Loading...
Backup Documents 09/10/2013 Item #16A48 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIf 4 8 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO V THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. Purchasing �y Rhonda Cummings `'l 2. 3. County Attorney Office County Attorney Office 9h 3)/3 4. BCC Office Board of County k>� \�� Commissioners �� cAVCA\- 5. Minutes and Records Clerk of Court's Office -/ 5 5 l PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event ne of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Marlene Messam/Trans ortation Phone Number 252-5773 Contact/ Department Engineering Agenda Date Item was September 10,2013 Agenda Item Number 16.A.48(11 G) Approved by the BCC Type of Document Change Order Number of Original l Attached Documents Attached PO number or account —PO1#45 134104—laer.r 134104—¶ i) nr1 . q`ic4t number if document is Ivo+ c•e—c-e , 171A to be recorded "`-� INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature? 2. Does the document need to be sent to another agency for additional signatures? If yes, 'I provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed J by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 9/10/13 and all changes made during the Ai _ meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes,if applicable. 9. Initials of attorney verifying that the attached document is the version approved by the BCC,all changes directed by the BCC have been made,and the document is ready for e JI�� Chairman's signature. 124 I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 6 A4 8 MEMORANDUM Date: September 18, 2013 To: Marlene Messam, Sr. Project Manager Trans/ECM From: Martha Vergara, Deputy Clerk Minutes & Records Department Re: Change Order #1 — Contract #11-5639 T.Y.Lin International Attached please find one (1) copy of the original change order as only one original was sent to our department (Agenda Item #4-6A48 #11G), as referenced above and approved by the Board of County Commissioners on Tuesday, September 10, 2013. The original is being kept by the Minutes & Records Department as a part of the Board's Official Records. If you should have any questions, please call me at 252-7240. Thank you. Attachment (1) 16M8 8 TYLININTERNATIONAL engineers planners scientists August 14,2013 Marlene Messam Senior Project Manager Collier County Growth Management Division 2885 S. Horseshoe Drive Naples, FL 34104 Re: CR 29 Bridge over Chokoloskee Bay, Collier County Florida Bridge Number 030161 Dear Ms. Messam: Based on input received at the February Public Information Meeting for the above-named project and subsequent discussions with COUNTY staff,T.Y. Lin International (CONSULTANT) proposes to provide the following additional services in accordance with Contract 11-5639 ARTICLE TWO: 1. Re-align the vertical geometry to increase navigational clearance under the bridge 2. Re-design the structural plans to accommodate changed geometry 3. Revise plans to incorporate vertical walls in lieu of riprap shore protection 4. Revise geotechnical analysis and report for walls and large diameter piles 5. Modify storm surge model 6. Evaluate existing seawalls and design rehabilitation 7. Revise plans to create a paved pull off area in SW quadrant of bridge 8. Revise permit applications and exhibits to incorporate change to impacts 9. Resubmit 60%Plans for County review CONSULTANT proposes to provide the above Additional Services for a Lump Sum fee of $68,500. Please call If you need additional information on this matter. cerely. Jim Molnar,iP.E. An Affirmative Action/Equal Opportunity Employer M/F/D/V 2400 1st Street,Suite 200 I Fort Myers, Florida 33901 I T 239.332.4846 I F 239.332.4798 I www.tylin.com 16A481 • E ORDER ORIGINAL CHANG CHANGE NO. 1 CONTRACT NO. 11-5639 BCC Date: September 13,2011 Agenda Item: 16.A.11 TO: Jim Molnar, P.E., Vice President T.Y. Lin International 2400 First Street, Suite 200 Fort Myers, FL 33901 DATE: August 15, 2013 PROJECT NAME: Design and Related Services for Chokoloskee Bridge Replacement PROJECT NO.: 66066.9 Under our AGREEMENT dated 9/13, 2011 You hereby are authorized and directed to make the following change(s) in accordance with terms and conditions of the Agreement: Attached and dated August 14, 2013 FOR THE (Additive) Sum of: $68,500.00; Sixty-eight thousand, Five hundred Dollars and no cents. Original Agreement Amount $450,000.00 Sum of Previous Changes $0.00 / This Change Order add is $68,500.00 Present Agreement Amount Ir $518,500.00 The time for completion shall be increased by 0 calendar days due to this Change Order. Accordingly, the Contract Time is now 1460 calendar days. The substantial completion date is December 1, 2015 and the final completion date is January 30, 2016. Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. IN WITJNESS WHEREOF,the Contractor and the County have each,respectively,by an authorized person or agerit,,,Iiei inset their hands and seals on the date(s) indicated below. Accepted: Sp em be.r 2013 TT ST: _ �� OWNER: i -3-t.` 0 V ��r•;; BOARD �1F •• TY a OM ISSIONERS 4 Deiht E. Brock; ier COLLIER C• d , :! OR DA 4 k � . , , ' By: Attest as to Chairman's Georg . A. -filler,Esq., Chairwoman signature only. . 1 6 ik4 .r 1 CONTRACTOR: .,/ 1 T.Y.Lin International B /r ra - ,Ii! . _=... / rlene Messa i P.E.,Project Manager By: • . TI C9 w r DEPA'T NT DIRECT R By: �' VA /3 V, J hmad,P ((( Cone •ctor First Witness ?'1 M, Axe L,✓kg-, DIVISIO MINISTRATOR C' T e/print witness name b .2147 'rta By:4Contractor Second Witness " Ni Casal guida DMA/ I)/GG ON PRA MENT .TRA GIST Type/print witness name Irk k // • f2/Ai Br a T onda Cummings ir Approved as to form and Legal ffic'ency: 7 puty Co id Attorney PROCESSED Y' 'CO ft r County Lisa Ta r" A4 8 Purchasing Department Administrative Services Division Change Modification Form Purchasing ® Contract Change Request ❑Work Order Modification Contract#: 11- Change#: 1 PO/Work Order#: 45- Project Name: Design & Related 5639 134104 Services for Chokoloskee Bridge Replacement Project#: 66066.9 Project Manager: Department: Transportation Contractor/Firm Name: T.Y. Lin Marlene Messam Engineering International Original Contract/Work Order Amount $ 450,000.00 9/13/2011 Original BCC Approval Date; A.I.# 16.A.11 Current BCC Approved Amount $ 450,000.00 9/13/2011 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 450,000.00 SAP Contract Expiration Date (Master) Dollar Amount of this Change $68,500.00 15.22% Total Change from Original Amount Revised Contract/Work Order Total $518,500.00 15.22% Change from Current BCC Approved Amount Cumulative Changes $68,500.00 15.22% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Original completion date: January Last approved completion date: Revised completion date (includes thi 30, 2016 January 30, 2016 change): January 30, 2016 Number of days added : 0 Each step on the contract modification checklist form has been reviewed prior to me submitting for approval M.A.M. (this box must be initialed by Project Manager) ❑Add new task(s) ❑ Change task(s) ❑ Delete task(s) ® Other(specify): 60% Phase re-design 1. Provide a detailed and specific explanation of the requested change(s)to the task(s) and/or the additional days added: On May 23, 2013, a public information meeting was held to present the 60%design phase proposed improvements to the residents and stakeholders and to solicit comments.The meeting was conducted by County Staff.Attendees included Commissioner Nance and the design engineers were on hand to provide technical support. The comments received from residents and the Ochopee Fire Department was overwhelmingly in support of more clearance under the bridge to allow boats better navigational access to the bay.The other concerns were for preservation of the recreational aspect to the area including parking and fishing. Some of these aspects would have been lost with the new bridge due to the fact that the new bridge would take up more room than the existing bridge and also the design team was concerned with avoiding and minimizing impacts to the sensitive environment surroundings of the project.With the current conservative design the idea was to minimize costs as much as possible with a utilitarian design. 2. Provide detailed rationale for the requested change: After the meeting,staff requested that the designers investigate the following: a. Alternate profile geometries which could provide a higher navigable clearance. They were also asked to identify potential parking areas; recreational access to the water from either end of the bridge; evaluate the environmental and permit implications of dredging under the bridge as part of the project; and, reevaluate the potential for slope failure during construction due to unstable soils being behind the existing seawalls. b. The designers came up with three alterative profiles that would raise the bridge 2 to 5 feet as well as provide the additional footprint for parking and water access. These items could potentially increase the cost of the project from $500,000.00 to $750,000.00. Staff has made the decision to modify the current design so that the bridge could be raised an additional 3 feet. The justification from an engineering standpoint is that the additional height would satisfy one aspect of the clearance requirements that the current design did not meet. Debris clearance criterion requires that the low member of the bridge be 2' above flood stage. Due to the current utilitarian design this criterion could not be met. From a social standpoint a higher bridge, better parking and water access would provide a benefit to the residents and stakeholders who use the bridge. 3. Provide explanation why change was not anticipated in original scope of work: Revised 5.16.12 In order to provide the most efficient design the design started from a basic premise which was to minimize cost and to preserve as much as possible the natural environment.This is change is a refinement of the design parameters to provide the benefits stated earlier.The effort needed was more than was anticipated when the original contract was negotiated. 1 6 A4 8 4. Describe the impact if this change is not processed: The existing bridge is deficient and needs to be replaced.This is a health and safety concern. Type of Change/Modification ❑ 1. Planned / Elective ❑ 2. Unforeseen ❑ 3. Quantity or price adjustment conditions/circumstance ❑ 4. Correction of error(s) ® 5. Value added ❑ 6. Schedule adjustment Change Requested By ❑ Contractor/Consultant ® Owner ® Using Department ❑ Design Professional ❑ Regulatory Agency (specify): ❑ Other(specify): Purchasing Profes .onal Participated in Negotiation of Change/ Modification: ❑ Yes ❑ No Approved by: / ' Date: 11 8r//520/3 Name and Ti No a -ne Me sam ':-nior Project Manager Reviewed by$' � 141410 Date: Procuremen/ L.tegist's e: Rhonda Cum'. Revised 5.16.12