Agenda 07/27/2010 Item #16D11Agenda Item No. 16D11
July 27, 2010
Page 1 of 11
EXECUTIVE SUMMARY
Recommendation that the Board terminate the contract with White General
Constructors Inc., Bid #08 -5114, for Naples Station Museum Phase III
Restoration.
OBJECTIVE: To ensure the Naples Depot is restored in a timely manner as
specified in the contract and suitable for operation as a branch of the Collier
County Museum.
CONSIDERATIONS:
1. The Board of County Commissioners awarded contract #08 -5114, Naples
Station Museum Phase III, to White General Constructors, Inc. on May 6, 2009
with a final completion date of January 26, 2010. The completion date of the
contract has been extended to April 30, 2010.
2. During the course of the project several problems began to arise with White
Construction: 1) poor workmanship; 2) incomplete paperwork submissions; 3)
lack of supervision; 4) failure to remain on schedule; 5) failure to protect Museum
property: and 6) noncompliance with contract specifications.
3. On May 13, 2010, the Collier County Purchasing staff convened a meeting
with Museum staff, BSSW Architects, and White General Constructors to discuss
all the issues concerning the project. As a result of the meeting, Mr. White was
to provide County staff with a plan and time schedule to correct all the
deficiencies. Mr. White sent County staff an e-mail on May 19th requesting until
June 15 to complete the project at the Naples Depot, followed by an e-mail on
June 1st requesting an additional 5 days due to the extensive work required to
repair the outside doors. This equates to a project completion date of June 20,
2010.
4. On June 2 "d the Collier County Purchasing Department sent Mr. White a cure
notice via e-mail informing him that his firm has failed to: 1) provide an updated
schedule with the project's critical path, 2) provide a Release and Affidavit
certifying that all subcontractors and suppliers have been paid, and 3) submit the
required specifications for the substitute materials used during the project and
the reasons why these are equivalent to those specified on the plans. Mr. White
was to remedy those failures by close of business on Thursday, June 10, 2010.
5. On June 9th, in response to the cure notice, Mr. White sent Museum staff an
e -mail with a revised project schedule attached. According to that schedule, Mr.
White was to have a walk- through of the completed project on June 18th. The
schedule submitted on June 9th indicated that White Construction would prepare
the wood floor for refinishing on June 7, 2010. Mr. White didn't start preparing
Agenda Item No. 16D11
July 27, 2010
Page 2 of 11
- the floor until the week of June 21 and was still preparing the floor the week of
June 28th. He was already behind on the day he provided Museum staff the
revised schedule. On June 30th, the day Museum staff issued a Stop Work Order
to Mr. White, Museum staff had still not received another revised schedule.
6. Mr. White's June 9th e-mail also stated that, "The waiver will be signed and
notarized and hand delivered to Gary V. today." As of July 8, 2010 Museum staff
had not received the waiver. The waiver is a notarized document affirming that
all suppliers and subcontractors have been paid.
7. As of July 8, 2010, Mr. White has failed to provide the specifications and shop
drawings required by the contract and demanded in the Cure Notice of June 2 "d
8. Additionally, when Museum staff issued Mr. White the stop work order on
June 30th the outside doors that were supposed to be repaired were still coming
apart. The construction and installation of the outside doors remains
unacceptable. The wooden floor that was installed in the Northern portion of the
building has scratches, gouges, and circular swirl marks from the sanding
machine. The preparation of the wooden floor also remains unacceptable.
9. Additionally, Mr. White failed to protect the original 1927 terrazzo floor on
which White Construction or its subcontractor spilled dark wood stain. Several
attempts have been made to remove the stain, which still remains.
FISCAL IMPACT: There is currently $20,562.00 remaining on the White
Construction contract and, per the contract, the County is withholding 10 percent
of processed payments totaling $59,285.00 for a total available amount of
$79,847.00
GROWTH MANAGEMENT IMPACT: There is no growth management impact
associated with this Executive Summary.
LEGAL CONSIDERATIONS This Executive Summary has been reviewed for
legal sufficiency and is legally sufficient for Board action. (STW)
RECOMMENDATION: That the Board of County Commissioners terminate the
current contract with White General Constructors, Inc., authorize staff to retain
the total available amount remaining of $79,847.00, and direct staff to complete
the renovations at the Naples Depot using the available $79,847.00 and the bond
posted by White General Constructors, Inc.
Prepared by: Gary Vincent
Item Number:
Item Summary:
Meeting Date:
Agenda Item No. 16D11
July 27, 2010
Page 3 of 11
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
16D11
Recommendation that the Board terminate the contract with White General Constructors Inc.,
Bid #08 -5114, for Naples Station Museum Phase III Restoration.
7/27/2010 9:00:00 AM
Prepared By
Gary A. Vincent Manager - Museum Date
Public Services Division Museum 7/14/2010 4:20:42 PM
Approved By
Gary A. Vincent Manager - Museum Date
Public Services Division Museum 7/8/2010 4:55 PM
Approved By
Ron Jamro
Director - Museum
Date
Public Services Division
Museum
7/14/2010 4:22 PM
Approved By
Lyn Wood
Contracts Specialist
Date
Administrative Services
Division
Purchasing & General Services
7/1512010 1:50 PM
Approved By
Scott Johnson
Purchasing Agent
Date
Administrative Services
Division
Purchasing & General Services
7/15/2010 2:56 PM
Approved By
Kelsey Ward
Manager - Contracts Administration
Date
Administrative Services
Division
Purchasing & General Services
7/15/2010 3:49 PM
Approved By
Marla Ramsey
Administrator - Public Services
Date
Public Services Division
Public Services Division
7/1512010 4:32 PM
Approved By
Steven Williams
Assistant County Attorney
Date
County Attorney
County Attorney
711512010 4:48 PM
-- Approved By
Steve Carnell
Director - Purchasing /General Services
Date
Administrative Services
Division
Purchasing & General Services
Agenda Item No. 16D11
July 27, 2010
Page 4 of 11
7/1512010 4:53 PM
Approved By
OMB Coordinator
Date
County Manager's Office
Office of Management & Budget
7/16/2010 8:21 AM
Approved By
Jeff Klatzkow
County Attorney
Date
7116/2010 2:48 PM
Approved By
Susan Usher
Management /Budget Analyst, Senior
Date
Office of Management &
Budget
Office of Management &Budget
712012010 10:34 AM
Approved By
Leo E. Ochs, Jr.
County Manager
Date
County Managers Office
County Managers Office
7/2012010 11:07 AM
Agenda Item No. 16D11
July 27, 2010
Page 5 of 11
ca ,� {city
AdnitistE" SeNicets Division
Purrhasing
June 1, 2010
Mr. Phillip White
White General Constructors, Inc.
4680 -7'h Avenue South West
Naples, FL 34119 VIA Email
RE: Contract # 08 -5114 "Naples Station Museum —Phase III"
Dear Mr. White:
It has come to my attention that your firm has failed to provide:
1. An updated schedule with the project's critical path,
2. Release and affidavit certifying that all subs and suppliers have been paid, and
3. The required specifications for the substitute materials used during the project and
the reasons why these are equivalent to those specified on the plans.
Your firm is in breach of contract, Exhibit H, General Terms and Conditions:
Section 3: Schedule
3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly
updates to the Progress Schedule shall be subject to the Project Manager's review and
approval. Contractor shall submit the updates to the Progress Schedule with its monthly
Applications for Payment noted below. The Project Manager's review and approval of
the submitted Progress Schedule updates shall be a condition precedent to the Owner's
obligation to pay Contractor.
Section 4: Progress Payments
4.7 Each Application for Payment, subsequent to the first pay application, shall be
accompanied by a Release and Affidavit, in the form attached as Exhibit C, showing that
all materials, labor, equipment and other bills associated with that portion of the Work
payment is being requested on have been paid in full. For all payments subsequent to
the first payment, the Owner shall not be required to make payment until and unless
these affidavits are furnished by Contractor.
Section 7: Submittals and Substitutions
7.3 if Contractor wishes to furnish or use a substitute item of material or equipment,
Contractor shall make application to the Project Manager for acceptance thereof,
certifying that the proposed substitute shall adequately perform the functions and
achieve the results called for by the general design, be similar and of equal substance to
that specified and be suited to the same use as that specified. The application shall
state that the evaluation and acceptance of the proposed substitute will not prejudice
Contractor's achievement of substantial completion on time, whether or not acceptance
of the substitute for use in the Work will require a change in any of the Contract
Documents (or in the provisions of any other direct contract with Owner for the Project)
_. to adapt the design to the proposed substitute and whether or not incorporation or use
Puafiasng Depa lrTwil • 3301 Tamiarni Trail East • Naples, Fonda 34112 • vm".mllu,Kgov.net'purthasing
Agenda Item No. 16D11
July 27, 2010
Page 6 of 11
Page Two
Mr. Phillip White
June 1, 2010
by the substitute in connection with the Work is subject to payment of any license fee or
royalty. All variations of the proposed substitute from that specified will be identified in
the application and available maintenance, repair and replacement service shall be
indicated. The application also shall contain an itemized estimate of all costs that will
result directly or indirectly from acceptance of such substitute, including costs for
redesign and claims of other contractors affected by the resulting change, all of which
shall be considered by the Project Manager in evaluating the proposed substitute. The
Project Manager may require Contractor to furnish at Contractor's expense additional
data about the proposed substitute.
7.5. The Project Manager shall be allowed a reasonable time within which to evaluate
each proposed substitute and, if need be, to consult with the Design Professional. No
substitute will be ordered, installed or utilized without the Project Manager's prior written
acceptance which shall be evidenced by either a Change Order, a Work Directive
Change, a Field Order or an approved Shop Drawing. The Owner may require
Contractor to furnish at Contractor's expense a special performance guarantee or other
surety with respect to any substitute. The Project Manager will record time required by
the Project Manager and the Project Manager's consultants in evaluating substitutions
proposed by Contractor and making changes in the Contract Documents occasioned
thereby. Whether or not the Owner accepts a proposed substitute, Contractor shall
reimburse Owner for the charges of the Design Professional and the Design
Professional's consultants for evaluating each proposed substitute.
Further, your firm is in breach of contract for failing to get the written order to proceed with
the changes to the work as cited below:
10. Changes in the Work
10.1. Owner shall have the right at any time during the progress of the Work to
increase or decrease the Work. Promptly after being notified of a change, Contractor
shall submit an itemized estimate of any cost or time increases or savings it foresees as
a result of the change. Except in an emergency endangering life or property, or as
expressly set forth herein, no addition or changes to the Work shall be made except
upon written order of Owner, and Owner shall not be liable to the Contractor for any
increased compensation without such written order. No officer, employee or agent of
Owner is authorized to direct any extra or changed work orally. Any alleged changes
must be approved by Owner in writing prior to starting such items Owner will not be
responsible for the costs of any changes commenced without Owner's express prior
written approval. Failure to obtain such prior written approval for any changes will be
deemed (i) a waiver of any claim by Contractor for such items and (ii) an admission by
Contractor that such items are in fact not a change but rather are part of the Work
required of Contractor hereunder.
In addition to that, since your firm has failed to achieve Substantial Completion by March
31, 2010, as specified in Change Order #4, the County is entitled to assess liquidated
damages for each calendar day until Substantial Completion is achieved.
Agenda Item No. 16D11
July 27, 2010
Page 7 of 11
Page Three
Mr. Phillip White
June 1, 2010
Construction Agreement - Section S. Contract Time and Liquidated Damages.
Section B. Should Contractor fail to achieve Substation Completion within the number of
calendar days established herein, Owner shall be entitled to assess, as liquidated
damages, but not as a penalty, two hundred dollars and forty cents ($200.40) for each
calendar day thereafter until Substantial Completion is achieved.
As partial remedy, please provide the documents specified in the first three (3) items above
by close of business Thursday, June 10, 2010. If I do not receive the documents by that
date, the County has the following remedy pursuant to Section 18.2, Termination for Default:
The County may terminate Contractor's right to proceed under the Agreement, in whole
or in part, and take possession of all or any portion of the Work and any materials, tools,
equipment, and appliances of Contractor, take assignments of any of Contractors
subcontracts and purchase orders, and complete all or any portion of Contractor's Work
by whatever means, method or agency which Owner, in its sole discretion, may choose.
If you have any questions, I can be reached at 239 - 252 -8375 or dianadeleon0collieroov. net
- Sincerely,
Diana De Leon
Contract Technician
C: Gary Vincent, Project Manager, Museum
EXHIBIT C
RELEASE AND AFFIDAVIT FORM
COUNTY OF COLLIER )
STATE OF FLORIDA )
Agenda Item No. 16D11
July 27. 2010
Page 8 of 11
Before me, the undersigned authority, personally appeared Phillip B- White of White General Constructors Inc who
after being duly sworn, deposes and says:
(1) In accordance with the Contract Documents and in consideration of $ 17 550.00 paid, White General
Constructors. Inc. ( "Contractor") releases and waives for itself and it's subcontractors, material -men, successors and
assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County
Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor
and Owner dated May 6. 2009 , 2008 for the period from March 1 2010 to April 1. 2010 excluding all
retainage withheld and any pending claims or disputes as expressly specified as follows:
None
(2) Contractor certifies for itself and its subcontractors, material -men. successors and assigns, that all charges for
labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a
demand against any payment bond might be filed, have been fully satisfied and paid.
(3) To the maximum extent permitted by law, Contractor agrees to indemnify, defend and save harmless Owner from
all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the
performance by Contractor of the Work covered by this Release and Affidavit.
(4) This Release and Affidavit is given in connection with Contractor's [monthly /final] Application for Payment No.
10
CONTRACTOR
White General Constructors, Inc.
BY: Phillip B White
ITS: President
DATE: April 15. 2010
Witnesses
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me this _ day of 2010, by
, as of
corporation, on behalf of the corporation. He /she is personally known to me or has produced
as identification and did (did not) take an oath.
My Commission Expires:
(AFFIX OFFICIAL SEAL)
♦RFi 4
GC- CA -0 -1
(Signature of Notary)
(Legibly Printed)
Notary Public, State of
Commissioner No.:
Agenda Item No. 16D11
July 27, 2010
Page 9 of 11
From: WHITE GENERAL CONSTRUCTOR [mailto:whitegc @embargmail.com]
Sent: Wednesday, June 09, 2010 11:38 AM
To: DeLeonDiana
Cc: VincentGary
Subject: naples train depot
Attached is a revised schedule through the projected end of the job. The waiver will be signed
and notorized and hand delivered to Gary V. today.
Phill White
Under Florida Law, e-mail addresses are public records. If you do not want your e -mail address released in response to a public records
request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing.
Agenda Item No. 16D11
July 27, 2010
Page 10 of 11
ill l E (T,%EralAOvI,l;rl °rol ;s.ln!.
SEQUENCE OF WORK FOR NAPLES TRAIN DEPOT RESTORATION
FOR THE WEEKS OF MAY 1 THROUGH JUNE 18 2010
May 1-6: No work due to meetings to determine status of change orders and punch list
completion and acceptance.
May 6: Site visit with Diana DeLeon and Gary Vincent of Collier County, Dan Sommers of
BSSW Architects.
May 7: Work commences on verbal and written punch list items.
May 10 - 15: Varied work on Punch List items. Included is the demand of Dan Sommers to
remove all false door panel from their frames and create a air space all around to permit
doors to breath.
May 17 -21: Varied work on door panels and other punch list items.
May 23- 31 Varied work on punch list items interior and exterior. Reinstalled door panels
due to lack of Architects direction. All panels have 1 /8- 1/4" gaping around for expansion,
contraction and breathing. Phase 11 construction documents show a different condition than
Phase III documents which was noted in writing. All false door panels have been reinstalled
per Phase III construction documents per .Architects direction.
June 1 -4 Continue to complete Architect's and Owner's punch list items primarily exterior
and interior painting and staining.
June 5: Prep and install plaster patch at one door opening. Will prime and await Owner's
inspection to accept or reject new patch texture.
June 6: install Owner's desired flake texture on sealed concrete floor in Phase II area. Will
await Owner's acceptance, rejection or remediation before final clear coat sealing.
June 7: Preparation of wood floor to be refinished.
June 8 -I5: Floor refinishing, completion of plaster patching around doors, exterior
repainting issues including false door panel repainting and plaster patch repainting.
Iliml Ih ite. Sou1611ml - aldrs. Florida :)1111 - ;'boor: -':dl :;III -21 Ili l ar. 1 -2249
Agenda Item No. 16D11
July 27. 2010
Page 11 of 11
June 16-17: Repair of the toilet partitions and final clean.
June 18: Walk through with County and architects representatives.