Agenda 06/07/2005 W
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
~
JOINT BOARD OF COUNTY COMMISSIONERS
AND PARKS & RECREATION ADVISORY BOARD
BEACH ACCESS WORKSHOP
AGENDA
June 7, 2005
2 p.m. to 5 p.m.
Fred W. Coyle, Chairman, District 4
Frank Halas, Vice-Chairman.Commissioner, District 2
Donna Fiala, Commissioner, District 1
Tom Henning, Commissioner, District 3
Jim Coletta, Commissioner, District 5
NOTICE: ALL PERSONS WISHING TO SPEAK ON ANY AGENDA
ITEM MUST REGISTER PRIOR TO SPEAKING. SPEAKERS MUST
REGISTER WITH THE COUNTY MANAGER PRIOR TO THE
PRESENTATION OF THE AGENDA ITEM TO BE ADDRESSED.
COLLIER COUNTY ORDINANCE NO. 2004-05 REQUIRES THAT ALL
LOBBYISTS SHALL, BEFORE ENGAGING IN ANY LOBBYING
ACTIVITIES (INCLUDING, BUT NOT LIMITED TO, ADDRESSING THE
BOARD OF COUNTY COMMISSIONERS), REGISTER WITH THE
CLERK TO THE BOARD AT THE BOARD MINUTES AND RECORDS
DEPARTMENT.
ALL REGISTERED PUBLIC SPEAKERS WILL RECEIVE UP TO FIVE
(5) MINUTES UNLESS THE TIME IS ADJUSTED BY THE CHAIRMAN.
IF YOU ARE A PERSON WITH A DISABILITY WHO NEEDS ANY
ACCOMMODATION IN ORDER TO PARTICIPATE IN THIS
PROCEEDING, YOU ARE ENTITLED, AT NO COST TO YOU, TO THE
PROVISION OF CERTAIN ASSISTANCE. PLEASE CONTACT THE
COLLIER COUNTY FACILITIES MANAGEMENT DEPARTMENT
LOCATED AT 3301 EAST TAMIAMI TRAIL, NAPLES, FLORIDA, 34112,
(239) 774-8380; ASSISTED LISTENING DEVICES FOR THE HEARING
IMPAIRED ARE AVAILABLE IN THE COUNTY COMMISSIONERS'
OFFICE.
Page 1
June 7, 2005
I. Invocation and Pledge of Allegiance
II. Presentations followed by discussion
a) Topics raised at previous workshop
b) Shuttle systems
c) Beach stickers
d) Capital and operational plan, budget, and funding
III. Public Comment
IV. Adjourn
Page 2
June 7, 2005
Board of County Commissioners/ Parks and Recreation Advisory Board
JOINT WORKSHOP on BEACH ACCESS
June 7, 2005
The following materials address issues raised at the BCC/PARAB Joint Workshop on
Beach Access held on March 31, 2005, and proposes a Capital and Operational Plan and
Budget and funding sources.
Carrying Capacities
According to Park, Recreation, Open Space and Greenway Guidelines, published by the
National Recreation and Park Association, the national use standard for beach areas is 50
square feet ofland and 50 square feet of water per user. The state standard, established by
the Florida Statewide Comprehensive Outdoor Recreation Planning Guide, is 200 to 500
square feet of beach per person.
In response to public opinion that a variety of beach experiences is desirable, the Parks
and Recreation Department recommends a variable standard for beach use, based on the
type of experience a given beach area supports. For the tables below, variable levels of
intensity were applied to beach segments in accordance with the desired amount of
impact to the resource.
Table 1. shows carrying capacities of Collier County beaches based on square footage of
sandy beach.
Table 1.
Beach area Total beach Level of Persons beach
area service will hold at any
(sq ft) (sq ft per given time
person)
Barefoot Beach Access 65,000 100 650
Lely Barefoot Beach 710,000 250 2,840
Development
Barefoot Beach Preserve 750,000 500 1,500
Delnor- Wiggins Pass State 324,000 200 1,620
Park*
Vanderbilt Beach Accesses 685,000 250 2,740
Area
Vanderbilt Beach Park 37,500 100 375
Pelican Bay Development 1,200,000 250 4,800
Clam Pass Park 320,000 250 1,280
North Gulf Shore Access 135,000 250 540
Park Shore Accesses 1,300,000 250 5,200
City of Naples 2,472,000 250 9,888
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 1
Naples Pier and Lowdermilk 528,000 100 5,280
Park
Keewaydin Island 4,000,000 500 8,000
Hideaway Beach 528,000 250 2,112
Tigertail Beach Park 390,000 500 780
Marco Island 1,300,000 250 5,200
South Marco Beach Access 120,000 100 1,200
TOTAL 54,005
·calculations made in accordance with Delnor-Wiggins Pass State Park Unit Land Management Plan
Table 2. calculates carrying capacities of Collier County beaches using the same level of
service standards, but reduces beach area to that which is within 'i4 mile of a publicly
accessible dune crossover.
Table 2.
Beach area Total beach Level of service Persons beach
area (sq ft per will hold at
(sq ft) person) any
~iven time
Barefoot Beach Access 138,000 100 1,380
Barefoot Beach Preserve 358,500 500 717
Delnor- Wiggins Pass State 324,000 200 1,620
Park*
Vanderbilt Beach Access 681,500 250 2,726
Vanderbilt Beach Preserve 169,500 100 1,695
Clam Pass Park 225,000 250 900
Gulf Shore Beach Access 264,000 250 1,056
Park Shore Area 621,000 250 2,484
City of Naples 1,757,500 250 7,030
Naples Pier and Lowdermilk 528,000 100 5,280
Park
Tigertail 143,000 500 286
South Marco Beach Access 192,500 100 1,925
TOTAL 24,649
·calculations made in accordance with Delnor-Wiggins Pass State Park Unit Land Management Plan
Table 3. calculates carrying capacity based solely on available public parking, using the
standard multiplier of 2.4 persons per vehicle. Ten percent is added for those who access
the beach through non-vehicular modes.
Table 3.
Beach area Parking spaces Persons beach will hold
at any ~iven time
Barefoot Beach Access 100 264
Barefoot Beach Preserve 356 964
Delnor- Wiggins Pass State Park 350 924
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 2
Vanderbilt Beach Accesses 80 211
Vanderbilt Beach 150 396
Clam Pass Park 175 462
North Gulf Shore Access 38 100
City of Naples Accesses 1110 2,830
Tigertail Beach 210 554
South Marco Beach Access 70 185
TOTAL 2,639 6,890
Beach Facilities
Among the approximately 50 beach access points countywide, restrooms are currently
available to the beach-going public at the following 8 locations:
· Barefoot Beach Preserve
· Delnor- Wiggins Pass State Park
· Vanderbilt Beach
· Clam Pass Park
· Lowdermilk Park
· Naples Pier
· Tigertail Beach
· South Marco Beach Access
Within the Capital and Operational Plan and Budget additional rest rooms are proposed
for 4 locations: Conner Park, Gulf Shore Drive, a second rest room at Tigertail Beach
Park, and a compo sting rest room on a County-puchased parcel on Keewaydin Island.
(See pages 7-12.)
Beach Maintenance
The current beach maintenance schedule is as follows:
Marco Island raked 1x/2 weeks
groomed lx/2 weeks
tilled and graded 1 x/year
loose litter collected 1 x/week
trash cans emptied 2x/day
Vanderbilt Beach raked as needed
groomed 2x/week
loose litter collected lx/week
trash cans emptied 2x/day
Pelican Bay raked 1 x/week
groomed 2x/week
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 3
¡loose littler collected
¡ 1 x/week
The City of Naples now maintains its own beach areas.
The Beach Maintenance staff includes 2 equipment operators. Personal services,
equipment, and supplies total $220,500 annually. Trash cans are emptied by the Beach
and Water Maintenance staff, which has two crews and maintains the upland areas of all
beach and water parks.
Additional beach maintenance for litter control can be added at approximately $33,000
annually per staff member, plus approximately $5000 start-up cost per staff member for
equipment.
Since the last Beach Access Workshop the Parks and Recreation Department has learned
that when the City of Naples took over the maintenance of its beaches a small segment of
beach that was thought to be maintained by the City has been neglected. The portion of
the beach between North Gulfshore Access and Clam Pass will now be patrolled for litter
collection regularly. This is the area that was a focus of concern during a citizen
presentation at the last workshop.
Traffic Control
At its May 24, 2005 meeting the Board of County Commissioners authorized the Parks
and Recreation Department to contract for the installation of Collier County Sheriff s
deputies at the intersections of Gulf Shore Drive and Bluebill Avenue and Gulf Shore
Drive and Vanderbilt Beach Road during peak use periods to ease traffic congestion and
direct traffic flow in an orderly manner. This service began May 29, 2005 and is
successfully alleviating the traffic problems in this area during busy beach days.
Vehicular Shuttles
The pilot Beach Shuttle program run May 29 and 30 was a success. User totals were as
follows:
Sunday May 29, 2005
Service Service Service
Bus Start time End time Hours Passen~ers
27 8:00 A.M. 2:00 P.M. 6 162
2:00 P.M. 8:00 P.M. 6 23
81 8:30 A.M. 3:30 P.M. 6 126
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 4
25 8:00 AM. 2:00 P.M. 6 216
2:00 P.M. 8:00 P.M. 6 15
26 8 :00 A.M. 2:00 P.M. 6 201
2:00 P.M. 8:00 P.M. 6 21
TOTAL 764
Monday May 30, 2005
Service Service Service
Bus S tart time End time Hours Passen~ers
27 8 :00 A.M. 2:00 P.M. 6 209
2:00 P.M. 8:00 P.M. 6 30
81 10:30 A.M. 1:00 P.M. 2.5 15
25 8:00A.M. 2:00 P.M. 6 189
2:00 P.M. 8:00 P.M. 6 38
26 8:00 AM. 2:00 P.M. 6 202
2:00 P.M. 8:00 P.M. 6 50
TOTAL 733
Customer comment cards solicited during the Beach Shuttle pilot are currently being
tallied. A summary of the public's feedback will be presented at the workshop on June 7.
Operational expense for the pilot Beach Shuttle program was $3,900 per day. The Capital
and Operational Plan and Budget proposes implementation of the Beach Shuttle program
on a permanent basis. (See page 10.)
Vessel Shuttles
Vessel shuttles remain a viable option for providing a value-added beach access
opportunity. Operation of a one-vessel shuttle with a 15-minute travel time from parking
location to beach destination will allow 40 to 50 beachgoers to reach the beach each hour.
Cost to operate such a service is estimated at $1000 per 8-hour service day. The service
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 5
will include an educational component to encourage environmental stewardship.
Appropriate accommodations will be made for ADA compliance and passenger safety in
inclement weather. The Capital and Operational Plan and Budget proposes a vessel
shuttle operation from Bayview Park to Keewaydin Island. (See page 8.)
Cooperation with State/Cities
Upon Board direction, staffwill prepare the following letters for the Chairman's
signature:
· to the City of Naples asking for continued cooperation, particularly acceptance of a
vehicular shuttle route to City beach destinations
· to the City of Marco asking them to make use of, or allow the County to make use of,
the beach access granted by the Marriott Hotel.
· to the Marco Island Civic Association asking to purchase the lot by South Marco
Beach Access.
· to the State Parks Department asking them to increase the parking at Delnor- Wiggins
Pass State Park meet their carrying capacity, or possibily proposing the lease or
purchase of the park by the County.
Beach Stickers
Recommendation: Charge a $20 administrative fee for a 2-year beach parking sticker
Objectives:
· Recover administrative cost associated with issuance of stickers
· Derive additional revenue during tight budget years
· Bar coded stickers trigger gate at Vanderbilt Garage
· Begin to track beach usage
· Accurate cash handling
· Renewals spread throughout year
Stickers Issued:
· 58,000 in 2003
· 73,000 in 2004
· 33,000 in 2006 (estimated)
Implementation:
· Add on to existing park membership computer system
· Additional licenses
· Sticker printers
· Continue existing residency requirements
· Eliminate distribution at City site
· Must be ready by 10/2005
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 6
CostlBenefit Picture:
Estimated # to be sold annually 33,000
Annual Revenue $660,000
Total first year implementation cost $72,090
Total annual cost $30,250
Total cost/sticker after first year $0.92
Five yr Revenue $3.3M
Five yr Expenses $200,000
Five yr Return on Investment $3.1M
Other Considerations:
· Anticipated car pooling may create capacity
· Track usage at Vanderbilt Garage, initially
· Future potential to do same at other parks via hand held scanners
· Ability to communicate with "customers"
· If shuttles are deemed a primary solution, then suggest no stickers at all - charge $5
· Sticker does not guarantee parking spot
Capital and Operational Plan and Budget
At its May 2005 meeting the Parks and Recreation Advisory Board identified the
following five priority projects:
Pro· ect
Gulf Shore Drive Support
Facilities - The purchase of lots
along Gulf Shore Drive will
allow for the provision or a rest
room, beach shuttle pull-off area,
and handicapped parking that
will greatly increase the amenity
of Vanderbilt Access 1 through 7.
Vanderbilt Accesses 2-6 -
Accesses 1 and 7 have recently
been built or refurbished.
Accesses 2 through 6 will
similarly be refurbished with
dune crossovers, pavers,
landscaping, and signage as
s ace ermits.
Ac uisition
Purchase of
Gulf side lots is
preferable, but
lots on the east
side of Gulf
Shore Drive are
also viable for
this purpose.
Estimated
acquisition cost
is $10,000,000
The accesses
arem
inventory.
Develo ment
Development of
restrooms,
parking, and
pull-off
facilities on
vacant property
is estimated at
$400,000.
Retrofit of
existing
structures is
ossible.
Refurbishment
of the accesses
is estimated at
$200,000 each,
for a total of
$1,000,000.
o eratin
Contracted
service for rest
room cleaning
will cost $2,400
annually. Other
operating costs
will be
subsumed
within the
Beach and
Water budget.
Staffing costs
for patrol and
maintenance are
estimated at
$60,000
annually.
BBCIPARAB Joint Workshop on Beach Access June 7, 2005 page 7
Clam Pass Southern The park is in Construction of Operating costs
Boardwalk - A boardwalk inventory. a lI8-mile will be
splitting offthe existing one and boardwalk is subsumed
heading to the south will alleviate estimated at within the
crowding at the terminus of the $2,000,000. Beach and
existing boardwalk and distribute Water budget
beachgoers more evenly at this for patrol and
park. maintenance.
Expansion of
tram service is
not
recommended.
Tigertail Southern Restroom The park is in Construction of Contracted
and Dune Crossover - Facilities inventory. the rest room service for rest
to help beachgoers reach the Gulf and dune room cleaning
side of Sand Dollar Island will crossover IS will cost $2,400
facilitate true beach access at estimated at annually. The
Tigertail. $1,000,000. BCC has
discussed a
tram service
from this
location to the
Gulf side of
Sand Dollar
Island.
Budgetary
figures on this
servIce are
being explored.
Vessel Shuttle from Bayview to The Parks and If acquired the Staffing costs
Keewaydin - As proposed the Recreation target parcel for patrol and
service will make use of County- Department has will be maintenance are
purchased land on Keewaydin identified a developed estimated at
Island and parking developed target parcel for minimally. $50,200
near Bayview Park. purchase on Elements would annually.
Keewaydin include a Vessel shuttle
Island. compo sting rest servIce IS
Estimated room, shelters, estimated at
purchase price and docks, $1000 per day
for the 5-acre estimated at per vessel
area IS $1,000,000. running 8
$2,500,000. Continued hours. A shuttle
purchase of from Bayview
land near will require two
Bayview Park is vessels. Staff
current! y proposes that
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 8
_._-._-,----~-
budgeted at the shuttle run 7
$667,000. days January
additional funds through March
for the project and weekends
are proposed for and holidays the
FY 06 at balance of the
$200,000. year. Annual
expense will be
$352,000. User
fees can be
assessed to
offset the
expenditure.
TOTAL Proposed Proposed Estimated
acquisitions development operating costs
will gain will result in are $467,000
approximately 7 three new rest per year. Vessel
acres 0 f room facilities, shuttling
beachfront or three new beach expenses can be
near-beach access points, recouped in part
property for and support or whole by
$12,500,000. facilities such user fees.
as parking and
shelters for
$4,400,000.
The following projects also remain viable:
Pro' ect
Vanderbilt Access 8 - The need
for a public access point between
Delnor- Wiggins Pass State Park
and the existing Vanderbilt Inn
remams.
Conner Park Shelter and Rest
Room - This park is currently
used as a park-and-walk access to
De1nor- Wiggins Pass State Park.
In conjunction with this use and
the planned acquisition of
Ac uisition
An easement
should be
obtained either
from the State
or through the
redevelopment
approval
process for the
Vanderbilt Inn
ro ert .
The park is in
inventory.
Develo ment
Development
with boardwalk,
dune crossover,
pavers,
landscaping and
. .
sIgnage IS
estimated at
$200,000.
Development of
these support
facilities is
estimated at
$300,000.
o eratin
Operating costs
associated with
this access are
discussed in the
Vanderbilt
Access 2-6
project above.
Contracted
service for rest
room cleaning
will cost $2,400
annually. Other
operating costs
BBC/PARAB Joint Workshop on Beach Access June 7, 2005 page 9
Vanderbilt Access 8, support
facilities are needed.
Clam Pass Parking Garage -
Development of a multistory
parking facility on the footprint
of the current at-grade parking
area will add up to 250 parking
spaces to the County's inventory.
The facility will be designed to
minimize its aural and visual
impact on the surrounding
nei borhood.
Vehicular Beach Shuttle
(Vanderbilt Loop) - The
success of the pilot program
suggests that this solution should
be implemented on a permanent
basis.
Vehicular Beach Shuttle
(N aples Loop) - The success of
the ilot ro am su ests that
The park is in
inventory.
If the program
is to remain a
weekend and
holiday only
service, parking
can be secured
though
agreements
such as those
used for the
pilot program.
If the service is
to be expanded
to weekdays,
land needs to be
identified and
purchased. No
cost estimate is
currently
available for
acquisition of a
dedicated
parking area.
Development of
the facility is
estimated at
$10,000,000.
If the program
is to be
implemented
permanently,
purchase of
three buses at
$287,000 per
bus is
necessary, for a
total cost of
$861,000. If
expanded
. .
servIce reqUIres
the purchase of
dedicated land,
development
costs will be
associated with
constructing
parking and rest
room facilities.
Development
costs associated
with the
will be
subsumed
within the
Beach and
Water bud et.
Staffing costs
are estimated at
$72,000.
Additional
revenues
generated by
the new parking
spaces will
offset the
ex ense.
Patrol and
maintenance
costs associated
with this project
are discussed in
the Vanderbilt
Access 2-6
project above.
Currently staff
recommends
offering the
service 111
days per year
(weekends and
holidays).
Operating hours
are proposed as
lOam to 4 pm.
Operating
expense will
then be
$216,450
annually. Staff
does not
recommend
associating a
user fee with
this service.
Costs
associated with
the 0 eration of
BBC/PARAB Joint Workshop on Beach Access June 7, 2005
page 10
this solution should be for a vehicular purchase of the shuttle
implemented on a permanent beach shuttle dedicated buses service will be
basis and possibly expanded. using the are the same as similar to those
parking garages above. The above. The
at the longer route longer route
Government will require will require
Complex. additional additional
buses. buses, and
thereby
generate
additional
operating
expense.
Vessel Shuttle from This project Development of Staffing costs
Cocohatchee to Barefoot Beach will be most the parking area for patrol and
Preserve - The County has viable with the is estimated at maintenance are
secured a contribution from the purchase of $300,000. estimated at
Coconilla PUD that will further additional land Development of $25,100
this proj ect. for parking near the back bay annually.
Cocohatchee pier at Barefoot Vessel shuttle
River Park. Beach Preserve servIce IS
Estimated cost is funded estimated at
is $1,200,000. through a $1000 per day
developer per vessel
contribution of running 8
$1,000,000. hours. This
service will
reqUIre one
vessel. Staff
proposes that
the shuttle run 7
days January
through March
and weekends
and holidays the
balance of the
year. Annual
expense would
be $176,000.
User fees can
be assessed to
offset the
expenditure.
Additional Vessel Shuttle Staff does not Staff does not Vessel shuttle
Routes - Staff recommends currently have currently have servIce IS
pursuing the vessel shuttles any land any estimated at
BBC/PARAB Joint Workshop on Beach Access June 7, 2005
page 11
proposed above, and if successful acquisitions development $1000 per day
implementing others such as targeted in proj ects per vessel
Caxambas or Goodland to Cape associated with proposed in running 8
Romano Area or Cocohatchee to additional associated with hours.
selected northern beaches. vessel shuttles. additional
vessel shuttles.
TOTAL Proposed Proposed Estimated
acquisitions development operating costs
will gain will result in the are $491,950
approximately 4 addition of two per year. Vessel
acres of near- beach accesses, shuttling and
boat-access one rest room, parking fees
property for one shelter, will offset some
$1,200,000. approximatel y of these
300 parking expenses.
spaces, and
three buses to
inventory for
$11,661,000.
Total unfunded elements of all proposed projects are:
Capital Expenditures $29,761,000
Annual Operating Expenditures $958,950
can be partially offset by user fees
Total Gain:
· 11 acres of waterfront or near-water property
· 4 new rest room facilities
· 5 new beach access points
· 4 shelters
· 305 parking spaces
· 3 buses
· 2,140 more people on the beach on any given day that all services are running
Funding Sources
Current funding sources for capital projects include:
. Tourist Tax at $2 million per year
o $500,000 of this pays debt service on the Vanderbilt parking garage
o $200,000 is used for upkeep of existing facilities
o $1.3 million remains for new beach access proj ects
BBC/PARAB Joint Workshop on Beach Access June 7, 2005
page 12
--,~._---,...,.._-. ...._-------~.~---
· Impact Fees at $6 million per year
o $3.4 million of this pays debt service on North Collier Regional Park
o $2.6 million remains for purchase and development of all growth-related
park proj ects
· User Fees at $600,000 per year
o $400,000 of this pays the City for the reciprocal beach parking program
o $200,000 remains for general beach-associated operating and maintenance
· Ad Valorem-Funded Capital at $800,000 per year
o dedication of these funds varies year to year
o example projects include neighborhood parks, boat ramp projects,
facilities with a regional draw, and municipality funding requests
Proposed additional funding sources to facilitate the projects above include:
· Fourth Penny Tourist Tax
o $3 million per year
· Dedicated Property Tax Millage
o $3.5 to $17 million per year (see chart)
$20
$18
$16
$14
$12
$10
$8
$6
$4
$2
$0 It)
e
e
N
IID11 .05 mill
($5/$100K
taxable value)
1ID11.10 mil
($1 0/$1 OOK
taxable value)
..25mil
($25/$100K
taxable value)
CD
e
e
N
.....
e
e
N
co 0') e
e e 0r-
e e e
N N N
· Sales Tax Referendum
o 1¢ = $45.5 million per year
o Y2¢ = $22.75 million per year
o 'i4¢ = $11.3 8 million per year
· Bond Referendum
o 30 year debt service on $100 million = $6 million per year
o 20 year debt service on $100 million = $10 million per year
· User Fees
o $500,000 per year at $1 O/parking sticker
o $600,000 per year at $5/use of parking space
BBCIPARAB Joint Workshop on Beach Access June 7, 2005 page 13
.. "-'--~'-""'- .--.-"-..--- ^ _._~-
At its May 2005 meeting, the Parks and Recreation Advisory Board recommended
funding the Capital and Operational Plan through a combination of the Fourth Penny
Tourist Tax, dedicated Property Tax Millage, and User Fees. A bond referendum was
only recommended if it were well packaged and marketed.
BBC/PARAB Joint Workshop on Beach Access June 7, 2005
page 14
BOAT AND BEACH ACCESS REPORT
2003
Collier County
BOAT AND BEACH ACCESS REPORT
2003
OBJECTIVE
The purpose of the Boat and Beach Access Report is to assess Collier County's
performance in providing beach access and boat launch facilities to County residents and
visitors. This report will identify the overarching complications involved with providing
beach access and boat launch services that keep up with growth, examine current level of
service standards adopted by Collier County and the recreation industry, inventory
current facilities and update the 1999 Report with regard to options and inventories, and
suggest future options for expansion of services and facilities.
SUPPLY AND DEMAND
While the Gulf of Mexico is a vast but not unlimited resource for water-dependent
recreation, limited access to it limits the population's ability to use it. Sandy beach, on the
other hand, is a finite recreational resource even further limited by the constraints of
access and available parking. Collier County's population continues to grow, but its miles
of sandy beach are fixed. The challenge is to provide expanding access to beaches and
waterways, including the attendant requisite parking, without exceeding the carrying
capacities of the resources and thereby decreasing their desirability and worth. The
decreasing availability and increasing cost of land that comes with growth exacerbate this
issue. The more access is needed, the more difficult it is to find and afford.
LEVELS OF SERVICE
The Collier County Growth Management Plan outlines level of service standards
(LOSS) for parkland in three categories: facilities value, community park acreage, and
regional park acreage. Beach, beach parking, and boating access acreage are currently
included the regional park acreage measure for purposes of comprehensive plan
concurrency. The 2001 Annual Update and Inventory Report projects satisfaction of
regional park acreage LOSS through 2009 based on acreage acquisitions planned in CIP
through 2004.
Satisfaction of comprehensive plan acreage standards, however, will not maintain
the levels of service Collier County residents and visitors currently enjoy with regard to
beach and boating access. This is because the comprehensive plan requires no distinction
between regional park acreage located inland or developed to serve other functions and
acreage reserved for beach and water access. To understand the expectations of the
population an examination of the levels of service they have been experiencing is
necessary.
Boat Ramps
Currently 27 boat ramp lanes serve boaters countywide. The Parks and Recreation
Department maintains eleven ofthese lanes; City or State government provides seven;
Collier County Boat and Beach Access Report 2003 2
and nine are privately owned but open to the public. Table 1 below outlines the locations
and amenities of these facilities.
Table 1. Boat Ramp Facilities Available to the Public
III ~
Q
u .!!!
III
Co ')(
III
C) III ::J
Q III
c: E "E
~ c:
... 0 'u III
III ëii J! ::J III
Co III C) ~
... Q U III
..! u ë:
1~ c: >-
0 .~ .!!!
Twenty-one thousand vessels were registered in Collier County in 2002. Less than
6000 wet slips and less than 3000 commercial dry storage spaces are available to house
them. As a result, at least 12,000 vessels countywide are dependent on boat ramps for
water access. At an average of 20 launches per vessel per year, countywide facilities
should be able to accommodate 240,000 launches per year to meet demand. Spread
across the 27 boat ramp lanes available, facilities will average 8,889 launches per year, or
24 launches per day. This figure is in accordance with the recommendation of the Florida
Statewide Comprehensive Outdoor Recreation Planning Guide of 2000, which suggests
that a single boat ramp lane can accommodate 36 launches per day (20 minutes total put-
in and pull-out time over a 12-hour period). These calculations are ideal numbers,
however, and do not provide for peak use times such as weekends and holidays or for any
boats trailered in from outside of the county.
The Florida Statewide Comprehensive Outdoor Recreation Planning Guide
recommends that average peak use be calculated as follows: Total user occasions are
multiplied by 55 percent and divided by 111. This formula is derived from state park
attendance, where 55 percent ofthe total annual attendance occurred over 111 days (52
weeks times two weekend days plus seven weekday holidays). Average weekend and
holiday use for Collier County's boat ramp-dependent vessels then is 1189 launches, or
44 launches per lane per day. To meet the recommended carrying capacity of 36 launches
Collier County Boat and Beach Access Report 2003 3
per lane per day on an average weekend or holiday Collier County needs an additional six
boat ramp lanes countywide.
The growth of boating countywide is a further consideration with regard to the
level of service County boaters can expect to experience. The number of registered
vessels in the county has grown steadily at 1000 boats per year over the past six years.
Currently few solutions exist for finding homes for these additional boats in dry storage
or slips. They will most likely become ramp users, too. At 20 launches per year they will
require an additional 55 launches each day or 99 launches on an average weekend day.
This translates to a need for an additional two boat ramp lanes per year for as long as this
growth rate is sustained in order to maintain the levels of service County boaters
currently enjoy. Table 2 projects boat ramp lane deficiencies for the next ten years.
Year
Table 2. Pro'ection of Boat Ram Need
Number of Number of vessels Number of ramp
wet/dry slips using boat ramps lanes countywide
Ramp lane
deficit
t annual increase of 180 wet slips per year for 2002 to 2007, based on an average of the number of permits
issued by Collier County over the last four years; reduced to 120 per year for 2008 to 2012, anticipating
stronger environmental law and decreased availability of undeveloped waterfront property
::t: increase of 350 dry slips based on proposed development of Hamilton Harbor
* 3-lane increase based on planned development of the Pulling property by the City of Naples
** 2-lane increase based on the planned development of Goodland Boating Park by Collier County
Observation reveals, however, that where Collier County-run boat ramps are
concerned 36 launches per lane per day offers a generous launch and retrieval time, and
County boat ramp users can potentially significantly maximize a ramp's capacity with
efficient usage. The problem resides not in the carrying capacity of the ramp but of the
parking area. Table 3 illustrates the dearth of parking available at some County facilities.
Bayview Park, for example, according to the standard could accommodate 72 launches
per day, but offers only 16 trailer parking spaces. Weekends see Bayview ramp users
parking along the roadside as far as a mile away from the park. Because the County
recently adopted a policy to charge a launch fee instead of a parking fee, boaters who
must walk significant distances from and to their vehicles are still required to pay $3 to
use the facility.
Collier County Boat and Beach Access Report 2003
4
An additional consideration with respect to boating is access to fresh water.
Currently only Lake Trafford is officially available for freshwater boating, although a
considerable amount of boat traffic finds its way to the canal system. More access to
fresh water may alleviate some of the burden on existing facilities and, as the County
population grows, may become an increasing demand in its own right.
Beach Access
The State of Florida recommends a distance of one half-mile between sites for the
spacing of beach access points at state-financed beach restoration projects. Collier
County beaches offer a wide range of choices with regard to the frequency of access
points along its beaches. In general, State and County beach parks have more sparsely
spaced access points to maintain lesser density and a more natural beach environment and
experience. The City of Naples, on the other hand, maintains 34 of its 37 access points
within a five-mile stretch of beach, allowing for a more urban beach experience. County
residents and visitors are well served by this variety, but to keep up with growth the
County should continuously seek ways to improve access, amenity, and parking at its
beaches. Table 4 is a summary of the public access available along the county's
shoreline, from north to south (facilities operated by Collier County Parks and Recreation
are highlighted):
Amenities
Collier County Boat and Beach Access Report 2003 5
Park Shore 13,000 3 City of Naples accesses are available see none
Accesses Ci amid North Gulf Shore condominiums below
City of Naples 30,000 34 accesses stretch from north of The 1122 variable
Accesses Beach Club to 32nd Avenue South; total
Lowdermilk Park and accesses near
Naples Pier offer full amenities; select
others have showers and foot showers
Ke adin Island 40,000 water access onl 0 none
Hideaway Beach 5280 private residences and condominiums, 0 none
Development 75% inaccessible to the general
ublic·
* Accessibility calculated by subtracting y.. mile from the total linear footage for each contiguous publicly
accessible beach.
Even more than for boaters, a beachgoer's enjoyable day at the beach is only as
attainable as the nearest available parking space. In the last three years Collier County
has added 93 beach parking spaces to its inventory: 80 at Conner Park (which allow for
access to Delnor- Wiggins State Recreation Area or Vanderbilt Beach) and 13 at North
Gulf Shore Access. Total spaces at County beaches with the completion of the North
Gulf Shore project will be 1179. Spaces at City of Naples and State ofPlorida beaches
have remained static at 1122 and 350, respectively. Table 5 outlines the number of beach
parking spaces per capita in season over the past three years and projected for the next
ten. Even with the recent additions, available parking is not keeping pace with growth.
This year Collier County's population will exceed the 1: 150 space-to-resident ratio
recommended by the Parks and Recreation Advisory Board in 1999.
Collier County Boat and Beach Access Report 2003 6
The 1: 150 space-to-resident ratio was established as a goal by comparing the
number of public parking spaces to the seasonal population of the county. To retain the
validity of the standard the same formula has been used in the table above. However, a
number of considerations improve the outlook where the County's ability to provide
sufficient parking for beach access is concerned. For example, the areas listed in Table 4
as partially inaccessible to the general public nonetheless do serve a portion of the
population. Those people who live in the appropriate areas and/or purchase the required
memberships are served by accesses and parking at such semiprivate beaches. The
organizations that manage these beaches are able to provide a higher level of service to
their constituents than the general public enjoys. Pelican Bay, for example, provides 174
parking spaces for 8600 units. That's a 1 :123 space-to-resident ratio assuming 2.5
residents per unit. Marco's Residents Beaches offer a total of 390 spaces for 6654
dwelling units, or 1 space for every 42 residents. Nonetheless the managers of both areas
attest that their facilities are inadequate during peak use times, and both have taken steps
to improve their service. Pelican Bay is expanding its parking facilities, while Residents
Beach restricts guest parking on weekends during season.
Additionally, thousands of residences in Collier County are west of Lely Barefoot
Boulevard, Gulf Shore Drive, Gulf Shore Boulevard, Gordon Drive, and Collier
Boulevard. The people who live in those residences do not need parking accommodation
because they live within walking distance of the beach.
The recent introduction ofthe Collier Area Transit System may be relieving some
of the burden on beach parking for inland dwellers. Current routes take riders as far west
as 6th Street in downtown Naples, which would give a beachgoer a six-block walk to his
destination. The County should pursue expanding CAT service to local beaches, as will
be discussed in greater detail in the Recommendations section of this report.
Other Recreation
A final topic in assessing the County's levels of service with regard to beaches
and boating is the introduction of alternative recreational activities. Sugden Regional
Park is home to the 60-acre Lake Avalon, which supports a swimming beach and
opportunities to participate in non-motorized boating such as sailing, canoeing, kayaking,
and paddle boating. Clam Pass Park and Barefoot Beach Preserve offer canoe launches.
Future plans also call for a non-motorized vessel launch at the bridge at State Road 92.
Upon completion of North Naples Regional Park residents and visitors can enjoy a first-
class water park with slides, a lazy river, and children's activity pools-a perfect
alternative to the beach for cooling down on a hot day. The existing Golden Gate Aquatic
Center and small water park at Vineyards Community Park provide more choices, as
well. The County should continue to diversify the recreational activities it offers. Variety
builds the participant base and alleviates the burden on traditional resources such as
beaches.
PLANNED CAPITAL IMPROVEMENTS
Many of Collier County's Parks and Recreation facilities are relatively new, and
few to date have required extensive renovations. As these facilities age and the burden of
use--or overuse if new facilities are not constructed-accumulates, renovations to
Collier County Boat and Beach Access Report 2003 7
existing facilities will become an increasing demand on capital expenditures. Meanwhile
the county's population will continue to grow and demand for new facilities will remain.
Balancing the need to sustain or improve existing facilities and add new ones will be a
mounting challenge in the future. The mix of renovation and construction as a destination
for capital dollars is reflected already in the following boat ramp and beach access
projects, all of which are incorporated in the five-year Capital Improvement Plan:
Bayview Park Renovation and Dredging
Renovations will include an additional dock and renovations of the existing dock and
fish-cleaning tables. Funding through a Florida Recreation Development Assistance
Program grant is secured for up to $120,000. A fifty percent match is required; $75,000 is
approved for FY 03. The balance of the match will be made up from reserves or through
in-kind services. Dredging will constitute a separate project, for which $100,000 is
approved for FY 03.
Gulf Shore Drive Beach Accesses Improvements
The six accesses along Gulf Shore Drive at Vanderbilt Beach will be refurbished over
several years. Improvements at Bayview Drive are approved for $125,000 ofTDC
funding for FY 03.
Collier Boulevard Boating Park Expansion and Oveñlow Parking
Expansion to the north will add an additional 47 trailer parking spaces. A second phase of
expansion to the south may add an additional 28 trailer parking spaces. Lease of and
improvements to a parcel of land across CR 951 may supply additional overflow parking
spaces. This will be a multiyear project for which $600,000 is approved for FY 03 and
$600,000 is planned for FY 04.
lake Trafford Park Improvements
Improvements will be the installation of riprap around the water bank and repairs to the
pier. Planned funding is $75,000 in FY 04.
land Purchase for Shuttle Parking
The Department will pursue purchasing land along the US 41 corridor to develop for
parking in conjunction with a CAT beach shuttle service. Proposed funding is $2,000,000
in FY 04.
Cocohatchee River Park Seawall and Dock Repair
Seawall and dock repair is proposed for FY 04 at a cost of $1 00,000.
Caxambas Park Seawall Repair and landscaping
Seawall repair and landscaping projects are proposed for FY 05 at $60,000 each.
Goodland Boating Park Development
Park development will include two boat ramp lanes and 50 to 75 trailer parking spaces as
well as a neighborhood park. This multiyear project is scheduled for master planning at
$100,000 in FY 06 and Phase I development at $1,000,000 in FY 07.
Collier County Boat and Beach Access Report 2003 8
RECOMMENDATIONS
Staff recommends the following general principles guide the County's decisions
with regard to maintaining and expanding boat launch and beach access facilities:
. Standards set by the Florida Statewide Comprehensive Outdoor Recreation
Planning Guide or comparable industry guidance tools should be adhered to
whenever practicable.
· Estimates of carrying capacities and levels of service should always take into
consideration peak use times and seasonal populations.
· All new boat ramp and beach access facilities should be developed with adequate
parking as a primary goal.
· Improvement upon the current level of service for boat launch facilities should be
a goal of the County.
· Maintenance of the 1: 150 parking space-to-resident ratio for beach access should
be a goal ofthe County.
· A more even distribution of impact on County beaches through an increased
frequency of access points should be a goal of the County.
· Creation of a system for more countywide comprehensive planning with regard to
boat launch and beach access facilities should be considered.
· The County should consider the purchase of available properties that would be
suitable locations for boat ramps.
· The County should consider the purchase of available properties that would be
suitable locations for beach access and beach parking.
More specifically, the following are areas where Collier County can maintain or improve
its services to residents and visitors by expanding their access to open water and the
beach:
lake Access at Heritage Bay
In its review of the Heritage Bay Development of Regional Impact, the Parks and
Recreation Department has requested that the developer, US Homes, provide one
hundred acres and access to one of the lakes within the area to offset the added strain on
existing park facilities that the development will create.
Access to Golden Gate Canals
Issues regarding recreational use of the Golden Gate canal system are currently under
review by the County Attorney's office. Currently an opportunity exists to purchase a
parcel of land at the terminus of 58th Street, which could be developed to provide canal
access.
Bayview Park
The County should consider purchasing available residential lots along Danford Street to
be used for overflow trailer parking. The Parks and Recreation Department requested
additional parking from the Hamilton Harbor Development of Regional Impact, and in
original plans fifteen spaces were provided. However, the most recent plans for the
Hamilton Harbor marina do not provide the requested spaces.
Collier County Boat and Beach Access Report 2003
9
Shell Island Road Boat Ramp
The Florida Department of Environmental Protection at Rookery Bay is interested in
purchasing the boat ramp facility at the end of Shell Island Road from the Conservancy
of Southwest Florida. DEP would then consider selling or leasing the ramp to Collier
County in exchange in part for funding to pave Shell Island Road. Improvements to the
facility would be necessary, and possession is preferred over lease holding.
Everglades National Park
The master plan for Everglades National Park includes a boat ramp. The facility has yet
to be built because demand did not appear high enough and funds have not been
available. An opportunity exists for the County to partner with the national parks system
to see this facility to fruition.
Barefoot Beach Preserve
Not exceeding the carrying capacity of this park is a primary objective because of its
status as a nature preserve. Some current uses raise concern. For example, excursion
vessels frequently drop off visitors at the southern tip ofthe park. This practice is
damaging to the fragile ecosystem at Wiggins Pass. A dock and pier are planned for the
inland side of the island to accommodate waterborne visitors while protecting the beach
and dunes. This area will also allow Preserve visitors a better look at the mangrove
habitat, which presently is only accessible by canoe. Educational programs and signage
will accompany the facility.
Another concern is visits to the park by excursion buses. The parking fee of $4
per vehicle per day was established in part to encourage carpooling, but a $4 entrance fee
for a full busload of visitors is not financially comparable to the amount of impact such a
group has on the park. An increased fee for vehicles transporting over eight passengers as
is charged at State facilities should be considered.
Vanderbilt Beach Area
Conflicting sentiment surrounds the future of the Vanderbilt Beach area. Resident outcry
prompted the current moratorium, but preliminary investigation reveals that the process
of change that residents sought to hold in abeyance may be too far underway to be
prevented. While a more equitable distribution ofbeachgoers along the entire Gulf front
should be a primary goal of the County, Vanderbilt Beach is currently the most viable
locus for improving beach access. The possibilities are as follows, addressed from north
to south:
Officials at Delnor- Wiggins State Recreation Area advise that parking at that park
does not accommodate the full carrying capacity of the facility. The State should install
an additional 180 parking spaces, equal to the additional 500 beachgoers the facility can
hold.
The Parks and Recreation Department developed Conner Park on Bluebill Avenue
with future plans of securing a beach access point between Delnor- Wiggins State
Recreation Area and the Vanderbilt Inn. Eighty parking spaces are available to serve an
access that as yet is not forthcoming. To the north, the State so far has been unwilling to
grant an access easement in exchange for improvements at Delnor- Wiggins. To the south,
Collier County Boat and Beach Access Report 2003 10
plans to renovate the Vanderbilt Inn are mired in the current moratorium. The owners
wish to convert the hotel to condominiums, and the County was going to exchange a
small setback variance for a public beach access. This deal may still go through once the
moratorium is lifted.
A more equitable distribution ofbeachgoers along Vanderbilt Beach itself is
called for to reduce the burden on Vanderbilt Beach Park. To this end, refurbishments
will be made to the six walkway easements along Gulf Shore Drive. However, these
renovations will not greatly improve the usefulness of the accesses unless closer parking
or shuttle service accompanies them. The County should consider the purchase of
available lots along this portion of Gulf Shore Drive to be used for parking. See also the
transportation recommendation below.
A two-story, 400-space parking garage is planned for Vanderbilt Beach Park. This
project is currently delayed by litigation in which Collier County is suing WCI
developers over deed restrictions on the site. Resolution of the issue and completion of
the project remains a recommendation of staff.
Land Development Code Provisions
Currently, staff conducts negotiations for allowances for public access on a case-by-case
basis as coastal properties are developed or redeveloped. These deals are then approved
by the Board along with the development or redevelopment plan for the site. A more
formalized system to provide for these exchanges should be codified through the Land
Development Code. The substance of the trade should be based on quantifiable
characteristics, such as number of units developed or refurbished or acreage involved.
The remuneration would likewise need to be pre-established, as a given number of
parking spaces, rest rooms, feet of easement, or acres of land. The system would ensure
that the amount of public benefit would be commensurate for each case of private gain.
Tigertail Beach
The tidal lagoon at this park is now almost completely enclosed. A boardwalk connecting
the mainland to Sand Dollar Island may be necessary in the future to allow visitors true
Gulf-front access. The Parks and Recreation Department has secured funding to study the
feasibility of this endeavor.
Transportation Shuttle Service
Because the purchase ofland west of US 41 is often cost prohibitive, the County should
consider providing beach access through a shuttle service. The existing CAT system
should be expanded to include more stops near beach accesses. The County should
consider the purchase of appropriate available lots along the US 41 corridor to be used
for parking in conjunction with shuttle service to Vanderbilt, North Gulf Shore, and Clam
Pass Beaches. Bus loading and unloading lanes along Gulf Shore Drive would increase
the amenity of the six walkway easements along Vanderbilt Beach.
FISCAL OPTIONS
Improving levels of service for beaches and boat ramps will be a costly affair. The
2002 Park Impact Fee Update on which Parks Impact Fees are currently based calculated
beach parking acreage at $875,000 per acre based on the value of one acre or larger
Collier County Boat and Beach Access Report 2003 11
commercial parcels west of US 41 in the vicinity of Vanderbilt Beach. Development of
such a parcel into a beach parking facility consistent with County code would yield
approximately 60 parking spaces per acre at $1000 per space. The Impact Fee Update
assigned a cost per acre of$1,350,000 to beach and boating access land, based on the
recent purchase of parcels at Barefoot Beach and Goodland. Development of the
Goodland property with two boat ramp lanes, parking, and minor other recreation
facilities is estimated to cost $1,500,000.
Funding sources for these projects are limited. Current budgets suffice for
maintenance and minor improvements to existing facilities, but acquisition and
development projects of a magnitude that will keep pace with growth will require
millions more. Over the next five years a significant portion of Parks Impact Fees are
dedicated to development of regional and community parks. Boater Improvement Funds
and boat registration fees should be used for capital improvements to launch facilities, but
they too are earmarked for necessary expansions and renovations to existing ramps over
the next several years. Grant revenues are a consistent but not munificent source of funds,
accounting for about $200,000 per year in capital improvement dollars.
The most appropriate available source of funds for purchase and development of
additional boat ramp and beach access facilities is tourist development money. Ifthe
Board of County Commissioners agrees with the recommendations ofthis report, then the
Tourist Development Council should consider increasing the Parks and Recreation line
item within the TDC budget to address these issues. This use of TDC funds is clearly
within the parameters set forth for their use and is consistent with the Growth
Management Plan, as well.
Unfortunately, Conservation Collier funds will seldom be appropriate for the
types ofprojects described here. Little undeveloped coastal land that would be suitable
for beach access and boat ramps remains, and in most cases these uses would create a
greater impact on the parcels than is the intention ofthe Conservation Collier program.
CONCLUSION
In summary, the levels of service that today's residents and visitors enjoy are
currently adequate for beach parking but under the established standards for boat
launches. Over the next ten years, continued growth will significantly lessen the levels
provided unless new public beach parking and boat launching facilities are developed. As
existing facilities age, competition for capital dollars between renovation projects and
development projects will intensify, and current funding levels are already too low to
allow for significant expansion of the beach access and boat launch network.
Collier County Boat and Beach Access Report 2003 12
EXHIBIT A
2003 COLLIER COUNTY PARKS AND RECREATION
BOAT LAUNCH AND BEACH ACCESS MASTER PLAN
A. GUIDING POLICIES
1. The frequency of beach access locations will be increased to distribute beach
use more evenly.
2. The County's goal is to provide one parking space per one hundfed fifty
residents (1:150) when determining the need for beach parking.
3. The County will maximize parking opportunities at existing boat launch
locations. Recognizing the cost of waterfront boat launch facilities, the
County should pursue opportunities to expand parking around present
locations. Recommendations regarding the expansion of services to include
onsite boat storage Of other amenities not previously provided by the County
(as has been requested by some fesidents of the community) are not within
the scope of this plan.
4. The Comprehensive Plan and Land Development Codes will reflect the
County's goal to expand public beach and boat launch opportunities.
5. The County will identify and consider the purchase of available properties
for future boat ramp sites.
6. The County will continue to develop alternative opportunities to saltwater
beach access and boat launch amenities.
B. IMPLEMENTATION POLICY
Based upon the policies listed above, the following is a master plan for the practical
implementation of these recommendations:
1.
BEACH ACCESS
1. Barefoot Beach Preserve
1.1. Back Bay Dock and Pier. Currently, excursion vessels drop off visitors at the
southern tip of the park. This practice is damaging to the fragile ecosystem at
Wiggins Pass. A dock and pier are planned for the inland side of the island to
accommodate waterborne visitors while protecting the beach and dunes. This
area will also allow Preserve visitors a better look at the mangrove habitat, which
presently is only accessible by canoe. Educational programs and signage will
accompany the facility.
2. North Vanderbilt Beach and Conner Park
2.1. Bluebill Access. The Parks and Recreation Department developed Conner Park
on Bluebill Avenue with eighty parking spaces to serve a future access point
hphxTPpn J)plnnT_Wio-o-inc <;:'t<ltp npl"TP<ltinn ÂTP<I <Inri thP '1<1nrlPThilt Tnn ThP
3. Gulf Shore Drive. The Boat and Beach Access Report acknowledged the conflicting
sentiment surrounding the future of the Vanderbilt Beach area and the resident outcry
that prompted the current moratorium. The report concluded that while a more
equitable distribution of beachgoers along the entire Gulf front should be a primary
goal of the County, Vanderbilt Beach is currently the most viable location for
improving beach access. The following projects will work to that end:
3.1. Refurbishment of the Pedestrian Accesses. Refurbishment of the walkway
easement on Gulf Shore Drive at the Mansions condominium is currently
underway. Staff recommends improvements to the other five walkways as well.
3.2. At the workshop on March 12, 2003, staff was given direction to provide rest
room facilities in conjunction with any transportation shuttle program that would
serve the improved accesses. The access easements are too narrow for such a
facility, so the purchase of and improvements to lots along Vanderbilt Beach to
serve that purpose will be necessary. This will improve the County's ability to
qualify for State and Federal funding for renourishment of this beach, since the
provision of a public beach access point everyone-half mile is a requirement of
these programs.
4. Transportation Shuttle Service. To cost-effectively maintain the 1: 150 parking ratio
recommended in the Boat and Beach Access Report, a transportation shuttle service is
proposed for the northern Collier County beaches. The purchase of Shuttle Busses
and land for the parking area, as well as improvements to the parking area will be
necessary. Florida Department of Transportation grant funds may be available for
purchase ofthe shuttle busses.
5. Vanderbilt Beach Park. A two-story, 400-space parking garage is planned for
Vanderbilt Beach Park. This project is currently delayed by litigation, but resolution
of the issue and completion of the project remains a recommendation of staff. With
the introduction of a shuttle parking service and the possible construction of a parking
garage at Vanderbilt Beach Park, this facility's existing rest rooms and boardwalks
will need refurbishment or expansion.
6. Pelican Bay Beach Access. Collier County owns some inaccessible parcels of land
between Vanderbilt Beach and Clam Pass. Staff recommends examining the viability
of providing accesses in these areas.
7. Clam Pass Park. Refurbishments planned for this facility include parking lot
resurfacing, new handrails, and improvements to the entrance booth.
8. Tigertail Beach Park. The tidal lagoon at this park is now almost completely
enclosed. A boardwalk connecting the mainland to Sand Dollar Island may be
necessary in the future to allow visitors true Gulf-front access. The Parks and
Recreation Department is currently developing the scope of a feasibility study to
evaluate the environmental impact of this endeavor. Repairs to the dune walkovers at
this park will be necessary within the next ten years.
2.
BOATING ACCESS
1. Lake Access at Heritage Bay. In its review of the Heritage Bay Development of
Regional Impact, the Parks and Recreation Department has requested that the
developer, US Homes, provide access to one of the lakes within the area to offset the
added strain on existing park facilities that the development will create.
Impact, and in original plans fifteen spaces were provided. However, the most recent
plans show that the request could not be accommodated due to environmental issues.
4. Collier Boulevard Boating Park Expansion and Overflow Parking. Expansion to the
north will add an additional 47 trailer parking spaces. A second phase of expansion to
the south may add an additional 28 trailer parking spaces. This will be a multiyear
project for which $600,000 is approved for FY 03 and $600,000 is planned for FY 04.
Source funds are Boater Improvement Funds and Impact Fees.
5. Shell Island Road Boat Ramp. The Florida Department of Environmental Protection
at Rookery Bay is interested in purchasing the boat ramp facility at the end of Shell
Island Road from the Conservancy of Southwest Florida. DEP would then consider
leasing the ramp to Collier County in exchange in part for funding to pave Shell
Island Road. Improvements to the facility would be necessary.
6. Goodland Boating Park. Based upon previous Board direction, present Park plans will
include two boat ramp lanes and 50 to 75 trailer parking spaces as well as a
neighborhood park. This multi-year project has been accelerated to capitalize on
existing permits issued to the previous property owner. Master planning is scheduled
for FY 04 at $150,000. A $75,000 Florida Boater Improvement Program Grant has
been applied for to offset this cost. Phase I development at $1,500,000 is slated for
FY 05. Boater Improvement Grant funds can be pursued for development as well.
7. Everglades National Park. The master plan for Everglades National Park includes a
boat ramp. The facility has yet to be built because funds have not been available. An
opportunity exists for the County to partner with the National Parks System to see this
facility to fruition.