Backup Documents 06/14-15/2011 Item #16A 1[PRINTER TABLE command: COURIER]
ITEM NO. :
16 A 1
.
DATE RECEIVED:
FILE NO. :
ROlITED TO:
DO NOT WRITE ABOVE THIS LINE (orig. 9/89)
REQUEST FOR LEGAL SERVICES
Date: October 28,2011
AR- 7597
To: Office of the County Attorney, Attention: StCl... Williams
~-
~~12-
\013'\\\
c.. \ c... ~ c:, w C. (1\ C\
5., O(f"- c>- Jlftr
~.
From: John R. Houldsworth, Senior Engineer
Development Services, Engineering Review
Re: Bucks Run Preserve
. ~
BACKGROUND OF REQUESTIPROBLEM:
Please review attachedCqqstruction & Maintenance Agreement for legal sufficiency.
.~:~~.'..~ . ~-.:
(Are there documents or other information needed to review this matter?)
This item has not been previously submitt'ed.
(If previously submitted provide County Attorney's Office file no.)
..pp. i) ccvV\
'\.f\ "'" f"'~ - . ~ wI
fVV'?r ~ 4
ACTION REQUESTED: Review, execute if found to be sufficient and forward to BCC office ~ ~
for Chair's signature, 'V ~7~ f,oA.L V4Y . RL~.
- ---
t" /Yt)l .
~' ;
---:t'
WTHER COMMENTS:
,
:....
J
16 A 1
.1
CONSTRUCTION AND MAINTENANCE AGREEMENT
FOR SUBDIVISION IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS entered into this .te 1"'day of ~f 2011, between BRLP Lots, LLC
hereinafter referred to as "Developer," and the Board of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board".
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the
approval by the Board of a certain plat of a subdivision to be known as: Bucks Run Reserve.
B. Chapters 4 and 10 of the Collier County Land Development Code requires the Developer
to post appropriate guarantees for the construction of the improvements required by said
subdivision regulations, said guarantees to be incorporated in a bonded agreement for the
construction of the required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants
hereinafter set forth, Developer and the Board do hereby covenant and agree as follows:
1. Developer will cause to be constructed: Road, water, sewer and drainage for
Bucks Run Reserve within twenty four (24) months from the date of approval said subdivision
plat, said improvements hereinafter referred to as the required improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto
as Exhibit "A" and by reference made a part hereof) in the amount of $196,086.79 which amount
represents 10% of the total contract cost to complete construction plus 100% of the estimate cost
of to complete the required improvements at the date of this Agreement.
3. In the event of default by the Developer or failure of the Developer to complete
such improvements within the time required by the Land Development Code, Collier County
may call upon the subdivision performance security to insure satisfactory completion of the
required improvements.
4. The required improvements shall not be considered complete until a statement of
substantial completion by Developer's engineer along with the final project records have been
furnished to be reviewed and approved by the County Manager or his designee for compliance
with the Collier County Land Development Code.
Page 1 of3
16 A 1
5. The County Manager or his designee shall, within sixty (60) days of receipt of the
statement of substantial completion, either: a) notify the Developer in writing of his preliminary
approval of the improvements; or b) notify the Developer in writing of his refusal to approve
improvements, therewith specifying those conditions which the Developer must fulfill in order to
obtain the County Manager's approval of the improvements. However, in no event shall the
County Manager or his designee refuse preliminary approval of the improvements if they are in
fact constructed and submitted for approval in accordance with the requirements of this
Agreement.
6. The Developer shall maintain all required improvements for a minimum period of
one year after preliminary approval by the County Manager or his designee. After the one year
maintenance period by the Developer has terminated, the Developer shall petition the County
Manager or his designee to inspect the required improvements. The County Manager or his
designee shall inspect the improvements and, if found to be still in compliance with the Collier
County Land Development Code as reflected by final approval by the Board, the Board shall
release the remaining 10% of the subdivision performance security. The Developer's
responsibility for maintenance of the required improvements shall continue unless or until the
Board accepts maintenance responsibility for and by the County.
7. Six (6) months after the execution of this Agreement and once within every six
(6) months thereafter the Developer may request the County Manager or his designee to reduce
the dollar amount of the subdivision performance security on the basis of work complete. Each
request for a reduction in the dollar amount of the subdivision performance security shall be
accompanied by a statement of substantial completion by the Developer's engineer together with
the project records necessary for review by the County Manager or his designee. The County
Manager or his designee may grant the request for a reduction in the amount of the subdivision
performance security for the improvements completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this
Agreement, upon certification of such failure, the County Manager or his designee may call upon
the subdivision performance security to secure satisfactory completion, repair and maintenance
of the required improvements. The Board shall have the right to construct and maintain, or cause
to be constructed or maintained, pursuant to public advertisement and receipt and acceptance of
bids, the improvements required herein. The Developer, as principal under the subdivision
Page 2 of3
/
16 A 1
.,~
performance security, shall be liable to pay and to indemnify the Board, upon completion of such
construction, the final total cost to the Board thereof, including, but not limited to, engineering,
legal and contingent costs, together with any damages, either direct or consequential, which the
Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this
Agreement.
9. All of the terms, covenants and conditions herein contained are and shall be
binding upon the Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to
be executed by their duly authorized representatives this ~ day ofSipteffl6er 2011.
- t>>bbc.,.-
SIGNED IN THE PRESENCE OF:
(BRLP Lots, LLC)
~~~
Qk.-lv' ~ _
Print Name: . . . ..IY\Ctt.-+ndS~
B~-~
",,""""J '.
. ".M'c"/}(:J"..
ATTES!: "....~~::. ........~C"
DWIGHT Jt,]3R:OGI<;., Ol~".,
.. g;;~t{;}S;t ') ~-.
" .. ..' .. . .. C
.. ': J." .. .... _, ~,
,~ilerk
BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA
By; NW.~
Fred W. Coyle, Chairm
By:
'.
Approved as to fonD
and legal sufficiency:
. Jdf,,,y A. Kla~~~ rC.~
Assistant County Attorney
~ . yJ"",,, ~ "' t..
Approved Form -JAK - February 2006
Page 3 of3
16 A 1
4
II GradyMinor
Civil Engineers · Land Surveyors · Planners . Landscape Architects
CONSTRUCTION MAINTENANCE AND COST TO
COMPLETE BOND AMOUNT SUMMARY
BUCKS RUN RESERVE
September 19,2011
Revised October 27,2011
Original 40 Lot Infrastructure
Construction Cost
$ 542,281.25
Cost to Adjust Infrastructure
To support 60 lots
$ 455.463.66
$ 997,744.91
Total Construction Costs
10% Maintenance bond
$ 99,774.49
Cost to Complete
$ 96,312.30
Bond amount required to record plat
(10% maintenance bond plus
cost to complete)
$ 196,086.79
Q. Grady Minor & Associates. P.A.
3800 Via Del Rey ,
Bonita SprHi't!~~flE'gJllp8iJ-no6DP\Plat RecordinglBond Costs R VSD 10-27-11.doc
Ph. 239-947-1144 · Fx: 239-947-0375
EB 0005151 · LB 0005151 . LC 26000266
www.gradyminor.com
(Bond Purposes)
ORIGINAL INFRASTRUCTURE
BUCKS RUN RESERVE
SUMMARY
SCHEDULE "A"
SCHEDULE "8"
SCHEDULE "C"
Site Work
Drainage System
Sanitary Sewage Collection System
SCHEDULE"D"
Water Distribution System
SCHEDULE "E"
Roadway Construction
G:\PROJ-ENG\B\BRPL 1\06DPlPlal Recording\[Original EOPC.xls]Paving
16 A 1
.,
$38,402.50
$207,756.75
$133,468.00
$78,4] 0.00
$84,244.00
TOTAL
$542,281.25
16 A 1
"'l
(Bond Purposes)
ORIGINAL INFRASTRUcrURE
BUCKS RUN RESERVE
SCHEDULE "A"
SITE WORK
DESCRIPTION
I QUANTlTyl UNIT I UNIT COST I TOTAL
A-I Clearing and Grubbing (I)
10.2 AC $0.00 $0.00
6.2 AC $5,250.00 $32,602.50
21,383 CY $0.00 $0.00
21,838 CY $0,00 SO.OO
69,172 CY $0,00 $0,00
2,900 SY $2.00 $5,800.00
17,220 LF $0.00 $0,00
A-2 Clearing and Grubbing (Exotics Removal)
A-3 Lake Excavation (includes blasting and rock crushing) (1)
A.4 Fill Placement and Grading (1)
A.S Imported Fill Placed and Graded (1)
A.6 Sod (lake banks)
A.7 Erosion Control-Silt Fence (2)
Site Work Sub-Total
538,402.50
EARTHWORK NOTES:
(1) Bonded under excaavation or not applicable to bond.
(2) Included in completion estimate.
G:IPROJ-ENG\B\BRPL Tl06DPIPlat Recording\[Original EOPC,xls]Paving
16 A 1
'"1
(Bond Purposes)
BUCKS RUN RESERVE
SCHEDULE "B"
DRAINAGE SYSTEM
DESCRIPTION
Bo] Control Structure
B-2 15" RCP (I)
B-3 18" RCP
B-4 24" RCP (1)
B-5 30" RCP
B-6 36" RCP
B-7 12" HOPE (I)
B-8 24" Flared End Section (1)
B-9 36" F]ared End Section
3 EA $2,450.00 $7,350,00
170 LF $24.50 $4,165.00
385 LF $30.00 $11,550.00
309 LF $44.00 $13,596.00
405 LF $60.00 $24,300.00
1,003 LF $87,25 $87,5] 1.75
1,000 LF $15.25 $15,250.00
I EA $1,982.00 $1,982.00
2 EA $2,706.00 $5,412,00
8 EA $1,945.00 $15,560,00
5 EA $1,432.00 $7,160.00
3 EA $2,040.00 $6,120.00
5 EA $786.00 $3,930,00
5 EA $774.00 $3,870.00
B-1 0 Valley Gutter Throat Inlet
B-ll Grate Inlet
B-12 Junction Box (1)
B-13 Yard Drain
B-14 Type X Inlet
Storm Drainage Sub-Total
$207,756.75
STORM DRAINAGE NOTES:
(1) Portions removed as part of completion
G:IPROJ-ENGIBIBRPL li06DPIPlat Recording\[Original EOPC,xlsjPaving
16 A 1
..
(Bond Purposes)
BUCKS RUN RESERVE
SCHEDULE "C"
SANITARY SEWAGE COLLECTION SYSTEM
DESCRIPTION
C-I 8" PYC Sanitary Sewer (0-6' Cut)
C-2 8" PYC Sanitary Sewer (6-8' Cut)
C-3 8" PYC Sanitary Sewer (8- I 0' Cut)
C-4 Trenching for Rock
C-5 Manhole 4' Diameter (0-6')
C-6 Manhole 4' Diameter (6-8')
C-7 Manhole 4' Diameter (8-10')
C-8 Manhole 4' Diameter (10-12')
C-9 Single Sewer Service (I)
C-IO Double Sewer Service
SANITARY SEWER NOTES:
( I ) Removed as part of completion.
UNIT COST TOTAL
1,141 LF $26.00 $29,666.00
231 LF $28.00 $6,468,00
279 LF $49.00 $13,671.00
357 LF $30.00 $10,710.00
5 EA $3,852.00 $19,260.00
2 EA $4,300.00 $8,600.00
3 EA $4,855,00 $14,565.00
4 EA $6,] 25.00 $24,500,00
I EA $666.00 $666.00
7 EA $766.00 $5,362.00
Sanitary Sewer Sub-Total $133,468.00
G:IPROJ-ENGIBIBRPL Tl06DPIPlal Recordingl[Original EOPC.xlsjPaving
DESCRIPTION
D-] Single Water Service (I)
D-2 Double Water Service (I)
D-4 Water Service Casings
D-5 8" Water Main connection
D-6 8" PVC Water Main (CL 150)
D-7 8" PVC Water Main (CL 200)
D-8 8" Gate Valve wlBox
D-9 Fire Hydrant (Complete Assembly)
D-II Permanent Bacterial Sample Point
0-12 Temporary Bacterial Sample Point
D-13 8" Air Release Valve
POTABLE WATER NOTES:
(1) Removed as part of completion.
(Bond Purposes)
BUCKS RUN RESERVE
16 A 1
',4
SCHEDULE "0"
WATER DISTRIBUTION SYSTEM
TOTAL
5 EA $550.00 $2,750.00
5 EA $625.00 $3,125.00
360 LF $7.25 $2,610.00
I EA $1,000.00 $1,000.00
1900 LF $23.50 $44,650.00
50 LF $24.00 $1,200.00
1 EA $825.00 $825.00
6 EA $2,500,00 $]5,000.00
I EA $950,00 $950,00
3 EA $350.00 $1,050.00
3 EA $1,750.00 $5,250.00
Potable Water Sub-Total
578,410.00
G;\PROJ-ENG\B\BRPL l\06DP\Plal Recording\[OriginaJ EOPC.xIs]Paving
16 A 1
,
(Bond Purposes)
BUCKS RUN RESERVE
SCHEDULE "E"
ROADWAY CONSTRUCTION
DESCRIPTION
TOTAL
E-I Valley Gutter
4,000 LF $6,85 $27,400.00
4,440 SY $2.50 $11,100.00
4,440 SY $8.10 $35,964.00
4,890 SY $2.00 $9,780.00
2,220 SY $0.00 $0.00
2,220 SY $0.00 $0.00
1 LS $0.00 $0.00
450 SY $0,00 $0.00
E-2 1 1/2" Asphaltic Concrete ( Type S-II1) (2 lifts) (1)
E-3 6" Limerock Base (compacted and primed)
E-4 12" Stabilized Subgrade
E-5 5' Concrete Sidewalk (2)
E-6 4" Limerock (under sidewalk) (2)
E-7 Signing & Pavement Markings (2)
E-8 Sodding (sod strip behind curb) (2)
Paving Sub-Total
$84,244.00
PA VING NOTES:
(I) First Lift
(2) Included in completion,
G:IPROJ-ENGIBIBRPL li06DPIPJal Recording\[Original EOPC,xls]Paving
16 A 1 ~
e.,. County
Growth Management Division
2800 Horseshoe Drive N.
Naples, FL
34104
239-252-2400
Receipt Number:
Transaction Number:
Date Paid:
Amount Due:
Payment Details:
Amount Paid:
Change I Overage:
Contact:
FEE DETAILS:
Fee DescriDtiol1
Refundable Bonds
Cashier Name:
Batch Number:
Entered By:
RECEIPT OF PAYMENT
2011045522
2011-015682
10/28/2011
$196,086.79
Pavme.,t Methoct
Check
Amount Paid Check Number
$196,086.79 0199
$196,086.79
$0.00
BRLP LOTS, LLC
7350 POINT OF ROCKS RD
SARASOTA, FL 34242
Reference Number Oriainal
~
PL20110001395 $196,086.79
Amount GL Account
bid
$196,086.7 670-000000-220113
9
kathleenvansickle
2287
toniaspangler
16 A 1 t:;,_
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
COST TO COMPLETE
SEPTEMBER 19,2011
REVISED OCTOBER 27,2011
I. Construction
A. Earthwork and Site Preparation $0.00
B. Drainage Improvements $2,172.30
C. Sanitary Sewage Collection System $0.00
D. Potable Water Distribution System $0.00
E. Roadway $94,140.00
TOTAL $96,312.30
G:IPROJ-ENGIBIBRPL'I\06DPlPlal RecordinglEOPCost to complete RVSD 10-27-1 I ,doc
16 A 1
f
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
COST TO COMPLETE
SEPTEMBER 19,2011
REVISED October 27,2011
B. Drainage Improvements
The work performed under this schedule includes furnishing, handling and installing all
materials to complete the working drainage system. The unit price for pipe shall include
compaction testing, clean-up, hydro-vacuum or other methods to clean the catch basins
and culverts. Erosion control measures such as hay bales or silt barriers shall be removed
and disposed of upon completion of the project or upon satisfactory stabilization of the
surrounding earth.
Removal includes excavation, disconnection, removal and disposal of the material and
debris off the owners properties, backfill compaction and clean-up.
Item
Total
$2,172.30
$2,172.30
General Clean-u
G:\PROJ-ENGIBIBRPLT\06DP\Plat RecordinglEOPCost to complete RVSD 1O-27-1I.doc
16 A 1 .~
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
COST TO COMPLETE
SEPTEMBER 19,2011
REVISED OCTOBER 27,2011
C. Roadway
The work performed under this section shall include furnishing, hauling, handling and
installing all materials to construct the roadways as shown on the plans and to Collier
County specifications. The unit prices shall include compaction testing, density tests,
road core samples and testing, compliance inspections, maintenance of traffic and clean-
up.
Quanti Unit Price Total
1 2240 $27.00 $60,480,00
4 1 $1,000.00 $1,000.00
6 4165 $4.00 $16,660,00
7 8 $2,000.00 $16,000.00
Sub-Total $94,140.00
*Signed agreement with FPL attached.
G:IPROJ-ENGIBIBRPL T\06DPIPlat RecordinglEOPCOSI to complete R VSD 10-27-11.doc
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
I. Construction
A. Earthwork and Site Preparation $108,329.00
B. Drainage Improvements $128,942.00
C. Sanitary Sewage Collection System $53,710.00
D. Potable Water Distribution System $21,500.00
E. Roadway $124,005.00
F. Landscaping $18,977.66
TOTAL $455,463.66
G:\PROJ-ENGIBIBRPL T\06DP\02PPLAIEOPC RVSD 10-27-\ \ ,doc
16 A 1
..
16Al "1
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
A. Earthwork and Site Preparation
The work performed under this schedule includes reshaping of lakes I and 2 and
construction of the perimeter berms and swales per the plans and specifications.
Excavation includes excavating material from the new portions of the lakes, hauled,
placed and compacted to backfill lakes, construct berms, swales and lake banks per cubic
yard of in-situ material. Imported off-site clean material shall be provided, placed and
compacted to construct the lake banks, backfill, berms and swales. The unit price for
imported fill shall include final grading and compaction testing and is stated in cubic yard
truck measure.
The construction area shall be enclosed with FDEP approved siltation fencing prior to
commencement of work. The unit price shall include maintenance of the fence thru the
duration of construction.
Erosion control measures shall be provided per the generic storm water pollution
prevention plan and the lump sum price shall include compliance reporting and record
keeping.
Item
1 Silt Fence
2 Erosion Control
3 Excavation
4 1m orted Fill
Quanti
7286
1
1900
8300
Sub-Total
Unit Price
$1.50
$3,000.00
$6.00
$10.00
Total
$10,929,00
$3,000.00
$11,400.00
$83,000.00
$108,329.00
G:\PROJ-ENGIBIBRPLT\06DP\02PPLAIEOPC RVSD 10-27-ll.doc
16 A 1
...,
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
B. Drainage Improvements
The work performed under this schedule includes furnishing, handling and installing all
materials to complete the working drainage system. The unit price for pipe shall include
compaction testing, clean-up, hydro-vacuum or other methods to clean the catch basins
and culverts. Erosion control measures such as hay bales or silt barriers shall be removed
and disposed of upon completion of the project or upon satisfactory stabilization of the
surrounding earth.
Removal includes excavation, disconnection, removal and disposal of the material and
debris off the owners properties, backfill compaction and clean-up.
Item Quantity . Unit Price Total
1 12" HOPE Drain Pipe 1550 LF $18.00 $27,900.00
Remove 12" HOPE Drain Pipe Including
2 Yard Drains 502 LF $5.00 $2,510.00
3 15" RCP 343 LF $28.00 $9,604.00
4 Remove 15" RCP 597 LF $7.00 $4,179.00
5 18" RCP 171 LF $34.00 $5,814.00
6 24" RCP 170 LF $42.00 $7,140.00
7 Remove 24" RCP 195 LF $9.00 $1,755.00
8 30" RCP 380 LF $48.00 $18,240.00
9 Remove 30" RCP 325 LF $12.00 $3,900.00
10 Type E Junction Box 4 EA $2,550.00 $10,200.00
11 Type C Junction Box 7 EA $2,200.00 $15,400,00
12 Remove Catch Basin or Junction Box 7 EA $500.00 $3,500,00
13 Yard Drain 17 EA $350.00 $5,950,00
14 12" FES 1 EA $550.00 $550.00
15 24" FES 1 EA $750.00 $750.00
Connect to existing Catch
16 Basin/Junction Box 5 EA $350.00 $1,750.00
Brick-up existing Catch Basin/Junction
17 Box 8 EA $250,00 $2,000.00
18 Type 'C' Catch Basin 4 EA $1,950.00 $7,800.00
Sub-Tot $128.942.00
G:IPROJ-ENGIBIBRPLT\06DPI02PPLAIEOPC RVSD 1O.27-1I.doc
1 '" n ,
16 A 1
~
.
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
C. Sanitary Sewage Collection System
The work performed under this section includes furnishing, handling and installing all
materials to complete the working sewage collection system. The unit prices shall
include compaction testing, flushing, video T.V. of the sewage main, inspection walk
thru, assistance in conveyance of the constructed utilities to Collier County and final
clean-up all per Collier County Utility Division and FDEP standards and specifications.
Removal includes excavation, disconnection, removal and disposal of material and debris
off the owners property, back-fill, compaction, grading and clean-up.
Item Quanti
6" service line from back of curb to new
1 lot corner 38 A
New single service connection
2 w/cleanout 8 EA
New double service connection
3 w/cleanout 26 EA
4 Ca existin lateral per cap) 76 EA
Remove existing service connection
5 incudin cleanout 26 LS
Sub-Total
Unit Price
Total
$ 36,100,00
$ 2,600.00
$ 9,750,00
$2,660.00
$ 2,600,00
$ 53,710,00
$ 950.00
$ 325.00
$ 375.00
$ 35.00
r'~ t4l%i" 'S{l("W:,S#IliRiJ8'V
-.:aflD~..""L.l~lL_~ '''' _~ )11
$ 100.00
G:\PROJ-ENGIBIBRPL 1\06DP\02PPLAIEOPC R VSD 10-27-1 I. doc
16 A 1
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
D. Potable Water Distribution System.
The work performed under this section includes furnishing, handling and installing all
material and appurtenances to complete the working water distribution system.
The unit prices shall include flushing, pressure testing, disinfection, laboratory testing,
compaction testing, compliance inspections, temporary meter, cost of water during
construction and final clean-up. The contractor shall assist in conveyance of the
constructed utilities to Collier County. The system shall be constructed per Collier
County and FDEP standards and specifications.
Item Quanti Unit Price Total
1 Extend water service line 21 EA $ 100.00 $ 2,100.00
New service tap including service line
2 and meter boxes 15 EA $ 450.00 $ 6,750.00
3 Plu service ta at main line 16 EA $ 150.00 $ 2,400.00
Relocate existing meter boxes (single
4 and double) 30 EA $ 125.00 $3,750.00
Relocate Fire Hydrant Complete
5 Assembl 3 EA $ 1,500,00 $ 4,500.00
6 Directional bore 4" casin 1 LS $2,000.00 $ 2,000.00
Sub-Total $ 21,500.00
G:IPROJ.ENG\B\BRPL T\06DP\02PPLAIEOPC R VSD IO-27.11.doc
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
E. Roadway
16 A 1
The work performed under this section shall include furnishing, hauling, handling and
installing all materials to construct the roadways as shown on the plans and to Collier
County specifications. The unit prices shall include compaction testing, density tests,
road core samples and testing, compliance inspections, maintenance of traffic and clean-
up.
1
2
3
4
5
6
7
8
9
10
(1) By FPL. No cost to developer. See contract.
G:\PROJ-ENGIBIBRPL Tl06DPI02PPLAlEOPC RVSD JO-27-ll,doc
Quanti
280 LF
80 LF
2240 SY
445 SY
445 SY
470 SY
1 LS
1330 SY
4165 SY
8 EA
Sub-Total "
Unit Price
$14.00
$18.00
$27.00
$32.00
$9.00
$2.00
$1,000.00
$4.00
$4.00
$2,000.00
Total
$3,920.00
$1,440,00
$60,480.00
$14,240.00
$4,005.00
$940.00
$1,000.00
$5,320,00
$16,660.00
$16,000.00
$124,005.00
1 h ^ "
16 A 1
BUCKS RUN RESERVE
COMPLETION OF INFRASTRUCTURE IMPROVEMENTS
AND DRAINAGE AND UTILITY ADJUSTMENTS
F. Landscaping
The work performed under this section shall include furnishing, hauling, handling and
installing all materials to construct the roadways as shown on the plans and to Collier
County specifications. The unit prices shall include compaction testing, density tests,
road core samples and testing, compliance inspections, maintenance of traffic and clean-
up.
Item
1 Landscapin Improvements
QUanti
1
Sub-Total
Total
$18,977.66
$18,977.66
G:\PROJ-ENGIBIBRPL Tl06DP\02PPLAIEOPC R VSD 10-27-1 1 ,doc
COLEMAN. Yov ANOVICH & KOESTER, P.A.
ATTORNEYS AT LAW
16 A 1
Kevin G. Coleman
Riehard D. Y ovanovieh
Edmond E. Koester
William M. Burke
Gregory L. Urbaneic
Matthew L. Grabinski
NORTHERN TRUST BANK BUILDING
400 I T AMIAMI TRAIL NORTH
SUITE 300
NAPLES, FLORIDA 34103
239-435-3535
239-435-1218 FACSIMILE
www.evklawfirm.eom
Linda C. Brinkman
Craig D. Grider
Matthew M. Jackson
Jeffrey J. Beihoff
Harold J. Webre
Caroline M. Magliolo
ChulesA.B.Tho~on
David Kerem
Writer's Email:
hwebre@cyklawfinn.com
Of Counsel:
Kenneth R. Johnson
October 27, 2011
The Collier County Board of County Commissioners
3301 Tamiami Trail East
Naples, Florida 34112
Re: Title Opinion for Plat of Bucks Run Reserve
Dear Madam(s) and/or Sir(s):
We previously provided the above referenced title opinion which covered matters of record
through and including June 27, 2011 @ 11:00 p.m., and the purpose of this letter is to update said
opinion to include additional matters against title subsequently recorded in Collier County, Florida,
namely:
1. Notices of Commencement recorded in O.R. Book 4717, at Page 3370 and O.R. Book 4718, at
Page 754;
2. Maintenance and Cost Sharing Agreement recorded in O.R. Book 4713, at Page 2037; and
3. Resolution No. 2011-150 recorded in O.R. Book 4721, at Page 1527.
This letter shall supplement the above Title Opinion and is based upon our reliance on
Attorney's Title Fund Services, LLC title update, which is effective through October 27,2011 @ 11:00
P.M. We do not make any opinion as to matters of title thereafter.
COLEMAN, YOVANOVICH&KOESTER,P.A.
ATTORNEYS AT LAW
16 A 1
/11""
Kevin G. Coleman
Richard D. Yovanovich
~ E. Koester
W' M. Burke
Grego L. Urbaocic
Matthe;v L. Grabinslci
NOR1HERN nm8T BANK BUILDING
4001 Tamiami Trail North
Suite 300
Naples, FL 34103
23943S.3S35
239435-1218 Facsimile
www.cvklawfinn.com
Linda C. Brinkman
Craig D. Grider
~w M. Jac:bon
Jeffi'ey J. Bcihoff
Harold J. Webre
Caroline M. Magliolo
Writer'. EmaiI:
bwebre(mcyklawfum.com
Of Co1mS!!:
Kenneth R Johnson
July 29, 2011
TITLE OPINION
PLAT OF BUCKS RUN RESERVE
This opinion is provided pursuant to Section 177.041, Florida Statutes, to:
The Collier County Board of County Commissioners
3301 Tamiami Trail East
Naples, Florida 34112
I, Harold J. Webre, of Coleman, Y ovanovich & Koester, P.A. am an attorney licensed to practice in the
State of Florida and I have this 29lh day of July, 2011, examined title to the real property described on
Exhibit "A It attached hereto and made a part hereof.
This examination of the Public Records of Collier County, Florida is evidenced by Attorneys' Title
I Insurance Fund, Inc., Owner's Title Insurance Policy No. 2225730 effective through October 6, 2005 @
9:12 a.m. in favor of the prior owner of the subject property, as well as an examination of the information
I contained in Attorney's Title Fund Services, LLC title examination schedules prepared for the current
property owner from the period of time through and including June 27, 2011 @ 11:00 p.m.
Based solely upon my examination of the foregoing, and assuming the accuracy of the information
contained in the documentation relied upon, it is our opinion that as of June 27,2011:
The record title to the above-described property is vested in BRLP LOTS, LLC, a Florida limited liability
company, by the following warranty deed, a copy of which is attached hereto and made a part hereof as
Exhibit "Bit:'
1. Warranty Deed recorded December 22,2010 in Official Records Book 4635, Page 1912,
of the Public Records, Collier County, Florida.
Said record title holder has a fee simple title thereto subject, however, to the following encumbrances or
qualifications:
I. Collier County Ordinance Number 75-20 which regulates the installation of water
I distribution and wastewater collection systems; Ordinance Number 75-21 which protects certain trees
I
16 A 1
: Attorney's Title Opinion
: Plat of Bucks Run Reserve
July 29, 201)
Page 2 of3
within Collier County; and Ordinance Number 75-24 which is mown as the "Collier County Zoning
I Ordinance for the Coastal Arca Planning District"; all of which were recorded May 19, 1975, in Official
! Records Book 619, Pages 1177 through 1381, inclusive, of the Public R.ecords of Collier County, Florida.
2. Oil, gas, mineral or other reservations as set forth in deed by B8ITon Collier, Jr., recorded
in Deed Book 3D, Page 91, Public Records of Collier County, Florida. No determination has been made as
to the current record owner for the interest excepted herein.
3. Oil, gas, mineral or other reservations as set forth in deed by Brace Corporation recorded
; in Deed Book 37, Page 152, Public Records of Collier County, Florida. No determination has been made
as to the current record owner for the interest excepted herein.
, 4. Subject to the Rules and Regulations of Immokalee Area Planni.,g District as contained
I in Resolution executed by the Board of Collier County Commissioners to the Public dated May 4, 1976
and recorded May 6, 1976 in Official Records Book 649, Page 1239 of the Public Records of Collier
County, Florida.
S. Subject to the rules and regulations of surface and ground water utilization as contained
I in Agreement executed by The South Florida Water Management District to the Public dated March 31,
11989 and recorded March 31, 1989 in Official Records Book 1428, Page 2003 of the Public Records of
Collier County, Florida.
I 6. Easement over and across the East 30 Feet of the North 1/2 of the Southeast Quarter of
the Southwest Quarter of Section 35. Township 48 South, Range 26 East, Collier County, Florida. By
Resolution No. 2004-01. recorded On January 14. 2004 in O.R. 3484. Page 162, said Easement was
vacated as to the Public's interest.
I 7. Infrastructure Cost Sharing Agreement for Bucks Run P.ll.D. by and between
I Restoration Church. Inc., and ~il1iam L. Hoover, Trustee of the Bucks Run Land Trust d~ted J~ly ~7,
11999, tecorded June 27,2001, m O.R. Book 2849. Page 0323, as lDlended by the followmg: (1) First
I Amendment recorded March 26, 2004, in O.R. Book 3529, Page 697 and (ll) Second Amendment
recorded November 15.2004, in 'O.R. Book 3679, Page 25.
I 8. Subject to Resolution No. 93-8-3 Of the Big Cypress Basin of the South Florida Water
I Management District dated December 9,2004 and recorded on December 14,2004 in O.R. Book 3696,
Page 1354.
I 9. Subject to conditions and restrictions of Permit Number 12516, issued by The South
Florida Water Management District, recorded March 30, 2005, in O.R. Book 3763, Page 164.
, 10. Environmental Resource Permit Notice recorded in O.R. Book 4212, Page 3293, Public
I Records of Collier County, Florida.
" II. Easement recorded in O.R. Book 4258, Page 2014, Public Records of Collier County,
Florida.
12.
I Florida.
Notice recorded in O.R. Book 4265. Page 2818, Public Records of Collier County,
.-
16 A 1
Attorney's Title Opinion
Plat of Bucks Run Reserve
July 29, 2011
Page 3 of3
I 13. Utilities Facilities Warranty Deed and Bill of Sale recorded in O.R. Book 4397, Page
1889, Public Records ofColIier County, Florida.
I 14.
, Florida.
Resolution recorded in O.R. Book 4610. Page 2307. Public Records of Collier County,
IS.
Notices of Commencement recorded in O.R. Book 4684, Page 2524, and 4702, Page
1130.
Note: Taxes for the year 2011 became a lien upon the land on January 1. 2011. but are not due
and payable until November 1, 2011. Taxes for the year 2010 and prior years have been paid.
Respectfully submitted,
HaroldJ. Webre
For the Firm
INSTR 4508629 01 4635 pc; 1912 REalRDm 12/22/2010 12:18 PM PAGES 4
DWIGHT E. lROCX ~_ COLLIER COUNTY a.ERK OF TllE CRaJIT alURT
DOCI.70 $8,750.uu REe S35.50
CONS $1,250,000.00
^fO' Exbi.b1t "B"
f/} IV" - lfJ
l;Jt 1f1'b if> .4>
, l6 '1{,~'
nII__nl......... .,.... *r........
z:.turD to:
Ki.obael A. Durant
COlGO~ , CClllIlOr ~ DURA1ft', P .A.
2210 Vanderbilt hach JlOacI, Sute 1201
Wap1e., lrloz::Lda 34109
.......101(...... 00206040000
Warranty Deed
This ladealure, Madelbls 17t:h dayoC DeCJ~z . 2010 A.D.. Betweea
Buak. Ibm ".ezye, LLC, a 1'1Qzlda li1d.t:e4 11ahllit.y ~l"
Dr ... c:.., or Coll1ez: . SIIIIo .r 1'1oz:1da . graDlor. DIIlI
ma.J I.O'l'S, LLC, a fiodda 11a1tecl liab:UJ.t.y cClIIIpaDY
"taa. __ it: 7350 Point ol llocke Roacl, Sara.ota, J'L 34242
or .... c-, or Sara.au . SlIIe .r lrl.ozida . gr'IIJltee.
Wlm_seth ....... GRAH1'OR. r..... _____orllae_or
------------------------~ DOLLaRS ($10)----------------------- ~
"'" oUIIr pod IIId voIulIlr ~ ... GRANTOR ill .... poId II)' GRANTEE. "" IIICIIipl ......,. It .......,. odroltwIedpd, ....
...... NIpiIIod ... lOW ID die IDi4 GllAN'TEE ... GRAHlEE'S ...... _ .... III/pt r_. ... ........, ........ -II. ........
.,.,..........c..,.... Colliez: R C or fio:dda ID_
S_ attached Bxhib:U; -A- by ~8%eDce.
hbj.at to zeal P3:OpeZ
year.; aolU.nV, buU 9
VO__I1t:a1 aut:bozl
~ao;z:c!, U any; ;z:..
~ .1IbcIi"i.:l.on.
2011 and .aba.~t
. :l.ot1.onal iIIpo_d by
min.za1 :l.Dtezeat o~
d ..._u 0_ to
'l'ogoethez: vi1;h all
be10Dg':l.Dlf OJ: :l.D _yri.
':0 Ba". and. to Bold,
t911.aee. ~z:ato
... 1M ....... .... """"r My _ 1M 11110 Ie IIid Iond. IIlII will ..._ ... _ ..... InIlII ...... .r 011 pa-. __.
III WIlD... Whereof.............. ___.. iII...............,....)at lint _.......
..,n~ ..-...._
G:r&cSy KiDoz:, Co-JCanage;z:
P'O..YdIao:SI'71_A._JIlo...... ...;141..,
By~.7)~~
Ki.cbae1 D. Kooz:a, Co-Hafta9a&"
roO. Addrou: Iln_A.w_ N.".. fLJ411J
(Carp_Ie Seal)
t, ~... li
=-"h~
.."'....,....'. _ 9 .-
W~tAeaa .
(SoU)
STATE OF lr1o%:Lda
COUNTY OF CoU.lez:
l100 ........ -..- ". _..... w_ _ IIiI I~""'- _ or nao-bazo . 2010
Q;z:ady Kino&', c~ o~ B1Iake bD ....~, x.r.c, . I'l.ozo:l.da 1:l.ai.t:.d.
lillb:l.l:l.t.y aCllllpaDY, on ~ o~ t:h. o~, who ~. pez:.oaa11y Jcnown
to_.
1If
iJIIimIII
...=~'1lO"-
"~Q:laIIIl',,2DU
.........,_u--
Au(Jt#;?)l-
Pdnt41J4 H_;
Jl'otazl" hbUa
My c....loIloo EIIpiIn:
---
'--.........-.... _ -........ _"--,
16 A 1
..
OA 4635 PG 1113
16 A 1
, ~ l
Warranty Deed . PlIP 2
. .....iIU_... 0020'040000
STATE OF r10dda
COUNTY OF Co11.:i..&' ,
n. r..... ~ _ ..........1Ioftn 1M dtIs ,fJI1-.. of Dea.-be&' .2010.,.
HiGh..1 D. Hoo~, Co-Nlmapz or Blick. Ibm ".ItZ'ftt, u.c, & 1'10&'.:1da
1iait:eclllabil:i.t:y ~y, _ ~u of tIle~&D , wbo:i.. pezo.0A&1.1y
JcDoWII t:o _.
~'_ -..t"::r~."
-. 1IIl", . ..,pa
i;jE'~<~"
1llPII80:~' .~_
...,..._1'". A
,...
IIzu
'--..0....._...."," _....... ._ft..,...
OR 46JS PG 1914
16 A 1
EXHIBIT"AW
Parcell (Fee SImple)
ne North ~ of the Soa~ % of the Soatlnftst % of Sedioa 35, TowasJifp 48 Sou.... Rallle
2Ci Eat, CoOler Couty,l1orida, I.. IIDd acept lIa.e West 100 feef thereof preriODlly coaveyed
fora road aud aaal rtpt-Gf-way.
AND
The North ~ oftb. Soudaeut ~ .ftll. So....... % ofSectio. 35, TOWIlUlp 48 South,.. 26
Eat, CoWer Cuaty, Florida.
LESS AND EXCEPT tbe foDowlDI parcels orllUlcJ:
Pan:eJ I-A: A portion of the Norda ~ of
TOWIIllalp 48 South, Raage 26 ~
thereof, prnlolllly CODveyed
described .. foUows~ Com
SectiOD 35; theac:e ruB N
Quarter for a dlstabCe of
of 100.07 feet to th. PolD of
Soutb In dearees 47' 32"
East for a dfabulee of 37
'82.62 feet; thenee ruD N (tII.
JIe&IDDIDa olda. para! 0
AND
Parcel 1-8: A portloD of tbe ~ of tbe Soatlnrelt % of SeedOD 35,
TOWJIIblp 48 Soatb, Ranle 26 E.. lid.. leu .Dd ueept tbe West 100 feet
tbereof, pl'ft'foDlly eoaveyed for a I'8Il cual rlpt-GHray, beiDl more partlcalarly
described .. Ionow-: COmmeace at the Solltbwest coraer al the Soatlnveat Qaarter of said
SeedoD 35; theace nn North 00 depws 00' 10" East 8IoDI tile West Oae 01 aid Soatlawest
Quarter for. d....Da1 oU71.01 feet; the.ee raD SOIdh In dqrea 41' 39" East for a dfstaDce of
100.07 feet to the Poia. of Bealnalal or the parcel of ..ad described bema; tlanee coadaae
Soatla 87 d...... 47' 39" East for. dlstaaee of982.62 feet; theaee raa Soath 10 dtp'eel 52' 27"
Eat for. dllta.ee of 309.3' feet; th~ ruB Nortla In deana 47' 3'" West for a dfatuee of
1041.03 feet; theaee l'1Ia North OO'cIepoees 00' 00" East lor a dlsfalace of 301.58 feet to the Polat
olBealnaJaa: of fle Parcel of lalld bereiD described, co.taiaiag 7.000 ac,..,more or leu.
Parcel 2 (Apparte.....t Euemeat)
TOGE11IER WITH aa Aceeis EuemeDt IraDted by that eertai. Deed of Easement recorded
OD November 20, 2003 aDdrec:orded I. O.R. Book 34C7, pale 3.14, PabUc Reconb 01 CoWer
CouaCy, Florida, described .. 101l0Wl1
A pareeI of tile laud 17111I fa tile Sou.... Quarter orSectioa 35, TOWDIlaIp'" So...., RaDle 26
E.... CoDJer CoaaCy, FJorlda, beiae more particularly described as 10U..:
Commeaee at the Soatlnvest caner of the So.tlawest % of SectIoa .35, Towaahip 48 So......
EXHIBIT -A-
Page 1 012
. . *-.' OR 4635 PG 1915 ***
16 A 1
, .
Ranle 26 East; dleate ran North 00 degrees 00' 00" East, aloa, the West liae oC the SouUnvest
% DC aid Seetloa 35, TOWIIShlp 48 South, RaD,e 26 East for a dlJtaace oC 1,328.88 feet; ClaeDce
rllll Soudl 87 cIepoea 47' 3%" East for a distaace of 100.07 fee.. to the PolDt oC BearJDIIID' of the
parcel of land herela descnlJed; theace coatiDue South 11 degrees 47' 32" East aloDI aaicI UDe
for a dlstaDc. oC745.98 feet; "eace I'IUI South 4J deg~ 17' 37" East for a dlstaDce oC 153.01
feet; tbeace raa South 60 degrees 24' 23" East for a dfstaace of 108.02 feet; tbence raa South 10
degrees 32' 01" East for a distaDCe of 101.48 reet; thtace rua North 'I degrees 41' 07" West for
a dittaace of 93.34 Cee.; tbeace rua North 70 degrees 46' 08" West for a dgtaDce oC6O.26 feet; to
the beglaning oC a taa,eatlal circular curve coacave Nortlleast; Claeace i1ID Northwesterly alon,
the an: oC old curve to the ....... having a radial of 100.00 feet; Ibro. a central angle oC 29
degrees 01' 40", .1IbteDded by a chord oC son feet at a haria, of North 56 dear... 15' 18"
West, for an arc leagtb of SO.66 Ceet to the end of laid curve: thence Nortb 41 degl'ftS 44' 28"
West for a distaace of 100.88 feet, to the beglaalnl of a 'anleadal circular cnrve coacave
Southwest; "'eace I'WI Northwesterly aloag tile an: oC laid curve to tbe left, havial a radius oC
60.00 Ceet, tbroulb a central angle of 46 degrees 03' 04",l1Ibleaded by a cbord of~94 reet at a
hearia, or North 64 degrees 46' 00" arc leagth of 48.22 fee. to tbe ead of oid
cUn'e; tbence roD North 00 deg :tI; aC&iOO:' tance or671..97 feet; thence rua North
for a dlsfance of80.06 feet; to. iD !'tel oflaad herein described.
C;
EXHIBIT-A-