Recommendation to approve an agreement between the Diocese of Venice in Florida, Quality
Enterprises, Inc. and Collier County to construct a gravity wall to address an unsafe slope
condition on a waste water pump station relocation project.
OBJECTIVE: To maintain reliable wastewater collection in compliance with Florida Department of
Environmental Protection agency regulations.
CONSIDERATIONS: On October 27, 2015, as Agenda Item 16.C.1, the Board of County
Commissioners (Board) approved Request for Quotation 14-6213-45 with Quality Enterprises, Inc. (QE)
for the relocation of wastewater pump station (PS) 302.09. In the same time frame, The Diocese of
Venice in Florida was constructing a parking lot expansion at Saint Peter the Apostl e Catholic Church
(Church) on Rattlesnake Hammock Road.
Pump station 302.09 was originally located on Church property where it conflicted with the Church’s
plans to expand their parking lot. The Collier County Water-Sewer District (CCWSD) agreed to relocate
the pump station within its easement in a manner that allowed for more Church parking and eliminated
the need for lengthy bypass pumping during pump station construction.
The Church and the CCWSD coordinated their projects during pump station design; however, field
changes made to both projects resulted in an unsafe slope along the Church’s property line. Quality
Enterprises, Inc. installed the pump station wet well at a location different than what was specified by the
County. While the resulting wet well location was within the easement, it was closer to the edge of
property, but did not create an issue with the Church’s original design. The Church changed their site
elevations to avoid cap rock field conditions discovered during the County’s project. The Church’s
design change, combined with the as-built wet well location, necessitated the addition of a 13.5 foot long
gravity wall to address the unsafe slope.
To resolve this issue, all three parties agreed to equally share $12,000 in cost for the Church to construct
the gravity wall (See Attachment 1 - Settlement Agreement). The cost to the CCWSD is $4,000. The
$12,000 was based on an initial estimate provided by the Diocese of Venice; actual construction costs
were higher (See Attachment 2 - Change Order).
FISCAL IMPACT: Funding is available in, and is consistent with, the FY2018 Capital Budget
approved by the Board on September 21, 2017. The source of funding is the Wastewater User Fee Fund
(414).
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
LEGAL CONSIDERATIONS: This item is approved as to form and legality. A majority vote is
needed for Board approval. -HFAC
RECOMMENDATION: That the Board of County Commissioners, as the Governing Body of Collier
County and the Ex-officio Governing Board of the Collier County Water -Sewer District, approves an
agreement between the Diocese of Venice in Florida, Quality Enterprises, Inc. and Coll ier County, and
authorizes the Chairman to sign and execute the agreement.
16.C.1
Packet Pg. 857
09/11/2018
Prepared by: Tom Chmelik, Public Utilities Engineering and Project Management Director
ATTACHMENT(S)
1. Attachment 1: Agreement (PDF)
2. Attachment 2 - Change Order (PDF)
16.C.1
Packet Pg. 858
09/11/2018
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.1
Doc ID: 6007
Item Summary: Recommendation to approve an agreement between the Diocese of Venice in
Florida, Quality Enterprises, Inc. and Collier County to construct a gravity wall to address an unsafe slope
condition on a waste water pump station relocation project.
Meeting Date: 09/11/2018
Prepared by:
Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management
Name: Tom Chmelik
06/19/2018 10:31 AM
Submitted by:
Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management
Name: Tom Chmelik
06/19/2018 10:31 AM
Approved By:
Review:
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 06/20/2018 11:29 AM
Public Utilities Planning and Project Management Craig Pajer Additional Reviewer Completed 06/20/2018 8:36 PM
Public Utilities Department Sarah Hamilton Level 1 Division Reviewer Completed 06/21/2018 9:59 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 06/22/2018 8:22 AM
County Attorney's Office Heidi Ashton-Cicko Level 2 Attorney of Record Review Completed 08/09/2018 10:55 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/09/2018 11:11 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/09/2018 1:20 PM
Office of Management and Budget Susan Usher Additional Reviewer Completed 08/09/2018 2:02 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/02/2018 7:24 AM
Board of County Commissioners MaryJo Brock Meeting Pending 09/11/2018 9:00 AM
16.C.1
Packet Pg. 859
16.C.1.a
Packet Pg. 860 Attachment: Attachment 1: Agreement [Revision 2] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.a
Packet Pg. 861 Attachment: Attachment 1: Agreement [Revision 2] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.a
Packet Pg. 862 Attachment: Attachment 1: Agreement [Revision 2] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.a
Packet Pg. 863 Attachment: Attachment 1: Agreement [Revision 2] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.a
Packet Pg. 864 Attachment: Attachment 1: Agreement [Revision 2] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.a
Packet Pg. 865 Attachment: Attachment 1: Agreement [Revision 2] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 866Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 867Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 868Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 869Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 870Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 871Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 872Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 873Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)
16.C.1.bPacket Pg. 874Attachment: Attachment 2 - Change Order [Revision 1] (6007 : St. Peter's Church Settlement Agreement)