Loading...
Backup Documents 09/24/2013 Item #16A13ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATIA A 13 Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines #1 through #2 as appropriate for additional signatures, dates, and/or information needed. If the document is already complete with the exce tion of the Chairman's signature draw a line throw h routing lines # 1 throu #2, complete the checklist, and forward to the Coon Attorney Office. Route to Addressees (List in routing order) Office Initials Date 1. appropriate (Initial) Applicable) Agenda Date Item was September 24, 2013 Agenda Item Number 16.A.1� 1. Does the document need to be sent to another agency for additional signatures? If yes, / Type of Document Change Order Number of Original 1 3. County Attorney Office County Attorney Office] Documents Attached J ? 4. BCC Office Board of County Commissioners X 5 Minutes and Records Clerk of Court's Office rN to be recorded I 03% PRIMARY CONTACT INFORMATION &+`- Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above mav need to contact staff for additional or missing information. Name of Primary Staff June Lehmann/Transportation Engineering Phone Number 252 -5834 Contact / Department appropriate (Initial) Applicable) Agenda Date Item was September 24, 2013 Agenda Item Number 16.A.1� Approved by the BCC Does the document need to be sent to another agency for additional signatures? If yes, / Type of Document Change Order Number of Original 1 Attached Original document has been signed/initialed for legal sufficiency. (All documents to be Documents Attached PO number or account signed by the Chairman, with the exception of most letters, must be reviewed and signed X number if document is by the Office of the County Attorney. to be recorded All handwritten strike - through and revisions have been initialed by the County Attorney's N/A INSTRUCTIONS & CHECKLIST I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05; Revised 11/30/12 Initial the Yes column or mark "N /A" in the Not Applicable column, whichever is Yes N/A (Not appropriate (Initial) Applicable) 1. Does the document require the chairman's original signature? X 2. Does the document need to be sent to another agency for additional signatures? If yes, X provide the Contact Information (Name; Agency; Address; Phone) on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman, with the exception of most letters, must be reviewed and signed X by the Office of the County Attorney. 4. All handwritten strike - through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the X document or the final negotiated contract date whichever is applicable. 6. "Sign here" tabs are placed on the appropriate pages indicating where the Chairman's X signature and initials are required. 7. In most cases (some contracts are an exception), the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 9/24/13 (enter date) and all changes X made during the meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes, if applicable. 9. Initials of attorney verifying that the attached document is the version approved by the lip BCC, all changes directed by the BCC have been made, and the document is ready for the & C hairman's signature. - I: Forms/ County Forms/ BCC Forms/ Original Documents Routing Slip WWS Original 9.03.04, Revised 1.26.05, Revised 2.24.05; Revised 11/30/12 16A13 MEMORANDUM Date: October 3, 2013 To: June Lehmann, Operations Coordinator Transportation Engineering From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Change Order No. 4 to Contract #12 -5820R with ZEP Construction, Inc. to complete White Boulevard Bridge Replacement Project 66066 Attached for your records is a copy of the document referenced above, (Item #16A13) approved by the Board of County Commissioners on Tuesday, September 24, 2013. The Minutes and Record's Department has held the original copy for the Board's Official Record. If you have any questions, please call me at 252 -8406. Thank you. Attachment CHANGE ORDER NOA- TO:Mr. Rade Vujaklija ZEP Construction, Inc. 7802 Jean Blvd. Ft. Myers FL 33967 DATE: September 10, 2013 RECEIVED 6A13 onia CHANGE ORDER S E P 11 T.E. & C.M. Dept-) CONTRACT NO. 12 -5820R BCC Date: 9/11/12 Agenda Item: 11 B PROJECT NAME: White Blvd Bridle Replacement PROJECT NO.: 66066 Under our AGREEMENT dated September 11, 2013, you are directed to move funds from the ALLOWANCES to various ITEMS to cover over runs (See Attachment A). FOR THE Sum o£ $0 Zero dollars. Original Agreement Amount $1,982,066.74 Sum of Previous Changes $0 This Change Order $0 Present Agreement Amount $1,982,066.74 The time for completion shall be increased by 0 calendar days due to this Change Order. Accordingly, the Contract Time is now 285 calendar dayVour e substantial completion date is July 19, 2013 and the final completion date is August 19, 2013. acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Prepared by:, _ / i� Date: r' Kevin Dugan, ct M er Transportation n/.V/, giineering Department Accepted By: G�-- Date: P Rade Vujaklija, Pr ' ct M er ZEP Construction, Inc. Q Approved by: Date: / J%- Steve Ritter, Road Construction Manager Transportation Engineering Department -APPro -ed bv: --- - Date: a Ahmad Direc r Y > Transpo tion Engineering Department Approved Date: C al a, mistrator Approved by: Growth anageme ivisi Date. nda Cummins, r cureme Strategi 16A13 IN WITNESS WHEREOF, the Contractor and the County have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date(s) indicated below. r : Accepted: �x� �l 20 3 ATTE:S d' OWtGeoi BOA TY O MISSIONERS t E. Brai cie COL �[N Y, DA .; e5� �S.'�O��YaItIYk1Ci� By A. iller, Esq., Chairwoman ,�i�rtatuCe onFy:��` Approved as to form and Legal'sertc . ,9ssief&rrrCounty Attorney %µ� 2 Accelerated Bridge Construction, Project #66066 Change Order #4 Description Part I Roadwa Items 16�i3 Transfer $125,000.00 from Bridge Items Allowance to Roadway Items Allowance to cover overruns Delete From Existing Pay Items CC- 950 — BRG — Bridge Items Allowance 1 LS @ $150,000.00 = ( +) $125,000.00 Revised Allowance $150,000.00 $(125,000.00) = $25,000.00 Balance to date $25,000.00 Add to Existing Pa. Items CC- 950 -RDW — Roadway Items Allowance 1 LS @ $27,468.00 = + $125,000.00 Revised Allowance $27,468.00 + $125,000.00 = $152,468.00 f'/ Balance to date $152,468.00 TOTAL = $0.00 Part II Bridge Items Transfer $21,326.00 from Bridge Items Allowance to Items 400 -2 -4, 455 -34.3 and 530 -1, to cover overruns 16A13 Delete From Existing _Pay Items CC- 950 — BRG — Bridge Items Allowance 1 LS @ $25,000.00 = ( +) $21,326.00 Revised Allowance $25,000.00 $(21,326.00) = $3,674.00 Balance to date $3,674.00 Add to Existing Pay Items 400 -2 -4 — Concrete Class II, Superstructure Sidewalk = + $9,360.00 Original Quantity: 50 CY Increase Quantity by: 12 CY x $780.00 Revised Quantity: 62 CY Increase Existing Pay Item 400 -2 -4: $39,000.00 + $9,360.00 = Revised Contract Amount: $48,360.00 455 -34 -3 — Prestressed Concrete Piling = + $11,880.00 Original Quantity: 2240 LF Increase Quantity by: 132 LF x $90.00 Revised Quantity: 2372 LF Increase Existing Pay Item 455 -34 -3: $201,600.00 + $11,880.00 = Revised Contract Amount: $213,480.00 530 -1 — Riprap — Sand — Cement = + $86.00 Original Quantity: 60 CY Increase Quantity by: .20 CY x $430.00 Revised Quantity: 60.20 CY ✓ �/ Increase Existing Pay Item 530 -1: $25,800.00 + $86.00 = Revised Contract Amount: $25,886.00 Subtotal Bridge Items: j� = + $21,326.00 TOTAL = $0.00 Roadwa. Items 16A13 Transfer $84,492.92 from Roadway Items Allowance to Items 104 -11, 110 -7 -1, 334 -1 -13, 337 -7- 32, 350 -1 -1, 520 -2 -41, 522 -2, 530 -3 -4 and 530 -78 , to cover overruns Delete From Existing Pay Items CC- 950 — RDW — Roadway Items Allowance 1 LS @ $152,468.00 = ( +) $90,476.18 Revised Allowance $152,468.00 $(84,492.92) _ $61,991.82 Balance to date $61,991.82 Add to Existing Pa. Items 104 -11 — Floating Turbidity Barriers = + $594.50 Original Quantity: 518 LF Increase Quantity by: 82 LF x $7.25 `! / Revised Quantity: 600 LF V Increase Existing Pay Item 104 -11: $3,755.50 + $594.50 = Revised Contract Amount: $4.350.00 110 -7 -1 — Mail Box. F &I Single = + $186.62 Original Quantity: 6 EA Increase Quantity by: 1 EA x 186.62 Revised Quantity: 7 EA Increase Existing Pay Item 110 -7 -1: $1,119.72 + $186.62 = Revised Contract Amount: $1,306.34 334 -1 -13 — Super Pave Asphalt = + $43,337.64 Original Quantity: 341 TN Increase Quantity by: 353.2 TN x $122.70 / Revised Quantity: 694.2 TN r/ Increase Existing Pay Item 334 -1 -13: $41,840.70 + $43,337.64 = Revised Contract Amount: $85,178.34 337 -7 -32 — Friction Course Asphalt Original Quantity: 114 TN _ + $5,353.39 Increase Quantity by: 31 TN x $172.69 Revised Quantity: 145 TN V Increase Existing Pay Item 337 -7 -13: $19,686.66 + $5,353.39 = Revised Contract Amount: $25,040.05 3 50-1 -1 — Cement Concrete Pavement 16A13 _ + $6,645.12 Original Quantity: 344 SY Increase Quantity by: 159.7 SY x $41.61 Revised Quantity: 503.7 SY Increase Existing Pay Item 350 -1 -1: $14,313.84 + $6,645.12 = V/ Revised Contract Amount: $20,958.96 520 -2 -41 — Drop Curb = + $12.50 Original Quantity: 64 LF / Increase Quantity by: 1 LF x $12.50 Revised Quantity: 65 LF Increase Existing Pay Item 520 -2 -41: $800.00 + $12.50 = Revised Contract Amount: $812.50 522 -2 — Concrete Sidewalk = + $5,983.26 Original Quantity: 301 SY Increase Quantity by: 129.62 x $46.16 Revised Quantity: 430.62 Increase Existing Pay Item 522 -2: $13,894.16 + $5,983.26 = Revised Contract Amount: $19,877.42 530 -3 -4 — Rip -Rap Rubble / _ + $25,808.56 Original Quantity: 293 TN Increase Quantity by: 468.65 TN x $55.07 Revised Quantity: 761.65 TN Increase Existing Pay Item 530 -3 -4: $16,135.51 + $25,808.56 = Revised Contract Amount: $41,944.07 530 -78 — Rip -Rap Articulating Block Original Quantity: 281 SY Increase Quantity by: 20.7 SY x $123.41 Revised Quantity: 301.7 SY _ + $2,554.59 16A13 Increase Existing Pay Item 530 -78: $34,678.21 + $2,554.59 = Revised Contract Amount: $37.232.80 Subtotal Roadway Items: = + $90,476.18 TOTAL ROADWAY = $0.00 Signing and Pavement Markinsz Items Transfer $284.02 from Signing & Pavement Marking Items Allowance to Items 706 -3, 711 -11- I I I and 711 -11 -211 , to cover overruns Delete From Existing Pa. Items CC- 950 — SPM — Signing & Pavement Items Allowance 1 LS @ $612.00 = ( +) $284.02 Revised Allowance $612.00 $(284.02) = $327.98 Balance to date V $327.98 Add to Existing _Pay Items 706 -3 — Retro Reflective Pavement Markings Original Quantity: 44 EA Increase Quantity by: 4 EA x $5.68 Revised Quantity: 48 EA Increase Existing Pay Item 706 -3: $249.92 + $22.72 — Revised Contract Amount: $272.64 711 -11 -111 — Thermoplastic Pavement Markings (White) Original Quantity: 0.32 NM Increase Quantity by: 0.02 NM x $5,226.07 Revised Quantity: 0.34 NM x $5,226.07 Increase Existing Pay Item 711 -11 -111: $1,672.34 + $104.52 = Revised Contract Amount: $1.776.86 = + $22.72 = + $104.52 16A13 711 -11 -211 — Thermoplastic Pavement Markings (Yellow) _ + $156.78 Original Quantity: 0.32 NM Increase Quantity by: 0.03 NM x $5,226.07 Revised Quantity: 0.35 NM Increase Existing Pay Item 711 -11 -211: $1,672.34 + $156.78 = Revised Contract Amount: $1.829.12 Subtotal Roadway Items: _ + $284.02 TOTAL SIGNING & PAVEMENT = $0.00 Net amount of Notification #4 = $0.00 Cotner County Adm nisItaiive dices Division Purchasing ® Contract Change Request 16A13 Purchasing Department Change Modification Form ❑ Work Order Modification Contract #: 12- Change#: 4 PO/Work Order #: Project Name: White Blvd Bridge 5820R $ 1,982,066.74 4500139885 Replacement Project #: 66066 Project Manager: Kevin Department: Transportation Contractor /Firm Name: ZEP Dollar Amount of this Change Dugan Construction M mt Construction Original Contract/Work Order Amount $ 1,982,066.74 9/11//12 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 1,982,066.74 N/A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 1,982,066.74 submitting for approval (this box must be initialed by Project Manager) SAP Contract Expiration Date (Master) Dollar Amount of this Change $0.00 ® Other (specify): Balance 0.00% Total Change from Original Amount Revised Contract/Work Order Total $1,982,066.74 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): Several items were 0.00% Change from Current BCC Approved Amount Cumulative Changes $0.00 3. Provide explanation why change was not anticipated in original scope of work: The overruns arose due to 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Original completion date: July 5, Last approved completion date: Revised completion date (includes this 2013 August 19, 2013 change): August 19, 2013 Number of days added: 45 Each step on the contract modification checklist form has been reviewed prior to me Purchasing Professional Participated in Negotiation of Change / Modification: ❑ Yes ❑ No submitting for approval (this box must be initialed by Project Manager) Add new task(s) ❑ Change task(s) Delete task(s) ® Other (specify): Balance Overruns 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): Several items were overrun in Road items. Funds need to be transferred from the Bridge Allowance to cover the overruns in Road items. 2. Provide detailed rationale for the requested change: A change order is required to move funds between separate allowance items within the same contract to properly reflect final quantities of items used in the construction project. An overall savings of $102,726.27 was achieved from the original contract amount for the project. 3. Provide explanation why change was not anticipated in original scope of work: The overruns arose due to conditions encountered in the field. 4. Describe the impact if this change is not processed: The contractor will not receive compensation for work that was necessary to complete the project. Type of Change / Modification 1. Planned / Elective ® 2. Unforeseen conditions /circumstance I ❑ 3. Quantity or price adjustment 4. Correction of errors ❑ 5. Value added I ❑ 6. Schedule adjustment Change Requested By ❑ Contractor /Consultant ® Owner I ❑ Using Department ❑ Design Professional ❑ Regulatory Agency (specify): ❑ Other(specify): Purchasing Professional Participated in Negotiation of Change / Modification: ❑ Yes ❑ No Revised: 7/27/11 1 . V ./ U 3 Revised: 7/27/11