Loading...
Agenda 09/11/2018 Item #16A1209/11/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Azure at Hacienda Lakes Phases A1 and A2, PL 20160003517 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Azure at Hacienda Lakes Phases A1 and A2, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on May 3, 2017. At that time, the value of these potable water and sewer utility facilities (assets) was $176,845.49 and $292,893.36, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interes t by Utility Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5378, at Page 1159, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the r equired one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on August 1, 2018 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4,000. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this action will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $469,738.85 (no depreciation applied). Water and Wastewater assets will be recorded in the county financial records. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.12 Packet Pg. 365 09/11/2018 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Azure at Hacienda Lakes Phases A1 and A2, PL 20160003517 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.12 Packet Pg. 366 09/11/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.12 Doc ID: 6373 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Azure at Hacienda Lakes Phases A1 and A2, PL 20160003517 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 09/11/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 08/06/2018 4:11 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 08/06/2018 4:11 PM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 08/07/2018 7:42 AM Water Beth Johnssen Additional Reviewer Completed 08/07/2018 8:19 AM Wastewater Beth Johnssen Additional Reviewer Completed 08/07/2018 8:20 AM Wastewater Steve Nagy Additional Reviewer Completed 08/07/2018 9:47 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 08/07/2018 3:20 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 08/08/2018 10:35 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 08/08/2018 11:59 AM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 08/08/2018 2:38 PM Growth Management Department Matthew McLean Additional Reviewer Completed 08/09/2018 5:05 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 08/10/2018 12:08 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 08/13/2018 3:05 PM Growth Management Department James C French Deputy Department Head Review Completed 08/21/2018 10:26 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/21/2018 2:02 PM Office of Management and Budget Allison Kearns Additional Reviewer Completed 08/21/2018 4:05 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/22/2018 1:19 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/01/2018 9:09 AM 16.A.12 Packet Pg. 367 09/11/2018 Board of County Commissioners MaryJo Brock Meeting Pending 09/11/2018 9:00 AM 16.A.12 Packet Pg. 368 AZURE AT HACIENDA LAKES PHASES A1 AND A2 LOCATION MAP 16.A.12.a Packet Pg. 369 Attachment: Location Map (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2017380008 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.12.b Packet Pg. 370 Attachment: Exhibit A (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2) PROJECT NAME LOCATION: VERIFICATION OF FINAL COST Azui€ at Hacienda Lakeg I ?r*rn-, f, Tract R, Azure at Hacienda Lakes, a subdivision according to the plat thereot recorded in Plat Book_, Pages _ through _, in the Public Records of Collier County, Florida. Toll FL Xlll LTO Partne6hip 250 Gib.alt r Road Horsham. PA l9(M4 POTABLE WATER (MATERIAL AND SERVICES)TYPE OF UTILITY SYSTEM ITEM SIZE QUAN. UNIT COST TOTAL PVC Water Main (C900, DR14) PVC Water Main (C900, OR18) PVC Water [,lain (C900, DR14) PVC Water Main (C900, DR18) PVC Wate. Main (C900, DR14) Gate Valve Gate Vaive Gate Valve Relocation Single Water Service, Complete Double Water Service, Complete Multi-Family-Water Service, Single Multi-Family-Fire Servace, Single Permanent Bacterial Sample Point Temporary Blow-off Air Release Valve Fire Hydrant, Complete 6" 10" 10" 8', 10" 10' 1" 't.5" 266 1328 58 2909 994 12 1 24 '15 I 3 2 20 LF LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA $14.58 $21.42 $27.O7 $29.46 s3r.70 $1,152.26 $1,901.94 $'t,'152.26 $1,368.33 $1,597.77 $1,654.62 $1,368.95 $1,976.73 $1,811.33 $1,564.61 $4.173.'12 $3.878.28 $28,445.76 $1.570.06 $85,699.14 $34,49'1.80 $5,761.30 $22.823.28 $1,152.26 $12,314.97 $38,346.48 $24,819 30 $31,485.85 $1,976.73 $5.433.99 $3.129.22 $83.462.40 $384,790.82TOTAL COST I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system. Shanc eaker OF:Bonness lNC. 1900 Seward Avenue Naples. FL 34109 STATE OF COUNTY OF FL COLLIER The foregoing instrument was signed and acknowledged before me this 21 st day of December, 2016 by Shane Meaker who is personally known to me _ OR who produced identifrcation _ DAVID MASTIN Notary public . State o, florida My^Comm Erpires Jafl t5.20rg Lommrssion # FF 0S5692 9d Ndary tssn.Eonded Ihroogh Nali David Martin :Notary ic Seal NAME & ADDRESS OF OWNER: cER.FYTNK 16.A.12.b Packet Pg. 371 Attachment: Exhibit A (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2) PROJECT TIAME: LOCATION: VERIFICATION OF FINAL COST Azurl .t Haclenda Lales A?o*;oo ol Tr.ct R, a.zurc at Hacisnda Lakos, a Eubdlvl.lon .ccordlng to rhe plat ther€of r€coded ln Pl.t Boot_, Pag6s _th.ough-- ln th€ Publlc R€cods ol Colll€r County, Florld.. TollFL Xlll LTO PartneBhip 250 Glbmltrr Rood HoBh.m. PA 19(X4 ryPE OF UTILITY SYSTEM SANITARY SEWER (MATERIAL AND SERVICES) ITEM stzE QUAN. UNIT COST TOTAL Prmp Strtion (Complete) Coflnecl To Erisling Force Main 4' PVC Force Main (DR-14) 4" PVC Force Main (ORl 8) 6' PVC Force Main (oR-14) 6" PVC ForEe Main (OR-l8) 6" Plug Valv6 Tomporary FM Blow Or T.levision lospeclioo 6' Singlo PVC S€*€r S€rvice 6" Doobl€ PvC S6tv€r S€rvice MunlFamily 6" Sewer Service 8" PVC Senitary S$rcr SDR-26 (G6') A' PVC S.nitary Se*rr SDR-26 (64') 8' PVC Senilary S€s€r SDR-26 (&10) a' PVC S.nnary Sex,er SDR-26 (1O12) 8" PVC S,lit ry S€*rr SDR-26 ( 12-14 ) 8' PVC Sanilay S€r€r SDR-26 (1+16') 8'PVC S{la.try Sser SDR-26 (1t18') Manhole 4 Diefieter witn IET coeting (05) Merhole,l' Daarn€ter with IET Coating (6{) Msnhole 4 Diarieter with tET Coating {&lO) Menhole 4 DROP Oiarl€ter with IET Coat ng (&rO) Manhole 4 Oisrneler wirh IET Coaring (1G12) Manholc 4' Oiameler witi tET Coaling (12-14) Manholo 4 Oiarneler wilh IET Coaling (1+16') Menhole 4' Oismeter wlh IET Coaiing ( 1e1 8 ) I 6" 6" 6' 5" 6" 6' 8', 8" 8', E" E" I 4 1', 1 1 60 1@ 197 2690 2 2 1 ut552 12 1 894 1196 &a 525 142 121 2 1 4 1 1 3 EA 1217,727 93 EA S1.160.96LF 318 srt LF $10.57LF t!9 23LF 122-32EA S976.50 EA t2.071 19 EA 31.678.08LF S2 A7 EA $1,033.72EA 11.241.21EA 01,033.72EA 5.A22-73LF 919.90 LF 322t.64LF t28.64LF $31.78LF 3417/LF $76.63LF $137 89EA $4.508.52EA 35,10714 EA 97.027.61EA 89.145.9AEA $7.402.86EA t8,714.70EA 19,155.68EA 915,m3.91 s217.727.93 t1.160.96 11.112.40 31.057 @ $3.788 31 160,040 60 11,953.@ t t.142.38 t1.676.0A t13.064.24 t12.404 64 t28,187.28 $23,775.56 s6.822.73 $4.437.70 ,22,028 16 $34,253.44 i29.49344 $21,929.25 133,870.it6 t58.455.36 t9.017 04 321,629.76 328.11056 19,146.94 $29.611 44 t8,71a 70 ,27.167 U 360,015.64 TOTAL COST I do horoby cerlfy lhat the quartities ol m:terial and seNices descnb€d above sre a true and or the as-inslalled cost ol tha syslem CERTI s805.140.28 1900 Seward Avenue NaDles. FL 34109 STATE OF COUNTY OF COLLIER The lo{egoing inslrunled was sign€d and actnorladg€d belore ft|e this 21 st day of Dec€rnb€r, 201 6 by Shan€ M€ater who is personally known to m€ _ OR who produced idedificalioo '-,,,-ffi OAVIO MARTIN Notary Public - State olFlorlda My Comm. €xpirrs Jan 15.2018 Commission # tF 055692 Eonded lhrd,oh Mlcnal t{dary Assn. Seal NAME & ADDRESS OF OWNER: OF 16.A.12.b Packet Pg. 372 Attachment: Exhibit A (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2017380008 Transaction Number:2017-003484 Date Paid:01/19/2017 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 09802715 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:Toll Bros, Inc 250 Gibraltar Rd Horsham, PA 19044 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Utility Performance Refundable Bond PL20160003517 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:AlinaHarris Batch Number:6016 Entered By: melissaalvarez 16.A.12.b Packet Pg. 373 Attachment: Exhibit A (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2) CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECI NAUE LOCATION:A?orlton oQ TEct R, a4r€ .t tLd€rd. 1.t.., r stdvislon .@di.r to th€ pl.t th.r.ol r.@rd.d in Pl.i Sootr P.t6 -lhroqd - h lhc Psblk icc6& ot collicr Colnty, loll FL Xlll LTO P.rheEhip azure at Haciend. Lates IYPE OF UIILITY SYSTEM SANIARY SEWER IMATERIALS ONLY) ITEM stzE QUAN. UNIT COST TOTAL NAME & ADORESS OF OWNER: CERTIFYING: OF Pump $nion (Co.nplete) Coned To Ensihg Fo@ M6in 4" PvC F(re Main (OR-14) 4" PVC Fo@ Main (OR-18) 6' PVC F(ru Maln (DRr4) 6" P\rc F(re Main (OR-18) Tomporary FM Blow Ofi 6" Single PvC Sewd Seruie 6- Dabre PvC Sffi Src Muni'Famiry 6' Serer Src 8'PVC Sanitary Serer SDR'26 (06') 8" PvC Sanitary S€',ver SDR-26 (G€') r PvC Sdilny Selver SDR 26 (&10) r PvC SaiLry se{ef SDR-26 (lc1z) r PvC Saitrry S6,vef SDR 2€ (12 14) 8" PVC Sanilary Sevrer SDR 26 ( l+16 ) A PVC Sanitary Sere. SOR-26 (ld18') Manhole 4' OiametEr *ih IET Coaiilg (0$) Mahole { DiaiEter rdh IET Coaihg (ffi) Menhole 4 Dia.n€terwih IET Co8trE (&10) Mahole 4 DROP Diamerer *ith IET Coatng (&10) Manhol€ 4 Diamler wiih IEI Coatng (1G 12') Manhole 4 Diameiorwilh IET Coaling (12-14') Manhole 4 Diameierwitn IET Coaling (1+16') Manhde 4 Diameter wifl IET Coslino (1e18) 6', e 6- 6: 6' 6. 8' 8'ra I' 4' 1' 1' rEa1EA 60 IF 100 tF 197 LF 2690 tF 2EA 2EA 1EA/t552 LF 12 EA 22 EA 23 EA 1Ea 223 LF 894 LF 1196 LF 8'A LF 525 LF 112 LF 121 tF 2EA 1EA 1EA 3EAaE+ TOTAL COST 3ra6,344_76 1247.61 r.2.2.1 tr.?4 t1.42 3:l a1 t527.17 41.12A 21 ,527 17 s2.@ 936.53 s293.O8 3236.53 9r,790.86 $3.65 t3.65 I,i).65 91.65 s|.65 13.65 l:l-65 t2,217.60 t2.025.92 13.150.56 43.a96.73 s:r,667.5,r t4,512-68 44,900.06 t5,329.9 31rt6,3E476 1247.61 $132.60 $174 00 $470.74 s9,17290 t1.054.34 t2.852.4a 4527.17 59.r0/1.00 !2.a3a.36 !6.r!17 76 ts,rlrlo 19 $4,790 86 $a13 95 33.26310 9,365.,rc 33,095.20 11,9t6.25 11,613.30 $1,547 60 i4,435.20 110.503.64 s12,@2.21 t3.496 73 314.670.16 14,5r2.68 t14,700.18 s21,319.92 1292,893.36 I do hereby c6.lit that he quanliiies of mabnal desdibed abovo are a lrue and a@rate rcpre*ntrtion of he system b€ing cont ib'ried to Collier Counv Ulililies. Naoles. FL 34109 STATE OF COUNIY OF COLLIER The tofegoi.g inslrument was signed and aclnoqledged beforc me this 21 ' day ol D@mber, 2016 by Share Me6kd who is personalry known to me _ e8r*efred{GedideEtfcalioe _ t Seal .:K:',,ffi OAVIO MARTIN Nolary Public - State of florida My Comm. Erpires Jao 1S,20to Commisslon]l tt 055692 Eonded hrorgh Nationat NXary Assn. 16.A.12.c Packet Pg. 374 Attachment: Assets Sheet (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2) PROJECT NAME LOCATION: CERTIFICATION OF CONTRIBUTORY ASSETS . COUNTY Azure at Hacienda Lakos A Porl;oa of Tract R, Arureat Hacienda lakes, a subdivision according to the plat thereof recorded in Plat EookJ Pages _ through J in the Public Records ofCollier County, Florida. NAME & ADDRESS OF OWNER Toll FL Xlll LTD Pa.h6rship 250 Gibraltar Road Horsham. PA 19044 POTABLE WATER (MATERIALS ONLY) tzE QUAN. UNIT PRICE TOTAL PVC Water Main (C900, DR14) PVC Water l\4ain (C900, DR 18) PVC Water Main (C900, DR14) PVC Waler Main (C900, DR18) PVC Waler Main (C900, DR'14) 8" Gate Valve 10" Gate Valve Gate Valve Relocation Single Water Service, Complete Double Water Service, Complete Multi-Family-Water Service, Single Multi-Family-Fire Service, Single Permanent Bacterial Sample Point Temporary Blow-oIf Aire Release Valve Fire Hydrant, Complete 6" 8" 8" 10" 10" 10" 10" 1" 1.5" 2" 2" $4.42 $7.91 $7.37 $13.84 s11.90 $810.86 $1,287.51 $287.51 $377.47 $499.83 $702.27 $92.69 $1,O78.77 $943.20 $735.35 $2,453 43 266 1328 58 2909 994 5 12 1 I 24 15 23 1 3 2 20 LF LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA $1.175.72 $10,504.48 $427.46 $40,260.56 $11,828.60 $4,054.30 $15,450.12 $287.51 $3,397.23 $11,995.92 s10.534.05 s12.481.87 $1.078.77 $2,82S.60 $1.470.70 $49.068.60 TOTAL COST 3176,845.49 I do hereby certify that the quantities of material described above are a true and accurale representation oflhe system being contributed to Collier County Utilities. CERTIFYING nG Meaker OF Bonness lNC. I 900 Seward Avenue l{apl63, FL 3.1109 SIATE OF FL COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this 21 st day of Decembe., 2016 by Shane Meaker wtro is personally known to me _ OR who produced identification _ ";.ffi. OAVIO MAETIN Notary Public - State ot Ftorida My Comm. Expkes Jan t5,2018 Commission # Ft 055692 Bond€d Through Micnd itotary Asso. id irartin :Notary Public Seal TYPE OF UTILITY SYSTEM: ITEM 16.A.12.c Packet Pg. 375 Attachment: Assets Sheet (6373 : Final Acceptance of Utilities - Azure at Hacienda Lakes Phases A1 and A2)