Loading...
Agenda 09/25/2018 Item #16A 809/25/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer facilities for Kalea Bay Phase 1B, PL20160002553, accept unconditional conveyance of a portion of the potable water and sewer facilities, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $98,202.30 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of the potable water and sewer facilities, accept unconditional conveyance of a portion of the potable water and sewer facilities, and to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $98,202.30, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Kalea Bay Phase 1B, has constructed the potable water and sewer facilities within dedicated easements to serve this private development (see attached location map). A portion of the potable water and sewer facilities will be conveyed to the County, as described in Official Records (O.R.) Book 5448, Page (PG) 3466, and (O.R.) Book 5448, Page (PG) 3449. The remaining potable water and sewer facilities will be private. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on February 15, 2017. At that time, the value of these potable water and sewer utility facilities (assets) was $97,941.64 and $323,718.31, respectively. (See attached asset sheet). 3) Staff recorded all preliminary acceptance documents associated with the potable water and sewer facilities conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its interest in a portion of the potable water and sewer facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records (O.R.) Book 5448, Page (PG) 3466, and (O.R.) Book 5448, Page (PG) 3449 of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on August 20, 2018, in coordination with Public Utilities, and these facilities have been found to be satisfactory and acceptable. 6) The on-site potable water and sewer utilities, less the potable water and sewer utilities described in (O.R.) Book 5448, Page (PG) 3466, and (O.R.) Book 5448, Page (PG) 3449, are owned and maintained by the developer. 7) Staff recommends final acceptance of the subject utility facilities and to release the Utility Performance Security (UPS) and Final Obligation Bond in the total amount of $98,202.30. (See attached Exhibit A). 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 16.A.8 Packet Pg. 856 09/25/2018 9) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to a portion of the potable water and sewer utility facilities, which at the time of preliminary acceptance, had a total gross value of $421,659.95 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval -SAS RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for Kalea Bay Phase 1B, PL20160002553, accept unconditional conveyance of a portion of the potable water and sewer facilities, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $98,202.30 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.8 Packet Pg. 857 09/25/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.8 Doc ID: 6467 Item Summary: Recommendation to approve final acceptance of the potable water and sewer facilities for Kalea Bay Phase 1B, PL20160002553, accept unconditional conveyance of a portion of the potable water and sewer facilities, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $98,202.30 to the Project Engineer or the Developer’s designated agent. Meeting Date: 09/25/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 08/20/2018 4:52 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 08/20/2018 4:52 PM Approved By: Review: Wastewater Steve Nagy Additional Reviewer Completed 08/21/2018 8:34 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 08/21/2018 9:49 AM Water Steve Messner Additional Reviewer Completed 08/21/2018 12:48 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 08/21/2018 2:34 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 08/21/2018 4:51 PM Water Pamela Libby Additional Reviewer Completed 08/22/2018 8:38 AM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 08/22/2018 9:45 AM Wastewater Beth Johnssen Additional Reviewer Completed 08/24/2018 3:45 PM Growth Management Department Matthew McLean Additional Reviewer Completed 08/27/2018 9:27 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 08/27/2018 3:43 PM Growth Management Department James C French Deputy Department Head Review Completed 08/27/2018 9:19 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 08/30/2018 4:36 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/31/2018 9:55 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/31/2018 10:08 AM Office of Management and Budget Allison Kearns Additional Reviewer Completed 09/06/2018 6:51 PM 16.A.8 Packet Pg. 858 09/25/2018 County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 09/17/2018 1:50 PM Board of County Commissioners MaryJo Brock Meeting Pending 09/25/2018 9:00 AM 16.A.8 Packet Pg. 859 KALEA BAY PHASE 1B LOCATION MAP 16.A.8.a Packet Pg. 860 Attachment: Location Map (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond $94,202.30 929643071 Final Obligation Bond $4,000 2016371487 Total Amount $98,202.30 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Performance Bond 3. Receipt of Payment 16.A.8.b Packet Pg. 861 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) VERIF ICATION OT FINAL COS I Kalea Bay PRO.IFCT NAME: Section 20 Township 48 South Range 25 East Collter County, Florida LOCATION: NAME A ADDRESS OF OWNER: Lodge Abbott Associates, LL C 3400 Lafayette Street Detroit. Ml 48207 POTABLE WATER TYPE OT UTILITY SYSTEM: lED |/fern Cost Quant, ry Units m. $5,428 58 $6,648 71 $38,088 00 $47,215.14 $3,810.50 $42,754,08 $12,844 10 $32,417.01 $2,311 05 $3,508.37 $7,569 28 $5 158 86 $4.690 90 $29,510 70 $3,209 69 S1.931.52 S6.814 74 S6.337 96 $3,259 10 $1,730 97 $7,443 90 $7,845.29 $5,814.64 $2,571 64 $6,814.74 $2,414.37 $19,699 88 $4,150.08 $2/3.17 $3 688 75 $1,605.05 $5,428.58 $6,648.71 $24.00 $16.59 $1,905 25 $3,562 84 $1 284 41 $10 805 67 $2,311.05 $3,508.37 $1,892.32 $12 11 $938.18 $29.510 70 $3,209.69 $1,931 52 $2,271.58 $1,584.49 $1,629.55 SI.730.97 $9 19 $7.845 29 $2,907.32 $1,285 82 $2,271 58 $804 79 $19 699 88 $7 92 $4.63 $737 75 $1 605.05 $1.831.92 LA 12" x 8" *2* x 10" 1 I appmg Sleeve & Valve Tapping Sleeve & Valve C900 DR 14 C 900 DR 14 Gale Valve Eire Hydrant Assembly wGV Gale Valve Rack! nw Preventer Assembly Check Valve EA 1 LF 10" 1 58/ 2 846 LF 8" EA 10" 2 LA 12 10 EA 8" EA 3 8 EA 1 8" EA 1 8" PIV LA 4 8' Permanent Blow Oil C 900 DR 14 Gate Valve Meter Assembly 426 I F 6" EA 6" 5 EA 1 6" EA 1 6" PIV EA 0" 1 Check Valve FDC Permanen' Rlow OH Air Release Valve Permanent Bacterial Sample Point C 900 DR 14 Back flow Preventer Assembly EA 3 6" FA 4 6" EA 2 LA 1 LF 810 4" EA 4* 1 2 EA 4" PIV FA 2 4" Check Valve FDC Gate Vaive Meier Assembly Poly Tube Poly Tube Gate Valve Saddle w/1" Corp Stop Saddle wI T Corp Stop EA 3 4" LA 4" 3 FA 3" 1 524 LF r Lf 1" 59 5 EA 2" EA 8"x 1" 8' x 2" 1 LA 2 $330,824.61 TOTAL COST I do hereby certify that the quantities of malarial and services described above are true and an accurate representation of the as-installed system CERTIFYING: Name and Title of Engineer Certifying Omega Consulting Group 5620 Sonnen Court Ft. Myers. FL 33919 OF: arn true and an accurate I dc. hereby certify that the quantities of material and services described above representation of the as-installen cost of Ihe system CERTIFYING: ^ Kev^Jensert. Presiden t / 16.A.8.b Packet Pg. 862 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples. Florida 34109 Olr: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) the foregoing instrument was signed and acknowledged before me this 14th day of October. 2016 by Keyin Jensen . who is personally known to me and who did not lake an oath. I K L luL._ Donna L. Ventre , Notary SEAL: 'f: jOHHf • • V, .I 16.A.8.b Packet Pg. 863 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) VERIFICATION OF FINAL COST PROJECT NAME: Kalea Bay Section 20 Township 48 South Range 25 East Collier County, Florida LOCATION: NAME & ADDRESS OF OWNER: Lodge Abbott Associates, LLC 3400 Lafayette Street Detroit, Ml 48207 TYPE OF UTILITY SYSTEM: SANITARY SEWER EH jHEfl quantity Units Es=sL $5,392.95 $36 01 $11.06 $373 45 $11 5? $4,575.14 $1,848.32 S 176.983.25 $65,288.00 $99,607 59 $11,239.68 S8.192.84 S80.894.25 $116 708 41 $8,505 14 $7 469 00 $7 40/ 36 $4,575 14 $1,848 32 $176,983 25 $65,288 00 $99,607.59 $33,719.04 $8.192.84 $611,198.34 15 EA Manholes SDK 26 Lateral Cleanout Assembly C-900 Chock Valve Air Release Valve Lift Station Odor Control Generator Grease Trap Grease Trap LF 8" 3,241 LF 6" 769 20 EA 6" 643 LF 6" FA 6" 1 1 EA EA 1 EA 1 EA 1 EA 1250 3 750 1 EA TOTAL COST I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed system CERTIFYING: Name and Title of Engineer Certifying Omega Consulting Group 5620 Sonnen Court Ft. Myers. FL 33919 OF: I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed cost of the system /f CERTIFYING'y^y / / »Jenson, , President Kevin JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 6th day of October, 2016 by Kevin Jensen . who Is personally known to me and who did not take an oath. fv J /- / u 1 *LL gonna L Ventre .Notary Public lA SEAL: OONNALVFNfftE I/.Y COUld iCN* IT «Ct04 : .-. rXPIfUlG: Jms 1.7319 - . i • is » • •• <•.--i MI.-i. f! ' • ' • 16.A.8.b Packet Pg. 864 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 865 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 866 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 867 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 868 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 869 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 870 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 871 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 872 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 873 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 874 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 875 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 876 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 877 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 878 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 879 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 880 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 881 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 882 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 883 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 884 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 885 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 886 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 887 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 888 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 889 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) 16.A.8.b Packet Pg. 890 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2016371487 Transaction Number:2016-078125 Date Paid:12/06/2016 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 00002468 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:LODGE/ABBOTT ASSOCIATES LLC 3400 E LAFAYETTE ST DETROIT, MI 482074962 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Utility Performance Refundable Bond PL20160002553 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:LeaDerence Batch Number:5907 Entered By: melissaalvarez 16.A.8.b Packet Pg. 891 Attachment: Exhibit A (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) CERTIFICATION OF CONTRIBUTORY COSTS (WATER) PROJECT NAME: Kalca Day LOCATION: Section 20 Township 48 South Range 25 East Collier County, Florida NAME & ADDRESS OF OWNER: Lodge Abbott Associates, LLC 3400 Lafayette Street Detroit. Ml 48207 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ZED 1 Item Size Quantity Units 12" x 8" 12" x 10" Cost $2,220,46 $3,196 24 $26,370.13 $16,934 7 7 $3,300.50 $20,739 88 $9,144.20 $5,145 16 $342.16 $3,415.90 $3,937 96 $2,272.56 $1,362.10 $15.95 $1,099.58 S105.05 $303.24 $29 80 $97,941.64 $2,220 46 $3,19624 $15.99 $9 09 $1,650 25 $2,962.84 $914.42 $1,286.29 $6.11 $683.18 $984.49 $1,136.28 $1 362.10 $3.19 $549 79 $105.05 $151.62 $2 98 Tapping Sleeve & Valve T apping Sleeve & Valve C 900 DR 14 C 900 DR 14 Gate Valve Fire I lydrant Assembly w/ GV Gate Valve Permanent Blow Off C 900 DR 14 Gate Valve Permanent Blow Off Air Release Valve Permanent Bacterial Sample Point C 900 DR 14 Gate Valve Saddle w/1" Corp Stop Saddle w/ 2" Corp Stop Poly T ube 1 EA 1 EA 10" 1.587 8" 1,753 LF I F 10" 2 EA 7 EA 8" EA 10 8" 4 EA 6" 56 LF 6" 5 EA 6" EA 4 2 EA EA 1 5 LF 4" 4" EA 2 8" x 1" EA 1 2 EA 8" x 2" 2-10 LF I OTAL COST I do hereby certify that the quantities of material described above are true and an accurate representation o' the as-installed system. CERTIFYING: NAME & TITLE OF ENGINEER CERTIFYING Omega Consulting Group 5620 Sonnen Court Ft. Myors, FL 33919 OF: I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING: Kevin Jensen, President / JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 \\JENSON01\Company\Excel_Doc\DONNA-1\Tim\VOFC\Collier Counly\Kalea\Kalea County Water OF: 16.A.8.c Packet Pg. 892 Attachment: Assets Sheet (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B) CERTIFICATION OF CONTRIBUTORY COSTS (SEWER) Kalea Ray PROJECT NAME: LOCATION: Section 20 Township 48 South Range 25 Fast Collier County, Florida NAME & ADDRESS OF OWNER; Lodge Abbott Associates, LLC 3400 Lafayette Street Detroit, Ml 48207 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONLY) Hi sun Ms. »""s Cosi S3.478.07 $5 56 $3.06 $5.52 $3,075.14 $1,248.32 $134,483.25 $54,288.00 $85.868 61 $31,302.63 $9,774.48 $128.52 $3,549 36 $3,075.14 $1,248 32 $134,483 25 $54,288.00 $85.868.61 $323,718.31 Manholes SDR 26 Lateral C-900 Check Valve Air Release Valve Lift Station Odor Control Generator 9 LA 8" 1.758 LF 42 LF 6" 643 LF 6" 6" LA 1 EA 1 EA 1 EA 1 1 FA TOTAL COST I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed system. CERTIFYING: NAME & TITLE OF ENGINEER CERTIFYING Omega Consulting Group 5620 Sonnen Court OF: Ft. Myers, FL 33919 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING: n Jensen, Presl dent Kevl OF: / JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 6th day of October, 2016 by Kevin Jesnen who is personally known to me and who did not take an oath. DOKMAl.VfMlll-: v.rcoHtnsiONiUT .-cv.m / ; ,L i, ik • • : ,IIIHI•'&>IH« i ;no - x li-J rMiicit JLLUL SEAL: i Hun 16.A.8.c Packet Pg. 893 Attachment: Assets Sheet (6467 : Final Acceptance of Utilities - Kalea Bay Phase 1B)