Agenda 09/11/2018 Item #16D2309/11/2018 EXECUTIVE SUMMARY Recommendation to approve two (2) after-the-fact grant requests to the Florida Department of Environmental Protection (FDEP) Florida Recreation Development Assistance Program (FRDAP), one (1) for funding in the amount of $150,000 to purchase and install a playground at Vineyards Community Park and one (1) for funding in the amount of $150,000 to purchase and install a playground at East Naples Community Park. (Net Fiscal Impact - $300,000) OBJECTIVE: To enhance recreational opportunities for children at Vineyards Community Park and East Naples Community Park. CONSIDERATIONS: FRDAP is a competitive program which provides funding for projects that provide recreational enhancements and opportunities for children. Pursuant to Section 375.075(5)(a), F.S., the Florida Legislature awarded $4 million in FRDAP funding effective July 1, 2018, for these projects. A parks division must have the requested projects listed in a 5-year Capital Improvement Plan to be eligible. The Parks and Recreation Division (Division) has $175,000 requested in the FY19 Parks Capital Improvement budget for community park playgrounds to fund a playground at East Naples Community Park. If the County approves the Division’s capital budget request and the Division is awarded these two (2) grant requests, the Division will be able to purchase and install two (2) community park playgrounds instead of one (1). Staff submitted the grant request to the State last month prior to the August 15 th deadline for submission. Collier County CMA #5330 authorizes the County Manager to approve the submittal of grant applications with subsequent Board of County Commissioners (Board) action at the next available Board of County Commissioners meeting to ratify the approval as “after-the-fact.” FISCAL IMPACT: The total cost of the playground at Vineyards is $150,000. The grant program allows for a 1:1 match. The funding request is $75,000 with $75,000 local match. The playground at East Naples is $150,000 with a funding request for $75,000 and $75,000 local match. The total cost for both playgrounds is $300,000. The total funding request is $150,000. Local matching funds of $150,000 are requested in 2019, Parks Capital Fund (306), Project 80305, Community Park Playgrounds. GROWTH MANAGEMENT IMPACT: There is no Growth Management Plan impact. ADVISORY BOARD RECOMMENDATION: Due to the grant deadline of August 15, 2018, the Parks and Recreation Advisory Board will be notified of this Item at their August 15, 2018 Meeting. LEGAL CONSIDERATIONS: This Item is approved for form and legality and requires a majority vote for Board approval. -JAB RECOMMENDATION: To approve two (2) after-the-fact grant request to the Florida Department of Environmental Protection Florida Recreation Development Assistance Program, one for funding in the amount of $150,000 to purchase and install a playground at Vineyards Community Park and one for funding in the amount of $150,000 to purchase and install a playground at East Naples Community Park. Prepared By: Carrie Drew, Operations Analyst, Parks and Recreation Division ATTACHMENT(S) 1. (linked) APPLICATION - 2018 FRDAP (Child) - Vineyards Park- Final (PDF) 16.D.23 Packet Pg. 1468 09/11/2018 2. (linked) APPLICATION - 2018 FRDAP Childrens- East Naples -Final (PDF) 3. CM Memo 2018 08-10 FDEP FRDAP (PDF) 16.D.23 Packet Pg. 1469 09/11/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.D.23 Doc ID: 6510 Item Summary: Recommendation to approve two (2) after-the-fact grant requests to the Florida Department of Environmental Protection (FDEP) Florida Recreation Development Assistance Program (FRDAP), one (1) for funding in the amount of $150,000 to purchase and install a playground at Vineyards Community Park and one (1) for funding in the amount of $150,000 to purchase and install a playground at East Naples Community Park. Meeting Date: 09/11/2018 Prepared by: Title: Operations Analyst – Parks & Recreation Name: Matthew Catoe 08/23/2018 10:36 AM Submitted by: Title: Division Director - Parks & Recreation – Parks & Recreation Name: Barry Williams 08/23/2018 10:36 AM Approved By: Review: Parks & Recreation Barry Williams Additional Reviewer Completed 08/24/2018 9:42 AM Parks & Recreation Matthew Catoe Additional Reviewer Skipped 08/24/2018 9:47 AM Public Services Department Joshua Hammond Additional Reviewer Completed 08/24/2018 4:35 PM Public Services Department Todd Henry Level 1 Division Reviewer Completed 08/27/2018 10:14 AM Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 08/27/2018 12:14 PM Grants Erica Robinson Level 2 Grants Review Completed 08/28/2018 8:48 AM County Attorney's Office Jennifer Belpedio Level 2 Attorney of Record Review Completed 08/30/2018 3:53 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/31/2018 7:58 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/31/2018 10:09 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 09/04/2018 10:26 AM Grants Therese Stanley Additional Reviewer Completed 09/04/2018 11:51 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/04/2018 1:27 PM Board of County Commissioners MaryJo Brock Meeting Pending 09/11/2018 9:00 AM 16.D.23 Packet Pg. 1470 Vine yards Community Park COLLIER COUNTY FLORIDA August 15, 2018 FRDAP Children’s Gr ant Progr am Florida Department of Environmcntal Protection FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM GRANT APPLICATION PACKAGE RequiredSignatures: AdobeSignature PART I - GENERAL INFORMATION 1. APPI,ICANT INFORMATION Application Numbcr: (DEP USE ONLY) Received: Postmarked: A. Name ofApp 11."n,. Collier County B. Federal Employer Identifi cation 5r-6". ** 59-6000558 **(This number must be registered at Mv Florida Market Place with the address the warrant will be forwarded) C. Popu 1u11or.357,470 D. Current Operating Budge t 690,747,900 (This is the operating budget for the city, county or special district, and notjust the department budget) E. Contact person. Carrie Drew 111.. Operations Analyst (The contact person is someone who will be in direct contact with DEP and be responsible for administering this grant if arvarded) F. Mailing Addrcss: 15000 Livingston Rd City/State . Naples, FL Zip 6o6".34109 Telephone (39;2524025 g-6xil. Carrie.Drew@]colliercountyfl .gov FAX: I hereby certify that this project will exclusively provide recreational enhancements and opportunities for children, will include playground equipment and lighting that is adequate for evening use, will be at least . 1 0 in size. Project costs in the amount of $-f!,QQQ will be matched dollar-for-dollar for the development of a riprimary facility" as defined in Rule 62D-5.054, Florida Administratiye Code, incorporating unique abilities. I further ccrtif,, that thc in on pro vidcd in this application is true and accurate and I possess the authority to a on lfofthe e Sign DRP ofCi ty or Coun er/Title Date - 106 (Effective 8- I -2018 {qj T1lLb L (,^-r^! NarW pply for this \0 Page I of28 2.PROJECT INFORMATION A.Name of Project:_________________________________________________________ B.Project Type (Check One): Project cannot be a combination of acquisition and development Acquisition: ________ Development: ______ ______On land owned by applicant ______On land currently under site control by applicant Date site control expires: ________________ Trail Construction: ______ ______On land owned by applicant ______On land currently under site control by applicant Date site control expires: ________________ Development projects must be under site control (owned by deed, or leased or dedicated for minimum of 30 years from the date of application) by the close of the submission period (August 15, 2018). •School board property is ineligible either by lease or ownership. •Include a copy of the site control documents (e.g., deed, lease, etc.). If providing a Quit Claim Deed, please attach a copy of a 30 year title search or title opinion. (Tab as Exhibit “N”) DRP-106 (Effective 8-1-2018) Page 2 of 28 C.PROJECT LOCATION: Street Address: __________________________________________________________ City: ______________________County: ______________ Zip Code: ________-______ GIS Coordinates: Latitude: ___________________ Longitude: ____________________ 1.Submit a boundary map of the project area providing a description and sketch of the project area boundaries, display known easements and be legally sufficient to identify the project area. Aerial photographs are accepted as boundary maps, as long as the boundaries are identified (Visit website for example). (Tab as Exhibit “K”) 2.Submit color, on-site photographs for all three copies of your application, sufficient to depict the physical characteristics of the project area. (Tab as Exhibit “L”) 3.Location map and directions: Submit a detailed road map precisely locating the project site along with clear written driving instructions from the nearest federal or state highway. NOTE: Confirm that street names listed are the same as those posted on street signs in the area. Please do not use Map Quest or any other computer mapping program for this. (Tab as Exhibit “M”) D.LEGISLATIVE DISTRICTS IN WHICH THE PROJECT SITE IS LOCATED: This should be the Florida Senate and Florida House district in which the proposed project site is located. If you are not sure of the district, contact your local office of the Supervisor of Elections. (There is only one each.) State Senator: ______________________________ Senate District Number: _________ State Representative: _________________________ House District Number: _________ E.TOTAL NUMBER OF ACRES BEING ACQUIRED OR TOTAL NUMBER OF ACRES BEING DEVELOPED: _______________________ DRP-106 (Effective 08-1-2018) Page 3 of 28 F.DESCRIBE THE PHYSICAL CHARACTERISTICS OF THE PROJECT. 1)For Development Projects: (a)Provide a description of the proposed project which includes existing and future uses, existing and proposed physical improvements, natural and historical resources, any proposed resource protection/conservation and any existing buildings on site. (b)Indicate if a natural spring is located on project site:_____Yes ______No (c)Indicate if there is public access to the park either through an existing street or easement: _____Yes ______No Describe Public Access: (If additional room needed - Tab as Exhibit “P”) 2)For Acquisition Projects: (in addition to the above information) (a)If the proposed project consists of acquiring multiple parcels or from multiple owners, identify specific order in which the parcels will be acquired to ensure that in the event that all parcels cannot be acquired, the purposes of the project can be achieved. Also address the ability to have public access to the park either through an existing street or easement. (If additional room needed - Tab as Exhibit “P”) DRP-106 (Effective 08-01-2018) Page 4 of 28 3.FINANCIAL INFORMATION GRANT MATCH RATIOS: (Based on the grant cap of $250,000) Project Cost State Share Grantee Share $50,000 or less 50% 50% $50,001 to $150,000 50% 50% $150,001 up to $500,000 50% 50% Project Cost = State Share + Grantee Share Refer to Chapter 62D-5.055(4), F.A.C. for complete information on match requirements and match types. The Total Project Cost (Line F) must equal the grant request (Line A) plus the total local match (Line E). This figure (Line F) should not total more than $500,000 for the purpose of this application. A.FRDAP Funds Requested (State Share)Line A $__________________ B.Local Funds Available: (Grantee Share) 1.Cash:Line B $__________________ 2.In-Kind:Line C $__________________ 3.Land Value:Line D $__________________ If property is developed, land value CANNOT be used as a match. Total Local Match: Line E $__________________ Sum of lines B, C and D C.Total Cost of Proposed Project:Line F $__________________ Sum of Lines A and E (Should not total more than $500,000) Forms at http://dep.state.fl.us/lands/Land_and_Recreation/Land_Recreation.htm) (Tab as Exhibit “O”) DRP-106 (Effective 08-01-2018) Page 5 of 28 (If approved for REDI Match Waiver, fill out REDI ---------------------------------------------------------------------------------------------------------------------------------------Waiver Form located under FRDAP Administrative ---------------------------------------------------------------------------------------------------------- ------------------------------- REDI Match Waivers may not be submitted for this Application Cycle. D.PROJECT BUDGET DETAIL (COMPLETE FOR ALL PROJECTS, DEVELOPMENT AND ACQUISITION): On page 7 & 8 list ed the Project Budget Detail for the elements for this application. The Project elements are listed with the related tasks and deliverables. Primary elements and support elements should be listed separately. Use as many project elements and tasks needed to complete the project. Remember to include each element in your conceptual site plan. Submit a conceptual site plan displaying the areas and facilities to be developed as proposed on page 7 &8 of this application. The site plan must correlate with the project boundary map and budge detail elements. The site plan must CLEARLY DELINEATE using color codes between facilities/opportunities currently existing, facilities proposed for funding (page 7 & 8) in this application and facilities planned for future development. If project is an acquisition project, be sure to submit on the site plan the proposed elements to be developed as listed on page 17 of this application. Also identify different FRDAP phases on the site plan and any LWCF phases. DEVELOPMENT PROJECTS: PRIMARY RECREATION AREAS AND FACILITIES: Primary facilities include all recreation facilities and opportunities. Primary cost must be equal to or greater than fifty percent (50%) of the total cost. Primary examples are: beach access, picnic facilities, fishing piers, ball fields, tennis courts, trails, trailheads, shade structures for recreational facilities, etc. Enclosed structures are not eligible costs. Costs of planning and site preparation should be included within the cost of each element. If land value is used as match, it should be included under primary cost. If this is a trail project, list the uses or types of trails. If developing one trail for multi-purposes state multi-purpose trail, but if doing several different trails list separately with each use (example: walking trail or bike trail). SUPPORT FACILITIES AND IMPROVEMENTS: Support facilities are facilities which cannot stand alone, or which would have little or no public outdoor recreational value without the primary facility. No enclosed structures are eligible except restrooms, bathhouses or restroom/concession stands. Other support examples are: parking, landscaping, and security lighting. Amenities such as benches, or bike racks will receive no points when being scored. The enclosed structures listed above cannot be phased and must be completed with one grant. ACQUISITION PROJECTS: If acquisition project, on page 7 & 8, list the project budget detail for the acquisition phase of the project. (Tab as Exhibit “H”) DRP-106 (Effective 08-01-2018) Page 6 of 28 FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM (FRDAP) DEVELOPMENT PROJECT BUDGET DETAIL Project Name: ______________________________________________________________________ Grantee Name: _____________________________________________________________________ The project reimbursement is limited to one (1) invoice upon completion of all Project Elements listed below and submittal of all Deliverables and required documentation identified in the table below. Completion Documentation required prior to Reimbursement Request. Project Tasks, Deliverables and Required Documentation Task #1: Development of:_________________________ Amount of Costs to be Paid with Grant Funds Amount of Costs to be Paid with Grantee Match Deliverables and Documentation To Be Submitted Upon Completion And Before Reimbursement Can Be Approved (List each Primary project element) Provide Budget Detail Provide Budget Detail Project Completion Certification Final as-built site plan Florida Recreation and Parks Inventory Form Color Photographs of Project Notice of Limitation of Use Boundary Survey DRP-106 (Effective 08-01-2018) Page 7 of 28 (List each Support project element) *All work will be completed in accordance with the approved plans. TOTALS: $ $ Performance Standard: Approval of deliverables is based upon review for compliance with the requirements for funding under the Florida Recreation Development Assistance Program (FRDAP); approved plans and application approved for funding. DRP-106 (Effective 08-01-2018) Page 8 of 28 INSTRUCTIONS FOR COMPLETING PROJECT BUDGET DETAIL: DELIVERABLES/ELEMENTS/WORK TO BE COMPLETED: Identify ALL elements that will be completed under this Agreement. DELIVERABLE/ELEMENT BUDGET AMOUNT FOR REIMBURSEMENT: Must provide a budget for each element and identify the expense category and budget detail. Provide description of the costs as follows: Salaries: identify the position title/hourly rate/# of hours to complete the deliverable; Fringe benefits: identify the % used to calculate the fringe benefits; Contractual Services: identify what service will be paid for under the contract for services; Equipment: the purchase of equipment is not allowed under this Agreement, the rental of equipment is the only costs allowed that are associated with equipment; Supplies and Materials: identify what supplies/materials will be purchased; Other costs: identify what other costs are being requested (such as printing costs, other costs that do not fit into the other established cost categories (salaries, fringe benefits, equipment, supplies, indirect, contractual services); Indirect Costs: identify the percentage that is used for the indirect being claimed for reimbursement (cannot exceed 15% unless prior approval has been obtained by the Department).. MATCH AMOUNT TO BE CLAIMED: The same level of detail must be provided for match as for reimbursement. DOCUMENTATION/DELIVERABLES TO BE SUBMITTED UPON COMPLETION: All of these deliverables must be submitted before final reimbursement can be processed. Completion Documentation required prior to Reimbursement DRP-106 (Effective 08-01-2018) Page 9 of 28 PART II — EVALUATION CRITERIA GENERAL CRITERIA 1.CAPITAL IMPROVEMENT PLAN A.Is the proposed project identified, in whole or in part, in the applicant’s capital improvement plan or schedule during the current or next three (3) fiscal years? Provide: 1) A letter from the agency’s city or county manager certifying the five year capital improvement schedule is officially adopted and date adopted. Project will not receive points if letter is not submitted and does not state the date CIP was adopted. -AND ­ 2) A copy of the five-year capital improvement schedule included in the applicant’s adopted Local Comprehensive Plan, stating project by name, amount and year (County or City budgets are not the same as capital improvement schedules) Please highlight project name, amount and year. (20 points) ________ Yes _________ No ---OR --­ B. Is the proposed project identified as part of the plan through an adopted resolution committing the applicant to amend their capital improvement plan or schedule and complete the project should it receive program funds? Provide: a copy of a fully executed resolution amending the existing schedule to include the proposed project. The resolution must clearly indicate the proposed project by name, amount and year and cannot be older than 3 years. (10 points) ________ Yes ________ No (Tab as Exhibit “A”) 2.STATE COMPREHENSIVE OUTDOOR RECREATION PLAN A.Explain how the proposed project would address one or more of the issues or goals identified in the State Comprehensive Outdoor Recreation Plan. Use the current OUTDOOR RECREATION IN FLORIDA­ (Chapter 5). Provide quotations or other appropriate references with explanations to justify the correlation. To receive points, must give a detailed explanation as to how the project meets the goals, cannot only list the goals. (Tab as Exhibit “B”) (4 points) DRP-106 (Effective 08-01-2018) Page 10 of 28 B.2008 Relative Need Index by Region The proposed project provides for a priority resource or facility need in the applicant’s planning region identified in the Statewide Comprehensive Outdoor Recreation Plan. Locate the applicant’s region and circle each priority resource/facility need as proposed in the project cost on page 7 & 8 of this application: (7 points) I Saltwater Beach Activities* Baseball or Softball * Picnicking *Football Outdoor Swimming Pool Use * Saltwater Non-Boat Fishing * Golf RV / Trailer Camping * Freshwater Boat Ramp Use * Soccer or Rugby II Saltwater Beach Activities * Nature Study * Historical or Archeological Sites Baseball or Softball * Picnicking * Freshwater Boat Ramp Use * Football Hunting * Horseback Riding * Outdoor Swimming Pool Use III Football * Picnicking * Nature Study * Soccer or Rugby * Baseball or Softball Horseback Riding * Outdoor Basketball * RV / Trailer Camping Freshwater Boat Ramp Use * Bicycle Riding – Unpaved Trails IV Historical or Archeological Sites * Baseball or Softball * Football Saltwater Beach Activities * Picnicking * Outdoor Swimming Pool Use * Outdoor Basketball * Nature Study * Golf * Soccer or Rugby V Picnicking * Football * RV / Trailer Camping * Nature Study * Baseball or Softball Bicycle Riding - Unpaved Trails * Outdoor Basketball * Soccer or Rugby Horseback Riding * Outdoor Swimming Pool Use VI Picnicking * RV / Trailer Camping * Football * Baseball or Softball Outdoor Swimming Pool Use * Nature Study * Historical or Archeological Sites Outdoor Basketball * Saltwater Beach Activities * Soccer or Rugby VII RV / Trailer Camping * Picnicking * Baseball or Softball * Outdoor Swimming Pool Use Nature Study * Freshwater Boat Ramp Use * Football * Golf * Horseback Riding Outdoor Basketball ______VIII Picnicking * RV / Trailer Camping * Baseball or Softball * Football * Outdoor Swimming Pool Use Saltwater Beach Activities * Golf * Outdoor Basketball * Outdoor Tennis * Soccer or Rugby IX Picnicking * RV / Trailer Camping * Saltwater Beach Activities * Outdoor Swimming Pool Use Golf * Football * Nature Study * Baseball or Softball * Outdoor Tennis * Historical or Archaeological Sites ______X Football * Golf * Baseball or Softball * Outdoor Swimming Pool Use * Picnicking * Outdoor Tennis Saltwater Beach Activities * Outdoor Basketball * RV / Trailer Camping * Soccer or Rugby DRP-106 (Effective 08-01-2018) Page 11 of 28 _______XI Outdoor Swimming Pool Use * Picnicking * Football * Baseball or Softball * Saltwater Beach Activities * Outdoor Tennis * Golf * Outdoor Basketball * Saltwater Non-Boat Fishing * RV / Trailer Camping DRP-106 (Effective 08-01-2018) Page 12 of 28 3.PUBLIC PARTICIPATION Indicate which of the following apply (Check ALL that apply): (To receive points for this section any meetings, presentations, or surveys must be held in the current year or within the previous 3 years of application and each of the three meetings must be held separately to receive each set of points. Meetings also must be held prior to the application submittal.) ______A. A pre-advertised public meeting was held solely for the purpose of discussing the proposed project. Attach a copy of ad and proof of publication for the advertisement. Advertisement needs to state where and when advertised. If submitting 2 applications, must hold separate meeting for each project (unless they are phased projects of the same park). If not advertised in a newspaper, need a written explanation as to how, when and where advertised, along with a copy of notice/advertisement. (Tab as Exhibit “C-1”) (10 points) ______B. The project was discussed at a regularly scheduled meeting of the applicant’s advisory board responsible for park, recreation or leisure service activities. Provide a copy of the minutes of the advisory board meeting(s) where this project was discussed. The board must be an appointed group of citizens, such as a parks and recreation advisory board, who would normally review projects similar to the proposed grant application. Planning and zoning or similar boards may be used if a parks and recreation advisory board does not exist. CITY OR COUNTY COMMISSIONS ARE NOT CONSIDERED ADVISORY BOARDS. (Tab as Exhibit “C-2”) (7 points) ______C. Public input on the proposed project was obtained through presentations to community organizations, neighborhood associations and/or a written opinion survey. Provide documentation (minutes from the meeting which the project was discussed with date or thank-you letter from an organization, association, etc.) showing that presentations regarding this project were made to community organizations or groups OR provide a copy of the survey, who surveyed and summary of the results. Letters of support are not acceptable to receive points. (Tab as Exhibit “C-3”) (4 points) DRP-106 (Effective 08-01-2018) Page 13 of 28 4.OPERATION AND MAINTENANCE Capability to develop, operate and maintain the project site: (Check ONLY one): Provide a brief description of how development, programming and maintenance will be provided and a copy of an agency organizational chart. Must provide both to receive points. ______The applicant has a full-time recreation or park department staffed to provide facility development, programming and maintenance. (Tab as Exhibit “D”) (6 points) ______The applicant has demonstrated the existence of a full-time ability to provide facility development, programming and maintenance. (Tab as Exhibit “D”) (4 points) ______The applicant has other means of providing facility development, programming and maintenance. (Tab as Exhibit “D”) (2 points) 5.PARK PARTNERSHIP The proposed project is supported through a fully executed written cooperative agreement between the applicant and a private or public entity (within the current or past 3 years) in which said entity agrees to furnish 10% or more of the total project costs in cash, land, or labor services for the development/construction of this project with the applicant holding the leading management responsibility. The written agreement must be executed by the end of the submission period and quantify the donation in monetary units. This can be a cooperative agreement between either parties or a letter from the entity agreeing to furnish 10% of the total project costs in cash, materials, land, or labor services. (A management or maintenance agreement is not acceptable.) ______Yes ______No (Tab as Exhibit “E”) (3 points) 6.TRAIL CONNECTIVITY The project provides for increased trail access by connecting an existing, publicly owned and designated recreational trail which is outside the project boundary. Indicate on the site plan the project trail/connection and name and location of existing trail(s) outside the boundaries. ______Yes ______No (Tab as Exhibit “G”) (5 points) DRP-106 (Effective 08-01-2018) Page 14 of 28 DEVELOPMENT CRITERIA (COMPLETE ONLY FOR DEVELOPMENT PROJECTS) 1.NEW DEVELOPMENT List the existing facilities/improvements on the project site. Include improvements such as baseball fields, basketball courts, trails, boat ramps, etc. (Bullet lists are encouraged) (If undeveloped, state None). The site plan must clearly delineate between facilities/opportunities currently existing, facilities proposed for funding in this application and facilities planned for future development. Identify and color code different funding phases from the existing facilities. (Tab as Exhibit “G”) (5 points, if undeveloped) 2.INFRASTRUCTURE ASSESSMENT OF LOCAL GOVERNMENT RECREATION AND PARK DEPARTMENT FACILITY NEEDS IN THE STATE OF FLORIDA A)List the facilities which are addressed on page 7 & 8 of this application which are identified in the priority ranked index clusters of outdoor facilities needs for renovation and/or new construction identified within the applicant’s population density as set forth in the Department’s study entitled “Infrastructure Assessment of Local Government Recreation and Park Department Facility Needs in the State of Florida” effective December 1995. (See attached pages 22-26 for Priority Ranked Index Clusters. A project facility not listed in the priority ranked indexes will receive a score of a similar facility included in the indexes, as determined by the Department staff.) (If developing trails, must have separate trails to receive separate points. (Maximum 30 points) DRP-106 (Effective 08-01-2018) Page 15 of 28 B)Does the proposed project, in whole or in part, address the highest priority of infrastructure funding needs for the applicant’s population density as set forth in the study titled “1995 INFRASTRUCTURE ASSESSMENT OF LOCAL GOVERNMENT RECREATION AND PARK DEPARTMENT FACILITY NEEDS IN THE STATE OF FLORIDA”. Use the table below to determine in which priority funding need ranking the project falls. (Check ONLY one): _______________ Highest Priority Funding Need (13 points) _______________ Second Highest Priority Funding Need (8 points) Population Density 1 – Population Under 10,000 Rank 1 Rank 2 Construction Renovation Population Density 2 – Population 10,000 to 24,999 Rank 1 Rank 2 Renovation Construction Population Density 3 – Population 25,000 to 49,999 Rank 1 Rank 2 Construction Renovation Population Density 4 – Population 50,000 to 99,999 Rank 1 Rank 2 Construction Renovation Population Density 5 – Population 100,000 and Over Rank 1 Rank 2 Renovation Construction Source: The 1995 Infrastructure Assessment of Local Government Recreation and Park Department Facility Needs in the State of Florida DRP-106 (Effective 08-01-2018) Page 16 of 28 Outdoor Facility Needs Ranked by Priority Index: Population Density 5 Rank Renovation Construction Facility Points Facility Points 1 Support Facilities 6 Support Facilities 6 Cluster I 2 Rest Rooms 5 Baseball Fields 5 Cluster II 3 Playgrounds 5 Playgrounds 5 4 Tennis Courts 4 Softball Fields 4 5 Swimming Pools 4 Rest Rooms 4 Cluster III 6 Boating Facilities 4 Soccer Fields 4 7 Basketball Courts 4 Picnic Facilities 4 8 Golf Courses 3 Bike Trails 3 9 Softball Fields 3 Swimming Pools 3 10 Picnic Facilities 3 Exercise Trails 3 11 Historical Facilities 3 Hiking Trails 3 Cluster IV 12 Baseball Fields 3 Other 3 13 Fishing Piers 3 Golf Courses 3 14 Exercise Trails 3 Camping 3 15 Soccer Fields 3 Beach Access 3 16 Handball Courts 2 Historical Facilities 2 17 Camping 2 Tennis Courts 2 18 Football Fields 2 Basketball Courts 2 Cluster V 19 Nature Trails 2 Boating Facilities 2 20 Beach Access 2 Fishing Piers 2 21 Bike Trails 2 Football Fields 2 22 Other 2 Nature Trails 2 23 Hiking Trails 2 Handball Courts 2 24 Horse Trails 1 Horse Trails 1 Cluster VI 25 Shuffleboard Courts 1 Shuffleboard Courts 1 Population Density 5 - Population From 100,000 & Over DRP-106 (Effective 08-01-2018) Page 26 of 28 Table of Contents Exhibit A..............Capital Improvement Program Exhibit B..............SCORP Exhibit C .............Public Meeting Exhibit D .............Organization Chart Exhibit E..............Cooperative Agreement Exhibit F..............Comprehensive Plan Exhibit G .............Conceptual Site Plan Exhibit K..............Boundary Map Exhibit L ..............Photographs Exhibit M .............Location Map & Directions Exhibit N .............Site Control Exhibit P..............Project Description Collier County Government Fiscal Year 2018 Adopted Budget - Capital Improvement Program Capital Improvement Program Parks & Recreation Capital Projects (306) CIP Category / Project Title Adopted ForecastedAmended BudgetBudgetBudgetBudgetBudget FY 2017 FY 2017FY 2017 FY 2022FY 2021FY 2020FY 2019FY 2018 Parks & Recreation AOlesky Pier Repair - - - - - 52,800 52,848 - AOlesky Sea Wall Repair - - - - - 104,300 104,332 - Bayview Pk Expansion - - - - - 7,100 7,158 - Caxambas Coast Guard Bldg Replac - - - - - 282,500 282,500 200,000 Coast Guard Bldg - - - - - 6,400 6,363 - Com Pk - Fiber Optics - - - - - 137,500 137,568 125,000 Com Pk - IWF Repair - - - - - 26,400 26,367 45,000 Com Pk - Security Cameras - - - - - 35,500 35,479 - ComPk - Assessments - - - - 200,000 - - - ComPk - Athletic Field/Court Maintenance - - - - 135,000 - - - ComPk - Fitness Equipment - - - - 250,000 - - - ComPk - Lighting Infrastructure Maint - - - - 75,000 - - - ComPk - Other Repairs/Maintenance - - - - 50,000 - - - ComPk - Pathway/Road Repairs - - - - 100,000 66,000 66,000 - ComPk - Playground/Shade Structure Maint - - - - 50,000 145,000 145,000 145,000 ComPk - Pool Repairs - - - - 390,000 - - - Corkscrew School Courts - - - - - 100 116 - Cricket Pitch - - - - - 23,000 23,000 - E Naples - Irrigation - - - - - 20,000 20,000 20,000 E Naples Com Pickleball - - - - - 1,700 1,718 - E Naples Com Pk Shade Structure - - - - - 30,000 30,000 - GGCP Pool Repairs - - - - - 36,600 36,585 65,000 Golden Gate Field Lighting - - - - - 650,000 650,000 650,000 Gordon River Greenway Pk - - - - - 8,300 8,300 - Immok Pool Repairs - - - - - 64,000 64,005 100,000 Immok Sports Complex ADA Kiddie Pool - - - - - 200 159 - Immok Sports Complex Fitness Renov - - - - - 437,500 437,426 250,000 Light Pole Analysis - - - - - 15,000 15,000 - Mar-Good Cottage Restoration - - - - - 46,900 46,913 - NCRP Admissions Equip - - - - - 55,000 55,000 - NCRP Lazy River & Slide Maint - - - - - 672,100 672,080 750,000 NCRP Outdoor Furniture - - - - - 8,700 8,692 - NCRP Pond Shade - - - - - - - 15,000 NCRP Pool Pump Repairs - - - - - 86,600 86,622 35,000 RegPk - Assessment - - - - 200,000 - - - RegPk - Exotic Removal - - - - - 2,400 2,344 - RegPk - Other Repairs/Maintenance - - - - 254,500 - - - RegPk - Pathway/Road Repairs - - - - 100,000 17,400 17,425 - RegPk - Playground/Shade Structure Maint - - - - - 119,600 119,589 - RegPk - Security - - - - 50,000 32,800 32,845 - RegPk - Sun-N-Fun Pool Repairs - - - - 395,500 91,300 91,295 - TRosbough Irrigation Well - - - - - 1,300 1,333 - Vanderbilt Beach Master Meter - - - - - 10,000 10,021 - Veterans Pk Pickleball Courts - - - - - 114,900 114,938 - Vineyards Aeration Pump Replacement - - - - - 700 652 - X-fers/Reserves - Fund 306 - - - - 44,400 2,120,700 3,219,187 2,570,900 - - - - 2,294,400 5,530,300 6,628,860 4,970,900Parks & Recreation 4,970,900 - - - - 2,294,400 5,530,300 6,628,860Program Total Project Budget Fiscal Year 2018 34 Capital Improvement Program SCORP STATE COMPREHENSIVE OUTDOOR RECREATION PLAN Collier County Vineyards Communinty Park from State Comprehensive Outdoor Recreation in Florida 2013 Goal 1-2: Emphasize outdoor recreation's impact on health and quality of life The project furthers the goal of providing outdoor recreational facilities that increase time spent outdoors. Through outdoor play and activity the overall health of the community is enhanced. Goal 2-2: Coordinate recreation providers to better connect lands and opportunities The project will create a partnership between local and state recreation providers. Funding from State agencies such as FDEP is critical in ensuring that the needs of the community are met. Goal 2-3: Increase and improve universal accessibility The project is being designed and constructed to allow for use by all users. The playground will be fully ADA accessible. In addition, educational signage will be installed that is specifically designed to allow for full accessibility. These elements are based off established techniques for similar type of facilities. Cor.tnxy Public Services Deparfnent Parks & Recreation Division J uly 13, 2018 Ms. Linda Reeves Program Administrator Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 585 Tallahassee. Florida 32399-3000 Re: Collier County FRDAP (Children's) Sole Purpose l4eeting Dear Ms. Reeves: Collier County is pleased to provide you with a capture shot of our online meeting calendar. The meeting for the sole purpose of discussing the FRDAP grant application was advertised through the website starting on luly 23, 2018 until the meeting date of July 26, 2018. The Village uses this section of the website to notify the community about upcoming meetings and events. Should you have any questions, please do not hesitate to call. S incerely, Barry Wi liams Director Parks and Recreation ffi 133-rrrlrcn Hsan Reor*r!. 1fO00 LMmsbn Ro€d .,i&t€s. Fto ra 341$ , 23$252_4000 . FAx 23951/L8657. w*rp 66figiDarrs cqr Collier County Government Communication & Customer Relations Division 3299 Tamiami Trail E., Suite 102 Naples, Florida 34112-5746 colliergov.net twitter.com/CollierPIO facebook.com/CollierGov youtube.com/CollierGov July 23, 2018 FOR IMMEDIATE RELEASE VINEYARDS COMMUNITY PARK CAPITAL IMPROVEMENTS PUBLIC MEETING THURSDAY, JULY 26, 2018 11:30 AM Collier County will conduct a public meeting to discuss capital improvements for Vineyards Community Park. The sole purpose of this meeting will be to discuss a $75,000 application for a FRDAP Program Grant to help finance improvements to the children’s playground facilities at the Park. The meeting will be conducted on Thursday, July 26, 2018 at 11:30 a.m. at North Collier Regional Park Administration Building, Conference Room C, 15000 Livingston Road, Naples, FL For more information call 239-252-4000 August 7, 2018 Barry Williams, Director Collier County Parks and Recreation 15000 Livingston Road Naples, FL 34109 Dear Mr. Williams, Thank you for presenting your plans for the playground improvements at Vineyards Community Park. Our organization supports your efforts to secure a FRDAP Grant in the amount of $75,000. We believe that the improvements to these facilities will greatly benefit the children of our community. Should I be able to assist you in anyway, please do not hesitate to contact me. Sincerely, JohnDina John Dina President 239-289-0584 john@optimistsoccer.org www.optimistsoccer.org The Collier County Parks and Recreation Department is committed to maintaining all public park facilities located inside its jurisdiction. Any facility including parks will be maintained and operated by the Department as to best meet the needs of the County's residents and guests. The full time department will handle development and maintenance of the project at Vineyards Community Park. Please see the organization chart provided. Organizational Chart Board of County Commissioners Jeffrey Klatzkow County Attorney Leo Ochs, Jr. County Manager Mark Strain Chief Hearing Examiner Executive Director of Corporate Business Operations Tim Durham Administrative Services Department Len Golden Price, Dept.Head Public Services Department Steve Carnell, Dept.Head Operations Support Division Gene Shue, Director Public Utilities Department G. George Yilmaz, Dept. Head Dan Rodriguez, Deputy Dept. Head Growth Management Department Thaddeus Cohen, Dept.Head James French, Deputy Dept. Head University Extension Service Division Twyla Leigh, Director Domestic Animal Services Division Darcy Andrade, Director Library Division Tanya Williams, Director Museum Division Amanda Townsend, Director Parks & Recreation Division Barry Williams, Director Community &Human Services Division Kim Grant, Director Fleet Management Division Dan Croft, Director Facilities Management Division VACANT, Director Human Resources Division Amy Lyberg, Director Information Technology Division E.Michael Berrios, Director Procurement Services Division Ted Coyman, Director Risk Management Division Jeff Walker, Director Development Review Division Matt McLean, Director Operations & Regulatory Mgmt Division Ken Kovensky, Director Engineering & Project Management Division Tom Chmelik, Director Bureau of Emergency Services Division Dan Summers, Director Solid & Hazardous Waste Management Division Dilia Camacho, Interim Director Wastewater Division Beth Johnssen, Director Water Division Steve Messner, Director Operations Support Division Joseph Bellone, Director Public Transit & Neighborhood Enhancement Division Michelle Arnold, Director Transportation Engineering Division Jay Ahmad, Director Road Maintenance Division Travis Gossard, Director Health Division Stephanie Vick,Director Code Enforcement Division Mike Ossorio, DirectorCommunication & Customer Relations Division Mike Sheffield,Director Corporate Financial & Management Services Division Mark Isackson, Director Pelican Bay Services Division Neil Dorrill, Director Tourism Division Jack Wert, Director Zoning Division Michael Bosi, Director Business & Economic Development Division Jace Kentner, Director Operations & Veteran Svcs Division Sean Callahan, Director Nick Casalanguida Deputy County Manager Capital Project Planning, Impact Fees, and Program Management Amy Patterson, Director Community Redevelopment Areas Debrah Forester, Director Corporate Compliance and Internal Review Michael Nieman, Compliance Counsel Building Plan Review & Inspection Division Rich Long, Director Emergency Medical Services Tabatha Butcher, Chief April 25, 2018 Click on box to open the web page of each area. Site Plan Trail Connection Vineyards Community Park and it’s playground facility are located along the County’s designated bike trail network. The park and it’s facilities can be accessed through walking, jogging and riding from throughout the County via this system. The park connects to the trail system through fully accessible pathways entering at Vineyards Road to Vanderbilt Beach Rd. The site also connects to the (SUN) Trail and the corridors on the OGT Land Trails Opportunity Map. The project location is identified on the following maps: COLLIER COUNTY URBAN AREA BICYCLE & PEDESTRIAN FACILITIES MAP (SUN) TRAIL CORRIDOR MAP FLORIDA OGT LAND TRAIL OPPORTUNITY MAP COLLIER COUNTY URBAN AREA BICYCLE & PEDESTRIAN FACILITIES MAP DEFINITIONS BIKE LANE: a lane designated with a stripe and symbols for the preferential use of bicy- cles on a roadway. PAVED SHOULDER: any pavement to the right of the white edge stripe of a roadway but not marked as a bike lane. Bicyclists may choose to ride in this area. SHARED USE PATH: a separate facility open to non-motorized traffic only. SIDEWALK: a paved or improved area along the roadway intended for pedestrian travel. Note: On roads with a shared use path on one side and a sidewalk on the other side, only the shared use path facility is shown. EVERGLADES CITY To Everglades City (see inset map above) To Marco Island (see inset map on reverse) To Immokalee see inset map on reverse N Downtown Naples (see inset map on reverse) N 0 10 20 30 405Miles L A N D T R A I L S L A N D T R A I L S O P P O R T U N I T Y M A P O P P O R T U N I T Y M A P µM A P I N D E XM A P I N D E XSouthernSouthernRegionRegion¹Map Date: 12/15/15* 2015 LAND TRAIL OPPORTUNITY CORRIDORS* The different colors of the Land Trails represent the beginning and ending points of individual corridors.2012 LAND TRAIL OPPORTUNITY CORRIDORS I-75 SI-75 NVineyards BLVDVillage Walk CIRVanderbilt Beach RD Arbor BLVD LaliqueCIRCamelot CIRCommon s C IR Regency R e s e rv e C IR VintageReserv e C IR Rio Poco CT San Carlo CT San Pa blo C T V enturaC TOakesBLVDO Drawn By: Phillip Sherman Department: SHWMD-TSL Date: August 8, 2018 Public Utilities Department Disclaimer: This map is a representation of compiled public information. It is believed to be an accurate and true depictionfor the stated purpose, but Collier County and its employees make no guarantees, implied or otherwise, as to the accuracyof completeness. We therefore do not accept any responsibilities as to its use. This is not a survey, nor is itto be used for design.0 17085 Feet Vineyards CP (VYCP) Park Boundary Photographs Location Map and Directions Direction from Tallahassee 1.Head east on I-10 to I -75 South 2.Head south on I-75 south 3.Exit at Immokalee Road, head west 4.Turn right, head south on Logan Blvd. 5.Turn left onto Vanderbilt Beach Rd., head west 6.Turn left onto Vineyards Rd. head south 7.Park is on the left Vineyards Community Park Collier County EXHIBIT “P” Vineyards Community Park is a 34-acre recreational facility that provides a wide range of outdoor/indoor recreational facilities. The park has both passive and active facilities such as basketball and tennis courts, athletic fields, picnic facilities, trails, playground and splash pad. Support facilities throughout the site include parking, restrooms, lighting, signage and landscaping. The site is located in a built-up densely populated area of Collier County. The park is surrounded by residential neighborhoods and is located directly on Vineyard Road. The park is accessible via the County Bicycle and Pedestrian Trail System and connects to the Statewide SUN Trail corridor. Users of the proposed FRDAP project will be able to visit the new playground either by automobile or on bike or foot through the larger trail system. The proposed 2018 FRDAP project will replace an existing playground facility with a modern ADA accessible system. The playground will include traditional play elements such as slides and swings but incorporate newer and more popular components such as climbing features and interactive games. Some of these features will provide educational opportunities with numbers, letters and colors. The facility will be designed and constructed to provide lighted universal accessibility. Features being installed to enhance access for those children with unique abilities include: •Both ramp and transfer access to all play components •Ramps to every “getting on spot” or “sit/stand & do it spot” of every play component •Transfer system from the ground up to the main deck located near the exits of slides and climbers furthest from the ramp onto the structure •Unitary safety surface such as poured-in-place or rubber tiles •Play panels are located at heights so they can be used from a seated position or standing •Wide variety of experiences for every capability •Signage and accessible rest areas The playground facility will include sensory, physical and social activities to create a dynamic educational experience. There will be multiple levels of user skills, including cozy spaces and vestibular motions for to support children with autism. The County has engaged the public about the project, garnering public support during a meeting for the sole purpose of discussing the grant project and through reaching out to local organizations. The response for the project has been universally positive. TO: Leo E. Ochs, Jr., County Manager vlnw Office of [Management & Budget c,Rff"rco "t/ Barry Williams Division Director - Parks & Recreation FROM: Therese Stanley Manager - OMB Grants Complian DATE: August 9, 2018 RE County Manager review and approval for submittal of a Florida Recreatron Development Assistance Program grant application administered by the Florida Department of Environmental Protection (FDEP) in the amount of $300,000 (ATF 18- 034 & 18-035) The Parks and Recreation Division is applying for funding under the Florida Department of Environmental Protection Florida Recreation Development Assistance Program (FRDAP) for the installation of two community park playgrounds, one at Vineyards Community Park and one at East Naples Community Park. The total project cost is expected to be $300,000. lf awarded FRDAP would provide g150,000 and the county would be required to provide a 50% match or 9150,000. The total cost for Vineyards Community Park project is 9150,000; $75,000 funding request and $75,000 local match. The total cost for East Naples Community Park project is 9150,000; $75,000 funding request and $75,000 local match. The local matching funds of $15o,ooo are requested in 2019 in the Parks Capital Project Fund 306, Project 80305, Community park playgrounds. The notice of funding was released on July 1 , 2018 with the application being due on August 1 5, 2018. Due to the Board summer recess, we are asking for your approval to submit the application, followed by After the Fact approval by the Board of county commissioners at the september 11, 2018 BCC meeting. once you have reviewed the application, please sign in the box above and in the areas marked throughout the application and call me for pickup al239-252-2959. Thank you, and please let me know if you have any questions regarding this request. After{he-Fact Approval by the BCC is required at the September I l, 2018 BCC meeting Approved by County V Grant App lication Reviewed an C nt ec date anager, or 3299 Ta miamiTrail East, Suite 201 . Naptes, Ftorida 34112-5746.239-252{]973. Fld 239-252_8S28 16.D.23.c Packet Pg. 1471 Attachment: CM Memo 2018 08-10 FDEP FRDAP (6510 : FRDAP Grant Playgrounds at VYCP & ENCP) Eas t Naples Community Park Playground COLLIER COUNTY FLORIDA August 15, 2018 FRDAP Children’s Gr ant Progr am Florida Department of Environmental Protection FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM GRANT APPLICATION PACKAGE RequiredSignatures: AdobeSign.ture PART I - GENERAL INFORI'\'{ATION (DEP USE ONLY) Received: Postmarked: Application Number: I. APPLICANT INFORMATION A. Name of Applicant:Collier County B. F-ederal Employer ldentification Number:**59-6000558 **(This number must be reg istered at Mv Florida Market Place with th e address the warrant will be forwarded) C. Popu 1u11or.357,470 D. Current Operating Budget .690,747,900 (This is the operating budget for the city, county or special district, and notjust the department budget) E. Contact p".ron. Carrie Drew 1i11.. Operations Analyst (The contact person is someone who will be in direct contact with DEP and be responsible for administering this grant if awarded) F. Mailing Address: 1 5000 Livingston Rd City/State Zip 2524025 6-6a11. Carrie.Drew@colliercountyfl .gov FAX: I further certiry that the information s application is true and accurate and I on f of the Signa ofC ty or County /Title Date DRP-106 (Effective 8- l-2018)lw (. I hereby certify that this project will exclusively provide recreational enhancements and opportunities for children, will include playground equipment and lighting that is adequate for evening use, will be at least . 10 in size. Project costs in the amount of $]!QQQ will be matched dollar-for-dollar for the development of a !'primary facility" as defined in Rule 62D-5.054, Florida Administrative Codc, incorporating uniquc abilities. J(, co,r^,|3 rror\Cid€l Page I of28 Naples, FL 6o6". 34109 Telephone d39; the authority to apply for this \ 2.PROJECT INFORMATION A.Name of Project:_________________________________________________________ B.Project Type (Check One): Project cannot be a combination of acquisition and development Acquisition: ________ Development: ______ ______On land owned by applicant ______On land currently under site control by applicant Date site control expires: ________________ Trail Construction: ______ ______On land owned by applicant ______On land currently under site control by applicant Date site control expires: ________________ Development projects must be under site control (owned by deed, or leased or dedicated for minimum of 30 years from the date of application) by the close of the submission period (August 15, 2018). •School board property is ineligible either by lease or ownership. •Include a copy of the site control documents (e.g., deed, lease, etc.). If providing a Quit Claim Deed, please attach a copy of a 30 year title search or title opinion. (Tab as Exhibit “N”) DRP-106 (Effective 8-1-2018) Page 2 of 28 C.PROJECT LOCATION: Street Address: __________________________________________________________ City: ______________________County: ______________ Zip Code: ________-______ GIS Coordinates: Latitude: ___________________ Longitude: ____________________ 1.Submit a boundary map of the project area providing a description and sketch of the project area boundaries, display known easements and be legally sufficient to identify the project area. Aerial photographs are accepted as boundary maps, as long as the boundaries are identified (Visit website for example). (Tab as Exhibit “K”) 2.Submit color, on-site photographs for all three copies of your application, sufficient to depict the physical characteristics of the project area. (Tab as Exhibit “L”) 3.Location map and directions: Submit a detailed road map precisely locating the project site along with clear written driving instructions from the nearest federal or state highway. NOTE: Confirm that street names listed are the same as those posted on street signs in the area. Please do not use Map Quest or any other computer mapping program for this. (Tab as Exhibit “M”) D.LEGISLATIVE DISTRICTS IN WHICH THE PROJECT SITE IS LOCATED: This should be the Florida Senate and Florida House district in which the proposed project site is located. If you are not sure of the district, contact your local office of the Supervisor of Elections. (There is only one each.) State Senator: ______________________________ Senate District Number: _________ State Representative: _________________________ House District Number: _________ E.TOTAL NUMBER OF ACRES BEING ACQUIRED OR TOTAL NUMBER OF ACRES BEING DEVELOPED: _______________________ DRP-106 (Effective 08-1-2018) Page 3 of 28 F.DESCRIBE THE PHYSICAL CHARACTERISTICS OF THE PROJECT. 1)For Development Projects: (a)Provide a description of the proposed project which includes existing and future uses, existing and proposed physical improvements, natural and historical resources, any proposed resource protection/conservation and any existing buildings on site. (b)Indicate if a natural spring is located on project site:_____Yes ______No (c)Indicate if there is public access to the park either through an existing street or easement: _____Yes ______No Describe Public Access: (If additional room needed - Tab as Exhibit “P”) 2)For Acquisition Projects: (in addition to the above information) (a)If the proposed project consists of acquiring multiple parcels or from multiple owners, identify specific order in which the parcels will be acquired to ensure that in the event that all parcels cannot be acquired, the purposes of the project can be achieved. Also address the ability to have public access to the park either through an existing street or easement. (If additional room needed - Tab as Exhibit “P”) DRP-106 (Effective 08-01-2018) Page 4 of 28 3.FINANCIAL INFORMATION GRANT MATCH RATIOS: (Based on the grant cap of $250,000) Project Cost State Share Grantee Share $50,000 or less 50% 50% $50,001 to $150,000 50% 50% $150,001 up to $500,000 50% 50% Project Cost = State Share + Grantee Share Refer to Chapter 62D-5.055(4), F.A.C. for complete information on match requirements and match types. The Total Project Cost (Line F) must equal the grant request (Line A) plus the total local match (Line E). This figure (Line F) should not total more than $500,000 for the purpose of this application. A.FRDAP Funds Requested (State Share)Line A $__________________ B.Local Funds Available: (Grantee Share) 1.Cash:Line B $__________________ 2.In-Kind:Line C $__________________ 3.Land Value:Line D $__________________ If property is developed, land value CANNOT be used as a match. Total Local Match: Line E $__________________ Sum of lines B, C and D C.Total Cost of Proposed Project:Line F $__________________ Sum of Lines A and E (Should not total more than $500,000) Forms at http://dep.state.fl.us/lands/Land_and_Recreation/Land_Recreation.htm) (Tab as Exhibit “O”) DRP-106 (Effective 08-01-2018) Page 5 of 28 (If approved for REDI Match Waiver, fill out REDI ---------------------------------------------------------------------------------------------------------------------------------------Waiver Form located under FRDAP Administrative ---------------------------------------------------------------------------------------------------------- ------------------------------- REDI Match Waivers may not be submitted for this Application Cycle. D.PROJECT BUDGET DETAIL (COMPLETE FOR ALL PROJECTS, DEVELOPMENT AND ACQUISITION): On page 7 & 8 list ed the Project Budget Detail for the elements for this application. The Project elements are listed with the related tasks and deliverables. Primary elements and support elements should be listed separately. Use as many project elements and tasks needed to complete the project. Remember to include each element in your conceptual site plan. Submit a conceptual site plan displaying the areas and facilities to be developed as proposed on page 7 &8 of this application. The site plan must correlate with the project boundary map and budge detail elements. The site plan must CLEARLY DELINEATE using color codes between facilities/opportunities currently existing, facilities proposed for funding (page 7 & 8) in this application and facilities planned for future development. If project is an acquisition project, be sure to submit on the site plan the proposed elements to be developed as listed on page 17 of this application. Also identify different FRDAP phases on the site plan and any LWCF phases. DEVELOPMENT PROJECTS: PRIMARY RECREATION AREAS AND FACILITIES: Primary facilities include all recreation facilities and opportunities. Primary cost must be equal to or greater than fifty percent (50%) of the total cost. Primary examples are: beach access, picnic facilities, fishing piers, ball fields, tennis courts, trails, trailheads, shade structures for recreational facilities, etc. Enclosed structures are not eligible costs. Costs of planning and site preparation should be included within the cost of each element. If land value is used as match, it should be included under primary cost. If this is a trail project, list the uses or types of trails. If developing one trail for multi-purposes state multi-purpose trail, but if doing several different trails list separately with each use (example: walking trail or bike trail). SUPPORT FACILITIES AND IMPROVEMENTS: Support facilities are facilities which cannot stand alone, or which would have little or no public outdoor recreational value without the primary facility. No enclosed structures are eligible except restrooms, bathhouses or restroom/concession stands. Other support examples are: parking, landscaping, and security lighting. Amenities such as benches, or bike racks will receive no points when being scored. The enclosed structures listed above cannot be phased and must be completed with one grant. ACQUISITION PROJECTS: If acquisition project, on page 7 & 8, list the project budget detail for the acquisition phase of the project. (Tab as Exhibit “H”) DRP-106 (Effective 08-01-2018) Page 6 of 28 FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM (FRDAP) DEVELOPMENT PROJECT BUDGET DETAIL Project Name: ______________________________________________________________________ Grantee Name: _____________________________________________________________________ The project reimbursement is limited to one (1) invoice upon completion of all Project Elements listed below and submittal of all Deliverables and required documentation identified in the table below. Completion Documentation required prior to Reimbursement Request. Project Tasks, Deliverables and Required Documentation Task #1: Development of:_________________________ Amount of Costs to be Paid with Grant Funds Amount of Costs to be Paid with Grantee Match Deliverables and Documentation To Be Submitted Upon Completion And Before Reimbursement Can Be Approved (List each Primary project element) Provide Budget Detail Provide Budget Detail Project Completion Certification Final as-built site plan Florida Recreation and Parks Inventory Form Color Photographs of Project Notice of Limitation of Use Boundary Survey DRP-106 (Effective 08-01-2018) Page 7 of 28 (List each Support project element) *All work will be completed in accordance with the approved plans. TOTALS: $ $ Performance Standard: Approval of deliverables is based upon review for compliance with the requirements for funding under the Florida Recreation Development Assistance Program (FRDAP); approved plans and application approved for funding. DRP-106 (Effective 08-01-2018) Page 8 of 28 INSTRUCTIONS FOR COMPLETING PROJECT BUDGET DETAIL: DELIVERABLES/ELEMENTS/WORK TO BE COMPLETED: Identify ALL elements that will be completed under this Agreement. DELIVERABLE/ELEMENT BUDGET AMOUNT FOR REIMBURSEMENT: Must provide a budget for each element and identify the expense category and budget detail. Provide description of the costs as follows: Salaries: identify the position title/hourly rate/# of hours to complete the deliverable; Fringe benefits: identify the % used to calculate the fringe benefits; Contractual Services: identify what service will be paid for under the contract for services; Equipment: the purchase of equipment is not allowed under this Agreement, the rental of equipment is the only costs allowed that are associated with equipment; Supplies and Materials: identify what supplies/materials will be purchased; Other costs: identify what other costs are being requested (such as printing costs, other costs that do not fit into the other established cost categories (salaries, fringe benefits, equipment, supplies, indirect, contractual services); Indirect Costs: identify the percentage that is used for the indirect being claimed for reimbursement (cannot exceed 15% unless prior approval has been obtained by the Department).. MATCH AMOUNT TO BE CLAIMED: The same level of detail must be provided for match as for reimbursement. DOCUMENTATION/DELIVERABLES TO BE SUBMITTED UPON COMPLETION: All of these deliverables must be submitted before final reimbursement can be processed. Completion Documentation required prior to Reimbursement DRP-106 (Effective 08-01-2018) Page 9 of 28 PART II — EVALUATION CRITERIA GENERAL CRITERIA 1.CAPITAL IMPROVEMENT PLAN A.Is the proposed project identified, in whole or in part, in the applicant’s capital improvement plan or schedule during the current or next three (3) fiscal years? Provide: 1) A letter from the agency’s city or county manager certifying the five year capital improvement schedule is officially adopted and date adopted. Project will not receive points if letter is not submitted and does not state the date CIP was adopted. -AND ­ 2) A copy of the five-year capital improvement schedule included in the applicant’s adopted Local Comprehensive Plan, stating project by name, amount and year (County or City budgets are not the same as capital improvement schedules) Please highlight project name, amount and year. (20 points) ________ Yes _________ No ---OR --­ B. Is the proposed project identified as part of the plan through an adopted resolution committing the applicant to amend their capital improvement plan or schedule and complete the project should it receive program funds? Provide: a copy of a fully executed resolution amending the existing schedule to include the proposed project. The resolution must clearly indicate the proposed project by name, amount and year and cannot be older than 3 years. (10 points) ________ Yes ________ No (Tab as Exhibit “A”) 2.STATE COMPREHENSIVE OUTDOOR RECREATION PLAN A.Explain how the proposed project would address one or more of the issues or goals identified in the State Comprehensive Outdoor Recreation Plan. Use the current OUTDOOR RECREATION IN FLORIDA­ (Chapter 5). Provide quotations or other appropriate references with explanations to justify the correlation. To receive points, must give a detailed explanation as to how the project meets the goals, cannot only list the goals. (Tab as Exhibit “B”) (4 points) DRP-106 (Effective 08-01-2018) Page 10 of 28 B.2008 Relative Need Index by Region The proposed project provides for a priority resource or facility need in the applicant’s planning region identified in the Statewide Comprehensive Outdoor Recreation Plan. Locate the applicant’s region and circle each priority resource/facility need as proposed in the project cost on page 7 & 8 of this application: (7 points) I Saltwater Beach Activities* Baseball or Softball * Picnicking *Football Outdoor Swimming Pool Use * Saltwater Non-Boat Fishing * Golf RV / Trailer Camping * Freshwater Boat Ramp Use * Soccer or Rugby II Saltwater Beach Activities * Nature Study * Historical or Archeological Sites Baseball or Softball * Picnicking * Freshwater Boat Ramp Use * Football Hunting * Horseback Riding * Outdoor Swimming Pool Use III Football * Picnicking * Nature Study * Soccer or Rugby * Baseball or Softball Horseback Riding * Outdoor Basketball * RV / Trailer Camping Freshwater Boat Ramp Use * Bicycle Riding – Unpaved Trails IV Historical or Archeological Sites * Baseball or Softball * Football Saltwater Beach Activities * Picnicking * Outdoor Swimming Pool Use * Outdoor Basketball * Nature Study * Golf * Soccer or Rugby V Picnicking * Football * RV / Trailer Camping * Nature Study * Baseball or Softball Bicycle Riding - Unpaved Trails * Outdoor Basketball * Soccer or Rugby Horseback Riding * Outdoor Swimming Pool Use VI Picnicking * RV / Trailer Camping * Football * Baseball or Softball Outdoor Swimming Pool Use * Nature Study * Historical or Archeological Sites Outdoor Basketball * Saltwater Beach Activities * Soccer or Rugby VII RV / Trailer Camping * Picnicking * Baseball or Softball * Outdoor Swimming Pool Use Nature Study * Freshwater Boat Ramp Use * Football * Golf * Horseback Riding Outdoor Basketball ______VIII Picnicking * RV / Trailer Camping * Baseball or Softball * Football * Outdoor Swimming Pool Use Saltwater Beach Activities * Golf * Outdoor Basketball * Outdoor Tennis * Soccer or Rugby IX Picnicking * RV / Trailer Camping * Saltwater Beach Activities * Outdoor Swimming Pool Use Golf * Football * Nature Study * Baseball or Softball * Outdoor Tennis * Historical or Archaeological Sites ______X Football * Golf * Baseball or Softball * Outdoor Swimming Pool Use * Picnicking * Outdoor Tennis Saltwater Beach Activities * Outdoor Basketball * RV / Trailer Camping * Soccer or Rugby DRP-106 (Effective 08-01-2018) Page 11 of 28 _______XI Outdoor Swimming Pool Use * Picnicking * Football * Baseball or Softball * Saltwater Beach Activities * Outdoor Tennis * Golf * Outdoor Basketball * Saltwater Non-Boat Fishing * RV / Trailer Camping DRP-106 (Effective 08-01-2018) Page 12 of 28 3.PUBLIC PARTICIPATION Indicate which of the following apply (Check ALL that apply): (To receive points for this section any meetings, presentations, or surveys must be held in the current year or within the previous 3 years of application and each of the three meetings must be held separately to receive each set of points. Meetings also must be held prior to the application submittal.) ______A. A pre-advertised public meeting was held solely for the purpose of discussing the proposed project. Attach a copy of ad and proof of publication for the advertisement. Advertisement needs to state where and when advertised. If submitting 2 applications, must hold separate meeting for each project (unless they are phased projects of the same park). If not advertised in a newspaper, need a written explanation as to how, when and where advertised, along with a copy of notice/advertisement. (Tab as Exhibit “C-1”) (10 points) ______B. The project was discussed at a regularly scheduled meeting of the applicant’s advisory board responsible for park, recreation or leisure service activities. Provide a copy of the minutes of the advisory board meeting(s) where this project was discussed. The board must be an appointed group of citizens, such as a parks and recreation advisory board, who would normally review projects similar to the proposed grant application. Planning and zoning or similar boards may be used if a parks and recreation advisory board does not exist. CITY OR COUNTY COMMISSIONS ARE NOT CONSIDERED ADVISORY BOARDS. (Tab as Exhibit “C-2”) (7 points) ______C. Public input on the proposed project was obtained through presentations to community organizations, neighborhood associations and/or a written opinion survey. Provide documentation (minutes from the meeting which the project was discussed with date or thank-you letter from an organization, association, etc.) showing that presentations regarding this project were made to community organizations or groups OR provide a copy of the survey, who surveyed and summary of the results. Letters of support are not acceptable to receive points. (Tab as Exhibit “C-3”) (4 points) DRP-106 (Effective 08-01-2018) Page 13 of 28 4.OPERATION AND MAINTENANCE Capability to develop, operate and maintain the project site: (Check ONLY one): Provide a brief description of how development, programming and maintenance will be provided and a copy of an agency organizational chart. Must provide both to receive points. ______The applicant has a full-time recreation or park department staffed to provide facility development, programming and maintenance. (Tab as Exhibit “D”) (6 points) ______The applicant has demonstrated the existence of a full-time ability to provide facility development, programming and maintenance. (Tab as Exhibit “D”) (4 points) ______The applicant has other means of providing facility development, programming and maintenance. (Tab as Exhibit “D”) (2 points) 5.PARK PARTNERSHIP The proposed project is supported through a fully executed written cooperative agreement between the applicant and a private or public entity (within the current or past 3 years) in which said entity agrees to furnish 10% or more of the total project costs in cash, land, or labor services for the development/construction of this project with the applicant holding the leading management responsibility. The written agreement must be executed by the end of the submission period and quantify the donation in monetary units. This can be a cooperative agreement between either parties or a letter from the entity agreeing to furnish 10% of the total project costs in cash, materials, land, or labor services. (A management or maintenance agreement is not acceptable.) ______Yes ______No (Tab as Exhibit “E”) (3 points) 6.TRAIL CONNECTIVITY The project provides for increased trail access by connecting an existing, publicly owned and designated recreational trail which is outside the project boundary. Indicate on the site plan the project trail/connection and name and location of existing trail(s) outside the boundaries. ______Yes ______No (Tab as Exhibit “G”) (5 points) DRP-106 (Effective 08-01-2018) Page 14 of 28 DEVELOPMENT CRITERIA (COMPLETE ONLY FOR DEVELOPMENT PROJECTS) 1.NEW DEVELOPMENT List the existing facilities/improvements on the project site. Include improvements such as baseball fields, basketball courts, trails, boat ramps, etc. (Bullet lists are encouraged) (If undeveloped, state None). The site plan must clearly delineate between facilities/opportunities currently existing, facilities proposed for funding in this application and facilities planned for future development. Identify and color code different funding phases from the existing facilities. (Tab as Exhibit “G”) (5 points, if undeveloped) 2.INFRASTRUCTURE ASSESSMENT OF LOCAL GOVERNMENT RECREATION AND PARK DEPARTMENT FACILITY NEEDS IN THE STATE OF FLORIDA A)List the facilities which are addressed on page 7 & 8 of this application which are identified in the priority ranked index clusters of outdoor facilities needs for renovation and/or new construction identified within the applicant’s population density as set forth in the Department’s study entitled “Infrastructure Assessment of Local Government Recreation and Park Department Facility Needs in the State of Florida” effective December 1995. (See attached pages 22-26 for Priority Ranked Index Clusters. A project facility not listed in the priority ranked indexes will receive a score of a similar facility included in the indexes, as determined by the Department staff.) (If developing trails, must have separate trails to receive separate points. (Maximum 30 points) DRP-106 (Effective 08-01-2018) Page 15 of 28 B)Does the proposed project, in whole or in part, address the highest priority of infrastructure funding needs for the applicant’s population density as set forth in the study titled “1995 INFRASTRUCTURE ASSESSMENT OF LOCAL GOVERNMENT RECREATION AND PARK DEPARTMENT FACILITY NEEDS IN THE STATE OF FLORIDA”. Use the table below to determine in which priority funding need ranking the project falls. (Check ONLY one): _______________ Highest Priority Funding Need (13 points) _______________ Second Highest Priority Funding Need (8 points) Population Density 1 – Population Under 10,000 Rank 1 Rank 2 Construction Renovation Population Density 2 – Population 10,000 to 24,999 Rank 1 Rank 2 Renovation Construction Population Density 3 – Population 25,000 to 49,999 Rank 1 Rank 2 Construction Renovation Population Density 4 – Population 50,000 to 99,999 Rank 1 Rank 2 Construction Renovation Population Density 5 – Population 100,000 and Over Rank 1 Rank 2 Renovation Construction Source: The 1995 Infrastructure Assessment of Local Government Recreation and Park Department Facility Needs in the State of Florida DRP-106 (Effective 08-01-2018) Page 16 of 28 Outdoor Facility Needs Ranked by Priority Index: Population Density 5 Rank Renovation Construction Facility Points Facility Points 1 Support Facilities 6 Support Facilities 6 Cluster I 2 Rest Rooms 5 Baseball Fields 5 Cluster II 3 Playgrounds 5 Playgrounds 5 4 Tennis Courts 4 Softball Fields 4 5 Swimming Pools 4 Rest Rooms 4 Cluster III 6 Boating Facilities 4 Soccer Fields 4 7 Basketball Courts 4 Picnic Facilities 4 8 Golf Courses 3 Bike Trails 3 9 Softball Fields 3 Swimming Pools 3 10 Picnic Facilities 3 Exercise Trails 3 11 Historical Facilities 3 Hiking Trails 3 Cluster IV 12 Baseball Fields 3 Other 3 13 Fishing Piers 3 Golf Courses 3 14 Exercise Trails 3 Camping 3 15 Soccer Fields 3 Beach Access 3 16 Handball Courts 2 Historical Facilities 2 17 Camping 2 Tennis Courts 2 18 Football Fields 2 Basketball Courts 2 Cluster V 19 Nature Trails 2 Boating Facilities 2 20 Beach Access 2 Fishing Piers 2 21 Bike Trails 2 Football Fields 2 22 Other 2 Nature Trails 2 23 Hiking Trails 2 Handball Courts 2 24 Horse Trails 1 Horse Trails 1 Cluster VI 25 Shuffleboard Courts 1 Shuffleboard Courts 1 Population Density 5 - Population From 100,000 & Over DRP-106 (Effective 08-01-2018) Page 26 of 28 Table of Contents Exhibit A..............Capital Improvement Program Exhibit B..............SCORP Exhibit C .............Public Meeting Exhibit D .............Organization Chart Exhibit E..............Cooperative Agreement Exhibit F..............Comprehensive Plan Exhibit G .............Conceptual Site Plan Exhibit K..............Boundary Map Exhibit L ..............Photographs Exhibit M .............Location Map & Directions Exhibit N .............Site Control Exhibit P..............Project Description Collier County Government Fiscal Year 2018 Adopted Budget - Capital Improvement Program Capital Improvement Program Parks & Recreation Capital Projects (306) CIP Category / Project Title Adopted ForecastedAmended BudgetBudgetBudgetBudgetBudget FY 2017 FY 2017FY 2017 FY 2022FY 2021FY 2020FY 2019FY 2018 Parks & Recreation AOlesky Pier Repair - - - - - 52,800 52,848 - AOlesky Sea Wall Repair - - - - - 104,300 104,332 - Bayview Pk Expansion - - - - - 7,100 7,158 - Caxambas Coast Guard Bldg Replac - - - - - 282,500 282,500 200,000 Coast Guard Bldg - - - - - 6,400 6,363 - Com Pk - Fiber Optics - - - - - 137,500 137,568 125,000 Com Pk - IWF Repair - - - - - 26,400 26,367 45,000 Com Pk - Security Cameras - - - - - 35,500 35,479 - ComPk - Assessments - - - - 200,000 - - - ComPk - Athletic Field/Court Maintenance - - - - 135,000 - - - ComPk - Fitness Equipment - - - - 250,000 - - - ComPk - Lighting Infrastructure Maint - - - - 75,000 - - - ComPk - Other Repairs/Maintenance - - - - 50,000 - - - ComPk - Pathway/Road Repairs - - - - 100,000 66,000 66,000 - ComPk - Playground/Shade Structure Maint - - - - 50,000 145,000 145,000 145,000 ComPk - Pool Repairs - - - - 390,000 - - - Corkscrew School Courts - - - - - 100 116 - Cricket Pitch - - - - - 23,000 23,000 - E Naples - Irrigation - - - - - 20,000 20,000 20,000 E Naples Com Pickleball - - - - - 1,700 1,718 - E Naples Com Pk Shade Structure - - - - - 30,000 30,000 - GGCP Pool Repairs - - - - - 36,600 36,585 65,000 Golden Gate Field Lighting - - - - - 650,000 650,000 650,000 Gordon River Greenway Pk - - - - - 8,300 8,300 - Immok Pool Repairs - - - - - 64,000 64,005 100,000 Immok Sports Complex ADA Kiddie Pool - - - - - 200 159 - Immok Sports Complex Fitness Renov - - - - - 437,500 437,426 250,000 Light Pole Analysis - - - - - 15,000 15,000 - Mar-Good Cottage Restoration - - - - - 46,900 46,913 - NCRP Admissions Equip - - - - - 55,000 55,000 - NCRP Lazy River & Slide Maint - - - - - 672,100 672,080 750,000 NCRP Outdoor Furniture - - - - - 8,700 8,692 - NCRP Pond Shade - - - - - - - 15,000 NCRP Pool Pump Repairs - - - - - 86,600 86,622 35,000 RegPk - Assessment - - - - 200,000 - - - RegPk - Exotic Removal - - - - - 2,400 2,344 - RegPk - Other Repairs/Maintenance - - - - 254,500 - - - RegPk - Pathway/Road Repairs - - - - 100,000 17,400 17,425 - RegPk - Playground/Shade Structure Maint - - - - - 119,600 119,589 - RegPk - Security - - - - 50,000 32,800 32,845 - RegPk - Sun-N-Fun Pool Repairs - - - - 395,500 91,300 91,295 - TRosbough Irrigation Well - - - - - 1,300 1,333 - Vanderbilt Beach Master Meter - - - - - 10,000 10,021 - Veterans Pk Pickleball Courts - - - - - 114,900 114,938 - Vineyards Aeration Pump Replacement - - - - - 700 652 - X-fers/Reserves - Fund 306 - - - - 44,400 2,120,700 3,219,187 2,570,900 - - - - 2,294,400 5,530,300 6,628,860 4,970,900Parks & Recreation 4,970,900 - - - - 2,294,400 5,530,300 6,628,860Program Total Project Budget Fiscal Year 2018 34 Capital Improvement Program SCORP STATE COMPREHENSIVE OUTDOOR RECREATION PLAN Collier County East Naples Communinty Park from State Comprehensive Outdoor Recreation in Florida 2013 Goal 1-2: Emphasize outdoor recreation's impact on health and quality of life The project furthers the goal of providing outdoor recreational facilities that increase time spent outdoors. Through outdoor play and activity the overall health of the community is enhanced. Goal 2-2: Coordinate recreation providers to better connect lands and opportunities The project will create a partnership between local and state recreation providers. Funding from State agencies such as FDEP is critical in ensuring that the needs of the community are met. Goal 2-3: Increase and improve universal accessibility The project is being designed and constructed to allow for use by all users. The playground will be fully ADA accessible. In addition, educational signage will be installed that is specifically designed to allow for full accessibility. These elements are based off established techniques for similar type of facilities. Cor.tnxy Public Services Deparfnent Parks & Recreation Division J uly 13, 2018 Ms. Linda Reeves Program Administrator Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 585 Tallahassee. Florida 32399-3000 Re: Collier County FRDAP (Children's) Sole Purpose l4eeting Dear Ms. Reeves: Collier County is pleased to provide you with a capture shot of our online meeting calendar. The meeting for the sole purpose of discussing the FRDAP grant application was advertised through the website starting on luly 23, 2018 until the meeting date of July 26, 2018. The Village uses this section of the website to notify the community about upcoming meetings and events. Should you have any questions, please do not hesitate to call. S incerely, Barry Wi liams Director Parks and Recreation ffi 133-rrrlrcn Hsan Reor*r!. 1fO00 LMmsbn Ro€d .,i&t€s. Fto ra 341$ , 23$252_4000 . FAx 23951/L8657. w*rp 66figiDarrs cqr Collier County Government Communication & Customer Relations Division 3299 Tamiami Trail E., Suite 102 Naples, Florida 34112-5746 colliergov.net twitter.com/CollierPIO facebook.com/CollierGov youtube.com/CollierGov July 23, 2018 FOR IMMEDIATE RELEASE EAST NAPLES COMMUNITY PARK CAPITAL IMPROVEMENTS PUBLIC MEETING THURSDAY, JULY 26, 2018 11:00 AM Collier County will conduct a public meeting to discuss capital improvements for East Naples Community Park. The sole purpose of this meeting will be to discuss a $75,000 application for a FRDAP Program Grant to help finance improvements to the children’s playground facilities at the Park. The meeting will be conducted on Thursday, July 26, 2018 at 11:00 a.m. at North Collier Regional Park Administration Building, Conference Room C, 15000 Livingston Road, Naples, FL For more information call 239-252-4000 The Collier County Parks and Recreation Department is committed to maintaining all public park facilities located inside its jurisdiction. Any facility including parks will be maintained and operated by the Department as to best meet the needs of the County's residents and guests. The full time department will handle development and maintenance of the project at East Naples Park. Please see the organization chart provided. Organizational Chart Board of County Commissioners Jeffrey Klatzkow County Attorney Leo Ochs, Jr. County Manager Mark Strain Chief Hearing Examiner Executive Director of Corporate Business Operations Tim Durham Administrative Services Department Len Golden Price, Dept.Head Public Services Department Steve Carnell, Dept.Head Operations Support Division Gene Shue, Director Public Utilities Department G. George Yilmaz, Dept. Head Dan Rodriguez, Deputy Dept. Head Growth Management Department Thaddeus Cohen, Dept.Head James French, Deputy Dept. Head University Extension Service Division Twyla Leigh, Director Domestic Animal Services Division Darcy Andrade, Director Library Division Tanya Williams, Director Museum Division Amanda Townsend, Director Parks & Recreation Division Barry Williams, Director Community &Human Services Division Kim Grant, Director Fleet Management Division Dan Croft, Director Facilities Management Division VACANT, Director Human Resources Division Amy Lyberg, Director Information Technology Division E.Michael Berrios, Director Procurement Services Division Ted Coyman, Director Risk Management Division Jeff Walker, Director Development Review Division Matt McLean, Director Operations & Regulatory Mgmt Division Ken Kovensky, Director Engineering & Project Management Division Tom Chmelik, Director Bureau of Emergency Services Division Dan Summers, Director Solid & Hazardous Waste Management Division Dilia Camacho, Interim Director Wastewater Division Beth Johnssen, Director Water Division Steve Messner, Director Operations Support Division Joseph Bellone, Director Public Transit & Neighborhood Enhancement Division Michelle Arnold, Director Transportation Engineering Division Jay Ahmad, Director Road Maintenance Division Travis Gossard, Director Health Division Stephanie Vick,Director Code Enforcement Division Mike Ossorio, DirectorCommunication & Customer Relations Division Mike Sheffield,Director Corporate Financial & Management Services Division Mark Isackson, Director Pelican Bay Services Division Neil Dorrill, Director Tourism Division Jack Wert, Director Zoning Division Michael Bosi, Director Business & Economic Development Division Jace Kentner, Director Operations & Veteran Svcs Division Sean Callahan, Director Nick Casalanguida Deputy County Manager Capital Project Planning, Impact Fees, and Program Management Amy Patterson, Director Community Redevelopment Areas Debrah Forester, Director Corporate Compliance and Internal Review Michael Nieman, Compliance Counsel Building Plan Review & Inspection Division Rich Long, Director Emergency Medical Services Tabatha Butcher, Chief April 25, 2018 Click on box to open the web page of each area. Site Plan Trail Connection East Naples Community Park and it’s playground facility are located along the County’s designated bike trail network. The park and it’s facilities can be accessed through walking, jogging and riding from throughout the County via this system. The park connects to the trail system through fully accessible pathways entering at Thomasson Road. The site also connects to the (SUN) Trail and the corridors on the OGT Land Trails Opportunity Map. The project location is identified on the following maps: COLLIER COUNTY URBAN AREA BICYCLE & PEDESTRIAN FACILITIES MAP (SUN) TRAIL CORRIDOR MAP FLORIDA OGT LAND TRAIL OPPORTUNITY MAP COLLIER COUNTY URBAN AREA BICYCLE & PEDESTRIAN FACILITIES MAP DEFINITIONS BIKE LANE: a lane designated with a stripe and symbols for the preferential use of bicy- cles on a roadway. PAVED SHOULDER: any pavement to the right of the white edge stripe of a roadway but not marked as a bike lane. Bicyclists may choose to ride in this area. SHARED USE PATH: a separate facility RSHQWRQRQPRWRUL]HGWUDIÀFRQO\ SIDEWALK: a paved or improved area along the roadway intended for pedestrian travel. Note: On roads with a shared use path on one side and a sidewalk on the other side, only the shared use path facility is shown. EVERGLADES CITY To Everglades City (see inset map above) To Marco Island (see inset map on reverse) To Immokalee see inset map on reverse N Downtown Naples (see inset map on reverse) N FRDAP Project Site (TRAIL CONNECTION) Florida OGTLand Trail Opportunity Map Thomasson DR Elbow AVEAntigu a W A Y Karen DR Constitutio nDRRepublic DR Haiti DRVerity LNAcadia LNAlladin LNCottage Grove AVE Highbourne DRDominion DRO Drawn By: Phillip Sherman Department: SHWMD-TSL Date: August 8, 2018 Public Utilities Department Disclaimer: This map is a representation of compiled public information. It is believed to be an accurate and true depictionfor the stated purpose, but Collier County and its employees make no guarantees, implied or otherwise, as to the accuracyof completeness. We therefore do not accept any responsibilities as to its use. This is not a survey, nor is itto be used for design.0 11055 Feet East Naples CP (ENCP) Park Boundary Photographs Location Map and Directions Direction from Tallahassee 1. Head east on I-10 to I -75 South 2. Head south on I-75 south 3. Exit at Santa Barbara Blvd. south 4. Head south to Rattlesnake Hammock Rd. 5. Head west on Rattlesnake Hammock Rd. 6. Rattlesnake Hammock Rd. will turn into Thomasson Rd 7. Park is on the left East Naples Community Park Collier County EXHIBIT “P” East Naples Community Park is a 43-acre recreational facility that provides a wide range of outdoor/indoor recreational facilities. The park has both passive and active facilities such as basketball and tennis courts, athletic fields, picnic facilities, trails, playground and community center. Support facilities throughout the site include parking, restrooms, lighting, signage and landscaping. The park is also home to the US Pickleball Academy. The site is located in a built-up densely populated area of Collier County. The park is surrounded by residential neighborhoods and is located directly on Thomasson Road, a major roadway. The park is accessible via the County Bicycle and Pedestrian Trail System and connects to the Statewide SUN Trail corridor. Users of the proposed FRDAP project will be able to visit the new playground either by automobile or on bike or foot through the larger trail system. The proposed 2018 FRDAP project will replace an existing playground facility with a modern ADA accessible system. The playground will include traditional play elements such as slides and swings but incorporate newer and more popular components such as climbing features and interactive games. Some of these features will provide educational opportunities with numbers, letters and colors. The facility will be designed and constructed to provide lighted universal accessibility. Features being installed to enhance access for those children with unique abilities include •Both ramp and transfer access to all play components •Ramps to every “getting on spot” or “sit/stand & do it spot” of every play component •Transfer system from the ground up to the main deck located near the exits of slides and climbers furthest from the ramp onto the structure •Unitary safety surface such as poured-in-place or rubber tiles •Play panels are located at heights so they can be used from a seated position or standing •Wide variety of experiences for every capability •Signage and accessible rest areas The playground facility will include sensory, physical and social activities to create a dynamic educational experience. There will be multiple levels of user skills, including cozy spaces and vestibular motions for to support children with autism. The County has engaged the public about the project, garnering public support during a meeting for the sole purpose of discussing the grant project and through reaching out to local organizations. The response for the project has been universally positive. TO: Leo E. Ochs, Jr., County Manager vlnw Office of [Management & Budget c,Rff"rco "t/ Barry Williams Division Director - Parks & Recreation FROM: Therese Stanley Manager - OMB Grants Complian DATE: August 9, 2018 RE County Manager review and approval for submittal of a Florida Recreatron Development Assistance Program grant application administered by the Florida Department of Environmental Protection (FDEP) in the amount of $300,000 (ATF 18- 034 & 18-035) The Parks and Recreation Division is applying for funding under the Florida Department of Environmental Protection Florida Recreation Development Assistance Program (FRDAP) for the installation of two community park playgrounds, one at Vineyards Community Park and one at East Naples Community Park. The total project cost is expected to be $300,000. lf awarded FRDAP would provide g150,000 and the county would be required to provide a 50% match or 9150,000. The total cost for Vineyards Community Park project is 9150,000; $75,000 funding request and $75,000 local match. The total cost for East Naples Community Park project is 9150,000; $75,000 funding request and $75,000 local match. The local matching funds of $15o,ooo are requested in 2019 in the Parks Capital Project Fund 306, Project 80305, Community park playgrounds. The notice of funding was released on July 1 , 2018 with the application being due on August 1 5, 2018. Due to the Board summer recess, we are asking for your approval to submit the application, followed by After the Fact approval by the Board of county commissioners at the september 11, 2018 BCC meeting. once you have reviewed the application, please sign in the box above and in the areas marked throughout the application and call me for pickup al239-252-2959. Thank you, and please let me know if you have any questions regarding this request. After{he-Fact Approval by the BCC is required at the September I l, 2018 BCC meeting Approved by County V Grant App lication Reviewed an C nt ec date anager, or 3299 Ta miamiTrail East, Suite 201 . Naptes, Ftorida 34112-5746.239-252{]973. Fld 239-252_8S28 16.D.23.c Packet Pg. 1471 Attachment: CM Memo 2018 08-10 FDEP FRDAP (6510 : FRDAP Grant Playgrounds at VYCP & ENCP)