Loading...
Agenda 09/25/2018 Item #16D 509/25/2018 EXECUTIVE SUMMARY Recommendation to award Agreement No. 18-7380 Golden Gate Municipal Service Taxing Unit (MSTU) Landscape Maintenance to Green Effex, LLC. in the amount of $139,648.31. OBJECTIVE: To provide for on-going maintenance of landscaping and irrigation installed by the Golden Gate MSTU within its boundary. CONSIDERATIONS: On May 18, 2018, the Procurement Services Division released notices of Invitation to Bid No. 18-7380 to 5,409 vendors for Golden Gate MSTU Landscape Maintenance. Vendors downloaded fifty (50) bid packages, and the County received five (5) bids by the June 19, 2018 deadline. The County elected not to award line items #39-40 and #51-52, which is consistent with the ITB’s Award Criteria to select award options that represent the best value and are in the best interest of the County. Staff found the following three (3) vendors non-responsive for failing to submit a bid schedule, required forms, and/or certifications: MCWDCC Auto Sales & Services Corp, Ground Zero Landscaping Services Inc., and Hannula Landscaping and Irrigation Inc. The bids were as follows: Company Name City State Bid Amount Responsive/Responsible MCWDCC Auto Sales & Services Corp Ft. Myers FL $133,000 NO/NO Green Effex, LLC. Naples FL $139,648.31 YES/YES Superior Landscaping & Lawn Service Inc. Miami FL $206,564 YES/YES Ground Zero Landscaping Services Inc. Naples FL $267,333 NO/YES Hannula Landscaping & Irrigation Inc. Ft. Myers FL $362,383.50 NO/YES Staff determined the lowest responsive and responsible bidder to be Green Effex, LLC. The Golden Gate MSTU Advisory Committee was notified of the award at the August 21st Meeting, consistent with the recommendation of the MSTU Project Manager. LEGAL CONSIDERATIONS: This Item is approved as to form and legality and requires majority vote for the Board of County Commissioners (Board) approval. -SRT FISCAL IMPACT: The Fund 153 FY19 budget has $333,900 allocated for Operating Expenses, which includes an allocation to cover normal landscape maintenance and other incidental items. GROWTH MANAGEMENT IMPACT: There is no Growth Management impact. RECOMMENDATION: To award Bid #18-7380 Landscape Maintenance for the Golden Gate MSTU to Green Effex, LLC in the amount of $139,648.31 and authorize the Chairman to sign the attached agreement. Prepared By: Dan Schumacher, MSTU Project Manager, Public Transit and Neighborhood Enhancement 16.D.5 Packet Pg. 1602 09/25/2018 ATTACHMENT(S) 1. 1-18-7380-Green Effex Contract-VendSign-GG (PDF) 2. 2-18-7380-NORA-GG (PDF) 3. 3-18-7380-Bid Tabulation-GG (PDF) 4. 4-18-7380-Green Effex Proposal-GG (PDF) 5. 5-18-7380-Solicitation-GG (PDF) 6. 6-18-7380 Addendum #1-GG (PDF) 7. 7-18-7380 Addendum #2-GG (PDF) 8. 8-18-7380-Exhibit1-GG (PDF) 16.D.5 Packet Pg. 1603 09/25/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.D.5 Doc ID: 6536 Item Summary: Recommendation to award Agreement No. 18-7380 Golden Gate Municipal Service Taxing Unit (MSTU) Landscape Maintenance to Green Effex, LLC. in the amount of $139,648.31. Meeting Date: 09/25/2018 Prepared by: Title: Project Manager – Public Transit & Neighborhood Enhancement Name: Dan Schumacher 08/25/2018 2:52 PM Submitted by: Title: Division Director - Pub Tran & Nbrhd Enh – Public Transit & Neighborhood Enhancement Name: Michelle Arnold 08/25/2018 2:52 PM Approved By: Review: Public Transit & Neighborhood Enhancement Caroline Soto Additional Reviewer Completed 08/27/2018 8:56 AM Public Transit & Neighborhood Enhancement Michelle Arnold Additional Reviewer Completed 08/27/2018 7:45 PM Public Services Department Joshua Hammond Additional Reviewer Completed 08/31/2018 3:54 PM Procurement Services Viviana Giarimoustas Additional Reviewer Completed 09/04/2018 8:27 AM Procurement Services Sandra Herrera Additional Reviewer Completed 09/04/2018 1:35 PM Procurement Services Ted Coyman Additional Reviewer Completed 09/06/2018 12:33 PM Procurement Services Swainson Hall Additional Reviewer Completed 09/11/2018 11:15 AM Public Services Department Todd Henry Level 1 Division Reviewer Completed 09/11/2018 12:02 PM Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 09/11/2018 12:23 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 09/11/2018 4:02 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 09/11/2018 4:23 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 09/12/2018 7:32 AM Budget and Management Office Ed Finn Additional Reviewer Completed 09/12/2018 2:10 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 09/12/2018 2:43 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/16/2018 6:14 PM Board of County Commissioners MaryJo Brock Meeting Pending 09/25/2018 9:00 AM 16.D.5 Packet Pg. 1604 16.D.5.aPacket Pg. 1605Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1606Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1607Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1608Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1609Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1610Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1611Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1612Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1613Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1614Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1615Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1616Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1617Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.a Packet Pg. 1618 Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1619Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1620Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1621Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1622Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1623Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1624Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1625Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1626Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1627Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1628Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1629Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1630Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1631Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1632Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1633Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1634Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1635Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1636Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1637Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1638Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1639Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.aPacket Pg. 1640Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY $ $ 16.D.5.a Packet Pg. 1641 Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.a Packet Pg. 1642 Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.a Packet Pg. 1643 Attachment: 1-18-7380-Green Effex Contract-VendSign-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.b Packet Pg. 1644 Attachment: 2-18-7380-NORA-GG (6536 : Golden Gate MSTU Landscape Maintenance) Project Manager: Dan SchumacherProcurement: Viviana GiarimoustasWitness: Evelyn ColonBid Tabulation# 18‐7380 Golden Gate MSTULandscape MaintenanceNotifications Sent: 5,409Downloaded: 50Submissions: 5 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL112 Ea $              9.99  $              119.88  $         45.00  $          540.00  $         50.00  $          600.00  $             125.00  $              1,500.00 212 Ea $              9.99  $              119.88  $         45.00  $          540.00  $         50.00  $          600.00  $             125.00  $              1,500.00 352 Ea $            37.50  $           1,950.00  $         50.00  $       2,600.00  $         50.00  $       2,600.00  $               85.00  $              4,420.00 452 Ea $            75.00  $           3,900.00  $      170.00  $       8,840.00  $      200.00  $     10,400.00  $             175.00  $              9,100.00 526 Ea $            63.50  $           1,651.00  $      120.00  $       3,120.00  $      135.00  $       3,510.00  $             125.00  $              3,250.00 652 Ea $          112.50  $           5,850.00  $      120.00  $       6,240.00  $      150.00  $       7,800.00  $             600.00  $           31,200.00 712 Ea $          675.00  $           8,100.00  $      530.00  $       6,360.00  $      700.00  $       8,400.00  $             150.00  $              1,800.00 852 Ea $            42.50  $           2,210.00  $         70.00  $       3,640.00  $         65.00  $       3,380.00  $             125.00  $              6,500.00   $               ‐     $                   ‐     $                      ‐   912 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      375.00  $       4,500.00  $             200.00  $              2,400.00 1012 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      200.00  $       2,400.00  $             200.00  $              2,400.00 1112 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      200.00  $       2,400.00  $             175.00  $              2,100.00  $                   ‐     $                          ‐   1212 Ea $            79.00  $              948.00  $      195.00  $       2,340.00  $      300.00  $       3,600.00  $             300.00  $              3,600.00 1312 Ea $            79.00  $              948.00  $      195.00  $       2,340.00  $      250.00  $       3,000.00  $             300.00  $              3,600.00 1426 Ea $            85.00  $           2,210.00  $      135.00  $       3,510.00  $      280.00  $       7,280.00  $             200.00  $              5,200.00  $         30,130.76  $     47,090.00  $     60,470.00  $           78,570.00 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL1552 Ea $            37.50  $           1,950.00  $         50.00  $       2,600.00  $         70.00  $       3,640.00  $               85.00  $              4,420.00 1652 Ea $            82.50  $           4,290.00  $      170.00  $       8,840.00  $      210.00  $     10,920.00  $             175.00  $              9,100.00 1752 Ea $            63.50  $           3,302.00  $      120.00  $       6,240.00  $      125.00  $       6,500.00  $             125.00  $              6,500.00 1852 Ea $          127.50  $           6,630.00  $      120.00  $       6,240.00  $      125.00  $       6,500.00  $             600.00  $           31,200.00 1912 Ea $          575.00  $           6,900.00  $      530.00  $       6,360.00  $      800.00  $       9,600.00  $             150.00  $              1,800.00 2052 Ea $            42.50  $           2,210.00  $         70.00  $       3,640.00  $      145.00  $       7,540.00  $             125.00  $              6,500.00 2152 Ea $            85.00  $           4,420.00  $         90.00  $       4,680.00  $      116.00  $       6,032.00  $             200.00  $           10,400.00  $                       ‐   2252 Ea $            91.75  $           4,771.00  $         45.00  $       2,340.00  $         35.00  $       1,820.00  $             130.00  $              6,760.00 2352 Ea $            91.75  $           4,771.00  $         45.00  $       2,340.00  $         35.00  $       1,820.00  $             130.00  $              6,760.00   $                       ‐   2412 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      375.00  $       4,500.00  $             200.00  $              2,400.00 2512 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      200.00  $       2,400.00  $             200.00  $              2,400.00 2612 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      200.00  $       2,400.00  $             175.00  $              2,100.00  $                       ‐   2712 Ea $            79.00  $              948.00  $      195.00  $       2,340.00  $      325.00  $       3,900.00  $             300.00  $              3,600.00 2812 Ea $            79.00  $              948.00  $      195.00  $       2,340.00  $      300.00  $       3,600.00  $             300.00  $              3,600.00 2926 Ea $            85.00  $           2,210.00  $      135.00  $       3,510.00  $      280.00  $       7,280.00  $             200.00  $              5,200.00  $         45,474.00  $     58,490.00  $     78,452.00  $         102,740.00 AREA SPECIFIC TURF  ‐ Contractor supplies chemicals and applicationTurf: Insecticides & Fungicides, applied to areas as needed per monthTurf: Herbicides, applied to areas as needed per monthIRRIGATION MAINTENANCE ‐ Contractor utilizes Cell Phone capability to access HydroPoint controller to conduct Wet‐Checks.Bi‐Weekly Irrigation System Wet‐check & Controller InspectionSection 2 Total: Pedestrian Shelter on Tropicana Blvd @ 31st Ave SW:  Items 1, 3, 4, 6 completed weekly   (Sheet No. 3)Pedestrian Shelter on 28th Ave SW @ Tropicana Blvd:  Items 1, 3, 4, 6 completed weekly   (Sheet No. 3)AREA SPECIFIC SPRAYING ‐  Contractor supplies chemicals and applicationGroundcover, Shrubs, & Trees: Insecticides, applied to all areas as needed per monthGroundcover, Shrubs, & Trees: Fungicides, applied to areas as needed per monthGroundcover, Shrubs, & Trees: Herbicides, applied to areas as needed per monthWeekly Mowing & Edging:  Side ROW, (1) Mower PassWeekly Weeding ‐ shrubs, groundcover for a weed‐free site  (hand & chemical) Monthly General Trimming & Pruning ‐ entire area completed once per monthWeekly Post‐service CleaningWeekly Irrigation System Wet‐check & Controller InspectionAREA SPECIFIC MAINTENANCESection 1 Total:   Section 2:  TROPICANA BLVD & PEDESTRIAN SHELTERS ‐ Work Areas 1c & 1e                                                                         Exhibit 1,  Sheet No. 3DESCRIPTIONBASIC LANDSCAPE MAINTENANCEWeekly Trash RemovingWeekly Mowing & Edging:  MediansGroundcover, Shrubs, & Trees: Herbicides, applied to areas as needed per monthAREA SPECIFIC TURF  ‐ Contractor supplies chemicals and applicationTurf: Insecticides & Fungicides, applied to areas as needed per monthTurf: Herbicides, applied to areas as needed per monthIRRIGATION MAINTENANCE ‐ Contractor utilizes Cell Phone capability to access HydroPoint controller to conduct Wet‐Checks.Bi‐Weekly Irrigation System Wet‐check & Controller InspectionWeekly Weeding ‐ shrubs, groundcover for a weed‐free site  (hand & chemical) Monthly General Trimming & Pruning ‐ entire area completed once per monthWeekly Post‐service CleaningAREA SPECIFIC SPRAYING ‐  Contractor supplies chemicals and applicationGroundcover, Shrubs, & Trees: Insecticides, applied to all areas as needed per monthGroundcover, Shrubs, & Trees: Fungicides, applied to areas as needed per monthGreen Effex HannulaSuperior Landscaping Ground ZeroImproved Median on 18th Plc SW @ Sunset Rd:  items 3, 4 (Edge only), 6, 7; serviced as needed per month        (Sheet No. 2)BASIC LANDSCAPE MAINTENANCESection 1:  SUNSHINE BLVD & IMPROVED MEDIANS ‐ Work Areas 1b & 1d                                                      Exhibit 1,  Sheet No. 1 & Sheet No. 2DESCRIPTIONIMPROVED MEDIANS ‐ Not IrrigatedImproved Median on 18th Ave SW @ 40th Ter SW:  items 3, 4 (Edge only), 6, 7; serviced as needed per month   (Sheet No. 1)Weekly Trash RemovingWeekly Mowing & Edging:  MediansBi‐Weekly Mowing & Edging:  Side ROW, (1) Mower Pass#18-7380 Golden Gate MSTU Landscape MaintenanceProvide all inclusive pricing for Items #1-79. Estimated Quantities, Dimensions, and total base bid are for award determination purposes only and does not reflect actual usage or demand. Work will be paid by the unit price provided. Pricing to include MOT and Disposal costs. Contractor may sub-contract upon written review and consent of the Project Manager or designee, however it shall not exceed the price provided on the Bid Schedule. Material mark up shall be at cost plus 10%. Normal hours are between 7:00AM- 6:00PM, after hours are from 6:01PM-6:59AM. After hours will be paid at time and a half, subject to pre-approval by the Project Manager.1 of 316.D.5.cPacket Pg. 1645Attachment: 3-18-7380-Bid Tabulation-GG (6536 : Golden Gate MSTU Landscape Maintenance) Project Manager: Dan SchumacherProcurement: Viviana GiarimoustasWitness: Evelyn ColonBid Tabulation# 18‐7380 Golden Gate MSTULandscape MaintenanceNotifications Sent: 5,409Downloaded: 50Submissions: 5 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL3052 Ea $            37.50  $           1,950.00  $         50.00  $       2,600.00  $         80.00  $       4,160.00  $               85.00  $              4,420.00 3152 Ea $            53.50  $           2,782.00  $      170.00  $       8,840.00  $         45.00  $       2,340.00  $             376.00  $           19,552.00 3152 Ea $            69.30  $           3,603.60  $      120.00  $       6,240.00  $         75.00  $       3,900.00  $             175.00  $              9,100.00 3252 Ea $          167.50  $           8,710.00  $      120.00  $       6,240.00  $      150.00  $       7,800.00  $             600.00  $           31,200.00 3312 Ea $          475.00  $           5,700.00  $      530.00  $       6,360.00  $      800.00  $       9,600.00  $             150.00  $              1,800.00 3452 Ea $            42.50  $           2,210.00  $         70.00  $       3,640.00  $         75.00  $       3,900.00  $               75.00  $              3,900.00 3552 Ea $            85.00  $           4,420.00  $         90.00  $       4,680.00  $      125.00  $       6,500.00  $             225.00  $           11,700.00  3612 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      450.00  $       5,400.00  $             200.00  $              2,400.00 3712 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      250.00  $       3,000.00  $             200.00  $              2,400.00 3812 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      375.00  $       4,500.00  $             175.00  $              2,100.00  $                   ‐   39n/a Ea $                   ‐     $                       ‐     $      195.00  $          195.00  $               ‐     $                   ‐     $             300.00  $                 300.00 40n/a Ea $                   ‐     $                       ‐     $      195.00  $          195.00  $               ‐     $                   ‐     $             300.00  $                 300.00 4126 Ea $            85.00  $           2,210.00  $      135.00  $       3,510.00  $      320.00  $       8,320.00  $             200.00  $              5,200.00  $         33,709.60  $     49,520.00  $     59,420.00  $           94,372.00 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL4252 Ea $            32.50  $           1,690.00  $         50.00  $       2,600.00  $         70.00  $       3,640.00  $               85.00  $              4,420.00 4352 Ea $            43.50  $           2,262.00  $      170.00  $       8,840.00  $         45.00  $       2,340.00  $             175.00  $              9,100.00 4352 Ea $            69.50  $           3,614.00  $      120.00  $       6,240.00  $      100.00  $       5,200.00  $             125.00  $              6,500.00 4452 Ea $          107.50  $           5,590.00  $      120.00  $       6,240.00  $      150.00  $       7,800.00  $             600.00  $           31,200.00 4512 Ea $          375.00  $           4,500.00  $      525.00  $       6,300.00  $      800.00  $       9,600.00  $             150.00  $              1,800.00 4652 Ea $            42.50  $           2,210.00  $         70.00  $       3,640.00  $      150.00  $       7,800.00  $             125.00  $              6,500.00 4752 Ea $            85.00  $           4,420.00  $         90.00  $       4,680.00  $      125.00  $       6,500.00  $             200.00  $           10,400.00  4812 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      400.00  $       4,800.00  $             200.00  $              2,400.00 4912 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      350.00  $       4,200.00  $             200.00  $              2,400.00 5012 Ea $            59.00  $              708.00  $      195.00  $       2,340.00  $      250.00  $       3,000.00  $             175.00  $              2,100.00  $                   ‐   51n/a Ea $                   ‐     $                       ‐     $      195.00  $          195.00  $               ‐     $                   ‐     $             300.00  $                 300.00 52n/a Ea $                   ‐     $                       ‐     $      195.00  $          195.00  $               ‐     $                   ‐     $             300.00  $                 300.00 5326 Ea $            85.00  $           2,210.00  $      135.00  $       3,510.00  $      280.00  $       7,280.00  $             200.00  $              5,200.00  $         28,620.00  $     49,460.00  $     62,160.00  $           82,620.00 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL541 Hr. $            45.00  $                 45.00  $         65.00  $            65.00  $         55.00  $            55.00  $               70.00  $                   70.00 551 Hr. $            34.50  $                 34.50  $         35.00  $            35.00  $         38.00  $            38.00  $               65.00  $                   65.00 561 Hr. $            42.50  $                 42.50  $         55.00  $            55.00  $         54.00  $            54.00  $               95.00  $                   95.00 571 Hr. $            34.50  $                 34.50  $         45.00  $            45.00  $         48.00  $            48.00  $               75.00  $                   75.00  $              156.50  $          200.00  $          195.00  $                 305.00 Supervisor (per man hour)Laborer/Helper (per man hour):Irrigation Supervisor (per man hour)Irrigation Technician (per man hour)Section 5 Total: Turf: Herbicides, applied to areas as needed per monthIRRIGATION MAINTENANCE ‐ Contractor utilizes Cell Phone capability to access HydroPoint controller to conduct Wet‐Checks.  (future)Bi‐Weekly Irrigation System Wet‐check & Controller InspectionSection 4 Total:   SECTION 5: HOURLY SERVICESDESCRIPTIONAREA SPECIFIC SPRAYING ‐  Contractor supplies chemicals and applicationGroundcover, Shrubs, & Trees: Insecticides, applied to all areas as needed per monthGroundcover, Shrubs, & Trees: Fungicides, applied to areas as needed per monthGroundcover, Shrubs, & Trees: Herbicides, applied to areas as needed per monthAREA SPECIFIC TURF  ‐ Contractor supplies chemicals and applicationTurf: Insecticides & Fungicides, applied to areas as needed per monthWeekly Mowing & Edging:  MediansWeekly Mowing & Edging:  Side ROW, (1) Mower PassWeekly Weeding ‐ shrubs, groundcover for a weed‐free site  (hand & chemical) Monthly General Trimming & Pruning ‐ entire area completed once per monthWeekly Post‐service CleaningWeekly Irrigation System Wet‐check & Controller InspectionBi‐Weekly Irrigation System Wet‐check & Controller InspectionSection 3 Total:   Section 4:  HUNTER BLVD ‐ Work Area 1g                                                                                                                                  Exhibit 1,  Sheet No. 5DESCRIPTIONBASIC LANDSCAPE MAINTENANCEWeekly Trash RemovingGroundcover, Shrubs, & Trees: Fungicides, applied to areas as needed per monthGroundcover, Shrubs, & Trees: Herbicides, applied to areas as needed per monthAREA SPECIFIC TURF  ‐ Contractor supplies chemicals and applicationTurf: Insecticides & Fungicides, applied to areas as needed per monthTurf: Herbicides, applied to areas as needed per monthIRRIGATION MAINTENANCE ‐ Contractor utilizes Cell Phone capability to access HydroPoint controller to conduct Wet‐Checks.  (future)Weekly Weeding ‐ shrubs, groundcover for a weed‐free site  (hand & chemical) Monthly General Trimming & Pruning ‐ entire area completed once per monthWeekly Post‐service CleaningWeekly Irrigation System Wet‐check & Controller InspectionAREA SPECIFIC SPRAYING ‐  Contractor supplies chemicals and applicationGroundcover, Shrubs, & Trees: Insecticides, applied to all areas as needed per month  Section 3:  CORONADO PKWY ‐ Work Area 1f                                                                                                                           Exhibit 1,  Sheet No. 4DESCRIPTIONBASIC LANDSCAPE MAINTENANCEWeekly Trash RemovingWeekly Mowing & Edging:  MediansWeekly Mowing & Edging:  Side ROW, (1) Mower Pass2 of 316.D.5.cPacket Pg. 1646Attachment: 3-18-7380-Bid Tabulation-GG (6536 : Golden Gate MSTU Landscape Maintenance) Project Manager: Dan SchumacherProcurement: Viviana GiarimoustasWitness: Evelyn ColonBid Tabulation# 18‐7380 Golden Gate MSTULandscape MaintenanceNotifications Sent: 5,409Downloaded: 50Submissions: 5 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL581Ea $          258.00  $              258.00  $         15.00  $            15.00  $         25.00  $            25.00  $             130.00  $                 130.00 591Ea $            55.00  $                 55.00  $         45.00  $            45.00  $         35.00  $            35.00  $             130.00  $                 130.00 601Ea $              2.49  $                   2.49  $         20.00  $            20.00  $           5.00  $               5.00  $               12.00  $                   12.00 611Ea $              2.49  $                   2.49  $         20.00  $            20.00  $           5.00  $               5.00  $               24.00  $                   24.00 621Ea $              2.49  $                   2.49  $         20.00  $            20.00  $           7.00  $               7.00  $               24.00  $                   24.00 631Ea $              2.49  $                   2.49  $         20.00  $            20.00  $           5.00  $               5.00  $               24.00  $                   24.00      641Ea $              2.49  $                   2.49  $           4.00  $               4.00  $           4.00  $               4.00  $                 7.50  $                     7.50  $              325.45  $          144.00  $            86.00  $                 351.50 ITEMEstimated QTYUNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL651Ea $            41.00  $                 41.00  $         95.00  $            95.00  $      200.00  $          200.00  $             240.00  $                 240.00 661Ea $            81.00  $                 81.00  $      150.00  $          150.00  $      400.00  $          400.00  $             345.00  $                 345.00 671Ea $            42.00  $                 42.00  $         95.00  $            95.00  $      200.00  $          200.00  $             240.00  $                 240.00 681Ea $            62.00  $                 62.00  $      150.00  $          150.00  $      350.00  $          350.00  $             345.00  $                 345.00 691Ea $            45.00  $                 45.00  $         95.00  $            95.00  $      450.00  $          450.00  $             240.00  $                 240.00 701Ea $            85.00  $                 85.00  $      150.00  $          150.00  $      800.00  $          800.00  $             450.00  $                 450.00 711Ea $            91.00  $                 91.00  $      150.00  $          150.00  $      400.00  $          400.00  $             270.00  $                 270.00 721Ea $          101.00  $              101.00  $      150.00  $          150.00  $      800.00  $          800.00  $             370.00  $                 370.00 731Ea $          110.00  $              110.00  $      150.00  $          150.00  $      400.00  $          400.00  $             270.00  $                 270.00 741Ea $          135.00  $              135.00  $      200.00  $          200.00  $      800.00  $          800.00  $             480.00  $                 480.00 751Ea $          115.00  $              115.00  $      200.00  $          200.00  $      400.00  $          400.00  $             270.00  $                 270.00 761Ea $          145.00  $              145.00  $      250.00  $          250.00  $      900.00  $          900.00  $             480.00  $                 480.00 771 Hr. $            52.00  $                 52.00  $      225.00  $          225.00  $      125.00  $          125.00  $             175.00  $                 175.00 781 Hr. $            79.00  $                 79.00  $      285.00  $          285.00  $      250.00  $          250.00  $             325.00  $                 325.00 791 Hr. $            48.00  $                 48.00  $         95.00  $            95.00  $         75.00  $            75.00  $             125.00  $                 125.00  $           1,232.00  $       2,440.00  $       6,550.00  $              4,625.00  $    139,648.31  $                    ‐    $    139,648.31 Landscape Contractors LicenseYesMOT CertificationYesPesticide Applicator LicenseYesRequired FormsYesNOYesNOYesYesYesYesYesYesYesYesNORestanding & Staking Large Canopy Tree (2x4 posts, greater than 6" caliper)Bobcat & Operator (Unit per Hr.)DESCRIPTIONStaking Small Palm (4"‐6" Caliper)Staking Large Palm (Caliper greater than 6")Staking Small Ornamental Tree (4"‐6" Caliper)Stump Grinder & Operator (Unit per Hr.)Truck Operator, Class B or higher current State of Florida Driver License (Unit per Hr.)Section 7 Total: Staking Large Canopy Tree (2x4 posts, greater than 6" caliper)Restanding & Staking Small Palm (4"‐6" Caliper)Restanding & Staking Large Palm (Caliper greater than 6")Restanding & Staking Small Ornamental Tree (4"‐6" Caliper)Restanding & Staking Large Ornamental Tree (2x4 posts, greater than 6" caliper)Restanding & Staking Small Canopy Tree (2x2 posts and guy wire, 4"‐6" caliper)15‐0‐15 Poly Plus 50% ; 5 bags total@ 50 lb/bag, 2 apps/year (5+5) ‐ Unit Application Price/bagStaking Large Ornamental Tree (2x4 posts, greater than 6" caliper)Staking Small Canopy Tree (2x2 posts and guy wire, 4"‐6" caliper)08‐02‐12 Palm Special ; 6 bags total@ 50 lb/bag, 2 apps/year (6+6) ‐ Unit Application Price/bag08‐02‐12‐180 ; 130 bags total@ 50 lb/bag, 2 apps/year (65+65) ‐ Unit Application Price/bagMULCH ‐ Material supplied & delivered separately under County contractOrganic Application, per 1,000 bags @ 2 cuft ea ‐ Unit Application Price/bagSection 6 Total:   SECTION 7: ADDITIONAL SERVICESDESCRIPTIONOCCASIONAL MAINTENANCE FUNCTIONSLamp Pole Spider Webs ‐ Remove from lens face of light pole fixture, upon request  (Approx 15ft height) ‐ Unit Price per Light PoleLamp Pole Tree Limbs ‐ Remove from lens face of light pole fixture, upon request  (Approx 15ft height) ‐ Unit Price per Light PoleFERTILIZER ‐ County supplies & Contractor applies  (Turf, Groundcover, Shrubs, and Trees)0‐0‐22 So‐Po‐Mag 180 ; 43 bags total @ 50 lb/bag, 1 app/year (43) ‐ Unit Application Price/bag  SECTION 6: GENERAL MAINTENANCE FUNCTIONS267,333.00$                      TOTAL BASE BID (Sections 1‐7)County has elected to not award  line item #39‐#40 and #51‐#52 780.00$                                    $                           207,344.00  $                           267,333.00  $                                         363,583.50 REVISED TOTAL BASE BID206,564.00$                      362,383.50$                                  1,200.00$                                             ‐$                                          3 of 316.D.5.cPacket Pg. 1647Attachment: 3-18-7380-Bid Tabulation-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1648 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1649 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1650 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1651 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1652 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1653 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1654 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1655 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1656 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1657 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1658 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1659 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1660 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1661 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1662 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1663 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1664 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1665 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1666 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1667 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.dPacket Pg. 1668Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) Department of State /Division of Corporations /Search Records /Detail By Document Number / Document Number FEI/EIN Number Date Filed Effective Date State Status Detail by Entity Name Florida Limited Liability Company GREEN EFFEX, LLC Filing Information L08000076767 26-3142790 08/11/2008 08/11/2008 FL ACTIVE Principal Address 4555 Radio Road Naples, FL 34104 Changed: 01/31/2013 Mailing Address 4555 Radio Road Naples, FL 34104 Changed: 01/31/2013 Registered Agent Name & Address Savoretti, Andrea K. 4555 Radio Road Naples, FL 34104 Name Changed: 01/31/2013 Address Changed: 01/31/2018 Authorized Person(s) Detail Name & Address Title MGRM Savoretti, Andrea K. 4555 Radio Road Naples, FL 34104 Annual Reports Report Year Filed Date DIVISION OF CORPORATIONSFlorida Department of State Page 1 of 2Detail by Entity Name 6/19/2018http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 16.D.5.d Packet Pg. 1669 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 2016 03/23/2016 2017 01/13/2017 2018 01/31/2018 Document Images 01/31/2018 -- ANNUAL REPORT View image in PDF format 01/13/2017 -- ANNUAL REPORT View image in PDF format 03/23/2016 -- ANNUAL REPORT View image in PDF format 02/11/2015 -- ANNUAL REPORT View image in PDF format 01/09/2014 -- ANNUAL REPORT View image in PDF format 01/31/2013 -- ANNUAL REPORT View image in PDF format 01/04/2012 -- ANNUAL REPORT View image in PDF format 02/07/2011 -- ANNUAL REPORT View image in PDF format 01/22/2010 -- ANNUAL REPORT View image in PDF format 03/03/2009 -- ANNUAL REPORT View image in PDF format 08/11/2008 -- Florida Limited Liability View image in PDF format Florida Department of State, Division of Corporations Page 2 of 2Detail by Entity Name 6/19/2018http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 16.D.5.d Packet Pg. 1670 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1671 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1672 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1673 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1674 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1675 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.d Packet Pg. 1676 Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) 16.D.5.dPacket Pg. 1677Attachment: 4-18-7380-Green Effex Proposal-GG (6536 : Golden Gate MSTU Landscape Maintenance) COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS INVITATION TO BID (ITB) FOR GOLDEN GATE MSTU LANDSCAPE MAINTENANCE SOLICITATION NO.: 18-7380 VIVIANA GIARIMOUSTAS, PROCUREMENT STRATEGIST PROCUREMENT SERVICES DIVISION 3295 TAMIAMI TRAIL EAST, BLDG C-2 NAPLES, FLORIDA 34112 TELEPHONE: (239) 252-8375 Viviana.Giarimoustas@colliercountyfl.gov (Email) This solicitation document is prepared in a Microsoft Word format. Any alterations to this document made by the Consultant may be grounds for rejection of proposal, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government. 16.D.5.e Packet Pg. 1678 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) SOLICITATION PUBLIC NOTICE INVITATION TO BID (ITB) NUMBER: 18-7380 PROJECT TITLE: GOLDEN GATE MSTU LANDSCAPE MAINTENANCE BID OPENING DAY/DATE/TIME: Tuesday June 19, 2018 10:00AM EST PLACE OF BID OPENING: PROCUREMENT SERVICES DIVISION 3295 TAMIAMI TRAIL EAST, BLDG C-2 NAPLES, FL 34112 All proposals shall be submitted online via the Collier County Procurement Services Division Online Bidding System: https://www.bidsync.com/bidsync-cas/ INTRODUCTION As requested by the Public Transit & Neighborhood Enhancement Division (hereinafter, the “Division or Department”), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Invitation to Bid (hereinafter, “ITB”) with the intent of obtaining bid submittals from interested and qualified vendors in accordance with the terms, conditions and specifications stated or attached. The vendor, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated. The results of this solicitation may be used by other County departments once awarded according to the Board of County Commissioners Procurement Ordinance. The Golden Gate Municipal Service Taxing Unit (MSTU) is soliciting for annual Landscape Maintenance. Historically, County departments have spent approximately $135,000 for ongoing landscape maintenance; however, this may not be indicative of future buying patterns. BACKGROUND The Golden Gate Beautification MSTU is responsible for roadway landscaping principally on Sunshine Blvd, Coronado Pkwy, Hunter Blvd, and Tropicana Blvd within the MSTU district. The medians are landscaped with a variety of plants, shrubs, and trees, most of which are irrigated. All aspects of Landscape Maintenance are addressed; including Irrigation controller operation, system testing, and maintenance repair. TERM OF CONTRACT The contract term, if an award(s) is/are made is intended to be for three (3) years with two (2) one (1) year renewal options. Prices shall remain firm for the initial term of this contract. Surcharges will not be accepted in conjunction with this contract, and such charges should be incorporated into the pricing structure. All goods are FOB destination and must be suitably packed and prepared to secure the lowest transportation rates and to comply with all carrier regulations. Risk of loss of any goods sold hereunder shall transfer to the COUNTY at the time and place of delivery; provided that risk of loss prior to actual receipt of the goods by the COUNTY nonetheless remain with VENDOR. 16.D.5.e Packet Pg. 1679 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) AWARD CRITERIA ITB award criteria are as follows:  The County’s Procurement Services Division reserves the right to clarify a vendor’s submittal prior to the award of the solicitation.  It is the intent of Collier County to award to the lowest priced, responsive and responsible vendor(s) that represents the best value to the County.  For the purposes of determining the winning bidder, the County will select the vendor with the lowest total price as outlined below:  Award will be based on the lowest total base bid provided on the Bid Schedule  Collier County reserves the right to select one, or more than one suppliers, award on a line item basis, establish a pool for quoting, or other options that represents the best value to the County; however, it is the intent to select:  Single Awardee  The County reserves the right to issue a formal contract or standard County Purchase Order for the award of this solicitation.  The following licenses/certifications shall be submitted with the bid:  Landscape Contractor’s License  MOT Certification  Pesticide Applicator License DETAILED SCOPE OF WORK The following specifications outline the minimum requirements of Collier County for a prospective Contractor to enter into a contract to provide Landscape Maintenance services, principally on specified roadways within the boundaries of the Golden Gate Municipal Service Taxing Unit (MSTU). The responsibility to discern the Scope of Service detailed in this specification shall rest solely with the Contractor. A failure of the Contractor to accurately assess the Scope shall not relieve any of the responsibilities to perform under the Contract Documents, nor shall it be considered the basis for any claim for additional compensation. All sections of these Specifications may not be applicable to all service areas listed and the frequency of any services provided by the Contractor may be modified as needed by the MSTU Project Manager. SCOPE OF SERVICE The Contractor shall furnish all labor, tools, materials, and processes necessary to perform the work described hereunder, except for items that may be provided separately by the County (i.e. fertilizer, mulch, etc.) as identified. LOCATION AND DESCRIPTION OF WORK AREAS The areas of work included in these specifications are located as described below and/or as shown in Exhibit 1. WORK AREA DESCRIPTIONS: 1. SUNSHINE BLVD: (Work Areas 1b & 1d) a. Sheet No. 1 – Improved Median on 18th Ave SW @ 40th Ter SW. b. Sheet No. 2 – i. Medians #1, #2, #3, #4, #5, #6. ii. Segments #7, #8. 16.D.5.e Packet Pg. 1680 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) iii. Improved Median on 18th Plc SW @ Sunset Rd. iv. Irrigation Controller, Pump Station, Electrical Shutoff, & FPL Meter located on Median #3. 2. TROPICANA BLVD: (Work Areas 1c & 1e) a. Sheet No. 3 – i. Medians #1, #2, #3, #4, #5, #6. ii. Pedestrian Shelter on Tropicana Blvd @ 31st Ave SW. iii. Pedestrian Shelter on 28th Ave SW @ Tropicana Blvd. iv. Irrigation Controller, Pump Station, & Electrical Shutoff located on Median #4. v. FPL Meter located in alley behind 2841 Tropicana Blvd. 3. CORONADO PKWY: (Work Area 1f) a. Sheet No. 4 – i. Medians #1, #2, #3, #4, #5, #6, #7, #8, #9, #10, #11, #12. ii. Irrigation Controller, Pump Station, & Shutoff located on Hunter Blvd, Median #5. 4. HUNTER BLVD: (Work Area 1g) a. Sheet No. 5 – i. Medians #1, #2, #3, #4, #5, #6, #7, #8, #9, #10, #11, #12, #13, #14. ii. Irrigation Pump Station located on Median #5. iii. Irrigation Controller, Electrical Shutoff, and FPL Meter located in alley behind 2243 Hunter Blvd. WEEKLY LANDSCAPE SERVICE Weekly Landscape Service in the designated MSTU area(s)–details described below-shall include trash removing, mowing, edging, weeding, general trimming & pruning, post-service cleaning, and inspecting & reporting. Trash Removing  At the start of Landscape Maintenance Service on the day of service and prior to mowing, the Contractor shall remove and dispose of all trash and debris from the service area and right-of-way.  This shall include, but is not limited to, horticultural and non-horticultural debris, palm fronds, tree branches and limbs, loose shrubbery, leaves, rocks, paper, bottles, cans, cigarette butts, and other miscellaneous objects on the ground or attached in the service area and the associated right-of-way.  Disposal of trash and debris shall be at a proper landfill or disposal site. Mowing  Mowing shall be performed in specified MSTU areas, including medians, along the outside edge of the sidewalks of adjacent properties which are not currently maintained by the property owners.  Right-of-way mowing of turf and applicable vegetation is required from back of curb or sidewalk to the right-of- way line.  Turf and vegetation shall be cut to a height of no less than three and one-half inches (3½”) and the height of the grass blade shall not exceed six inches (6”).  Roadside swales shall be mowed throughout the entire year. When mowing is not possible due to standing water or soft ground, string trimmers shall be used to reduce the height of turf and vegetation to the waterline.  All turf shall be mowed with mulching type mower equipment to eliminate the need to bag and transport grass clippings. Should bagging be necessary, bagged clippings shall be collected and removed at no additional cost to the MSTU. All equipment guards and deflectors are to be installed and functional.  The Contractor shall use appropriate mowing practices, alternate patterns, or walk-behind equipment within narrow or water-soaked areas so as not to create wheel ruts or wear down the turf. 16.D.5.e Packet Pg. 1681 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance)  Ruts caused by mowers shall be repaired at no additional costs to the MSTU.  The Contractor shall avoid mowing patterns that eject clippings, rocks, or any miscellaneous debris onto pedestrians and vehicles or into moving traffic. Edging  Mechanical edging of turf boundaries shall be performed with each mowing to establish a clean line of demarcation and eliminate grass root runners.  Edged areas shall include parking lots, sidewalk edges, back of curbs, plant beds, utility service boxes, street light bases, sign posts, headwalls, guardrails, timer pedestals, posts and trees; as well as around isolated trees, sprinkler heads, valve boxes, shrubs, sign posts, and manholes, etc. where they exist.  Metal blade edging is not permitted along plant bed and turf boundaries where underground irrigation components are present.  Chemical herbicide shall not be used for edging. Weeding  Weeding shall be performed weekly throughout the year to provide a weed-free and well-maintained appearance, removing undesired and invasive vegetation on the ground (including palm pups).  Areas to be weeded include plant beds, mulched spaces, rocks, sidewalks (concrete, paver, asphalt, etc.), concrete medians, curb joints, utility bases and access boxes, guardrail bases, and tree grates, etc.  Weeds that are less than 3-inches from plantings shall be hand pulled.  The Contractor may have the option to use chemical weed-killer or pre-emergent, upon pre-approval by the Project Manager of both the location and product to be used.  Any plants damaged or killed by application of chemical weed-killer or pre-emergent shall be replaced at the expense of the Contractor within 72-hours.  Should concerns be identified regarding chemical weeding, the Project Manager may direct that hand-weeding be performed. General Trimming & Pruning  General Trimming & Pruning shall be defined as the cutting of all vegetation below a height of ten feet (10’) to provide a tight, well maintained appearance throughout the year.  This includes groundcovers, shrubs, trees (except magnolias), and palms.  See Specific Plant Maintenance, for specifications and heights for various foliage within the MSTU.  Within this specification, groundcovers and shrubs are “trimmed,” while trees and palms are “pruned;” with the exception of magnolias.  Both trimming and pruning shall meet ANSI standards and include the removal of all diseased or dead vegetation, old leaf growth, broken branches, and suckers at tree bases.  Groundcovers and Shrubs shall be trimmed: o at regular intervals, generally monthly, except to allow for flowering. o with heights and shapes alternating by plant variety, or as determined by the MSTU Project Manager. o to an angled or rounded shape so as not to encroach over curbs or into roadways and pathways. o in a consistent manner for each plant variety to give the appearance of continuity throughout the landscape, adjusted as needed for local topography. o to maintain one foot (1’) of clearance from the edge of curbs, sidewalks, roadways, or pathways, etc.  Ornamental Grasses shall be trimmed: o after flowering, during the first two weeks of October and April (or as approved by the Project Manager). 16.D.5.e Packet Pg. 1682 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) o at the base to remove old growth. o in a manner to provide a cone shape and without a flat top.  Hedges on the right-of-way shall be trimmed: o to maintain a height of six feet (6’). o to maintain a flat top and flat, vertical side toward the roadway. o to not extend over an adjacent sidewalk or roadway. o Property Owner Exception:  Effected only upon written request from the Property Owner and signed approval by the Project Manager.  Property Owner agrees to maintain hedge at maximum height of ten (10) feet at their expense consistent with the top and vertical side specifications as described above.  Exception may be cancelled at any time by the Project Manager.  Trees and palms shall be pruned: o to clean out dead limbs, fronds, suckers, etc. o on a quarterly basis, or as needed, to maintain a minimum ten-foot (10’) canopy height over sidewalks and pedestrian pathways.  For line-of-sight visibility, vegetation of any kind within turn lanes, at median ends, and along intersection roadsides shall be trimmed or pruned to eighteen inches (18”) height by October 1st of each year and subsequently maintained to no more than twenty-four inches (24”) per FDOT Indexes.  The frequency of trimming or pruning may be adjusted at the direction of the Project Manager. Post-Service Cleaning  On the same day as Weekly Landscape Service and before departing the MSTU, the entire service area shall be cleaned to maintain a neat and safe condition.  This includes removal of any accumulation of debris or anything generated from the maintenance performed.  All hard surfaces shall be blown-down; to include the four (4’) foot area from the face of the sidewalks, gutters and curbs, turn lanes, medians, and adjacent parking lots and athletic courts.  Blow-down shall be directed toward the existing landscape median or grass.  Grass clippings or other debris shall not be blown onto adjacent private property or accumulate on the right-of-way, paved areas, or blown into traffic or roadways. Irrigation Check & Inspection  It shall be the Contractor's responsibility to inspect, operationally test, and perform minor repairs to the irrigation system on a weekly basis to enable proper and safe operation.  See “Irrigation Service” below for further description. Inspecting & Reporting  The Contractor shall inspect all plant, shrub, tree and grass areas in the MSTU during each week’s service to the site for completion and cleaning.  The Contractor shall be responsible to promptly notify the MSTU Project Manager of any disease infestation, insect infestation, foliage die-off, irrigation issues, maintenance problems, additional necessary maintenance, or unusual occurrence or finding.  A completed monthly Landscape Maintenance Report shall be filled-in by the Contractor and submitted to the Project Manager no later than the third business day after the last service week of each month. 16.D.5.e Packet Pg. 1683 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance)  The Project Manager shall have the option to require a weekly submission, no later than the Tuesday following the maintenance week.  The Contractor shall be available for on-site inspection in the MSTU to verify work completed or to review open issues at the Project Managers request. Miscellaneous Responsibilities  The removal of existing tree and palm staking shall be the responsibility of the Contractor.  To avoid damage to curbs and turf, the Contractor shall provide and utilize ramps or other devices for ingress and egress, as needed. Damage attributable to the Contractor shall be repaired at the Contractor's expense, as determined by the MSTU Project Manager. IRRIGATION SERVICE The landscape Contractor shall maintain the installed irrigation system for proper function. The areas of responsibility shall include:  Update and coordinate the watering schedules with the Project Manager as required for monitoring purposes and make recommendations to the Project Manager as conditions warrant. All irrigation schedule change requests shall be confirmed via e-mail.  Fill-in the Irrigation section of the Landscape Maintenance Report with each submission. Service Requirements  It shall be the Contractor's responsibility to inspect, operationally test, and perform minor repairs to the irrigation system on a weekly basis to enable proper and safe operation.  Minor repairs include replacement of heads, nozzles, decoders, installation or replacement of risers, repair of minor/lateral PVC piping breaks or subsurface piping or restricted sprinkler lines, replacement of damaged valve boxes/lids, etc.  If any irrigation issues beyond the scope of the weekly service are determined, the Contractor shall promptly notify the Irrigation Project Manager.  Visual inspection of the irrigation system(s) shall be performed to check for: o Cuts o Leaks o Pipe damage o Dry areas o Flooded areas o Damaged or deteriorated valve boxes  Operational testing of the irrigation system(s) shall be performed to verify that source water is available and accessible. o Pumps are operating. o Control enclosures are intact and controllers are powered and responding to inputs. o Controller activated zone control, zone sequence, and zone duration is operational. o Rain sensors are intact and functioning. o Valves are opened and closed to confirm proper function, either manually at the valve box or at the controller. o Spray patterns deliver complete water coverage while avoiding overspray. o Water meters are registering flow and water consumption readings are recorded. 16.D.5.e Packet Pg. 1684 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance)  Valve boxes shall be kept fully accessible and clear of debris inside, with lids fully closed when not being serviced.  Valve assemblies shall be inspected and cleaned, with sprinkler heads, nozzles, and screens cleared and adjusted.  Only County-approved replacement parts may be used and only matched precipitation head replacements may be installed. All irrigation parts shall be supplied by Collier County under a separate annual contract. The landscape Contractor must arrange for pickup or delivery in accordance with the Division’s Standard Operating Procedures (SOPs).  Repairs to defective or non-operational controllers shall be performed only after direct consultation with the Project Manager.  Major repairs are not included in the weekly irrigation service. These include repairs to valves, controllers, electrical wiring and main lines. Prior to proceeding, the Project Manager shall be consulted, the repairs evaluated and quoted. Major repairs may be sourced separately from other vendors, as determined by the Project Manager.  PARTS: Irrigation parts are available for pick-up under a separate Purchase Order, currently with Florida Irrigation Supply (FIS). ORNAMENTAL & TURF SPRAYING Application  Spraying of trees, shrubs, plants, and turf is to be performed by the Contractor, who must be certified to apply the chemicals (pesticides) used.  If the primary Contractor is not certified, a certified sub-Contractor may be hired upon approval by the Project Manager and at no additional cost to the MSTU.  Every insecticide, fungicide, and herbicide chemical to be applied shall be approved by the Environmental Protection Agency for its intended use and manner of application.  The rate of application shall conform to specifications on the manufacture's labels.  Applications shall be performed when the plant material is dry.  Special applications may be performed upon prior approval of the Project Manager. General Schedule  Spraying may be performed upon prior approval by the Project Manager.  Time frames: Trees, Shrubs, Groundcovers, Turf Chemical General Insecticide As-needed Fungicide As-needed Beds Chemical General Pre-emergent Post-emergent Herbicide As-needed Feb Sep Nov Jan Mar 16.D.5.e Packet Pg. 1685 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) Turf Chemical General Pre-emergent Post-emergent Herbicide As-needed Feb Sep Nov Jan Mar Records Records must be kept of all chemical (pesticide) applications, including:  Name of person performing the application.  Trade name & manufacturer.  Date & time of application.  Weather conditions. FERTILIZER Application  Fertilizer is supplied by Collier County under a separate annual contract at the time of application with delivery coordinated by the receiving Contractor.  Fertilizing shall be performed at prescribed intervals throughout the year.  Slow release formulations shall be used when available.  Fertilizer shall be broadcast throughout the designated medians, planting beds, and turf areas.  Tree bases and pit areas shall be fertilized evenly so as not to produce a fertilizer ring.  Shrubs and groundcovers shall have the fertilizer blown or fan raked off the foliage following the broadcast application.  Fertilizers shall be removed from curbs, sidewalks, and any surfaces where staining may occur. MULCH Application  Mulch is supplied by Collier County under a separate annual contract at the time of application with delivery coordinated by the receiving Contractor.  The timetable for installing mulch shall be on an as-needed basis, upon direction by MSTU Project Manager.  All designated plant beds shall be mulched by covering all unplanted areas in bed.  The areas to receive mulch shall be raked to establish a level base.  Areas to receive an initial application of mulch shall have mulch evenly distributed to provide a three inch (3") non-compacted or unsettled depth, measured from the base.  Areas to be re-mulched shall have mulch evenly distributed to provide a two inch (2") non-compacted or unsettled depth, measured from the base.  Mulch shall not be placed over valves or valve boxes that are located within mulched areas.  All adjacent areas not mulched (curbs, sidewalks, roadways, etc.) shall be cleared of any mulch or foreign debris.  Upon completion of mulching, all excess material, bags and foreign debris shall be collected and disposed of by the Contractor, leaving the overall landscape in a neat and orderly condition. 16.D.5.e Packet Pg. 1686 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) MAINTENANCE OF TRAFFIC (MOT)  The Contractor shall verify current MOT certification and comply with the requirements of Collier County’s Maintenance of Traffic (MOT) Policy.  The Contractor shall utilize adequate barricades, warning devices, and the necessary safety equipment according to Collier County Right-of-Way Ordinance.  Flagmen are required when two-way traffic is obstructed.  Blocking of a public right-of-way (ROW) or street, except under extreme emergency conditions, shall not be permitted without prior approval of the Project Manager and arrangements made with agencies having jurisdiction over the street to be closed.  For safe worker visibility; approved bright day-glow red/yellow/orange colored safety vests (Class 3) shall be worn by employees when servicing the area. REPORTS  Reports shall be written in English.  All reports shall be emailed to the Project Manager prior to submission of monthly invoices for payment.  Report sheets in County format will be provided to the Contractor for this purpose.  Contractor’s format may be acceptable, upon review and approval by the Project Manager. MEETING ATTENDANCE  Required meetings: o The Contractor shall attend a monthly field review (drive-through) scheduled 1-week before the Advisory Committee meeting. (approx. 1-hour) o The Contractor shall attend the monthly MSTU Advisory Committee meeting to discuss the ongoing status of Landscape and Irrigation maintenance, per the weekly reports, and answer any questions. (approx. 1- hour) o At the request of the Project Manager, the Contractor shall be available for on-site inspection in the MSTU to verify work completed or to review open issues.  There shall be no additional charge for attendance at these meetings. GENERAL PROVISIONS  The Contractor shall identify an English-speaking singular point of contact with radio, cellular phone and e-mail for on-site and off-site communication to coordinate with the Project Manager.  The Contractor shall provide a sufficient crew size for each Weekly Landscape Service to be completed within one (1) day, and if required, a consecutive day immediately following.  Professional courtesy, conduct, and clothing are expected at all times.  Replacement of plants, shrubs, trees, grass or foliage due to death caused by neglect or damage by the Contractor, Contractor's employees or a sub-Contractor, as determined by the Project Manager, shall be at the Contractor's sole expense. 16.D.5.e Packet Pg. 1687 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance)  Accidents, thefts, and vandalism shall be reported to the Project Manager on the same day as discovered, including pictures when reasonably available to be taken. CONTRACTOR EMPLOYEES  All employees of the Contractor working under this specification shall at all times be sole employees of the Contractor’s company and under the Contractor’s sole direction and not an employee or agent of Collier County.  The Contractor shall supply competent and physically capable employees.  At the direction of the Project Manager, the Contractor shall remove any employee deemed to be careless, incompetent, insubordinate, or otherwise objectionable and whose continued services are not in the best interest of the County. SUB-CONTRACTING  Contractor use of a sub-Contractor, compliant with all County provisions, may be requested in writing to the Project Manager.  The cost of utilizing a sub-Contractor shall not exceed that of the Bid Specification or add cost to the MSTU; including any markup, if applicable.  Detailed sub-Contractor invoices, Bill of Material’s (BOM), and receipts shall accompany Contractor’s invoice to the County. HOURS OF SERVICE Work performed at the specific direction of the Project Manager and billable at hourly rates shall be invoiced as follows:  Normal Hours - from 7:00 AM to 6:00 PM  After Hours - from 6:01 PM to 6:59 AM After Hours service must be pre-approved by the Project Manager at each occurrence. MARK-UP  Material mark-up is fixed cost at plus 10%. DISCLAIMER: Every effort has been made toward accuracy and completeness. Errors or omissions will be corrected when identified. 16.D.5.e Packet Pg. 1688 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) TABLES & REPORTS The report below shall be prepared and submitted to the Project Manager to identify work performed and issues to be evaluated or addressed. The minimum frequency is monthly and may be increased as deemed necessary by the Project Manager.    SITE: Golden Gate Beautification MSTU Bid No: n/a PO No: WEEK DATE TRASH MOW EDGE WEED CLEAN INSPECT DATE G'COVER SHRUBS TREES PALMS MEDIAN ❶ ___ ❷ ___ ❸ ___ ❹ ___ ❺ ___ WEEK DATE Fertilizer Insecticide Fungicide Herbicide DATE Fertilizer Insecticide Fungicide Herbicide DATE ❶ ___ ❷ ___ ❸ ___ ❹ ___ ❺ ___ CONTRACTOR NOTES AND COMMENTS: DATE # BAGS LOCATION OPEN ISSUES TO BE ADDRESSED: Collier County, PTNE Contractor:  BASIC MAINTENANCE FUNCTIONS TRIMMING / PRUNING WORK LOCATIONS STREET Landscape Maintenance Report FY‐18 DATE: _________________   450018yyyy ____________________________ BLEND / NAME LOCATION CHEMICAL APPLICATIONS IRRIGATION CHECK CHEMICAL APPLIED TURF ___ G'COVER      ___ SHRUB      ___ TREE      ___ PALM MULCH 16.D.5.e Packet Pg. 1689 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) The following table lists specific plant varieties and acceptable pruning for each. During the course of this contract, pruning specifications may be changed or added at the direction of the MSTU Project Manager. All changes to this table shall be submitted in writing to the Contractor for implementation. If changes in the table result in a different cost of service, the Contractor shall submit a change request in writing to the Project Manager detailing the additional work and price difference. Golden Gate M.S.T.U. Trim & Prune Guidelines FY 17-18 Common Name Scientific Name Trimming Guidelines Shrubs Bougainvillea (Dwarf) Bougainvillea glabra 'Helen Johnson' • Maintain 24" rounded ht. & 2 ft. offset from back of curb, within limits of clear sight areas • Frequency: Remove shoots weekly • Bi-seasonal 50% heavy reduction only upon approval Bougainvillea 'Silhouette' Bougianvillea spp. 'Silhouette' • Maintain 36" rounded ht. & 2 ft. offset from back of curb • Frequency: Remove shoots weekly • Bi-seasonal 50% heavy reduction upon approval Firebush (Dwarf) Hamelia patens 'galbra' • Trim to 36" rounded ht. • Maintain up to 48" rounded ht. • Frequency: As needed Plumbago Plumbago auriculata 'Imperial Blue' • Trim to 36" rounded ht. • Maintain up to 48" rounded ht. • Frequency: Remove shoots weekly Saw Palmetto (Silver or Green) Serenoa repens • Trim to maintain natural rounded ht. • Maintain up to 60" rounded ht. • Frequency: As needed for shape and to remove dead stems Schefflera (Dwarf) Schefflera arboricola 'Trinette' • Trim to 36" rounded ht. • Maintain up to 48" rounded ht. • Maintain 24" rounded ht. in limits of clear sight areas • Frequency: As needed Accent Plants n/a n/a n/a 16.D.5.e Packet Pg. 1690 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) Golden Gate M.S.T.U. Trim & Prune Guidelines FY 17-18 (Con't.) Native & Ornmental Grasses Pink Muhly grass Muhlenbergia capillaris • Trim level at 2" above grade & 2ft. Offset from back of curb • Frequency: After blooming or in March and July for 100% rejuvenation Sandcord grass Spartina bakeri • Trim level at 2" above grade • Frequency: Once per year in July for 100% rejuvenation, if needed Ground Covers Blueberry Flax Lily Dianella tasmanica 'Variegata' • Remove dead or diseased foliage and flower stalks • Frequency: April and October • 75% rejuvenation cut only upon approval Crown of Thorn (Dwarf) Euphorbia milii 'Big Rose' • Uniform shape to 18" ht. in limits of clear sight areas • Frequency: As needed Juniper Parsoni Juniper chinensis 'Parsonii' • Uniform shape to 24" ht. in limits of clear sight areas • Frequency: As needed Perennial Peanut Archis glabrata 'Ecoturf' • Mow at 4-inch blade ht. to tip foliage • Frequency: Once per year in June Spider Lily Hymenocallis latifolia • No pruning necessary except to remove dead or diseased foliage • Frequency: As needed • 100% rejuvenation cut only upon approval 16.D.5.e Packet Pg. 1691 Attachment: 5-18-7380-Solicitation-GG (6536 : Golden Gate MSTU Landscape Maintenance) Addendum #1 Date: 5/21/18 From: Viviana Giarimoustas, Procurement Strategist To: Interested Bidders Subject: Addendum # 1 Solicitation #18-7380 Golden Gate MSTU Landscape Maintenance A request has been made to view the previous bid tabulation sheet. The pages that follow are from the previous solicitation #12-5976. If you require additional information please post a question on our Bid Sync (www.bidsync.com) bidding platform under the solicitation for this project. Please sign below and return a copy of this Addendum with your submittal for the above referenced solicitation. (Signature) Date (Name of Firm) Email: Viviana.Giarimoustas@colliercountyfl.gov Telephone: (239) 252-8375 16.D.5.f Packet Pg. 1692 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL BID SCHEDULE FOR AREA #1 BASIC MAINTENANCE FUNCTIONS FOR: Work Area No. 1a – Green Boulevard Median #1 (CR 951 to 40th Terrace SW) QTY UNIT TOTAL TOTAL TOTAL Non Responsive Non Responsive 1 Mowing & Edging: Side of Right of Way 26 Ea 1,170.00 650.00 1,300.00 286.00 1,300.00 2 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 3,640.00 2,600.00 2,756.00 676.00 5,200.00 3 General Site Pruning 52 Ea 1,560.00 1,300.00 3,276.00 156.00 1,300.00 4 Weekly Irrigation System Service Requirements (3 service personnel required, Est. .25 hrs)52 Ea 4,420.00 2,600.00 2,080.00 780.00 5,200.00 5 Trash Removal 52 Ea 780.00 1,300.00 520.00 10.40 1,300.00 6 Street Cleaning 52 Ea 1,144.00 1,300.00 520.00 10.40 1,300.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area No. 1a 7 All Canopy Trees (various species) (April and September)12 Ea 12.00 12.00 264.00 12.00 300.00 8 All Palms (Cabbage/Sabal palms) (June and October)12 Ea 180.00 180.00 252.00 96.00 300.00 FERTILIZATION (County will supply granular fertilizer) Turf, Groundcover, Shrubs, and Trees 9 8-2-12-180 (Three times a yr.; Unit Price per bag) 3 Ea 13.50 15.00 30.00 6.00 45.00 10 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 1 Ea 4.50 5.00 10.00 2.00 15.00 ORNAMENTAL SPRAYING 11 Groundcover, Shrubs, & Trees: Insecticides 12 Ea 1,140.00 300.00 1,200.00 780.00 600.00 12 Groundcover, Shrubs, & Trees: Fungicides 12 Ea 1,140.00 300.00 900.00 780.00 600.00 13 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 120.00 50.00 200.00 130.00 100.00 14 Ferromec AC 15-0-0 plus 6% Iron, 3% sulfur 6 Ea 510.00 150.00 1,200.00 360.00 300.00 MULCHING 15 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)247 Ea 308.75 123.50 247.00 185.25 209.95 PAVERS 16 Pressure Cleaning Brick Pavers ( 57 sq. ft.)1 Ea 20.00 10.00 25.00 6.00 100.00 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL $16,162.75 $10,895.50 $14,780.00 Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR: Work Area 1b – Sunshine Boulevard (Golden Gate Parkway to Green Boulevard) QTY UNIT TOTAL TOTAL TOTAL Non Responsive Non Responsive 17 Mowing & Edging: Side of Right of Way 26 Ea 1,300.00 1,300.00 10,400.00 390.00 1,300.00 18 Mowing & Edging: Medians Only 52 Ea 6,760.00 3,900.00 10,400.00 7,540.00 5,200.00 19 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 4,784.00 23,400.00 7,072.00 5,200.00 5,200.00 20 General Site Pruning 52 Ea 3,120.00 5,200.00 20,800.00 1,560.00 2,080.00 21 Weekly Irrigation System Service Requirements (3 service personnel required, Est. 1.5 hrs.)52 Ea 6,604.00 7,800.00 8,372.00 3,900.00 5,200.00 22 Trash Removal 52 Ea 2,808.00 2,600.00 1,040.00 2,600.00 1,300.00 23 Street Cleaning 52 Ea 2,496.00 2,600.00 2,600.00 2,600.00 1,300.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area 1b CANOPY TREE AND PALM PRUNING 24 All Canopy Trees (various species) (April and September)154 Ea 154.00 154.00 3,388.00 154.00 2,310.00 25 All Palms (Cabbage/Sabal palms) (June and October)92 Ea 1,380.00 1,380.00 1,932.00 736.00 1,380.00 FERTILIZATION (County will supply granular fertilizer) Turf, Groundcover, Shrubs, and Trees 26 8-2-12-180 (Three times a yr.; Unit Price per bag) 24 Ea 108.00 120.00 240.00 48.00 360.00 27 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 5 Ea 22.50 25.00 50.00 10.00 75.00 28 15-0-15 (Four times a yr.; Unit Price per bag) 20 Ea 90.00 100.00 200.00 40.00 300.00 1 of 9 16.D.5.f Packet Pg. 1693 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL 29 21-0-0 (One time a yr.; Unit Price per bag) 2 Ea 9.00 10.00 40.00 4.00 30.00 30 20-20-20 (Two times a yr.; Unit Price per lb.) 36 Ea 162.00 180.00 720.00 5.40 540.00 ORNAMENTAL SPRAYING 31 Groundcover, Shrubs, & Trees: Insecticides 12 Ea 1,800.00 1,200.00 3,600.00 900.00 600.00 32 Groundcover, Shrubs, & Trees: Fungicides 12 Ea 1,800.00 1,200.00 3,600.00 900.00 600.00 33 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 240.00 50.00 500.00 150.00 100.00 34 Turf: Insecticides 6 Ea 600.00 1,200.00 1,800.00 420.00 300.00 35 Turf: Fungicides 4 Ea 460.00 800.00 1,000.00 280.00 200.00 36 Turf: Herbicides 6 Ea 750.00 1,200.00 1,800.00 420.00 300.00 37 Ferromec AC 15-0-0 plus 6% Iron, 3% sulfur 6 Ea 450.00 150.00 0.00 480.00 300.00 MULCHING 38 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)1519 Ea 1,443.05 759.50 1,519.00 1,139.25 1,291.15 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL $37,340.55 $55,328.50 $81,073.00 Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR: Work Area No. 1c – Improved Medians & Right-of-way maintenance: Tropicana Boulevard (32nd Ave. SW to Golden Gate Parkway) QTY UNIT TOTAL TOTAL TOTAL Non Responsive Non Responsive 39 Mowing & Edging: Side of Right of Way 26 Ea 780.00 1,300.00 2,080.00 1,040.00 1,300.00 40 Mowing & Edging: Medians Only 52 Ea 5,356.00 3,900.00 10,400.00 7,800.00 2,600.00 41 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 4,004.00 23,400.00 5,200.00 5,200.00 15,600.00 42 General Site Pruning 52 Ea 4,316.00 5,200.00 10,400.00 1,820.00 5,200.00 43 Weekly Irrigation System Service Requirements (3 service personnel required, Est. 1.5 hrs.)52 Ea 8,060.00 7,800.00 8,372.00 3,900.00 3,900.00 44 Trash Removal 52 Ea 2,444.00 2,600.00 520.00 2,080.00 2,600.00 45 Street Cleaning 52 Ea 2,132.00 2,600.00 3,120.00 1,820.00 2,600.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area No. 1c 46 All Canopy Trees (various species) (April and September)130 Ea 130.00 1,300.00 2,860.00 390.00 1,950.00 47 All Palms (Cabbage/Sabal palms) (June and October)128 Ea 1,920.00 1,920.00 2,688.00 1,280.00 1,920.00 FERTILIZATION (County will supply granular fertilizer) Turf, Groundcover, Shrubs, and Trees 48 8-2-12-180 (Three times a yr.; Unit Price per bag) 15 Ea 67.50 75.00 150.00 30.00 225.00 49 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 3 Ea 13.50 15.00 30.00 6.00 45.00 50 15-0-15 (Four times a yr.; Unit Price per bag) 16 Ea 72.00 80.00 160.00 32.00 240.00 51 21-0-0 (One time a yr.; Unit Price per bag) 2 Ea 9.00 10.00 20.00 4.00 30.00 52 20-20-20 (Two times a yr.; Unit Price per lb.) 62 Ea 279.00 310.00 1,240.00 9.30 930.00 ORNAMENTAL SPRAYING 53 Groundcover, Shrubs, & Trees: Insecticides 12 Ea 1,980.00 1,200.00 1,800.00 780.00 600.00 54 Groundcover, Shrubs, & Trees: Fungicides 12 Ea 1,980.00 1,200.00 1,800.00 780.00 600.00 55 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 230.00 50.00 300.00 130.00 100.00 56 Turf: Insecticides 6 Ea 570.00 1,200.00 900.00 360.00 300.00 57 Turf: Fungicides 4 Ea 440.00 800.00 600.00 240.00 200.00 58 Turf: Herbicides 6 Ea 720.00 1,200.00 1,200.00 360.00 300.00 59 Ferromec AC 15-0-0 plus 6% Iron, 3% sulfur 6 Ea 900.00 150.00 1,200.00 420.00 300.00 MULCHING 60 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)1620 Ea 1,539.00 810.00 1,620.00 1,215.00 1,377.00 PAVERS 2 of 9 16.D.5.f Packet Pg. 1694 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL 61 Pressure Cleaning Brick Pavers (2,112 sq. ft.)1 Ea 75.00 10.00 1,000.00 30.00 50.00 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL $38,017.00 $57,130.00 $57,660.00 Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR: Work Area No. 1d – Improved Medians for Traffic Calming – Quantity 2 (two): #1 at Intersection of 40th Terrace SW 18th Avenue SW and at Intersection of 18th Place SW and at Sunset Road; and #2 at Intersection of 18th Place SW and at Sunset Road QTY UNIT TOTAL TOTAL TOTAL Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR Work Area No. 1d 62 Mowing & Edging: Side of Right of Way 26 Ea 260.00 260.00 1,300.00 260.00 1,300.00 63 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 1,560.00 3,900.00 2,756.00 364.00 5,200.00 64 General Site Pruning 52 Ea 1,300.00 2,600.00 3,328.00 260.00 10,400.00 65 Trash Removal 52 Ea 624.00 1,300.00 520.00 156.00 2,600.00 66 Street Cleaning 52 Ea 624.00 1,300.00 780.00 52.00 2,600.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area No. 1d 67 All Palms (Cabbage/Sabal palms) (June and October)12 Ea 180.00 180.00 252.00 96.00 300.00 FERTILIZATION (County will supply granular fertilizer) Turf, Groundcover, Shrubs, and Trees 68 8-2-12-180 (Three times a yr.; Unit Price per bag) 3 Ea 13.50 15.00 30.00 6.00 45.00 69 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 1 Ea 4.50 5.00 10.00 2.00 15.00 70 20-20-20 (Two times a yr.; Unit Price per lb.) 2 Ea 9.00 10.00 120.00 0.30 30.00 71 Ferromec AC 15-0-0 plus 6% Iron, 3% sulfur 6 Ea 240.00 30.00 1,200.00 240.00 90.00 ORNAMENTAL SPRAYING 72 Groundcover, Shrubs, & Trees: Insecticides 12 Ea 480.00 600.00 600.00 480.00 1,200.00 73 Groundcover, Shrubs, & Trees: Fungicides 12 Ea 480.00 600.00 600.00 480.00 1,200.00 74 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 50.00 20.00 100.00 60.00 200.00 MULCHING 75 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)35 Ea 43.75 17.50 35.00 70.00 29.75 PAVERS 76 Pressure Cleaning Brick Pavers ( 100 sq. ft.)1 Ea 20.00 10.00 50.00 10.00 50.00 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL $5,888.75 $10,847.50 $11,681.00 Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR: Work Area No. 1e – Improved Pedestrian Shelter Areas – Quantity 2 (two): #1 Shelter at 28th Ave. SW Shelter (with amenities, includes landscaping) and #2 Shelter at Tropicana Blvd at 31st Ave. SW (with amenities, includes landscaping) BASIC MAINTENANCE FUNCTIONS FOR Work Area No. 1e 77 Mowing & Edging: Side of Right of Way 26 Ea 312.00 260.00 1,300.00 260.00 1,300.00 78 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 1,560.00 520.00 5,200.00 1,560.00 10,400.00 79 General Site Pruning 52 Ea 1,560.00 520.00 5,200.00 1,560.00 7,800.00 80 Weekly Irrigation System Service Requirements (In conjunction with Area 1c, Est. .25 hrs.)52 Ea 4,420.00 520.00 2,600.00 780.00 5,200.00 81 Trash Removal 52 Ea 312.00 260.00 520.00 780.00 2,600.00 82 Street Cleaning 52 Ea 312.00 260.00 624.00 10.40 2,600.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area No. 1e 83 All Canopy Trees (various species) (April - September)4 Ea 4.00 4.00 88.00 4.00 100.00 84 All Palms (Cabbage/Sabal palms) (June and October)8 Ea 120.00 120.00 168.00 64.00 200.00 3 of 9 16.D.5.f Packet Pg. 1695 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL FERTILIZATION (County will supply granular fertilizer) Turf, Groundcover, Shrubs, and Trees 85 8-2-12-180 (Three times a yr.; Unit Price per bag) 3 Ea 13.50 15.00 30.00 6.00 45.00 86 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 1 Ea 4.50 5.00 10.00 2.00 15.00 ORNAMENTAL SPRAYING 87 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 100.00 10.00 20.00 60.00 100.00 MULCHING 88 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)4 Ea 5.00 2.00 4.00 4.00 3.40 PAVERS 89 Pressure Cleaning Brick Pavers (512 sq. ft.)1 Ea 20.00 10.00 250.00 50.00 50.00 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL $8,743.00 $2,506.00 $16,014.00 Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR: Work Area No. 1f – Improved Medians & Right-of-way Maintenance: Coronado Parkway (Golden Gate Parkway to Santa Barbara Boulevard) QTY UNIT TOTAL TOTAL TOTAL TOTAL TOTAL 39 Mowing & Edging: Side of Right of Way 26 Ea 1,820.00 650.00 5,200.00 910.00 1,300.00 41 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 4,784.00 15,600.00 10,400.00 5,720.00 10,400.00 42 General Site Pruning 52 Ea 4,992.00 5,200.00 10,400.00 6,500.00 13,000.00 43 Weekly Irrigation System Service Requirements (3 service personnel required, Est. 1.5 hrs.)52 Ea 8,840.00 5,200.00 8,372.00 4,160.00 5,200.00 44 Trash Removal 52 Ea 2,808.00 2,600.00 1,040.00 1,560.00 2,600.00 45 Street Cleaning 52 Ea 2,496.00 2,600.00 1,560.00 1,560.00 2,600.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area No. 1f 46 All Canopy Trees (various species) (April and September)28 Ea 28.00 28.00 616.00 28.00 700.00 47 All Palms (Cabbage/Sabal palms) (June and October)28 Ea 420.00 420.00 588.00 224.00 700.00 FERTILIZATION (County will supply granular fertilizer) Groundcover, Shrubs, and Trees 48 8-2-12-180 (Two times a yr.; Unit Price per bag) 36 Ea 162.00 180.00 360.00 72.00 540.00 49 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 6 Ea 27.00 30.00 60.00 12.00 90.00 ORNAMENTAL SPRAYING 53 Groundcover, Shrubs, & Trees: Insecticides 12 Ea 1,980.00 1,200.00 2,400.00 900.00 600.00 54 Groundcover, Shrubs, & Trees: Fungicides 12 Ea 1,980.00 1,200.00 2,400.00 900.00 600.00 55 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 230.00 50.00 400.00 140.00 100.00 59 Ferromec AC 15-0-0 plus 6% Iron, 3% sulfur 6 Ea 900.00 150.00 1,200.00 360.00 300.00 MULCHING 60 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)2696 Ea 2,830.80 1,348.00 2,696.00 2,156.80 2,291.60 PAVERS 61 Pressure Cleaning Brick Pavers (2,778 sq. ft.)1 Ea 125.00 10.00 1,000.00 220.00 50.00 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL $34,422.80 $36,466.00 $48,692.00 Non Responsive Non Responsive BASIC MAINTENANCE FUNCTIONS FOR: Work Area No. 1f – Improved Medians & Right-of-way Maintenance: Hunter Boulevard (Coronado Parkway to Santa Barbara Boulevard) QTY UNIT TOTAL TOTAL TOTAL TOTAL TOTAL 39 Mowing & Edging: Side of Right of Way 26 Ea 1,820.00 650.00 4,680.00 962.00 1,300.00 41 Weeding (includes hand removal and herbicide applications for weed free beds)52 Ea 4,784.00 15,600.00 9,360.00 6,500.00 7,800.00 42 General Site Pruning 52 Ea 4,992.00 5,200.00 9,360.00 7,280.00 10,400.00 43 Weekly Irrigation System Service Requirements (3 service personnel required, Est. 1.5 hrs.)52 Ea 8,840.00 5,200.00 8,372.00 4,160.00 5,200.00 4 of 9 16.D.5.f Packet Pg. 1696 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL 44 Trash Removal 52 Ea 2,808.00 2,600.00 1,040.00 2,080.00 2,600.00 45 Street Cleaning 52 Ea 2,496.00 2,600.00 2,600.00 2,080.00 2,600.00 SITE SPECIFIC MAINTENANCE FUNCTIONS FOR Work Area No. 1f 46 All Canopy Trees (various species) (April and September)56 Ea 56.00 56.00 1,232.00 56.00 1,400.00 47 All Palms (Cabbage/Sabal palms) (June and October)18 Ea 270.00 270.00 378.00 100.00 450.00 FERTILIZATION (County will supply granular fertilizer) Groundcover, Shrubs, and Trees 48 8-2-12-180 (Two times a yr.; Unit Price per bag) 42 Ea 189.00 210.00 420.00 84.00 630.00 49 0-0-22 SPM (So-Po-Mag)(One time a yr.; Unit Price per bag) 8 Ea 36.00 40.00 80.00 60.00 120.00 ORNAMENTAL SPRAYING 53 Groundcover, Shrubs, & Trees: Insecticides 12 Ea 1,980.00 1,200.00 2,160.00 960.00 600.00 54 Groundcover, Shrubs, & Trees: Fungicides 12 Ea 1,980.00 1,200.00 2,160.00 960.00 600.00 55 Groundcover and Shrub Beds and Mulched Areas: Herbicides 2 Ea 230.00 50.00 360.00 150.00 100.00 59 Ferromec AC 15-0-0 plus 6% Iron, 3% sulfur 6 Ea 900.00 150.00 1,200.00 390.00 300.00 MULCHING 60 Mulching: Organic Application (2" mulch depth, 2 cu. ft. bags)2696 Ea 2,830.80 1,348.00 2,696.00 2,696.00 2,291.60 PAVERS 61 Pressure Cleaning Brick Pavers (2,778 sq. ft.)1 Ea 125.00 10.00 1,000.00 220.00 50.00 LANE CLOSURE - Maintenance of Traffic to be included in unit pricing SUBTOTAL 34,336.80 36,384.00 47,098.00 Non Responsive Non Responsive Landscape Maintenance Services - Work Area 1 and Emergency Services Project Sites: Work Area No. 1 – MSTU MAINTENANCE includes specific areas noted as: 1a, 1b, 1c, 1d, 1e, 1f, 1g General Services Irrigation Supervisor (per man hour):1 Hr.75.00 65.00 55.00 40.00 55.00 Irrigation Technician (per man hour):1 Hr.55.00 65.00 45.00 30.00 55.00 Laborer/Helper (per man hour):1 Hr.45.00 55.00 28.00 25.00 45.00 Irrigation System Review; Unit per hour 1 Hr.75.00 25.00 75.00 30.00 90.00 Staking of Small Palm (4"-6" Caliper) 1 Ea 70.00 70.00 65.00 25.00 50.00 Staking Large Palms (Caliper greater than 6")1 Ea 75.00 90.00 100.00 40.00 50.00 Staking Small Canopy Tree (2x2 posts and guy wire, 4"-6" caliper)1 Ea 70.00 70.00 75.00 35.00 50.00 Staking Large Canopy Tree (2x4 posts, greater than 6" caliper)1 Ea 75.00 90.00 100.00 55.00 50.00 Restanding and Staking Small Palm (4"-6" Caliper) 1 Ea 225.00 200.00 220.00 35.00 60.00 Restanding and Staking Large Palms (Caliper greater than 6")1 Ea 250.00 225.00 320.00 90.00 120.00 Restanding and Staking Small Canopy Tree (2x2 posts and guy wire, 4"-6" caliper)1 Ea 100.00 200.00 220.00 45.00 60.00 Restaking Large Canopy Tree (2x4 posts, greater than 6" caliper)1 Ea 225.00 90.00 380.00 45.00 120.00 Mowing and Edging; Unit Sq. Ft.1 Ea 2.00 0.10 0.02 2.00 1.00 Weeding (Hand removal and hand sprayed herbicide); Unit Sq. Ft.1 Ea 3.00 0.10 0.03 3.00 1.00 Pruning (Removal and delivery of debris to landfill site); Unit per Hr.1 Hr.100.00 65.00 0.04 70.00 15.00 Fertilization (Labor for broadcasting 50 lb. Bag); Unit per bag 1 Ea 4.50 5.00 50.00 2.00 15.00 Mulch Application (Labor for applying 2 cu.ft. bags); Unit per bag 1 Ea 1.50 1.00 3.75 1.00 0.85 Trash Pick-up and Removal (Bagging and disposal to a landfill of trash from landscape areas and on-site containers); Unit Per Hr.1 Hr.100.00 65.00 25.00 60.00 40.00 Travel time; Unit per hour 1 Hr.75.00 50.00 65.00 35.00 40.00 Truck Operator (Class B or higher current State of Florida Driver License); Unit per hr.1 Hr.75.00 50.00 32.00 75.00 50.00 Stump Grinder and Operator; Unit per Hr. 1 Hr.275.00 95.00 75.00 120.00 60.00 Bobcat and Operator; Unit per Hr. 1 Hr.150.00 95.00 85.00 130.00 60.00 5 of 9 16.D.5.f Packet Pg. 1697 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL SUBTOTAL $2,126.00 $1,671.20 $2,018.84 Non Responsive Non Responsive PLANTS 1 Gallon Container Coontie 1 Ea 6.00 12.00 12.00 4.95 8.00 Juniper 'Parsonil'1 Ea 3.00 8.00 5.00 4.95 8.00 Bougainvillea 'Helen Johnson'1 Ea 5.00 8.00 4.75 4.95 8.00 Liriope 'Evergreen giant'1 Ea 5.00 8.00 4.25 4.95 8.00 Muhly grass 1 Ea 5.00 8.00 4.25 4.95 8.00 Crown of Thorn (various varities, small leaf red, Big Rose)1 Ea 6.25 8.00 5.75 4.95 8.00 Asian jasmine 'Minima'1 Ea 5.00 8.00 4.00 4.95 8.00 Bougainvillea 'Silhouette' or 'Ms. Alice'1 Ea 6.00 8.00 5.25 4.95 8.00 Sunshine Mimosa 1 Ea 3.00 8.00 4.75 4.95 8.00 Ilex 'Schellings dwarf'1 Ea 5.00 8.00 6.00 4.95 8.00 3 Gallon Container Dwarf Firebush 1 Ea 8.00 16.00 10.00 8.95 15.00 Thryallis 1 Ea 8.00 16.00 10.00 8.95 15.00 Bougainvillea 'silhouette'1 Ea 12.00 16.00 12.00 8.95 15.00 Allamanda Hendersonii Dwarf 1 Ea 9.00 16.00 10.00 8.95 15.00 Bougainvillea 'Helen Johnson'1 Ea 12.00 16.00 10.00 8.95 15.00 Juniper 'Parsoni'1 Ea 15.00 16.00 12.00 8.95 15.00 Variegated Arboricola 'Trinette'1 Ea 8.00 16.00 10.00 8.95 15.00 Dwarf bougainvillea 1 Ea 12.00 16.00 10.00 8.95 15.00 Green Island Ficus 1 Ea 8.00 16.00 10.00 8.95 15.00 Muhly grass 1 Ea 8.00 16.00 10.00 8.95 15.00 Plumbago 1 Ea 8.00 16.00 10.00 8.95 15.00 Saw Palmetto (Silver-'Cinerea' or Green)1 Ea 20.00 25.00 14.00 8.95 15.00 Ilex 'Schellings dwarf'1 Ea 9.00 16.00 11.00 8.95 15.00 Indian hawthorn 'Alba', white 1 Ea 9.00 16.00 12.00 8.95 15.00 Zanadu 1 Ea 16.00 18.00 11.00 8.95 15.00 10 Gallon Container Bottlebrush 'Red cluster'1 Ea 50.00 50.00 55.00 25.00 60.00 Crinum Lily 1 Ea 40.00 50.00 50.00 25.00 60.00 Crape Myrtle 1 Ea 70.00 50.00 55.00 25.00 60.00 Jamaican Caper 1 Ea 40.00 50.00 60.00 25.00 60.00 Myrsine 1 Ea 40.00 50.00 65.00 25.00 60.00 Silver Buttonwood 1 Ea 40.00 50.00 75.00 25.00 60.00 Simpson or Spanish Stopper 1 Ea 40.00 50.00 65.00 25.00 60.00 Sabal minor 1 Ea 65.00 110.00 65.00 25.00 60.00 15 Gallon Container Red Maple 1 Ea 90.00 60.00 85.00 90.00 70.00 Black Olive 'Shady Lady'1 Ea 80.00 60.00 125.00 90.00 70.00 Floss Silk Tree 1 Ea 125.00 60.00 125.00 90.00 70.00 Yellow Poinciana 1 Ea 80.00 60.00 125.00 90.00 70.00 Bald Cypress 1 Ea 90.00 60.00 125.00 90.00 70.00 Hong Kong Orchid 1 Ea 90.00 60.00 125.00 90.00 70.00 6 of 9 16.D.5.f Packet Pg. 1698 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL 25 Gallon Container Bottlebrush 'Red Cluster'1 Ea 175.00 110.00 280.00 120.00 160.00 Silver Buttonwood 1 Ea 175.00 110.00 280.00 120.00 160.00 Crape Myrtle 1 Ea 150.00 110.00 280.00 120.00 160.00 Dahoon Holly 1 Ea 160.00 110.00 280.00 120.00 160.00 Holly 'East Palatka'1 Ea 150.00 110.00 280.00 120.00 160.00 Foxtail Palm 1 Ea 150.00 110.00 280.00 120.00 160.00 Ligustrum 1 Ea 215.00 110.00 280.00 120.00 160.00 Live Oak 1 Ea 175.00 110.00 350.00 120.00 160.00 Magnolia 1 Ea 150.00 110.00 280.00 120.00 160.00 Red Maple 1 Ea 200.00 110.00 350.00 120.00 160.00 Tabebuia 'Golden'1 Ea 150.00 110.00 280.00 120.00 160.00 Tabebuia 'Ipe'1 Ea 200.00 110.00 380.00 120.00 160.00 Wax Myrtle 1 Ea 200.00 110.00 380.00 120.00 160.00 Orchid Tree (White)1 Ea 150.00 110.00 380.00 120.00 160.00 45 Gallon Container Silver Buttonwood 1 Ea 225.00 140.00 440.00 175.00 350.00 Crape Myrtle 1 Ea 250.00 140.00 440.00 175.00 350.00 Dahoon Holly 1 Ea 225.00 140.00 460.00 175.00 350.00 Holly 'East Palatka'1 Ea 225.00 140.00 460.00 175.00 350.00 Foxtail Palm 1 Ea 250.00 140.00 460.00 175.00 400.00 Ligustrum 1 Ea 225.00 140.00 600.00 175.00 350.00 Live Oak 1 Ea 225.00 140.00 450.00 175.00 350.00 Magnolia 1 Ea 275.00 140.00 466.00 175.00 350.00 Red Maple 1 Ea 225.00 140.00 460.00 175.00 350.00 Tabebuia 'Golden'1 Ea 250.00 140.00 460.00 175.00 350.00 Tabebuia 'Ipe'1 Ea 250.00 140.00 460.00 175.00 350.00 Wax Myrtle 1 Ea 225.00 140.00 460.00 175.00 200.00 Orchid Tree (White)1 Ea 250.00 140.00 460.00 175.00 350.00 65 Gallon Container Silver Buttonwood 1 Ea 275.00 400.00 540.00 260.00 400.00 Crape Myrtle 1 Ea 300.00 400.00 590.00 260.00 400.00 Dahoon Holly 1 Ea 275.00 400.00 580.00 260.00 400.00 Holly 'East Palatka'1 Ea 275.00 400.00 580.00 260.00 400.00 Foxtail Palm 1 Ea 325.00 175.00 580.00 260.00 400.00 Ligustrum 1 Ea 300.00 400.00 790.00 260.00 400.00 Live Oak 1 Ea 300.00 175.00 580.00 260.00 400.00 Magnolia 'DD Blanchard' 1 Ea 325.00 400.00 790.00 260.00 400.00 Magnolia 'Little Gem' 1 Ea 325.00 400.00 790.00 260.00 400.00 Shady Lady Black Olive 1 Ea 275.00 175.00 580.00 260.00 400.00 Rain Tree 1 Ea 275.00 400.00 680.00 260.00 400.00 Tabebuia 'Golden'1 Ea 300.00 400.00 580.00 260.00 400.00 Tabebuia 'Ipe'1 Ea 300.00 400.00 580.00 260.00 400.00 Wax Myrtle 1 Ea 275.00 75.00 580.00 260.00 400.00 Bald Cypress 1 Ea 275.00 400.00 580.00 260.00 400.00 Hong Kong Orchid 1 Ea 300.00 400.00 580.00 260.00 400.00 Orchid Tree (White)1 Ea 300.00 400.00 580.00 260.00 400.00 7 of 9 16.D.5.f Packet Pg. 1699 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL Various Sizes Live Oak 100 gal.1 Ea 415.00 700.00 1,600.00 325.00 800.00 Live Oak 200 gal.1 Ea 600.00 700.00 2,600.00 600.00 1,600.00 Live Oak 300 gal.1 Ea 700.00 700.00 3,600.00 775.00 1,900.00 Hong Kong Orchid / 10'-12'1 Ea 350.00 125.00 280.00 225.00 295.00 Hong Kong Orchid / 14'-20' OA 1 Ea 500.00 500.00 540.00 295.00 345.00 Hong Kong Orchid / 15'-35' OA 1 Ea 1,250.00 250.00 880.00 425.00 400.00 Alexander Palm / 8'-10' OA 1 Ea 150.00 125.00 220.00 122.00 345.00 Alexander Palm / 10'-16' OA 1 Ea 450.00 500.00 330.00 155.00 595.00 Coconut Palm / 10'-15' GW 1 Ea 600.00 250.00 1,440.00 475.00 1,200.00 Coconut Palm / Larger sizes, cost per foot of wood 1 Ea 150.00 100.00 125.00 35.00 195.00 Foxtail Palm / FG 8'-10'1 Ea 200.00 125.00 280.00 145.00 345.00 Foxtail Palm / FG 10'-15' OA 1 Ea 450.00 500.00 380.00 275.00 595.00 Foxtail Palm / Larger sizes, cost per foot of wood 1 Ea 100.00 50.00 38.00 40.00 295.00 Royal Palm / 7'-10' GW 1 Ea 400.00 400.00 400.00 255.00 995.00 Royal Palm / 12'-16' GW 1 Ea 700.00 800.00 660.00 375.00 1,500.00 Royal Palm / Larger sizes, cost per foot of wood 1 Ea 75.00 75.00 55.00 55.00 150.00 Sabal Palm / 10' -18' OA 1 Ea 200.00 300.00 280.00 125.00 350.00 Thatch Palm / 6' - 8' OA 1 Ea 280.00 450.00 300.00 195.00 550.00 Thatch Palm / Larger sizes, cost per foot of wood 1 Ea 100.00 50.00 75.00 45.00 175.00 Wax Myrtle / 10' OA 1 Ea 80.00 50.00 240.00 85.00 175.00 Wax Myrtle / 12' OA 1 Ea 97.00 65.00 320.00 145.00 250.00 Wax Myrtle / 14' OA 1 Ea 140.00 70.00 420.00 190.00 300.00 Crape Myrtle 'Muskogee' / 8' - 10' OA 1 Ea 250.00 125.00 240.00 140.00 300.00 Crape Myrtle 'Muskogee' / 10' - 14' OA 1 Ea 350.00 400.00 380.00 185.00 450.00 Crape Myrtle 'Natchez' / 8' - 10' OA 1 Ea 250.00 125.00 240.00 205.00 400.00 Crape Myrtle 'Natchez' / 10' - 14' OA 1 Ea 350.00 400.00 380.00 235.00 450.00 Crape Myrtle 'Tuscarora' / 8' -10' OA 1 Ea 250.00 125.00 240.00 150.00 400.00 Crape Myrtle 'Tuscarora' / 10' - 14' OA 1 Ea 350.00 400.00 380.00 200.00 450.00 Magnolia 'DD Blanchard' / 100 gal.1 Ea 500.00 450.00 520.00 350.00 800.00 Magnolia 'Little Gem' / 100 gal.1 Ea 500.00 350.00 550.00 395.00 800.00 Shady Lady Black Olive / 10' - 18'OA 1 Ea 200.00 200.00 480.00 225.00 450.00 Shady Lady Black Olive / 16' -20'OA 1 Ea 225.00 500.00 720.00 285.00 550.00 Bald Cypress / 100 gal.1 Ea 550.00 400.00 520.00 175.00 800.00 SUBTOTAL $23,413.25 $20,675.00 $42,127.00 Non Responsive Non Responsive TOTAL BASE BID $200,450.90 $231,903.70 $321,143.84 Non Responsive Non Responsive TOTAL MEN (Crew Size) TO PERFORM LANDSCAPE SERVICES (Minimum two (2) five (5) person crews required per week) Per Week:10 10.00 10 10 0 Annual (52)10 520.00 80 520 0 TOTAL MEN (Crew Size) TO PERFORM IRRIGATION SERVICES (Minimum Three (3) person crew required per week) Per Week:3 3.00 3 3 0 Annual (52)3 156.00 21 156 0 8 of 9 16.D.5.f Packet Pg. 1700 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Proj. Mgr.: Darryl Richard PS: Rhonda Cummings Due: 04/16/2013 BID 12-5976 Golden Gate MSTU/MSTD Roadway Grounds Maintenance Notices: 656 Bids Downloaded: 38 Bids Received:5 Non-Responsive: 2 ITEM DESCRIPTION QTY UNIT Hannula TOTAL Commercial Land TOTAL Superior TOTAL Leo Jr TOTAL Caribbean Lawn TOTAL ESTIMATED TOTAL MAN- HRS TO PERFORM REQUIRED SERVICES (Contractor shall submit the # of man-hours that they intend to provide to this contract on a weekly basis). Hours per week 5 8.00 8 16 0 Crew size (Personnel on Site)10 10.00 10 10 0 Man Hours 50 80.00 80 160 0 Materials cost plus mark-up cannot exceed twenty-five percent (25%). The percentage does not affect the bid but will not be awarded to the bidder who omits or exceeds the allowable limit.0.25 25.00 0.18 0.25 0 Corrected calculation error Y Y Y N Y Corrected cell (28) that was not included in original bid schedule (Added it to the total) Carribean Lawn Services does not meet the required 5 years MOT experience and is therefore deemed non-responsive Leo Sod, Jr. does not meet the required 5 years MOT experience and is therefore deemed non- responsive Attachment 3: bid Response Form Y Y Y Y Y Attachment 4: Affidavit for Claiming Status as a Local Business Y Y Y Y Y Attachment 5: immigration Law Affidavit Certification Y Y Y Y Y Attachment 6: Vendor Substitute W-9 Y Y Y Y Y Attachment 7: Insurance and Bonding Requirements Y Y Y Y N Certificate of Competency Y Y Y Y Y Maintenance of Traffic Certification (Minimum 5 years experience)Y Y Y N N Pesticide Certification Y Y Y Y N Listing of Equipment Y Y Y Y N Addendum #1 Y Y Y Y Y 9 of 9 16.D.5.f Packet Pg. 1701 Attachment: 6-18-7380 Addendum #1-GG (6536 : Golden Gate MSTU Landscape Maintenance) Addendum #2 Date: June 13, 2018 From: Viviana Giarimoustas To: Interested Bidders Subject: Addendum # 2 Solicitation #18-7380 Golden Gate MSTU Landscape Maintenance The following clarifications are issued as an addendum identifying the following clarification to the scope of work, changes, deletions, or additions to the original solicitation document for the referenced solicitation: Change 1. Correction to Local Vendor Preference Language on the Instruction to Bidders Form and Form 7: Vendor Submittal – Local Vendor Preference Affidavit: Current Language: Local business means the vendor has a current Business Tax Receipt issued by the Collier County Tax Collector for at least one year prior to bid or proposal submission to do business within Collier County, and that identifies the business with a permanent physical business address located within the limits of Collier County from which the vendor’s staff operates and performs business in an area zoned for the conduct of such business. A Post Office Box or a facility that receives mail, or a non-permanent structure such as a construction trailer, storage shed, or other non-permanent structure shall not be used for the purpose of establishing said physical address. In addition to the foregoing, a vendor shall not be considered a "local business" unless it contributes to the economic development and well-being of Collier County in a verifiable and measurable way. This may include, but not be limited to, the retention and expansion of employment opportunities, support and increase to the County's tax base, and residency of employees and principals of the business within Collier County. Vendors shall affirm in writing their compliance with the foregoing at the time of submitting their bid or proposal to be eligible for consideration as a "local business" under this section. A vendor who misrepresents the Local Preference status of its firm in a proposal or bid submitted to the County will lose the privilege to claim Local Preference status for a period of up to one year under this section. Updated Language: Local business means the vendor has a current Business Tax Receipt issued by the Collier County Tax Collector for at least one year prior to bid or proposal submission to do business within Collier County, and that identifies the business with a permanent physical business address located within the limits of Collier County from which the vendor’s staff operates and performs business in an area zoned for the conduct of such business. A Post Office Box or a facility that receives mail, or a non-permanent structure such as a construction trailer, storage shed, or other non-permanent structure shall not be used for the purpose of establishing said physical address. In addition to the foregoing, a vendor shall not be considered a "local business" unless it contributes to the economic development and well-being of Collier Email: Viviana.Giarimoustas@colliercountyfl.gov Telephone: (239) 252-8375 16.D.5.g Packet Pg. 1702 Attachment: 7-18-7380 Addendum #2-GG (6536 : Golden Gate MSTU Landscape Maintenance) County in a verifiable and measurable way. This may include, but not be limited to, the retention and expansion of employment opportunities, support and increase to the County's tax base, and residency of employees and principals of the business within Collier County. Vendors shall affirm in writing their compliance with the foregoing at the time of submitting their bid or proposal to be eligible for consideration as a "local business" under this section. A vendor who misrepresents the Local Preference status of its firm in a proposal or bid submitted to the County will lose the privilege to claim Local Preference status for a period of up to one year under this section. If you require additional information please post a question on our Bid Sync (www.bidsync.com) bidding platform under the solicitation for this project. Please sign below and return a copy of this Addendum with your submittal for the above referenced solicitation. (Signature) Date (Name of Firm) 16.D.5.g Packet Pg. 1703 Attachment: 7-18-7380 Addendum #2-GG (6536 : Golden Gate MSTU Landscape Maintenance) MEDIAN # 1 - WORK AREA 1a GREEN BLVD.COLLIER BLVD.CR 951MEDIAN #13GREEN BLVD. PUMP STATION & CONTROLLER LOCATION PUMP STATION ELEC. METER & SHUT-OFF 40TH TER SWN. R/W AREA S. R/W AREA WORK AREA 1d 18TH AVE SW COLLIER BLVD.CR 95140TH TER SWGOLDEM GATE MSTU ROADWAYS MAINTENANCE BID: WORK AREA: 1a - Green Blvd. & 1d 18 th Ave SW SHEET No. 1 16.D.5.h Packet Pg. 1704 Attachment: 8-18-7380-Exhibit1-GG (6536 : Golden Gate MSTU Landscape Maintenance) SUNSHINE BLVD. WORK AREA 1b MEDIAN #1 SUNSHINE BLVD. STREETLIGHTING ELEC. METER & SHUT-OFF 20THPL SWSUNSHINE BLVD. WORK AREA 1bGOLDE N GATE PARKWAYMEDIAN #2 MEDIAN #3 23RDAVE SW20TH CTIRRIGATION CONTROLLER PUMP STATION, LIGHTING ELEC. METER & SHUT-OFF GOLDEN GATE COMMUNITY CENTER PUMP STATION SUNSET RDMEDIAN #4 MEDIAN #5 MEDIAN #6 SEGMENT #7 SEGMENT #8 SUNSET RD18TH PL SW18TH AVE SW16TH PL SW19THAVE SWSTREETLIGHTING ELEC. METER & SHUT-OFF GREEN BLVD.SUNSHINE BLVD. WORK AREA 1b SUNSET RDWORK AREA 1d 18TH PL SW S U N S E T R D T O S U N S HIN E B L V D. GOLDEM GATE MSTU ROADWAYS MAINTENANCE BID: WORK AREA: 1b - Sunshine Blvd. & Work Area 1d SHEET No. 2 MATCH LINE A-AMATCH LINE A-A16.D.5.h Packet Pg. 1705 Attachment: 8-18-7380-Exhibit1-GG (6536 : Golden Gate MSTU Landscape Maintenance) T R O P IC A N A B L V D .W O R K A R E A 1 c M E D IA N #6 GOLDEN GATE PARKWAY25 TH PL SW26 TH PL SWM E D IA N #5 M E D I A N #5 T R O P I C A N A B L V D . W O R K A R E A 1 c 28 TH AVE SW2 0 ' P A V E D A L L E Y 2 0 ' P A V E D A L L E Y STREET LIGHTING ELEC. SHUT-OFF20' PAVEDALLEYGOLDEN GATE PARKWAY28 TH AVE SWM E D I A N #428 TH AVE SWT R O P I C A N A B L V D . W O R K A R E A 1 c W O R K A R E A 1 e TROPICANA BLVD. WORK AREA 1c32 SD AVE SWMEDIAN #1 MEDIAN #2 MEDIAN #3 MEDIAN #4 IRRIGATION CONTROLLER & PUMP STATION 31 STPL SW31 STAVE SW30 THPL SW30 THPL SWSTREETLIGHTING ELEC. SHUT-OFF STREETLIGHTING ELEC. SHUT-OFF WORK AREA 1e STREETLIGHTING ELEC. SHUT-OFF PUMP STATION ELEC. METER & SHUT-OFF 20' PAVED ALLEY 2 0 ' P A V E D A L L EY CANALCANALGOLDEM GATE MSTU ROADWAYS MAINTENANCE BID: WORK AREA: 1c - Tropicana Blvd., & Work Area 1e SHEET No. 3 MATCH LINE A-AMATCH LINE A-A16.D.5.h Packet Pg. 1706 Attachment: 8-18-7380-Exhibit1-GG (6536 : Golden Gate MSTU Landscape Maintenance) G O L D E N G A T E P A R K W A Y M-#8 M-#7 M-#6 G O L D E N G A T E P A R K W A Y C OR ONA D O P KWY .WOR K A R E A 1 f M- #1M- # 2 M-#3 M-#4 LUCERNEBLVD.M-#5 A 50TH TERR. SWCORONADO PKWY.M-#1HUNTER BLVD.WORK AREA 1gCORONADO PKWY. WORK AREA 1f M-#14 M-#13 M-#12 M-#11 M-#10 M-#9 M-#8A SANTA BARBARA BLVD.52ND TERR. SW54TH TERR. SW55TH ST. SW55TH TERR. SWALLEYGOLDEM GATE MSTU ROADWAYS MAINTENANCE BID: WORK AREA: 1f - Coronado Pkwy. SHEET No. 4MATCH LINE A-AMATCH LINE A-A16.D.5.h Packet Pg. 1707 Attachment: 8-18-7380-Exhibit1-GG (6536 : Golden Gate MSTU Landscape Maintenance)