Backup Documents 12/10-11/2013 Item #16A 7V1%11T111L-11L_4 LVI.UIV 1V I l IIi.' <,I�L1�J1 Qi: nVU lllrli JLlr
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENTT
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNI A 7
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
Complete routing lines #I through #2 as appropriate for additional signatures, dates, and/or information needed. If the document is already complete with the
exception of the Chairman's signature, draw a line through routing lines #I through #2. complete the checklist. and forward to the Countv Attornev Office.
Route to Addressees (List in routing order)
Office
Initials
Date
I.
aivrovriate.
(Initial)
Applicable)
2.
December 10, 2013 V
Agenda Item Number
16-A7
3. County Attorney Office
County Attorney Office
JH
4. BCC Office
Board of County
Commissioners
W
2
5. Minutes and Records
Clerk of Court's Office
V'
1Z�id
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above, may need to contact staff for additional or missing information.
Name of Primary Staff
John Houldsworth
Phone Number
x-5757
Contact / Department
aivrovriate.
(Initial)
Applicable)
Agenda Date Item was
December 10, 2013 V
Agenda Item Number
16-A7
Approved by the BCC
Tuscany Pointe
JH
Type of Document
Plat
Number of Original
One
Attached
Original document has been signed/initialed for legal sufficiency. (All documents to be
I Documents Attached
PO number or account
signed by the Chairman, with the exception of most letters, must be reviewed and signed
number if document is
by the Office of the County Attorney.
to be recorded
All handwritten strike -through and revisions have been initialed by the County Attorney's
N/A
INSTRUCTIONS & CHECKLIST
Dv J
Initial the Yes column or mark "N/A" in the Not Applicable column, whichever is
Yes
N/A (Not
aivrovriate.
(Initial)
Applicable)
1.
Does the document require the chairman's original signature?
JH
2.
Does the document need to be sent to another agency for additional signatures? If yes,
JH
provide the Contact Information (Name; Agency; Address; Phone) on an attached sheet.
3.
Original document has been signed/initialed for legal sufficiency. (All documents to be
JH
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney.
4.
All handwritten strike -through and revisions have been initialed by the County Attorney's
N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5.
The Chairman's signature line date has been entered as the date of BCC approval of the
JH
document or the final negotiated contract date whichever is applicable.
6.
"Sign here" tabs are placed on the appropriate pages indicating where the Chairman's
sianature and initials are required.
7.
In most cases (some contracts are an exception), the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines! la A o / 13
8.
The document was approved by the BCC on A9i,4.and a c anges made
during the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes, if applicable.
9.
Initials of attorney verifying that the attached document is the version approved by the
r 1,11
BCC, all changes directed by the BCC have been made, and the document is ready for the
(
a-
Chairman's signature.
1: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.0 eevised 11/30/12
vitilill\f�L 1JVl V1v1L' 1�1 1 a 1,111,1,riL1J 1 aL KV U 111111sJL A ,
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 16 7
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
Complete routing lines #1 through #2 as appropriate for additional signatures, dates, and/or information needed. If the document is already complete with the
exception of the Chairman's signature, draw a line through routing lines #I through #2- comnlete the checklist and fnr nrd to the Cn,mty ntt—ow nffr,.
Route to Addressees (List in routing order)
Office
Initials
Date
1.
aivrovriate.
(Initial)
Applicable)
2.
December 10, 2013
Agenda Item Number
16-A7
3. County Attorney Office
County Attorney Office
JH
4. BCC Office
Board of County
Commissioners
Number of Original
Two
5. Minutes and Records
Clerk of Court's Office
Documents Attached
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above, may need to contact staff for additional or missing information.
Name of Primary Staff
John Houldsworth
Phone Number
x-5757
Contact / Department
aivrovriate.
(Initial)
Applicable)
Agenda Date Item was
December 10, 2013
Agenda Item Number
16-A7
Approved by the BCC
Tuscany Pointe
JH
Type of Document
Construction & Maintenance Agreement
Number of Original
Two
Attached
Original document has been signed/initialed for legal sufficiency. (All documents to be
Documents Attached
PO number or account
signed by the Chairman, with the exception of most letters, must be reviewed and signed
number if document is
by the Office of the County Attorney.
to be recorded
All handwritten strike -through and revisions have been initialed by the County Attorney's
N/A
INSTRUCTIONS & CHECKLIST
I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05; Revised 11/30/12
Initial the Yes column or mark "N/A" in the Not Applicable column, whichever is
Yes
N/A (Not
aivrovriate.
(Initial)
Applicable)
1.
Does the document require the chairman's original signature?
JH
2.
Does the document need to be sent to another agency for additional signatures? If yes,
JH
provide the Contact Information (Name; Agency; Address; Phone) on an attached sheet.
3.
Original document has been signed/initialed for legal sufficiency. (All documents to be
JH
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney.
4.
All handwritten strike -through and revisions have been initialed by the County Attorney's
N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5.
The Chairman's signature line date has been entered as the date of BCC approval of the
JH
document or the final negotiated contract date whichever is applicable.
6.
"Sign here" tabs are placed on the appropriate pages indicating where the Chairman's
—signature
and initials are required.
7.
In most cases (some contracts are an exception), the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines! l ��1 10 /i3
8.
The document was approved by the BCC on.Auril R '7014 anall changes made
during the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes, if applicable.
9.
Initials of attorney verifying that the attached document is the version approved by the
BCC, all changes directed by the BCC have been made, and the document is ready for th
Chairman's signature.
I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05; Revised 11/30/12
TuY�y porn �e
16A7
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTION AND MAI NTENAN E AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this �— day of AI / , 20 1 between
V9A,,6h hereinafter referred to as "Developer," and the Board of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board.
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of certain plat of a subdivision to be known as: TUSCANY POINTE
B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set
forth, Developer and the Board do hereby covenant and agree as follows:
1. Developer will cause to be constructed: Roadway, drainage, water & sewer improvements
within 18 months from the date of approval said subdivision plat, said improvements
hereinafter referred to as the required improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of $1744,311 - which amount represents 10% of
the total contract cost to complete the construction plus 100% of the estimated cost of to complete
the required improvements at the date of this Agreement.
1 In the event of default by the Developer or failure of the Developer to complete such improvements
within the time required by the Land Development Code, Collier may call upon the subdivision
performance security to insure satisfactory completion of the required improvements.
4. The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished to be
reviewed and approved by the County Manager or his designee for compliance with the Collier
County Land Development Code.
5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of
substantial completion, either: a) notify the Developer in writing of his preliminary approval of the
improvements, or b) notify the Developer in writing of his refusal to approve improvements,
therewith specifying those conditions which the Developer must fulfill in order to obtain the County
Manager's approval of the improvements. However, in no event shall the County Manager or his
designee refuse preliminary approval of the improvements if they are in fact constructed and
submitted for approval in accordance with the requirements of this Agreement.
6. The Developer shall maintain all required improvements for a minimum period of one year after
preliminary approval by the County Manager or his designee. After the one year maintenance period
by the Developer has terminated, the Developer shall petition the County Manager or his designee to
inspect the required improvements. The County Manager or his designee shall inspect the
improvements and, if found to be still in compliance with the Land Development Code as reflected by
final approval by the Board, the Board shall release the remaining 10% of the subdivision
performance security. The Developer's responsibility for maintenance of the required improvements
shall continue unless or until the Board accepts maintenance responsibility for and by the County.
16A7
7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter
the Developer may request the County Manager or his designee to reduce the dollar amount of the
subdivision performance security on the basis of work complete, Each request for a reduction in the
dollar amount of the subdivision performance security shall be accompanied by a statement of
substantial completion by the Developer's engineer together with the project records necessary for
review by the County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the improvements
completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager or his designee may call upon the subdivision
performance security to secure satisfactory completion, repair and maintenance of the required
improvements. The Board shall have the right to construct and maintain, or cause to be constructed
or maintained, pursuant to public advertisement and receipt and acceptance of bids, the
improvements required herein. The Developer, as principal under the subdivision performance
security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the
final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent
costs, together with any damages, either direct or consequential, which the Board may sustain on
account of the failure of the Developer to fulfill all of the provisions of this Agreement.
9. All of the terms, covenants and conditions herein contained are and shall be binding upon the
Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Dizveloper sed this Agreement to be executed by
tj�er awy authorized representatives this ,14 - daf of l 20jA�_
SIGNED IN THE PRESENCEAf:
(Name of Enti ) DR HORTON,
By:
Printed/Na
J �
/
s--'
Printed NamelTitle
(President, VP, or CEO)-�-
"'t- `__._....
,� ✓ Nc? -f
(Provide Proper Evidence of Authority)
Printed Name
ATTEST:
DWIGHT E. BROCK, CLERK
BOARD OF COU TY CO ISSIONERS
OF COLLIER NT , ORID,j
By:
Depu y Clerk
t
TOM HENNING, CHAIRMAN
App o �4$y lity:
Assistant County Attorney
16 A7
owned. leased or otherwise controlled by the Entities and (Ili) to execute and deliver
model home leases and such other agreements, instruments or documents as the
Approving Officers shall direct.
RESOLVED FURTHER, that in connection with the management of the
Entities' business, the Vice President is hereby authorized and empowered, in the
name and on behal fo f the Entities in the Area, to execute and deliver (1) contracts,
agreements and other documents and instruments for the subdivision, development
and/or improvement of real property, (11) home sales contracts, sales person
eiriployinent agreements and similar or equivalent agreements, documents or
instruments and (iii) personal property leases for, among other things, office
equipment and construction trailers.
RESOLVED FURTHER, that in connection with the management of the
Entities' business in the Area, the Vice President shall be authorized and empowered,
in the name and on behalf of the Entities in the Area, to exec -ate and deliver any and
all documents and instruments necessary to sell and convey title to single-family
homes.
RESOLVED FURTHER, that Jonathon M. Pentecost is hereby removed
from the office of Assistant Secretary of the Company he held prior to this date.
RESOLVED FURTHER,. that effective as of the date hereof, the authority
hereby granted to the Vice President supersedes authority previously granted by
Written Consent of Executive Committee of the Board of Directors to the Vice
President.
IN WITNESS WHEREOF, the undersigned has set his hand on the 17"' day ofNovember,
201.1.
ThomasB. Montano
Assistant Secretary
U:J FEWAL1`ACD'11)111'•11 11,wY17-CO1S.wpd
PERFORMANCE BOND
16 A7
BOND NO. 478689S
KNOW ALL PERSONS BY THESE PRESENTS: that
D.R. Horton, Inc. (Name of Owner)
10541 Ben C. Pratt/Six Mile Cypress Pkway., Ste. 100 (Address of Owner)
Fort Myers, FL 33966 (Address of Owner)
(Hereinafter referred to as "Owner') and
Developers Surety and Indemnity Company (Name of Surety)
100 Second Ave. South, Ste. 704 South (Address of Surety)
St. Petersburg, FL 33701 (Address of Surety)
(727) 822-5610 (Telephone Number)
(hereinafter referred to as "Surety') are held and firmly bound unto Collier County, Florida, (hereinafter
referred to as "County") in the total aggregate sum of One Million, Seven Hundred Forty * Dollars
($1,744,311.00 ) in lawful money of the United States, for the payment of which sum well and truly
to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context
requires. ' Four Thousand, Three Hundred Eleven and 00/100 Dollars
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
the Board of a certain subdivision plat named Tuscany Pointe and that
certain subdivision shall include specific improvements which are required by Collier County Ordinances
and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall
commence on the date this Bond is executed and shall continue until the date of final acceptance by the
Board of County Commissioners of the specific improvements described in the Land Development
Regulations (hereinafter the "Guaranty Period").
NOW THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties
in accordance with the Land Development Regulations during the guaranty period established by the
County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save
harmless the County from and against all costs and damages which it may suffer by reason of owners
failure to do so, and shall reimburse and repay the County all outlay and expense which the County may
incur in making good any default, then this obligation shall be void, otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that
no change, extension of time, alteration, addition or deletion to the proposed specific improvements
shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration, addition or deletion to the proposed specific improvements.
PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the
n
16 A7
Owner and the Surety to the full and faithful performance in accordance with the Land Development
Regulations. The term "Amendment", wherever used in this Bond, and whether referring to this Bond,
or other documents shall include any alteration, addition or modification of any character whatsoever.
IN WITNESS WHER parties hereto have caused this PERFORMANCE BOND to be
executed this 7th day f April / 2014 /
WITNESSES: I(
(Owner Na 4e and Title if Corporation) D.R. HOInc.
A,
Printed Name
Printed Nme/Title `t
(Provide Proper Evidence of Authority)
inted Na
ACKNOWLEDGEMENT
STATE OF r L,
COUNTY OF L -L
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS DAY OF
OF A�� , 1 Vy� 20 �� by ,,O'(�A�0(\ �'(i i���C (NAME
LEDGER) AS V t (TITLE) OF _� . Q1 (�(�D(�\iC (NAME OF
COMPANY) WHO IS PERSONALLY KNOW TO ME, OR HAS PRODUCED
AS IDENTIFICATION.
Notorwulzilic — e of ""'0"" °`11 NICOLE GATTLIFINA
`.` Notary Public - State of Florida
( AL) ;
My Comm Expires Oct 29, 2016
Commission # EE 847232
Printed Name
Witness:
i
N la Barnola
Develo ers Sur ty and InderTIn ompany
By: '
Anett Cardinale, Attorney -in -Fact A
Florida Licensed Resident Agent
ib A7
POWER OF ATTORNEY FOR
DEVELOPERS SURETY AND INDEMNITY COMPANY
PO Box 19725, IRVINE, CA 92623 (949) 263-3300
KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY, does hereby make, constitute and appoint:
"'Carol H. Hermes, Margaret A. Ginem, Linda Horn, David Carr, Anett Cardinale, Shirley Hill Shilts, Eric C. Parker, jointly or
severally—
as its true and lawful Attomey(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporation, as surety, bonds, undertakings and contracts of suretyship
giving and granting unto said Attomey(syin-Fad full power and authority to do and to perform every ad necessary, requisite or proper to be done in connection therewith as each of said
corporation could do, but reserving to each of said corporation full power of substitution and revocation, and all of the acts of said Attomey(s)-in-Fad, pursuant to these presents, are
hereby ratified and confirmed.
This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolution adopted by the Board of Directors of DEVELOPERS SURETY AND
INDEMNITY COMPANY, effective as of January 1st, 2008.
RESOLVED, that a combination of any two of the Chairman of the Board, the President, any Executive Vice -President, Senior Vice -President or Vice -President of the
corporation be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attomey(s) named in the Power of Attorney to execute, on behalf of the
corporation, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of the corporation be, and each of them hereby is, authorized to attest the
execution of any such Power of Attomey;
RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such
Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporation when so affixed and in the future with respect to any bond, undertaking
or contract of suretyship to which it is attached.
IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY has caused these presents to be signed by its officers and attested by its Secretary or Assistant
Secretary this May 23, 2013.
By: \ I G%�/�L� `�( AND
Daniel Young, Senior Vice -President �R4oR l�;P
tar OCT. :<_UJ
l
By. Gregg N. 0 ice -Pres dent ? 0j> 1936 : b�
.iowP,...•�a,
State of California
County of Orange
On May 23, 2013 before me, Gina L. Gamer, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Daniel Young and Gregg N. Okura
Name(s) of Si ner(s)
GINA L. GARNER
o COMM. # 2021213
ORANGECOUNTY
My cortin. expires May 18, 2017
Place Notary Seal Above
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized
capacity(ies), and that by his/her/their signature(s) on the instrument the persori or the entity upon behalf of
which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is
true and correct.
WITNESS my hand and official seal.
Signature
CERTIFICATE
6n4i /dnoo-r�
Gina L. Gamer, Notary Public
The undersigned. as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY does hereby certify that the foregoing Power of Attorney
remains in full force and has not been revoked and, furthermore, that the provisions of the resolution of the Board of Directors of said corporation set forth in the Power of Attomey are in
force as of the date of this Certificate.
This Certificate is executed in the City of Irvine, California, this 7th day of April , 2014 .
By: Z�� 7�t_-7� ��
Mark J. Lansdon, Assistant Secretary
ID-1438(Rev.05/13)
16 A7
H:\2004\2004112\EN\Wilson\cost estimates\tuscany - Eng. Est. 091213 1 of 2
Engineer's Opinion of Probable Cost
TUSCANY
POINTE
HM# 2004.112
Date:
9/12/2013
Desoi tion
QuantRy
Units Unit Cost
Total
GRAVITY SEWAGE COLLECTION SYSTEM
Sewage Lift Station (w/o Odor Control) (16' deep)
1
EA
$90,000.00
$90,000.00
8" PVC Gravity Sewer 0'-6' Cut
3,023
LF
$30.00
$90,690.00
8" PVC Gravity Sewer 6'-8' Cut
290
LF
$35.00
$10,150.00
8" PVC Gravity Sewer 10'-12' Cut
247
LF
$66.00
$16,302.00
Manhole 0'-6' Cut, IET Lined
7
LF
$3,000.00
$21,000.00
Manhole 6'-8' Cut, IET Lined
4
LF
$3,900.D0
$15,600.00
Manhole 8'-10' Cut, IET Lined
1
EA
$6,800.00
$6,800.00
Manhole 10'-12' Cut, IET Lined
4
EA
$8,000.00
$32,000.00
6" PVC Lateral
1,625
LF
$20.00
$32,500.00
6" Single Clean-out
12
EA
$250.00
$3,000.00
6" Double Clean -outs
52
EA
$250.00
$13,000.00
Video Gravity Sewer
3,560
LF
$2.00
$7,120.00
Video Gravity Sewer (1 yr. after accept)
Subtotal Gravity Sewage System
FORCE MAIN
4" PVC FM DR18
3,560
1,290
LF
LF
$2.00
$12.00
$7,120.00
$345,282.00
$15,480.00
4" PVC FM DR14
30
LF
$14.00
$420.00
Air Release Valve (sewage)
1
EA
$1,250.00
$1,250.00
Subtotal Force Main System
$17,150.00
Note: Aerial crossing included with potable water cost.
WATER DISTRIBUTION SYSTEM -
11/2" PVC Water Service
1,575
LF
$8.50
$13,387.50
4" PVC Casing for Water Service
1,575
LF
$15.00
$23,625.00
8" PVC Water Main DR18
4,060
LF
$17.40
$70,644.00
8" PVC Water Main DR14
40
LF
$19.00
$760.00
8" Gate Valve
5
EA
$1,200.00
$6,000.00
Fire Hydrant Assembly
10
EA
$3,000.00
$30,000.00
Air Release Valve
4
EA
$1,250.00
$5,000.00
BSP (permanent)
2
EA
$2,000.00
$4,000.00
BSP (temporary)
2
EA
$1,750.00
$3,500.00
Temp. Gap Configuration
1
EA
$2,500.00
$2,500.00
Horizontal Directional Drill (8" HDPE w/ 14" casing pipe)
including waterline hot tap.
1
LS
$36,000.00
$36,000.00
Aerial Crossing structure (includes 8" DI water main and 4" DI
force main with force main hot tap)
1
LS
$70,000.00
$70,000.00
1" Single Meter
116
EA
$600.00
$69,600.00
Subtotal Water Main System
$335,016.50
DRAINAGE & STORMWATER MANAGEMENT
15" RCP
313
LF
$24.00
$7,512.00
18" RCP
686
LF
$25.00
$17,150.00
24" RCP
418
LF
$35.00
$14,630.00
30" RCP
505
LF
$50.00
$25,250.00
36" RCP
504
LF
$70.00
$35,280.00
42" RCP
481
LF
$90.00
$43,290.00
15" Mitered End Section
2
EA
$1,000.00
$2,000.00
18" Mitered End Section
4
EA
$1,200.00
$4,800.00
24" Mitered End Section
3
EA
$1,500.00
$4,500.00
42" Mitered End Section
1
EA
$2,500.00
$2,500.00
Curb Inlet
17
EA
$4,300.00
$73,100.00
Type "A" Catch Basin
1
EA
$3,000.00
$3,000.00
Type "8" Catch Basin
1
EA
$3,000.00
$3,000.00
Water Control Structure
1
EA
$3,000.00
$3,000.00
Junction Box
5
EA
$4,300.00
$21,500.00
Inlet Protection
1
LS
$1,000.00
$1,000.00
Subtotal Drainage
$261,512.00
H:\2004\2004112\EN\Wilson\cost estimates\tuscany - Eng. Est. 091213 1 of 2
16 A7
BOND AMOUNT CONSTRUCTION MAINTENANCE AGREEMENT:
110% OF CONSTRUCTION COST = $1,585,737.28*1.1 = $1,744,311.00
g.EXANDFR
*f
ATE OF rva►
!it1llll%
H:\2004\2004112\EN\Wilson\cost estimates\tuscany - Eng. Est. 091213 2 of 2
Engineer's Opinion of Probable Cost
TUSCANY
POINTE
HM# 2004.112
Date:
9/12/2013
Desai tion
QuantIty
Units Unit Cost
Tota/
PAVING
11/2" & 2" Asphalt Paving - Type S-111
9,949
Sy
$9.00
$89,541.00
6" Limerock Base
9,949
Sy
$6.00
$59,694.00
12" Stabilized Subgrade (LBR 40)
11,939
Sy
$1.85
$22,086.78
Valley Gutter curb (2' wide) Std.
8,280
LF
$7.00
$57,960.00
5' Concrete Sidewalk
4,545
Sy
$2.50
$11,362.50
Subtotal Roadway Pavement
$240,644.28
Silt Fencing
7,092
LF
$1.50
$10,638.00
Turbidity Barrier
80
LF
$7.50
$600.00
Rough Grading (+/- 0.2' tolerance)
29
AC
$650.00
$18,850.00
Sod
919
Sy
$1.50
$1,378.50
Perimeter Berm Grading
6,276
LF
$3.50
$21,966.00
Construction Entrance
1
EA
$1,500.00
$1,500.00
Subtotal Site Grading & Earthwork
$54,932.50
Landscaping (see attached)
1
LS
$160,200.00
$160,200.00
Irrigation System (see attached)
1
LS
$79,000.00
$79,000.00
Subtotal Landscaping
$239,200.00
Street lighting pole
46
EA
$2,000.00
$92,000.00
Subtotal Lighting
$92,000.00
Grand Total
1,585,737.28
BOND AMOUNT CONSTRUCTION MAINTENANCE AGREEMENT:
110% OF CONSTRUCTION COST = $1,585,737.28*1.1 = $1,744,311.00
g.EXANDFR
*f
ATE OF rva►
!it1llll%
H:\2004\2004112\EN\Wilson\cost estimates\tuscany - Eng. Est. 091213 2 of 2