Backup Documents 06/14-15/2011 Item #16A 2
ORIGINAL DOCUMENTS CHECKLIST & ROUTING sLIP16 A 2
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. Original documents should be hand delivered to the Board Office. The completed routing slip and original
documents are to be forwarded to the Board Office only after the Board has taken action on the item.)
ROUTING SLIP
Complete routing lines #1 through #4 as appropriate for additional signatures, dates, and/or information needed. If the document is already complete with the
ex tion of the Chairman's si ature, draw a line throu routin lines #1 throu #4, co lete the checklist, and forward to Sue Filson line #5).
Route to Addressee(s) Office Initials Date
ist in routin order
1.
2.
3.
4.
5 Ian Mitchell, Supervisor, BCC Office
Board of County
Commissioners
Clerk of Court's Office
~}I5 II
6. Minutes and Records
'/,,/f{
PRIMARY CONTACT INFORMATION
{The primary contact is the holder of the original document pending BCC approval. Normally the primary contact is the person who created/prepared the executive
summary. Primary contact information is needed in the event one of the addressees above, including Sue Filson, need to contact staff for additional or missing
information. All original documents needing the BCC Chairman's signature are to be delivered to the BCC office only after the BCC has acted to approve the
item.
Name of Primary Staff Jamie French Phone Number 252-5717
Contact
Agenda Date Item was June 14,2011 Agenda Item Number 16.A.2.
A roved b the BCC
Type of Document Resolution Number of Original
Attached Documents Attached
1.
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark "N/ A" in the Not Applicable column, whichever is
a ro riate.
Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney. This includes signature pages from ordinances,
resolutions, etc. signed by the County Attorney's Office and signature pages from
contracts, agreements, etc. that have been fully executed by all parties except the BCC
Chairman and Clerk to the Board and ssibl State Officials.)
All handwritten strike-through and revisions have been initialed by the County Attorney's
Office and all other arties exce t the BCC Chairman and the Clerk to the Board
The Chairman's signature line date has been entered as the date ofBCC approval of the
document or the final ne otiated contract date whichever is a licable.
"Sign here" tabs are placed on the appropriate pages indicating where the Chairman's
si ature and initials are re uired.
In most cases (some contracts are an exception), the original document and this routing slip
should be provided to Ian Mitchell in the BCC office within 24 hours ofBCC approval.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of our deadlines!
The document was approved by the BCC on 6/1412011 (enter date) and all changes
made during the meeting have been incorporated in the attached document. The
Coon Attorne 's Office has reviewed the chan es, if a licable.
?J
JJ /It
2.
3.
4.
5.
6.
9f
~
I: Forms! County Forms! BCC Forms! Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05
16A 2
Ann P. Jennejohn
From:
Sent:
To:
Cc:
Subject:
Attachments:
PuigJudy [JudyPuig@colliergov.net]
Friday, June 17,20111:16 PM
Ann P. Jennejohn
French, James; Kovensky, Kenneth
Resolutions
Clean version - Fee Schedule (2).doc; Clean version - VFH Admin Policy Manual (1 2).doc
Hi Ann,
Please see attached the Fee Schedule and the Vehicle for Hire manual, thanks!
-Si~tf
Judy Puig
Judy Puig
Operations Analyst
Growth Management Division/Planning & Regulation
Operations & Regulatory Management Department
2800 N. Horseshoe Drive
Naples, FL 34104
(239) 252-2370
(239) 252-6348 Fax
you
mail to this entity. [f1slead. contact this office by telephone in
to puhlic records request. do not send
1
16A 2
RESOLUTION NO. 2011 -~
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA,
AMENDING RESOLUTION NO. 2010-130, THE COLLIER
COUNTY GROWTH MANAGEMENT DIVISION/PLANNING
AND REGULATION FEE SCHEDULE; AND PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, on July 27, 2010, the Board of County Commissioners (Board) approved
Resolution 2010-130, establishing a revised Collier County Community Development and
Environmental Services Fee Schedule and re-titled same to the Collier County Growth
Management Division/Planning and Regulation Fee Schedule; and
WHEREAS, the Board finds that it is in the government and public interest to amend the
Fee Schedule by modifying the refund provisions for Planning, Environmental or Engineering
related fees.
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that:
The Board of County Commissioners hereby declares that the fees set forth in the revised
Collier County Growth Management Division/Planning and Regulation Fee Schedule, attached
hereto, are all fair and reasonable sums to be assessed to the Land Development Code and the
County's corresponding development review and permitting process.
BE IT FURTHER RESOLVED that this Resolution be recorded in the minutes of this
Board with an effective date of lolly} Jo II .
I I
THIS RESOLUTION ADOPTED after motion, second and majority vote on this the
IL/-lh day of ::run-tl ,2011.
ATTEST:
DWIGHT E. BROCK, Clerk
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
, erk
~ &vf\
W '^,
By: . ~
FRED W. COYLE, CHAIRMlAN
c
<>
~*
l TiT'.
16 A 2
e
T
c
...
u.
....
r.
y
...........
COLLIER COUNTY
GROWTH MANAGEMENT DIVISION/PLANNING AND REGULATION
FEE SCHEDULE
BCC Approved version, June 14, 2011
Contents:
A) ADMINISTRATION... h _ _ _ _ _ _ _ _ _ _..h. _ _ _ _ _ _ _ _ _.. _. _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _. _. _ _ _ _ _.2
B) BLASTING PERMITS & INSPECTIONS _________h...___________.._h__ ______..______ __._.___ _______..______ __....____ ______.h____.h....________..h_.2
C) ENVIRONMENTAULANDSCAPING _ _ _ _ _ _ _ __.... _ _ _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _ h _. _. _ _ _ _ _ _ _ _ _. h _ _ _ _ _ _ h" _ _ _ _ _ _ _ _ _ _... _ h _ _ _ _ _ _... _ _ _ _ _ _ _ _... hhh _ _ _'_'hm.2
D) EXCA V A TION PERMITS _ _ _ _ _ _ _ _ _ _.. h _ _ _ _ _ _ _ _ _ _ _ _.. _ _ h _ _ _ _ _ _..... _ _ _ _ _ _ _ _... _. _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _. _. h _ _ _ _ _ h. _ _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _.... _ _ _ _ h _ _... _ _ _ _.3
E) FIRE CODE REVIEW FEES. _ _ h _ _ _...... _ _ _ _ _ _ _ h _. _.. _ _ _ _ _ _ _ _ _ _..... _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _.. h _ _ _ _ h _... _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _..... _ _ _ _ _ _ _ _ _.. _ _.4
F) SITE DEVELOPMENT PLANS. _ _ _..... _ _ _ _ _ _ _ _ _ _. h _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _.4
G) SUBDIVISION h. _ _ _ _ _ h -...... _ _ _ _ _ _ _ _ _.. _. _ _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _..... _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.. _. _ _ _ _ _ _ _ _... _ m5
H) ENGINEERING INSPECTION FEES _ _ _ _ _. h _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ h h _ _ _ h_ _ _ _ _ _.6
I) TEMPORARY USE FEES. _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _.... _ _ _ _ _ _ _ h.. _ _ _ _ _ _.6
J) WELL PERMITS/INSPECTIONS _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _.. h _ _ _ _ _. _.. _ h _ _ _ _ _.... _ _ _ _ _ _ _ _ _.. _ _ _.7
K) ZONING/LAND USE PETITIONS _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _.. _ _ _.7
L) MISCELLANEOUS _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _ _.. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _. __ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _.9
M) BUILDING PERMIT APPLICATION FEE.hm--hh.h_hhhh_.hhhm..._mhh.hh_m.h_mhh_.hmhh__.hmhhhmmhh.hhm I I
N) BUILDING PERMIT FEES __________ _._._ _ ________..h________..________ hh.______._h_______....________..__ _______.____ _ __...________...h________.__ _ 12
0) ELECTRICAL PERMIT FEES h_hhmhmh_'hm _ hh_hmhhmhm mh.hhh hh..hh _ h...hmm_.hmhh .hmhm.hh _ hh....h _ h 12
P) PLUMBING PERMIT FEES. _ _ _. _. _. _ _ _ _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _ _. _. _ h _ _ _ _.. _ _ _ _ _ _ _. _.. _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _._. h _ _ h 12
Q) MECHANICAL PERMIT FEES _ _ _ _..... _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ h'" _ _ _ _ _ _ _ _. _.. _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _... _ _ _ _ _ _... _ _ _ _ _ __ _.. _ _ _ _ _ _.... _ _ _ _ _ _ _ _.. _ _ _ h _ _ _ _ _.. _ _ _ _ _ 13
R) FIRE PREVENTION AND CONTROL PERMIT FEES ...-mhh-..hhhhh_hhhhh.hhhh_.hmm...hmh..hmhm.hhhm..hmmI3
S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES -.hhhhh.hhmh.hmm..._hhm..hmh....hhhm.hm13
T) CHICKEES AND SIMIIYAR STRUCTURES m.hmhhhh-hhhhh__hhhm_..hmm_.hhhhhhmmhhmhh..h_m_...._hhm...m13
U) POOL OR SPA PERMIT FEES __..h_______h.._________...._________..__________.____h--..____________________.0._______.._________...______.__._______14
V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES mh.hhhhm.hmhhhhhhh_hmhh..hhmhhhmm.mhhh._hhhhh.hmI4
W) SIGN PERMIT FEES ._____ ____...._____ _ ____..__________._. _______..._____ _ ____.._______..__ ______..._____ __..______h.__________..._____h_..____________14
X) CONVENIENCE PERMIT FEES _. _......... _ _ _ _ _..... _ _ _ _ _...... _ _ _ _ _...... hh _...... _ _ _ _....... _ h _...... _ _ _ _.... u _ _........ _ _ h...... hhmu Um .14
Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS h.hmhh.hhhh..hmh._.hmh...hhm_..h_mmh_14
Z) PERMIT EXTENSION. _..... _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ 0. _ _ _ _ _ _ _.. h _ _ _ _ _ _. h _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ 15
AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES.-mhhmhmhh..hmmhhmh_hmhhhhmhhhhhm.hmhh.15
BB) PRE-MOVING INSPECTION FEES. _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _. _. _ _ _ _ _ _ _ _... h _ _ _ __.. _ _ _ _ _ _ _ _. h _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ 15
CC) INSPECTION FEES. _ _ _ _.... _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ h _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. h _ _ _ _ _ _.. _ _ _ _ _ _ _... _ _ _ _ _ _ _.. _ 15
DD) REINSPECTION FEES. _.. _ _ _ _ _ _ _.... h _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ h _ _. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _. h _ _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ 15
EE) FAILURE TO OBTAIN A PERMIThhhhhhh.hhhm..hhmhhmhhhhhhh..._mh_..hmm.hmm.hhhhhummmhh_h..h 15
FF) LICENSING _ _ _ _. u. _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _.. _ h_ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ 'h_ _ _ _ _ _.. _ _ h _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ _ _ h" _ _ _ _ _ _ _. _ h _ _ _ _ _... _ _ _ _ _ _.. h _ _ _ _ _ _ _h _ 15
GG) DUPLICATE PERMIT CARDS ...._______....________. .._________.._______. ..h_____..h______..._______._________._ _______...__ h__..________...______ 16
HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS mh.hhhh._hmm._.hhhmhmhhhmhh__hmm__h_m_..hhhh...hmI6
II) PERMIT FEE REFUNDS __ __...____ ________._____ _ ._._________..__ _ _ ____..________..________.._______.._____________ ____.._____________h_.._______...____16
JJ) RECORD RETRIEVAL h_hhhm h_h_m _ h_.hh _ hh__,mhhh_ mhhm_mhm hhm _hh_m hh.mm h_m mh.hmm.hmhhhhmI7
KK) COPY FEES hh_ _ ..hh _ _h_._.h_h _ hh.h_ _ _ hh" h h hh_hhhhh__h_hhhhhhh_hhh_ hhh_ _ hh.hh_ hhh _ _hhhh_hhh_h_hh.hh 17
LL) RESEARCH _ _.... _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _.... _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ __. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 17
MM) SUBSCRIPTION SERVICE. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _. _.. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _.. _ _ _ _ _ _ _... _ _ _ _ _ _.. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _.. h_ _ _ _. _. _ _ _ _ _ _ _ _ _. 18
NN) RESERVED. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _: _ _ _ _ _. _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. 0. _ _ _ _ _... _ _ _ h.... _ _ _ _ _ _ _. _ _ _ _ _ _ _.. _ _ _ _ _ _ _. _ _ _ _ _ _ _... h _ _ _ __ h _h _ _ _ 18
00) PROPERTY INSPECTIONS_ _ _ _ _. h _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ h _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _. _. _ _ _ _ _ _.. _ _ _ _ _ _ _ _ 0. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _. _ _ _ _ _ _... _ _ _ 18
PP) CERTIFICATE TO BOARD BUILDING h.hhhm._m _ _ h_.h_mhhhmhh.m _ _ _ h_hhmh.hmm_hmm.m_m.. 'hhm.hhm'hm 18
QQ) ADDITIONAL FEE REFUND PROVISIONS .hmhmh-mh-hmhmhhhmuhhh_hhmhhmhh.h_mhmmmhhhm__mhmh 18
RR) REFUND PROVISIONS. __ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ __ h _ _ _ _ _ _. _ _ _ h _ _ _.. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _. _ _ _ _ _ _... _ _ _ _ _ _.. _ _ _ _ _ 18
SS) ADDITIONAL FEE PROVISIONS hhm _'hhhh h 'hhhh.hhh h.Uhhmh_mhh_m _ hh__mmh.m hh_hhm_.hhm ..hmmhm_ _19
TT) PUBLIC VEHICLE FOR HIRE FEEShmmuhhmm._hhmhhm__hhm...mm..hmmhmm__hh m__mhm.hhhmhm_ h'hh 19
UU) "PAYMENT IN LIEU OF" FEE FOR PA THW A YS (SIDEWALKS, AND BIKE LANES) .h-mmh_m.._mh..hhm.hhm.hhhh.hh20
VV) OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS hhh.hm-m_m_m__hhhh.hmh.hmm.hmmhhhh.hhhh._h20
WW) FENCES - -.... _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _.. _ _ _ _ _ _ _.. _ _ _ _ _ _ _. _ _ _ _ _ _ _.. _ _ _ _ _ _ _. _ _ _ _ _ _ _... _ _ _ _ _ _.20
XX) CERTIFICATE OF OCCUPANCY _ hhmh _ h__m _ m_U.hhm.hm _ h.hmm.hm_._Uhhmhhm.___ mm_hhhh.hhm_.hmh..m 20
Fees are in bold
GMD/P & R Operations rev 04/2112011/lkw
Page I
FEES ARE ESTABLISHED BY THE BOARD OF COUNTY COMMISSIONERS RESOLUTION, AND CANNOT
BE WAIVED OR SUSPENDED WITHOUT AN ACTION BY THE BOARD OF COUNTY COMMISSIONERS.
ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY
DETERMINED BY THE DIRECTOR OF THE APPROPIATE DEPARTMENT, AS APPLICABLE. WHERE AS
PART OF A REZONING, PLAT OR SIMILAR APPLICATION TYPE, THE BOARD OF COUNTY
COMMISSIONERS DIRECTS APPROVAL OF FUTURE DEVELOPMENT ORDERS DIFFERENT FROM THE
STANDARD TYPE OF APPROVAL PROCESSES REQUIRED, THE DIRECTOR OF THE APPROPRIATE
DEPARTMENT SHALL DETERMINE THE FEES TO BE APPLIED TO THE PROCESS NECESSARY TO MEET
THE BOARDS REQUIREMENTS. THE APPLICABLE FEES SHALL BE THOSE WHICH MOST CLOSELY
RESEMBLE THOSE CHARGED FOR SIMILAR PROCESSES INCLUDING EXTRA FEES FOR ADVERTISING
AND THE LIKE.
A) ADMINISTRATION
1) Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or
Building Construction Administrative Code (Administrative Code). Based on staff hours: Less than 20 hours
$1,500.00, 20 to 40 hours $3,000.00, more than 40 hours $5,000.00
2) N/ A
3) Determination of Vested Rights. $100.00 (plus the County's out-of-pocket expenses associated with hearing
officer and hearings)
4) Appeal of Vested Rights Determination. $100.00
5) Amendment to Land Development Code. $3,000.00
6) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or
the LDC). $1000.00 (non-refundable)
7) Appeal to Board of Zoning Appeals or Building Board of Adjustments and Appeals (as may be provided for in
the Collier County Administrative Code or the LDC). $1,000.00 (non-refundable)
B) BLASTING PERMITS & INSPECTION
1) 30 day permit fee, non-refundable payable upon application. $250.00
2) 90 day permit fee, non-refundable payable upon application. $600.00
3) Yearly permit fee, non-refundable payable upon application. $1,500.00
4) Renewal permit fee, non-refundable payable upon application. $200.00
5) After-the-fact fee, due to blasting without a permit. $10,000.00
6) Fine fee, per detonated shot with after-the-fact permit. $200.00
7) Handler fee, for handler who assists the user or blaster in the use of explosives. $100.00
8) Blasting Inspection Fee. $200.00 (per inspection)
9) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts.
Upon completion, fees will be adjusted to reflect actual number of blasts.
C) ENVIRONMENTAL/LANDSCAPING
1) Site Clearing Permit, first acre or fraction of an acre. $250.00 each additional acre or fraction of an acre.
$50.00 ($3,000.00 maximum)
2) Agricultural Land Clearing
a. Land Clearing Notification $250.00
b. Land Clearing Permit $250.00 each additional acre or fraction of an acre. $50.00 ($3,000.00
maximum)
GMD/P & R Operations rev 04/21/2011 Ilkw
Page 2
3) Landscape Tree Removal Fee $250
4) Environmental Impact Statement (EIS) $2,500.00 for 1 st submittal and 2nd submittal if applicable, 3rd
submittal $1,000.00, 4th and subsequent submittals $500.00 each
16A 2
5) Landscape Re-inspection 1 st $50.00, 2nd $75.00, every inspection afterward $100.00
6) Vehicle on the Beach Permit Application. $250.00 (Permit fee shall be waived for public and non-profit
organizations engaging in environmental activities for scientific, conservation or educational purposes).
7) Beach Nourishment Permits - $400
8) Special Treatment Review
a. First five acres or less. $400.00
b. Each additional acre, or fraction thereof. $50.00 ($5,000.00 Maximum)
c. n/a
9) Coastal Construction Setback Line (CCSL):
a. CCSL Permits $400.00
b. Variance - Petition. $1000.00
10) Sea Turtle Permit-
a. Sea Turtle Handling Permits. $25.00
b. Sea Turtle Nesting Area Construction Permit. $200.00
c. Sea Turtle Nest Relocation. $100.00
11 ) Vegetation Removal Permit
a. First acre or fraction of an acre less. $250.00
b. Each additional acre, or fraction thereof. $50.00 ($3,000.00 Maximum)
12) After-the-fact Environmental or Landscape Permits
a. CCSL Variance Petition. 2x normal fee
b. All other Environmental or Landscape Permits. 4x normal fee
13) Informal Wetland Jurisdictional determination for single family parcels up to 5 acres - $300.00
14) Conservation Easement review fee - $300.00 application fee plus the following additional site fee:
$200.00 for CE acres less than 5 acres; $400.00 for CE area between 5 acres and 10 acres; $600.00
for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between 20 and 50
acres; and an additional $200.00 for every 40 acres of CE area over 50 acres.
15) Listed or Protected Species review fee (when an EIS is not required) - $1000.00
D) EXCA V A nON PERMITS
1) Annual Renewal. $300.00
2) Application (Private). $400.00
3) Application (Commercial). $2,000.00
4) Application (Development). $400.00
5) $200.00 per inspection paid in advance for 12 months
6) Reapplication: $300.00 plus $200.00 per month inspection fee
7) Cubic Yardage Review Fee: $200.00 first 5000 cy, plus $10.00 per additional 1000 cy with a maximum of
$20,000.00
8) Time Extension. $150.00 plus $200.00 per month inspection fee
9) After-the-fact Excavation Permit. 4x application fee
10) Over excavation penalty fee per yard. Plus Permit/Review $0.05 per cubic yard fee, unless maximum
have been paid.
GMD/P & R Operations rev 0412]/20] 1/1kw
Page 3
E) FIRE CODE REVIEW FEES
1) Fire Code Review fees associated with each of the following processes:
16A 2
a. SDP - Site Development Plan
b. SDP A - Site Development Plan, Amendment
c. SDPI - Site Development Plan, Insubstantial
d. SIP - Site Improvement Plan
e. SIPI - Site Improvement Plan, Insubstantial
f. PSP - Preliminary Subdivision Plans
g. PSP A - Preliminary Subdivision Plans, Amendment
h. PPL - Plans & Plat, Subdivision
1. FP - Final Plat
J. CONSTR - Construction Plans, Subdivision/Utilities
k. ICP - Construction Plans, Insubstantial
l. DRl - Development of Regional Impact
m. DOA - Development Order, Amendment
n. PUDZ - Planned Unit Development, Rezone
o. PUDA - Planned Unit Development, Amendment
p. PDI - Planned Unit Development, Insubstantial
q. RZ - Rezone, Regular Zoning
r. CU - Conditional Use
F) SITE DEVELOPMENT PLANS
1) Site Development Plan Review (SDP). $5000.00
$200.00
$150.00
$100.00
$150.00
$100.00
$150.00
$100.00
$100.00
$100.00
$100.00
$100.00
$200.00
$150.00
$150.00
$150.00
$100.00
$100.00
$150.00
a. plus $40.00 per DIU
b. plus $100.00 per residential building structure
c. plus $.10 per square foot for non-residential except that structures designed exclusively for parking
(parking garages) shall be calculated at $.05 per square foot.
d. plus $200.00 per building for non-residential
e. Additional fees for 3rd review $1,000.00, 4th review $1,500.00, 5th review $2,000.00, 6th and subsequent
reviews $2,500.00
When a building consist of both residential and non-residential (commercial, retail, office) uses, the following
fees will apply.
a. $5000.00 base fee plus $40.00 per DIU
b. $200.00 per building for non-residential
c. plus $0.10 per square foot of non-residential floor area
d. Additional fees for 3rd review $1,000.00, 4th review $1,500.00, 5th review $2,000.00, 6th and
subsequent reviews $2,500.00
2) Pre-application fee. $500.00 (to be credited toward application fee submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staffs request will be held at no charge to the applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
3) Simultaneous Review Fee (planning review of simultaneous building permit applications) $100.00 per
building permit application.
4) Site Development Plan Insubstantial Change
a. Site Development Plan Insubstantial Change. $400.00 for first sheet, $100.00 for each and every
additional sheet submitted.
b. Site Development Plan Insubstantial Change for Public Utility System Accessory Uses. $500.00
for the first sheet, $125.00 for each and every additional sheet.
GMD/P & R Operations rev 04/2112011l1kw
Page 4
c.
Additional fees for 3rd review $1,000.00, 4th Review $1,500.00, 5th and subsequent review
$2,000.00
16A 2
5) Site Development Plan Conceptual Review (CSP), Unified Development Plan (UDP), Neighborhood Park Site
(NPSP) $750.00
6) Site Improvement Plan Review (SIP). $1000.00 (plus Engineering review fees)
7) Utility Plan Review & Inspection Fees-
a. Construction Document Review. 0.75% of probable water and/or sewer construction costs
b. Construction Inspection. 2.25% of probable water and/or sewer construction costs. Fifty percent of the
Inspection fee will be collected at time of application submittal. The remaining amount will be due at the
pre-construction meeting. No construction shall take place until the fee is paid in full. Fees are
considered to be non-refundable after payment is received unless otherwise determined by the Board of
County Commissioners.
c. Construction Document Resubmission or Document Modification, submit as insubstantial change.
$150.00 for first sheet, $75.00 for each additional sheet
8) Engineering Site Plan Review Fee
a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code
Minimum Landscaping, and any other appurtenant cost of construction
b. Construction Inspection 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum
Landscaping, and any other appurtenant cost of construction. Fifty percent of the Inspection fee will be
collected at time of application submittal. The remaining amount will be due at the pre-construction
meeting. No construction shall take place until the fee is paid in full. Fees are considered to be non-
refundable after payment is received unless otherwise determines by the Board of County Commissioners.
unless otherwise determined by the Board of County Commissioners.
9) Site Development Plan Amendment (SDP A) $2,500.00
a. Plus $40.00 per DIU plus $100.00 per residential building structure
b. plus $.10 per square foot
c. plus $200.00 per building for non-residential
d. Additional fees for 3rd review $1,000.00, 4th Review $1,500.00, 5th and subsequent review $2,000.00
10) SBR Fees
a. Pre-Acquisition Meeting $500.00 (no refunds or credits)
b. Pre-application fee. $500.00 (to be credited toward application fee upon submittal) (all normal pre-
application provisions apply)
c. SBR Fee $5000.00 with hourly reconciliation at project completion for hourly variation greater than 10%,
final project charges at $100.00 per hour for all associated staff hours
11) Violation of the conditions of approval of the SDP/SIP or installation of improvements, clearing, or other
land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP. 4x the SIP/SDP
application fee
12) Request for alternative architectural design $500.00, no separate or additional fee for appeals to, or requests
for assistance from, the Architectural Arbitration Board.
13) Site Development Plan Sheet change out (per GMD-P&R policy guidelines) $35.00 per page.
14) Town Home Site Plan Review - $6,000.00 base fee, additional fees for 3rd review $1,000.00, 4th review
$1,500.00, 5th review $2,000.00, 6th and subsequent review $2,500.00.
15) SDP Extension - $150.00
16) Post Take Site Plan - Base Fee $1,000.00, Resubmittal Fee $250.00 each submittal, $3,000.00 additional if
objection filed.
GMD/P & R Operations rev 04/21/2011/1kw
Page 5
G) SUBDIVISION
1) Lot Line Adjustment (LLA) and Lot Split Review $250.00
16 A 2
2) Subdivision Review Fees (PPL), (PPLA) -
a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code
Minimum Landscaping and any other appurtenant cost of construction
b. Subdivision Inspection Fee 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum
Landscaping, and any other appurtenant cost of construction. Fifty percent of the Inspection fee will be
collected at time of application submittal. The remaining amount will be due at the pre-construction
meeting. No construction shall take place until the fee is paid in full. Fees are considered to be non-
refundable after payment is received unless otherwise determined by the Board of County
Commissioners.
c. Construction Document Resubmission or Document Modification -Submit as Insubstantial Change
$400.00 for first sheet, $100.00 for each additional sheet
d. Subdivisions - 3rd and subsequent additional reviews - $500.00
e. Subdivisions - Substantial deviations from approval construction documents $500.00
3) Subdivision, Preliminary Plat (PSP)-
a. Petition Application $1000.00 plus $5.00 per acre (or fraction thereof) for residential, plus $10.00 per
acre (or fraction thereof) for non-residential; (mixed use is residential)
4) Subdivision Final Plat (FP) $1,000.00 plus $5.00 per acre (or fraction thereof) for residential, $1000.00 plus
$10.00 per acre (or fraction thereof) for nonresidential; (mixed use is residential)
5) Additional review of construction plans for phased construction of subdivision improvements. $1000.00 per
phase
6) Two-year Extension $150.00
7) Water and Sewer Facilities Construction Document Review 0.75% of probable water and/or sewer
construction costs
8) Construction Document Resubmission or Document Modification 0.25% of probable water and/or sewer
construction costs
a. 3rd and subsequent re-submitlals - $500.00
b. Water and Sewer Facilities Construction Inspection Fee 2.25% of probable water and/or sewer
construction costs. Fifty percent of the Inspection fee will be collected at time of application submittal.
The remaining amount will be due at the pre-construction meeting. No construction shall take place until
the fee is paid in full. Fees are considered to be non-refundable after payment is received unless
otherwise determined by the Board of County Commissioners.
9) Violation of the conditions of approval of approved construction plans or installation of improvements,
clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved
construction plans or permit. 4x the PPL, PPLA, PSP, CNSTR or Final Plat Review Fee (FP).
10) Administrative Amendment $250.00
H) ENGINEERING INSPECTION FEES
1) Engineering Inspection Fee $150.00 per set of required engineering inspections charged at time of building
permit issuance.
2) Re-inspection Fees: 151 re-inspection $75.00, 2nd re-inspection $100.00, 3rd and thereafter re-inspection
$125.00
GMD/P & R Operations rev 04/21/2011/1kw
Page 6
I) TEMPORARY USE PERMITS
1) Beach Events Permits-
a. Individual Permit $100.00
b. Block of 25 calendar days $2,250.00
c. Block of 50 calendar days $4,500.00
d. Block of75 calendar days $6,750.00
e. Block of 100 calendar days $9,000.00
f. Block of 125 calendar days $11,250.00
g. Block of 150 calendar days $13,500.00
16A 2
2) Temporary Use Permit Special Sales & Events. $200.00
3) Model Homes and Sales Centers $500.00
4) Construction and Development, Mobile home, Agricultural Zoning, and Temporary use for "Coming Soon"
sign $125.00
5) Residential and Non-Profit Garage and Yard Sale Permits No Charge
6) Temporary Use Amendment. $100.00
7) Renewals or extensions requested after the expiration date $200.00.
8) Temporary Use Permit for Special Events requiring BCC approval, including Circus and Carnival Permits.
$275.00
9) Political Signs (Bulk Temporary Permit) $5.00
10) Fees for Temporary Use permits issued After the Fact, ATF: 2x normal fee
J) WELL PERMITSIINSPECTIONS
l) Hydraulic elevator shaft permit $300.00
2) Test hole permit (including 1st six holes) $300.00, each additional hole $20.00
3) Well permit (abandonment) $50.00
4) Well permit (construction, repair, or combined construction and abandonment at one site) $300.00
5) Well permit (monitoring) $150.00
6) Well Permit (modification of monitor/test well to a production well) $75.00
7) Well Reinspections
a. First Reinspection $75.00
b. Second Reinspection $100.00
c. Third Reinspection $150.00
8) After the fact well permits 4x normal fee per violation.
NOTE: Multiple wells may be allowed on one permit, but each well must be accounted for and the appropriate fee
shall be charged for each well in accordance with the above listed schedule.
K) ZONINGILAND USE PETITIONS
l) Pre-application meeting fee $500.00 (to be credited toward application fee upon submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staffs request will be held at no charge to the applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
2) Alcoholic Beverage or Service Station Separation Requirement Waiver $1000.00
GMD/P & R Operations rev 04/2112011llkw
Page 7
3) Boat Dock Extension Petition $1,500.00 Boat Lift Canopy Administrative Review $500.00
4) Conditional Use Permit $4,000.00 when filled with Rezone Petition ($1,500.00) Additional fee for 5th and
subsequent reviews - 20% of original fee.
5) Conditional Use Monitoring Review: $750.00
6) Conditional Use Extension $3,000.00
7) DRI Review (In addition to cost of rezone) $10,000.00 plus $25.00 an acre (or fraction thereof) Additional fee
for 5th and subsequent reviews - 20% of original fee Amendments deemed to be minor in nature, that is
requiring minor strike thru and underline text amendments of no more than 10 different lines of text changes
in the DRI will be capped at $13,000.00. Any amendment which includes a map and text change will be
assessed the full fee (no cap).
8) DRI/DO Amendment $6,000.00 plus $25.00 per acre (or fraction thereof). The acreage charge does not apply
for amendments which only change the build-out date of the DO for a time period ofless than five years.
Additional fee for 5th and subsequent reviews - 20% of original fee.
a. DRI Extension - $100.00
9) DRIABN - DRI Abandonment $1,500.00
10) Flood Variance Petition $1000.00
11) Interim Agriculture Use Petition $350.00
12) Non-Conforming Use Change/Alteration $1,500.00
13) Parking Exemption $1,500.00. Additional fee for 5th and subsequent reviews - 20% of original fee.
14) Parking Reduction (Administrative) $500.00
15) Rezone Petition (POO to PUD): $8,000.00 plus $25.00 an acre (or fraction thereof) (Requires a submittal of a
new PUD document), additional fee for 5th and subsequent reviews - 20% of original fee (excludes minor
minor revisions as required by staff).
16) Property owner notifications: $1.50 non-certified mail, $3.00 certified return receipt mail (Petitioner to
pay this amount prior to advertisement of petition)
17) Planned Unit Development Amendments (PUD) $6,000.00 plus $25.00 an acre or fraction of an acre.
(Substantial changes to the text and Master Plan), Additional fee for 5th and subsequent reviews - 20%
of original fee. Text changes that do not impact the Master Plan $6,000.00 (the $25.00 an acre fee will not
apply. Amendments deemed to be minor in nature that is requiring minor strike thru and underline
amendments of no more than 10 different lines of text changes in the PUD will be capped at $9,000.00.
Any amendment which includes a map and text change will be assessed the full fee (no cap).
18) Planned Unit Development Amendment - Insubstantial (POI) $1,500.00 requires a hearing by the CCPC only
for a minor change to the POO Master Plan, POO Minor Change (PMC) $1,000.00 (Administrative Review
for minor change to the Master Plan)
19) Rezone Petition (Regular) $6,000.00 plus $25.00 an acre (or fraction thereof), Additional fee for 5th and
subsequent reviews - 20% of original fee.
20) Rezone Petition (to PUD) $10,000.00 plus $25.00 an acre (or fraction thereof), Additional fee for 5th and
subsequent reviews - 20% of original fee.
21) Street Name Change (Platted) $500.00 plus $1.50 for each property owner requiring notification of proposed
street name change
GMD/P & R Operations rev 04/21/2011/1kw
Page 8
22) Un-platted street name or project name change: $100.00 per application fee plus $50.00 per a
Partial hour of research required to process application, not to exceed $500.00
23) Variance petition: $2,000.00 residential, $5,000.00 non- residential, Additional fee for 5th and subsequent
Reviews - 20% of original fee.
24) Variance (Administrative) $1,000.00
25) Zoning Certificate: Residential: $50.00, Commercial: $125.00
26) PUD Extension - Sun Setting: $1000.00
27) Sign Variance Petition: $2000.00
28) Stewardship Receiving Area Petition (SRA): $7000.00 per SRA plus $25.00 per acre for. Stewardship
Sending Area Petition (SSA): $9,500.00, Stewardship Receiving Alternative Deviation Design (SRDD)
$500.00. SRA Amendments deemed to be minor in nature, that is requiring minor strike thru and
underline text amendments of no more than 10 different lines of text changes in the SRA will be capped
at $10,000.00.
29) After-the-Fact Zoning/Land Use Petitions 2x the normal petition fee
30) Land Use Petition Continuances Including Appeal of an Administrative Decision and Appeal to Board of
Zoning Appeals
a. Requested after petition has been advertised $500.00
b. Requested at the meeting $750.00
c. Resultant additional required advertising charged in addition to continuance fees.
31) PUD and SRA Monitoring (one-time charge at time of building permit pick -up)
a. $100.00 per dwelling unit for residential construction within a PUD and SRA ($3,000.00 maximum
fee per building permit application)
c. $0.12 per square foot for non-residential construction within a PUD and SRA ($3,000.00 maximum fee
per building permit application)
32) Any legal advertising required during any GMD-P&R activity or approval process will be charged in addition
to
stated fees, at actual costs. GMD-P&R reserves the right to charge an estimated amount with the initially
required
project fees, and will reconcile and adjust such charges against actual legal advertising recording billings
at the completion of the project.
33) Mixed Use Project (MUP) $2,500.00
a. Mixed Use Project Deviation $1,000.00
34) Amplified Sound Permit $300.00.
35) Planned Unit Development (PUD) closeout application and processing $2,500.00
36) Development of Regional Impact (DR!) closeout application and processing $10,000.00
L) MISCELLANEOUS
1) Reserved
2) Reserved
3) Official Zoning Atlas Map Sheet Publications, maps, and reports shall be copied at actual cost.
GMD/P & R Operations fev 04/211201 1I1kw
Page 9
4) The following fee shall be assessed for all Lien Search Requests and Payoff Requests: $25.00/per property
address.
5) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base
salary hourly rate of the staff member conducting the service for time in excess of 1 hour.
6) The fee for creating and designing special computer generated reports that are not a part of regular standard
reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member
conducting the service for time in excess of 1 hour.
7) CD Burning: $5.00
8) Complete sets of Official Zoning Atlas Map Sheets $100.00 per set.
9) Staff shall charge the following fees for duplication of public records:
a. $0.15 for each one sided photocopy of documents less than Ilx17 inches.
b. $0.20 for each two sided photocopy of documents less than l1x17 inches.
c. $1.00 for each certified copy of a public record.
10) Property Notification Address Listing:
a. MS Excel spreadsheet on Disc $70.00
b. Print out on Paper $75.00 + $0.05 for every record over 1500
c. Mailing Labels $80.00 + $0.06 for every record over 1500
d. Print out on Paper + Mailing Labels $85.00 + $0.11 for every record over 1500
11) Comprehensive Plan Consistency Review
a. CU's $300.00
b. Rezoning $750.00
c. PUD's or PUD Amendments: $2250.00
d. Letter of GMP consistency to outside agencies: $250
e. SRA - Stewardship Receiving Area - $2,250.00
f. DR! - Development of Regional Impact - $2,250.00
g. flAM - fiscal Impact Analysis - $4,000.00
12) Plan Review fee (for planning review of all building permit applications)
a. Permit Application - Complex (more than one trade): $125.00 per building permit application, 2nd review
50% of fee, 3rd and subsequent 25% of fee (2nd and subsequent review fees related to Zoning approvals
only)
b. Permit Application - Basic (no trade or one trade): $50.00 per building permit application, 2nd review
50% of fee, 3rd and subsequent 25% of fee (2nd and subsequent review fees related to Zoning approvals
only)
13) Project Meetings: Active applications under review for the following project types will be afforded one inter-
departmental meeting at no charge: Planned Unit Development re-zonings and Site Development Plan
applications (except for conceptual site plan approval and insubstantial change approval). Meeting requests
for all other application types and additional meetings will be subject to the following fees:
a. Meetings with Departmental Project Approval Staff member per applicant request, reviews and petitions
in progress, $150.00 per one hour minimum, $75.00 per 12 hour thereafter. Additional Department staff
attending meeting per applicant request $75.00 per 12 hour per staff member.
b. Inter-Departmental Project Meeting per applicant request, site plan reviews and land use petitions in
progress, $500.00 per one hour minimum, $250.00 per 12 hour thereafter.
14) Adequate Public Facilities
a. Planning Applications requiring COA process review (such as fP's, PPL's & SIP's, SDPs) $200.00 +
25.00 per residential dwelling unit or + 25.00 per 1000 sq ft commercial ($5000.00 maximum)
b. Building permit applications requiring COA process review not covered under l2.a above $100.00 per
building permit application.
GMD/P & R Operations rev 04/2112011l1kw
Page 10
15) Zoning Confirmation Letters
a. Standard Response $100.00 (includes up to 1 hour research)
b. Extended Research $100.00 per hour (any response with research in excess of 1 hour)
16 A 2
16) N/A
17) CDD
a. Community Development District $15,000.00
b. Chapter 189 Special District, Independent or Dependent, $15,000.00
18) GMP Amendment
a. Small Scale $9000.00
b. General $16,700.00
c. Legal advertising in addition to sub-sections a and b fees, and subject to applicable fee schedule
provIsIOns.
d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions:
$250
e. n/a
19) Application for issuance TDR, $250 (non-refundable); plus $25 per TDR issued and recorded (total fees not to
exceed $2,750.00)
20) Engineering Services
a. Vacation of Easements: $2,000
21) Building Board of Adjustments and Appeals $250.00
22) Early Work Authorization (EW A) permit: $500.00 (does not include site clearing fee).
23) Legal Non-conforming Lot (LNC) $100.00
24) Vested Rights Determination (VRD) $1,500.00
25) Time Extension $150.00
M) BUILDING PERMIT REVIEW AND INSPECTION FEES
1) Minimum fee of$110.00 for each of the following: plumbing, mechanical (A/C), electrical and structural.
Minimum fee for all other applications - $110.00.
2) Review fees are to be paid at the time of application, and are non-refundable. Estimated inspection fees to
be paid at the time of permit issuance, and will be reconciled to the actual number of inspection performed
(refunds issued if estimated inspections exceed actual, additional payment required prior to the CO issuance
if actual inspections exceed estimated).
3) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any
fee adjustments necessary. Exterior shell and interior construction are separate reviews for commercial
construction, whether permitted simultaneously or under separate shell and build out permits.
4) Exemptions for minor repairs residential. The following permit exemptions have been established for Collier
County based on Section 102.2.5 (3) of the Florida Building Code and Section 553.80(3)(c), Florida Statutes.
Permit exemption is for owners of single family detached residences performing work on single family
properties. All work performed shall comply with the standards of the Florida Building Code Residential.
A) Electrical: Repair work performed by a licensed electrical contractor that does not exceed $1,500.00 in
value of materials and labor.
GMO/P & R Operations rev 04121120 IlIlkw
Page II
B) Plumbing: Repair/replace work performed by licensed plumbing contractors that does not exceed
$1,500.00 in value of materials and labor.
C) Mechanical: Repair work performed by licensed mechanical contractors that does not exceed $1,500.00 in
cost for parts and labor.
D) Building:
a. Repair work performed by licensed contractors per Florida Statute 489 that is not structural in nature and
does not change the occupancy, does not affect life safety and the value of which does not exceed
$1,500.00 in labor and materials.
b. The repair of any roof covering not exceeding $1,500.00 in value of materials and labor or work not
exceeding two roofing squares (200 sq. ft.) in extent.
5) The building permit fee shall be considered the addition of all individual trade plan review fees involved in
the process plus the inspection fees.
N) STRUCTURAL PERMIT FEES
1) The fee for a structural permit shall be computed as follows: Such fees shall be either based on the contractor's
valuations of construction cost or based on square footage. Minimal accepted calculated costs of construction
are set forth on the attached Building Valuation Data Table - ICC Building Valuation Data Table, produced
February, 2007. Valuation of construction costs ofless than $750.00 - No permit or fee is required, but
construction must comply with all County Codes and Ordinances. If inspections are required by the Building
Official or requested by the applicant, the appropriate fees shall be paid.
EXCEPTION: All work involving structural components and/or fire rated assemblies requiring permits and
inspections regardless of construction cost, signs must secure permits as stated in Collier
County Code of Laws and Ordinances - Chapter 22 Building and Building Regulations.
a. Valuation of construction costs up to $4,999.99 - $50.00 plus $60.00 application per inspection as
required.
b. New construction review fee of $0.055 per square foot total area for valuation of construction costs
$5,000 or over.
c. Alternative Minimum Review Fee: all construction under 500 square feet with valuation in excess of
$100,000, and all construction three floors or over in height, $333.00 plus $3.00 per thousand dollars of
building valuation in excess of $50,000 plus $60.00 per inspection.
0) ELECTRICAL PERMIT FEES
1) The fees for electrical permits for new structures or placement or relocation of structures shall be computed as
follows:
a. New construction review fee of $0.055 per square foot total area
b. Alternative Minimum Review Fee:
i. $0.40 per ampere rating of all single-phase panel boards.
ii. $0.15 per ampere rating for switch or circuit whichever is greater, if item
#1 above does not apply.
iii. When not a complete installation, all switch and circuit breakers ahead of
panel boards shall be computed at $0.15 per ampere.
iv. Permit fees for any change in electrical installation shall be computed at
the above rates for that portion of new and/or increased fees in existing
electrical facilities.
v. The minimum for any electrical permit shall be $110.00 per unit or tenant
space
GMD/P & R Operations rev 04/21/20111lkw
Page 12
vi. Fifty percent (50%) in additional fee costs shall be added to all above fees
for three phase installations.
16A 2
P) PLUMBING PERMIT FEES
1) The following fee calculations shall be applied separately when the permit
involves mixed occupancies.
a. Residential occupancies: The fee for a plumbing permit shall be computed at the rate of $0.055 per square
foot total area to be charged for each living unit with one to three bathrooms with a minimum of $110.00.
An additional fee of $10.00 will be assessed for each additional bathroom
b. Nonresidential occupancies: The fee for a plumbing permit shall be computed by the following methods,
whichever is calculated to be the greatest fee:
1. The rate of $0.055 per square foot total area with a minimum of $11 0.00; or
2. Institutional facilities, hospitals, schools, restaurants and repairs in any occupancy classification shall
be charged at the rate of $1.00 per fixture unit or
3. Minimum of$110.00 for each occupancy or tenant space.
2) Grease traps: An additional fee of$50.00 shall be assessed for each grease trap.
3) The cost for retrofit piping shall be computed at the minimum fee of$50.00
per floor for each main riser.
4) The cost of a permit for lawn sprinkler systems shall be computed using the dollar valuation as shown under
Section M of this Resolution.
5) The minimum plumbing permit fee shall be $110.00.
Q) MECHANICAL PERMIT FEES
1) The following fee calculations shall be applied separately when the permit involves mixed occupancies.
a. Residential occupancies: The mechanical permit fees shall be computed at the rate of$0.055 per square
foot total area to be charged for each living unit up to three tons of air conditioning. Each additional ton
or part thereof shall be $3.00 per ton.
b. Nonresidential occupancies: The mechanical permit fees shall be computed by one of the following
methods, whichever is calculated to be the greatest fee: The rate of $0.055 per square foot total area to be
charged for the first three tons or three horsepower of air conditioning or other mechanical systems per
tenant space, each additional ton of air conditioning or horsepower shall be $3.00.
2) The cost of retrofit piping shall be computed at the minimum fee of$50.00 per floor for each cooling tower, or
$50.00 for the first 3 horsepower and $3.00 for each additional horsepower, whichever is greater.
3) The minimum mechanical permit fee shall be $110.00.
4) A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the
minimum fee whichever is greater.
R) FIRE PREVENTION AND CONTROL PERMIT FEES
1) The fees and exemptions set forth in the "Exhibit B" affixed hereto and made a part of this Schedule of
Development Review and Building Permit Fees shall apply to Fire Prevention and Control Permits for both
the independent and dependent fire districts.
S) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES
1) The permit fee shall be $50.00 to set-up a single-wide trailer or mobile home on an approved site plus
electrical, plumbing, mechanical, inspection and fire protection fees as applicable.
GMD/P & R Operations rev 04/21/20 11Ilkw
Page 13
2) The permit fee shall be $75.00 to set-up a double wide or larger mobile homes on an approved site plus
electrical, plumbing, mechanical, inspection and fire protection fees as applicable.
T) CHICKEES AND SIMILAR STRUCTURES
1) The permit fee will be based upon a calculated cost of construction of $4.00 per square foot under roof or the
contractor's estimated cost of construction, whichever is greater. The fee will then be calculated in accordance
with Section N of this Resolution. Additional permit fees for electric, plumbing, mechanical, inspections, fire,
etc., will be charged when applicable.
U) POOL OR SPA PERMIT FEES
1) F or construction of each public pool or spa the fee shall be -
a. Valuation of construction costs of up to $4,999.99. $100.00
b. Valuation of construction costs of $5000.00 through $49,999.99: $80.00 plus $7.00 per thousand dollars,
or fraction thereof, of building valuation in excess of $2,000.00.
c. Valuation of construction costs of $50,000.00 through $1,000,000.00: $333.00 plus $3.00 per thousand
dollars, or fraction thereof, of building valuation in excess of $50,000.00.
d. Valuation of construction costs over $1,000,000.00: $3,474.00 plus $3.00 per thousand dollars, or fraction
thereof, of building valuation in excess of$l,OOO,OOO.OO.
2) For construction of each private pool or spa the fee shall be: $50.00 application plus $60.00 per inspection as
required.
V) SCREEN ENCLOSURE PERMIT & PAN ROOF FEES
1) N/A
2) The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution.
W) SIGN PERMIT FEES
1) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical
Permit Fees outlined in this document, the Collier County Development Fee Schedule. The minimum
building permit fee for sign shall be $110.00.
2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit,
however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the
above subsection 1 of Sign Permit Fees.
X) CONVENIENCE PERMIT FEES
1) Convenience permits are issued in blocks of 10 each. Only licensed contractors are eligible to purchase
convenience permits are limited to the use specified on the permit. The fee for a book of 10 convenience
permits is $750.00 (1 inspection only)
Y) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS
I) PERMIT AND PLAN REVISIONS The fee for each permit revision submitted after permit issuance shall be
calculated using fee schedules outlined in Sections N through R above. The minimum permit fee for revisions
to permitted projects shall be $50.00.
2) AS BUILT PLANS The fee for "As Built" plan review shall be ten (10%) percent of the original building
permit fee or $150.00, whichever is greater, but shall not exceed $500.00. The fee is intended to cover the cost
of reviewing amended building plans in the office to determine that change orders and various field changes
are in compliance with the minimum construction and fire codes of Collier County. The following are required
for as-built drawings review:
a. An itemized list of all changes made after permit plan approval.
GMD/P & R Operations rev 04/21/2011/1kw
Page 14
b. As-built plans that have all changes made after permit plan approval "clouded".
c. As-built plans and changes shall be signed and sealed by the engineer and/or architect of record.
3) CORRECTIONS TO PLANS
a. First Correction to Plans. No charge
b. Second Correction to Plans. $75.00
c. Third & subsequent correction to plans. $100.00
Z) PERMIT EXTENSION
I) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or $100.00,
whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing
existing or amended building plans to determine and verify code compliance
AA) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES
1) The permit fee shall be $25.00 application for the demolition of any building or structure; plus $60.00 per
inspection as required.
BB) PRE-MOVING INSPECTION FEES
1) The fee shall be $150.00 for the pre-moving inspection of any building or structure.
CC) INSPECTION FEES
1) A charge of $60.00 per inspection shall be assessed for inspections for which a permit is not necessary.
2) A user fee of $120.00 shall be assessed for all inspections on a time specified basis.
3) All required and partial inspections: $60.00 per inspection.
DD) REINSPECTION FEES
1) Re-inspections for any type of building permit, or required Engineering re-inspections, shall result in an
additional fee of $75.00 per reinspection.
EE) FAILURE TO OBTAIN A PERMIT
1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where such action was cited by Code Enforcement or by Contractor Licensing and resulted in a finding of
violation from either the Code Enforcement Board, the Special Magistrate, or the Contractor Licensing Board,
the fees herein specified shall be 2x the regular fee, as defined in this fee schedule, unless otherwise directed
by the Board of County Commissioners.
2) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where a contractor or agent/provider where the building official or zoning official or hislher designee, (for
cases involving land use development) deems that the contractor/provider should have known that a permit
was required but voluntary seeks compliance by obtaining the necessary permits to abate the violation, the
fees herein specified shall be 2x the regular fee, as defined in this fee schedule.
3) Where work for which a permit is required is started or proceeded with prior to obtaining said permit, and
where the unpermitted work mayor may not have been completed by the property owner, and where the
current owner seeks voluntary compliance by obtaining said permit to assure compliance with all applicable
codes, the fees will be assessed at the regular rate as defined in this fee schedule.
4) The payment of such fee shall not relieve any person from fully complying with the requirements of any
applicable construction code or ordinance in the execution of the work, or from any penalty prescribed within
any construction code, law or ordinance of Collier County.
5) The fees within section EE shall not be applicable for the re-issuance of any rmssmg permit, rmssmg
certificate of occupancy, or missing certificate of completion that was presumed to be issued prior to April 1,
1997, upon the verification of such items presented by the property owner, or hislher designee, to the building
official, or his/her designee; but shall be applicable for all reviews requiring inspection, review of plans, and
GMD/P & R Operations rev 04/21/2011/1kw
Page 15
all other applicable fees associated with the issuance of said permit(s), certificate of occupancy, or certificate
of completion, as determined by the building official, or hislher designee, in addition to the zoning director, or
his/her designee (for cases involving land use development), as defined within this fee schedule.
FF) LICENSING
1) The fee for licensing items is as follows:
a. Letters of Reciprocity. $55.00
b. Contractors Change of Status. (active to dormant) $10.00
c. Voluntary Registration of State Certified Contractors $45.00
d. Pictures. $2.00
e. Laminating $1.00 (per license)
f. Pee for a 6 month temporary contractor's license $55.00
g. Certified copies of Experience letters $35.00
h. Duplicate or replacement (of Competency cards) $25.00
1. Second entity application fee $105.00
2) Certificated of Competency (Annual)
a. Contractor
Initial License Pee
Renewal Fee
b. Specialty Contractor
Initial License Fee
Renewal Pee
c. Journeyman
Initial License Pee
Renewal Pee
$230.00
$145.00
$205.00
$125.00
$ 80.00
$ 55.00
3) Dormant Certificates of Competency (Annual)
a. Contractor $130.00
b. Specialty Contractor $130.00
c. Penalty fees after 9/30 $ 20.00 per month until 12/31
4) Reinstatement of Delinquent License
a. Contractor
b. Specialty Contractor
c. Journeyman
d. Examination Administrative Pee
$230.00 plus back years
$205.00 plus back years
$ 80.00 plus back years
$130.00 good for 6 months
GG) DUPLICATE PERMIT CARDS
1) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason.
HH) CHANGE OF CONTRACTOR OR SUBCONTRACTORS
I) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $50.00.
This fee includes the issuance of a new permit card.
II) PERMIT FEE REFUNDS
A) Building Permit Review Standards apply to all internal GMD-P&R reviews for building permit applications
with previously approved site plans, including all required trade reviews, along with any required Zoning,
Engineering and Impact Pee reviews. Reviews external to GMD P&R, such as a Pire, are excluded. The
performance standard time frame begins upon submission of the application, and runs until either issuance
of a comment letter or at approval. Review standard guarantees require the submission of a sufficient number
of plan sets (to be determined by the Building Department) to accommodate parallel trade reviews.
GMD/P & R Operations rev 04/21/2011/1kw
Page 16
1) New Residential construction reviews will be completed within 5 business days (iflonger than 5 business days
50% of review fee refunded).
2) New Commercial construction reviews will be completed within 15 business days (iflonger than 15 business
days 50% of review fee refunded).
3) Alterations, Additions and Minor Permits:
a) Residential permit application reviews will be completed within 5 business days (if longer than 5 business
days 50% of review fee refunded).
b) Commercial permit applications requiring only a single trade review and will be completed within 5
business days (iflonger than 5 business days 50% of review fee refunded).
c) Commercial permit applications requiring only 2 or 3 trade reviews will be completed within 10 business
days (iflonger than 10 business days 50% of inspection fee refunded).
B) Annual Fee Adjustments
1) Proposed Annual Fee adjustments for Building Department fees shall equal the average personnel cost change
(COLA plus average merit) approved by the BCC as part of that fiscal year's budget, adjusted for any change
in staffing levels.
2) Annual fee adjustments will become effective on Ian 1 of each fiscal year if approved.
3) Annual fee adjustments require full review and recommendation to the BCC from the Development Services
Advisory Committee. Annual fee adjustments also require full BCC approval.
4) Annual fee adjustments require Building Fund total reserves to be less than 6 months of the Building Fund
operating budget for that fiscal year. Ifreserves exceed six months of budgeted operating expenses, no
annual adjustment can be requested.
C) Special Fee Adjustment
1) If Building Fund total reserves are projected to exceed six months of operating expenses in the proposed
budget of any upcoming fiscal year, fees will be lowered in sufficient amount to insure Building Fund
reserves remain under six months of budgeted expenses.
2) If Building Fund total reserves are projected to fall below three months of operating expenses in the
proposed budget of any upcoming fiscal year, a special fee increase in sufficient amount to insure Building
Fund total reserves remain over three months of budgeted expenses will be proposed for full Development
Services Advisory Committee review and BCC approval.
3) Six months following any fee adjustment, other than annual increases, a full review of resulting revenue will
be presented for the review of the Development Services Advisory Committee. The committee can make a
recommendation to the BCC to lower fees if revenue exceeds either revenue projections used in fee
adjustment calculations or targeted reserve levels.
D) Estimated inspection fees to be paid at the time of permit issuance, and will be reconciled to the actual
number of inspections performed (refunds issued if estimated inspections exceed actual, additional payment
required prior to the CO issuance if actual inspections exceed estimated).
JJ) RECORD RETRIEVAL
1) No charge for normal retrieving of records from inactive or remote storage including microfilmed documents.
2) Next day expedited retrieval of records from inactive or remote storage: $75.00
KK) COPY FEES
1) The fee for blueprint and miscellaneous copying shall be as follows:
GMO/P & R Operations rev 04/21/2011/1kw
Page 17
a. Microfilm copies, of documents less than l1x17 inches: $0.15 other sizes at cost ofproducti
b. Microfilm or Blueprint copies:
18 X 24 $1.25 per page
30 X 36 $2.50 per page
30 X 42 $3.25 per page
34 X 44 $5.00 per page
c. Growth ManagementIPlanning & Regulation self-service copier, public access and not related to public
record retrieval or public record copies: documents less than l4x8.5 inches $0.15 per page inclusive of
sales tax.
LL)RESEARCH
1) The fee for researching records, ordinances, and codes shall be at no charge for the fIrst hour, then at the base
salary hourly rate of the staff member conducting the service for time in excess of 1 hour
2) The fee for creating and designing special computer generated reports that are not part of the regular standard
reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member
conducting the service for time in excess of 1 hour.
MM) SUBSCRIPTION SERVICE
The fee for one-year subscription service to be mailed quarterly shall be $15.00 per year. The subscription
year is from Oct. 1 through Sept. 30.
NN) RESERVED
00) PROPERTY INSPECTIONS
1) Property Inspection
a. Property Inspection - $200.00 per unit
b. Re-inspection Fee - $50.00 per re-inspection per unit.
c. Initial Registration Fee through 2009 rental registration period - $30.00 per property.
d. Annual Renewal - $20.00/per property through 2009 rental registration period.
e. Annual Late Fee - $10.00/ per day per property up to a maximum of$80.00 through 2009
rental registration period.
f. The term "property" means a parcel or contiguous parcels with any number of rentals located
thereupon under common ownership and/or management.
PP) CERTIFICATE TO BOARD BUILDING
1) Initial Boarding CertifIcate - $0
2) Boarding Certificate Extension - $150
QQ) ADDITIONAL FEE REFUND PROVISIONS
1) Requests for fee waivers may only be approved by the Board of County Commissioners. Waiver requests for
development review and building permit fees shall be submitted in writing directly to the appropriate
Community Development & Environmental Services Division Staff, who will prepare an executive summary
for consideration by the Board. Such requests shall include a statement indicating the reason for the fee
waiver request and, if applicable, the nature of the organization requesting the fee waiver.
RR) REFUND PROVISIONS
1 ) PAYMENT OF FEES: Full payment of fees is required for a complete application. Department policy
requires full payment of fees at the time of application submittal. No work will begin on staff review of the
application until all fees are paid in full. If full payment of fees is not received within 14 calendar days of
application submittal, the application will be considered void. At this point, a new application and full
payment of fees will be required to proceed with a project.
GMD/P & R Operations rev 04/2 1120 IlIlkw
Page 18
2) There will be no refund of Planning, Environmental, or Engineering related fees, except those applications
which have been deemed not sufficient for staff review or inspection and withdrawn by the applicant. The
applicant may, within 4 years of payment apply for a refund for only those staff review or inspection services
that were not performed. Failure to make timely application for a refund shall waive any right to a refund.
16
The application for a refund shall be filed with the County Manager of hislher designee and shall contain the
following:
a. The name and address of the applicant;
b. The location of the property upon which the development was proposed;
c. The date the specified fee was paid;
d. A copy of receipt of payment; and
e. Payment of a non-refundable "refund processing fee" equal to one percent (1 %) of the refund requested,
except that the minimum processing fee shall be $25.00 and the maximum processing fee will not exceed
$250.00.
Refund requests totaling $25,000.00 or more cannot be approved administratively and must be submitted to
the Board of County Commissioners for approval.
3) In no cases will there be refunds for pre-application fees, data conversion fees, appeals of administrative
decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment.
4) If staff error causes the inappropriate or unnecessary filing of an application and payment of fees, 100 percent
of all inappropriate fees, shall be refunded upon written request and with the concurrence of Department
management.
SS) ADDITIONAL FEE PROVISIONS
1) In those cases where alternative methods or timing of payments for GMD-P&R services and / or fees listed in
this schedule associated with SBR reviews are deemed to best serve the public good, the Growth Management
Division Administrator will have the authority to approve such alternatives. Such alternative must be in
writing and signed by all principals involved. In no case shall final C.O. or such certifications of project
completeness be issued until payments due GMD-P&R are received in full.
2) All hourly fees are computed and charged from actual Divisional time tracking records.
3) All acreage totals used in fee calculations will be rounded up to the nearest whole acre.
4) When deemed essential for project review or approval, there will be no additional charge for any meetings
requested by GMD-P&R staff.
TT) PUBLIC VEHICLE FOR HIRE FEES
1) The following fees shall be assessed for the Public Vehicle for Hire Program: (In the event that the
background check fee charged to the county exceeds the minimum fee established by the county,
the applicant(s) shall be responsible for the actual cost of the search).
a. Initial Application fee (new Companies) - $200
b. Initial Certificate to Operate (Feb l-Jan 31) - $325.00
c. Annual Certificate to Operate Renewal - $325.00
d. Late Fee for CTO Renewal- $200.00
e. Sub-Certificate Application Fee (New Companies) - $100.00
f. Sub-Certificate - $162.50
g. Annual Sub-Certificate renewal- $162.50
h. Late Fee for Sub-Certificate Renewal- $100.00
1. Vehicle Decal - $50.00
J. Temporary Vehicle Decal- $5.00 per vehicle/per day
k. Temporary Vehicle Decal (In case of inoperable decaled vehicle) - $5.00/per vehicle
GMD/P & R Operations rev 04121/20 11/1kw
Page 19
I. Driver Identification Card (Initial/Renewal) - $75.00 per driver
m. 2nd Driver Identification Card - $25.00
n. Replacement Driver ID - $10.00
o. On-site Vehicle Permitting - $15.00 per vehicle
16A 2
UU)"P A YMENT IN LIEU OF" FEE FOR P A THW A YS (SIDEWALKS, AND BIKE LANES)
1) Calculated using the current Florida Department of Transportation (FDOT) construction costs or an
engineering estimate not to exceed twenty-five percent (25%) of the submitted application request's total
project cost.
VV) OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS
1) Optional expedited building permit plan review fee shall be 30% of the building permit fee (additional to full
building permit fees) with a minimum fee of $50.00
a. Participation in the optional expedited review program is subject to limited availability, applications will
be accepted on a first come first served basis.
b. Review completion times are guaranteed to equal, or be less than, one half of the normal advertised
completion timeframes. Should the expedited review exceed this guaranteed completion time, the 30%
optional expedited building permit review fee will be refunded to the applicant, and all normal permit fees
will apply. Such guarantee and refund provisions shall apply to reviews, and do not infer or relate to
approvals.
c. Optional expedited building permit review fees shall be due at the time of building permit application
submission.
d. Any required re-submissions of permit applications' leading to re-reviews, when due to applicant
insufficiencies, shall be subject to additional optional expedited building permit plan review fees if an
additional expedited review is requested by the applicant for the re-review, and shall be calculated against
re-submission charges.
WW) FENCES
1) $50.00 application fee plus $50.00 per inspection as required.
XX) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY
1) $250.00 for commercial, over 30,000 sq. ft $500.00.
2) $100.00 for residential
This is the last page of the GMD-P&R Fee Schedule
Page 20
GMD/P & R Operations rev 04/21/20 11/1kw