SECTION I. 1.1 BASIC LANDSCAPE MAINTENANCE&IRRIGATION Work Areas 4&22:Collier Blvd: Port Au Prince to one median past Hammock Bay,approx. Prices 1.50 Miles Item Uesciipiion UOM Unit Price 89 Median Mowing&Edging Weekly $ 25.00 90 Side ROW Mowing&Edging Bi-Weekly $ 10.00 91 Weeding Weekly $ 800.00 92 General Site Trimming Monthly $ 50.00 93 Street Cleaning Weekly $ 250.00 94 Trash Removal Weekly $ 250.00 95 hrigation System Maintenance&Repair Weekly $ 250.00 Work Areas 4&22: Collier Blvd:Mc Llevan Bridge to Jolley Bridge,approx.1.90 Miles Item Description UOM Unit Price 96 Median Mowing&Edging Bi-Weekly $ 10.00 97 Side ROW Mowing&Edging Bi-Weekly $ 10.00 98 Weeding Weekly $ 1,600.00 99 Street Cleaning Weekly $ 300.00 100 Trash Removal Weekly $ 300.00 101 Irrigation System Maintenance&Repair Weekly $ 350.00 4Q ANCE Tree&Palm Maintenance Canopy Trees (April-September) ten Price 102 Live Oak Fach $ 25-00 103 Bridal Veil Each 5 1.00 Palms(June) Unit Price 104 Sabal Each $ 18.00 105 Coconut Palm Each $ 35.00 Palms,Seed Pod Removals,as needed Unit Price 106 Bismark Each $ 25.00 t�1}11.�GrOljkd over,Shrub,Tree,&'.Palm(Granular-County-supplied/Liquid-Contractor Unit Prig;. supplied) 107 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 33 bags per application 108 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 2 bags per application 109 Application labor rate only(Granular fertilizer 8-2-12,County supplied), 50 LB Bag $ 10.00 Additional for Palms;Approximately 3 bags per application Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 110 Supplied) 1 1 1 Application labor&materials(Drench) Lump Sum $ 100.00 (Sequestrene Iron,Contractor supplied) 112 Application labor&materials Lump Sum $ 100.00 (20-20-20 w/Ferromec AC 13-0-0 plus 6%Iron,Contractor supplied) Ornaments &)I `Spraying: Turf,Groundegver,Shrub,Tree,and Palm curt Priee' ( actirr uupp#1@d eh em teats) 113 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 750.00 114 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 1,000.00 115 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Sum $ 500.00 Page 1 (Florida Land Agreement#18-7430) 16A14 6 4 116 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 25.00 117 Herbicides Application Labor&Materials(Turf) Lump Sum $ 500.00 GrovethRegulator Applications(Connectorsuppliod•Trimtec or tliyalent) UakPates 118 Growth Regulator Applications Labor&Materials Lump Sum S 50.00 Mttte to 2t muleit,2cuiie'foot bait) untrrke 119 Contractor purchases mulch&labor to install Per Bag $ 4.80 120 County supplies mulch&Contractor provides labor to install Per Bag $ 2.00 Pressure .,g(ladu#veR rf bac./ ®qulpmeR)IG�rcompletethework) tJnitPace 121 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Sum $ 50.00 Page 2 (Florida Land Agreement#18-7430) 16A14 is 3 SECTION I L 1 BASIC LANIISt 4PE MAINTENANCE&IRRIGATION„ qty Work Area 6-Phase 2.Immokalee Road(Tarpon Bay Boulevard to Preserve Lane),2.0 Miles Prices Item Description UOM Unit Price 194 Side ROW Mowing&Edging Bi-Weekly $ 50.00 195 Weeding Weekly $ 1,600.00 196 General Site Trimming Monthly $ 50.00 197 Street Cleaning Weekly $ 300.00 198 Trash Removal Weekly $ 300.00 199 Irrigation System Maintenance&Repair Weekly $ 350.00 Work Area 6-Phase 3.Immokalee Road(Preserve Lane to Collier Boulevard),1.5 Miles Item Description UOM Unit Price 200 Side ROW Mowing&Edging Bi-Weekly $ 50.00 201 Weeding Weekly $ 1,050.00 202 General Site Trimming Monthly $ 50.00 203 Street Cleaning Weekly $ 300.00 204 Trash Removal Weekly $ 300.00 205 Irrigation System Maintenance&Repair Weekly $ 300.00 SECTION II 1!.2 SITE SEECIFIC'NIATNTENANCE, Tree and Palm Maintenance Work Area 6-Phase 2.Immokalee Road(Tarpon Bay Boulevard to Preserve Lane),2.0 Miles Canopy Trees (April-September) Unit Price 206 Tabebuia,Ipe Each $ 25.00 207 Tabebuia,Golden Trumpet Each $ 25.00 Palms(June) Unit Price 208 Sabal Each $ 18.00 209 Sylvester Palm Each $ 25.00 Palms,Seed Pod Removals,as needed Unit Price 210 Montgomery Each $ 15.00 211 Sabal Each $ 10.00 212 Sylvester Palm Each $ 15.00 Work Area 6-Phase 3.Immokalee Road(Preserve Lane to Collier Boulevard),1.5 Miles Canopy Trees (April-September) 213 Tabebuia,Golden Trumpet Each $ 25.00 Palms(June) Unit Price 214 Sabal Each $ 18.00 215 Sylvester Palm Each $ 25.00 Palms,Seed Pod Removals,as needed Unit Price 216 Montgomery Each $ 15.00 217 Sabal Each $ 10.00 218 Sylvester Palm Each $ 15.00 Fertilization:Groundeover,Shrub,Tree,&Palm(Granular-Countysupplied/Liquid-Contractor Unit Price supplied) Work Area 6-Phase 2.Immokalee Road(Tarpon Bay Boulevard to Preserve Lane),2.0 Miles Page 3 (Florida Land Agreement#18-7430) 16A14 I g Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 42 bags per application 220 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 2 bags per application 221 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Work Area 6-Phase 3.Immokalee Road(Preserve Lane to Collier Boulevard),1.5 Miles X22 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 24 bags per application 223 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately bags per application 224 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Ornamental St Turf Spraying; Turf,Groundcover,Shrub,Tree,and Palm Lime Price (Contractor supplied chemicals) Work Area 6-Phase 2.Immokalee Road(Tarpon Bay Boulevard to Preserve Lane),2.0 Miles Insecticides&Fungicides Application Labor&Materials(Foliar) 225 Lump Sum $ 25.00 Groundcover,Shrubs,Trees X26 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 227 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Work Area 6-Phase 3.Immokalee Road(Preserve Lane to Collier Boulevard),1.5 Miles 228 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 229 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 230 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Growth Regulator Applications(Contractor supplied-Trimtect®or Equivalent): Unit Price '. Work Area 6-Phase 2.Immokalee Road(Tarpon Bay Boulevard to Preserve Lane),2.0 Miles 231 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 Work Area 6-Phase 3.Immokalee Road(Preserve Lane to Collier Boulevard),1,5 Miles 232 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Unit Price 233 Contractor purchases mulch&provides labor to install Per Bag $ 4.80 234 County supplies mulch&Contractor provides labor to install Per Bag $ 2.00 Pressure Cleaning(inclusive of all labor,materials,equipment to complete the work) Unit Price Work Area 6-Phase 2.Immokalee Road(Tarpon Bay Boulevard to Preserve Lane),2.0 Miles 235 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Suns $ 50.00 Work Area 6-Phase 3.Immokalee Road(Preserve Lane to Collier Boulevard),1,5 Miles 236 Brick Pavers&Concrete Surfaces-all areas Lump Sum $ 50:00 Page 4 (Florida Land Agreement#18-7430) 1 6 A 1 4 SBMOS L L1 BASIC NDSCA1'P MAINTENANCE&iy1111GATION Work Area 10A: Golden Gate Overpass(Bears Paw to Livingston Road),5.50 miles Prices Item Description UOM Unit Price 304 Median Mowing and Edging 01-Weekly $ 100.00 305 Side ROW Mowing&Edging Bi-Weekly $ 50.00 306 Weeding Weekly $ 2,800.00 307 General Site Trimming Monthly $ 50.00 308 Street Cleaning Weekly $ 450.00 309 Trash Removal Weekly $ 450.00 310 Irrigation System Maintenance&Repair Weekly $ 500.00 Work Area IOB:Golden Gate Parkway(Livingston Road to 66th St SW&60th St SW to Santa Barbara Blvd),1.50 miles 311 Median Mowing and Edging Bi-Weekly $ 50.00 312 Side ROW Mowing&Edging Bi-Weekly $ 50.00 313 Weeding Weekly $ 1,000.00 314 General Site Trimming Monthly $ 50.00 315 Street Cleaning Weekly $ 250.00 316 Trash Removal Weekly $ 250.00 317 Irrigation System Maintenance&Repair Weekly $ 300.00 SE ION IL 1.2 SITE,SPECIFIC 14IAINTi NAI CCF f.;, u Tree and Palm Maintenance 10A: Golden Gate Overpass(Bears Paw to Livingston Road) Canopy Trees (April-September) Unit Price 318 Black Olive Each $ 25.00 319 Crape Myrtle(Natchez) Each $ 1.00 320 Crape Myrtle(Muskogee) Each $ 1.00 321 Hong Kong Orchird(white) Each $ 25.00 322 Live Oak Each $ 25.00 Palms(June) Unit Price 323 Sabal Each $ 18.00 324 Thrinax Each $ 10.00 Palms,Seed Pod Removals,as needed Unit Price 325 Thrinax Each $ 10.00 1013:Golden Gate Parkway(Livingston Road to Santa Barbara Blvd) Canopy Trees (April-September) Unit Price 326 Black Olive Each $ 25.00 327 Hong Kong Orchid Each $ 25.00 328 Glossy Privet Each $ 25.00 329 Purple Trumpet Tree Each $ 25.00 330 Live Oak Each $ 25.00 Palms(June) unit Price 331ISabal I Each $ 18.00 Page 5 (Florida Land Agreement#18-7430) 16A14 Palms,Seed Pod Removals,as needed Unit Price 332 Foxtail Each $ 15.00 Fertilization:Groundcover,Shrub,Tree,&Palm(Granular-County supplied'I Liquid-Contractor Unit Price supplied) 10A: Golden Gate Overpass(Bears Paw to Livingston Road) 333 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 92 bags per application 334 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 fertilizer;Approximately 19 bags per application 335 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 13 bags per application 336 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 10B:Golden Gate Parkway(Livingston Road to Santa Barbara Blvd) 337 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 24 bags per application 338 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 fertilizer Approximately 14 bags per application 339 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 1 bags per application 340 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Ornamental&Turf Spraying: Turf Groundcover,Shrub,Tree,and Palm > GriotPriee (Contractor supplied chemicals) 10A: Golden Gate Overpass(Bears Paw to Livingston Road) 341 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 342 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 343 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 10B:Golden Gate Parkway(Livingston Road to Santa Barbara Blvd) 344 Insecticides&Fungicides Application Labor&Materials(Foliar) Monthly $ 25.00 Groundcover,Shrubs,Trees 345 Insecticides&Fungicides Application Labor&Materials(Drench) Monthly $ 25.00 Groundcover,Shrubs,Trees 346 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Growth Regulator Applications(Contractor supplied-Trim tect®or Equivalent) Unit Price 10A: Golden Gate Overpass(Bears Paw to Livingston Road) 347 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 10B:Golden Gate Parkway(Livingston Road to Santa Barbara Blvd) 348 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Unit Price 349 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 350 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressure Cleaning(inclusive of all labor,materials,equipment to complete the wor() UnitiMee'. 10A: Golden Gate Overpass(Bears Paw to Livingston Road) 351 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Sum $ 50.00 Page 6 (Florida Land Agreement#18-7430) 1 6 A 14 10B:Golden Gate Parkway(Livingston Road to Santa Barbara Blvd) 352 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Sum $ 50.00 Page 7 (Florida Land Agreement#18-7430) 1 6 A 1 4 wk a 10.,91141100501101, SECTION I. L I BASIC LANDSCAPE MAINTENANCE&IRRIGATION Work Area 11:Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard),2.2 Miles Prices Item Description UOM Unit Price 355 Median Mowing and Edging Weekly $ 50.00 356 Side ROW Mowing&Edging Bi-Weekly $ 50.00 357 Weeding Weekly $ 2,600.00 358 General Site Trimming Monthly $ 50.00 359 Street Cleaning Weekly $ 400.00 360 Trash Removal Weekly $ 350.00 361 irrigation System Maintenance&Repair Weekly $ 350.00 Work Area 11:Collier Blvd.Phase A(588 Feet from City Gate Blvd.to Golden Gate Parkway)& Phase B(Golden Gate Parkway to Green Blvd.) Item Description UOM Unit Price 362 Median Mowing and Edging Weekly $ 25.00 363 Side ROW Mowing&Edging Bi-Weekly $ 50,00 364 Weeding Weekly $ 2,500.00 365 General Site Trimming Monthly $ 50.00 366 Street Cleaning Weekly $ 350.00 367 Trash Removal Weekly $ 350.00 368 Irrigation System Maintenance&Repair Weekly $ 350.00 SECTION IL 1,2 SITE SPECIFIC MAINTENANCE Tree and Palm Maintenance Work Area 11:Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard),2.2 Miles Canopy Trees (April-September) Unit Price 369 Live Oak Each $ 25.00 370 Crepe Myrtle Each $ 1.00 371 Ligustrum Each $ 0.01 372 Golden Trumpet Each $ 25.00 373 Hong Kong Orchid Each $ 25.00 374 Bottlebrush Each $ 25.00 Palms(June) Unit Price 375 Sabal Palm Each $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 376 Foxtail Each $ 15.00 Work Area 11:Collier Blvd.Phase A(588 Feet from City Gate Blvd.to Golden Gate Parkway)& Phase B(Golden Gate Parkway to Green Blvd.) Canopy Trees (April-September) Unit Price 377 Live Oak Each $ 25.00 378 Crepe Myrtle Each $ 1.00 Palms(June) Unit Price 379 Sabal Each $ 18.00 Fertilization:Groundcover,Shrub,Tree,&Palm(Granular-County supplied/Liquid-Contractor Unit Price supplied) Page 8 (Florida Land Agreement#18-7430) 1 6 A 1 4 Work Area 11:Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard),2.2 Miles 380 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 78 bags per application 381 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately bags per application 382 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 383 Application labor&materials(Drench) Lump Sum $ 100.00 (Sequestrene Iron,Contractor supplied) 384 Application labor&materials u Lump Sum $ 100.00 (20-20-20 w/Ferromec AC 13-0-0 plus 6%Iron,Contractor supplied) Work Area 11:Collier Blvd.Phase A(588 Feet from City Gate Blvd.to Golden Gate Parkway)& Phase B(Golden Gate Parkway to Green Blvd.) 385 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 97 bags per application 386 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 32 bags per application 387 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 388 Application labor&materials(Drench) Lump Sum $ 100.00 (Sequestrene Iron,Contractor supplied) 389 Application labor&materials Lump Sum $ 100.00 (20-20-20 w/Ferromec AC 13-0-0 plus 6%Iron,Contractor supplied) Ornamental&Turf Spraying: Turf,Groundcover,Shrub,Tree,and Palm unit Prdec (Contractor supplied chemicals) Work Area 11:Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard),2.2 Miles 390 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 391 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Suns $ 25.00 Groundcover,Shrubs,Trees 392 Insecticides&Fungicides Application Labor&Materials(Sod) Lump Sum $ 25.00 393 Herbicides Application Labor&Materials(Sod) Lump Sum $ 25.00 394 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Work Area 11:Collier Blvd.Phase A(588 Feet from City Gate Blvd.to Golden Gate Parkway)& Phase B(Golden Gate Parkway to Green Blvd.) 395 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 396 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 397 Insecticide&Fungicides Application Labor&Materials(Sod) Lump Sum $ 25.00 398 Herbicides Application Labor&Materials(Sod) Lump Sum $ 25.00 399 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Growth Regulator Applications(Contractor supplied-Trim teas or Equivalent); Unit Price Work Area 11:Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard),2.2 Miles 400 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Work Area 11 Collier Blvd.Phase A(588 Feet from City Gate Blvd.toGolden Gate Parkway)& Phase B(Golden Gate Parkway to Green Blvd.) 401 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Page 9 (Florida Land Agreement#18-7430) 1 6 A 1 4 Mulching (2"mulch,2 cubic foot bags) UnitPrice 402 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 403 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressure Cleaning(inclusive of all tabor,materials,equipment to complete the work) Unit Price Work Area 11:Golden Gate Parkway(Santa Barbara Boulevard to Collier Boulevard),2.2 Miles 404 Brick Pavers&Concrete Surfaces- all areas Lump Sum $ 50.00 Work Area 11:Collier Blvd.Phase A(588 Feet from City Gate Blvd.to Golden Gate Parkway)& Phase B(Golden Gate Parkway to Green Blvd.) 405 Brick Pavers&Concrete Surfaces-all areasLump Sum $ 50.00 l4' ";l SECTION I. I,I BASIC LANDSCAPE MAINTENANCE 8t TR[I:GATION ;y y„ Work Area 12.Phase 1-Davis Blvd(Sandpiper Blvd to Airport Pulling Road),1.60 miles Prices Item Description UOM Unit Price 408 Side ROW Mowing&Edging Bi-Weekly $ 10.00 409 Weeding Weekly $ 1,300.00 410 General Site Trimming Monthly $ 50.00 411 Street Cleaning Weekly $ 250.00 412 Trash Removal Weekly $ 250.00 413 Irrigation System Maintenance&Repair Weekly $ 300.00 Work Area 12.Phase 2-Davis Blvd(Airport Pulling Road to County Barn Road),3.00 miles Item Description UOM Unit Price 414 Median Mowing and Edging Weekly $ 50.00 415 Side ROW Mowing&Edging Bi-Weekly $ 50.00 416 Weeding Weekly $ 2,600.00 417 General Site Trimming Monthly $ 100.00 418 Street Cleaning Weekly $ 400.00 419 Trash Removal Weekly $ 400.00 420 Irrigation System Maintenance&Repair Weekly $ 450.00 SECTION II. 1.2 SITE PBCIFIC MAINTENANCE 1.. Tree and Palm Maintenance Work Area 12.Phase 1-Davis Blvd(Sandpiper Blvd to Airport Pulling Road),1.60 miles Canopy Trees (April-September) Unit Price 421 Live Oak Each $ 25.00 Palms(June) Unit Price 422 Sabal Each $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 423 Alexander Each $ 15.00 424 Alexander(Double) Each $ 25.00 425 Alexander(Multi) Each $ 25.00 Work Area 12.Phase 2-Davis Blvd(Airport Pulling Road to County Barn Road),3.00 miles Canopy Trees (April-September) Unit Price 426'Jacaranda Each $ 25.00 Page 10 (Florida Land Agreement#18-7430) 1 6 A1 4 427 Copperpod Each $ 25.00 428 Yellow Elder Each $ 25.00 429 Orange Geiger Each $ 1.00 430 Live Oak Each $ 25.00 Palms(June) Unit Price 431 Sabal Each $ 18.00 Fertilization:Groundeover,Shrub,Tree,&Palm(Granular-County supplied!Liquid-Cantraesor unit supplied) Work Area 12.Phase 1' Davis Blvd(Sandpiper Blvd to Airport Pulling Road),1.60 miles 432 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 63 bags per application 433 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 3 bags per application 434 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Work Area 12.Phase 2-Davis Blvd,(Airport Pulling Road to County Barn Road),';3.00 miles 435 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 121 bags per application 436 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 1 bag per application 437 Application labor rate only(Granular fertilizer,Micronutrients.County 50 LB Bag $ 20.00 Supplied) Ornamental&Turf Spraying: Turf,Groundeover,Shrub,Tree,and Palm Unit Price (Contractor supplied chemicals) Work Area 12.Phase 1-Davis Blvd(Sandpiper Blvd to Airport Pulling Road),1.60 miles 438 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 439 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 440 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 441 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,and Shrubs 442 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,and Shrubs 443 Insecticides&Fungicides Application Labor&Materials Sod Lump Sum $ 1.00 Page 11 (Florida Land Agreement#18-7430) 1 6 A 14 444 Herbicides Application Labor&Materials-Sod Lump Sum $ 1.00 445 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Work Area 12.Phase 2-Davis Blvd(Airport Pulling Road to County Barn Road),3.00 miles 446 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 447 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 448 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 449 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,and Shrubs 450 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,and Shrubs 451 Insecticides&Fungicides Application Labor&Materials Sod Lump Sum $ 1,500.00 452 Herbicides Application Labor&Materials-Sod Lump Sum $ 1,500.00 453 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Growth Regulator Applications(Contractor supplied-T rinstect®or Equivalent)', Unit Price Work Area 12.Phase 1-Davis Blvd(Sandpiper Blvd to Airport Pulling Road),1.60 miles 454 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Work Area 12.Phase 2-Davis Blvd(Airport Pulling Road to County Barn Road),3.00 miles 455 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Unit Price 456 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 457 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressure Cleaning(inclusive of all labor,materials,equipment to complete the work) Unit Price'. Work Area 12.Phase 1-Davis Blvd(Sandpiper Blvd to Airport Pulling Road),1.60 miles 458 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Sum $ 50.00 Work Area 12.Phase 2-Davis Blvd(Airport Pulling Road to County Barn Road),3.00 miles 459 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Sum $ 50.00 3 � :9✓/n �/ S� �� �f i / 4 °"�v // , / ` �'c k /h.3'3;§ �' �` t 5 a &f A G �° 5ti MigIVA....�.... ,,, ,a,v„��� //ai/s'"<..... ...�� ,�� ,,, �i/uaw,r,� ,,,�. � �2>r.� /%�a.3 SECTION I. I1 BASIC LANDSCAPE MAINTENANCE&IRRIGATION'. 13.Phases 1&2: US 41 North, (Seagate Dr/Pine Ridge Rd to Vanderbilt Beach Rd and includes medians on Seagate Dr and Vanderbilt Beach Rd),3.40 miles Prices Item Description UOM Unit Price 462 Median Mowing and Edging Weekly $ 50.00 463 Trail Blvd Bahia Mowing and Edging Bi-Weekly $ 50.00 464 Weeding Weekly $ 2,200.00 465 General Site Trimming Monthly $ 150.00 466 Street Cleaning Weekly $ 400.00 467 Trash Removal Weekly $ 400.00 468 Irrigation System Maintenance&Repair Weekly $ 450.00 13.Phasee-3: US 41 North(Vanderbilt Beach Rd to Immokalee Rd),1.50 miles Page 12 (Florida Land Agreement#18-7430) 1 6 A 1 4 Item Description UOM Unit Price 469 Weeding Weekly $ 1,000.00 470 General Site Trimming Monthly $ 50.00 471 Street Cleaning Weekly $ 250.00 472 Trash Removal Weekly S 250.00 473 Irrigation System Maintenance&Repair Weekly $ 275.00 13.Phase 4: US 41 North(Immokalee Rd to Wiggans Pass Rd),2.00 miles Item Description UOM Unit Price 474 Median Mowing and Edging Weekly $ 50.00 475 Weeding Weekly $ 1,000.00 476 General Site Trimming Monthly $ 50.00 477 Street Cleaning Weekly $ 300.00 478 Trash Removal Weekly $ 300.00 479 Irrigation System Maintenance&Repair Weekly $ 300.00 13.Phase 5: US 41 North(Wiggans Pass Rd to the County Line),2.00 miles Item Description UOM Unit Price 480 Median Mowing Weekly 8 50.00 481 Side ROW Mowing&Edging Bi-Weekly $ 50.00 482 Weeding Weekly $ 1,500.00 483 General Site Trimming Monthly $ 50.00 484 Street Cleaning Weekly $ 350.00 485 Trash Removal Weekly $ 350.00 486 Irrigation System Maintenance&Repair Weekly $ 350.00 SECTION 0; 1.2 SITE SPECIFIC MAINTENM CE Tree and Palm Maintenance 13.Phases 1&2: US 41 North, (Seagate Dr Ii Pine Ridge Rd to Vanderbilt Beach Rd and includes medians on Seagate Dr and Vanderbilt Beach Rd),3.40 miles Canopy Trees (April-September) Unit Price 487 Live Oak Each $ 25.00 Palms(June) 488 Foxtail Each $ 1.00 489 Sabal Each $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 490 Foxtail Each $ 15.00 13.Phasee 3': US 41 North(Vanderbilt Beach Rd to Immokalee Rd),1.50 miles Palms(June) Unit Price 491 Foxtail Each $ 1.00 Palms,Seed Pod Removals,as needed Unit Price 492 Foxtail Each $ 15.00 13.Phase 4: US 41 North(Immokalee Rd to Wiggans Pass Rd),2.00 miles Canopy Trees (April-September) Unit Price 493 Live Oak Each $ 25.00 Palms(June) Unit Price 494 Foxtail Each $ 1.00 Palms,Seed Pod Removals,as needed Unit Price Page 13 (Florida Land Agreement#18-7430) 1 0 A 1 4 495 Foxtail Each $ 15.00 13.Phase 5: US 41 North(Wiggans Pass Rd to the County Line),2.00 miles Canopy Trees (April-September) Unit Price 496 Ligustrum Each $ 0.01 Palms(June) Unit Price 497 Alexander Each $ 1.00 498 Foxtail Each $ 0.01 499 Sabal Each $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 500 Alexander Each $ 15.00 501 Foxtail Each $ 15.00 Fertilization:Gi oundenVer,Shrub,Tree,&Palm(Granular-Countysnpplled/Liquid-Contractor tics supplied) 13.Phases 1&2: US Al North, (Seagate Dr/Pine Ridge Rd to Vanderbilt Beach Rd and includes medians on Seagate Dr and Vanderbilt Beach Rd),3.40 miles 502 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 63 bags per application 503 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 3 bags per application 504 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 505 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 Supplemental;Approximately 11 bags per application 13.Phasee 3: US 41 North(Vanderbilt Beach Rd to Immokalee Rd),1.50 miles 506 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf; 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 9 bags per application 507 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 4 bags per application 508 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 509 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 Supplemental;Approximately 6 bags per application 13.Phase 4: US 41 North(Immokalee Rd to Wiggans Pass Rd),2.00 miles 510 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 8 bags per application 511 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 4 bags per application 512 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 513 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 Supplemental;Approximately 6 bags per application 13.Phase 5: US 41 North(Wiggans Pass Rd to the County Line),2.00 miles 514 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf; 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 18 bags per application 515 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 11 bags per application Page 14 (Florida Land Agreement#18-7430) 1 6 A 4 516 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 517 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 48 bags per application Ornamental&Turf Spraying: Turf,Groundcover,Shrub,Tree,and Palm unotrwtae (Contractor supplied chemicals) 13.Phases 1&2: US 41 North, (Seagate Dr/Pine Ridge Rd to Vanderbilt Beach Rd and includes medians on Seagate Dr and Vanderbilt Beach Rd),3.40 miles 518 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 519 Insecticides&Fungicides Application Labor&Materials-Sod Lump Sum $ 25.00 Groundcover,Shrubs,Trees 520 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 521 Herbicides Application Labor&Materials-Sod Lump Sum $ 25.00 522 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 13.Phasee 3: US 41 North(Vanderbilt Beach Rd to Immokalee Rd),1.50 miles 523 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 524 Root Application Labor&Materials-Minors/Liquid Fertilizer(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 525 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 526 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 13.Phase 4: US 41 North(Immokalee Rd to Wiggans Pass Rd),2.00 miles 527 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 528 Root Application Labor&Materials-Minors/Liquid Fertilizer(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 529 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 530 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 13.Phase 5: US 41 North(Wiggans Pass Rd to the County Line),2.00 miles 531 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 532 Insecticides&Fungicides Application Labor&Materials-Sod Lump Sum $ 25.00 Groundcover,Shrubs,Trees 533 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 534 Herbicides Application Labor&Materials-Sod Lump Sum $ 25.00 535 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 Growth Regulator Applications(Contractor supplied-Trteeth or Equivalent) Unit Price 13.Phases 1&2: US 41 North, (Seagate Dr/Pine Ridge Rd to Vanderbilt Beach Rd and includes medians on Seagate Dr and Vanderbilt Beach Rd),3.40 miles 536 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 13.Phasee 3: US 41 North(Vanderbilt Beach Rd to Immokalee Rd),1.50 miles Page 15 (Florida Land Agreement#18-7430) 16A14 537 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 13.Phase 4: US 41 North(Immokalee Rd to Wiggans Pass Rd),2.00 miles 538 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 13.Phase 5: US 41 North(Wiggans Pass Rd to the County Line),2.00 miles 539 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Unit Price 540 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 541 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressure Cleaning(inclusive of all labor,materials,equipment to cam plate the work) Unit Price' 13.Phases 1&2: US 41 North, (Seagate Dr/Pine Ridge Rd to Vanderbilt Beach Rd and includes medians on Seagate Dr and Vanderbilt Beach Rd),3.40 miles 542 Brick Pavers&Concrete Surfaces- all areas Lump Sum $ 50.00 13.Phasee 3: US 41 North(Vanderbilt Beach Rd to Immokalee Rd),1.50 miles 543 Brick Pavers&Concrete Surfaces-all areas Lump Sum $ 50.00 13.Phase 4: US 41 North(Immokalee Rd to Wiggans Pass Rd),2.00 miles 544 Brick Pavers&Concrete Surfaces-all areas Lump Sum $ 50.00 13.Phase 5: US 41 North(Wiggans Pass Rd to the County Line),2.00 miles 545 Brick Pavers&Concrete Surfaces- all areas Lump Sum $ 50.00 SECTION.1t 1 BASIC LAl!NBSeXP A.1NTENANCE&TI i T LUIS Work Area 16: Radio Road to Pine Ridge Road Prices Item Description UOM Unit Price 548 Median Mowing&Edging Weekly $ 50.00 549 Side ROW Mowing&Edging Bi-Weekly $ 50.00 550 Weeding Weekly $ 3,150.00 551 General Site Trimming Monthly $ 50.00 552 Street Cleaning Weekly $ 450.00 553 Trash Removal Weekly $ 450.00 554 Irrigation System Maintenance&Repair Weekly $ 450.00 SECTION IL 1.2 SITE SPECIFIC MAINTE+NANCL . .. Tree&Palm Maintenance Canopy Trees (April-September) Unit Price 555 Live Oak Each $ 25.00 556 Black Olive Each $ 25.00 557 Jacaranda Each $ 25.00 558 Ligustrum Each $ 0.01 559 Floss Silk Each $ 25.00 560 Cattley Guava Each $ 0.01 561 Poinciana Each $ 25.00 562 Tabebulia Each $ 25.00 563 Crape Myrtle Each $ 1.00 564 Hong Kong Orchid Each $ 25.00 565 Silver Buttonwood Each $ 0.01 Page 16 (Florida Land Agreement#18-7430) 1 Palms(June) Unit Price 566 Sabal Each $ 18.00 567 Paurotis Each $ 25.00 568 Foxtail Each $ 0.01 569 Thatch Palm Each $ 10.00 Palms,Seed Pod Removals,as needed Unit Price 570 Alexander Each $ 15.00 571 Paurotis Each $ 25.00 572 Foxtail Each $ 15.00 573 Thatch Palm Each $ 10.00 (GragAly{#'-typugtpaupplied/Ligmd-Contractor unit 1 me ... euppliad) 574 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 81 bags per application 575 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 16 bags per application 576 Application labor rate only(Granular fertilizer 8-2-12,County supplied), 50 LB Bag $ 10.00 Additional for Palms;Approximately 9 bags per application 577 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Ornamental&Turf Spraying: Turf,Groundcover,Shrub,Tree,and Palm tiattP ke (Contractor supplied chemicals) 578 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 579 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 580 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Sum $ 25.00 581 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 582 Herbicides Application Labor&Materials(Turf) Lump Sum $ 25.00 Growth Regulator.Applications(Contractor supplied-Trim tect''or Equivalent) Unit Price- 583 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Unit Price 584 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 585 Application labor only rate (County supplied mulch) Bae $ 2.00 Pressure Cleaning(inclusive of all labor',materials,cquipm en t to coal pl me the wN rkl Unit Price Work Area 16: Radio Road to Pine Ridge Road 586 Brick Pavers&Concrete Surfaces- all areas Lump Sum $ 50.00 Page 17 (Florida Land Agreement#18-7430) 16A14 6 A 4 sats VtA , � wP 3 t �3t f �: SECTION L:I I BASIC LANDSCAPE MAINTENANCE&IRRIGATION Work Area 17: Phase 3-Pine Ridge Road to Vanderbilt Beach Road Prices Item Description UOM Unit Price 589 Median Mowing&Edging Bi-Weekly $ 50.00 590 Side ROW Mowing&Edging Bi-Weekly $ 100.00 591 Weeding Weekly $ 2,700.00 592 General Site Trimming Monthly $ 100.00 593 Street Cleaning Weekly $ 350.00 594 Trash Removal Weekly $ 350.00 595 Irrigation System Maintenance&Repair Weekly $ 300.00 Work Area 17: Phase 4-Vanderbilt Beach Road toImmokalee Road Item Description UOM Unit Price 596 Median Mowing&Edging Bi-Weekly $ 50.00 597 Side ROW Mowing&Edging Bi-Weekly $ 100.00 598 Weeding Weekly $ 2,700.00 599 General Site Trimming Monthly $ 100.00 600 Street Cleaning Weekly $ 350.00 601 Trash Removal Weekly $ 350.00 602 Irrigation System Maintenance&Repair Weekly $ 300.00 Work Area 17: Phase 5-Immokalee Road to the County Line Description UOM Unit Price 603 Median Mowing&Edging Bi-Weekly $ 50.00 604 Side ROW Mowing&Edging Bi-Weekly $ 50.00 605 Weeding Weekly $ 2,875.00 606 General Site Trimming Monthly $ 50.00 607 Street Cleaning Weekly $ 450.00 608 Trash Removal Weekly $ 450.00 609 Irrigation System Maintenance&Repair Weekly $ 450.00 SECTION a I i SITE SPECIFIC MAINTEN NCE Tree',&Palm Maintenance Work Area 17: Phase 3-Pine Ridge Road to Vanderbilt Beach Road Canopy Trees (April-September) Unit Price 610 Live oak Each $ 25.00 611 Hong Kong Orchid Each $ 25.00 612 Black Olive'Shady Lady' Each $ 25.00 613 Tabebuia Each $ 25.00 Page 18 (Florida Land Agreement#18-7430) 1 6 A 1 4 614 Jacaranda Each $ 25.00 Palms(June) Unit Price 615 Sabal Palms Each $ 18.00 616 Paurotis Palms Each $ 25.00 617 Coconut Palms Each $ 25.00 618 Florida Thatch Palms Each $ 15.00 Palms,Seed Pod Removals,as needed Unit Price 619 Foxtail Palms Each $ 15.00 620 Paurotis Palms Each $ 10.00 621 Coconut Palms Each $ 25.00 622 Florida Thatch Palms Each $ 10.00 Work Area 17: Phase 4 Vanderbilt Beach Road to Immokalee Road Canopy Trees (April-September) Unit Price 623 Black Olive'Shady Lady' Each $ 25.00 624 Tabebuia Each $ 25.00 625 Live Oak Each $ 25.00 626 Hong Kong Orchid Each $ 25.00 627 Golden Rain Tree Each $ 25.00 Palms(June) Unit Price 628 Sabal Palms Each $ 18.00 629 Royal Palms Each $ 35.00 630 Coconut Palms Each $ 25.00 Palms,Seed Pod Removals,as needed Unit Price 631 Foxtail Palms Each $ 15.00 632 Royal Palms Each $ 35.00 633 Coconut Palms Each $ 25.00 Work Area 17: Phase 5-Immokalee Road to the County Line Canopy Trees (April-September) Unit Price 634 Black Olive'Shady Lady' Each $ 25.00 635 Live Oak Each $ 25.00 636 Golden Rain tree Each $ 25.00 637 Hong Kong Orchid Each $ 25.00 Palms(June) Unit Price 638 Sabal Each $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 639 Royal Each $ 35.00 Fertilization:<Groundcover,Shrub,Tree,&Palm(Granular-County supplied/Liquid-Contractor Unit Price'. supplied) Work Area 17:Phase 3-Pine Ridge Road to Vanderbilt Beach Road Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 640 Groundcover,Shrubs,Trees;Approximately 51 bags per application;Applied 2 50 LB Bag $ 10.00 times per year 641 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 1 bag per application 642 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Page 19 (Florida Land Agreement#18-7430) 1 6 A 1 4 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 643 Supplemental;Approximately 135.5 bags per application;Applied 2 times per 50 LB Bag $ 10.00 year Work Area 17: Phase 4-Vanderbilt Beach Road to Immokalee Road Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 644 Groundcover,Shrubs,Trees;Approximately 45 bags per application;Applied 2 50 LB Bag $ 10.00 times per year 645 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately bags per application 646 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 647 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 Supplemental;Approximately 10 bags per application;Applied 2 times per year Work Area 17: Phase 5-3mmokalee Road to the County Line 648 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 105 bags per application 649 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately bags per application 650 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 651 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 10.00 Supplemental;Approximately 5 bags per application;Applied 2 times per year Ornamental&Turf Spraying: Turf,Groundcover,Shrub,Tree,and Palm Unit Price (Contractor supplied chemicals) Work Area 17: Phase 3-Pine Ridge Road to Vanderbilt Beach Road 652 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 653 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 654 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Sum $ 25.00 655 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 656 Herbicides Application Labor&Materials(Turf) Lump Sum $ 25.00 Work Area 17: Phase 4-Vanderbilt Beach Road to Immokalee Road 657 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 1,000.00 658 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 1,500.00 659 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Sum $ 1,000.00 660 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 661 Herbicides Application Labor&Materials(Turf) Lump Suns $ 1,500.00 Work Area 17: Phase 5-Immokalee Road to the County Line 662 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 1,000.00 663 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 1,500.00 664 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Sum $ 1,000.00 665 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 10.00 666 Herbicides Application Labor&Materials(Turf) Lump Suns $ 1,500.00 Growth Regulator Applications(Contractor supplied-TrisntectE or Equivalent)', Unit Price Work Area 17: Phase 3-Pine Ridge Road to Vanderbilt Beach Road 667 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 Page 20 (Florida Land Agreement#18-7430) 1 6 A 1 4 Work Area 17: Phase 4-Vanderbilt Beach Road to Immokalee Road 668 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 Work Area 17: Phase 5-Immokalee Road to the County Line 669 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Boit Price 670 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 671 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressure Cleaning(inclusive of all labor,materials,equipment to complete the work) Unit Price Work Area 17: Phase 3-Pine Ridge Road to Vanderbilt Beach Road 672 Brick Payers&Concrete Surfaces- all areas Lump Sum $ 50.00 Work Area 17: Phase 4-Vanderbilt Beach Road to Immokalee Road 673 Brick Pavers&Concrete Surfaces- all areas Lump Sum $ 50.00 Work Area 17: Phase 5-Immokalee Road to the County Line 674 Brick Payers&Concrete Surfaces- all areas Lump Sum $ 50.00 Page 21 (Florida Land Agreement#18-7430) 16A14 4 . ;ffif,,kgarinin4f-:?7,11,1, 1,1(gt(101451111.41Ve r`k; Jr t r, .,�" SECTItJ I. L I BASIC T NDSCAPE MAIN,T NANO &IR IGATION Work Area 19.Immokalee Road Phase 1(U.S.41 to Strand Blvd.),3.50 miles Prices Item Description UOM Unit Price 677 Side ROW Mowing&Edging Bi-Weekly $ 50.00 678 Weeding Weekly $ 2,525 00 679 General Site Trimming Monthly $ 50.00 680 Street Cleaning Weekly $ 500.00 681 Trash Removal Weekly $ 500.00 682 Irrigation System Maintenance&Repair Weekly $ 450.00 Work Area 20: Immokalee Road and 1-75 Interchange(Strand Blvd.to Tarpon Bay Blvd)&Quadrants 2.00 miles Item Description UOM Unit Price 683 Side ROW Mowing&Edging Bi-Weekly $ 50.00 684 Weeding Weekly $ 600.00 685 General Site Trimming Monthly $ 10.00 686 Street Cleaning Weekly $ 300.00 687 Trash Removal Weekly $ 300.00 688 Irrigation System Maintenance&Repair Weekly $ 250.00 SECTION 11. 1.2 SITE"SPECIFIC MAIM MANCE .:_ Tree and Palm Maintenance Work Area 19.Immokalee Road Phase 1(U.S.41 to Strand Blvd.),3.50 miles Canopy Trees (April-September) Unit Price 689 Crepe myrtle Each $ 1.00 690 Tabebuia Each $ 25.00 691 Jatropha Each $ 0,01 692 Queen Crape Each $ 25.00 693 Live Oak Each $ 25.00 Palms(June) Unit Price 694 MacArthur Each $ 0.01 695 Foxtail Each $ 0.01 696 Alexander Each $ 0.01 Work Area 20.Immokalee Road and 1-75 Interchange(Strand Blvd.to Tarpon Bay Blvd)& Quadrants 2.00 miles Canopy Trees (April-September) 697 Hong Kong Orchid Each $ 25.00 698 Silk Floss Tree Each $ 25.00 699 Royal Poinciana Each $ 25.00 700 Jacaranda Each $ 25.00 701 Live Oak Each $ 25.00 Palms(June) Unit Price 702 Sabal Palm Each $ 18.00 Fertilization:Groundcover,Shrub,Tree,&Palm(Granular-County supplied/Liquid-Contractor unit Primo' supplied) Page 22 (Florida Land Agreement#18-7430) 16A14 4 Work Area 19.Immokalee Road Phase 1(U.S.41 to Strand Blvd.),3.50 miles 703 Application labor rate only(Granular fertilizer 8-2-12,County supplied), 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 48 bags per application 704 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 7 bags per application 705 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 706 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Palm 50 LB Bag $ 20.00 Supplemental;Approximately 48 bags per application Work Area 20.Immokalee Road and 1-75 Interchange(Strand Blvd.to Tarpon Bay Blvd)& Quadrants 2.00 miles 707 Application labor rate only(Granular fertilizer 8-2-12,County supplied), 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees,Approximately 48 bags per application 708 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 7 bags per application 710 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) Ornamental&Turf Spraying: Turf,Groundcover,Shrub,Tree,and Palm Unit Price (Contractor supplied chemicals) Work Area 19.Immokalee Road Phase 1(U.S 41 to Strand Blvd.),3.50 miles 711 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 712 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees Work Area 20.Immokalee Road and I-75 Interchange(Strand Blvd.to Tarpon Bay Blvd)& Quadrants 2.00 miles 713 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 25.00 Groundcover,Shrubs,Trees 714 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 25.00 Groundcover,Shrubs,Trees Growth Regulator Applications(Contractor supplied-Trim tect8t or Equivalent) Unit Price Work Area 19.Immokalee Road Phase 1(U.S 41 to Strand Blvd.),3.50 miles 715 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Work Area 20.Immokalee Road and I-75 Interchange(Strand Blvd.to Tarpon Bay Blvd)& Quadrants 2.00 miles 716 Growth Regulator Applications Labor&Material(Contractor supplied) Lump Sum $ 50.00 Mulching (2"mulch,2 cubic foot bags) Unit Price 717 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 718 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressure Cleaning(Inclusive of all labor,materials,equipment to complete the work) Unit Price Work Area 19.Immokalee Road Phase I(U.S.41 to Strand Blvd.),3.50 miles 719 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Suns $ 50.00 Work Area 20.Immokalee Road and 1-75 Interchange(Strand Blvd.to Tarpon Bay Blvd)& Quadrants 2.00 miles 720 Brick Pavers&Concrete Surfaces-lump sum for all areas Lump Sum $ 25.00 Page 23 (Florida Land Agreement#18-7430) ;1[.. 1 p`' Y Tei. I 11 SECTION I. LI BASIC LANDSCAPE MAINTENANCE&IRRIGATION z.... Work Area 24: Collier Blvd(US 41 East to Marino),approximately 4.95 MilesPrices Item Description UOM Unit Price 723 Median Mowing&Edging Bi-Weekly $ 50.00 724 Side ROW Mowing&Edging Bi-Weekly $ 50.00 725 Weeding Weekly $ 3,600.00 726 General Site Trimming Monthly $ 50.00 727 Street Cleaning Weekly $ 450.00 728 Trash Removal Weekly $ 450.00 729 Irrigation System Maintenance&Repair Weekly $ 500.00 SECTION II. 1' �rC ATI ,EIIANr, Tree and Palm Maintenance Canopy Trees (April-September) Unit Price 730 Jacaranda Each $ 1.00 731 Live Oak Each S 1.00 732 Muskogee Crape Each $ 1.00 733 Natchez Crape Each $ 1.00 Palms(June) Unit Price 734 Sabal Each $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 735 Foxtail Each S 15.00 736 Montgomery Each $ 15.00 P+itl#1IIzatlon1 Groundeover,Shrub,Tree,&Palm(Granular-County supplied I Liqul4 7ontra.ct(kC b, e supplied) .>.. „.�. 737 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 106 bags per application 738 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 10.00 supplied),Palms,Approximately 4 bags per application 739 Application labor rate only(Granular fertilizer 8-2-12,County supplied), 50 LB Bag $ 10.00 Additional for Palms;Approximately 16 bags per application 740 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 741 Application labor&materials(Drench) Lump Sum $ 100.00 (Sequestrene Iron,Contractor supplied) 742 Application labor&materials Lump Sum $ 100.00 (20-20-20 w/Ferromec AC 13-0-0 plus 6%Iron,Contractor supplied) Ornamental&Turf Spraying; Turf,Grouladcsf(er,S b,Tree,and Palm (Contractor supplied elttaniaals) a rte.... • ,,:..... .... 743 Insecticides&Fcides Application Labor&Materials(Foliar) Lump Sum $ 1,000.00 ungi 744 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 1,500.00 745 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Sum $ 1,000.00 Page 24 (Florida Land Agreement#18-7430) 16A14 746 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 25.00 747 Herbicides Application Labor&Materials(Turf) Lump Sum $ 1,500.00 Growth Regulator Applications(Contractor supplied-Trimtt ct orl of ent) Volt Prlee' 748 Growth Regulator Applications Labor&Materials Lump Sum $ 50.00 ulc is (2"f mutcb, isul 2 iiclaot bags) u'SP n ce 749 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 750 Application labor only rate (County supplied mulch) Bag $ 2.00 Pressurecleaning(iadtislueot al)lobar,,materials,equipment to complete the work) Unit Price 751 Brick Pavers&Concrete Surfaces-all areas Lump Sum $ 50.00 Page 25 (Florida Land Agreement#18-7430) 16A14 A SECTION!. 1.1 BASIC LANDSCAPE MAINTENANCE&IRRIGATION Work Area 25: Santa Barbara Blvd"David Blvd to 1-75 Bridge" Approx.1.64 miles Prices item Description UOM UnitPrice 754 Median Mowing&Edging Bi-Weekly $ 50.00 755 Side ROW Mowing&Edging Bi-Weekly $ 50.00 756 Weeding Weekly $ 2,100.00 757 General Site Trimming Monthly $ 50.00 758 Street Cleaning Weekly $ 250.00 759 Trash Removal Weekly $ 250.00 760 Irrigation System Maintenance&Repair Weekly $ 300.00 ° 2 EIYANCE Work Area 25: Santa Barbara Blvd"David Blvd to 1-75 Bridge" Approx.1.64 miles Tree and Palm Maintenance Canopy Trees (April-September) Unit Price 761 Cathedral Oak Each $ 1.00 762 Black Olive'Shady Lady' Each $ 1.00 Palms(June) Unit Price 763 Sabal Lac h $ 18.00 Palms,Seed Pod Removals,as needed Unit Price 764 Montgomery Each $ 15.00 Fertilization:Ground cover,Shrub,Tree,&Palm(Granular-County supplied I Liquid-Contractor QultBrtce'' supplied) 765 Application labor rate only(Granular fertilizer 8-2-12,County supplied),Turf, 50 LB Bag $ 10.00 Groundcover,Shrubs,Trees;Approximately 33 bags per application 766 Application labor rate only(Granular fertilizer,So-Po-Mag(0-0-22)County 50 LB Bag $ 20.00 supplied),Palms,Approximately 2 bags per application 767 Application labor rate only(Granular fertilizer 8-2-12,County supplied), 50 LB Bag $ 10.00 Additional for Palms;Approximately 3 bags per application 768 Application labor rate only(Granular fertilizer,Micronutrients,County 50 LB Bag $ 20.00 Supplied) 769 Application labor&materials(Drench) Lump Sum $ 100.00 (Sequestrene Iron,Contractor supplied) 770 Application labor&materials Lump Sum $ 100.00 (20-20-20 w/Ferromec AC 13-0-0 plus 6%Iron,Contractor supplied) Alf Ornamental&Turf s y Turf,Gr't drOvm'',alittrt,Tom,andI _ sitPnee (Contractor supplied chumieatij 771 Insecticides&Fungicides Application Labor&Materials(Foliar) Lump Sum $ 750.00 772 Insecticides&Fungicides Application Labor&Materials(Drench) Lump Sum $ 1,000.00 773 Insecticides&Fungicides Application Labor&Materials(Turf) Lump Suns $ 1,000.00 774 Herbicides Application Labor&Materials(Pre or Post Emergent) Lump Sum $ 25.00 775 Herbicides Application Labor&Materials(Turf) Lump Sum $ 1,500.00 Gros th Regulator4pplications((`ontractor supplied-I runtetti'or Equisalcnl) Unit PHce_ Page 26 (Florida Land Agreement#18-7430) 16A14 776 Growth Regulator Applications Labor&Materials Lump Sum $ 100.00 Mulching**ltlt,2 cubic foot bags) Unit Price 777 Application labor&materials rate(Contractor to supply mulch) Bag $ 4.80 778 Application labor only rate (County supplied mulch) Bag $ 2.00 Peessure Cleaning(inclusive of all labor,materials,Ott-uipment to complete the work) Unit Price 779 Brick Pavers&Concrete Surfaces-all areas Lump Suns $ 50,00 Page 27 (Florida Land Agreement#18-7430) 16A14 4 ,,,,„„„„„„„„i„,,,,,,,„,„„„„„„„,,,,,..„,,,,„„„,,,,,,,,,,,,,„,,D„,,,,„,„,,„,„:„,,,,:;,„,,.,,,,,,,,,„,„,„,,,,,,D„,,„„,„,,„,,„„.„„,,,,„,„,,,„„„„„,,,„„„„„„,,,„,,,,,,,,,,„,„„„„,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, „,„,„„,„,„„,„,„„,,,,,,,,,,,,,,,,,,„„„„„„„„„„,,„..,,,...SECTIONIIIIIZIADDITIONAUSERVICES1111111111111111111111Broll11111111111111111111111111111111111111111111n y Plant Materials Pm chases&Installation Services Prices (All inclusive of labor,equipment,and materials to purchase,deliver,and install the plants) Item Description UOM Unit Price 782 Crown of Thorns all varieties,Perennial peanut,jasmine,sea purslane,sensitive 6"Pot S 10.00 plant,and other herbaceous perennials 783 Crown of Thorns all varieties,Perennial peanut,jasmine,sea purslane,sensitive 8"Pot $ 12.00 plant,and other herbaceous perennials 784 Crown of Thorns all varieties,Perennial peanut,jasmine,sea purslane,sensitive 1 Gallon $ 10.00 plant,and other herbaceous perennials African Iris, Cordgrass all varieties,Plumbago,Lily of the Nile,Coontie, 785 Florida Gama Grass,Juniper`parsonii',Lantana,Liriope all varieties,Spider 1 Gallon $ 12.00 Lily,Muhly Grass,Asian Jasmine all varieties,Firebush all varieties, Powderpuff,Blueberry Flax Lily,and all varieties of Ornamental Grasses 786 Ground Orchid,and Cast iron plant all varieties I Gallon $ 18.00 Cocoplurn.Thryallis,allamanda all varieties,Bougainvillea all varieties,Ixora all varieties,Indian Hawthorne all varieties,Juniper`Parsonii'and all other varieties,Coontie,Ornamental Grasses all varieties,Florida Privet,Ilex 787 `Schellings dwarf'Wax Myrtle,Sea Oats,Arboricola all varieties,Silver 3 Gallon $ 18.00 Buttonwood,Green Buttonwood,Stoppers all varieties,Viburnum all varieties,, firebush all varieties,powderpuff,Blueberry Flax Lily,Green Island Ficus, myrsine,Pittisporum,Iris all varieties. 788 Saw Palmetto,Sabal Minor,Ground Orchids,Wild Coffee,podocarpus all 3 Gallon $ 35.00 varieties,Bird of Paradise,Philodendron xanadu Guava,Crape Myrtle all varieties,Crinum Lily,Hibiscus Standard,Jamacian Caper,Ligustrum,Myrsine,Silver Buttonwood,Stopper all varieties,Wax Myrtle, Red Maple,Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana, Yellow Poinciana,Bald Cypress,Pond Cypress,Hong Kong Orchid,Orchid tree all varieties,Tabebuia all varieties,Cassia,Live Oak,Foxtail Palm,Thatch 789 ]0 Gallon $ 200.00 Palm,Solitaire Palm,Veitchia Palm all varieties,Geiger tree all varieties, Yellow Elder,Magnolia,Holly all varieties, _Saw Palmetto,Sabal Minor,,Bird of Paradise,Lignum Vitae,Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum,Paradise Tree,,Purple Glory Tree,Kentia Palm, Powderpuff,Slash Pine, and Golden Raintree Guava,Crape Myrtle all varieties,Crinum Lily,Jamacian Caper,Ligustrum, Myrsine,Silver Buttonwood,Stopper all varieties,Wax Myrtle, Red Maple, Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana,Yellow Poinciana, Bald Cypress,Pond Cypress,Hong Kong Orchid,Orchid tree all varieties, 790 Tabebuia all varieties,Live Oak,Foxtail Palm,Thatch Palm,Solitaire Palm, 15 gallon $ 300.00 Veitchia Palm all varieties,Geiger tree all varieties,Yellow Elder,Magnolia all varieties,Holly all varieties,Saw Palmetto,Sabal Minor,Bird of Paradise, Lignum Vitae,Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum,Paradise Tree,Purple Glory Tree,Kentia Palm,Powderpuff,Slash Pine,Golden Raintree,and Tibuchina. Page 28 (Florida Land Agreement#18-7430) 1 6 A 1 4 Guava,Crape Myrtle all varieties,Crinum Lily,Jamacian Caper,Ligustrum, Myrsine,Silver or Green Buttonwood,Stopper all varieties,Wax Myrtle, Red Maple,Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana,Yellow Poinciana,Bald Cypress,Pond Cypress,Hong Kong Orchid,Orchid tree all 791 varieties,Tabebuia all varieties, Live Oak,Foxtail Palm,Thatch Palm,Solitaire 25 Gallon $ 350.00 Palm,Veitchia Palm all varieties,Geiger tree all varieties,Yellow Elder, Magnolia,Holly all varieties,Saw Palmetto,Sabal Minor,Lignum Vitae, Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum, Paradise Tree,Purple Glory Tree,Kentia Palm,Powderpuff,Slash Pine,Golden Raintree,and Tibuchina. Guava,Crape Myrtle all varieties,Crinum Lily,Jamacian Caper,Ligustrum, Myrsine,Silver or Green Buttonwood,Stopper all varieties,Wax Myrtle, Red Maple,Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana,Yellow Poinciana,Bald Cypress,Pond Cypress,Hong Kong Orchid,Orchid tree all 792 varieties,Tabebuia all varieties,Cassia,Live Oak,Foxtail Palm,Thatch Palm, 45 Gallon $ 450.00 Solitaire Palm,Veitchia Palm all varieties,Geiger tree all varieties,Yellow Elder,Magnolia,Holly all varieties,Saw Palmetto,Sabal Minor,Lignum Vitae, Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum, Paradise Tree,Purple Glory Tree,Kentia Palm,Powderpuff,Slash Pine,Golden Raintree,and Tibuchina Guava,Crape Myrtle all varieties,Crinum Lily,Hibiscus Standard,Jamacian Caper,Ligustrum,Myrsine,Silver or Green Buttonwood,Stopper all varieties, Wax Myrtle, Red Maple,Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana,Yellow Poinciana,Bald Cypress,Pond Cypress,Hong Kong Orchid, 793 Orchid tree all varieties,Tabebuia all varieties,Cassia,Live Oak,Foxtail Palm, 65 Gallon $ 550.00 Thatch Palm,Solitaire Palm,Veitchia Palm all varieties,Geiger tree all varieties,Yellow Elder,Magnolia,Holly all varieties,Saw Palmetto,Sabal Minor,Lignum Vitae,Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum,Paradise Tree,Purple Glory Tree,Kentia Palm, Powderpuff,Slash Pine,and Golden Raintree Guava,Crape Myrtle all varieties,Crinum Lily,Hibiscus Standard,Jamacian Caper,Ligustrum,Myrsine,Silver or Green Buttonwood,Stopper all varieties, Wax Myrtle, Red Maple,Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana,Yellow Poinciana,Bald Cypress,Pond Cypress,Hong Kong Orchid, 794 Orchid tree all varieties,Tabebuia all varieties,Cassia,Live Oak,Foxtail Palm, 100 Gallon $ 1,000.00 Thatch Palm,Solitaire Palm,Veitchia Palm all varieties,Geiger tree all varieties,Yellow Elder,Magnolia,Holly all varieties,Lignum Vitae, Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum, Paradise Tree,Purple Glory Tree,Kentia Palm,Powderpuff,Slash Pine,Golden Raintree Guava,Crape Myrtle all varieties,Crinum Lily,Hibiscus Standard,Jamacian Caper,Ligustrum,Myrsine,Silver or Green Buttonwood,Stopper all varieties, Wax Myrtle, Red Maple,Black Olive`Shady Lady'Floss silk Tree,Royal Poinciana,Yellow Poinciana,Bald Cypress,Pond Cypress,Hong Kong Orchid, 795 Orchid tree all varieties,Tabebuia all varieties,Cassia,Live Oak,Foxtail Palm, 200 Gallon $ 2500.00 Thatch Palm,Solitaire Palm,Veitchia Palm all varieties,Geiger tree all varieties,Yellow Elder,Magnolia,Holly all varieties,Lignum Vitae, Caesalipina all varieties,Podocarpus all varieties Gumbo Limbo, Pigeon Plum, Paradise Tree,Purple Glory Tree,Kentia Palm,Powderpuff,Slash Pine,and Golden Raintree 796 Alexander Palm/10'-16'OA,FG/RPG Each $ 750.00 797 Alexander Palm/8'-I0'OA,FG/RPG Each $ 300.00 798 Bald Cypress/10'OA,FG Each $ 300.00 799 Bald Cypress/100 gal.,FG/RPG Each $ 1,000.00 800 Coconut Palm/10'-15'GW,FG/RPG Each $ 2,500.00 801 Coconut Palm/Larger sizes,cost per foot of wood,FG/RPG Each $ 200.00 Page 29 (Florida Land Agreement#18-7430) 1 6 A 1 4 802 Crape Myrtle'Muskogee'/10'-14'OA,FG/RPG Each $ 600.00 803 Crape Myrtle Muskogee'/8'-10'OA,FG/RPG Each $ 400.00 804 Crape Myrtle'Natchez'/10'-14'OA,FG/RPG Each $ 600.00 805 Crape Myrtle'Natchez'/8'-10'OA,FG/RPG Each $ 400.00 806 Crape Myrtle Tuscarora'/10'-14'OA,FG/RPG Each $ 600.00 807 Crape Myrtle Tuscarora'/8'-10' OA,FG/RPG Each $ 400.00 808 Hong Kong Orchid/10'-12',FG/RPG Each $ 500.00 809 Hong Kong Orchid/14'-20'OA,FG/RPG Each $ 800.00 810 Hong Kong Orchid/15'-35'OA,FG/RPG Each $ 1,500.00 811 Jatropha/4'OA Each $ 400.00 812 Ligustrum/8'X 8' Each $ 800.00 813 Live Oak 100 gal.,FG/RPG Each $ 1,500.00 814 Live Oak 200 gal.,FG/RPG Each $ 2,000.00 815 Live Oak 300 gal.,FG/RPG Each $ 3,000.00 816 Magnolia'Little Gem'/100 gal.,FG/RPG Each $ 1,500.00 817 Magnolia'Southern'/100 gal.,FG/RPG Each $ 1,500.00 818 Maple Tree/100 gal.,FG Each $ 1,500.00 819 Maple Tree/12'OA,FG Each $ 800.00 820 Maple Tree/16'OA,FG Each $ 1,200.00 821 Montgomery Palm/10'OA,FG/RPG Each $ 300.00 822 Montgomery Palm/12'OA,FG/RPG Each $ 750.00 823 Perrinial Peanut Roll Each $ 2,000.00 824 Royal Palm/12'-16'GW,FG/RPG Each $ 2,500.00 825 Royal Palm/7'-l0'GW,FG/RPG Each $ 2,200.00 826 Royal Palm/Larger sizes,cost per foot of wood,FG/RPG Each $ 250.00 827 Sabal Palm/10'-18'OA Each $ 390.00 828 Shady Lady Black Olive/10'-18'OA,FG/RPG Each $ 1,500.00 829 Shady Lady Black Olive/16'-20'OA,FG/RPG Each $ 1,800.00 830 Sylvester Palm/FG 10'wd/RPG Each $ 3,000.00 831 Sylvester Palm/FG 6'wd/RPG Each $ 1,800.00 832 Sylvester Palm/FG 8'wd/RPG Each $ 2,500.00 833 Tabebuia/12'-14'OA,FG/RPG Each $ 700.00 834 Verawood/8'-10'OA,FG/RPG Each $ 500.00 835 Wax Myrtle/10'OA,FG/RPG Each $ 300.00 836 Wax Myrtle/12'OA,FG/RPG Each $ 400.00 837 Wax Myrtle/14'OA,FG/RPG Each $ 500.00 Page 30 (Florida Land Agreement#18-7430) 1 6 A 1 4 838 Arachis glabrata'Ecoturf/Perennial Peanut Rolled Turf Variety Installed Square Foot $ 10.00 839 Arachis glabrata'Ecoturf/Perennial Peanut Rolled Turf Variety Installed Square Foot $ 9.00 840 Bahia Sod Installed Pallet $ 500.00 841 Bahia Sod Installed Square Foot $ 4.00 842 Floratain Sod Installed Pallet $ 750.00 843 Floratam Sod Installed Square Foot $ 5.00 844 Organic Lee Compost Installed Cubic Yard $ 250.00 845 Organic Lee Compost Installed Cubic Foot $ 50.00 846 Planting Soil Installed Cubic Yard $ 250.00 847 Planting Soil Installed Cubic Foot $ 50.00 Landscape Personnel Labor Hours 848 Landscape Supervisor Hourly $ 85.00 849 Landscape Laborer Hourly $ 75.00 Irrigation Personnel Labor Hours 850 Imgation Supervisor Hourly $ 85.00 851 Irrigation Technician Hourly $ 85.00 852 Irrigation System Review Hourly $ 65.00 853 Irrigation Supervisor(After Hours(7:00 p.m.-6 30 am.)) Hourly $ 125.00 854 Irrigation Technician(After Hours(7:00 p.rn -6:30 a.m.)) Hourly $ 125.00 Emergency Response Labor Hours(After 5 p.m.,Monday-Friday,and 24.hours during weekends& holidays) 855 Supervisor Hourly $ 125.00 856 Laborer Hourly $ 125.00 Tree&Palm Maintenance Services(All inclusive of labor,equipment,watering,&materials to complete the work) 857 Staking Large Palms(Caliper greater than 6") Each $ 200.00 858 Staking Small Canopy Tree Each $ 200.00 (2x2 posts and guy wire,4"-6"caliper) 859 Staking Large Canopy Tree Each $ 400.00 (2x4 posts,greater than 6"caliper) 860 Restanding and Staking Small Palm Each $ 400.00 (4"-6"Caliper) Restanding and Staking Large Palms Each $ 800.00 861 Caliper greater than 6") Restanding and Staking Small Canopy Tree Each $ 500.00 862 2x2 posts and guy wire,4"-6"caliper) Restaking Large Canopy Tree Each $ 800.00 863 (2x4 posts,greater than 6"caliper) 864 Reconstructive/Restoration or Reduction Tree Pruning Each $ 400.00 865 Hazardous Tree Pruning Each $ 500.00 866 Root pruning,re-planting,re-standing and staking with 2x4 Each $ 600.00 (Tree or Palm) 867 Root Pruning,re-planting,re-standing and staking with 4x4 Each $ 500.00 (Tree or Palm) Page 31 (Florida Land Agreement#18-7430) 1 6M14 868 Root Pruning,re-planting,re-standing and staking with lodge poles Each $ 500.00 (Tree only) 869 Removal:Small Palms-Alexander,Pygmy Date,Montegomery,Thrinax' Each $ 400.00 Cocothrmax,(includes root balls and stumps) 870 Removal:Medium Palms-Foxtail&Sabal (includes root balls and stumps) Each $ 600.00 871 Removal:Large Palms-Royal&Bismarck Each $ 1,500.00 (includes root balls and stumps) 872 Removal:Small Trees-Trees up to 10 feet in height Each $ 500.00 (includes root balls and stumps) 873 Removal:Medium Trees-11 feet in height but less than 20 feet in height Each $ 650.00 (includes root balls and stumps) 874 Removal:Large Trees-20 feet in height and greater Each $ 800.00 (includes root balls and stumps) 875 Stump tip overs(small) Each $ 300.00 876 Stump tip overs(medium) Each $ 500.00 877 Stump tip overs(large) Each $ 700.00 878 Soil replacement(fill in stump tip over hole) Cubic Yard $ 250.00 879 Cut Dead Palm to a 3'stump(All sizes) Hour $ 85.00 880 Cut Dead Tree to a 3'stump(All sizes) Hour $ 85.00 881 Debris Removal Cubic Yard $ 150.00 Equipment&Operator Rates(All inclusive of labor,equipment,fuel&materials) 882 Bucket Truck Hour $ 200.00 883 Water Truck Hour $ 200.00 884 Mini Excavator Hour $ 200.00 885 Crane Truck Hour $ 100.00 886 Skid Loader Hour $ 200.00 Traffic Accident Clean up(All inclusive in unit price:labor,removal of material,hauling,disposal& disposal fees;blow mulch from roadway;or fix distriburded material if not damaged) 887 Site Clearing Damage Hourly $ 250.00 Materials markup percentage not to exceed 15%(non-bid line items require receipts as backup for invoices) 888 Materials markup Page 32 (Florida Land Agreement#18-7430) 1 6 A 1 4 Other Exhibit/Attachment Description: following this page (pages through ) n this exhibit is not applicable Page 17 of 17 Fixed Term Service Multi-Contractor Agreement 2017.008(Ver.1) 16A14 E(MM/ AC DDATDDIYYYY) ® CERTIFICATE OF LIABILITY INSURANCE DATE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Brown &Brown Of Florida, Inc. PHONE FAX 1421 Pine Ridge Road, Suite 200 (A/c.No.Extl:239-262-5143 (A/C,No):239-261-8265 Naples FL 34109 ADDRESS: certs@bbnaples.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Associated Industries Insurance Company, Inc. 23140 INSURED COMME-2 INSURER Southern-Owners Insurance Company 10190 Florida Land Maintenance Inc dba Commercial Land Maintenance INSURER c:Owners Insurance Company 32700 3980 Exchange Avenue INSURERD: Naples FL 34104 INSURERE: INSURER F: COVERAGES CERTIFICATE NUMBER:2035063963 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTRINSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) B X COMMERCIALGENERALLIABILITY Y Y 20229177 1/1/2018 1/1/2019 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $300,000 MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 PRO POLICY X JECT LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ C AUTOMOBILE LIABILITY 5039875901 1/1/2018 1/1/2019 COMBINED SINGLE LIMIT $1,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) A X UMBRELLA LIAB X OCCUR AWC1095736 1/1/2018 1/1/2019 EACH OCCURRENCE $5,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $5,000,000 DED RETENTION$ $ A WORKERS COMPENSATION Y AWC1076289 1/1/2018 1/1/2019 X STATUTE EORH AND EMPLOYERS'LIABILITY Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE N N/A E.L.EACH ACCIDENT $1,000,000 OFFICER/MEM BER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Landscaping Contractor General Liability includes Additional Insured status per form#55373-Blanket Additional Insured,when required under a written agreement with you. Blanket Waiver of Subrogation per General Liability Plus Endorsement. Workers Compensation includes Blanket Waiver of Subrogation per form#WC000313-Waiver of our Right to Recover from Others Endorsement. Landscaping Contractor General Liability includes Additional Insured status per form#55373-Blanket Additional Insured,when required under a written agreement with you. Blanket Waiver of Subrogation per General Liability Plus Endorsement.Workers Compensation includes Blanket Waiver of Subrogation per form#WC000313-Waiver of our Right to Recover from Others Endorsement Contract#18-7430 ' Landscape Maintenance Vendors— CERTIFICATE CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Collier County Board of County Commissioners 3227 Tamiami Trail East AUTHORIZED REPRESENTATIVE Naples FL 34112 I � •'� _Gid.�d��� ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD 1 6 A 1 4 COMMERCIAL GENERAL LIABILITY CG 20 01 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the additional insured. This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 04 13 ©Insurance Services Office, Inc., 2012 Page 1 of 1