Loading...
Agenda 09/11/2018 Item #16A 309/11/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer facilities for Golf Club of the Everglades Phase 1B, PL20160000995, accept unconditional conveyance of the potable water facilities, and a portion of the sewer facilities, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of the potable water and sewer facilities, accept unconditional conveyance of the potable water facilities, and a portion of the sewer facilities, and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Golf Club of the Everglades Phase 1B, has constructed the potable water and sewer facilities within dedicated easements to serve this private development (see attached location map). All of the potable water facilities, and a portion of the sewer facilities will be conveyed to the County, as described in Official Records (O.R.) Book 5331, Page (PG) 722. The remaining sewer facilities will be private. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on August 18, 2016. At that time, the value of these potable water and sewer utility facilities (assets) was $195,318 and $215,491, respectively. (See attached asset sheet). 3) Staff recorded all preliminary acceptance documents associated with the potable water and sewer facilities conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its interest in the potable water facilities and a portion of the sewer facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5331, at page 722 of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on June 21, 2018, in coordination with Public Utilities, and these facilities have been found to be satisfactory and acceptable. 6) The on-site sewer utilities, less the potable water and sewer utilities described in O.R. Book 5331, PG 722, are owned and maintained by the developer. 7) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount of $4,000. (See attached Exhibit A). 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 9) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. 16.A.3 Packet Pg. 274 09/11/2018 FISCAL IMPACT: Approval of this action will result in the Collier County Water-Sewer District receiving unconditional title to the potable water facilities and a portion of the sewer utility facilities, which at the time of preliminary acceptance, had a total gross value of $410,809 (no depreciation applied). Water and Wastewater assets will be recorded in the county financial records. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval -SAS RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for Golf Club of the Everglades Phase 1B, PL20160000995, accept unconditional conveyance of the potable water facilities, and a portion of the sewer facilities, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.3 Packet Pg. 275 09/11/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.3 Doc ID: 6043 Item Summary: Recommendation to approve final acceptance of the potable water and sewer facilities for Golf Club of the Everglades Phase 1B, PL20160000995, accept unconditional conveyance of the potable water facilities, and a portion of the sewer facilities, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 09/11/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 06/21/2018 1:37 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 06/21/2018 1:37 PM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 06/21/2018 1:40 PM Wastewater Steve Nagy Additional Reviewer Completed 06/21/2018 1:42 PM Water Steve Messner Additional Reviewer Completed 06/21/2018 1:48 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 06/21/2018 3:33 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 06/22/2018 10:24 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 06/25/2018 9:14 AM Wastewater Beth Johnssen Additional Reviewer Completed 06/25/2018 5:09 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 06/28/2018 2:01 PM Growth Management Department Matthew McLean Additional Reviewer Completed 08/09/2018 5:31 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 08/10/2018 12:01 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 08/14/2018 3:58 PM Growth Management Department James C French Deputy Department Head Review Completed 08/21/2018 11:38 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/21/2018 2:34 PM Office of Management and Budget Allison Kearns Additional Reviewer Completed 08/21/2018 3:54 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/22/2018 1:23 PM 16.A.3 Packet Pg. 276 09/11/2018 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/01/2018 8:59 AM Board of County Commissioners MaryJo Brock Meeting Pending 09/11/2018 9:00 AM 16.A.3 Packet Pg. 277 GOLF CLUB OF THE EVERGLADES PHASE 1B LOCATION MAP 16.A.3.a Packet Pg. 278 Attachment: Location Map (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2016321696 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.3.b Packet Pg. 279 Attachment: Exhibit A (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B) VERIFICATION OF FINAL COST (WATER) PROJECT NAME: Golf Club of the Everglades Phase 1B LOCATION: Section 31/36, Township 48 South, Range 27/26 East NAME & ADDRESS OF OWNER: Pulte Home Corporation 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS AND LABOR) ITEM SIZE QUAN. UNIT COST TOTAL Gate Valve & Valve Box Gate Valve & Valve Box Gate Valve & Valve Box CL 150 PVC (DR18) CL 200 PVC (DR14) CL 150 PVC (DR18) CL 200 PVC (DR14) CL 150 PVC (DR18) CL 200 PVC (DR14) Fire Hydrant Assembly Double Water Service Single Water Service Permanent Sample Point Automatic Flushing Device EA $2,020.00 EA $1,490.00 EA $1,010.00 LF $37.43 LF $40.61 LF $31.04 LF $32.66 LF $24.00 LF $26.00 EA $4,630.00 EA $1,010.00 EA $790.00 EA $1,420.00 EA $7,620.00 $28,280.00 $10,430.00 $1,010.00 $128,908.92 $4,873.20 $73,657.92 $3,951.86 $4,128.00 $1,144.00 $60,190.00 S24,240.00 $29,230.00 $4,260.00 $22,860.00 $397,163.90 10" 14 8" 7 6" 1 10" 3444 10" 120 2373 8" 8" 121 172 6" 6" 44 N/A 13 N/A 24 N/A 37 N/A 3 N/A 3 TOTAL COST I do hereby certify that the quantities of material described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: Mitchell Penner OF: Mitchell & Stark Construction Co., Inc. 6001 Shirley Street, Naples, FL 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this day of 2016 by Mitchell Penner who is personally known to me and who did not take an oath. * A «4Mki fLA CAMPS Notary PuMc • Slate ot Florida * (* My Comm. Expires Aug 21. 2018 VKSw" Commission # ff 120075 M?' BondwIBwudt National Nd»y tern. T SEAL: f. i mrm 16.A.3.b Packet Pg. 280 Attachment: Exhibit A (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B) VERIFICATION OF FINAL COST (SEWER) PROJECT NAME. Golf Club of the Everglades Phase 1B LOCATION: Section 31/36, Township 48 South, Range 27/26 East NAME & ADDRESS OF OWNER: Pulte Home Corporation 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: (MATERIALS AND LABOR) TOTAL I ITEM SIZE QUAN. UNIT COST $4,860.00 $5,750.00 $6,890.00 $8,510.00 $14.77 $24.77 $42.77 $51.77 $16.56 $14.86 $1,900.00 $820.00 $890.00 $175,000.00 $95,000.00 $82,620.00 $11,500.00 $6,890.00 $17,020.00 $37,412.41 $12,558.39 $30,965.48 $21,225.70 $10,929.60 $20,313.62 $1,900.00 $9,840.00 $30,260.00 $175,000.00 $95,000.00 Manhole 0'-6' cut Manhole 6'-8' cut Manhole 8-10' cut Manhole 10-12' cut 4' 17 EA 4' 2 EA 4' EA 1 4' EA 2 PVC Sewer (SDR 26) 0'-6" cut PVC Sewer (SDR 26) 6'-8' cut PVC Sewer (SDR 26) 8-10' cut PVC Sewer (SDR 26) 10'-12* cut PVC Force Main (SCH 80) PVC Force Main (DR 18) Plug Valve 2533 8" LF 507 LF 8" 8" 724 LF 8" 410 LF 2.5 660 LF LF 4" 1367 4" EA 1 Single Service w/ Cleanout Double Service w/ Cleanouts 6" 12 EA 6" 34 EA Lift Station (Complete) Grinder Pump Lift Station 6' EA 1 4' 1 EA TOTAL COST $563,435.20 I do hereby certify that the quantities of material described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: Mitchell Penner Mitchell & Stark Construction Co., Inc. 6001 Shirley Street, Naples, FL 34109 OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this A* day of/^A/ 2016 by Mitchell Penner who is personally known to me and who did not take an oath. it 8ELUOA 3URG8ACHER 10 A % MY COMMISSION * ff 102074 ||W*.,M EXPIRES: January 22, 2019 J! a*#*! TNM PMO vnemrna SEAL: 16.A.3.b Packet Pg. 281 Attachment: Exhibit A (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2016321696 Transaction Number:2016-028334 Date Paid:05/12/2016 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 0090199437 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:Pulte Group South Florida Division 3350 Peachtree Road NE Suite 150 Atlanta, GA 30326 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Refundable Bonds PL20160000995 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:MartinRuedy Batch Number:5283 Entered By: tamibuchan 16.A.3.b Packet Pg. 282 Attachment: Exhibit A (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B) CERTIFICATION OF CONTRIBUTORY ASSETS (WATER) PROJECT NAME: Golf Club of the Everglades Phase 1B LOCATION: Section 31/36, Township 48 South, Range 27/26 East NAME & ADDRESS OF OWNER: Pulte Home Corporation 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL Gate Valve & Valve Box Gate Valve & Valve Box Gate Valve & Valve Box CL 150 PVC (DR18) CL 200 PVC (DR14) CL 150 PVC (DR18) CL 200 PVC (DR14) CL 150 PVC (DR18) CL 200 PVC (DR14) Fire Hydrant Assembly Double Water Service Single Water Service Permanent Sample Point Automatic Flushing Device EA S1.430.00 EA $925.00 EA 5550.00 LF $16.00 LF $19.00 LF $10.00 LF $11.00 S4.00 $5.00 EA $3,000.00 EA $570.00 EA $410.00 EA $860.00 EA S4.830.00 $20,020.00 $6,475.00 S550.00 $55,104.00 $2,280.00 $23,730.00 51,331.00 $688.00 $220.00 $39,000.00 S13,680.00 $15,170.00 $2,580,00 $14.49000 $195,318.00 10" 14 8" ? 6" 1 10" 3444 10" 120 8" 2373 8" 121 6" 172 LF 6" 44 LF N/A 13 N/A 24 N/A 37 N/A 3 N/A 3 TOTAL COST I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, Inc. CERTIFYING: Mitchell Penner Mitchell & Stark Construction Co.. Inc. 6001 Shirley Street, Naples, FL 34109 OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 2-^ day of . 2016 by Mitchell Penner who is personally known to me and who did not take an oath. ? II t r A— -El* CAMPS NoU,J Public ' Su,e 01 Ft0fWJ i./j* JSJa-l My Comm. Expires Auj 21,2018 VyjCommission # FF 120075 Bonded Tftough National Nttary Assn. » 7^ SEAL: » i 16.A.3.c Packet Pg. 283 Attachment: Assets Sheet (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B) CERTIFICATION OF CONTRIBUTORY ASSETS (SEWER) PROJECT NAME: Golf Club of the Everglades Phase 1B LOCATION: Section 31/36, Township 48 South, Range 27/26 East NAME & ADDRESS OF OWNER: Pulte Home Corporation 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONLY) TOTAL SIZE QUAN. UNIT COST ITEM S44,200.00 S6.500.00 S3,850.00 S10,200.00 $12,665.00 $2,535.00 S3.620.00 S2.050.00 S4.101.00 $1,650.00 S3,240 00 S10.880.00 $110.000 00 $2,600.00 53,250.00 S3.850.00 S5.100.00 S5.00 S5.00 $5.00 S5.00 $3.00 S1,650.00 S270.00 $320.00 5110,000.00 Manhole 0'-6' cut Manhole 6'-8' cut Manhole 8'-10' cut Manhole 10'-12' cut PVC Sewer (SDR 26) 0'-6' cut PVC Sewer (SDR 26) 6'-8' cut PVC Sewer (SDR 26) 8"-10' cut PVC Sewer (SDR 26) 10'-12' cut PVC Force Main (DR 14) Plug Valve Single Service w/ Cleanout Double Service w/ Cleanouts Lift Station (Complete) EA 4' 17 EA 4' 2 EA 4' 1 EA 4' 2 LF 8" 2533 8" LF 507 8" LF 724 LF 8" 410 4" LF 1367 4" EA 1 6" EA 12 6" EA 34 6' EA 1 TOTAL COST S215.491.00 I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, Inc. CERTIFYING: Mitchell Penner OF: Mitchell & Stark Construction Co., Inc. 6001 Shirley Street. Naples. FL 34109 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this /(j day of f/Pl/W 2016 by Mitchell Penner who is personally known to me and who did not take an oath v~~' I, SEAL: !A- A V r'* Bcn-f 16.A.3.c Packet Pg. 284 Attachment: Assets Sheet (6043 : Final Acceptance of Utilities- Golf Club of the Everglades Phase 1B)