Loading...
Agenda 09/25/2018 Item #16D 309/25/2018 EXECUTIVE SUMMARY Recommendation to approve demolition of the Caretaker’s Residence at Conservation Collier’s Pepper Ranch Preserve. OBJECTIVE: To demolish the Caretaker’s Cottage at Pepper Ranch Preserve. CONSIDERATIONS: The Caretaker’s Cottage at Pepper Ranch Preserve was one of the original buildings acquired with the Pepper Ranch in 2010. It was built during the 1960s but is not considered a historic building. The Cottage was renovated in 2013 with the plan of housing a law enforcement officer on the premises as a security presence in return for specified caretaker duties. Two (2) sets of tenants lived in the 900-square foot structure between 2013 and 2017, including a Fish and Wildlife Conservation Commission (FWC) Officer and his wife and a Collier County Sherriff’s Office (CCSO) deputy and her family. In both cases, there were complaints of air quality and structural problems. Repairs were made promptly, but the problems persisted, and the tenants left due to the problems. In June 2017, a mold analysis performed for the cottage, which showed indoor fungi problems. In October 2017, an assessment was completed of all the Pepper Ranch buildings by CH2MHill and Able Home Inspections. Concerns at the Caretaker’s Cottage include: Foundation vents being at ground level allowing water to enter, Rotting in the exterior walls and front floor step, Poor quality work and materials on the roof, Ventilation problems, Improper wiring, Defective wall construction - needs drywall, Visible mold growth and mold spores inside, Soft spongy floors - need new subfloor, and No insulation in the crawl space and crawl space access was not provided in the last renovation. Hurricane Irma added to the existing moisture and mold problems at the Caretaker's Cottage. Due to the estimated cost for repairs ($45,200) and the consultant’s recommendation to consider removing the structure due to the likelihood of the issues recurring, staff believes the removal of the structure is warranted. No asbestos is present. A concurrent project is developing an RV pad with utility hookups adjacent to the campground so that volunteer campground hosts can move their RV onto the site for the camping season in exchange for an onsite presence for campers and twenty (20) hours per week of maintenance services. This is a common arrangement that is utilized in state and federal parks and provides public services at no cost to the park agencies. RV Hosts are vetted and sign an agreement to provide specific services for the season. The only difference between a campground host and an officer of the law would be enforcement capabilities. During the period that FWC and CCSO officers lived in the cottage, enforcement has not been necessary. This is likely due to the presence on the property. The RV pad project is currently being put out to bid. All other Pepper Ranch structural repairs identified by the September 4, 2017 CH2MHill Assessment are being performed through a combination of contracted and in-house labor. In addition to the ongoing structural repair issues, staff found that being a landlord was time-consuming. The development of an RV Pad will provide an onsite presence with minimal need for landlord activities beyond the oversight of contracted duties, which was also a part of the previous tenant situation. The Conservation Collier Land Acquisition Advisory Committee discussed the proposed demolition at 16.D.3 Packet Pg. 1493 09/25/2018 their May 14th public meeting and concurred with staff that demolition was warranted. The Committee had asked staff to explore having the Immokalee Fire Department conduct a training burn to remove the structure, but after examining the structure in July 2018, Fire Department officials advised that due to the cost and labor of getting the building ready to burn, using it as a training site would not be possible. FISCAL IMPACT: The estimated cost for removal of the building is $10,000. If approved, three (3) quotes will be obtained, and any necessary costs for demolition will be taken from the current Pepper Ranch Preserve land management budget. GROWTH MANAGEMENT: There is no Growth Management impact. LEGAL CONSIDERATIONS: This Item is approved for form and legality and requires a majority vote for Board approval. -JAB RECOMMENDATION: To approve demolition of the Caretaker’s Residence at Pepper Ranch Preserve. Prepared By: Alexandra Sulecki, Principal Environmental Specialist, Parks and Recreation Division ATTACHMENT(S) 1. CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (PDF) 2. 6315 Pepper Rd. Cottage (PDF) 16.D.3 Packet Pg. 1494 09/25/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.D.3 Doc ID: 6534 Item Summary: Recommendation to approve demolition of the Caretaker’s Residence at Conservation Collier’s Pepper Ranch Preserve. Meeting Date: 09/25/2018 Prepared by: Title: Operations Analyst – Parks & Recreation Name: Matthew Catoe 08/24/2018 4:11 PM Submitted by: Title: Division Director - Parks & Recreation – Parks & Recreation Name: Barry Williams 08/24/2018 4:11 PM Approved By: Review: Parks & Recreation Ilonka Washburn Additional Reviewer Completed 08/27/2018 8:15 AM Parks & Recreation Barry Williams Additional Reviewer Completed 08/27/2018 4:51 PM Public Services Department Joshua Hammond Additional Reviewer Completed 08/31/2018 3:48 PM Public Services Department Todd Henry Level 1 Division Reviewer Completed 09/05/2018 8:04 AM County Attorney's Office Jennifer Belpedio Level 2 Attorney of Record Review Completed 09/05/2018 11:38 AM Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 09/06/2018 8:27 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 09/07/2018 2:20 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 09/07/2018 2:25 PM Budget and Management Office Ed Finn Additional Reviewer Completed 09/12/2018 2:03 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/16/2018 5:53 PM Board of County Commissioners MaryJo Brock Meeting Pending 09/25/2018 9:00 AM 16.D.3 Packet Pg. 1495 TECHNICAL MEMORANDUM AUGUST 20, 2017 CH2M HILL, INC. 1 Pepper Ranch Preserve Facilities Assessment PREPARED FOR: Tony Barone, Project Manager, Collier County COPY TO: File PREPARED BY: M. Kussler/WPB, B. Gramer/SWF DATE: September 4, 2017 PROJECT NUMBER: 694985.01 Overview At the request of Collier County, CH2M has provided Architectural Assessments of the following structural facilities located within the Pepper Ranch Preserve: • Caretaker’s Cottage • Visitors’ Center • Pole Barn (aka Picnic Shelter) • Restroom(s) Building • Maintenance Shed The assessment was performed to evaluate various structural and maintenance issues discovered within each of the existing facilities. The assessment evaluated the existing conditions of the facilities and provides recommendations and cost estimates for Repair Vs. Replacement considerations/comparisons. The assessment included visual observation of each building during site visits conducted by CH2M staff on June 2 and July 10, 2017, as well as general inspections conducted by Able Home Inspections on June 2, 2017. A mold inspection was conducted at the Caretaker’s Cottage for which air and surface samples were collected, and an analysis of which was performed by Inspector Lab in Fort Lauderdale. The Inspection Report(s) prepared by Able Home Inspections and Inspector Lab are included in the Appendix of this technical memorandum. Appendix A: Caretaker’s Cottage Appendix B: Visitors’ Center Appendix C: Various Facilities o Pole Barn (aka Picnic Shelter) o Restroom(s) Building o Maintenance Shed Appendix D: Caretaker’s Cottage Mold Report 16.D.3.a Packet Pg. 1496 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 2 Note: No specific inspections were requested or performed pertaining to well and septic, termite, geological/soil conditions, or radon. Based on observations of the facilities “existing conditions” and subsequent test results, this memorandum will: • Provide an evaluation of the general condition of each building • Identify specific deficiencies requiring repair • Prioritize necessary remediation for occupant safety • Propose repair/remediation solutions • Provide cost estimates pertaining to proposed repairs • Provide a comparison of repair versus replacement costs (when applicable) Identified Repair(s) have been prioritized and categorized on a Scale of 1 to 3: (1) - Highest priority based on occupant health and safety (Necessary Repair) (2) - Maintenance concern or preventive measure (Suggested Repair) (3) – Lowest Level of Concern, Cosmetic Issue (Discretionary Repair) Estimated Cost(s) have been included for each repair item. However, it should be noted that costs may vary depending on several factors outside the control of CH2M, including but not limited to when the work is undertaken, as this can have a significant effect on both material and labor costs. Additionally, estimates are based on the premise of hiring an outside contractor to complete the work for each individual repair; costs would likely be reduced if the County direct-procures the materials and the County maintenance staff completes portions of the work, or if several tasks are grouped under a comprehensive repair plan. Note: ENGINEER’s Cost Opinions: In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, ENGINEER makes no warranty that COUNTY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from ENGINEER's opinions, analyses, projections, or estimates. Pepper Ranch Preserve Facilities Reviewed Caretaker’s Cottage: General Description The Caretaker’s Cottage is an approximately 960 square-foot, wood frame structure with T1-11 (plywood) siding on a raised concrete block foundation with a crawl space beneath. The roof system is wood truss and the exterior roof covering is metal panels with exposed fasteners. The front entrance on the west side is accessed via wood steps and the rear door exits to wood steps into a small screened porch on the east side which is on a concrete slab-on-grade and has a flat, modified bitumen roof. 16.D.3.a Packet Pg. 1497 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 3 Observations - See Inspection Report for Details and Photos (Appendix A) 1. Roof fasteners and sealing gaskets are generally deteriorated, appear to be of poor quality; caulking has been added at most fastener points, presumably to postpone leakage. 2. Gutters are full of debris and required cleaning. 3. Soffit vents present but have been painted over, reducing air flow to the attic. 4. Blown attic insulation appears to have been installed without proper ventilation chutes, restricting air flow within the attic and blocking air flow to soffit vents. 5. Plumbing vent on roof is capped (unable to determine reason for condition). 6. Exterior crawl space vents are at grade, allowing surface water to enter and possibly accumulate in space beneath foundation. 7. Grade along the north side slopes towards the structure. 8. No visible insulation or vapor barrier present at foundation/crawl space. 9. At rear screened porch, extension cord protruding from wall is not code compliant. 10. Wiring to rear motion detector light not properly installed, not code compliant. 11. Wood siding has small areas of rot in scattered locations. 12. Wood landing at front entrance has significant rot which has resulted in a hole in the middle of the landing. 13. Exterior walls are not code compliant: Paneling less than ¼” thick installed directly onto studs. 14. Musty smell upon entering, mold growth visible at air conditioning supply diffusers, and visible mold growth present on exterior wall in living room. 15. Floor deck: Plywood butt-jointed with visible gaps between panels (some taped over with duct tape,) fastened with drywall screws instead of wood screws in several locations, floors throughout uneven and not rigid in various areas with spots yielding to typical footstep pressure. 16. Mold report provided by Inspector Lab indicates high levels of indoor problem fungi Penicillium/Aspergillus in the “Problem” range, meaning mold concentrations in the air are abnormal and present an exposure concern, and Aspergillus, Hyphae, Cladosporium and Cladosporium sphaerospermum in the “Growth” range, meaning exposure is likely and will continue if growth is not removed. Many of these fungi can contribute to symptoms of hay fever, asthma, hypersensitivity pneumonitis, allergic sinusitis, and allergenic bronchopulmonary aspergillosis and some may become a pathogen to immunocompromised persons. Recommendations and Cost Estimates 1. Repair Roof: Repair any damaged panels, seal bitumen on rear flat roof as required, remove all existing fasteners, remove caulk from roof panel surface and clean to prepare for installation of new weather-resistant screws with proper gaskets. (1) • Estimated Cost: $3,750 2. Clean gutters: Install Gutter Screens, Maintain. (2) • Estimated Cost: $400 3. Replace soffit vents, Add Gable End Vent. (1) • Estimated Cost: $1,000 4. Install proper ventilation chutes in attic insulation. (1) 16.D.3.a Packet Pg. 1498 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 4 • Estimated Cost: $600 5. Verify that capped plumbing vent on roof is unused/unnecessary. (3) • Estimated Cost: $250 6. Relocate foundation vents to prevent surface water intrusion into crawl space. (1) • Estimated Cost: $1,000 7. Re-grade along the north side of the building for positive drainage away from the foundation. Install “French Drain” System around outside of foundation if required (1) • Estimated Cost: $3,000 8. Install vapor barrier at crawl space; grade ground, installing insulation would be very difficult due to the low clearance in the crawl space. Removal of all flooring material will be required (1) • Estimated Cost: $2,000 (Assumes Item 15 is performed and provides access) 9. Remove extension cord protruding from wall at screened porch and repair hole in wall. Reinstall exterior rated outlet according to code requirements. (1) • Estimated Cost: $450 10. Repair wiring to rear motion detector light in accordance with code requirements. (1) • Estimated Cost: $250 11. Repair/replace sections of wood siding with rot damage. Repaint Facility (2) • Estimated Cost: $3,000 12. Repair/replace wood landing at front entrance. (1) • Estimated Cost: $750 13. Remove paneling from inside of exterior walls, replace insulation as required, install drywall in accordance with code requirements, paint. Replace interior paneling with drywall, paint. (1) • Estimated Cost: $15,500 14. Clean and disinfect all areas with visible mold growth. (1) • Estimated Cost: $1,000 15. Remove existing floor deck, replace floor joists found to be damaged or in poor condition (NOT Inspected due to limited access), install properly designed and sealed floor deck. Add new floor finish (carpet and laminate) throughout. (1) • Estimated Cost: $12,500 (Assumes only minor issues with Joists) 16. Above remediation measures should resolve mold issues; until repairs have been completed, limit access to building to essential personnel and tasks. (1) • Estimated Cost: N/A Total Estimated Repair Costs: $45,200 (Note: Certain issues may re-occur in future due to age/location of facility, consideration of removal and replacement warranted*) *Removal of Cottage and Replacement with Manufactured Unit: $135,000 (Include site prep.) 16.D.3.a Packet Pg. 1499 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 5 Visitors’ Center General Description The Visitors’ Center is an approximately 2,500 SF, wood frame structure with wood lap siding on a raised foundation with a crawl space beneath and includes a screened porch (440 SF) on the southwest side. Primary access is via a wood ramp to the screened porch. Additional points of entry are on the northeast side of the building (the historical front door, on a raised concrete stoop,) and at the opposite end of the screened porch via concrete steps. The roof has wood trusses with metal panel exterior covering attached with exposed fasteners. Observations - See Inspection Report for Details and Photos (Appendix B) 1. Chimney does not extend far enough above roof (minimum 3 feet required,), there is no screen cap to prevent animal/debris intrusion. 2. There is evidence of roof leaks at various panel seams and other locations on roof exterior; exposed fasteners are rusting, appear to be of poor quality; some areas have been caulked presumably to postpone additional leakage. 3. Plumbing vent on roof is capped, (unable to determine reason for condition). 4. Tree limbs in contact with roof surface will cause wear/damage. 5. Drip edge appears to have been improperly installed as there are drip stains on face of fascia board that originate behind drip edge. 6. Attic ventilation is limited with only louver grill in gable end, no ridge vent or soffit venting present. 7. Attic insulation minimal, 1 to 2-inch thick in areas observed. 8. Exterior metal corner wraps below floor level show signs of corrosion and deterioration. 9. Threshold at screen door ramp landing exhibits signs of rot. 10. Additional rot damage evident at corner of porch adjacent to landing. 11. Evidence of roof leaks on ceiling of screened porch. 12. Evidence of roof leaks on ceiling of interior rooms. 13. Evidence of leak at air conditioner supply diffusers in several rooms, likely due to condensation at ducts above. 14. Ceiling in rear bathroom is sagging at diffuser and shows evidence of leak. 15. Light fixture installed above tub/shower is not rated for this use. 16. Electrical outlet next to range is not functional (no power.) 17. No vapor barrier present at crawl space. 18. Cast iron drain pipe in crawl space is sloped in wrong direction. 19. Floor joist brace visible in crawl space not part of original construction, may encourage termite infestation. 16.D.3.a Packet Pg. 1500 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 6 Recommendations and Cost Estimates 1. Because fireplace is anticipated to remain unused, provide screen cap to prevent animal intrusion (1). If the fireplace is put back into service in the future, renovations will be required to make the chimney code compliant. (3) • Estimated Cost: $150 (Screen Cap) • Estimated Cost: $1500 (Fireplace Renovations) 2. Repair roof: remove existing fasteners, remove caulk from roof panel surface and clean to prepare for installation of new weather-resistant screws with proper gaskets. (1) • Estimated Cost: $6,500 3. Verify that capped plumbing vent on roof is unused/unnecessary. (3) • Estimated Cost: $250 4. Trim tree limbs in close proximity to or touching roof, maintain. (2) • Estimated Cost: $500 5. Obtain inspection of drip edge by licensed roofing contractor to ascertain if drip edge was properly installed; replace/repair as necessary. (2) • Estimated Cost: $200 (Inspection) • Drip edge replace/repair $750 (If Required) 6. Install ridge vent or soffit vents or exhaust fan to improve attic ventilation; soffit vents and additional attic louver recommended due to price and relative ease of installation versus ridge vent. (2) • Estimated Cost: $1000 7. Install additional attic insulation to achieve higher R-value (6.25”t/R19), add attic ventilation chutes. (2) • Estimated Cost: $3,500 8. Replace exterior metal corner wraps below floor level where corroded/deteriorated. (3) • Estimated Cost: $300 9. Replace exterior threshold at screen door ramp landing. (2) • Estimated Cost: $200 10. Repair rot damage at corner of porch adjacent to landing. (3) • Estimated Cost: $300 11. After roof repairs are complete, repair/clean/repaint ceiling of screened porch where leak damage is present. (2) • Estimated Cost: $500 12. After roof repairs are complete, repair/clean/replace ceiling of interior rooms where leak damage is present. (2) • Estimated Cost: $500 13. After roof repairs are complete, identify/repair leaks in HVAC system and repair/clean/replace ceiling/air conditioner supply diffusers where leak damage is present. (2) 16.D.3.a Packet Pg. 1501 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 7 • Estimated Cost: $400 14. After roof repairs are complete, identify/repair leaks in HVAC system and repair/clean/replace ceiling/air conditioner supply diffusers in rear bathroom where leak damage is present. (2) • Estimated Cost: $200 15. Replace light fixture installed above tub/shower in hall bathroom with fixture rated for wet area usage. (1) • Estimated Cost: $200 16. Repair/replace electrical outlet next to range. (1) • Estimated Cost: $250 (Assumes other issues as well as new outlet) 17. Install vapor barrier at crawl space, grade ground, to minimize moisture absorption into floor framing. (1) • Estimated Cost: $2,000 18. Replace cast iron drain pipe in crawl space with new piping properly sloped for effective drainage. (2) • Estimated Cost: $1,000 19. Replace makeshift floor joist brace in crawl space with concrete pier support; design by structural engineer registered in the State of Florida. (2) • Estimated Cost: $1,500 Total Estimated Repair Costs: $20,200 Pole Barn General Description The Pole Barn is an open-sided shelter type structure on a concrete slab-on-grade, with wood post and beam construction supporting a wood truss roof system covered with corrugated metal panels. It is approximately 24 feet x 60 feet. Observations - See Inspection Report for Details and Photos (Appendix C) 1. Roof panels attached to framing with nails, many of which are loose, missing gaskets/seals, or missing altogether, resulting in leaks; leaks also at gaps between roof panels, and between end of roof panel and fascia boards as many roof panels are not installed properly/are out of square. 2. Fascia boards and several rafter tails are in generally poor condition, appear to be aging prematurely due to lack of proper drip edge allowing precipitation to drain onto face of boards. 3. Single tie-down straps from supporting posts to roof members improperly installed, not in compliance with current building code standards. 4. South gable end truss is not plumb, top of supporting post at southeast corner exposed to weather. 5. Tree limbs touching roof surface may cause wear/damage. 6. Truss/roof framing appearance is dirty/stained, no visible effect on structural performance. 16.D.3.a Packet Pg. 1502 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 8 7. Two supporting posts exhibit evidence of significant rot at floor level (one with hose bib attached, second at southwest corner). Below-grade probe indicates posts have substantial amount of solid wood below the floor slab. Recommendations and Cost Estimates 1. Repair roof: replace nails with properly gasketed weather-resistant screws, repair holes and seal gaps between panels. (2) • Estimated Cost: $2,500 2. Repair fascia boards: remove existing fascia boards, cut back rafter tails a minimum of four inches or to remove visible rotted wood, and replace with new fascia boards at new perimeter set back from edge of roof panels. (2) • Estimated Cost: $2,000  Alternate, Add metal drip edge, Replace rotted wood: $1,250 3. Remove existing tie-down straps and replace with code compliant array of tie-down straps designed by structural engineer registered in the State of Florida. (1) • Estimated Cost: $500 4. Cover top of exposed post with metal cap to prevent water intrusion. (2) • Estimated Cost: $150 5. Trim tree limbs in close proximity to or touching roof, maintain. (2) • Estimated Cost: $500 6. Clean trusses/roof framing to improve appearance; paint if desired. (3) • Estimated Cost: $300 (Pressure Wash/Clean) • Painting: $700 7. Repair two supporting posts: provide temporary bracing, remove rotted post or segment and replace with new post or segment as required, may require selective demolition and reconstruction of portions of concrete slab; design to be by structural engineer registered in the State of Florida. (1) • Estimated Cost: $2,800 Total Estimated Repair Costs: $9,450 • Reduce by $750 for Metal Drip Edge Alternative (See No. 2) • Alternate to cover existing panels with liquid roof coating additional $3,000-6,000 • Alternate to replace existing roof in its entirety, same configuration/metal panel only (corrugated aluminum): $7,200 (See No. 1) • Alternate to replace existing roof in its entirety, same configuration/metal panel only (galvanized steel): $8,700 (See No. 1) 16.D.3.a Packet Pg. 1503 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 9 Restrooms General Description The restroom building is a concrete block structure of approximately 1,200 SF, built on a concrete slab-on-grade foundation, with a wood truss roof system, and metal panel roof. In addition to a men’s restroom and women’s restroom, there is an interior storage/utility room between them, and a small screened porch on the west side of the building. Observations - See Inspection Report for Details and Photos (Appendix C) 1. Downspouts: One on east side missing bottom section and splashblock, two others (on west side) missing splash blocks, splash block turned to drain towards building at fourth location on north side. 2. Siding meets or nearly meets grade on all sides of building. 3. Pipe to ice maker on screened porch is dripping and causing algae build-up; cover/door of ice maker has mildew on exterior. 4. Gap in the center of each window at the inside sill, possibly purposeful for drainage, unable to verify. 5. Men’s restroom soap dispenser exhibits rust staining. 6. Accessibility: Based on casual observation (no measurements were taken), it appears that there are deficiencies relating to accessibility in both restrooms (the sink counters are too high (over 34”), and the required shower spray unit with hose is not provided.) A thorough ADA survey pertaining to accessibility would be required to confirm the extent of these and any other deficits along with recommendations for remediation. Note: Certain non-conforming features may be deferred until a planned alteration or renovation of the facility is performed but the facility may not provide the best level of accessibility for users until revised. Recommendations and Cost Estimates 1. Replace missing segment of downspout, add splashblocks at three downspouts, reorient fourth splashblock to drain away from building. (2) • Estimated Cost: $300 2. Remove soil from perimeter of building to provide a gap beneath the bottom edge of the siding of approximately four inches, re-grade as required to maintain positive drainage away from building on all sides. (2) • Estimated Cost: $1,000 3. Repair leak at ice maker pipe, or if required for condensate drain, extend to redirect to exterior; clean algae build-up, clean and disinfect ice maker cover/door. (2) • Estimated Cost: $300 4. Caulk gap if not required for louver drainage. (3) – Confirm with Manufacturer • Estimated Cost: $100 5. Replace soap dispenser using stainless steel mounting hardware. (3) 16.D.3.a Packet Pg. 1504 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) PEPPER RANCH PRESERVE FACILITIES REVIEWED AUGUST 20, 2017 CH2M HILL, INC. 10 • Estimated Cost: $100 6. Prior to next substantial alteration or renovation, obtain accessibility survey to determine need for accessibility related modifications. (3) • Estimated Cost: $2,500 (survey/report only, renovations and other buildings not included) Total Estimated Repair Costs: $1,800 • (ADA Survey and Report not included): Additional $2,500 Mower Covering/Shed General Description The mower covering/shed is a wood post and beam construction supporting a wood truss roof system covered with corrugated metal panels. Observations - See Inspection Report for Details and Photos (Appendix C) 1. Tree limbs in contact with roof surface will cause wear/damage. Recommendations and Cost Estimates 1. Trim tree limbs in close proximity to or touching roof, maintain. (2) • Estimated Cost: $100 Total Estimated Repair Costs: $100 Summary Based on the observations documented above, it is CH2M recommendation to immediately budget and perform all repairs designated with a Rating of (1) Repairs designated with a Rating of (2) or (3) can be deferred. However, deferring the repairs may lead to an increase in repair costs and/or additional deterioration of facility which will require additional repairs. END 16.D.3.a Packet Pg. 1505 Attachment: CH2M_PepperRanchAssessment_082017_Tech_Memo_R1 (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) We appreciate the opportunity to earn your business and your trust. Please read the report carefully. If you have any questions after reading the report, feel free to contact us. 16.D.3.b Packet Pg. 1506 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 1 of 25 16.D.3.b Packet Pg. 1507 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 2 of 25 16.D.3.b Packet Pg. 1508 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 3 of 25 16.D.3.b Packet Pg. 1509 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 4 of 25 16.D.3.b Packet Pg. 1510 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 5 of 25 16.D.3.b Packet Pg. 1511 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 6 of 25 16.D.3.b Packet Pg. 1512 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 7 of 25 16.D.3.b Packet Pg. 1513 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 8 of 25 16.D.3.b Packet Pg. 1514 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 9 of 25 16.D.3.b Packet Pg. 1515 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 10 of 25 16.D.3.b Packet Pg. 1516 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 11 of 25 16.D.3.b Packet Pg. 1517 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 12 of 25 16.D.3.b Packet Pg. 1518 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 13 of 25 16.D.3.b Packet Pg. 1519 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 14 of 25 16.D.3.b Packet Pg. 1520 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 15 of 25 16.D.3.b Packet Pg. 1521 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 16 of 25 16.D.3.b Packet Pg. 1522 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 17 of 25 16.D.3.b Packet Pg. 1523 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 18 of 25 16.D.3.b Packet Pg. 1524 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 19 of 25 16.D.3.b Packet Pg. 1525 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 20 of 25 16.D.3.b Packet Pg. 1526 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 21 of 25 16.D.3.b Packet Pg. 1527 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 22 of 25 16.D.3.b Packet Pg. 1528 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 23 of 25 16.D.3.b Packet Pg. 1529 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 24 of 25 This inspection summary is provided as a courtesy, it does not represent the full inspection report in its entirety. Some items in the report often will NOT be included in this summary. Summary is not a substitute for the full inspection report. Please read the entire report and view all photos, do not rely on this summary to represent all items in the report. We are not responsible if client does not read full report. 16.D.3.b Packet Pg. 1530 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve) Page 25 of 25 16.D.3.b Packet Pg. 1531 Attachment: 6315 Pepper Rd. Cottage (6534 : Demolition of Caretaker’s Residence at Pepper Ranch Preserve)