Loading...
Lely Beautification MSTU Agenda 09/20/2018 Page 1 of 2 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 3299 Tamiami Trail East, Suite 103 Naples, FL 34112 PROJECTOR PROJECTOR PROJECTOR AGENDA SEPTEMBER 20TH, 2018 I. CALL TO ORDER – II. ATTENDANCE – Tony Branco - Chair (10/1/21) Robert Slebodnik - Vice Chair (10/1/18) Kathleen Dammert (10/1/18) Linda Rae Jorgensen (10/1/21) Vacancy ( – ) III. APPROVAL OF AGENDA – IV. APPROVAL OF MINUTES – AUGUST 16TH, 2018 V. CHAIRMAN’S REPORT – TONY BRANCO A. ___________________. B. ___________________. C. ___________________. VI. LANDSCAPE ARCHITECT’S REPORT – MCGEE & ASSOCIATES VII. LANDSCAPE MAINTENANCE REPORT – COMMERCIAL LAND MAINTENANCE VIII. PROJECT MANAGERS REPORT – DAN SCHUMACHER A. Budget Report. B. Lighting Inspection Report. C. Irrigation. D. Plant & Tree replacements. E. STOP & Traffic Sign replacements. IX. OLD BUSINESS – A. REFURBISHMENT OF ENTRY MONUMENTS – 1. Monument Cap, McGee Existing, Elevation & Planform views. 2. Monument Cap, McGee Opinion of Cost, Rev 1, Quotes. B. NEW LIFT STATION @ HIDDEN VALLEY DRIVE – 1. FY-18 Public Utilities project – BCC meeting follow-up. C. UNFINISHED BUSINESS – 1. Insurance Pebble Beach Light Pole. 2. Insurance - St Andrews Median #3. X. NEW BUSINESS – A. TREASURE POINT LIGHTING B. PROJECT PROPOSALS FOR THE FY-18 YEAR 1. Lighting – Pebble Beach Circle, potentially Doral Circle. XI. MEMBER COMMENTS – AGENDA September 20, 2018 Lely Golf Estates Beautification MSTU Page 2 of 2 XII. PUBLIC COMMENTS – XIII. ADJOURNMENT – NEXT MEETING: OCTOBER 18TH, 2018 AT 2:00 PM Collier County Library East Naples Branch 8787 Tamiami Trail East Naples, FL 34113 (239) 775-5592 1/6 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 3299 Tamiami Trail East Suite 103 Naples, FL 34113 Minutes August 16, 2018 I. Call to Order Chairman Branco called the meeting to order at 2:18 PM. A quorum was established. II. Attendance Members: Tony Branco – Chair; Robert Slebodnik - Vice Chair (Excused); Kathleen Dammert; Linda Jorgensen; Vacancy County: Dan Schumacher - Project Manager Others: Mike McGee - Landscape Architect; Gary Gorden - CLM; Wendy Warren– Juristaff III. Approval of Agenda Ms. Dammert moved to approve the August 16, 2018 Agenda of the Lely Golf Estates Beautification M.S.T.U. as amended: Add: Item V. Chairman’s Report – A. Street Signage; B. Monthly Community Assessment; C. Pending Items Update. Second by Ms. Jorgensen. Carried unanimously 3 - 0. IV. Approval of Minutes – July 19, 2018 Ms. Dammert moved to approve the minutes of the July 19, 2018 Lely Golf Estates Beautification M.S.T.U. meeting subject to the following change: Page 5, Item IX. A. – Old Business: Review McGee Preliminary Opinion of Cost from “…The Committee decided to proceed with landscaping of the monument area…,” to … The Committee decided to proceed with planting the monument area behind the walls…).” Second by Ms. Jorgensen. Carried unanimously 3 - 0. V. Chairman’s Report – Tony Branco Chairman Branco reported on the community tour as follows: A. Street Signage • Mr. Schumacher will respond to Judy Kee’s (Manager, Anchor Associates, Inc.) query addressed to Felix Burgos, Traffic Operations, requesting additional street and STOP signs. The Committee noted individual street name signs are now the responsibility of the M.S.T.U. B. Monthly Community Assessment • Bougainvillea plants at the main entrance, outbound side, are stressed as a result of issues with irrigation. • The situation with the fitting on the primary reclaimed water supply pump at Warren Street has been resolved. • Mr. Schumacher will solicit a quote from Commercial Land Maintenance (CLM) for removal of a dead Washingtonia Palm on Pebble Beach Boulevard. • A community wide pruning of palm trees should be scheduled. MINUTES August 16, 2018 LELY GOLF ESTATES MSTU 2/6 • An auto accident on Median #1 damaged the flag pole and light. o CLM will attempt to straighten the pole Friday, August 17th. o An accident report could not be located. C. Pending Items Update US-41 Traffic Flow Mr. Schumacher prepared a diagram for submission to Traffic Operations for a review of traffic flow in the vicinity of the US-41 west bound U-Turn lane at the intersection of St. Andrews Blvd. The Department’s response will be reported at a future meeting. Holiday Decorations Mr. Schumacher will research the County’s contracts to confirm approved holiday lighting vendors including Whited Holiday Decor. The Committee will be updated on vendor selection options and the schedule for installation at a future meeting. Hart’s Electrical will be notified regarding action to minimize ground fault outages for the holiday lighting installation at the Lely US-41 entrance. Light Pole A & B Designation Product availability for A and B letter designation for poles with double luminaries continues to be researched. Numeric designation and stenciling are also being considered as options. Podocarpus Removal CLM will remove the damaged plant in the Podocarpus hedge on Rattlesnake Hammock Road and check the soil for pollution. Mr. Schumacher will request a quote from CLM for replacement of the plant if it is determined the soil is not polluted. Plant Replacements In accordance with Mr. McGee’s summary report list, Mr. Schumacher received a quote from CLM for plant replacement on the Saint Andrew’s side of Lely and will issue a Notice-to-Proceed after the Sabal Palms have been trimmed. VI. Landscape Architects Report – McGee & Associates A. Summary, Detail Mr. McGee summarized the “Lely Golf Estates Landscape Observation Report FY17-18” dated August 7, 2018 noting: General • Many of the items noted on prior reports have been addressed by CLM. • Torpedo grass weed to be monitored throughout medians and hand removed if present. • Prune Oak tree limbs away from light poles. • Reduction cut branches over hanging roadways. Mr. Schumacher will review pruning with Mr. Kindelan, CLM, and solicit a quote. Saint Andrews Boulevard & US 41 In bound R/W South monument landscaping: • Remove existing Arboricola plantings and turf at rear of monument; Royal Palms remain. • Install seven (7) 25 gallon small leaf Clusia shrubs, as per drawing “Community Entrance Signs Renovation Concept Plan” prepared by McGee & Associates. MINUTES August 16, 2018 LELY GOLF ESTATES MSTU 3/6 • Locate and attach to existing spray zone an irrigation line behind the wall including risers and spray nozzles. • Apply mulch. Out bound R/W North monument landscaping: • Remove existing turf at rear of monument. • Install seven (7) 25 gallon small leaf Clusia shrubs, as per drawing “Community Entrance Signs Renovation Concept Plan” prepared by McGee & Associates. • Locate and attach to existing spray zone an irrigation line behind the wall including risers and spray nozzles. • Apply mulch. Mr. Schumacher will: • Meet with Suncoast Credit Union management to apprise them of the project, assess responsibilities and determine the party responsible for cutting plants by the Bank. • Schedule Utility Locating Services prior to planting. • Solicit a Request for Quote (RFQ) from CLM for the landscaping project. Forest Hills Boulevard • Median #12: No evidence of caterpillars on recently treated Bougainvillea plants. Augusta & Forest Hills Boulevards by Golf Cart Crossing • Prune broken limb from the Mahogany tree by the lake. Irrigation • Warren Street reuse water for July 2018 was 184,525 gallons; potable water usage did activate during the filter repair period. • Valley Stream usage was 15,340 potable gallons. • Water usage is normal. • The flat water rate of $91 per month may qualify for a reduction if the water is not being discharged into the sewer. Mr. Schumacher will investigate and update the Committee on his findings at a future meeting. VII. Landscape Maintenance Report – Commercial Land Maintenance A. Summary Comments Mr. Gorden updated the Committee on landscape maintenance noting: • Bougainvillea plants on Forest Hills Boulevard were treated for caterpillars. • Bougainvillea plants on Saint Andrews Boulevard were treated for Thrips. • Condition of Bougainvillea plants at the front entrance is improving with recent rains. • Torpedo grass was treated. • Irrigation heads will be checked for accurate functioning. VIII. Project Managers Report - Dan Schumacher A. Budget Report Mr. Schumacher summarized the “Lely MSTU Fund Budget 152 dated August 16, 2018” for information purposes and provided an overview of the budget noting: • $245,962.65 of the FY18 Ad Valorem property tax revenue budget of $255,500.00 has been collected. MINUTES August 16, 2018 LELY GOLF ESTATES MSTU 4/6 • Total revenue FY18 is $563,500.00 including investment interest, transfers and contributions (minus a 5% reserve of $12,900). • Current Operating Expense budget is $192,000 of which commitments total $42,961.71; expenditures $121,408.90. • Uncommitted Operating Expense funds available are $23,629.39. No new Purchase Orders were issued. • Purchase Orders will be reissued for the FY-19 budget effective October 1, 2018. • Plant replacements will be funded by the Landscape Incidentals category. • Remaining balances will roll over to the FY-19 budget. • Improvements General funds of $148,900.00 can be accessed for special projects. • Reserves for Insurance and Catastrophic/Hurricane funds total $179,400.00, an increase of $9,400.00. • Total available balance less committed expenses $356,533.84. B. Lighting Inspection Report Report The August 18, 2018 report indicated four outages, one of which is an LED lamp. The Committee also observed two lamp outages at Saint Andrews and Pebble Beach Boulevards. Mr. Schumacher issued a Request for Quote (RFQ) to Hart’s Electrical for the four (4) LED lamp replacements noted on the report and noted only four lights remain in inventory. LED Lamp Warranty Staff will inquire regarding the warranty policy for LED lamps, noting one of the current outages is an LED light installed within one year. Flag Pole Lamp Mr. Schumacher submitted a photo of the Flag Pole Lamp damaged by an auto accident to Hart’s Electrical querying if the contractor can recommend a better product. An RFQ will be solicited for replacement. C. Irrigation Irrigation status was updated under Item V. Chairman’s Report and VII. Landscape Maintenance Report. D. Plant and Tree Replacement Plant replacements quotes are based on “time and materials.” A fifteen (15) percent mark-up is applied to the wholesale purchase price; labor is billed on actual hours worked. CLM has provided a quote for plant replacement on Saint Andrews Boulevard in the amount of $2,925; a Notice-to- Proceed for this work will be issued. E. STOP & Traffic Sign Replacements Mr. Schumacher updated the Committee on the status of sign replacement as follows: • Daniel Hall communicated it would not be advisable to mount Neighborhood Watch Signs below Speed Limit signs, noting the MUTCD code recommends against it. The MSTU will identify a location for the new pole. • At Mr. Schumacher’s request, Crown Castle USA sent a contractor to evaluate the wireless infrastructure on the poles. Mr. Schumacher will update the Committee on his findings at a future meeting. MINUTES August 16, 2018 LELY GOLF ESTATES MSTU 5/6 • Mr. Schumacher will follow up with Judy Key to address her communication with Felix Burgos, Traffic Operations, and confirm the MSTU is responsible for Street Sign poles and blades; Traffic Operations is responsible for STOP and Speed Limit signs. • The Procurement Division will issue a decision on the MSTU’s ability to increase Municipal Sign’s (MSS) scope of work or if a general Request for Quote (RFQ) is required for expansion of the sign project. • A meeting to review a solution to the unsatisfactory mounting of street signs was held with Municipal Supply & Sign Co. (MSS) management. The company’s technical expert will visit the site week ending August 25th to prepare recommendations agreeable to all parties to correct the problem. IX. Old Business A. Refurbishment of Entry Monuments 1. Review – McGee preliminary Opinion of Cost. Mr. McGee presented an opinion of cost for the Conceptual Design Development plans for the ST. Andrews Boulevard & US 41 Entrance Arbor Items. The Committee discussed the proposed project cost, funded by the Capital Outlay category of the budget, and concurred the options are not conducive to their budget. Mr. McGee will prepare an alternative design proposal for the September meeting. 2. Entry-side monument, back Landscaping. This item was addressed under VI. Landscape Architect’s Report – McGee & Associates. 3. Exit-side monument, back Landscaping This item was addressed under VI. Landscape Architect’s Report – McGee & Associates. B. New Lift Station @ Hidden Valley Drive 1. FY-18 Public Utilities project – BCC Follow-up. This item will be updated at a future meeting. C. Unfinished Business 1. Insurance Pebble Beach Light Pole. Ms. Sillery has submitted inventory information for repair cost to the pole to the insurance company. 2. Insurance – Saint Andrews Median #3.Auto Accident M A claim is pending. X. New Business A. Project Proposals for the FY -18 Year The following projects are under consideration and will be addressed in 2018: 1. Lighting Pebble Beach Circle, potentially Doral Circle. XI. Member Comments None XII. Public Comments None MINUTES August 16, 2018 LELY GOLF ESTATES MSTU 6/6 XIII. Adjournment There being no further business to come before the Committee, the meeting was adjourned by the Chair at 3:23 PM. LELY GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE ________________________________ Tony Branco, Chairman The Minutes were approved by the Committee on _____________________ 2018, as presented ____, or as amended _____. NEXT MEETING: SEPTEMBER 20, 2018 – 2:00 PM COLLIER COUNTY EAST NAPLES LIBRARY 8787 TAMIAMI TRAIL EAST, NAPLES, FL 34113 (239) 775-5592 McGee & Associates Landscape Architecture Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417-0707 * Fax (239) 417-0708 LC 098 * FL 1023A Project: LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Landscape Observation Report: September 2018 Location: MSTU DISTRICIT ROADWAYS Project Manager: Dan Schumacher, Collier County Public Services Division, Public Transportation & Neighborhood Enhancements Department Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa Contractor: Commercial Land Maintenance Contractor’s Representative: Robert Kindelan, Gary Gorden Report Date: FY17-18, 09/11/18 Observation Date: 09/11/18 Report No. 11 AC - Indicates major or repeating items recommended to be discussed by the Advisory Committee S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE/COMMENTS column when and which items are corrected. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size. LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS All locations X X 2 Foxtail palm seed stalks that can be reached with pole saw need to be removed. St. Andrews Blvd. & US 41 In bound R/W South X X X 2 Behind sign monument wall install (7) 25 gal., 9’ ht., 5’ spr. Small Leaf Clusia shrubs to include mulch and proposed irrigation (See attached drawing & notes) X 2 Remove volunteer weeds and vines on sign monument wall. X 2 Prune away Oak tree branches from Light pole #4. X X 10 (6) Bougainvillea Silhouette are missing at first Oak tree along back side of sidewalk. X X 10 (3) Bougainvillea Silhouette at Light pole #5 are missing. X X 10 (16-18) Allamanda shrubs are missing and/or de ad along parking lot edges. Shrubs are part of County LDC requirement for screening. Replacement with same or Variegated Schefflera should occur. Out bound R/W North X X X 2 Behind sign monument wall install (7) 25 gal., 9’ ht., 5’ spr. Small Leaf Clusia shrubs to include mulch and proposed irrigation (See attached drawing & notes) Suncoast Credit Union side of sidewalk X X X 4 Turf areas between the sidewalk and roadway between the Bougainvillea Silhouette and to the east of the Silhouette is non-existing with mostly bare soil exposed. Recommend removing weeds and lower soil level to 4 inches below valley gutter and then replant areas with sod type Perennial Peanut ‘Ecoturf’, approx. 150 sq. ft. One strip of sod east of Bougainvillea beds and three or four strips between Bougainvillea beds. X 10 (8-10) Dwarf Bougainvillea ‘Helen Johnson’ replacement shrubs are missing. X X 10 Turf areas are water stressed with multiple dead areas and areas containing noticeable weeds. St. Andrews Blvd. Median #1 X X 9 On end of median several Bougainvillea Silhouette have been remove d and will need to be replaced. (3 5) 3 gal. size. Median #2 X X X 4 Remove western end Crown of thorn and replace with dwarf Bougainvillea ‘Helen Johnson’, 3 gal., 3 rows, 1st row 22, 2nd row 20 & 3rd row 18 plants. Min. 3’ off edge of McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 08/07/18 Observation Date: 08/06/18 Report : 10 Page 2 of 6 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS turf and adjacent plants X X 10 On the west end about 240 s.f. of turf area contains dead areas and noticeable weeds. Median #3 X X 10 Washingtonia stump removal will cause about 1/3 of existing Plumbago to be removed. M&A: 7/10/18 Provide count for replacements. X X 10 (3) Queen’s crape myrtles (2) removed (1) damaged. Consider replacements of same or different species of Crape myrtle. Median #4 No major issues observed. Median #5 X X 10 At address 140: (1) Juniper dead and (1) Juniper missing X 11 At address 164: (2) Queen’s crape myrtle leaning. Reset and stake. X 11 At address 164: (1) Holly trees needs corrective pruning. Median #6 X X At address 250: (1) Ilex tree needs to be staked so straighten alignment. X X 4 At address 249: (11-12) dwarf Firebush plants have been run over. Prune off broken and damaged wood and review for replacements 3-gal size. Also review and clean out valve box and remove large stoned in median. X X 10 Plumbago look poor. Appears it maybe water stress or insects. M&A: 02/05/18 Recommend pruning shrubs to uniform shape and remove deadwood. M&A: 5/8/18 Shrubs still appear off color and seem stressed. X X 10 At address 228: (1) Holly tree is missing. X X 11 At address 246: (1) Washingtonia removed. Remove or grind stump. Option 1: Remove remaining Washingtonia palms and consider alternate replacement palms (i.e. Foxtail, Christmas, Alexander palms or Sabal) Median #7 No major issues observed. Median #8 No major issues observed. Median #8A No major issues observed. Median #9 X X 10 At address 388: (12-14) Dwarf Bougainvillea ‘Helen Johnson’ are missing or damaged. X X 11 At address 364, 376 & 388: (3) Holly trees removed. Consider replacements with crape myrtles or smaller palms (i.e. Foxtail, Alexander, Christmas palms) X 11 At address 390: (1) Holly trees needs corrective pruning. Median #10 X X 11 At address 402: (1) Holly tree removed. Consider replacement with same. X X 11 (1) Replacement Holly tree is defoliated and in decline. Consider replacement with same. Forrest Hills Blvd Median #11 X X 10 At address 455: (1) Washingtonia palm has lifted. Consider removal. X X 11 (1) Foxtail palm on south end removed due to accident damage. Replace with same. X 11 (1) Foxtail palm on north end needs pruning and then reviewed for bud damage. Median #12 X 4 At address 413: East curb section has been broken just south of light pole. The north of light pole is old chipped length of curbing. McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 08/07/18 Observation Date: 08/06/18 Report : 10 Page 3 of 6 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS X 10 The torpedo grass weeds are returning in the Bougainvillea shrubs at the north end of the median. X X X 10 At address 407-419: (4) Yellow Tabebuia trees have been removed. Consider replacement with Crape myrtle trees. X X 10 At address 426: (1) Holly tree removed. Consider replacement with same or Crape myrtle tree. Forest Hills Cart Crossing & Lake X X 6 Irrigation coverage on the north side of the roadway around the crown of thorn and Xanadu needs to be reviewed and heads adjusted so to improve coverage. X X X 8 Crown of thorn in all plant beds should be considered for replacement with perennial peanut. Valley Stream Cr. Median #13 X X 11 Paurotis palm needs dead frond removal. X X 11 Approximately 180 sq. ft. on the east side and 360 sq. ft. on the west side of the St. Augustine turf has died and contains weeds. Turf decline appears to be related to insect and/or fungus issues. Replacement is recommended. Pebble Beach Blvd. Median #14 No major issues observed. Median #15 X X 2 North end irrigation head should be changed to 6 -inch pop-up instead of 12-inch pop- up. X X 10 At address 32: (1) Holly tree needs to be removed and replacement considered. Replace with crape myrtle species. Median #16 X X At address 64: Washingtonia palm has died and needs to be remove. Median #17 X X 11 At address 140: (1) Tabebuia ‘Ipe’ removed. Replace with same or crape myrtle species. X X 11 At address 132: (2) Sabal palms with broken trunks. Remove and replace with same. M&A: 6/12/18 hole filled and ready for replacement planting. X X 11 At address 124: (1) Tabebuia ‘Ipe’ remove. Replace with same or crape myrtle species. X 11 At address 116: (1) Sabal palms with broken trunks needs to be removed. Remove and replace with same. M&A: 6/12/18 hole filled and ready for replacement planting. Median #18 X X 9 At address 164: (1) Washingtonia removed. Flush cut or grind stump. Option 1: Consider removal of all remaining Washingtonia palms and replant with smaller palms (i.e. Foxtail, Alexander, Christmas palms) M&A: 6/12/18 hole filled and ready for replacement planting. Median #19 X X North end irrigation head should be changed to 6 -inch pop-up instead of 12-inch pop- up. Pebble Beach Blvd. Golf Cart Crossing X X X 11 North side west end: Clean up debris and replant (5) Plumbago and recently removed Foxtail palm that was removed due to lightening. M&A: 01/09/18 Recommend replacement of previous removed Foxtail palm due to decline of existing Eucalyptus tree after hurricane Irma. Thorncrest Ln. cul-de-sac #20 X X 11 (3) Sabal palms removed. (5) dwarf Bougainvillea missing. Grind or remove stumps and replace missing Sabal with the same. Replant missing Bougainvillea. McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 08/07/18 Observation Date: 08/06/18 Report : 10 Page 4 of 6 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS X 10 Torpedo grass weed in Bougainvillea Briarcliff Ln. Cu-de-sac #21 X X 10 (1) Sabal palms removed. Hurricane debris storage and removal has caused about 60 dwarf Bougainvillea plants to be removed and/or damaged to the point of replacement. Grind or remove stumps and replace missing Sabal with the same. Replant missing Bougainvillea. Heather Grove Ln. Cul-de-sac #22 X X 8 Approximately 20 to 25 dwarf Bougainvillea shrubs are missing or have been damaged. Some of the damage is related to recent roadwa y paving. X X 10 (1) Sabal palms removed. No replacement needed or replace with same. Baltusrol Signs X X 7 Recommend removing Crown of thorn beds and replace with Perennial Peanut. X X 8 On south side it appears (4 or 5) Plumbago have died and should be replaced. Doral Cr. East R/W X Torpedo grass in Liriope beds around benches. X X 11 (1) Yellow Tabebuia tree uprooted. Remove and replace with Golden Tabebuia tree. X X 11 (1) Golden Tabebuia tree second from Rattlesnake Hammock needs corrective and structural pruning to create new main leader. Option 1: remove and replace with same. X X 11 (1) 50 ft. gray wood Royal palm has bud broken out. Remove and replace with smaller Royal palm. 4th from Rattlesnake Hammock West R/W & Rattlesnake Hammock Rd. X Volunteer plants along base of Podocarpus hedge needs to be removed (e.g. Snake plants) X X 3 Remove and replace (2) Podocarpus shrubs at previous motorcycle accident location. 15 or 25 gal. container to match existing. M&A: 9/11/18 Dead or damaged plants removed. X X 10 All broken and damaged tree branches hanging over the Podocarpus hedge should be removed. M&A: 8/7/18 Multiple tree branches are overhanging the Podocarpus hedge and over the sidewalk. The Podocarpus hedge is being shaded which will result in thinning and the less than 10-foot height branches over a sidewalk is not permitted. X X 11 Additional fertilizer is recommended for the first and fourth Foxtail palms west of Doral circle. 10 lbs. 13-3-13 palm special fertilizer with minors. M&A: 01/09/18 It is urgent that the fertilizer be placed in order to try and save the palm. M&A: Recommended due to level of decline and adjacent Oak tree growth over the palm that it be removed and not replaced. X X 18 31 54 +/- Blueberry Flax lilies are declined, dead and/or missing in the bed along Rattlesnake Hammock Rd. These plants were planted and maintained by the contractor. Replacements should be installed. M&A: 4/10/18 Well over 505 of the Flax lily are dead or missing. Recommend complete removal of all Flax lily and replacement with one row of Yellow African Iris 1 gal. size set 4 ft. off back of sidewalk and 4 ft. on center. (53) plants recommended. If two small area (less than 5 sq. ft.) of turf on the eastern end are removed an additional 3 plants will be required. M&A 9/11/18 less than 10 Flax lily remain. McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 08/07/18 Observation Date: 08/06/18 Report : 10 Page 5 of 6 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Median #23 X X Crown of thorn on south end east side have been run over. Prune away damage. X X X 11 (4) Jatropha trees are uprooted. (2) trees were removed and (2) need to be replanted and staked. Replace removed Jatropha trees. M&A: 6/12/18 Jatropha stump still in median. M&A: 8/7/18 After pruning of Ixora and Jatropha it may be best to allow the Jatropha to remain and grow them into tree form. Selective continued pruning will need to occur. Median #24 Treasure Point Cul- de-sac X X 8 (6) dwarf Bougainvillea shrubs need to be planted in open bed areas. 3 gal. size. Warren St. Pumping Station X X 10 Pump station area needs to be mulched. Fertilization X X Refer to schedule for October requirements. McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 08/07/18 Observation Date: 08/06/18 Report : 10 Page 6 of 6 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Lely Beautification MSTU Sep‐18 SEE  BELOW ST. ANDREWS ENTRANCE OFF US41 LIGHT DESCRIPTION AUG SEP Flagpole Light‐1 LED DOWN Flagpole Light‐1 LED Flagpole Light‐1 LED Sign Light‐North US41 Sign Light‐South US41  OUT Single Luminare‐1 LED Single Luminare‐2 LED Single Luminare‐3 LED Single Luminare‐4 LED Single Luminare‐5 LED Single Luminare‐6 LED Single Luminare‐7 LED Single Luminare‐8 LED Single Luminare‐9 LED Single Luminare‐10 LED Single Luminare‐11 LED PEBBLE BEACH LIGHTING Double Luminare‐1 LED LED OUT LED OUT Double Luminare‐2 Double Luminare‐3 Double Luminare‐4   Double Luminare‐5 Double Luminare‐6 Double Luminare‐7 Double Luminare‐8 BOTH OUT BOTH OUT Double Luminare‐9 Double Luminare‐10 LED   Double Luminare‐11 1 OUT 1 OUT Double Luminare‐12 LED Double Luminare‐13 Double Luminare‐14 Double Luminare‐15 Double Luminare‐16 LED Double Luminare‐17 LED Double Luminare‐18 Double Luminare‐19 Double Luminare‐20 Double Luminare‐21 Single Luminare‐22 Single Luminare‐23 LELY MSTU LIGHTING INSPECTIONS Lighting Inspection Report 1/2 Lely Beautification MSTU SOLAR LIGHT @AUGUSTA Solar Light‐@Augusta DORAL CIRCLE LIGHTING Double Luminare‐D‐1 Double Luminare‐D‐2 Sign Light‐DS‐1 Sign Light‐DS‐2   Single Luminare‐B1   Single Luminare‐B2 Single Luminare‐B3 Single Luminare‐B4 Lighting Inspection Report 2/2 S.E. SIGN WALL FRONT 1S.E.SIGN WALL FRONT 2S.E. SIGN WALL REARS.E. SIGN WALL TOP 1S.E.SIGN WALL TOP 2L:\Projects\CC Trans. Dept\2012-008 Lely MSTU St Andrews-US 41\DWG\Plan\Site\SIGN BORDER-CAP DETAILS 8-15-18.dwg, 8/15/2018 12:22:56 PM 3"4"G E OLF STATESA DEED RESTRICTED COMMUNITY18" +/-6"7.5833' EX.9.4833'PROPOSED17.1322' CURVED ARC1.9000' ARC4.8755'ARC16.2544'2.7280'2.7280'8"CONC.WALL6"+/-VARIESAPPLIEDLIMEROCKFIELDSTONE2.5"+/-HARD COAT STUCCOOVER WIRE MESH18"+/-AIR GAP1.5" +/- TO CLEAR STONE VENEER8"6"6.8404' ARC9.8662' ARC9.8682' ARC6.8404' ARC18" +/-6"1.5" +/- TO CLEAR STONE VENEER8"6"8"CONC.WALL1.5"+/-HARDCOATSTUCCOOVERWIREMESH2.5"+/-HARD COAT STUCCOOVER WIRE MESH18"+/-AIR GAPL:\Projects\CC Trans. Dept\2012-008 Lely MSTU St Andrews-US 41\DWG\Plan\Site\SIGN BORDER-CAP DETAILS 8-15-18.dwg, 8/15/2018 12:21:25 PM R40.3246'18"+/-50.5'+/-11'+/-EX.SIGNCOPYL:\Projects\CC Trans. Dept\2012-008 Lely MSTU St Andrews-US 41\DWG\Plan\Site\SIGN BORDER-CAP DETAILS 8-15-18.dwg, 8/15/2018 12:22:02 PM Lely MSTU  September 20, 2018 ‐ PRELIMINARY ‐ 1/1   Monument Recapping  (St Andrews Blvd @ US41)      Johnson Brothers, Inc.   Estimate # n/a   08/17/2018   Materials ONLY   NO Installation   (2) Signs   $7,964.00    Mr Foamy, Inc   Estimate #34975   08/24/2018   Materials – Precast   Installation   (2) Signs   $7,310.00    Mr Foamy, Inc   Estimate #34974   08/24/2018   Materials – Precast   Installation   (2) Signs   $13,078.00