Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 07/27/2010 Item #16A21
Agenda Item No. 16A21 July 27, 2010 Page 1 of 120 EXECUTIVE SUMMARY Recommendation to provide after the fact approval for the submittal of a State of Good Repair (SGR) Bus and Bus Facilities grant application, for the amount of $10.4 million, to the Federal Transit Administration (FTA) for the Collier Area Transit (CAT) Intermodal Transfer Station at the Collier County Government Center. OBJECTIVE: To receive after - the -fact approval from the Board of County Commissioners to submit a State of Good Repair (SGR) Bus and Bus Facilities grant application to the Federal Transit Administration (FTA) to fund the Collier Area Transit (CAT) Intermodal Transfer Station at the Collier County Government Center. CONSIDERATIONS: The FTA Section 5309 Bus and Bus Facilities grant program makes funds available to public transit providers to finance capital projects to replace, rehabilitate, and purchase buses and related equipment and to construct/rehabilitate bus - related facilities. The initiative will be funded with up to $775 million in unallocated Fiscal Year (FY) 2010 discretionary Bus and Bus Facility program funds authorized by 49 USC 5309 (b) of the Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA -LU). There is no floor or upper limit for any single grant under this program; however FTA intends to fund as many meritorious projects as possible. This grant program was announced in the Federal Register on May 4, 2010 and all applications must be submitted by June 18, 2010. Selected projects will be announced in September 2010. FTA will assess the extent to which a project addresses the following criteria: • Consistency with planning and prioritization at the local /regional level • The project is ready to implement • Technical, legal, and financial capacity to implement the particular project proposed In addition, for bus projects and facilities, the following criteria will apply: • The age of the asset to be rehabilitated or replaced relative to its useful life. • The degree to which proposed project addresses a demonstrated and verifiable backlog of deferred maintenance. • Supports emerging or advanced technologies for transit facilities and equipment. • For facilities, evidence of proposed project compliance with "Green Building" certification. Due to the short turnaround time, it was necessary to obtain County Manager approval to submit the application and obtain "after- the - fact" approval from the Board of County Commissioners. Collier County CMA #5330 authorizes the County Manager to approve the submittal of grant applications with subsequent Board of County Commissioners action at the next available Board meeting to ratify the approval as "after- the - fact." Collier Area Transit (CAT) currently has a temporary transit transfer facility located adjacent to the Collier County Government Center main campus facility. The current facility consists of tents, portable toilets, and bike racks. These amenities are not conducive for Florida's inclement weather conditions. Under a $2.6 million Intermodal Hub Capacity State Appropriation ($1.3 million state funding, $1.3 million local match from right of way acquisition and in kind services), CAT began the design phase of a scalable permanent intermodal transfer station. Agenda Item No. 16A21 July 27. 2010 Page 2 of 120 The Alternative Transportation Modes (ATM) Department, of the Growth Management Division, has prepared a proposal to submit to the FTA for funding. The federal grant amount requested is $10.4 million (80% of the $13.0 million project). The current matching share of the total project budget is $2.6 million. The grant proposal for the transfer facility requests funding to achieve the following goals: • To replace the temporary facility with a new Transit Intermodal Transfer Station offering first rate passenger amenities with appropriate and durable quality features and finishes; • To meet Leadership in Energy and Environmental Design (LEED) Certification requirements; • To implement a rooftop garage Photovoltaic System, with net metering to attain a "zero" energy use for the Intenmodal Transit Station and parking garage; • To replace four existing diesel buses with new electric buses; and • To offer solar automobiles electric charging stations in the adjacent parking garage to encourage hybrid and electric vehicle use. The anticipated budget is as follows: Base Project (No FTA Funds) Bare Minimum Facility Infill at Parking Garage $2.1 million Add Alternate 1 Upgrade Facility Including Platform Canopy, high - quality ITS System and platform amenities, exterior and interior upgraded durable finishes, Courthouse Annex Garage /Transfer Station icon $2.9 million Add Alternate 2 Photovoltaic Solar Panels on Courthouse Annex Garage Roof and Charging Stations $6.0 million Add Alternate 3 Replace Four Existing Diesel Buses with New Electric Buses $2.0 million Total $13.0 million One of CAT's goals /initiatives is to build projects that are environmentally friendly, sustainable and to reduce the carbon footprint created by gas and diesel fueled vehicles. With limited local funding, the design phase addresses the beginning of a permanent bus transfer facility, but further funding is needed to pursue enhancements to the permanent intermodal transfer station and to include green initiatives. FISCAL IMPACT: The total cost of the Collier Area Transit Intenmodal Transfer Station project is $13,000,000. As this is a 80/20 matching grant, if awarded, the grant will fund $10,400,000, leaving Collier County to match it with $2,600,000. The match is comprised of two primary sources: 1) $1,300,000 that was awarded as a separate &rant (JPA APF60) from the Florida Department of Transportation (funds are available in Fund 426, Cat Transit Enhancement, Project 33037) and approved by the BCC May 12, 2009, Item 16B7; and 2) $1,300,000 from the value of right of way acquisition and administrative and project management staff time related to the design and construction of the project. Staff has verified with the grantor and with the Florida Department of Transportation that use of the existing JPA APF60 and associated local matching funds described above are eligible to meet the match requirement. 2 Agenda Item No. 16A21 July 27. 2010 Page 3 of 120 The grant has been entered into the Grant Management System (GMS) and the assigned number is TR- 00000071. If awarded, a subsequent item will be brought before the board to accept the grant and authorize the necessary budget amendments. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office and is legally sufficient for Board action —SRT. GROWTH MANAGEMENT IMPACT: The Collier Area Transit Intermodal Transfer Station is consistent with the Transportation element of the Growth Management Plan. RECOMMENDATION: To provide after the fact approval for the submittal of a State of Good Repair Bus and Bus Facilities grant application to the Federal Transit Administration to fund the Collier Area Transit Intermodal Transfer Station located at the Collier County Government Center. PREPARED BY: Brandy Otero, Associate Project Manager Agenda Item No. 16A21 July 27, 2010 Page 4 of 120 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: 16A21 Item Summary: Recommendation to provide after the fact approval for the submittal of a State of Good Repair (SGR) Bus and Bus Facilities grant application, for the amount of $10.4 million, to the Federal Transit Administration (FTA) for the Collier Area Transit (CAT) Intermodal Transfer Station at the Collier County Government Center. (Michelle Arnold, Alternative Transportation Modes Director) Meeting Date: 7/27/2010 9:00:00 AM Prepared By Brandy Otero Operations Analyst Date Transportation Division Transportation Road Maintenance 7/2/2010 8:32:38 AM Approved By Norm E. Feder, AICP Administrator - Transportation Date Transportation Division Transportation Administration 7/2/2010 9:06 AM Approved By Marlene J. Foord Grant Development & Mgmt Coordinator Date Administrative Services Division Administrative Services Division 71212010 11:14 AM Approved By Michelle Edwards Arnold Director - Alt Transportation Modes Date Transportation Division Alternative Transportation Modes 7/212010 11:16 AM Approved By Glama Carter Planner, Principal Date Transportation Division Alternative Transportation Modes 717/2010 8:08 AM Approved By Jeff Klatzkow County Attorney Date 7/8/2010 11:04 AM Approved By Caroline Soto Management /Budget Analyst Date Transportation Division Transportation Administration 7/9/2010 10:56 AM Approved By Scott R. Teach Deputy County Attorney Date County Attorney County Attorney 7112/2010 9:50 AM Approved By Lisa Taylor Management /Budget Analyst Date Agenda Item No. 16A21 July 27, 2010 Page 5 of 120 Transportation Division Transportation Administration 7/1212010 1 :45 PM Approved By Nick Casalanguida Director - Transportation Planning Date Transportation Division Transportation Planning 7/12/2010 4:11 PM Approved By Natali Betancur Administrative Assistant Date Transportation Division Transportation Road Maintenance 7/1312010 9:31 AM Approved By OMB Coordinator Date County Manager's Office Office of Management & Budget 7/1312010 10:21 AM Approved By Therese Stanley Manager- Operations Support - Trans Date Office of Management & Budget Office of Management & Budget 7/14/2010 6:55 PM Approved By Leo E. Ochs, Jr. County Manager Date County Managers Office County Managers Office 7/15/2010 11:04 AM Agenda Item No. 16A21 July 27, 2010 Vo -per county Page 6 of 120 Administrative Services Division Grants Coordination TO: Leo Ochs, County Manager Grant application ewed an Approved by CC: Brandy Otero, Growth Management Con i er �� FROM: Marlene Foor , Grants Coordinator After- the -Fact Approval by the BCC is required at the .IuIv 27. 2010 BCC meeting DATE: June 16, 2010 SUBJECT: County Manager Review and Approval of a 2010 FTA State of Good Repair Bus and Bus Facilities Grant in the amount of $10.400,000.00. A Notice of Funding availability was announced on May 4, 2010 for a 2010 State of Good Repair Bus and Bus Facilities Grant. The total project cost is $13,000,000.00. The total federal share requested is $10,400,000.00. A local match of 20 %, 2,600,000.00 is required by the grant and is comprised of two primary sources: 1) $1.300,000 that was awarded as a separate grant (JPA APF60) from the Florida Department of Transportation and approved by the BCC on May 12, 2009, item 16B7 and 2) $1,300,000 from the value of right of way acquisition and administrative and project management staff time related to the design and construction of the project. Staff has verified with the grantor and with the Florida Department of Transportation that the use of the existing JPA APF60 and associated local matching funds described above is eligible to meet the match requirement. Collier Area Transit (CAT) is pursuing this grant opportunity to expedite the construction process of a permanent bus transfer facility that will achieve the following goals: • Replace the transfer facility with a new Transit Intermodal Transfer Station offering first rate passenger amenities with appropriate and durable quality features and finishes portable facilities with permanent facilities; • Meet LEED Platinum -level certification for the new Transit Intermodal Transfer Station; • Implement a rooftop garage Photovoltaic System, with net metering to attain a "zero" energy use for the Intermodal Transit Station and parking garage; • Replace four existing diesel buses (full), depreciated and in need of replacement) with new electric buses; • Offer solar automobile electric charging stations in the adjacent parking garage to encourage hybrid and electric vehicle use. The grant application deadline is June 18, 2010. Due to the complexity of the grant, and the need to hire a consultant to develop the technical portions of the grant, there was not sufficient time to submit for a BCC meeting prior to the application deadline. Once you have reviewed the proposal, please sign in the box above and call me for pickup at 252 -4768. Thank you and please let me know if you have any questions regarding this request. 3301 East Tamiami Trail • Naples, Florida 34112 • marleoefoordAcol l ierenv. net • (239) 252 -4768 • (239) 252 -8720 (fax) ProPose;d Project: Collier Area Transit Intermodal Transfer Static Submitted to: Submitted by: Department of Transportation - Federal Transit Administration C&Cr County Discretionary Bus and Bus Facilities Program June 18, 2010 ca f.M.. AREA TRANSIT 'lY ✓,vT Passenger low '� Transfer � Y ca f.M.. AREA TRANSIT Passenger low '� Transfer Center Table of Contents Table of Figures ........................ Listing of Tables ........................ Evaluation Criteria Checklist..... Executive Summary .................... Agenda Item No. 16A21 July 27, 2010 Page 8 of 120 .............................................................................. ............................... iv .............................................................................. ............................... iv ............................................................................... ............................... v ....1 ProposalInformation ................................................................................. ..............................2 Proposer's Name and FTA Recipient ID Number ........................................................ ..............................2 ContactInformation ................................................................................................... ..............................2 Services Provided by Collier County Alternative Transportation Modes Department ............................2 CAT and the Department of Alternative Transportation Modes .......................... ............................... 3 CAT's Planning Initiative ............................................................................................. ..............................3 CAT's Technical and Legal Capacity ............................................................................ ..............................3 Problem /Project Scope .............................................................................. ..............................5 Temporary Transit Intermodal Transfer Facility ......................................................... ..............................5 Goals /Objectives of the Project Scope ....................................................................... ..............................5 BusFleet ..................................................................................................................... ..............................6 FTAEvaluation Criteria ............................................................................................... ..............................7 Forbus projects: ................................................................................................................................... 7 The age of the asset to be replaced or rehabilitated by the proposed project, relative to its useful life.......................................................................................................................... ............................... 7 The degree to which the proposed project addresses a demonstrated and verifiable backlog of deferred maintenance ............................................................................................ ..............................7 Consistency with the proposer's bus fleet management plan ............................... ..............................7 Capital and Infrastructure Alternatives .................................................................. ..............................8 Condition and performance of the asset to be replaced by the proposed project, as ascertained through field inspections or otherwise, if available ............................................... ..............................9 Demonstrated positive impact on air quality ....................................................... .............................10 The degree to which the proposed project supports emerging or advanced technologies for transit buses..................................................................................................................... .............................13 The project conforms to FTA's spare ratio guidelines .......................................... .............................13 Line -Item Budget ....................................................................................................... .............................13 Federal Amount Requested ....................................................................................... .............................13 MatchingFunds ......................................................................................................... .............................14 SupportDocumentation ............................................................................................ .............................14 ProjectTime - Line ....................................................................................................... .............................14 Consistencywith Long -Range Plan ............................................................................ .............................14 LocalSupport ............................................................................................................. .............................16 EnvironmentalWork .................................................................................................. .............................17 Readyto Implement .................................................................................................. .............................17 TIP /STIP Amendments ............................................................................................... .............................17 Project Funds and Implementation ........................................................................... .............................18 Technical, Legal, and Financial Capacity .................................................................... .............................18 Bus Fleet Management Plan ...................................................................................... .............................19 Transit /Alternative - Fueled Vehicles ...................................................................... .............................19 EnvironmentalIssues ............................................................................................ .............................19 Page 7 Agenda Item No. 16A21 July 27, 2010 Page 9 of 120 Capital and Infrastructure Alternatives ................................................................. .............................20 BusFleet .................................................................................................................... .............................21 BusFacility ................................................................................................................. .............................21 Proposed Rooftop Photovoltaic Solar Panel Installation ...................................... .............................22 Transit Intermodal Transfer Station Methods and Design .......................... .............................24 BaseProject Narrative ............................................................................................... .............................24 AddAlternative 1 ....................................................................................................... .............................25 AddAlternative 2 ....................................................................................................... .............................28 Proposed Grant - Funded Renewable Energy Systems for LEED Certification ....... .............................29 LEED Certification Without Grant Funds ................................................................... .............................30 SustainableSites .................................................................................................... .............................30 Energyand Atmosphere ........................................................................................ .............................30 Materialsand Resources ....................................................................................... .............................30 IndoorEnvironmental Quality ............................................................................... .............................31 Innovationin Design .............................................................................................. .............................31 LEED Certification with Grant Funds ......................................................................... .............................31 ADDAlternative 3 ...................................................................................................... .............................37 BusFleet ................................................................................................................ .............................37 Proposed Replacement of Four Existing Diesel Buses with New Electric Buses ... .............................37 Collier County's Ongoing Program Management Approach 38 KeyPersonnel ........................................................................................... .............................39 Appendices............................................................................................. ............................... 40 A. Support Letters ......................................................................................... .............................40 B. Conceptual Drawing ................................................................................. .............................46 C. 2009 Transit Development Plan ............................................................... .............................47 Page HI Agenda Item No. 16A21 July 27. 2010 Page 10 of 120 Table of Figures Figure 1: Aerial view of Collier County Government Center, including current and proposed transfer facilitylocations .............................................................................................................. ..............................6 Figure 2: LEED scorecard without the grant (Silver -level certification) ....................... ............................... 33 Figure 3: LEED scorecard without the grant (Silver -level certification) ....................... ............................... 34 Figure 4: LEER scorecard with grant (Platinum -level certification) ............................... .............................35 Passenger Cars ............................................................................................. ............................... Figure 5: LEED scorecard with grant (Platinum -level certification) ............................... .............................36 Comparing Parking Garage Power Use and Air Quality Before and After Photovoltaic Listing of Tables Table1: Buses to Replace .............................................................................................. ..............................7 Table 2: Capital Alternatives Phasing Plan (FY 2011 -2020) ........................................... ..............................9 Table3: Passenger Buses ........................................................................................... ............................... 11 Table4: Passenger Cars ............................................................................................. ............................... 12 Table 5: Comparing Parking Garage Power Use and Air Quality Before and After Photovoltaic PanelInstallation ....................................................................................................... ............................... 22 Table 6: Courthouse Annex Parking Garage Proposed Rooftop PV Panel System .... ............................... 23 Page iv Agenda Item No. 16A21 July 27, 2010 Page 11 of 120 Evaluation Criteria Checklist This checklist is provided to assist the reviewer in identifying where FTA evaluation criteria were addressed within the document. IV. Proposal Submission Information A. Proposal Submission Process Project proposals must be submitted electronically through http:Z/www.grants.gov. Mail and fax submissions will not be accepted except for supplemental information that cannot be sent electronically. B. Proposal Content a. Proposer's name and FTA recipient ID number. 2 b. Contact information for notification of project selection (including contact name, title, address, congressional district, email, fax, and phone number). 2 c. A general description of services provided by the agency including ridership, fleet size, areas served, etc. , d. A description of the agency's technical, legal, and financial capacity to implement the proposed project. Some of this information is included in Standard Form 424 when applying through GRANTS.GOV. , a. Describe concisely, but completely, the project scope to be funded. As FTA may elect to only partially fund some project proposals (see below), the scope should be "scalable" with specific components of independent utility clearly identified. 5, 13 b. Address each of the evaluation criteria separately, demonstrating how the project responds to each criterion. v, 7 c. Provide a line -item budget for the total project, with enough detail to describe the various key components of the project. As FTA may elect to only partially fund some project proposals, the budget should provide for the minimum amount necessary to fund specific project components of independent utility. 13 d. Provide the Federal amount requested. 13 e. Document the matching funds, including amount and source of the match, demonstrating strong local or private sector financial participation in the project. 13,14 f. Provide support documentation, including audited financial statements, bond- ratings, and documents supporting the commitment of non - federal funding to the project, or a timeframe upon which those commitments would be made. 14 g. Provide a project time -line, including significant milestones such as the date anticipated to issue a request for proposals for vehicles, or contract for purchase of vehicle(s), and actual or expected delivery date of vehicles, or notice of request for proposal and notice to proceed for capital construction/ rehabilitation projects. 14,15 V. Proposal Review, Selection, and Notification A. Project Evaluation Criteria Projects will be evaluated by FTA based on the proposals submitted according to the following criteria. Each proposer is encouraged to demonstrate the responsiveness of a project to any and all of the selection criteria with the most relevant information that the proposer can provide, regardless of whether such information has been specifically requested, or identified, in this notice. FTA will assess the extent to which a project addresses the following criteria. Page v Agenda Item No. 16A21 July 27, 2010 Page 12 of 120 romm 11, a. Project is consistent with the transit priorities identified in the long range plan and /or contingency /illustrative projects. Proposer should note if project could not be included in the financially constrained Transportation Improvement Program (TIP) /Statewide Transportation Improvement Program (STIP) due to lack of funding (if selected, project must be in TIP before grant award). 14 b. Local support is demonstrated by availability of local match and letters of support for 16, project. Appendix A C. In an area with more than one transit operator, the proposal demonstrates coordination with, and support of, other transit operators, or other related projects within the proposer's MPO or the geographic region within which the proposed project will operate. 16 a. Any required environmental work has been initiated for construction projects requiring an Environmental Assessment (EA) or Environmental Impact Statement (EIS). 17 b. Project implementation plans are complete, including initial design of facilities projects. 17 c. TIP /STIP can be amended (evidenced by MPO /State endorsement). 17 d. Project funds can be obligated and the project implemented quickly, if selected. 18 a. The proposer has the technical capacity to administer the project. 18 b. There are no outstanding legal, technical, or financial issues with the grantee that would make this a high -risk project to implement quickly. 18 c. Source of local match is identified and is available for prompt project implementation if selected (no deferred local share will be allowed). 18 B. In addition for each project types below the following criteria will apply: a. The age of the asset to be replaced or rehabilitated by the proposed project, relative to its useful life. 7,21 b. The degree to which the proposed project addresses a demonstrated and verifiable backlog of deferred maintenance. 7 c. Consistency with the proposer's bus fleet management plan. 7 d. Condition and performance of the asset to be replaced by the proposed project, as ascertained through field inspections or otherwise, if available. 9 e. Demonstrated positive impact on air quality. 10 f. The degree to which the proposed project supports emerging or advanced technologies for transit buses. 13 g. The project conforms to FTA's spare ratio guidelines. 13 �l e a. The age of the asset to be rehabilitated or replaced relative to its useful life. 24 b. The degree to which proposed project addresses a demonstrated and verifiable backlog of deferred maintenance. 24 c. Supports emerging or advanced technologies for transit facilities and equipment. 13, 21 d. For facilities, evidence of proposed project compliance with "Green Building" -- certification. 29.30 Page A Agenda Item No. 16A21 July 27, 2010 Page 13 of 120 Executive Summary Collier County's significant growth over the last few decades led to the development of Collier Area Transit (CAT), which operates under the supervision of the Department of Alternative Transportation Modes (ATM) for the Collier County Growth Management Division. The mission of CAT is to provide "safe, accessible and courteous public transportation services to our customers." Since CAT's inception in February 2001, ridership has increased to more than 1 million passengers today and is projected to increase to 2.4 million by 2020. CAT serves as the public transit provider for Collier County, serving the Naples, Marco Island, and Immokalee areas 7 days per week (with the exception of major holidays). CAT currently provides a temporary passenger transfer facility located adjacent to the Collier County Museum on the County's Government Center property. This temporary facility includes portable tents and toilets while the County pursues building a permanent, sustainable Transit Intermodal Transfer Station nearby. Given Florida's susceptibility to violent thunderstorms, hurricanes, and sweltering heat, these portable "facilities" provide little protection or relief for passengers and are a very temporary fix in need of a permanent solution. As part of the sustainability effort, CAT is pursuing the Federal Transit Administration (FTA) grant State of Good Repair Bus Initiative to expedite the construction process and provide a permanent, modern transfer facility that will achieve the following goals: • Replace the temporary facility with a new Transit Intermodal Transfer Station offering first - rate passenger amenities with appropriate and durable quality features and finishes. • Meet LEED Platinum -level certification for the new Transit Intermodal Transfer Station. • Implement a rooftop garage Photovoltaic System, with net metering to attain a "zero" energy use for the Intermodal Transit Station and parking garage. • Replace four existing diesel buses (fully depreciated and in need of replacement) with new electric buses. • Offer solar automobile electric charging stations in the adjacent parking garage to encourage hybrid and electric vehicle use. The proposed project will be designed and constructed in a scalable implementation plan as listed below: • Base Project (No FTA Funds). Bare minimum facility infill at parking garage. • Add Alternative 1. Upgrade facility as indicated in Add Alternative 1 including platform canopy, high - quality ITS system and platform amenities, exterior and interior upgraded durable finishes, courthouse annex garage /transfer station icon. • Add Alternative 2. Photovoltaic solar panels on courthouse annex garage roof and charging stations. • Add Alternative 3. Replace four existing diesel buses with new electric buses. The ATM Department for the Collier County Growth Management Division and the Collier County Facilities Management Department will provide oversight and project management following the FTA grant award for this project. As part of the enhanced formal LEED Certification process, LEED Building Commissioning will be employed to verify that proposed upgraded sustainable features meet, or exceed, performance criteria. To view a video of the proposed project, visit: http:ZZwww.pbsibuzz.tv/article/draft/ArticleID/501.asp . The Federal grant amount requested is $10.4 million (80% of the $13 million project). The current matching share of the total project budget is $2.6 million. Page i Agenda Item No. 16A21 July 27, 2010 Page 14 of 120 Proposal Information Proposer's Name and FTA Recipient ID Number Collier County, Florida FTA Recipient ID is 1032 Contact Information Growth Management Division Collier County, Alternative Transportation Modes Department Michelle Arnold, Director 2885 South Horseshoe Drive Naples, Florida 34104 Congressional District: Florida's 14 District, The Honorable Connie Mack Phone: 239.252.8192 FAX: 239.252.3929 rnichellearnold(@colliergov.net Services Provided by Collier County Alternative Transportation Modes Department Once home to the Calusa Indians and then the Seminole Indians, today Collier County, Florida, is a dynamic community that seeks to balance preservation with twenty -first century sophistication and amenities. -- Collier County, created in 1923, was named after a Memphis, Tennessee, millionaire named Barron Gift Collier, who acquired his fortune through streetcar advertising. When Collier arrived, he introduced paved roads, electric power, telegraphs and many new businesses to the community. As a result, more people were attracted to the area. By 1950, the number of residents was 6,488. In 1980 that number grew to 85,000 and according to 2009 U.S. Census Bureau projections that number increased to 318,537, making it one of the fastest growing counties nationwide.' Located on Florida's southwest coast on the Gulf of Mexico, Collier County is home to nearly 50 miles of white -sand beaches. The County occupies nearly 2,000 square miles, making it the largest county in the state. Within the county are a number of nature preserves, state parks, wildlife refuges, and the Everglades National Park. Three incorporated areas in the county are: Naples, Everglades City, and Marco Island, which is a popular tourist destination. Yet, the widespread recession and Florida's high residential foreclosure rate have severely crippled Collier County's economic growth and development plans for the public transportation system. Grant funding opportunities, such as the State of Good Repair Bus Initiative, will make it possible for the County's transportation division to provide a sustainable transit system to the community. ' Source U.S. Census Bureau. State and County QuickFacts. Data derived from Population Estimates, Census of Population and Housing, Small Area Income and Poverty Estimates, State and County Housing Unit Estimates, County Business Patterns, Nonemployer Statistics, Economic Census, Survey of Business Owners Permits, Consolidated Federal Funds Report Last Revised: Thursday, 22- Apr -2010 08:34:34 EDT. http :/guickfacts.censusoov /afd /states /12 /12021 html (accessed May 27, 2010). Page 2 Agenda Item No. 16A21 July 27, 2010 Page 15 of 120 CRT and the Department of Alternative Transportation !,jOdC s The County's continued growth led to the development of the Collier Area Transit (CAT), which operates under the supervision of the Collier County Department of Alternative Transportation Modes (ATM) for the Collier County Growth Management Division. The mission of CAT is to provide "safe, accessible and courteous public transportation services to our customers." Since CAT's inception in February 2001, ridership has increased to more than one million passengers. CAT serves as the public transit provider for Collier County, serving the Naples, Marco Island, and Immokalee areas. The ATM Department has been successful in overseeing programs, such as the Transportation Disadvantaged Program. This program provides service 7 days per week and provides door -to- door transportation service to individuals who are unable to access the fixed -route bus service due to physical or cognitive conditions. Also, it provides service to those who have no other means of transportation available or who are not in a fixed -route service area. This service provides the disadvantaged with access to employment, medical appointments, shopping and leisure activities. CAT's Planning Initiative The ATM Department collaborates with the Collier Metropolitan Planning Organization (MPO) to implement short- and long -range planning of major roadway facilities and evaluate and manage strategic plans and goals under the Collier County Transit Development Plan (TDP). Part of CAT's initiatives /goals is to build projects that are environmentally - friendly, sustainable and help reduce the carbon footprint created by gas- and diesel - fueled vehicles. As part of the sustainability effort, CAT is designing a transfer station to replace the existing temporary facility. If awarded to CAT, this grant will allow for photovoltaic panels that will be able to power the entire transfer facility. The other purpose in pursuing the grant is to replace four existing buses in the fleet that are beyond their useful life with electric buses. CAT has begun transitioning from 100% diesel powered buses to hybrid electric buses that are expected to be received in June 2010 and, with the help of this grant, CAT will replace four existing buses with four electric buses. The use of a new, solar - powered transfer facility will produce enough sustainable energy to not only power the facility, but also to power other buildings at the government center; therefore, it will have enough power to recharge the electric buses and other electric vehicles. In other words, these buses will be "plugged" into the facility's charging station nightly to be re- charged, reducing the need for oil and diesel consumption. This will not only help cut expenses for Collier County, but it will also have a positive impact on the air quality and environment by reducing the carbon footprint and meeting new environmental pollution regulations. CAT's Technical and Legal Capacity Since CAT's inception in 2001, it has been operating with all technical and legal authority of similar Collier County departments. Collier Area Transit operates under the supervision of the County's Alternative Transportation Modes Department and the Growth Management Division. Within the Division are various departments with experienced professionals such as: licensed engineers (including environmental and traffic operations), designers, planners, construction project managers, landscape architects, transit managers, and many others who support CAT. Also, the County Attorney's office has assigned an attorney experienced in transit law, regulations and requirements to assist CAT. Page 3 Agenda Item No. 16A21 July 27, 2010 Page 16 of 120 CAT has extensive knowledge regarding federal, state and local regulations, in addition to the Collier MPO and Public Involvement process. Through audits conducted by the Florida Department of Transportation (FDOT), CAT has successfully managed grants and all compliance issues. FDOT recently audited CAT's Safety System Program Plan and Grants Program Management, and the audits were outstanding with zero findings. FTA recently conducted its first Triennial Review of the CAT system. Of the 24 areas, no deficiencies were found with FTA requirements in 22 areas. However, deficiencies were found in 2 areas: legal and drug -free workplace, both of which were corrected immediately after the site visit. CAT staff has FTA experience handling projects and grants. CAT received over $3 million in American Recovery and Reinvestment Act (ARRA) grant funding and is currently implementing all projects that include renovations to the existing operations facility, ITS, purchase of buses, security enhancements and transit enhancements. CAT has a total of 16 grants currently managed internally with a combined revenue of over $13.3 million for the ATM department of the Growth Management Division. All of these grant requirements, including compliance reports, performance measures, financial reports and audits and many other responsibilities are successfully managed by knowledgeable staff. Page 4 Problem /Project Scope Temporary Transit Intermodal Transfer Facility CAT currently has a temporary transit facility located adjacent to the Collier County Government Center Main campus facility within the County Museum's parking lot (see Figure 1). The facility consists of portable pop -up tents with portable benches, portable toilets and bike racks. These amenities are not conducive for Florida's inclement weather conditions where severe thunderstorms can turn deadly and the heat index can reach well over 100 °F during the summer months. During Florida's "rainy season" (May- August) the parking lot becomes flooded, leaving customers with no other option than to wait in the standing water and, in a torrential downpour, get drenched while waiting for the bus under crowded tents. Goals /Objectives of the Project Scope Dependable, economical, safe, secure, LEED Certified, cost effective and sustainable describe CAT's vision for its new Transit Intermodal Transfer Station (ITS). Agenda Item No. 16A21 July 27, 2010 Page 17 of 120 Under an Intermodal Hub Capacity State Appropriation ($2.6 million local share), CAT began the design phase of a scalable permanent passenger transfer station and intermodal facility at the Collier County Government Center, which is adjacent to U.S. 41 (Tamiami Trail) as shown in Figure 1. With limited local funding, this design phase addresses the beginnings of a permanent bus transfer facility but further funding is needed to implement the construction process quickly. Page 5 Agenda Item No. 16A21 July 27, 2010 Page 18 of 120 Figure 1: Aerial view of Collier County Government Center, including current and proposed transfer facility locations Bus Fleet CAT's initiatives /goals include building projects that are environmentally - friendly, sustainable and reduce the carbon footprint created by gas- and diesel - fueled vehicles. As part of the sustainability effort, CAT is designing a transfer station to replace the existing temporary facility. If awarded, this FTA grant will allow for photovoltaic panels to power the entire transfer facility. The grant will also allow the County to take this idea one step further and expand it by adding four new electric buses. The goal is to eventually replace the fleet in future years and hopefully achieve a 100% electric bus fleet. The proposed Transit Intermodal Transfer Station, with the rooftop photovoltaic electricity supply and along with net metering, will produce enough power to sustain itself and to power other buildings at the government center, as well as having enough power for the electric buses. In theory, the buses will be "plugged" nightly to be re- charged, reducing the need for oil and diesel consumption. The County and the community will benefit in many ways such as saving gas, lowering the dependency on foreign oil, reducing carbon footprint and meeting and exceeding new environmental pollution regulations. With the purchase of four new electric buses, the County will have more reliable buses as spares. This means that four of the buses used for service on a daily basis (see Table 1 "Buses to Replace," page 7) will become spares and four of the older buses will be retired. The life expectancy of these existing 2004 30 -foot, Champion medium -duty transit buses, according to the FTA, is 7 years or 350,000 miles. Page 6 Agenda Item No. 16A21 July 27, 2010 Page 19 of 120 FTA Evaluation Criteria For bus projects, The age of the asset to be replaced or rehabilitated by the proposed project, relative to its useful life. CAT has identified that the following four buses have exceeded their useful life. Using FTA criteria for similar buses of 350,000 miles as the acceptable life for this asset, these buses now have an average mileage of 484,578, which exceeds the target factor by over 38 %. Table 1: Buses to 42925 __2004 FREIGHTLINER 466,287 42926 2004 FREIGHTLINER 481,583 _ 42927 __2004 142928 FREIGHTLINER 532,175 j 2004 FREIGHTLINER 4582687 The degree to which the proposed project addresses a demonstrated and verifiable backlog of deferred maintenance. The four buses identified in Table 1 are continuing to result in deferred maintenance expenses to CAT. Using the FTA's mileage factor (350,000 miles) for similar buses, these four buses have exceeded their useful life and CAT continues to expend maintenance dollars on them, which will result in an ever - increasing operational expense. Consistency with the proposer',,; h;as flees rnana�etner.t pl(n. The proposed project is consistent with the bus fleet component of Collier County's 2009 Transit Development Plan (TDP) [See Appendix C, "2009 Transit Development Plan "]. Transit /Alternative - Fueled Vehicles CAT recently applied for transit stimulus funding from the ARRA. CAT will receive two new hybrid - powered buses through the funding program. The ARRA funds will be used to replace some of the older buses used to operate fixed -route service as well as operate the County's first hybrid buses. ENVIRONMENTAL ISSUES Air Quality Non - Attainment In Southwest Florida, several federal, state and local environmental issues have been addressed by CAT's initiatives. These include: 1. EPA's National Air Quality Standard (NAAQS). 2. State of Florida House Bill 696 (amending Ch 163, F.S.). 3. Local planning goal to reduce energy demand, implement green initiatives, and sustainable processes and protect Collier County's natural environment. 4. Implement Capital and Infrastructure alternatives identified in the 2009 TDP. In 2008, the federal government reduced the NAAQS for ozone. In March 2009, Florida's governor submitted recommendations to the EPA on the areas to be designated as Florida's nonattainment areas. At the current time, Collier County is not included in the recommended areas designated as Page 7 Agenda Item No. 16A21 July 27, 2010 Page 20 of 120 non- attainment. CAT will continue to implement service and technologies that positively impact air quality. House Bill 697 Effective July 1, 2008, House Bill (HB) 697 amended Ch. 163, F.S., to establish new local planning requirements that incorporate strategies to reduce greenhouse gas emissions. The bill requires local governments to apply new requirements no later than the due date of the evaluation -and- appraisal -report (EAR) -based amendments to reduce greenhouse gas emissions. CAT will receive two hybrid powered vehicles in June 2010. In addition, Collier County is in the process of developing a Master Mobility Plan (MMP) with the primary goal of reducing Vehicle Miles Traveled (VMT) and increasing mobility through alternative modes of transportation. The goals and objectives of the MMP are in compliance with HB 697. Goal 2: Reduce energy demand, implement green initiatives and sustainable processes, and protect Collier County's natural environment. Objective 2.2: Implement environmentally - friendly operating procedures. Initiatives for Objective 2.2: Initiative 2.2.1: Explore the potential to transition to alternative fuel vehicles for economic and environmental benefits. Initiative 2.2.2: Where appropriate, consider the potential to purchase smaller vehicles to match the capacity requirements of the new service areas. Initiative 2.2.3: Reduce fuel consumption by 1 percent each year, as service, new sources to power vehicles, and funding allow. Initiative 2.2.4: Construct future CAT facilities utilizing environmentally - friendly materials, where feasible. Objective 2.3: Reduce carbon emissions and fossil fuels. Initiatives for Objective 2.3: Initiative 2.3.1: Participate in local air quality improvement efforts in support of Florida HB 697 and EPA efforts. Capital and Infrastructure Alternatives The following capital and infrastructure alternatives were developed for the TDP's 10 -year planning horizon. Construct New Transit Intermodal Transfer Station —The existing CAT administrative facility located on Radio Road will undergo renovations in order to serve as a new passenger transfer facility with additional capacity for buses and bus maintenance. Renovate Government Center Transfer Facility —The existing transfer facility will undergo renovations to better serve transit customers by improving the traffic flow for automobiles, buses, and pedestrians. • Vehicle Replacement and Acquisition — Vehicle replacement and acquisition is the most important component of transit infrastructure for CAT. Following an increase in service frequency to 45 minutes or less, CAT should evaluate its vehicle replacement and acquisition plan including fixed - route, paratransit, and support vehicles to maintain an adequate number of vehicles and avoid exceeding the FTA spare ratio level. Page 8 Agenda Item No. 16A21 July 27, 2010 Page 21 of 120 Currently, all CAT buses are diesel propelled. In March 2010, CAT received three 35 -foot buses, which are larger than the current fleet and can accommodate more passengers. In June 2010, CAT will receive two 35 -foot hybrid buses that were purchased through the ARRA grant program. The capital alternatives listed in Table 2 reflect the capital and infrastructure improvements identified for implementation. Table 2[ Capital Altarnntivac Dk• e;mn 01— /w In„ �nnn% - - -- - - - - - ----I Capital Alternatives 012 - FY 2020 Improvements ,_ Purchase Rolling Stock for Bus Replacement and Fleet Expansion Purchase of Associated Capital Maintenance Items (ACMI) Purchase of Office Furniture, Fixtures, and Equipment (FIFE) Purchase of Paratransit Vans Purchase of Support Vehicles Purchase and Install Benches and Shelters Purchase and Install Bicycle Racks on Buses Purchase and Install Bicycle Racks at Bus Stops FY 2012 Improvements Radio Road Transfer Facility Construction Renovations to Government Center Facility Park - and -Ride Lot at US 41 and the Lee County Line FY 2013 Improvements Purchase of Mobile Data Terminals Purchase of Automatic Passenger Counters Purchase of Automatic Vehicle Locators (AVLs) and associated Global Positioning Video Cameras with On -Board Digital Video Recorders FY 2016 Improvements Pine Ridge Road Intermodal Transfer Center Collier -Lee Intermodal Transfer Center FY 2017 Improvements Park- and -Ride Lot at Collier Boulevard and Immokalee Road Park- and -Ride Lot at Immokalee Road and Gulf Shore Drive Condition and performance of the asset to be replaced hj, the proposed project, rrs ascertained through field inspections or otherwise, if avai7aWe. The condition of the four buses identified in Table 1 range from fair to poor, and the total cost for repairs and maintenance for each of these buses surpass their original purchase cost. Replacing these four buses with new electric buses will help minimize CAT's annual maintenance cost, improve the daily performance of service to the public and eliminate the COZ emissions significantly. Page 9 Agenda Item No. 16A21 July 27, 2010 Page 22 of 120 Demonstrated positive impact on air quality. The proposed project, along with the addition of four new electric buses will have a dramatic and demonstrable positive impact upon air quality in the region. After precise analysis of the CAT data from FY 2001 to FY 2009 the average CO2 emissions from passenger buses is calculated to be approximately 1,350 metric tons. The increase in the bus ridership over the subsequent years can be attributed directly towards decrease in the number of passenger cars driving to work five days /week. The average reduction in CO2 emissions by increasing the bus ridership between FY 2001 to FY 2009 accounts to be nearly 293,000 metric tons. Applying similar calculations to CAT's Existing Routes Ridership Forecast 2011 — 2020, an average reduction of 311,000 metric tons of CO2 emissions can be achieved. With the receipt of four new electric buses to replace four existing diesel buses, a 25% reduction in CO2 emissions may be achieved (i.e. 233,400 metric tons) for the period of 2011 -2020. Collier Area Transit Ridership Forecast 2011 -2020 ■ 2011 ■ 2012 a 2013 ■ 2014 Q 2015 IP 2016 :° 2017 € 2018 : 2019 W 2020 2 250 3102 318,1112,385,9112,453,711 2,114,709 2,182 510 „ 1,874,155 ORM ti a ��:.. 1,633,601 1,393,047 1,152,493 Total Ridership Forecast Based on Existing Routes Page 10 Agenda Item No. 16A21 July 27, 2010 Page 23 of 120 The U.S. Department of Energy estimates the fuel economy for passenger buses to be 6 miles /gallon of these 1.2 EPA estimates CO2 emissions from a gallon of diesel = 2,778 grams x 0.99 x (44/12) = 10,084 grams = 10.1 kg /gallon = 22.2 pounds /gallon.' Indicator Vehicle Diesel used CO2 Emissions CO2 Emissions Ridership Ridership Miles (VM) (Gallons) (Ibs) (Metric Tons) Increase FY 2001 233,773 2777 - - ...-- 38 962 - -- - - -8 - 86464,960 394 97,571 FY 2002 7 407,971 ���-- 67,995 - ---- --- 1,509,493 687 324,037 226,466 FY 2003 469,237 78,206 -_. 2..222__- --- 1,736,177 - -`- --- 7777 790 -- 7777 475,820 -- 151,783 FY 2004 578,150 96,358 2,139,155 973 627,824152,004 FY 2005 811,965 135,328 - - - 3,004,271 - --- 7777-- 1,367 --- - -- 951,601 - -_I 323,777 FY 2006 921,050 153,508 3,407,885 1,550 1,052,536 100,935 FY 2007 1,156,658 - - - -- 192,776 4,279,635 1,947 1,180,147 127,611 FY2008 ..7777 1,299,452 - -- _ 216,575-- - 13,789 FY 2009 - -- -.. - 1,329,652 7777 ---- 7222_._. ---- 221,609 -------- 7229 4,919,712 2,238 1,109,710 - 56,648, In -- Vehicle Miles - -- 7777- _--- Diesel used - - - - -- 7777 - CO2 Emissions 7777 -- CO2 Emissions Ridership Ridershi p (VM) (Gallons) Qbs)Estimated (Metric Tons) Estimated Increase " ''-� Estimated Estimated Estimated -- FY2010 - --- - --- 1,532,190 -- 2.27.2_._ 255,365 .. _._..----- 5,669,10? 2,579 1,109,710 0 FY 2011 -'-- - 7757 --- 1,678,452 -- -- - - - 279,742 -- 61210,272 _--.. 2,825 1,152,493 42,783 FY 2012 1,824,714 _._ 7222 304 119 ----- --- 6 751,442 -__ ...2777- 3,072 - --... 1,393,047 240,554 '.. FY 2013 ._._ -- 1,970,976 2.227 328,496 7,292,611 3,318 1 633,601 01 24 240,554 FY 2014 - 7777 -- -- 2,117,238 7777 - 7777....__ 352,873 7,833,781 3,564 1,874,155 240,554 ' FY 2015 _ 2 263,500 377,250 8,374,950 3,810 2,114,709 240,554', FY 2016 7777 8277 2409,762 - 7777 -- 401,627 8,916,119 4,056 2182,510 67,,800 800 ; FY 2017 _-- 7778 2,556,024 8887 --- -__ __ 7777- 426,004 2887- 7777.. 9,457,289 4,303 2,250,310 67,900 FY 2018 8822_ 2,702,286 --.. 7822. 2822__ 450,381 828 9,998,458 2 8288__ 4,549 9 8228 2,318,111 67,800 1 - 7777 -- 2,A48,548 7228- _ -474 - _. 759 10 539,628 .. - --_- ----_ 4,795 2,385,911 ---6-7,800-- - FY 2020 2,994,810 __._---- - 7222. 499,135 --- __ 11,OAQ797 __ - 5,041 2,453,71 1 67,800 11 Average COz Emissions 5,939,685 1,348 z The U.S. Department of Energy, http: / /www.nreI .gov /docs /fy00osti /26758.pdf (accessed June 3, 2010). 3 The U.S. Environmental Protection Agency, http: / /www.epa .gov /oms /climate /420f05001.htm (accessed June 3, 2010). 4 Vehicle Miles for 2010 thru 2020 were estimated using linear regression equation Y = 146262 x +69570; R Squared value = 0.9836 Page 11 Agenda Item No. 16A21 July 27, 2010 Page 24 of 120 According to the U.S. EPA, a gallon of gasoline produces an estimated 8.8 kilograms (or 19.4 Ibs) Of CO2 for passenger cars. The EPA's MOBILE6 Model shows an annual average mileage of 12,000 miles annually for passenger cars. The EPA's MOBILE6.2 calculates an overall average fuel economy for passenger vehicles of 20.3 mpg.5 Listed below are basic statistical data to substantiate these findings': • Gasoline used by a passenger car annually is 591.13 gallons • CO2 emissions produced by a passenger car annually 11467.98 Ibs • CO2 emissions produced by a passenger car annually 5.20 metric tons • 260 work days in a year (365 days); work day factor 260/365 = 71.23% • CO2 emissions produced by a passenger car annually (travelling to work) 8168.97 Ibs • CO2 emissions produced by a passenger car annually (travelling to work) 3.71 metric tons • Average occupancy for passenger car 1.6 Indicator Decrease in Passenger cars Decrease in CO2 Emissions (Ibs) Decrease in CO2 Emissions (Metric Tons) FY 2001 FY 2002 141,541 1,156 246,546 524,483 FY 2003 94,864 774,944,448 351,521 FY 2004 95,003 776 072,788 352,033 FY 2005 202,361 1,653,078,333 749 850 ._ _.____- FY 2006 -- -_.._.__ 63,084 --------_ 515,334,510 ..: 233,760 FY 2007 79,757 651 531,700 295,540 j FY 2008 -8,618 - 70,401,224 - 31,935 FY 2009 - 35,405 - 289,222,463 - 131,194 FY 2010----- ----- 0-- °___- ' °---- '- 0-- - -- -- -- :_ F Y 2011 _-- - - - -- 26,74-0 - --- _ 218 434,234 - - --- 99,084 !. FY 2012 150,346 1,228174,602 557,110 FY 2013 150,346 1,228,174,602 557,110'. .- F__ 20_4 ._®_5__ 46 1_,-2_ 2 817_4,6.._0._2 _.. ®.___-5._5_ 7,110 r FY 2015 150,346 1,228,174,602 557,110 ...._- -- FY 2016 ---- -.....---- 42,375 - --_ ..._..._._�. 346,162,242 -.- 157,022 ',. FY 2017 42,375 346 162,242 157,022 FY2018 - -- -42,375. ®._ 346,162,242 '1571022' FY 2019 ____ 42,375 -_.. 162..2_.._. _ .. 346 162,242 -__.._ 157,022 FY 2020 42,375 346,162,242 157,022 5 The U.S. Environmental Protection Agency, http: / /www.epa.gov /oms /climate /420f05004.htm (accessed June 3, 2010). 6 The U.S. Department of Transportation, http: / /cta.ornl.gov/ data /tedb28 /Spreadsheets /Figure8_O1.xls) U.S. Department of Transportation, Federal Highway Administration, 1995 Nationwide Personal Transportation Survey, Washington, DC, 1997, and 2001 National Household Travel Survey, Washington, DC, 2004. (Additional resources: www.fhwa.dot.gov, www- cta.ornl.gov /npts, nhts.ornl.gov) Page 12 Agenda Item No. 16A21 July 27, 2010 Page 25 of 120 The degree to which the proposed project supports emerging or advanced technologies for transit buses. Solar- powered mass transit is a key component to U.S. energy sustainability. Both technologies, solar and mass transit, are getting attention due to the rising costs of fuel. Public transportation and solar power have traditionally been independent of each other. However, the race to increase and improve mass transit infrastructure while reducing energy and fuel consumption is facilitating a close relationship between the two. Today transit facilities are moving more people than 50 years ago, yet many are installing solar Photovoltaic (PV) systems and in turn reducing global warming while lessening America's dependence on oil and creating green jobs. This shows investing in green transportation not only helps the planet, but creates jobs and strengthens the economy. This project will significantly reduce energy consumption and use green energy to provide 100% of the garage's electricity and reduce gas emissions by several tons every year. The project conforms to FTA's spare ratio guidelines. FTA guidelines state that for grantees with 50 or more fixed -route buses, a reasonable spare ratio should not exceed 20% of the vehicles operated in maximum fixed -route service. Maximum service means the revenue vehicle count during the peak season of the year; on the week and day that maximum service is provided. It excludes atypical days and one -time special events. Whether vehicles are locally funded, FTA funded, or have exceeded their service life are not relevant factors. For fleets of fewer than 50 fixed -route vehicles, judgment must be applied based on the age of the fleet and operating conditions to determine the reasonable number of spare vehicles. Although CAT falls below the 50 or more fixed -route threshold, its goal is to maintain the 20% criteria identified in the guidelines. The addition of four new electric buses will help CAT meet or exceed these criteria. Line -Item Budget The proposed project will be designed and constructed in a scalable implementation plan as follows: Bas a Project Iwo FTA Funds) Bare minimum facility infill at Add Alternative 1 Upgrade facility as indicated in Add Alternative 1 detailed spreadsheet (Including platform canopy, high - quality ITS system and platform amenities, exterior and interior upgraded durable finishes, courthouse annex garage /transfer station icon Add Alternative 2 Photovoltaic solar panels on courthouse annex garage roof and charging stations Add Alternative 3 Replace four existing diesel buses with new electric buses Total -__ - __ - --- Federal Amount Requested 2.1 million $2.9 million I $6 million $2 million $13 million Collier County has a local share of $2.6 million of the $13 million project cost. The federal share being requested is $10.4 million. Page 13 Agenda Item No. 16A21 July 27, 2010 Page 26 of 120 Matching Funds Collier County has obtained the local share match in appropriations totaling $2.6 million. The proposed project will be designed and constructed in a scalable implementation plan as listed below: Base Project (No FTA Funds). Bare minimum facility infill at parking garage. Add Alternative 1. Upgrade facility as indicated in Add Alternative 1 including platform canopy, high - quality ITS system and platform amenities, exterior and interior upgraded durable finishes, courthouse annex garage /transfer station icon. Add Alternative 2. Photovoltaic solar panels on courthouse annex garage roof and charging stations. Add Alternative 3. Replace four existing diesel buses with new electric buses. Support Documentation Please refer to the Appendices for additional supporting documentation. Project Time -Line The table on page 15 is a Base Project design schedule. Construction is anticipated to begin February 2011. Consistency with Long -Range Plan The proposed Transit Intermodal Transfer Station is consistent with Collier County's Comprehensive Plan and its 2009 TDP. The 2009 Collier County TDP (see Appendix C) identifies the means by which local government units and private- business enterprises may plan, develop, and implement a flexible, safe, efficient, visually- appealing, environmentally sound, and cost - effective public transportation system that provides for the mobility of residents and visitors, while being coordinated with local land use planning and economic development goals. The following summarizes the Goals 1 through 6 for implementation: • Goal 1: Develop an effective public transportation system. • Goal 2: Provide a transit system that is financially feasible by securing adequate funding. • Goal 3: Coordinate the transit system with the planning efforts of affected local governments. • Goal 4: Constantly seek to improve services that provide opportunities for Intermodal and Intramodal Transportation. • Goal 5: Provide quality passenger amenities and pursue overall transit quality improvements. • Goal 6: Establish a proactive public involvement process. The goals CAT has established for implementing its Transit Intermodal Transfer Station described in this proposal are as follows: • Replace the temporary facility with a new Transit Intermodal Transfer Station offering first - rate passenger amenities with appropriate and durable quality features and finishes. • Meet LEED Platinum -level certification for the new Transit Intermodal Transfer Station. • Implement a rooftop garage Photovoltaic System, with net metering to attain a "zero" energy use for the Transit Intermodal Transfer Station and parking garage. • Replace four existing diesel buses (fully depreciated and in need of replacement) with new electric buses. • Offer solar automobile electric charging stations in the adjacent parking garage to encourage hybrid and electric vehicle use. Page 14 FELDER AREA TEANRI ICATI SVSIFINAS,f TRANSFER SiATlOn - GROPOSED M TEAM VROJECI 6CNEEIII e�ielJOIO r.E II 1iirT � +Tnl � }� - ��sfLL •— r 1.i „T. w 1 AT T F- -,' Tr tl- k -'; L '.."y r -. AA i F T — L I w AT.T I, f II I I IF•In ! i TT If Y r L.ux + 11. AI in ai _$ V r �N �l y �I N — _ a —AL -:.- .. is - !w '_ _ ®owx e.cusmlmwwoo+wmceun+uecxm�vuws ove wswuzsarwss mear. -atrE t l } I laum mw uowuee mnrtw 11. •••� "`"�tia. -"a° mT_ am �.p .µ. nmrxvm.n.ao .nwec, a'.�.mou .cu..a mnuxwrmwrmr. �nwvznu[ inamEwrrtaow. mmvaJ[ rn¢ ucrvmurtrrtenro .nmrmmn.mErtxrt..uzxrass Agenda Item No, 16A21 July 27, 2010 Page 28 of 120 Local Support Included in this section is a list of CAT's community partners and their roles: • Collier Metropolitan Planning Organization (MPO) • Naples Pathways Coalition (NPC) • Commuter Services • Collier County Health Department (CCHD) • Smart Growth Coalition • Edison State College Collier MPO works with CAT on long -range transit planning, which includes funding for transit studies and training, and acts as CAT's advocate for the Growth Management Division. The MPO is currently governed by a nine - member board including five members from Collier NVU County, two from the City of Naples, one from Everglades City, and one M- Opohten Punning Drganuation from the City of Marco Island; one non - voting member represents the Florida Department of Transportation. The MPO is responsible for prioritizing state and federal capital improvements to address the County's travel needs as defined in the Transportation Improvement Plan (TIP) and the Long -Range Transportation Plan (LRTP). The Collier MPO Technical Advisory Committee (TAC) consists of public and private planners, engineers, and other technical professionals who are responsible for maintaining, controlling, developing, and improving the transportation system throughout the County. The TAC also reviews transportation plans and programs from a technical perspective and with the benefit of many years of experience. ATM Department's director, Michelle Arnold, serves as vice - chairwoman for TAC. NPC works with the city and county government to design and create a fully integrated transportation network of sidewalks, bike lanes, and ,1 iA�j S multiuse pathways to be used by cyclists, pedestrians, and other non- ; CUAIITI N motorized users throughout the city of Naples and Collier County. NPC supports transit by connecting communities and business parks to CAT's www.naplespathwals.urg system. As a program of the FDOT, Commuter Services coordinates with CAT to !® provide a viable means to alleviate traffic congestion and improve the Commuter/ quality of life for the area's business communities, travelers, and IJ commuters. Commuter Services offers free online ride - matching, carpool, and vanpool services, in addition to the Emergency Ride Home 1.866.585.RIDE program. www.Commuter5erulcesFL.com CCHD collaborates with CAT on programs to promote better health. Recently the Health Department and CAT coordinated an event to encourage the Collier County business community to take advantage of the transit system during lunch Health hours. Department Page 16 Agenda Item No. 16A21 July 27, 2010 Page 29 of 120 As part of the Health Department's mission to promote, protect, and improve the health of all people in Collier County, CCHD created the Smart Growth Coalition, which is comprised of multiple community partners and stakeholders. The Smart Growth Coalition meets monthly to encourage the building of sustainable communities that will promote safe, physical activity and partners with CAT in its efforts. A state - accredited college, Edison State College has four campuses in southwest Florida. With over 300 professional and support staff members, and nearly 20,000 students, Edison State relies on the County's transit system to provide accessible routes to commutes between campuses and - -- final destinations. As a community partner, CAT and Edison State EDISON STATE coordinated in sponsoring the college's annual "Green Fest" event. COLLEGE Environmental Work The existing Government Center and parking garage (where the proposed new transit transfer station will be located) is currently developed and will not have any additional environmental impacts associated with the proposed construction. The base bid phase of the design of the Transit Intermodal Transfer Station is underway. Local building and regulatory permits are anticipated to be needed and no additional delay is expected as a result of their anticipated review and issuance. Ready to Implement CAT has launched Phase I of the Transit Intermodal Transfer Station and bidding on construction is projected to begin in February 2011. However, due to limited local funding, the full vision of the Transit Intermodal Transfer Station will take years to implement without the support of this FTA Grant. Awarding of this FTA Grant to Collier County will not only result in an exemplary modern project, but most importantly, the upgraded ITS envisioned in this proposal will achieve the ambitious objectives of FTA's State of Good Repair (SGR) Bus initiative grant program, "to finance capital projects to replace, rehabilitate, and purchase buses and related equipment and to construct /rehabilitate bus - related facilities." it will also mean the project can be implemented quickly, generating jobs and stimulating the local economy. Collier County's Growth Management Division objective is to have the permanent facilities in place by FY 2011. TIP /STIP Amendments The Collier MPO will amend its Transportation Improvement Program (TIP) upon award of the Grant. In addition, the amendment will be incorporated into the State Transportation Improvement Program (STIP). Page 17 Agenda Item No. 16A21 July 27, 2010 Page 30 of 120 Project Funds and Implementation Collier County has appropriated a local match of $2.6 million dollars, which is sufficient to fund the Base Project, should no FTA additional grant funds be realized. The proposed project will be designed and constructed in a scalable implementation plan as listed below: Base Project (No FTA Funds). Bare minimum facility infill at parking garage. Add Alternative 1. Upgrade facility as indicated in Add Alternative 1 including platform canopy, high - quality ITS system and platform amenities, exterior and interior upgraded durable finishes, courthouse annex garage /transfer station icon. Add Alternative 2. Photovoltaic solar panels on courthouse annex garage roof and charging stations. Add Alternative 3. Replace four existing diesel buses with new electric buses. CAT has launched Phase I (Base Project) of the Transit Intermodal Transfer Station and bidding on construction is projected to begin in February 2011. However, due to limited local funding, the full vision of the Transit Intermodal Transfer Station will take years to implement without the support of this FTA Grant. Awarding of this FTA Grant to Collier County will not only result in an exemplary modern project, but most importantly, the upgraded ITS envisioned in this proposal will achieve the ambitious objectives of FTA's State of Good Repair (SGR) Bus initiative grant program. Technical, Legal, and Financial Capacity Collier County has no outstanding legal, technical, or financial issues that would make this a high -risk project to implement quickly. Since CAT's inception in 2001, it has been operating with all technical and legal authority of similar Collier County departments. Collier Area Transit operates under the supervision of under the supervision of the County's Alternative Transportation Modes Department and the Growth Management Division. Within the Division are various departments with experienced professionals such as: licensed engineers (including environmental and traffic operations), designers, planners, construction project managers, landscape architects, transit managers, and many others who support CAT. Also, the County Attorney's office has assigned an attorney experienced in transit law, regulations and requirements to assist CAT. CAT has extensive knowledge regarding federal, state and local regulations, in addition to the Collier MPO and Public Involvement process. Through audits conducted by the FDOT, CAT has successfully managed grants and all compliance issues. FDOT recently audited CAT's Safety System Program Plan, and the audits were outstanding with zero findings. FTA recently conducted its first Triennial Review of the CAT system. Of the 24 areas, no deficiencies were found with FTA requirements in 22 areas. However, deficiencies were found in 2 areas: legal and drug -free workplace, both of which were corrected immediately after the site visit. CAT staff has FTA experience handling projects and grants. CAT received over $3 million in ARRA grant funding and is currently implementing all projects that include renovations to the existing operations facility, ITS, purchase of buses, security enhancements and transit enhancements. CAT has a total of 16 grants currently managed internally with combined revenue of over $13.3 million. All of these grant requirements, including compliance reports, performance measures, financial reports and audits and many other responsibilities are successfully managed by knowledgeable staff. Page 18 Agenda Item No. 16A21 July 27, 2010 Page 31 of 120 Bus Fleet Management Plan As part of CAT's bus fleet management plan, the following information is contained in the 2009 TDP. By pursuing the purchase of electric buses CAT will be complying with the fleet management goals of the TDP. Transit /Alternative- Fueled Vehicles CAT recently applied for transit stimulus funding from the ARRA. CAT will receive two new hybrid - powered buses through the funding program. The ARRA funds will be used to replace some of the older buses used to operate fixed -route service as well as operate the County's first hybrid buses. Environmental Issues Air Quality Non - Attainment In Southwest Florida, several federal, state and local environmental issues have been addressed by CAT's initiatives. These include: 1. EPA's National Air Quality Standard ( NAAQS). 2. State of Florida House Bill 696 (amending Ch 163, F.S.). 3. Local planning goal to reduce energy demand, implement green initiatives, and sustainable processes and protect Collier County's natural environment. 4. Implement Capital and Infrastructure alternatives identified in the 2009 TDP. In 2008, the federal government reduced the NAAQS for ozone. In March 2009, Florida's governor submitted recommendations to the EPA on the areas to be designated as Florida's nonattainment areas. At this time, Collier County is not included in the recommended areas designated as non - attainment. CAT will continue to implement service and technologies that positively impact air quality. House Bill 697 Effective July 1, 2008, House Bill (HB) 697 amended Ch. 163, F.S., to establish new local planning requirements that incorporate strategies to reduce greenhouse gas emissions. The bill requires local governments to apply new requirements no later than the due date of the evaluation -and- appraisal- report-based amendments to reduce greenhouse gas emissions. CAT will receive two hybrid powered vehicles in June 2010. In addition, Collier County is in the process of developing a Master Mobility Plan (MMP) with the primary goal of reducing Vehicle Miles Traveled (VMT) and increasing mobility through alternative modes of transportation. The goals and objectives of the MMP are in compliance with HB 697. Goal 2: Reduce energy demand, implement green initiatives and sustainable processes, and protect Collier County's natural environment. Objective 2.2: Implement environmentally - friendly operating procedures. Initiative 2.2.1: Explore the potential to transition to alternative fuel vehicles for economic and environmental benefits. Initiative 2.2.2: Where appropriate, consider the potential to purchase smaller vehicles to match the capacity requirements of the new service areas. Initiative 2.2.3: Reduce fuel consumption by 1 percent each year, as service, new sources to power vehicles, and funding allow. Page 19 Agenda Item No. 16A21 July 27, 2010 Page 32 of 120 Initiative 2.2.4: Construct future CAT facilities utilizing environmentally - friendly materials, where feasible. Objective 2.3: Reduce carbon emissions and fossil fuels. Initiative 2.3.1: Participate in local air quality improvement efforts in support of Florida HB 697 and EPA efforts. Capital and Infrastructure Alternatives As part of the TOP 10 -year planning horizon, CAT developed the following capital and infrastructure alternatives: • Construct New Transit Intermodal Transfer Station — The existing CAT administrative facility located on Radio Road will undergo renovations in order to serve as a new passenger transfer facility with additional capacity for buses and bus maintenance. • Renovate Government Center Transfer Facility — The existing transfer facility will undergo renovations to better serve transit customers by improving the traffic flow for automobiles, buses, and pedestrians. • Vehicle Replacement and Acquisition — Vehicle replacement and acquisition is the most important component of transit infrastructure for CAT. Following an increase in service frequency to 45 minutes or less, CAT should evaluate its vehicle replacement and acquisition plan including fixed route, paratransit, and support vehicles to maintain an adequate number of vehicles and avoid exceeding the FTA spare ratio level. Currently, all CAT buses are diesel propelled. In March 2010, CAT received three 35 -foot buses, which are larger than the current fleet and can accommodate more passengers. In June 2010, CAT will receive two 35 -foot hybrid buses that were purchased through ARRA grant program. The capital alternatives listed in Table 2 (page 9) reflect the capital and infrastructure improvements identified for implementation. Page 20 Agenda Item No, 16A21 July 27, 2010 Page 33 of 120 Bus Fleet Due to the size of CAT's bus fleet and the nature of its small transit system, the bus routes are designed mainly using loops, which require passengers to use transfers in order to get from one destination to another. On average, about 500,000 passenger transfers take place annually in this facility. • Service area population for CAT increased from 161,181 in 2004 to 333,858 in 2008, an increase of 107 percent. • The passenger trips for CAT increased from 627,823 in 2004 to 1,166,358 in 2008, an increase of nearly 86 percent. • Total vehicle miles of service have increased from 578,150 in 2004 to 1,299,452 in 2008, an increase of almost 125 percent. • Revenue miles of service also increased from 552,572 in 2004 to 1,214,814 in 2008, an increase of almost 120 percent. FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 r. Ridership As part of CAT's goal for its bus fleet, the construction of the new facility will incorporate a system that will provide recharging stations for electric - powered vehicles and buses. CAT's goals are to: • Replace four existing diesel buses (fully depreciated and in need of replacement) with new electric buses; • Offer solar automobile electric charging stations in the adjacent parking garage to encourage hybrid and electric vehicle use. Bus Facility CAT is pursuing LEED for New Construction 2009 (LEED v3) certification, as administered by the U.S. Green Building Council, for this Transit Intermodal Transfer Station. The facility will incorporate various sustainable design and construction strategies to achieve the highest level of LEED certification possible while providing a cost - effective facility for Collier County residents. The project team is pursuing additional FTA State of Good Repair grant funds to install a solar photovoltaic (PV) panel system on the Page 21 Collier Area Transit (CAT) Ridership 1,400,000 — - - - - -- —_ - - -- 1,200,000 - - -- ---- -- - - -- 1,000,000 800,000 — _.---- -- - - -- --_ *Ny 19 600,000 i -- — —+ � _— 400,000 I — — 200,000 � � a FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 r. Ridership As part of CAT's goal for its bus fleet, the construction of the new facility will incorporate a system that will provide recharging stations for electric - powered vehicles and buses. CAT's goals are to: • Replace four existing diesel buses (fully depreciated and in need of replacement) with new electric buses; • Offer solar automobile electric charging stations in the adjacent parking garage to encourage hybrid and electric vehicle use. Bus Facility CAT is pursuing LEED for New Construction 2009 (LEED v3) certification, as administered by the U.S. Green Building Council, for this Transit Intermodal Transfer Station. The facility will incorporate various sustainable design and construction strategies to achieve the highest level of LEED certification possible while providing a cost - effective facility for Collier County residents. The project team is pursuing additional FTA State of Good Repair grant funds to install a solar photovoltaic (PV) panel system on the Page 21 Agenda Item No. 16A21 July 27, 2010 Page 34 of 120 _,. roof of the adjacent County -owned parking garage. This system will provide 100% of the electricity required by the new ITS and transfer facility with extra power available for recharging electric vehicles and buses. The facility is currently being designed to achieve LEED Silver certification without any additional grant funds. However, with the addition of the grant funding, a solar PV system will eliminate the project's need for electricity consumption from non - renewable resources and will result in potential LEED Platinum -level certification. The proposed Transit Intermodal Transfer Station is consistent with the Transportation Element of Collier County's Growth Management Plan, adopted October 1997 and last updated October 2004, which states: Goal 1: To plan for, develop and operate a safe, efficient and cost effective transportation system that provides for both the motorized and non - motorized movement of people and goods throughout Collier County. Proposed Rooftop Photovoltaic Solar Panel Installation Table 5 presents statistics for the first full year of electrical power consumption for operation of the adjacent garage facility from mid 2007 to mid 2008: Table 5: Comparing Parking Garage Power Use and Air Quality Before and After Photovoltaic MR! On Off Total Last KWH KWH % +�1 From To Cost Billing Year Days Peak Peak KWH KWH Increase Change 06/29/07 07/31/07 61,680 N/A 61,680 $5,292.69 32 61,680 0 07/31/07 08/29/07 55,920 N/A 55,920 $4,849.31 29 55,920 0 08/29/07 09/28/07 58,560 N/A 58,560 $5,046.24 30 58,560 0 09/28/07 10/29/07 59,280 N/A 59,280 $5,113.65 31 13,200 13 46,080 349.09% 10/29/07 11/29/07 58,560 N/A 58,560 $5,045.04 31 49,200 33 9,360 19.02% 11/29/07 01/02/08 64,080 N/A 64,080 $5,456.70 34 64,560 35 -480 -0.74% 01/02/08 02/01/08 51,840 N/A 51,840 $4,483.36 30 53,520 29 -1,680 -3.14% 02/01/08 03/03/08 29,040 N/A 29,040 $2,768.21 31 53,760 29 - 24,720 - 45.98% 03/03/08 04/01/08 27,360 N/A 27,360 $2,665.06 29 54,720 29 - 27,360 - 50.00% 04/01/08 04/30/08 25,920 N/A 25,920 $2,538.21 29 23,040 12 2,880 12.50% 04/30/08 05/30/08 25,680 N/A 25,680 $2,577.85 30 57,360 30 - 31,680 - 55.23% 05/30/08 06/30/08 24,720 N/A 24,720 $2,424.16 31 55,200 29 - 30,480 - 55.22% Page 22 Agenda Item No, 16A21 July 27, 2010 Page 35 of 120 The proposed PV panel system to be positioned across the vacant garage roof top will supply 0.913 KW of electricity. Incorporating the PV panel system is expected to save over $100.000 a year in electricity for Collier County as detailed in Table 6: NAPLES Panel Power (Wp): 240 240 Watt No of Modules: 5041 0 Degrees Total Peak Power (KwP): 1209.84 "Solar Radiation HSP "AC Energy (kWh)" (kWh /m2 /day)" 3.48 75.00 90,738 $6,351.66 4.41 87.00 105,256 $7,367.93 5.16 11.4.00 137,922 $9,654.52 6.15 130.00 157,279 $11,009.54 6.02 129.00 156,069 $10,924.86 5.77 118.00 142,761 $9,993.28 5.97 127.00 153,650 $10,755.48 5.67 121.00 146,391 $10,247.34 4.88 100.00 120,984 $8,468.88 4.34 93.00 112,515 $7,876.06 3.53 73.00 88,318 $6,182.28 3.34 72.00 87,108 $6,097.59 4.89 1,238.00 149,7782 $104,844.73 87,108.48 8,013.98 1.,829.28 278.75 kWh CO2 S02 NOx (kg) (kg) (kg) 90,738 8,347.90 1,905.50 290.36 105,256.08 9,683.56 2,210.38 336.82 137,921.76 12,688.80 2,896.36 441.35 157,279.2 14,469.69 3,302.86 503.29 156,069.36 14,358.38 3,277.46 499.42 142,761.12 13,134.02 2,997.98 456.84 153,649.68 14,135.77 3,226.64 491.68 146,390.64 13,467.94 3,074.20 468.45 120,984 11,130.53 2,540.66 387.15 112,515.12 10,351.39 2,362.82 360.05 88,318.32 8,125.29 1,854.68 282.62 87,108.48 8,013.98 1.,829.28 278.75 1,497,781.92 137,795.94 31,453.42 4,792.90 Page 23 Agenda Item No. 16A21 July 27, 2010 Page 36 of 120 Transit Intermodal Transfer Station Methods and Design Due to the temporary nature of the existing bus transfer facility (tents, portable toilets, and benches), the current facility has no remaining useful life and the new facility will fully address the backlog of deferred maintenance. Base Project Narrative The base project for the Transit Intermodal Transfer Station will be a bare minimum infill facility at the existing Collier County Government Center Courthouse Annex Parking Garage. This infill approach offers the least intrusive impact on the existing site and environment to allow the best opportunity to secure the highest possible LEED certification recognizing sustainability. The base facility will serve as a catalyst for intermodal synergies between pedestrians, bicyclists, "kiss- and - ride" passengers and from patrons leaving their vehicles in the parking garage to use the system. This facility design currently underway will provide a busway with turn- around, six saw -tooth configured bus berths, unprotected passenger platform with benches and trash receptacles and a static information kiosk, restrooms, customer service and ticketing, driver's lounge, staff restrooms, a few offices and administrative storage. Positioning of the CAT operational spaces on the second floor with expansive glazing will allow for clear sight lines and observation of the passenger platform, busway and immediate surroundings. Much of the existing funds for the project have been used for site acquisition and are set aside for site work necessary to provide an effective vehicular- reinforced busway surface width, pedestrian platform and associated retention pond enlargement /modifications. Landscaping will be to code, but sparingly positioned and limited to between the busway and adjacent modified retention ok b pond edge with relocated palm trees and native plants. Hardscape at the platform and walks will be standard uncolored concrete for heavy-duty suitable a y y pedestrian r n, � function. A bicycle rack will be positioned wn�*l.exas w�m areuT RM nw vv near the platform. Page 24 Agenda Item No. 16A21 July 27, 2010 Page 37 of 120 Add Alternative 1 With FTA funding, Add Alternative 1 will transform the Base Project into a full- feature, effective public intermodal transportation facility with modern, high - quality amenities and level of service. A continuous aluminum canopy will be added over the bus platform to provide much - needed protection from the elements for passengers waiting and boarding /de- boarding buses. A section of the parking garage set aside for waiting will be upgraded and finished appropriately for passenger comfort and will include a new floor finish over the existing concrete, new durable ceiling finish below the exposed concrete joists and heavy duty aesthetic surface wraps around existing columns and low wall surfaces. Page 25 069 F� Agenda Item No. 16A21 July 27, 2010 Page 38 of 120 Architectural renderings of Add Alternative 1 Page 26 Agenda Item No. 16A21 July 27, 2010 Page 39 of 120 Landscaping will be doubled to more effectively address the edges of pedestrian walks along the project site and areas immediately adjacent to the passenger platform. The added plants and tree density will appreciably soften the hard visual edges of the busway and parking garage and buses to passengers and the surrounding community and provide additional shade for pedestrians as they make their way to the new station. ful I 0"447 k' Hm+ffZFN n oS. rn )" -- ti MERV - t+zkd 4.1. n.4;nt us-7o p.. iJYr iA tY', I nr 14, tlihtr. W�' , ��_: �[YF „Y�IYV i9ifin1145 !AT , , 7100: kv.. Atr I The passenger platform will consist of integral colored, patterned concrete in lieu of plain concrete. Upgraded platform passenger amenities will include real -time ITS displays to show passengers real -time progress of approaching buses and estimated arrivals, important daily general and safety messages, ticketing /fare opportunities, environmental reminders and way - finding information. A static information kiosk in the Base Project will be converted to a video /audio display with interactive features. Project signage will enhance and increase in size and quantity to improve communication and way- finding and sustainable design project features will be highlighted prominently to encourage individual responsibility /green approaches away from the station. A project icon will be added at the adjacent parking garage stair tower to prominently identify the station to drivers and pedestrians nearby with additional canopy, bus berth and entrance signs. Bicycle racks will be enhanced with bicycle lockers to encourage intermodal activity and better peace -of -mind for passengers who will be bringing their bicycles to the station and leaving them unattended while they use the CAT bus system. A secure, enclosed platform storage space will be added to the project program to expedite maintenance equipment access and encourage enhanced maintenance /upkeep of the platforms. Page 27 Agenda Item No. 16A21 July 27, 2010 Page 40 of 120 _- Add Alternative 2 To combat rising energy costs, CAT proposes a sustainable energy conservation project that includes the construction of a solar canopy array on the adjacent garage rooftop to help meet the energy demands of the Transit Intermodal Transfer Station , garage and County's public building. With more than 350 days of sun each year in Collier County, the County has a potentially unlimited source of energy at its disposal. The roof of the parking garage is ideal to house the canopy, harness the abundant supply of the sun while also shading vehicles. Furthermore, the canopy will help the County decrease its annual electrical energy consumption significantly. The solar canopy will provide power for the garage while serving as a visible symbol of the County's commitment to sustainable energy development. Features such as monitoring equipment that provides real -time production, interactive visual displays will allow easy Page 28 accessibility for education opportunities. This can be used as an opportunity to educate the County and surrounding community on sustainability issues and options. The solar PV modules are oriented on flat, (south- facing) independent structures. With a total of 15 structures on the rooftop, each structure will accommodate 276 220 -watt solar modules. Each of the structures will produce approximately 60 kilowatts with the installation as a whole producing approximately 913,000 kilowatt -hours annually. This equates to a significant portion of the electrical energy demands for the County. Additionally, all equipment used on the project, PV- powered inverters and Canadian Solar modules, are in accordance with the Florida Solar Energy Center's certified list of eligible renewable equipment. Agenda Item No. 16A21 July 27, 2010 Page 41 of 120 Proposed Gi °ant- FundedFenei chleEnee-, qj ,- vsterns,foi- LEED Certification CAT is pursuing LEED for New Construction 2009 (LEED v3) certification, as administered by the U.S. Green Building Council, for its Transit Intermodal Transfer Station. The facility will incorporate various sustainable design and construction strategies to achieve the highest level of LEED certification possible while providing a cost- effective facility for Collier County residents. The project team is pursuing additional grant funds to install a solar PV panel system on the roof of the adjacent county -owned parking garage. This system will provide 100% of the electricity required by the new transfer station facility, with extra power available for recharging electric vehicles and buses. The design team is planning the current Base Project to achieve LEED Silver certification without any additional grant funds. The addition of the grant- funded solar PV system will allow the project to eliminate the electricity consumption from non - renewable resources, which will result in the facility having the ability to achieve LEED Platinum certification. The project's overall LEED strategy is outlined in this narrative, as well as the impact of the additional grant funds for renewable energy. Both of these options are summarized in the LEED scorecards in Figures 2 -5 (pages 33 -36). Page 29 Agenda Item No. 16A21 July 27, 2010 Page 42 of 120 LEED Certification Without Grant Funds CAT has developed a LEED strategy for this project based on the following sustainable design concepts. Sustainable Sites The CAT Transit Intermodal Transfer Station will be constructed on an existing site adjacent to the county government facilities. The site is within walking distance of many neighborhood services and has excellent public transportation access due to the nature of the facility. The existing surface lot will be removed and new landscaping will be provided to maximize vegetated open space using native and adapted vegetation. The new site will incorporate a stormwater management plan to reduce pollution from stormwater runoff and limit the amount of stormwater leaving the site. To reduce the heat island effect, the facility will use a highly reflective roof, which also reduces the building's cooling loads. Inserting much of the station platform, passenger and operational support spaces into the existing parking garage by design aligns with a primary sustainable site goal of minimizing new project footprints and impacts on the existing site and environment. Energy and Atmosphere The building will be designed to comply with ASHRAE 90.1 -2007 and reduce the energy consumption by at least 10% as compared to a building that simply meets code. Strategies to reduce energy consumption include increased insulation, LEER 2009 high - performance low- emissivity glazing, and high - ADVANCEMENTS TO THE RATING SYSTEM efficiency heating and cooling equipment. This design LEED ONLINE will reduce the amount of energy used for interior lighting and occupancy sensors will be included E% STER SMARTER BA BETTER USER EXPERIENCE throughout the building to further reduce lighting CERTIFICATION MODEL power consumption. All appliances included in the + ORCI6. CERTIFICATION BODIES project will be ENERGY STARO rated whenever applicable. These design strategies are expected to reduce the overall energy consumption by up to 14% below the ASHRAE 90.1 -2007 baseline; these energy savings will be verified with a three - dimensional whole building energy simulation. Since the basic design of the transfer facility does not include any on -site renewable energy, the project team will obtain Renewable Energy Certificates (RECs, or "green tags') to offset 100% of the electricity use in the project, as calculated using the energy model. This is a way for the owner to demonstrate a commitment to renewable energy development by purchasing the environmental attributes of renewable energy systems installed elsewhere. Materials and Resources To encourage staff and visitor recycling, the design team will include recycling areas for paper, plastic, metals, glass, and cardboard. During construction, a =ICCU Y3 Page 30 Agenda Item No. 16A21 July 27. 2010 Page 43 of 120 Construction Waste Management Plan will be implemented to divert at least 75% of the construction and demolition waste from landfill, including materials such as concrete, steel, drywall, cardboard, asphalt, and wood. During design and construction, building materials such as concrete, steel, drywall, ceiling tiles and carpet will be selected with high recycled content to achieve a recycled content value of at least 20% of the total materials cost. Materials such as steel, concrete, and gypsum will be selected from local or regional manufacturers for at least 10% of the total materials cost. At least 50% of the wood used in the project will be certified by the Forest Stewardship Council (FSC). Indoor Environmental Quality, A Construction Indoor Air Quality (IAQ) Management Plan will be implemented to minimize exposure to pollutants and to protect indoor air quality in the building. Low - emitting materials will be specified throughout the project, including adhesives, sealants, paints, coatings, and flooring systems. All composite wood and agrifiber products will be urea - formaldehyde -free. The project's lighting strategy will incorporate natural daylighting, including skylights and roof monitors whenever feasible. Additionally, individual lighting controls will be provided for the transfer station employees. The building envelope will be designed to provide exterior views in the work areas. The HVAC system will be designed to provide optimal thermal comfort for the building occupants. A post- occupancy thermal comfort survey will be administered to verify the thermal comfort levels of the transfer station employees. Innovation in Design Two of the sustainable strategies for the project involve ongoing commitment from the Collier County staff. The project team is proposing a Green Housekeeping plan to further protect indoor air quality, which will be administered by the County. To reduce the amount of mercury exposure to building occupants, the design team will specify low mercury lighting for all fluorescent lamps within the building and on -site. The County will continue to implement a low- mercury lighting purchasing policy in the facility. To promote the sustainability goals of Collier County, the building will be used as an educational tool for the public. This approach involves a comprehensive signage program built into the building's spaces to educate the occupants and visitors of the benefits of green buildings. For example, the program may include windows to view energy- saving mechanical equipment or signs to call attention to water - conserving landscape features. The facility may also include an interactive kiosk to graphically display facts and information and inform the public about the design and operation of the facility. After the project is finished, a case study will be published to inform other designers of the project's successes and overall sustainability impacts. LEED Certification with Grant Funds The grant funds pursued by the project team will be used to add sustainable features to the project that not currently within the project budget. This will include renewable energy technology and features to help the facility reduce water consumption. The County will also make an investment on long -term energy saving concepts such as building commissioning and utility measurement and verification programs. These services are typically very expensive, especially for a project of this size. But the long -term benefits will be improved building operation and the ability to understand how energy is used and potentially saved over the life of the facility. Page 31 Agenda Item No. 16A21 July 27, 2010 Page 44 of 120 The grant will help fund the purchase of solar PV panels to be installed on the adjacent parking garage as described earlier in this proposal. The addition of renewable energy systems greatly improves the LEED certification level of any project since LEED points are generously awarded for on -site renewable energy. Renewable energy sources for building projects typically include solar PV and /or solar thermal panels for domestic hot water. This project does not have enough hot water usage to justify solar thermal panels; therefore, solar PV for electricity generation will be the most effective on -site renewable energy system. The Transit Intermodal Transfer Station will use proven water - saving strategies to minimize the amount of potable water needed for both irrigation and flushing. For the site landscaping, irrigation will be supplied either through the rainwater harvesting system or municipally - supplied reclaimed water, such that no potable water is used for irrigation. Inside the building, the plumbing fixtures (water closets, "waterless' urinals, and faucets) will all be low -flow, or no -flow, fixtures to reduce overall water consumption. Additionally, harvested rainwater will be used for toilet and urinal flushing. This strategy is awarded with the maximum number of LEED points associated with energy use reduction and on -site renewable energy, which will allow the transfer facility to achieve LEED Platinum certification. These scenarios are shown in the LEED scorecards presented on the following pages in Figures 2 -5, with all achievable points marked as "Yes" and potential points marked as "Maybe." Page 32 Agenda Item No. 16A21 July 27, 2010 Page 45 of 120 LEED 2009 for New Construction and Major Renovation Project Scorecard Project Namc Colter Area Tolost ltanelo Rphpo SIL .R Project Mdrers: 1101 East lamraml T rail. Naples Ronde 22 4 yeti u : -h .ti a prerep 1 Rumg2 "hone, 3 2. 1, Credil1 1 Udall 3 ":!i ..1 no 4 Cradt5 r ir- Craft Fundamental Commissioning of 0ullding Energy Systems Minimum Energy Pedosmanu Fundamental Refrigerant Management Odhor Energy Perfenment Imwwn by 1296 for New soldeigs of 8% for E+letng Building Renovadone imwova by I4 %Igo New Nundnos or 10% to Eadro" Bmidr.iy Hma.Wro;ta ImWOVO 5y vi %he Dlew 3u4deg, n I24,Ina Fruung Bu'ndmg Remrvmiom rmeby l6 %to! How Puimngsa t4 %To, Euanng PwldmgF ....tans .wehy 25 %lo: New Buildmg,or 1d % 1m Eueti.g Buvding R,,trvatmns �mpmve Ly 22 °k Ia Nov: 9uiltlmgs of 1P % !or Exoling D, It, Ig Re .... tr ,cprrne by"A tai Nuw Budtlmya a 20W: Ina rn,ing Budding Rerervaeona ann•ovn by 2d% 1m 1 +%v Buddvgs m T %lot Ensmw Ewmmg Renoyolow wn I'H 2X %In' hove finiitlmg. m ?4% It Lnslmn BAN no Rennvatun in Ilnmo ve by l0 ^4 mi Naw 9rnlmngn or Pb'b to c.mm5 Rwldoq an no, mpmw W J2 %tn: Now Hu @ono- m 78% m. Exicliivg Footling P.enovamne Improve oY 3A °Ala Naw Buedrrzgs or 30°Lbi Casting 9uvong P,en>+anon, ImoT"ti by r %lot Wmw LeiJr in 3P'A Iv r cure.: fin iv.ng Rennyaiwis imcrtivo by 30 % IV Hew ixitl9n,s or 34 %in, Ea3slmo Bw deg Reroyafmw improve La 4Qry b, New 9 Ad In, or 16% hr Fereting B, drug Rem.atm, Imprrne ny 421% for Naw 3eddmgs or 35 nn it, Enatmo Buddng Ronmatena enpmvn b, 44% to Hew Lrdklrtl, in 40 F, to Eei,ling unio ng Renovemne enp•ove by 46% to New hill of or 42% Ina Erring Burlo,ig Rennyteans Ifni Ly 46 % -f, lm BJddingE DI 4it, to, Eaa .... . PL',lor, RBnJYtlLn.S on Site Renewal Energy 1 n5 Renewabe Energy J`4 Fro r eahlo Fvagv 5 %Renewable Energy 'k Renewable Erwgy 9 "g Renar+ablo Los, 11 %Renexm. Energy 11 %narcwnbn Enmgy Enhanced C.loneressnione, Enhall Refrigerant M....insist Measurement and Vard'Fatan Green poem Required Required Required I to 4g 1 5 5 S Q u 14 1] iP lg I tot 1 2 J 5 2 2 3 2 Figure 2: LEED scorecard without the grant (Silver -level certification) Page 33 Prong I Cmatructlon Added, Pollution Prevention Required GredilI Site Selection ? . +. Credit Development Density end Community Cmae,toney 1 �" fn Coal 3 Bre"lleld Redevelopment 5 '< Credit 4l Ahiturni Tranapohation -'rh6n Transportation Adam 1 my, Damon 42 Ateral Transportation Birytle Storage arm Charged Rama 6 '- Credit 4.3 Alternative Transpohadon Low- Emihingand Fue Citicmrn VehlGae 1 ".. 3?✓.. - Credit 4,4 Alternate. Transportation - Fall Capacity 3 2 %• " Credil 5.1 She Developmenl- Proles: fe Raemre to,ilal 1 .- oiedll 5 2 She Development - Mawmd, Cyan Spa. Creditfit Stormwater Cal Ouennty Oorlbol 1 limbl G2 Stmmwater Design Cualiv Cnndd 1 CrMll7t Hand [,land Sit N,,,00f 1 Crodd].2 Rest Island Enest - Root 1 Ctetlil a Light Pollution Reduction 1 1 fi i�4 L �n. as irlle� 7W Prernpl Wafer Use Reduction 4 Required olden Water Efferatent Landscapmg 2to4 d y 5C% �R 4 J WM • V Tlet LT.b o tr ga'mn 2 4 _ R Coral angadve Wastewater Technologies er 9 Col Water Use Reduction 2 Loo dy 15 �Rediee IiaJgce ey JS% 2 3 Redwe by 40% 4 prerep 1 Rumg2 "hone, 3 2. 1, Credil1 1 Udall 3 ":!i ..1 no 4 Cradt5 r ir- Craft Fundamental Commissioning of 0ullding Energy Systems Minimum Energy Pedosmanu Fundamental Refrigerant Management Odhor Energy Perfenment Imwwn by 1296 for New soldeigs of 8% for E+letng Building Renovadone imwova by I4 %Igo New Nundnos or 10% to Eadro" Bmidr.iy Hma.Wro;ta ImWOVO 5y vi %he Dlew 3u4deg, n I24,Ina Fruung Bu'ndmg Remrvmiom rmeby l6 %to! How Puimngsa t4 %To, Euanng PwldmgF ....tans .wehy 25 %lo: New Buildmg,or 1d % 1m Eueti.g Buvding R,,trvatmns �mpmve Ly 22 °k Ia Nov: 9uiltlmgs of 1P % !or Exoling D, It, Ig Re .... tr ,cprrne by"A tai Nuw Budtlmya a 20W: Ina rn,ing Budding Rerervaeona ann•ovn by 2d% 1m 1 +%v Buddvgs m T %lot Ensmw Ewmmg Renoyolow wn I'H 2X %In' hove finiitlmg. m ?4% It Lnslmn BAN no Rennvatun in Ilnmo ve by l0 ^4 mi Naw 9rnlmngn or Pb'b to c.mm5 Rwldoq an no, mpmw W J2 %tn: Now Hu @ono- m 78% m. Exicliivg Footling P.enovamne Improve oY 3A °Ala Naw Buedrrzgs or 30°Lbi Casting 9uvong P,en>+anon, ImoT"ti by r %lot Wmw LeiJr in 3P'A Iv r cure.: fin iv.ng Rennyaiwis imcrtivo by 30 % IV Hew ixitl9n,s or 34 %in, Ea3slmo Bw deg Reroyafmw improve La 4Qry b, New 9 Ad In, or 16% hr Fereting B, drug Rem.atm, Imprrne ny 421% for Naw 3eddmgs or 35 nn it, Enatmo Buddng Ronmatena enpmvn b, 44% to Hew Lrdklrtl, in 40 F, to Eei,ling unio ng Renovemne enp•ove by 46% to New hill of or 42% Ina Erring Burlo,ig Rennyteans Ifni Ly 46 % -f, lm BJddingE DI 4it, to, Eaa .... . PL',lor, RBnJYtlLn.S on Site Renewal Energy 1 n5 Renewabe Energy J`4 Fro r eahlo Fvagv 5 %Renewable Energy 'k Renewable Erwgy 9 "g Renar+ablo Los, 11 %Renexm. Energy 11 %narcwnbn Enmgy Enhanced C.loneressnione, Enhall Refrigerant M....insist Measurement and Vard'Fatan Green poem Required Required Required I to 4g 1 5 5 S Q u 14 1] iP lg I tot 1 2 J 5 2 2 3 2 Figure 2: LEED scorecard without the grant (Silver -level certification) Page 33 Agenda Item No. 16A21 July 27, 2010 Page 46 of 120 49 LEED 2009 for New Construction and Major Renovation Project Scorecard Propel Na.: Colter Area Tonal Transfer Station SILVER Propct Address: 3301 East Tamiami Trail Naples. Mine �6�1 7 9wa r� Pre, 1 Stmage and Collodion at Recyclbla Real 1iz v "3 Door 1.1 Building Rel - Mai Existing Walls, noun a al Root II Prompt Reuse 55% 1 Prereo2 Reuse 75% 2 �I I Reuse 95% 3 52k,i ".D+, 1 Sol 1.2 Building Reuse Maintain Interior Nonsnuclual Elwnt 1 ': Conslautllun Indoor Air Deal Management Plan- Before O-md.nct 1 Credil2 Cong"C6on Waste Management 1 M 2 .Credit 42 N250 "m Regrrad or Salu:ged 1 LowEninting Malrlxls Foonng Systems 2 75 %Rarynmdor91e,d 2 Credit Materials Reuse 11e2 Credit 6.1 BR.. 5% 1 Controllabllity of Systems - Tharmal Comunl 1 Reuse 111% 2 Deed Recycled content tto2 18 Bi t0 %o(Conlnl 1 Daylrghtand Vlevrs -Views 1 29 %of content 2 x=. {',• %. `;>. Cell 5 Regional Material tb3 R%.far ads Marerads 1 20 %of fassuiain 2 f col Randl, Brune bl lAauriafs 1 as -M. Credit] Carl Wood 1 8e -14 a ae•s,.•.I nr r Prompt Minimum turned, Air C lMy Pedortnence Required Prereo2 Eavbonmental Trial SteeNe IETS )Cannot Required �I I Dull Air DeNyery Mont inp 1 '.Gedi12 Increased Venlilrel 1 �01sd113.1 Conabudl led.., Air Ouallty Management Plan - DI Conshudion 1 �Credit 3 2 Conslautllun Indoor Air Deal Management Plan- Before O-md.nct 1 ICost Al LorEmiding Maleriala- Adhesives and Sealant 1 .Credit 42 Law -Erelding Maleriala Paint and Cdaungs i Cndll 4.3 LowEninting Malrlxls Foonng Systems 1 Credit 44 Lcure- Emiding Materials- Cmm,osrle Wood and Agr, rProdud, t Credit 5 Indoor Chemical and Pollutant Source Conuvl 1 Credit 6.1 Controllabllay of Systems- -ghong 1 16 Controllabllity of Systems - Tharmal Comunl 1 Qedll 7.1 Thermal Comimt - Design 1 6atli17.2 Themal Comfort - VanGnaeon 1 18 Daylighl and Views- Daylight 1 Sluff 8.2 Daylrghtand Vlevrs -Views 1 Credit I Innovation in Design 1 to s i Evemplary Performance EAsfif00 %Gann Power i 1 Groan HousMew„ling I 1 Buul:lg s Ed cation 1 1 Low MeuryLyh6n9 1 I fr s rn,,gy Swings Energy Site Appltnsos I Cront2 LEED' Accredited P lessional 1 2 r t '!pets .. ,..�ae ❑ , ,.r. o d e Gr 1 R Rot Priordy l W 4 o Dn_velnpmant Santini and Comma iry Cb'u.ndu rly 1 ol l Allernatiwe Tmnspordi n- Plblic TonspelaW Ail Q unwaeve Wastewater Technobose (2P %) , ll C (13 %), MRc5 (20 %) t 50 - r ., CertlTied. 40 -49 points Silver. 50 -5g points Gold. 6C 7P pints Platinum. 8g -pants Figure 3: LEED scorecard without the grant (Silver -level certification) Page 34 Agenda Item No, 16A21 July 27, 2010 Page 47 of 120 r -$.a' LEED 2009 for New Construction and Major Renovation �j�' Project Scorecard Projed Nam. Cdliol Al ee Bawd l mbtea Bmwn PtIITINIIM with GRA14T Pmjrcl Address: 3301 East lanuemr Lail. Nxpms Flb,ldn peer, l Constnedlem Adrvlly Pollution Pementare Regmred Credit 1 Sim Seletion I Credd2 Development Density and Cerear yC.m.yflegy S LTedi13 BrowmnNd Red.lmlopmenl I Credit 4A Alternate. Tmnapodalton P161ic lransporlamn AUmss 8 CreddQ Altemat. Tranepodatlon Brgda srnr, aM Cnangtng Rnrnm I Credal 4.3 AltemaowTranaperution� tow Ermlling and Feel- FnaenlVetvdes 3 I Credit La AAemalen, Trmapmlation Premg Cayvdry 2 Codd 5.1 Silo Development . Putted of Rarlole Habiml I Credit S 2 SRe Development 65axm, glen Spam I Credit 6l Slmymaater Design Ouannry Cndol I Cenralfi2 Slormeral DUlgn -OUeuq U,,,l I Ctadll 7.1 Heal Island Ennet Ngnr.f I Debt 7.2 Rea, Wand Elmnt -Rml I CledltB Llghr Pollution Reduction I 10 1 1 s. Prwegl water Use Ramaw. 4 Raqutmd "e.dnl warm emdem Lanaacapmg naa 2 B R d by�g% l an a lT.11cshn 4 C dl2 Ceredd 3 l' n Wannyataelr blongg.e. Water gain R tl ton 2 RSd""Styr Nadoa,by d5% 21o4 2 3 4 Rnnure bv4n% 4 etegl Fundamental COmmlalmning ofeaking E.a,,Syemma Required a+id Prereg2 Mlnlre Energy Pertomunu Requited Preo,3 Fundamenal Refrigerant Management Retuned Cledlll DPtimtae Energy Performance Ito 19 Inlpmvnpy 12 %Irr N. Rwdingc 11 B %lo Existing I di, RarinvaLane I InLP r by 14 %l., New Bmldings er 10 %tor Endhvg 6,,16, Renovabms 2 Bnptove by 16 %lrnrl— Butldr, vl l nr for Cnapng B.,llmg Renovalwnd B nlpubva oy ltl"L,f1lNewKAU,,ofl4% for Sx¢nng Bodiny Renovatwns 4 Inipwve by 20 %tor NrM Bk,i d r, or 16b, lot cxulwg Butldmg Rovovanpns Impnrve ov 2NU 1. New H,r ... . vt IB %Ica Evebnq Buildmg RemvabbN Imbrove dy 24 °Amr New BUCOmps C' 'J9: trr I"Itog BUddmg Reuovevurrs T IinP¢idy16%1.,N,e6ddm;r of L% Ior Evislmd BWdmgRencuauana P Irttpmve by 29%loi Nov Bredr,gs or 241 . bl Exanng h 1reng Rerovenms B Impmvnby30 %Iry kwv Ruudrn,or2F -A Iry L.aanog Rwlbha Rmtuvalai e IO Iglprovv uv R %fcrN[mBWA lllgd o,2b %lo Eeytnp Braiding RcnvuoLOrs tl I' -Plow by 31% 1., New Buvdings 11.0 %lor_xlseng CLlldavg rrr,v1ime 12 Impioye by 36 %iv New Bmldnge or -,2% Ira Er mnq Bwlmny Renovetms 13 Impmv =6yIMtr haw BOINIngebr34 %iv Cxreenp BnJrliny nanovalv:rm 14 r1l, 'C ey 40 , I, Nm Bundi, L: 3R% C, EpC. nXI BLrydI ] FeneYd:gnb js ImPrvve by 42 %Ina tlaw HluWmge..r 33 % lot Eelunq 9mldinq Rmmvabbns 16 nnprbve ov 445:.1, New Buumng; =or4D %iol E ,rr, Brill, Rencvaoons ❑ InpIOVe dv 45% to, New 3v,dn1pso14_2% by E ndACg BtAdmp P an, vaLons 1B Iairlove, by 46 -A � tot New Bmlmngs or U%, hr Exisrn, Build, Fenweliuris ]9 Ctedtl2 On-Star Ren.wable Energy I W I 1% Renewable Energy I 3 <. Idenmve14n Ervr by 59e p" no.bll Energy 3 og Renewable Energy 4 l %Remnable Frergy rI %Renewable Elreryy 6 Vyh 191 E. srgy Crool3 EnnancbG mmi - ing 2 ped l4 EnhanudR Mg IM negemem 2 � Cedl5 Meaeurement and VeNfwaoon 3 Ewa lo^ Vredl 6 Green Power 2 Figure 4: LEED scorecard with grant (Platinum -level certification) Page 35 Agenda Item No. 16A21 July 27, 2010 Page 48 of 120 r. a LEER 2009 for New Construction and Major Renovation Project Scorecard Project Nam.: Colliei Area Tinned Tender Slahgn PIATINUMwiN GRANT lonaN l Addel 3301 Eadl Temlami Ttall, flapled. Flonda Pmn, I Storage and Collection 01 Recyctabin Required .# ;w 4K Ctadil Ll Building Rem. - Maintain Eeidling Walls. Floors and Root 1103 Pad..Ii e'Ad 50% Energy Usc Redndien 55% 1 '.•= �Reuw Rouu 75% 2 We Reuu 95% 3 ,T y Credit 12 Building Rem. - Maintain lnlerro Nia,du umr.I Flemenle 1 . S": ". Cori2 Construction Waste Management 1to2 Liv. Mercury Lgning %Reamed or Selvoged 1 lit' B %Readied on Salvaged 2 ..:9C'd etk bore 3 Materials Reuve I is 2 1 e S% I BR R. yo 10% 2 Credit 4 R.,eed Content I to 2 12 10 %ol Content I 20% of Content 2 j ,mmt5 Regional MatenaN not 10 %o1 Materials t I 2L %m Materials 2 � ",?? Ceddli Rapidly Renewable Materials 1 "'! Credil7 condo t Wood 1 it I Innovation in Dealgn Pmrmti Minimum Indoor Air Damon, Pridemore.. Required Premy2 Euvimnm.ntal reheat. Smoke (ETS) Control Raddl Credli Outdoor Air Delivery MOnROdn9 1 Credl2 increased annotation 1 JCmdt1l Construction Indoor Air Quality Management Plan- During Colrshucton 1 EA.'Credit 32 C ... toothed Indoor Air Quell Management Ived Belmoe upatlq 1 Vu Credit 4l Low - Emitting Mandan Adle.evermd5nalams 1 ,r- 'Olson 4.2 Low - Emitting Neeriab - Pamk .,it Counted 1 'Credit 43 low - Emitting Matadals- FM... Syslemd i '.•Crndtl 44 Low - Emitting Matatlala- COraptate Wren and AgU@nr Producla t Io- Credit 5 Indoor Chemical and Pollutant Souris Control i CmdY6.l Controll.bllMyof Systems- Llgmuy 1 Credit 6.2 Conumbbillty of Syslema- Thnrmd Conlon 1 yA v Is ma Thereat n t Comfort Dea 1 6i Credit 72 Thermal Comfort Vetiflcallan t Credit 8.1 Daylight and Views - Daylight i Costs 89 Daylight and Views -a'Wwe 1 'tier) Pad..Ii e'Ad 50% Energy Usc Redndien v7v Als plit, '.•= i:. 7. We ni:e' r.. l$}Y_ axe .°uTm- ,w "at, t Liv. Mercury Lgning I +# lit' -i, Eum,dr,Pmii 15 °w Romwablo Emegy f' s;; 1" 0'19'; 1 -` _!:' Credit t Innovation in Dealgn 1 toy Pad..Ii e'Ad 50% Energy Usc Redndien 1 I Ginn llouseNeeping I �Irunrp31y t Brddingad Eduauon 1 t Liv. Mercury Lgning I 1 Eum,dr,Pmii 15 °w Romwablo Emegy 1 C'redil2 LEED' Accredited Professional 1 Cedli Regional Priedly Ito4 Sr1 DeveKPmOn: Densih antl Community U'roo ely I i HI S,"al IAh`lrlru Leo"norlalian Puink Tmngtortuimi AOons 1 I WEc2 Innovative Wa618wa19+Tacl,noo,ed I EAot(28 %).EAC2(13 %) MRd120 %1 I i -96�it "e e 1 Cents eei 4049 points Silver 5059 points Gold. 6079 Points Platinum 80+ punts Figure 5: LEED scorecard with grant (Platinum -level certification) Page 36 Agenda Item No, 16A21 July 27, 2010 Page 49 of 120 ADD Alternative 3 Bits Fleet Public transportation and solar power have traditionally been independent of each other. However, the race to increase and improve mass transit infrastructure while reducing energy and fuel consumption is facilitating creating a synergistic solution to providing public transportation. Solar- powered mass transit is a key component to U.S. energy sustainability. Both technologies, solar and mass transit, are getting attention due to the rising costs of fuel. Today many transit facilities are moving toward installing solar PV systems and, in turn, reducing global warming while decreasing America's dependence on oil and creating jobs. This shows investing in green transportation not only helps the environment, but also strengthens the economy. This project will significantly reduce energy consumption and use green energy to provide 100% of the garage's electricity and reduce gas emissions by several thousand tons annually. By replacing four diesel buses with four electric buses = 233,447.57 metric tons, the fully FTA- funded project is estimated to save: • Average reduction in CO2 emissions from 2002 -2009 = 293,007.38 metric tons • Average reduction in CO2 emissions from 2011 -2020 = 311,236.43 metric tons Proposed Replacement of Four G:isting Diesel Buses with New Electric Buses On an average weekday peak, CAT deploys 16 buses across its network. With the purchase of four new electric buses, the County will have more reliable buses as spares. This means is that four of the buses used for service on a daily basis (see Table 1 "Buses to Replace" page 7) will become spares and four of the older buses will be retired. The life expectancy of these existing 2004 30 -foot, Champion medium -duty transit buses, according to the FTA, is 7 years, or 350,000 miles. Accordingly, these buses have very much exceeded their useful life. The condition of these buses range from fair to poor and the total cost for repairs and maintenance for each of these buses surpass the purchase cost. Replacing these four buses will help CAT minimize annual maintenance costs and improve daily performance of service to the public. Page 37 Agenda Item No. 16A21 July 27, 2010 Page 50 of 120 Collier County's Ongoing Program Management Approach The ATM Department for the Collier County Growth Management Division and the Collier County Facilities Management Department will provide oversight and project management following the FTA grant award for this project. As part of the enhanced formal LEED Certification process, LEED Building Commissioning will be employed to verify that proposed upgraded sustainable features meet, or exceed, performance criteria. Specifically, the primary renewable energy system proposed (rooftop solar PV panel system) will be measured and periodically re- tested to ensure that the power savings estimated in this proposal are met. Long -term utility measurement and verification programs will further verify the system's effectiveness. Proposed water - saving strategies will be tested to confirm zero potable water usage for irrigation and minimal potable water usage plumbing fixture flushing with supplemental rainwater harvesting system water sourcing. All building commissioning test reports will be formally presented to the FTA, the ATM Department, Collier County Facilities Management Department, the building contractor and the design team. Any maintenance adjustments will be made expeditiously as required to ensure the ITS meets or exceeds proposed sustainable goals specifically funded by the FTA grant award. Page 38 Agenda Item No, 16A21 July 27, 2010 Page 51 of 120 Key Personnel The key personnel who will be responsible and involved in the project are listed in this organizational chart. Dan Croft I Skip Camp I I Marlene Foord, AICP Fleet Management Director Facilities Management Director Grant Development and Management Coordinator Page 39 Agenda Item No. 16A21 July 27, 2010 Page 52 of 120 Appendices Appendix A A.Support Letters Collier MPO Phil Tindall 2885 South Horseshoe Drive Naples, FL 34104 Naples Pathway Coalition Inc.* Michelle Avola Executive Director 300 Fifth Avenue South Suite 101, Box #464 Naples, FL 34102 Commuter Services* Lauren Lane Commuter Services Outreach Coordinator Department of Transportation, District One Modal Development Office /Public Transit __. Fort Myers Operations Center 2981 NE Pine Island Rd. Cape Coral, FL 33909 Collier County Health Department Dr. Joan Colfer Health Department Director Collier County Health Department 3301 East Tamiami Trail, Bldg. H Naples, FL 34112 Smart Growth Coalition Stacy Revay Healthy Communities Coordinator Collier County Health Department 3301 East Tamiami Trail, Bldg. H Naples, FL 34112 Edison State College Dr. Kirk Otto Science Lab Manager Edison College 7002 Lely Cultural Parkway - Naples, FL 34113 Page 40 Department of Transportation, District One* Jan Parham Transit Project Manager District One Modal Development /Transit 801 North Broadway Bartow, FL 33830 Political Support Letters* *To be submitted separately Page 41 Agenda Item No. 16A21 July 27, 2010 Page 53 of 120 Agenda Item No. 16A21 July 27, 2010 Page 54 of 120 inUl 2885 South Horseshoe Drive, Naples, FL 34104 • (239) 252.8192 a Fax (239) 252 -5815 June 14, 2010 Brandy Otero Assistant Project Manager 2885 South Horseshoe Dr. Naples, FL 34104 SUBJECT: CONSISTENCY LETTER: COLLIER COUNTY'S GRANT PROPOSAL FOR FEDERAL TRANSIT ADMINISTRATION STATE OF GOOD REPAIR BUS AND BUS FACILITIES INITIATIVE FUNDS Dear Ms. Otero: The Collier MPO staff has determined that the Collier Area Transit I1ltermodal Transfer Station project grant proposal and application is consistent with the following MPO Documents: • 2030 Long -Range Transportation Plan, • Transit Development Plan Major Update 2006 -2015 The Collier MPO can amend the Transportation Improvement Program for FY 2010/2011 — 2014/15, if the grant is awarded. If you have any questions or need additional information regarding the consistency of the grant proposal with the Collier MPO's plans, please let me know. Sincerely, Phil Tindall, AICP Collier MPO Director n7-1, ILIL Agenda Item No. MAY July 27, 2010 Page 55 of 120 Charlie Crist Governor Ana M Viamonte Ros, f,A.D_. rAP. H. State Suraeon General Brand} Otero .Associate Project Mana_er GrovNth Management Division AlternatiN'e Transportation \Modes Department 'S85 South HorenhDe Elm,- \ap.les. FL =g1C4 Wedncsday.June 15. 2010 Dear Ms. Brandy Otero: Collier Count} Health Department is vNritine this letter in support of the Sustainahle Interrnodal Transit Station project ':ocated at :-'01 East Tamianti Trail in Collier Countv. Florida. The Coller Countv Health Department cullahorates vv hh the CALier Area Tran,it l C-AT1 on programs to promote hener health for A people in the c.mununh). Recently. the Health Department and CAT coordinated an ev ent to encnump the hu.i conununity to take adv'antLg e t ranw ;aem dutin_ lunch hours. Sp i icalv.:he Health Depzrt:nent is 1:onlnmed to me wcceU of this tr n. w lroiew as an CC ii to .nn .?e ,7 COl:e public UanTortation to reduce stress and We mare active lifc,ide,. V pojeet \1 A enalfle .ad ac" de , ar re 'd . ena and \ ,. -. � :,:.... sn .r-ri,es in a on .nient and ti , ditiou� \ \:iy. Tile CAW County Ho u.h Dct " em toll\ supports and is .ot::pletely committed to the 'tali red -tics" of Ccdher.A ea Transit in eolluhoration void, Wpalunent of 10 m ativ e Tramp, anum 70, lies ATNI 1 Co Int} T;'a p, taticn LlivsiOn and the C-:he- C. ante Nve believe that rite CAT Su,lainne hne,m w 170,01 Star ", p two and pant application has he op, dei'eloned to _: tfiE i.. e.d> h' WL,ia. ll rUQ C :%l 3n. vA e spa 111a�V' ;t' j _ qLle ned in oo,i in the ':;: i' c mC i a,.. �: illls c,)untlmJe tGln lt'nitiaiilxe. T`..a1k v-emu f,_,: v cOa -ja LtlJll.:,_d 'Se lo. k ryv" d i,ctnc with Ct l er Sincerely. J Ab Mil!sap- Di Mr ci Alwon ti t H_alth Educwii,w, Collier Count} Health Deparment 3301 Tamiami Traii E • Bldg. H Naples, Florida • 34112 -4961 7weprione 12391 252-120) Joan M. Colfer, M.D., M.P -H.. Director vat. Collier C u ,t'y' Health ;i�pidrlTici''i IdaNng Address: Post Office Box 429 ...s FiC ioa . 6 -0429 Agenda Item No. 16A21 July 27, 2010 Page 56 of 120 Brandy Otero .Associate Project Manager Growth Management Division .Alternative Transportation Modes Department 2885 South Horseshoe Drive Naples, FL 34104 Wednesday, June 16, 2010 Dear Ms. Brandy Otero: The Smart Growth Coalition comprised of the Collier County Health Department, Collier County Comprehensive Planning, Community Traffic Safety Team, Transportation Department, Collier Area Transit (CAT) and many other agencies, coalitions, businesses and citizens will contentedly support the Sustainable Intermodal Transit Station project located at 3301 East Tamiami Trail in Collier County, Florida. The monies obtained trough this grant will enable and encourage the community to use alternative modes of transportation to get to work, shopping, community centers and parks. This is a step toward correcting the urban sprawl development pattern that is currently affecting our county. The CAT Sustainable Intermodal Transit Station will increase ridership while decreasing carbon emissions by designing an energy efficient structure where people of all ages, disabilities and capabilities can ride transit comfortably and efficiently. An infrastructure for multi -modal transportation will also assist in decreasing the inactivity and obesity epidemics that plague our nations' youth. We respectfully request your favorable consideration of the Grant funding requested to assist in the implementation of this countywide transit initiative. Sincerely,' Stacy Revay - Smart Growth Coalition, Chair R EDISON STATE -- COLLEGE - COLLIER CAMPus June 15, 2010 To Whom It May Concern, Agenda Item No. 16A21 July 27, 2010 Page 57 of 120 Edison State College is writing this letter in support of the Sustainable Intermodal Transit Station project located at 3301 TAMIAMI Trail, Naples FL, in Collier County, Florida. Edison State College is an accredited state college with four campuses in southwest Florida. To meet the needs of the students and faculty, Edison Community College depends upon Collier Area Transit (CAT) and the County's Transit System for reliable transportation. For the last two years, CAT has coordinated with ESC on its community "Green rest" event. (Greenrest seeks to present information, resources, services and products that promote healthier, more ecologically sound lifestyles, as well as educate attendees about the environmental impacts of vloesp -ead consumer actions and choices). CAT has also provided ESC students and staff with `acts on the benefit's of commuting, and the many ways taking CAT instead of driving can help reduce air pollution. As a community partner, ESC is familiar with the plans for this transit `.acility project and fully supports this effort. In conclusion, ESC is fully committed to the sustained success of Collier Area Transit in collaboration with Department of Alternative Transportation Modes ;ATM) for the Collier County Transportation Division and the Collier County Community We believe that the CAT Sustainable Intermodal Transit Station project and grant application has been developed to meet the needs of the community CAT serves. We respectfully request your favorable consideration of the Grant funding requested to assist in the implementation of this countywide transit initiative. Thank you for your consideration, and we look forward to working with Collier Area Transit. Sin c e , Kole Ange � Public Relations Specialist Edison State College — Collier Campus 7007 L.el% Cultural parkway Naples Et.34to; phone: (239) 732 -3957 Agenda Item No. 16A21 July 27, 2010 Page 58 of 120 Appendix B B. Conceptual Drawing (as of 6/7/10) Page 46 Agenda Item No. 16A21 July 27, 2010 Page 59 of 120 Appendix C C.2009 Transit Development Plan The Collier County 2009 Transit Development Plan is presented on the following pages. Page 47 Collier County Transit Development Plan Annual Update - Progress Report September 2009 Cor County Prepared for Agenda Item No. 16A21 July 27, 2010 Page 60 of 120 U Metropolitan Planning Organization DEPARTMENT OF ALTERNATIVE TRANSPORTATION MODES 2885 South Horseshoe Drive Naples, Florida 34104 And COLLIER METROPOLITAN PLANNING ORGANIZATION 2885 South Horseshoe Drive Naples, Florida 34104 I WILBUR SMITH ASSOCIATES, INCORPORATED Wiibwsmlth 3191 Maguire Boulevard Orlando, Florida 32803 The preparation of this document has been financed in part through grants from the Federal Highway Administration, the Federal Transit Administration, the U.S. Department of Transportation, under the Metropolitan Planning Program, Section 104(f) of title 23, U.S. Code, and local funding. The contents of this document do not necessarily reflect the official views or policy of the U.S. Department of Transportation. Agenda Item No. 16A21 July 2T 2010 Page 61 of 120 TABLE OF CONTENTS Section1: INTRODUCTION ............................................. ............................... 1-1 Organization of Report ........................................... ............................... 1 -2 Section 2: FIXED ROUTE SERVICE IMPROVEMENTS IMPLEMENTATION ...... 2 -1 Route Changes and Improvements ......................... ............................... 2 -1 FareChanges ........................................................ ............................... 2 -18 Capital Equipment and Facility Changes and Improvements .................... 2 -18 CustomerMarketing .............................................. ............................... 2 -21 Section 3: REVISIONS TO THE IMPLEMENTATION PLAN ............................... 3 -1 Accomplishments in the Past Year ........................... ............................... 3 -1 Accomplishments in 2009 Compared to Implementation Plan in 2005 MajorTDP .......................................................... ............................... 3 -3 Section 4: STATUS OF GOALS AND OBJECTIVES ............ ............................... 4 -1 Section 5: TENTH YEAR TRANSIT IMPLEMENTATION PLAN ......................... 5 -1 Section 6: FINANCIAL PLAN ........................................... ............................... 6 -1 FinancialPlan ........................................................ ............................... 6 -1 CostAssumptions .................................................. ............................... 6 -1 RevenueAssumptions ............................................ ............................... 6 -2 Costs and Revenues Summary ................................ ............................... 6 -5 Section 7: Farebox Recovery Report — In Compliance with Section341.071, F. S ....................................... ............................... 7 -1 Current Farebox Recovery Ratio .............................. ............................... 7 -1 Prior Years Fare Studies and Changes ..................... ............................... 7 -1 Proposed Fare Changes for the Upcoming Years ....... ............................... 7 -1 Strategies That Will Affect the Farebox Recovery Ratio ............................ 7 -2 Collier County ATM TDP Annual Progress Report i September 2009 Agenda Item No. 16A21 July 27, 2010 Page 62 of 120 FIGURES SECTION 1 NONE Figure 2 -1 Weekday Collier Area Transit System Map, March 2009 ........................... 2 -2 Figure 2 -2 Collier Area Transit (CAT) Ridership Summary Chart, FY 2004 - 2009 ** ...... 2 -3 Figure 2 -3 Route 1 Alignment Modifications, March 2009 .......... ............................... 2 -5 Figure 2 -4 Ridership by Fiscal Year for Routes 1A, 1B, and 1C (Red Route) ............... 2 -6 Figure 2 -5 Route 2 Alignment Modifications, March 2009 .......... ............................... 2 -7 Figure 2 -6 Ridership by Fiscal Year for Routes 2A and 2B (Orange Route) ................. 2 -9 Figure 2 -7 Ridership by Fiscal Year for Route 3A and 3B (Purple Route) .................... 2 -9 Figure 2 -8 Ridership by Fiscal Year for Route 4A and 4B (Green Route) .................... 2 -10 Figure 2 -9 Ridership by Fiscal Year for Route 5 (Blue Route) ..... ............................... 2 -11 Figure 2 -10 Route 6 Alignment Modifications, March 2009 .......... ............................... 2 -13 Figure 2 -11 Ridership by Fiscal Year for Route 6 (Yellow Route) .. ............................... 2 -14 Figure 2 -12 Ridership by Fiscal Year for Route 7 (Light Blue Route ) ............................ 2 -15 Figure 2 -13 Ridership by Fiscal Year for Route 8 (Pink Route) ..... ............................... 2 -15 Figure 2 -14 Route 9 Alignment Modifications, October 2008 ....... ............................... 2 -16 Figure 2 -15 Ridership by Fiscal Year for Route 9 (Brown Route) .. ............................... 2 -17 Figure 2 -16 CAT Passenger Transfer Facility Locations, March 2009 ............................ 2 -19 Figure 2 -17 Future Location of Collier Government Center Transfer Station ................. 2 -20 SECTION 3 Figure 3 -1 Fixed -Route CAT Ridership Trends (2003 -2009) ....... ............................... SECTION 4 None SECTION 5 None SECTION 6 None SECTION 7 None 3 -2 Collier County ATM TDP Annual Progress Report ii September 2009 Agenda Item No, 16A21 July 27, 2010 Page 63 of 120 TABLES SECTION 1 None SECTION 2 Table 2 -1 Collier Area Transit (CAT) Ridership Summary FY 2004 —FY 2009 (Depicted in Figure 2 -2) .............................. ............................... 2 -3 Table 2 -2 CAT Fares as of March 2009 ................................... ............................... 2 -18 SECTION 3 Table 3 -1 Improvements Initiated in 2008 / 2009 ...................... ............................... 3 -3 SECTION 4 Table 4 -1 Status of Goal 1 ..................................................... ............................... 4 -2 Table 4 -2 Status of Goal 2 ..................................................... ............................... 4 -3 Table 4-3 Status of Goal 3 ..................................................... ............................... 4 -4 Table 4-4 Status of Goal 4 .................................................. ............................... 4-5 Table 4-5 Status of Goal 5 ..................................................... ............................... 4 -5 Table 4 -6 Status of Goal 6 ..................................................... ............................... 4 -6 SECTION 5 Table 5 -1 Implementation Plan (FY 2010 through FY 2019) ..... ............................... 5 -3 SECTION 6 Table 6 -1 2009 Estimated Transit Vehicle Costs ...................... ............................... 6 -2 Table 6 -2 Vehicle Replacement Plan 2010 - 2019 ...................... ............................... 6 -2 Table 6 -3 Collier County Unfunded Transit Priorities ................ ............................... 6 -4 Table 6 -4A Planning Estimates for Fixed Route Costs & Revenues Collier County TDP Annual Progress Report (2010 -2014) ...................... 6 -6 Table 6 -46 Planning Estimates for Fixed Route Costs & Revenues Collier County TDP Annual Progress Report (2015 -2019) ....................... 6 -7 SECTION 7 None Collier County ATM TDP Annual Progress Report ��� September 2009 Agenda Item No. 16A21 July 27, 2010 Page 64 of 120 Collier Area Transit Mission "Collier Area Transit (CAT) is committed to providing safe, accessible and courteous public transportation services to our customers." SECTION 1 INTRODUCTION Collier Area Transit (CAT) operates under the supervision of the Collier County Department of Alternative Transportation Modes (ATM) for the Collier County Transportation Division. CAT serves as the public transit provider for Collier County, serving the Naples, Marco Island, and Immokalee areas. According to the Rule 14- 73.001, Florida Administrative Code, F.A.C., Transit Development Plans (TDPs) are required for grant program recipients pursuant to Section 341.052, Florida Statutes (F.S.). A TDP shall be the provider's planning, development, and operational guidance document, based on a ten -year planning horizon covering the year in which funding is sought through the nine subsequent years. A TDP or an annual update shall be used in developing the Florida Department of Transportation (FDOT) Five -Year Work Program, the Transportation Improvement Program, and the Department's Program and Resource Plan. A TDP shall be adopted by a provider's governing body. Rule 14- 73.001, F.A.C., sets forth the requirements for the TDP Annual Update, as stated verbatim below: 14- 73.001 Public Transit (4) Annual Update. Annual updates shall be in the form of a progress report on the ten -year implementation program, and shall include: a. Past year's accomplishments compared to the original implementation program; b. Analysis of any discrepancies between the plan and its implementation for the past year and steps that will be taken to attain original goals and objectives; c. Any revisions to the implementation program for the coming year; d. Revised implementation program for the tenth year; e. Added recommendations for the new tenth year of the updated plan; f. A revised financial plan; and g. A revised list of projects or services needed to meet the goals and objectives, including projects for which funding may not have been identified. This report is an Annual Update for the Collier County TDP, meeting all the Rule 14- 73.001, F.A.C., requirements listed above. Collier County ATM TDP Annual Progress Report 1 -1 September 2009 Agenda Item No, 16A21 July 27. 2010 Page 65 of 120 ORGANIZATION OF REPORT This report is organized into six major sections (including this introduction). The remainder of this section provides an overview of this Transit Development Plan Annual Update. Section 2: Fixed Route Service Improvements Implementation provides a review of the past year's implementation actions and describes improvements made to the fixed route services and facilities since the last annual progress report. This section partially addresses Rule 14- 73.001, Florida Administrative Code (FAQ, (4) (a) Past year's accomplishments compared to the original implementation program; Section 3: Revisions to Implementation Program provides a review of the past year's accomplishments compared to the original implementation plan. It also provides an analysis of the discrepancies between the 2005 Major Transit Development Plan and its implementation in the past year (Year Three) and any revisions to the steps that will be taken to attain the original goals and objectives. This section addresses Rule 14- 73.001, F.A.C., (4)(a), past year's accomplishments compared to the original implementation program; and Rule 14- 73.001, F.A.C., (4)(c), any revisions to the implementation program for the coming year; Section 4: Status of Goals and Objectives provides the status of the goals and objectives, including a revised list of projects or services needed to meet the goals and objectives, which include projects with funding that may not have been identified. This section addresses Rule 14- 73.001, F.A.C. (4) (b) Analysis of any discrepancies between the plan and its implementation for the past year and steps that will be taken to attain original goals and objectives; Section 5: Tenth Year Transit Implementation provides recommendations for the new tenth year of the updated plan with any revisions or additions to the goals, objectives, and implementations. This section addresses both Rule 14- 73.001, F.A.C. (4) (d) Revised implementation program for the tenth year; and Rule 14- 73.001, F.A.C. (4) (e) Added recommendations for the new tenth year of the updated plan; Section 6: Financial Plan provides the revised financial plan of how the transit improvements will be funded, with stated cost and revenue assumptions. This section will include a cost and revenue summary. This section addresses both Rule 14- 73.001, F.A.C. (4) (f) A revised financial plan; and Rule 14- 73.001, F.A.C. (4) (g) A revised list of projects or services needed to meet the goals and objectives, including projects for which funding may not have been identified; and, Section 7: Farebox Recovery Report provides the implementation plan describing strategies for the next fiscal year. This section addresses the requirements of Section 341.071, Florida Statutes, regarding Farebox recovery impacts. Collier County ATM TDP Annual Progress Report 1-2 September 2009 Agenda Item No, 16A21 July 27, 2010 Page 66 of 120 SECTION 2 FIXED ROUTE SERVICE IMPROVEMENTS IMPLEMENTATION This section provides a review of the past year's implementation actions and describes improvements made to the fixed route services and facilities since the last annual progress report. Route Changes and Improvements The previous TDP annual progress report was adopted in October 2008. Since that update, service on several fixed routes has changed. In December 2008, faced with budget cuts of approximately $415,000, CAT began looking at eliminating or reducing several bus routes. In compliance with Federal Title VI requirements, meetings were held in November and December of 2008 to receive public input regarding the proposed CAT route changes and fare increase proposed in response to increasing operating costs. Notices of these public meetings were provided via multiple mediums, including: television, radio, inside buses, handouts, and advertisements in the local newspaper, to maximize opportunities for citizens to attend these meetings and offer feedback. Through this public participation process, many suggestions for route changes, modifications, and /or eliminations were received. In particular, several citizens expressed concerns in regard to the proposed elimination of the Green Route, designated as Route 4B. Route 4B had been recommended for elimination by staff due to continuing decreases in route ridership (as discussed later in this section). However, a petition with over 100 signatures from concerned citizens was submitted at the November 2008 public meeting stating the need for the route and asking CAT to retain Route 4B. In response to citizen concerns, CAT staff was able to develop an alternative plan that would allow Route 4B to remain in service. Implementation of the route changes was delayed from January 2009 until March 2009 to allow staff to be as responsive as possible to public transportation needs while balancing budgetary constraints. Effective March 1, 2009 four CAT routes were modified, Routes 1, 2, 6, and 9, as described in the following section along with an increase in several fare categories. Sunday service was eliminated on Routes 1A, 2B, and 4B. Routes 3, 5, 7, and 8 were not modified and follow the same alignment as in 2008. Figure 2 -1 on the following page illustrates the alignment of all CAT routes that took effect on March 1, 2009. In the following sections, maps have been included to illustrate the route modifications implemented for Routes 1, 2, 6, and 9 in contrast to their previous alignments. County ATM TDP Annual Progress Report 2 -1 September 2009 1 N I U OLE D ' (7 CITY OF''� NAPLES Agenda Item No, 16A21 July 27, 2010 Page 67 of 120 Figure 2 -1 Weekday Collier Area Transit System Map, March 2009 P E~7 8RD m uuun• •ww TO IMMOKALEE 10 Dp LEGEND QNOSPRAL .SCHOOL pBRARY y�PApK YELLOW ROUTE 61 PHYSICIANS REGIONAL • cr •i.e r .t•:i ia k VT= a ♦ o RO Collier County ATM TDP Annual Progress Report 2-2 September 2009 ORONADOP m q GOLpEN GAZE PAKKWAV ER... „ V R` u s,l Q Eql les � E�L..EyALNMANN BLVD O �aAVEM MAPLES V !BF RAOp RD CP BSE i�N =._,. AIRPOPT 41ESTEV AVE j 'm o pl L� is IRO AVE 5 aI r-1 j I, 9P M OAV6 PLVD ��!/• g z _ LEGEND QNOSPRAL .SCHOOL pBRARY y�PApK YELLOW ROUTE 61 PHYSICIANS REGIONAL • cr •i.e r .t•:i ia k VT= a ♦ o RO Collier County ATM TDP Annual Progress Report 2-2 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 68 of 120 Figure 2 -2 Collier Area Transit (CAT) Ridership Summary Chart, FY 2004 - 2009 ** 300,000 W�- Glease rote rhal ridership Bela wes wnih� lw mNes Mpremenretl tlunn6 the mlo -year (Fw,faz 6 7, 8. and 9). ^FVMM Npdata imfu arty Parlia'repming In OcIMe. Xa^B INWgh June 2n ROUTES ROUTE 2 ROUTE 1 Table 2 -1 Collier Area Transit (CAT) Ridership Summary FY 2004 -FY 2009 (depicted in Figure 2 -2) Collier Area Transit Ridership FY 04 - FY 09 2004 2005 2006 2007 2008 2009 ** ROUTE 1 84,225 124,288 150,030 212,947 250,873 195,422 ROUTE 2 196,096 289,830 251,012 214,605 193,332 139,432 ROUTE 3 153,383 222,089 260,015 289,357 268,126 182,835 ROUTE 4 170,703 226,051 181,193 156,876 127,884 96,342 ROUTE 5 14,278 27,671 37,428 56,870 69,897 53,262 ROUTE 6* #N /A 26,221 44,891 41,368 40,015 34,718 ROUTE 7* #N /A 33,273 38,391 45,963 51,671 38,542 ROUTE 8* #N /A #N /A 63,830 68,619 91,978 68,600 ROUTE 9* #N /A #N /A #N /A 93,542 72,582 57,116 ' Please note that ridership data was omitted for routes Implemented during the mid -year (Routes 6, 7, 8, and 9) 2008 -09 data Is included through June 2009 only. Route 1C was initiated March 1, 2009 and is reflected above. Source: McDonald Transit Ridership Data, FY 2004 -2009 Figure 2 -2 and Table 2 -1 summarize the past five year's ridership trends by route. It should be noted that the data for FY 2009 is incomplete and only represents nine (9) months of ridership. It is difficult to draw too many conclusions from this data and chart because the routes have been modified to address operational issues and system growth. However, it is possible to examine the validity of some assumptions. For example, the Naples Community Hospital in Downtown Naples was first served by Route 2 and then by Route 1. The peak ridership for these two routes corresponds with the service to the Naples Community Hospital, Collier County ATM TDP Annual Progress Report 2 -3 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 69 of 120 as predicted in the 2008 TDP. It should also be noted that the service area expanded significantly in 2005 and that data for Routes 6, 7, 8, and 9 were not shown when it was operated for only a few months (a partial year). Red Route: The Red Route (Route 1A, 1B and IC) has three buses servicing the system. Under the previous service alignment, two buses ran from the Collier County Government Center Transfer Station at the government complex along Airport Road to Immokalee Road, west to US 41, with service to the Naples Community Hospital along US 41, and then south back to the Transfer Station. The third bus ran from the Collier County Government Center Transfer Station north along US 41 (with service to the Naples Community Hospital) continuing on to Immokalee Road, east to Airport Road, and then south back to the Transfer Station. On March 1, 2009 the routes were modified as shown on Figure 2 -3. Effective March 1, 2009,' Routes 1A and 1B no longer serve the Naples Community Hospital in Downtown Naples; this hospital is now served by the Orange Route. Route IA This route now only operates Monday through Saturday; Sunday service has been discontinued. This route has been streamlined and now runs from the Collier County Government Center Transfer Station, heads north on Airport- Pulling Road, west on Immokalee Road, south on US 41, and then returns to the Collier County Government Center. This route serves North Collier Hospital, Creekside Commerce Park, and the Coastland Mall. Route 16 This route continues to operate Monday through Sunday. The route has been modified and now heads north on US 41 from the Collier County Government Center Transfer Station, east on Immokalee Road to serve Creekside Parkway and North Collier Hospital. Route 1B travels west on Immokalee Road, south on US 41 serving the Coastland Mall, and then travels on US 41 back to the Collier County Government Center. Route 1B has a transfer connection with Route 1C on Creekside Parkway across the street from the post office between Creekside Trail and Creekside Way. Route IC This route was implemented on March 1, 2009 and operates Monday through Sunday. Route 1C runs from the Collier County Government Center Transfer Station, heading north on Airport- Pulling Road, west on Immokalee Road, serving Creekside Commerce Park, then travels east on Immokalee Road, south on Airport- Pulling Road back to the Collier County Government Center. This route serves North Collier Hospital and Creekside Parkway. Route 1C connects with Route 1B on Creekside Parkway across the street from the post office between Creekside Trail and Creekside Way. Figure 2 -3 illustrates the Route 1 modifications that took effect on March 1, 2009. The light pink dashed line illustrates the Route 1A and 1B alignments - as operated in FY 2008. The thin red line shows the Route 1A alignment that was implemented on March 1, 2009. Similarly, the green line depicts the Route 1B alignment that was recently implemented. As shown on Figure 2 -3, Routes 1A and Route 1B no longer stop at Naples Community Hospital. Collier County ATM TDP Annual Progress Report 2-4 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 70 of 120 Figure 2 -3 Route 1 Alignment Modifications, March 2009 Collier County ATM Top Annual Progress Report 2 -5 September 2009 180,000 160,000 140,000 120,000 a N 100,000 `w a 80,000 60,000 40,000 20,000 0 Agenda Item No. 16A21 July 27, 2010 Page 71 of 120 Figure 2 -4 Ridership by Fiscal Year for Routes 1A, 1B, and 1C (Red Route) muy -ub 2006 -07 2007 -08 2008 -09• I■ Route SA O Route 18 0 Route 1C'" _.._ _. - i " 2008 -09 data is included through July 2009 only. " Route IC was initiated March 1, 2009. As such, only March and April 2009 data is available for this route. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -4 shows ridership data by year for Routes 1A, 1B, and 1C. It should be noted that the previous annual update attributed ridership growth for Routes lA and 1B between 2005 and 2007 to stopping at the Naples Community Hospital in Downtown Naples. As noted earlier, as of March 1, 2009, routes lA and 113 no longer serve the Naples Community Hospital in Downtown Naples; the Orange Route (Routes 2A and 2B) now offers this service. Because of this change, ridership should be expected to remain stable or decrease through the end of FY 2008 -2009, due to the elimination of service to the Naples Community Hospital. Total ridership for 2008 -09 will need to be monitored to see how the recent route modification affects annual ridership. • Orange Route: As shown on Figure 2 -5, this route has been realigned to serve the Naples Community Hospital in Downtown Naples. In 2004, the Orange Route was operating over capacity so the stop at the Naples Community Hospital was diverted to the Red Route. On March 1, 2009, the revised service plan was approved so that the Orange Route stops at the Naples Community Hospital once again. Route 2A This route continues to operate Monday through Sunday. Route 2A now serves Naples Community Hospital in downtown Naples, which was previously served by Red Route 1A and 1B. Route 2A runs from Collier County Government Center Transfer Station, north on Airport - Pulling Road, west on Davis Boulevard, and around the Naples Community Hospital in Downtown Naples. The route then continues north Collier County ATM TDP Annual Progress Report 2-6 September 2009 1sas80 ?17 138701. if "92 10z 293'� 74 246 70445 "'r; rx: 35,049 F , ,. muy -ub 2006 -07 2007 -08 2008 -09• I■ Route SA O Route 18 0 Route 1C'" _.._ _. - i " 2008 -09 data is included through July 2009 only. " Route IC was initiated March 1, 2009. As such, only March and April 2009 data is available for this route. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -4 shows ridership data by year for Routes 1A, 1B, and 1C. It should be noted that the previous annual update attributed ridership growth for Routes lA and 1B between 2005 and 2007 to stopping at the Naples Community Hospital in Downtown Naples. As noted earlier, as of March 1, 2009, routes lA and 113 no longer serve the Naples Community Hospital in Downtown Naples; the Orange Route (Routes 2A and 2B) now offers this service. Because of this change, ridership should be expected to remain stable or decrease through the end of FY 2008 -2009, due to the elimination of service to the Naples Community Hospital. Total ridership for 2008 -09 will need to be monitored to see how the recent route modification affects annual ridership. • Orange Route: As shown on Figure 2 -5, this route has been realigned to serve the Naples Community Hospital in Downtown Naples. In 2004, the Orange Route was operating over capacity so the stop at the Naples Community Hospital was diverted to the Red Route. On March 1, 2009, the revised service plan was approved so that the Orange Route stops at the Naples Community Hospital once again. Route 2A This route continues to operate Monday through Sunday. Route 2A now serves Naples Community Hospital in downtown Naples, which was previously served by Red Route 1A and 1B. Route 2A runs from Collier County Government Center Transfer Station, north on Airport - Pulling Road, west on Davis Boulevard, and around the Naples Community Hospital in Downtown Naples. The route then continues north Collier County ATM TDP Annual Progress Report 2-6 September 2009 NAPLES COMMUNITY HOSPITAL Figure 2 -5 Route 2 Alignment Modifications, March 2009 p . t { •t •q • •tl • r' %u Naples .�,:.. _...._ _...,. • w, Schools " i ♦• +� 0 Llnranes • ° �.� •1 � •p ;j Hosptials •' �� ! * Airports vi � '•, Legend - z -•• -- Proposed BusRoute2A Proposed BusRoute2B •,> • `° °•'Existing BusRoute2A «•'' Agenda Item No. 16A21 July 27, 2010 Page 72 of 120 Collier County ATM TDP Annual Progress Report 2 -7 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 73 of 120 on US 41 and east along Fleischman Boulevard. Route 2A travels south along Goodlette -Frank Road to US 41, traveling south on Bayshore Drive and east on Thomasson Drive. Route 2A travels north from Thomasson Drive on US 41 to the Collier County Government Center Transfer Station. Route 28 This route now operates Monday through Saturday. Sunday service has been discontinued. Route 2B also now serves Naples Community Hospital in downtown Naples. Route 2B runs from the Collier County Government Center Transfer Station along US 41 to Thomasson Drive. The route continues traveling west along Thomasson Drive, north on Bayshore Drive, and north along US 41 to Fleischman Boulevard. From Fleischman Boulevard, Route 2B travels west to US 41 and then travels south. The route circulates around the Naples Community Hospital in Downtown Naples and then continues south along US 41, east on Davis Boulevard, and south on Airport - Pulling Road to the Collier County Government Center Transfer Station. Figure 2 -5 illustrates the Route 2 modifications that took effect on March 1, 2009. The light orange dashed line illustrates the Route 2 alignments - as operated in FY 2008. The thin dark orange line shows the Route 2A alignment and the medium orange line shows the Route 2B alignment as they were implemented on March 1, 2009. As shown on Figure 2 -5, Routes 2A and Route 2B now both stop at the Naples Community Hospital. Figure 2 -6 below shows ridership trends by year on Routes 2A and 2B. The previous TDP annual update indicated that a couple of factors contributed to the decline in ridership from 2005 to 2008. First, service to the Naples Community Hospital was diverted from the Orange Route to the Red Route in 2004. Secondly, the original Orange Route comprised two buses travelling in the same direction at 30 minute intervals. In April 2006, a reverse route was established creating Routes 2A and 2B with one -hour frequencies. An increase in ridership on this route may be expected for 2009 -10 due to the reinstatement of service to the Naples Community Hospital in Downtown Naples. Collier County ATM TDP Annual Progress Report 2-8 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 74 of 120 Figure 2 -6 Ridership by Fiscal Year for Routes 2A and 28 (Orange Route) 140,000 120,000 100,000 t 80,000 d 60,000 40,000 20,000 0 2005 -06 2006 -07 2007 -08 2008 -09" © Route 2A ❑ Rau[e 28 " 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Purple Route: Route 3A — This route has not been described or illustrated since no alignment, schedule, or other route modifications were approved this year. Route 3B — This route has not been described or illustrated since no alignment, schedule, or other route modifications were approved this year. 200,000 180,000 160,000 140,000 ou 120,000 L `w 100,000 80,000 60,000 40,000 20,000 0 Figure 2 -7 Ridership by Fiscal Year for Routes 3A and 38 (Purple Route) 2005 -06 2006 -07 2007 -08 2008 -09" 1. ■ Route 3A ❑Route 38 _. - -- " 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Collier County ATM TDP Annual Progress Report 2 -9 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 75 of 120 Figure 2 -7 shows ridership trends on Routes 3A and 3B. This route has experienced a steady ridership over the years and appears to be performing well. • Green Route: Route 4A — This route has not been described or illustrated since no alignment, schedule, or other route modifications were approved this year. Route 48 — This route operates Monday through Saturday. Sunday service has been discontinued. No other changes were implemented. 120,000 100,000 80,000 EL L N y 60,000 v z 40,000 20,000 0 Figure 2 -8 Ridership by Fiscal Year for Routes 4A and 4B (Green Route) 2005 -06 2006 -07 2007 -08 2008 -09" 6 Route 4A O Raute 4B�i " 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -8 shows ridership trends on Route 4A and 4B. This route has experienced a steady decline in ridership over the years. Ridership reductions were planned to ease overcrowding. High levels of ridership led to standing room only conditions on Route 4. Route 9 was implemented in 2007, overlapping Route 4, to ease capacity issues and improve customer comfort and convenience. Earlier this year, staff recommended that Route 4B be eliminated because ridership had continued to decline beyond planned levels. At the public hearing, several citizens expressed concern regarding the proposed elimination of Route 4B. A petition with over 100 signatures from concerned citizens was submitted at the November County ATM Top Annual Progress Report 2 -10 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 76 of 120 2008 public meeting requesting that CAT retain and continue to operate Route 413. In response to these concerns, CAT staff developed an alternative plan that would allow Route 413 to remain in service. CAT will continue to monitor ridership and route performance statistics to determine whether this route should be continued or modified. Ridership should be examined again next year when the Major TDP Update is prepared. • Blue Route: Route 5 — This route has not been described or illustrated since no alignment, schedule, or other route modifications were approved this year. 80,000 70,000 60,000 CL 50,000 w 40,000 30,000 20,000 10,000 0 Figure 2 -9 Ridership by Fiscal Year for Route 5 (Blue Route) 2005 -06 2006 -07 2007 -08 2008 -09* IN 2005 -06 ■ 2006 -07 IN 2007 -08 IN 2008 -09* * 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -9 depicts the ridership trend for Route 5. This route has demonstrated steady ridership growth consistent with a maturing fixed route service. Generally, new fixed route service takes three years to reach maturity. As a route matures, ridership gradually improves as local passengers benefitting from the service become increasingly aware of the service and destinations served by the route and use it to meet their daily travel needs. Collier County ATM TDP Annual Progress Report 2 -11 September 2009 r 69,897' r - a 56,870, a' rf �I 58,959 1 ¢ �y si 37,428":.' _> d y. 2005 -06 2006 -07 2007 -08 2008 -09* IN 2005 -06 ■ 2006 -07 IN 2007 -08 IN 2008 -09* * 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -9 depicts the ridership trend for Route 5. This route has demonstrated steady ridership growth consistent with a maturing fixed route service. Generally, new fixed route service takes three years to reach maturity. As a route matures, ridership gradually improves as local passengers benefitting from the service become increasingly aware of the service and destinations served by the route and use it to meet their daily travel needs. Collier County ATM TDP Annual Progress Report 2 -11 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 77 of 120 Yellow Route: Route 6 This route continues to operate Monday through Sunday, but portions of the route were eliminated as depicted on Figure 2 -10. Route 6 will now run from the Collier County Government Center north on Airport- Pulling Road, east on Davis Boulevard, north on Collier Boulevard, west on Golden Gate Parkway, north on Santa Barbara Boulevard, to Pine Ridge Road. This route will continue to serve Physicians Regional Medical Center on Pine Ridge Road, and then follow the reverse route back to the Collier County Government Complex. Route 6 will continue to serve the Super Wal- Mart at the intersection of Collier Boulevard and Davis Boulevard. The section of Route 6 that was eliminated includes Collier Boulevard between Golden Gate Parkway and Pine Ridge Road, Pine Ridge Road between Physicians Regional Medical Center and Livingston Road, Livingston Road between Pine Ridge Road and Vanderbilt Beach Road and Vanderbilt Beach Road from Livingston Road to Airport- Pulling Road. Route 6 previously extended along Collier Boulevard and Pine Ridge Road (as shown with a dashed light yellow line), north along Livingston Road and west along Vanderbilt Beach Road. The modified route alignment implemented starting March 1, 2009 is depicted as a medium yellow line on Figure 2 -10. Collier County ATM TDP Annual Progress Report 2-12 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 78 of 120 Figure 2 -10 Route 6 Alignment Modifications, March 2009 ATM TDP Annual Progress Report 2 -13 September 2009 46,000 45,000 44,000 43,000 t 42,000 41,000 40,000 39,000 38,000 37,000 Agenda Item No, 16.A21 July 27, 2010 Page 79 of 120 Figure 2 -11 Ridership by Fiscal Year for Route 6 (Yellow Route) 44,891 __41-368 40,015_ 39,744 2005 -06 2006 -07 2007 -08 2008 -09* * 2009 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -11 shows ridership data by year for Route 6. Ridership has declined on this route, but these declines have not been significant. As of March 1, 2009, a section of Route 6 was eliminated, including: Collier Boulevard between Golden Gate Parkway and Pine Ridge Road, Pine Ridge Road between Physicians Regional Medical Center and Livingston Road, Livingston Road between Pine Ridge Road and Vanderbilt Beach Road, and Vanderbilt Beach Road from Livingston Road to Airport - Pulling Road. This route will need to be monitored to see if the route modification in March 2009 has an effect on passengers who may have begun their trips in the Livingston Road and Vanderbilt Beach areas. • Light Blue Route: Route 7 – This route has not been described or illustrated since no alignment, schedule, or other route modifications were approved this year. Collier County ATM TDP Annual Progress Report 2 -14 September 2009 40,000 35,000 30,000 n 25,000 z w 20,000 a_ 15,000 10,000 5,000 0 Agenda Item No. 16A21 July 27, 2010 Page 80 of 120 Figure 2 -12 Ridership by Fiscal Year for Route 7 (Light Blue Route) 2005 -06 2006 -07 2007 -08 2008 -09* 0 Route 7M Express O Route 7M Circulator * 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -12 depicts the ridership trend for Route 7. This route has demonstrated steady ridership growth consistent with a maturing fixed route service. • Pink Route: Route 8 — This route has not been described or illustrated since no alignment, schedule, or other route modifications were approved this year. nr nnr 90,000 80,000 70,000 60,000 SO '000 ex 40,000 30,000 r rrr 10,000 Figure 2 -13 Ridership by Fiscal Year for Route 8 (Pink Route) 2005 -06 200607 2007 -08 2008 -09* O Raute BA ❑ Route88 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Collier County ATM TDP Annual Progress Report 2 -15 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 81 of 120 Figure 2 -13 depicts the ridership trend for Route 8. This route has demonstrated steady ridership growth consistent with a maturing fixed route service. • Brown Route: Route 9 —As shown on Figure 2 -14, this route has been extended to operate further south along US 41 from Charlee Estates Planned Unit Development to Naples Big Cypress Market. The route modification is illustrated in Figure 2 -14 and took place shortly after the market opened. The light brown dashed line depicts the alignment operated in FY 2008. The thin dark brown line illustrates the route alignment implemented on October 10, 2008. Figure 2 -14 Route 9 Alignment Modifications, October 2008 f , e � f N -pops Legend ---- P.p sed Bus RCWt 9 4 Exrstin6 Bus4outc9 S CHMLEE � "Y� NES - E O>RES61MAR FET Efts ESTFlTEB i r Collier County ATM TDP Annual Progress Report 2 -16 September 2009 100,000 90,00t 80,000 0,00 60,001 ool 40,111 30,001 20,001 ail I Agenda Item No. 16A21 July 27, 2010 Page 82 of 120 Figure 2 -15 Ridership by Fiscal Year for Route 9 (Brown Route) 2005 -06 2006 -07 2007 -08 2008 -09" E Route 9 2008 -09 data is included through July 2009 only. Source: McDonald Transit Ridership Data, FY 2005 -2009 Figure 2 -15 shows ridership data by year for Route 9. Ridership on this route peaked in FY 2007 and declined slightly in FY 2008. Ridership is projected to increase this year based upon the first two quarters but CAT should continue to monitor ridership on this route next year. As of October 2008, a section of Route 9 was extended to serve Naples Big Cypress Market and this may lead to continued ridership improvements. Collier County ATM TDP Annual Progress Report 2 -17 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 83 of 120 Fare Changes The Board of County Commissioners approved fare changes (as depicted in Table 2 -2) in December 2008, with a March 1, 2009 implementation date, in order for CAT to comply with budget cutbacks. Also, effective March 1, 2009, CAT introduced a weekly pass. The base fare increased by 25 cents, from $1.25 to $1.50. Fares for youth (under age 17) and riders who are elderly and disabled increased from 60 cents to 75 cents. Children, aged five and under, continue to ride all CAT buses for free. Transfer fees have been added for transferring from one bus to another. The transfer fee is 75 cents for full base fares and 35 cents for reduced fares. Prior to March 1, 2009, riders received one free transfer with each paid fare. The weekly pass is $15.00 for full base fare passengers and $7.50 for reduced fare passengers. Daily pass and monthly pass rates did not change. The monthly pass for full fare remains at $35.00 and for reduced fare, the rate remains at $17.50. Daily pass rates remain at $4 for full fare and $2.00 for reduced fare riders. Rates for the Marco Express did not change. Table 2 -2 CAT Fares as of March 2009 Service Category fare e $1.50 d Fare (for members of the Community, those 65 years and nd children under 17) tFullFare $0.75 5 ears of age and oun er FREE e Token $1.50 d Fare Token $D.75 s $0. 75 Reduced Transfers $0.35 Day Passes — Full Fare $4.00 UP — P asses — Reduced Fare $2.00 Weekly Pass —Full Fare $15.00 Weekl Pass — Reduced Fare $7.50 Monthly Pass —Full Fare $35.00 Mon[hl Pass — Reduced Fare $17.50 Marco Express —Full Fare $2.50 Marco Express Reduced Fare (for members of the disabled Community, those 65 years and older, and children under 17) $1'25 Marco Express Full Fare Monthl Pass $70.00 Marco Express Reduced Fare Monthly Pass (for members of the disabled Community. those 65 years and older, and children under 17) $35.00 Capital Equipment and Facility Changes and Improvements There are currently five (5) passenger transfer stations provided on the CAT system as shown on Figure 2 -16. Four of the five passenger transfer stops are located in the Naples area. The five locations include the passenger transfer stations at: Collier Government Center; K -Mart Plaza; Coastland Center; Creekside, and the Health Department in Immokalee. CAT's principal passenger transfer station is temporarily located adjacent to the Collier County Museum on the Collier County Government Center property. Grants have been awarded to (1) pursue a sixth potential passenger transfer facility at Radio Road and (2) for the design and construction of a permanent passenger transfer station on another portion of the Collier County Government Center site as described further below. County 2 -18 Progress Rc September Agenda Item No. 16A21 July 27, 2010 Page 84 of 120 Figure 2 -16 CAT Passenger Transfer Facility Locations, March 2009 MONDAY -SAT ROAY ° I � - ° � To ImoO t-EE tea- v° w i 1 � e w u 9 e m �. N'j E y 1i� THE PURRRFECT RIDE g y q neDNMb POeOHNNe. Fb,Ne°gM 7 � .COIINtpw.nellM a` �i'�rw.w I w p en > i CUT 01, NA [ P 8' 1 rv. :3 ✓ W wwnum 1 0 Fl � Legend: Passenger Transfer Centers N 1. Collier Government Center Transfer - A 2. K -Mart Transfer Center ' `r/',■�, 3. Coastland Mall Transfer Center 4. Immokalee Passenger Transfer Center 5. Connection at Creekside 1 a Pmposed Radio Road Passenger Transfer Station 7{ Collier County ATM TDP Annual Progress Report 2 -19 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 85 of 120 Collier Area Transit Transfer Facility at the Collier County Government Center The current passenger transfer facility is located adjacent to the Collier County Museum on the Collier County Government Center property. This transfer site is temporary while the County pursues building a future (permanent) transfer facility nearby on the government campus. Both the Government Center Transfer Facility locations are shown in Figure 2 -17. CAT has been awarded a grant to design and build a permanent passenger transfer station and intermodal facility at the Collier County Government Center adjacent to US 41 (Tamiami Trail) as shown on Figure 2 -17. CAT's plan is to temporarily provide a Transfer Facility as the County continues to move forward with the planning and design phases beginning next year for the permanent location. Figure 2 -17 Future Location of Collier Government Center Transfer Station Collier County has received an Intermodal Hub Capacity Grant in the amount of $1,300,000 over a three -year period. These State Intermodal Development Program funds will allow Collier County to begin design in FY 2010 with the goal of completing the facility by 2013. Collier County ATM TDP Annual Progress Report 2 -20 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 86 of 120 Collier Area Transit Operations and Administration Facility (CAT Ops) Collier County purchased a ten acre site at 8300 Radio Road, Naples, Florida in 2007. The property is located on the south side of Radio Road, a short distance west of the Radio Road/ Davis Boulevard intersection (see Figure 2 -16). When this property was purchased, Collier County intended to use the site for all CAT operations including a passenger transfer station. However, due to zoning restrictions, only the CAT Operations and Administration uses were approved and implemented. Collier County has been awarded a federal planning grant to pursue zoning approval for the passenger transfer station at the Radio Road site. A series of conditional use public hearings will be required to obtain final zoning approval. If approved, the proposed transfer station would be the sixth passenger transfer facility in the CAT system. The proposed Radio Road station would create a safe and convenient location for CAT passengers to make transfers in the eastern portion of the service area. CAT Routes 3, 5, and 6 (i.e. the purple, yellow, and blue routes) converge near the Radio Road site. Providing passenger transfer facilities in areas where bus routes already converge improves passenger convenience, reduces passenger commute times, enhances community connectivity, and leads to improved ridership over time. Customer Marketing CAT Transfer Facility at the Collier County Government Center: The CAT Transfer Facility offers customers an opportunity to meet the friendly and knowledgeable CAT personnel. Community outreach is strong at this transfer station. Many visitors to the Government Center stop to ask CAT personnel for directions, which helps to provide a positive image for transit. Updated Schedules: CAT continues to update the website with pertinent information, including: fares, routes, stops, and services offered. New schedules were printed and distributed throughout the community to inform citizens of route modifications effective March 1, 2009. The new route maps and schedules can also be downloaded from the website. Capital Equipment: With the election of a new President of the United States and new federal administration, several opportunities were introduced after January 2009 for "shovel ready" public transportation improvements. Collier County has requested and is pursuing American Recovery and Reinvestment Act of 2009 (ARRA) grant funds to provide for capital projects including electronic fare - boxes, CAT Operations building improvements for accessibility and safety, automatic vehicle location equipment, and computer aided dispatch devices. Other funding requests consisted of items including: system infrastructure upgrades to accommodate automated vehicle locaters, mobile data systems, expanded GIS /Route planning software, the purchase of hybrid buses, and security cameras for the fixed -route and paratransit vehicles. Collier County ATM TDP Annual Progress Report 2 -21 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 87 of 120 Electronic fare boxes, automatic vehicle location equipment, computer aided dispatch equipment, mobile data systems, and security cameras could enhance customer convenience, improve schedule adherence, and increase the efficiency of CAT fixed route service. These improvements were identified in the 2008 TDP Annual Update and were originally scheduled for implementation in FY 2014. If the ARRA grants are approved, then CAT will be able to implement these projects four years earlier. Collier County would not have been able to afford this type of equipment for many years without ARRA funding. If these ARRA grant requests are approved, they will represent significant progress for the agency which would not have been possible otherwise. County ATM TDP Annual Progress Report 2 -22 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 88 of 120 SECTION 3 REVISIONS TO THE IMPLEMENTATION PLAN This section provides a comparison of accomplishments in 2009 to the Implementation Plan as part of the 2005 Major Transit Development Plan (TDP). This section also provides an analysis of all discrepancies between the 2005 Major TDP, the implementation in the past year (2009), and any revisions to the steps that will be taken to attain the original goals and objectives in future years. Accomplishments in the Past Year: Accomplishment: Despite budget shortfalls, CAT was able to maintain the existing service area. CAT conducted a highly successful public outreach effort which informed CAT passengers that budget shortfalls would necessitate route, schedule, and /or fare modifications. Members of the public were able to attend the public meetings and state their concerns regarding public transportation priorities. Route, schedule, and fare modifications were made after considering the public comments and making the appropriate adjustments. As a result, CAT staff adjusted the routes, eliminated some Sunday services, and increased fares rather than eliminating routes. The route changes, schedule modifications, and fare increases were implemented on March 1, 2009. The CAT service area was maintained and riders were aware of the reason for service changes. Accomplishment: Collier County staff continues to pursue grant opportunities, such as the ARRA or "Stimulus" funding program. Staff has successfully identified potential grant opportunities and pursued new funding sources in cooperation with the Collier Metropolitan Planning Organization (MPO) staff and FDOT. In addition, Collier County staff continues to pursue the Job Access Reverse Commute (JARC) and New Freedom (NF) funds (FTA Sections 5316 and 5317, respectively). Accomplishment: CAT continues to offer quality customer service at the Transit Operations Facility and the CAT Transfer Facility at the Government Center. Personnel are available to assist customers, as needed, throughout the day. Accomplishment: CAT has maintained ridership, with approximately 1.2 million one -way trips annually as illustrated in Figure 3 -1. Staff will need to closely monitor CAT ridership and performance in the period following the fare and route modifications adopted on March 1, 2009 to gauge the effect on the overall system and ridership. Collier County ATM TDP Annual Progress Report 3 -1 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 89 of 120 Figure 3 -1: Fixed Route CAT Ridership Trends (2003 -2009) Fixed -Route CAT Ridership Trends (2003 -2009) 1,400,000 1 1,200,000 1,000,000 — - F= 800,000 600,000 -- O 400,000 200,000 =- - - 2003 -04 2004-05 2005 -06 2006 -07 2007 -08 Fiscal Year 2008 -09 (Est) Source: McDonald Transit Ridership Data, FY 2003 -2009 Please note that the ridership data for FY 2008 -2009 was projected based upon the ridership data for first two quarters provided by GAT. Accomplishment: Collier County staff implemented additional internal coordination meetings with the contract operator in an effort to enhance communications and proactively plan activities. The meetings focused on issues, opportunities, and constraints related to the day -to- day fixed -route bus operations and paratransit service delivery. Additionally, new report formats and performance analyses are being incorporated into planning meetings. Each body is now informed about future planning events, budget implications, schedule changes, vehicle updates, reporting deadlines, etc. Other smaller scale accomplishments have occurred over the past year and are discussed in the following chapter. Collier County ATM TDP Annual Progress Report 3-2 September 2009 moo N�-N N O `- O O C N 0 C N C C v -°.- o 7' g O O N m 3'aYi o O'v O m C y ~ O J t t N v � O �m v c in 8> S N lL Gl v O O c m N� v 3 E E u w .JO cu o c C 0 a � aaii O N m uJiv Euvic a a0C 0 w d E �. ��>mov�mY O Q E3oY o v O O ?v i O R a 010 O C M E L o a' E uomEao'-'` "O C o o +' -' > N v ` O N 'Y-' u3vE c o t'i E lL U u y 0> m 3 c 0 o a v y v i O- vOi c N E Q QQ J c cc u F� o woo 3 v C m U U E E w ¢¢ U S9` m L c `o o o v a „J c u c o c m m a) L m O m u �^ o.c >> O p L 0 u Q E ¢ t u M o� C o uvi o ou oo m N o C � C a (`a CL o O C C U i 0 d O N d 0 N C C a O a E E �o v �} O N > O H -O m a z0 i+ Y N C QH ) C C E T O O) O O 9 y v O � v O o 0 O 0 O N V v a) aJ L O O of O W O N O w E L C N N O N O N o py L E p CL E O ON C C c m yid = 0 o z � 3 CL E o c $ U) -0 r y i¢ c i v c 10 o N E @ C O O aO1 c U c E E o o o Y m m a s v c o n O N C o E o a, a1 a .4 p OO v fu u fu v O a... a N `O Y c oc i v O ` v 5 v - c E -0 o n E v 3 � o�Ev O fu C d � Ln y7 V s c cu a p 0 Vl C p 'p "O C� a c-0 a 3 O o E aci 5 a =° ru � u 3 E o ° in a N 0� o .c L N o Qj Q) QE L G t N Y L C O; C 3 U N 3 a v d v o a1 0 01 O O N G Go O O N E� M +O+ (D y N C v O a M t O1 O � 6 N d .0 L E o "a a`y m c 0 e Q CL O Q r e 0 U d U M M O O C U ;O O 3 C v T c u�{ g O a E a<0 m C y ~ O J a5v V1 v c C O O N v � O �m v c in 8> S N lL Gl v O O N C N� v m c N p .JO o uJiv Euvic °0`mM a0C 0 cvvE d Qoao� ��>mov�mY O o f E3oY o v ?v i �O v`" �O m� $ cL vvi 'o v 0v a c ai va; v v o L ia1 m3o:o V O U O c uo inty C 6,2 u uomEao'-'` "O C o o +' -' > N v O N 'Y-' u3vE m C N 0 " "O� v v1 .0 ._ v cT��+0 0 L E y lL U u y 0> m 3 c 0 mos C 0= i O- vOi c N E Q QQ J c cc u F� o woo 3 v C m U U E E w ¢¢ U S9` m L c `o o o v a „J c E v m c o c m m .�, c v' o m O m u �^ o.c >> U O m -O .E i C O Q C � CON Q ONE y � _ a a c v m Q t - c N � V o a a`y a O Q C 7 O U ^ N N v ¢ m c V yO T C � v m Y '.� � � v a ai v a �Fv v Mmcv F �'�a� Y y 0w io �' VI 4 V L V .3 Q OJ fp N Ol C >. v N m N .O y .- a L.L. .0 o -oav N` �ocN E E 3�J ° oo cu o W U L o io o c 3 a E v �i v p o vii C" J 0 Oi O O 6' U m j i U O U H O Vi tf , O O` a C N L v N¢ T C q:��O� N° iri i 'O �'. i `p O O N — T U in fp v �n G E N UJE ,J` ° °YO vE,�oJ c 'vvv �oo n> Naomi $ oc ino��m .n� i .� a o N �o w v �Ev 3 ?mc° °v >E°cO m '3w: m `�cN n0O c°a °c' Yii T uoYCO O �.v�c�.E l0 >� 10 L O V `o v >wa ¢ C O c O L a Z v U y > O c a'in x v m u O v pl C __ 'n > L 'v C O fO N j N t'i c O N ° v v i U v ou 3 a v u w- v 1p Fes- C J'p E o J J — T C N C VI `O L N J me L m .c. U U 2 m U T J Q vJi ¢ m O E,2 Q O V A C 0 QZ m c c of c N N 10 a a r O p a v m o E `v E p g v 9 C O v 0 c N c d E J in - m � C C N _U ` T O U O> m N J y°j >' N C O U N � u i 4J J E \ t0 u i U O c ? i^ a N J c ¢ O C o '"� o v-o o a m ,�c Mm d j z p T C O O N Y X U O Y .�i O! V C E c L �E� > com w u,_, U Ear E O d Y A M ti N M C N In lA i > > t Id N N 0 d O p O Z 0 O mo N U' QD t - c N � V o a a`y a O Q C 7 O U Agenda Item No. 16A21 July 27, 2010 Page 92 of 120 SECTION 4 STATUS OF GOALS AND OBJECTIVES The 2005 Transit Development Plan (TDP) developed for Collier County established six goals to guide future efforts over the ten -year planning period. These goals and objectives reflect the strategic focus of the TDP and are purposely designed to address the broad concepts of transit system operation that were identified during the goal updating process. As a result, the objectives vary in their level of specificity. It is envisioned that these goals will provide the framework from which CAT will continue to grow and develop. Each of the six goals has measured objectives to chart progress as well as action items that are to be taken in order to achieve the objectives. The goals and objectives are consistent with the Metropolitan Planning Organization (MPO) Long Range Transportation Plan (LRTP) and the portion of the Transportation Element of the Collier County Growth Management Plan. The Collier County Transportation Development Plan identifies means by which local government units and private- business enterprises may plan, develop, and implement a flexible, safe, efficient, visually - appealing, environmentally sound, and cost - effective public transportation system that provides for the mobility of residents and visitors, while being coordinated with local land use planning and economic development goals. The following tables examine all objectives in Goals 1 through 6 for implementation measures taken through May 2009. Collier County ATM TDP Annual Progress Report 4 -1 September 2009 moo N � N Q O r DN 0 O O N � Z TO E ' a N � � m a c 0 T El m r O N O � N F- m w N t C C a 6 o a a ,j% R 7 C Q G C 7 U `w V 0 m u T J U m a) O C y c a) O "C a > C 'O 0 `p Y m a) CD N c N N C a) C E (a U t6 cu U� N m O m n L O U d J c N �? o m 0 -o > ° o T N L aa) �. aci a) 0 y O Y m C C -C a a) T C 'O ❑ U C O» 0 a) Q m m Q Z N L F- m O U N N E C �O L .,J U aS m Q � a) m U N m C m E L o. Q) 3 0 ` m LL N c vi m c c 0-0 g yc o3 m co.m Tm -o �. °_m a) 2o0 c 0�� o.c o 0 a a)c��5 We =r°_n E.� aa))' mug N m� 0 U) U 0) a) m G m m U O a U N .0 O c O S m a CD m ° U m o E 0 a° m Z m °_ a o o ° E �0 a u0 O a) � � L m o> ° Z� E o. c 33 m �m o a Q °)> 0 a) ai o M L 0 E y U o.@ ° E o m 3 00 N m 2°° c a)a)YU a)c0 C6 _mm 3- Um °mFcaa))r w c y N.O E c m m m a p C a`) O 0 0 0 m 3 p E L _ N 'C M O U L c w "" y a) .0 C '� -M 0 0 0 U c a) O 0 m 0 0 3 0 a) L3 c m � c�� 0� m c w @ 300- 0 o � E ° m m' `� o o? °)� aci a) ° 2 m Q 20 oL� o' :=a)� a)c��c Umdmc a°)tiZoc 3mcU } ma) E__-o c -U<D yam) mmE .En >(D mccpno Cd °) m a) C a) ami m Sa o. ° � L a) .E a) � CD .> � � U n L v) m C M m O) �I c �EOCa° F-0U0, .2 CL mrm aa))am0>° (� J m (n m ❑ m D LL m Q❑ .0 -O m m m N w a3 a 0) N D E o a E c o c Q QCl) E O U O O c O Z T m 0 L C m c N _ y .° a) m y N m @ J O m U O c m m U a) m E ° E m> 0. 13 `m N n c m m m m C o o m m E m a O c T 0 m 6 y m C L a 0) c 0 U C m .0 0 C N U m 0 0 0 U M M E )a = T N y m E m OU E a N a) o- a) m 7 U al ... a) N :N '0 -0 c u. N m 'O T O C a) a) m L E` c6 N m�mam ` M C) wm`0'm — a) a a) n O c a � <D M OEwUa N�mro aw)�sU_ �a°oEu vi > O oEom'0E -cm-O a o CL E amU O E 3w 0a E LU d a N 0o It U .m m a) > o aa) � v o O O O O t C C a 6 o a a ,j% R 7 C Q G C 7 U `w V } C\3\ (e} El �§ )2 �2 /k kE cm 2 £ le E ) \% -§ [j§ \k. @.5 \\ } �\\ k0 \ ^f \ }� E }o \ ) \i C 0 f !22 )(\ & °, ca co � } ƒ\ }/} / / ok�l� E ( E \ E . ' 6 \ \k ] \) \ \\ . 0 /k kE cm 2 £ le moo N � N Q O �- pN O ONE Z To E 3 � _ a @ C a) Q M M O a� a o � H �6 7 F- M t � C '^ a E y L CL ay m C e Q a 0 H i H Q d U a) m O_ O o a a m m a a) o N N m a p CL U �cO c O N c.0 c o c a N O N .� Y C@ M O a) > c c m o o M mom c a) c a- Q @ 'O c a) C U a) m L-0 c° m t0 M o m C mcCC� m'OCC_-om C a 0 @ 'O y m Y C @' C@ @ @ maa��0c c 0 C a) Co @ ° O) @ C ° f6 Q) -0 O U ~ d @ ~ @ a) O O Y c a) °_ m .0 O N@. @ a) D_ N O C m m a ac moa� m aN.cK-o°.� E m J ° ° m N N F- - m N N L W -010 @ m ` L -M c° „O„ o) U O CO C_ ~- N N N m m C Y c °�Q� c 0 O)@ °�� Q Loo�o m@ ZQ)Q) aa3i�°W�rLn cccc_0� m c N 0 3 o c c m m a a.� °o o E w° a m m m @` L o E ° o F`Ew��UME a) �O D °).N O 0 L a T= � a) U O nO C > C C F- a)-n m a) ❑ C O � NJ C T N O 'O 'O O C Q O C m y a 0 C C�@ 2 �• O L N `.N a) 0 O a) > p L _ () Q C m N N C L d @2)@ N 'O a) 3 0 m 01? o o> M m a, 0 > @ >@ c._ m o ° o E Q 3 o° Q'oo in IL- Q c .� CUU a a) �C 4f OE7 0) m O) CL E m m ° O) O O O O O N w Uj a C_ C C G Y @ C -0 0 as o o0 m E m m@ c a M r M > m � a) C a) O C O .m+ a m @ @ 4- > m ` V O) L N O) L @ 0 O m c N 0 C_ O �' O a) U N D m C 3. @ E C ... N m C m o a) c aa c U O a.c @S . 0. @ ui @ m @ a) T o c m- '(D 3 @ a) c o E O @ m `D) a m@ .o m o 0 ° moE o o0 M vi U c w CL .E U a m N M d- R o > ° N r O 5 o U a) o O p 1 0 t � C '^ a E y L CL ay m C e Q a 0 H i H Q d U roo N r N Q O r p N Q T y @ d @ C N a M a o a f0 3 Ya CL N a �E o a L d ay Ln v _.O O a>.> o E @ o 0 CD O y N@ aS a) U@ N a� 0 E aa) 0 u, Q E y cm) Y :C @ J N> C U w `O 'O O p Q 0 'O� al -O V U 3 >. E o N N N N C@ a) oU K @ U to U @ @ Q) L a) 'Ox "O Voi Z O m C 'O to C@ C a) 0¢ aU= 7 a) y C@ a) ` a)� �s co E c 0 Q 0 Uoo)o (D E a) D (7 0a) >cK�c N ow o 0 0 m c n o c- U S E o@ m @ c n ~ 0 o. F " co N Q x o O C N a 0 C Q Y w o U N N O 0 .n o a a W r y E c �_0 o= c~ 3w c O a G) @ U C 0@@ m rA C m U p O Y L MmN r~ 0 o aco `otL -m3o ca N a >0 ID m= o ��Emcom 0 p_ C@ L U L E U 3 a 0 U O C N a) a E O 5 o O N @ 03 C U V a N N C i F- -E 2 U) am a o 03 �� d d dm C a C E m m 0 0 m 1.0 c U @ E -o O c C o o p o N 0 m Q ` N y a) U N N Q U > — a) N = C p @ a— E — a) j '@O !u N_ U o @ N O E E E; o f Qc0 E o p °.c d d > > • V N 7 U > > w ` 0 C N N Ya CL N a �E o a L d ay Ln v moo N � N pN O ° N m E J a a m m a Q N H O v o a � R � Hr .�4 t L L da E O 6 a D F C 7 U m m E V° Q m a U O Ot 0 �O E m U o vm i oa c c o ` m° E m m m o N U a Q C 3 L cc 50-50 min° `M m m CL m 'E Q) a) N `o U(D r�ZaNic mEo y o t0 Q° cmc E Waa), w a c c 'c r°n = 'U O ° E C .0 tt- > D C O C > a J N NO Cd O° O m L m O nL G N U J 2] J m m L m N U ym Lm. Z m m c N O O C .. (` m T V U a N U N N N> O 1] F"' N L j OU C L a N Q m N m m C m (D -o .° 3 a) m - N E m .m �CNm >c L.. > _m mLmc °> tq O m N U 'O C m m 3 tO to O= C � � ° m 0 =F- -o cU m c� > � 3� > m M E c 0Q mho m m am a 3 m m.4 E � E a t o N 0 Ja 5 E m a) o m o J= am p n o- o° c 0 c_ c N c m° m a) c a N m N m > m 0 m .- C N° O > wwm m E ° J U N J m O m m Q N m-O- C L C Z °) ° .J+ `o OV �.0 E N ~ C C O m m O U T - c c° F-- m mU E E c Qm a U LL U u C � o ( m Q Q L U 4) c m To Id m m c E ° °° U O L T O J N a) EE EO ° O a C O Q i �m c� Q m c CL d o E%° N o`6�m E a) ._ N m N w .> a m C L ° C Q C m .0 , 0 ° U m O)'O > to U J m m m G E E C O -- m m i' m U m N O O - C C N E ° 0 U.E Q > m L6 N M L6 m m :y m m N N N 0.2 U U O t L L da E O 6 a D F C 7 U \\\ % ©\ i0 2% �] � /k )E Ch CL IL w ! § wA � { a 0 C Ca /§. )) Co M \ }% \ <L) {± /) 2 -- \ § E.o 2i E - 0 \\ _ } {) ®\ cu j /(j ��) \ ) \ }/ [J:]. (C) /))%ƒ )/] : _ \\ \ \\ )j\ ) \E 2f-T \ t] @22 Z0)/) /(± - a J$� \�«0 \«m2{ \/� - :3 <oJ�� <;7 #�I � E z R \ ! ; f . 6 3 ) a | - _ _!{ \ 0 > 0) ! ' cl f \\E = \oc \n \ 0 CL 026= o§&EZE 0 # ± S 3 /k )E Ch CL IL w ! § wA � { a 0 Agenda Item No, 16A21 July 27, 2010 Page 99 of 120 SECTION 5 TENTH YEAR TRANSIT IMPLEMENTATION PLAN The 2005 Collier County Major TDP Update included a very comprehensive list of activities leading up to the creation of a strategic plan that would guide the County's development of services over a ten -year planning horizon. The process included an analysis of the demographics and economic conditions of the County, including vehicle availability, travel time to work, and journey to work characteristics. Public involvement was a critical component of the TDP update process. An extensive public involvement program was implemented, which included conducting and analyzing CAT on -board surveys and CAT bus operator surveys. A series of workshops were also conducted within the community to obtain the public perception of the transit system and gain insight into reasons for using and /or not using public transit. The process also included interviews with key local officials and other public involvement efforts. Existing transit services were evaluated to determine trends, which involved an examination of the system's performance from its inception through fiscal year (FY) 2004. Performance through 2005 was also considered. A peer review was conducted, comparing the performance of CAT with other select Florida transit systems that share similar vehicle Fleet sizes, service characteristics and operating environments. Other tasks completed in the development of the 2005 Major TDP involved the preparation of demand estimates for public transit in Collier County over the planning period, the assessment of mobility needs in the County, and an evaluation of alternative methods for increasing mobility through transit system improvements. The needs assessment also summarized information concerning unmet demands within the service area, service span and frequency, types of services, and multimodal linkages that may contribute to improved public transit service and mobility for residents and visitors of the County. Finally, a review of complementary planning documents was conducted in order to maintain consistency among transit goals and objectives for Collier County. The Comprehensive Plans for Naples, Marco Island and Everglades City, Collier County's Long Range Transportation Plan, Growth Management Plan, Comprehensive Pathways Plan, Transportation Disadvantaged Service Plan, Southwest Florida Regional Planning Council's (SWFRPC) Strategic Regional Policy Plan, and Florida Department of Transportation's (FDOT) Transit 2020: Strategic Plan for Public Transportation were all reviewed. Based on these technical evaluation results, public involvement, and transit operator and staff discussions, broad alternatives for CAT's future were developed and prioritized over the 10 -year planning period. These alternatives are based on CAT's vision and the goals and objectives identified in the 2005 Major TDP. Collier County ATM TDP Annual Progress Report 5 -1 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 100 of 120 Table 5 -1 provides details for the implementation actions recommended, hereafter known as the "Implementation Plan ", which also includes progress information for each project accomplished during the years identified and then re- prioritizes each project for the next year of the TDP. An additional tenth year is added to the implementation plan with each annual update. Collier County is faced with significant financial challenges resulting from the current economic recession and its impact on employment, dwindling local tax revenues and state funding, among other factors. In light of these factors and the magnitude of the proposed Implementation Plan, Collier County should consider preparing an independent strategic review of services known as a Comprehensive Operational Analysis (COA). The first step in implementing the proposed actions identified in Table 5 -1 should be to prepare a COA, which would ensure that actions identified in the Implementation Plan are pursued by CAT in a systematic and cost - effective manner. The purpose of this COA would be to conduct a complete evaluation of programmed services to determine the most effective approach to providing public transportation service in Collier County within the current financial and operating constraints. The COA would help to maximize the impact of taxpayer funding for transit by understanding how the results of one project would impact other investments, strategically pursuing new investments, improving system efficiency, and directing transit investments to areas where they are most needed and beneficial. The COA would consist of a system wide analysis of all operations including: the size of the fleet, size of the service area, existing fixed -route services, super stops, performance statistics, activity generators, transit orientation index, and would recommend the most efficient corridors as well as an overall operations plan. Conducting this COA would ensure that the Implementation Plan is undertaken as a systematic, rather than an incremental process. To identify potential components of a future COA, a column has been added to Table 5 -1 specifying which projects should be evaluated as part of a COA study, if conducted. This COA would be funded, in part, by combining the funds that would have been spent conducting incremental studies each year. In order to take this funding approach, the County would need to wait until 2013 to complete the analysis unless other funding became available sooner. Despite the budget shortfalls incurred by many local governments during this past fiscal year, CAT was able to complete some of the recommendations contained in the Implementation Plan. During the past year, the Government Center Transfer Facility has improved service and amenities for CAT passengers and the general public. CAT personnel are positioned at the transfer facility and are available for public outreach and personal customer service, thereby improving overall quality of service. Goal One and Goal Four focus on serving major activity centers and providing quality service. In addition, securing new funding sources through the Economic Recovery and Stimulus program are proactive planning actions being taken by ATM and will assist in the overall capital infrastructure of the program. Collier County ATM TDP Annual Progress Report 5 -2 September 2009 -Oo N - N <0- N O O N j Z F � d m a C m Q .4 LA d a F- 0% O N L Of 3 O L L O IA N C7 LL m " H e a a c O Y C E d CL H a 0 a m a m v m C �' tp • �a y m-°a o c a 0 0 d 0 a�i a�i T Q) J C 9 L O O 0 o m 3 o o C 0 ] �3 N N i 3 45 m p o E °> >' d lC a m° tO O m tO C C V a Q a m c 3 c o L 3 00 . Z p o CO a 0 m w- E E d U O Cp Q C .j U 3 O H n O 3 a T m N m m E N N � �„ T t0 c 0° 0 a� 0 ii o ° co U) 0— cn v°6 S c c a m � � � c E E° E o E a E m N U • p O N O N C p O p U C U C d � d N X (n W to W c N NL. OJ N m a w Q 0 m N 0 O d vd > d 0 O O N N E £ > 0 N O ° 3 t r- I d E L d O y� �a a� A C Q a �m Q C 0 O U d O U moo N � N Q O � � N O 7 N ZM m _ t4 c d c m Q N 1N O O y N E ch y o a a ^� m 7 C Q CL 0 wi a Zr c U d O U a Ln O U n o 00 o m o O O a d O` LL O a N O O N N .E o in -po S n o.5 ry c mi .5 000 o a..Ei E vi m° mm E m m 01 N O W N n (0 _O a o d =D-2 c U E `m o m o .�- o E aci m w E i y p? v o o E <n m o 3_ 0 J a m Z5 > Glad o N U c j N N c U_ 'O w o w O H p t0 y n U c O (p L N Vi C? = C N m p o 0,2 0 o 0 0 c m o m > r CO n m a o xi m c m E d m o. E a o o'E .N w= o c o c o X'cd om o.� °o2 O.c o °.4X aTi �N AEU W N J Ll `n mU N (n C7 >i NC7 m d�O� W .. O N N n E 0 U m 0 0 0 0 0 m a .6 O O O O • o 0 0 0 0 0 N N N C O C N O c fO m O. W W W O <om N2 O N O O � J � ` J o dp> N p) C J L - V n N U N F N S U U O ti N U C ; O. a O c (6 O L E o 0 o 5 a= E x w ci U n V` Q m M N M � O O y N E ch y o a a ^� m 7 C Q CL 0 wi a Zr c U d O U a Ln \ \\ J \/ ƒ / 3 / e 2E= }} {) �5 -o / } - _ 0 \ ;a e ( - - a41- i - -% /. 0- C = :E ) - - () - _ {-0 7§ _ #7)j 2 m _ IE ) - -_\ )\ }} 4- - \)\ 2' _w \/) \ ` �f / \ M ��- C3 y=== me )f -- ;e -) 0w - - \M E \ _ M5 _ \\ \\ 0- �\: [ E0 ƒ/ 3 D »)[ 2. 2fa r f - 72 27 »2J /20 77/ \) 2\ )) r, �E CL ) § $ f & c-00 N - N Q O C � N a N N • O O E° ° O O E ca ma m'c°0U ci°iU cm 0 Y d a U7 L N f0 0 3 L O � Q a o E E w c a°i E -3 y o m m w -° , a .c c "- c E-= c a m N T m m o vi WC w r o a o E° c o T m N c o U o d m 3 E m - = o L o U v I m o m m o _ ' o C vi � m N O L 3 O -0 O Z 0 C5, cn C:50= m o£ @ m E o E °c_' d m m m E E¢ "a aai ° d E E c E ° n o t 0 0 o c - c ° :w O d U m E C ti mu O °- m w L.2 �n o o o a n° m _° "3 g in E E F �.� y E .E 2 c � .'> E m> L : H = E E m m °n 'Ot c E c on a � m 0 0 V- a O c N oa Q U a -o ¢ - O a s o a�ni c c a U) m ion O N N m ¢ o o¢ m ¢ U ¢ m m .5 a m ¢ � � M N m O • E I m m `ooc me mm me a�a c o z 2 m o m o m nc m a s m a a` a a` a Iii O m a m ° m a N 20 u U m m T w Aa = E E v m E° c E m:s U m a OC o U >` _ QN ._ m o o 'C m g ". > m o O m— U I U a N U N 0 m U L � U p C ..� > � E O o o -> o Em a¢ °..' m m n n a s U m ma -° o a a m o m w m m m E r Ch 6 O w N c �a d C y Pa a� m C C Q a O H f Q G 0 U d 0 U �D of 0 0 N � N O ONO � m m a Q N LA d a A Q Q • O U c m Qo O E c c 'O a o ._ h m y m = 0 T� O w a LL c c Q o a o m m o.c ° o c c 3 o.m m c E 0 n L 0 o' O ai m Ma > m o ° L c m "� m a n w m U y 3 � ` m m c y m o o c N > m w m E m m a'`� .m m > > J �° c `m a"i ° -° > .� t ti D m'5 c o m E 3 y aNi a U) M m o j n 0 o w c m E Q c W c o .n V w OU c N a o `a y� m3 ° O i N � N O pN Q O C � � y � _ t9 � a c N Q N d 1 1 t CA 00 O y N C L 0 y Q a aV) A C C a a D H Q Z C 7 U d 0 U 00 h O O O O O C1 y U N °'v 3 ° E'0 y m om y C O E fn L C O c O ` U t° C O N U co d — o 3: a d C a F- .c a y Oc ~ N E U f0 U y .O Q O .'_' f4 m W 3 N C aU i In C N N Q N U N O .J O= .N '00 �O N d I] @ O E C N N N E C y L U C y C� Vl N> C O E C0 aCm a ONL C.. o m y O Ur y 0 U "O a .E ° d O U d O O O` O ,O y �2 a O L U N E G O '-'-- O y O) O N N -o N m w 3 -a `�' a =o O m "' o E c O U 3 F- .E N m 5 ¢ m m M 0 0 ° rn rn N N d C C c N N E rn � rn m o U O O ° O m co o� I I I w � N rn N N N N N N C C C C E y E O = O E O o O c O E N y U O U ON U U U U C U C U C U C ry S C _U C (n W co W fn W (n W 2 LL Cl) W U W � O � O C6 0 (p � N R N U t0 O) N w Q C W E 75 t9 O-a S a N nE o �" — 3 L m o> o O n m .N a c w c n> ; c R O U L O Y AT p N J a� i m 70 N ° s 3 o e 0 C N N O > N U L f ` 0 i I i o n ON N N I N N N N t CA 00 O y N C L 0 y Q a aV) A C C a a D H Q Z C 7 U d 0 U 00 h —oo N.-N Q O DN 0 O N p E = OJ N m m C a Q 9' N d a m F Q Q O Q O Q Q Q Q O O O O y C d N m N - m m :2 i n = .19 N S 0 mm m aU0 °-p' °' m 1,2 ,0L N w C I C O y M w .c 0 0 d N O C N m a o C W . o N n C C m e o m m m n w m n y Q .0 01 C C IJ O a U i c N c N N N N S d C OJ N -vl Q U N U lL .0 L .0 'O L ` O Ql N 'O N ° E} N N N` > o'er one n0 cN. O n3 =o m� -ONO oyo a� n O°- m U -O o c a> E E `o c, a Ea c ayi `o_ m a o L n, c` o` n E �o r� . n .J E c E n o m o o n c n. _ y 1O O .IJ p MW �N O p O L N ? dN > �D ' p (m n > Q Q LL Q m(n t0 N n O (n .0 .E Q N L Q f0 L m p C N O N O O O O i N O N C m O C m n n n Ow U)w o x O w O a N O w ti w p m m E C> m Q -92 O L o N Y (n N N C C w e m c o E m--c � Q x o m c m m mo �'�' o `oK o� E E m U `n a E .c m w,2 N > E y O C Y C N U T a L I- E UJ m U¢ m 0 (0 m o j v T v api axi Ei c °-' 0 o y 'E a Q Q U 00S. d o c y c y E -E N M r� �a E O a a` L% A c c Q a Q Z+' G 7 O U 6 U .-00 N r N Q O � N O 7 m a c m a Q N Yf • O U O O O O O O O m m m m m m m m m w:G 2 C S N N N N � N d N N fA N N N N N fn N Vl d N N V1 n V1 n V1 d N n p_ n fA % C a) m X C X m m X C X a) m X C m m X C m m X C m m a y m a X C m m X C d m x x x x x x x x o m o al o al o m p N o m o m p a> x c c d C d C d c d c m c m c m c m a y °o_ a 0 y o y o N o y o y o yc o c C , d c C c c a) m .rte C c w C m c w C d c .rte C m C m n m m p' m m m n d m an d °- rn E c E E c E m E c E c E c E m E c E rn c E m c E m c E m a� 0 ac 0 m ac m a m ac m .c Fi m—p_c m m n� a� m o.c d m m m p_c a� is ac a E m a.E m a.E m a E m a E a E m E a.E m a.E m a E m 0 n 02 d 02 0.2 n o p o o o p o o n c c m c a Z- c m c Z 0 o 0 o a o a :S O o S o m o .— m o m m 0 m p m o m m `»o ta m m m m - "mp - > m > > m > m > m aa > m Q L Q m L m L m m m L Q m Q m L m rn � u� cp co cp r r N N N N N N N N N • u7 u7 u7 �0 cp !cD cD r r N N N N N N N N N O O OD o o O O O O 0 a) U N U U U G U C n d n _U on o. Z n n n w 0 0 0 0 d w 0 Nw 0 U)w �nw 0)w Cl) cnw �U)w <nw C w N 0 x 0 d 2 7 ..' -- c o m o ! c 2 m !L m c m r w m a .� = gy m d m m I c m a� m 3 o a o p a c� O m m m o o c c ❑ c c c c 'a 'y U 00 0 o O T o T 0 T 0 T 0 T C C M m C m a> U U U U U U U • (7 U a�i a°i a�i °i as m .- OI c m m m O d y h �'i y 0 y ti vmi v, �? P3 m c OE c E c c c cam° c cam° c II i G O W N C � �a E a W 0 0, A 7 C Q CL D H .j Q e 0 V d O U O N Ln NT-N � N O ONE Z E � m � � m @ c m Q H Ln d a F L N C O p o Q ya L U rn d U U O C N 0 CL N 7 5 m -o O m Q C T@ y m o E t m a m to c a E m m ° m E E .n D t- 0 i E m ? 3 o � E .°c % aJQi @ " d on 3 a�i C d (0 N y O. O n N N fn h m@ (A Y d N O Vl C E t/I �L � V T f y ~ E .p E ; c@ ° " -o o U .o ° ti o m p t U p� @ c @ E E c C. o a `—° m c E m .p n U p api .> N> .� (CO N J j L a N d W V w V@ 00 C N O d UJ h °, �_ w m wO- a w H-a 3 cmi m ` m o 3 m n S s E `o a o w c c d m m H n 3 _ 0 �' c w m 5 m y E a T ,2 `o m y E @> E m v o t h " d@ d m m m Ny o E m O m= O = .� N ° ` T d a j S U O w a U o n 3 m a E 0 o N m c 9 m ti c_ d.c a m p m o c o E o m c 5 .M g T ` @ C W O T N n y O T .Ol �O m -O n l0 @ Q d n d N = C Vl U (A O m d O (n d VO > W .E m N 0 0 0 y C (n �9 C m P O (n lL 22. (n N H M M M m o m QO O O O N i • � w i i 0 N 0 N o f N f 1 c @ 0 @ e a E m c o " � cn w cn a 'fn w a c fn w U) a E a Q.`° m n y y o o c � c 1 20 o ^ a m m J E o n @ c m a E o sFn [[ m �_ 0 Q c t -Fu O L C N L _= Fu C O Z, ._ m 0 E o - E n m E a a, c m a � Q o c> m D U .E U C L N C CL N o } ya L rn d 7 0 CL 7 E m� i Cc c O o � U � Q U > CL V .n D t- 0 i N i� Q) D E J a 7 > O CV J CV C L } L 7 7 J o � U � U > j O .n 7 V �n i io i� : N E 7 > . N �L � V T f y . 1 y i N a E O V c C. I N U SECTION 6 FINANCIAL PLAN FINANCIAL PLAN Agenda Item No. 16A21 July 27, 2010 Page 110 of 120 A number of assumptions were made pertaining to public transportation costs and revenues for the time period from FY 2010 through FY 2019. These assumptions, made for operating and capital costs and revenues for fixed -route and complementary ADA paratransit services, are based on a variety of factors, including trend data and previous TDPs. These assumptions are summarized below. Cost Assumptions • Estimated costs for FY 2010 -2019 are based on budget estimates from the adopted 2008 TDP Minor Update and from updated operational information from the ATM Department, as appropriate. • The annual operating costs for maintaining fixed -route and paratransit services are updated from the ATM Department's current operating costs with a 3.5 percent inflation rate used from 2011 -2019. Note that the cost of providing ADA paratransit is included with the total fixed -route operating costs for each year. No additional ADA paratransit service costs are assumed for the funded service increases, which are planned in the same areas where ADA paratransit services are currently available. • The number of replacement buses is determined based on FTA guidelines and fleet management recommendations. Based on transit staff input, an average unit cost of $400,000 is assumed for a fixed -route replacement bus while an average unit cost of $75,000 is assumed for an ADA paratransit replacement bus, also a van for $42,000 and a support vehicle /truck for $40,000. In addition, the unit cost for engine rebuilds is assumed at $40,000. Unit cost assumptions for the capital items are summarized below on Table 6 -1, with the vehicle replacement schedule shown on Table 6 -2 on the following page. • Acquisition and installation of bus stop shelters assumes a cost of approximately $145,000 for 2010, based on discussions with Collier County staff. FY 2011 has an estimate of $150,500 and $158,000 for FY 2012. A flat planning estimate of $250,000 per year is budgeted for this infrastructure program for years 2013 through 2019. Collier County ATM TDP Annual Progress Report 6 -1 September 2009 Agenda Item No, 16A21 July 27, 2010 Page 111 of 120 Table 6 -1 2009 Estimated Transit Vehicle Costs Vehicle T e Unit Cost $ Fixed -route Bus $400,000 ADA Paratransit Bus $75,000 Van $42,000 Su ort Vehicle /Truck $40,000 Bus En ine Rebuild $40,000 Source: 2008 Collier County Transit Development Plan Table 6 -2 Vehicle Replacement Plan 2010 -2019 Year Fixed -route Bus ADA Paratransit Bus Van Support Vehicle/Truck Bus Engine Rebuild 2010 5 4 0 1 3 2011 4 _ 1 0 1 4 2012 3 5 1 0 3 2013 3 7 0 0 3 2014 3 4 0 0 3 2015 3 5 0 1 3 2016 3 4_ 1 1 3 2017 4 1_ 0 0 3 2018 4 5 0 0 3 2019 3 7 0 1 0 1 3 Source: 2008 Collier County Transit Development Plan Revenue Assumptions • Federal Transit Administration Section 5307 funds for capitalized operating expenses and capital from 2010 -2019 are projected at a 3.5 percent increase each year, assuming that CAT tracks all the preventive maintenance costs for its equipment and facilities in the future years. • The Federal Section 5309 funds are based on current SAFETEA-LU revenue allocations from the ATM Department. The SAFETEA -LU legislation expires in September 2009. When the new federal transportation bill is passed, these revenues should be updated. For planning purposes it is assumed that the County will be successful in capturing $274,000 in 2010, with a 3.5 percent inflation factor per year from 2011 -2019. Collier County ATM TDP Annual Progress Report 6-2 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 112 of 120 • The existing FDOT State Block Grant revenues are contained in the FDOT Work Program. The total allocation for Collier County is determined based on total revenue miles and total ridership reported to the NTD. Future revenues are based on the assumption that Collier County will annually submit National Transit Database (NTD) reports. • FDOT Service Development funds for FY 2010 ($492,556) are based upon current allocations as provided by ATM staff. The FY 2010 is larger due to a one -time allocation. For planning purposes, FY 2011 is at the level of $250,000, with a 3.5 percent inflation rate for 2012 -2019. • Section 5316 - Job Access Reverse Commute (]ARC) funds for FY 2010 ($98,268) are based upon current allocations. For planning purposes, the FY 2011 -2019 allocations have been projected based upon the current allocation with an annual increase at the assumed rate of inflation (3.5 %), as suggested by ATM Staff. • Section 5317 — New Freedom (NF) funds for FY 2010 ($91,133) are based upon current allocations. For planning purposes, the FY 2011 -2019 allocations have been projected based upon the current allocation with an annual increase at the assumed rate of inflation (3.5 %), as suggested by ATM Staff. • Farebox revenues for existing fixed -route services ($811,000) are based on current farebox income provided by ATM staff. For planning purposes, FY 2011 -2019 Farebox Revenue has been projected to grow at an annual rate of three percent (3 %) which is lower than the inflation rate. Farebox revenues for the expanded services reflect the projections provided in the last Major TDP Update except that the numbers have been rounded. This is additional farebox revenue that is anticipated to be generated by service improvements and would not occur at these levels if service improvements are delayed due to budgetary or other constraints. • The FY 2010 local gas tax option is budgeted at $1,778,000. FY 2011 is estimated at $1,500,000 based upon recent data from the ATM Department. FY 2012 -2019 assumes a 3.5 percent growth. • Collier County funds for FY 2010 and FY 2011 are estimated at $2,089,400 and $1,880,400 based upon ATM Department data. FY 2012 -2019 assumes a 3.5 percent growth rate. Figure 6 -3, shown on the following page, is the unfunded transit priorities list, as approved by the MPO Board on September 12, 2008. A new unfunded transit priorities list is anticipated to be approved by the MPO Board on September 11, 2009 Collier County ATM TDP Annual Progress Report 6 -3 September 2009 moo Q O E B CL 0 ca 0 CL O CL 0 5 I 4, .4 Cd O o CL CL tw Agenda Item No. 16A21 July 27, 2010 Page 114 of 120 COSTS AND REVENUES SUMMARY Tables 6 -4A and 6 -46 provide the summary of combined costs and revenues for Collier County's fixed -route and ADA paratransit services, categorized by operating costs and capital costs as well as operating revenues and capital revenues for FY 2010 through FY 2019. These tables are shown for planning purposes only and should not be considered a proposed budget. It should be noted that budget shortfalls have been identified. It is not unusual for planning level documents such as the TDP to include projects for which funding has not yet been identified. The operating deficit for fixed -route and ADA paratransit services is projected to be $17.8 million and capital deficit is $3.9 million, with a total deficit of approximately $21.7 million for the five year period from IY 2010 — FY 2014. The estimated cost for continuing existing services at their current levels is $44,110,572 for the five year period from FY 2010 — FY 2014. The projected cost for implementing planned projects would be $3,113,235. The estimated costs and revenues are also presented for FY 2015 — FY 2019, which is shown for planning purposes only, and provides some insight on potential financial conditions during the last five year period of this TDP. This view allows planners to gauge public transportation development potential and assess progress toward the MPO's long range plan. Operating expenses for fixed -route and ADA paratransit services for FY 2015 — FY 2019 is projected to be at a deficit of approximately $30.4 million. The capital expenses have a projected deficit of approximately $277,805. An overall deficit for FY 2015 -2019 is $30.7 million for the last five years of the TDP. Alternative funding sources should be pursued to address future funding deficits in order to ensure the continued fiscal health of the transit system and to ensure the recommendations of the TDP can be achieved. Consideration should be given to mobility fees and increases in local sales tax as potential dedicated funding sources which would require support from the citizens of Collier County. Collier County ATM TDP Annual Progress Report 6 -5 September 2009 N N Q o N O n p N C � � N m = a m a s n d z o C N ce N J3 L N U y d � a$Z b FA cg V � � O LL d ~ O � r. C C B Q Ma E� '� W C Ol 7 C O = U C i ao U a m c 0 E U d U W a C U m 8 U a m a m O 2 f N a e t CA 00 CL O y N Ch a�+ o a CL Lj A c H e a o � y O o �- N M a m c 0 E U d U W a C U m 8 U a m a m O 2 f N a e <o O 4 � � a m m a C Q W O C fV i rl � N 0a v 00 y 3 H CO v w L W O CA �LLaL L � W C 2a "a `' n W C 01 3 C O .E U C L A N a c U N n h W oPi P Liz C E U a v U G U C U n U a m a c m O Z tal 00 C N a vE o c a`y N IL O S NR O S - QEQ H N r°nn VOi O LS nr�mm � nm w p p N w N b rO N N � V N .... .......... n N ............ p N �<Eo OWE ° m m m ^ m Or n A n W m n rn O Q P N ry N w w n o- N n O N � w N q O O P m M p N r O � p M w N N N r� BE N o gg m � h S c a N S NO u) m _ _ m y N N b w .h A W N p N w N N O -p N Q v3 P O w N P O - W O m o m w c T O tV N c w N C m J N ALL o m m jL U U a E e U C d Yf n O 0 "gyp rfi Q w N m m N h m pN pQw t9 wN _ m O w N P N p N N o ry o n y� o! O w N N j E nj rV 2 w N N m o E 3 o E't 2 `c a ac�d�ia.NE�� —w� C d E E� - w n E ~ c'^ o a y y (� c � E p ry N ry E E N E- n N n h W oPi P Liz C E U a v U G U C U n U a m a c m O Z tal 00 C N a vE o c a`y N IL r°nn - rove nr�mm � nm w p p N w rO � V ry n N ............ p N �<Eo OWE ° m m m ^ m Or n A n W m n rn O Q P N ry N w w n o- N n � N � w N q O O P m M r O � p M N N r� N !� m � h O a N S NO u) m _ _ m y N N w .h A W w N N O m Q v3 P O w N - W w ^ w 2 T Uj w N c C m J ALL m m jL U U a E e U - d n 0 "gyp rfi w N m m e h m w N N n � w N j E 2 o E o E't 2 `c a ac�d�ia.NE�� —w� C E� ry N ry N n h W oPi P Liz C E U a v U G U C U n U a m a c m O Z tal 00 C N a vE o c a`y N IL r°nn N � w p p N w � ry n � p N �<Eo OWE ° m ^ m Or n A n W O Q P N ry N w w n o- N n � N � w N O O m m M r O � N N r� N !� � h O a N _ m N N w w N O m Q N w N a W w 2 c C m J ALL jL U U a E e U d m m e h m N n h W oPi P Liz C E U a v U G U C U n U a m a c m O Z tal 00 C N a vE o c a`y N IL Agenda Item No. 16A21 July 27, 2010 Page 117 of 120 While it is not unusual for TDPs to include funding gaps, the current Collier County cutbacks and the general state of the economy indicate that the planned improvements identified in Table 5 -1 which emerged from the 2005 Major TDP Update may need to be delayed or even reconsidered. For that reason, the next Major TDP Update scheduled to be conducted next year should evaluate whether all of the programmed projects are necessary and feasible. In addition, serious consideration should be given to conducting a Comprehensive Operational Analysis (COA) to consider the most cost - effective approach for providing public transportation services in Collier County. As discussed earlier in this report, a broad array of projects have the potential to increase ridership but they may not be feasible in light of the anticipated budget shortfalls projected to occur over the next ten years. Given the estimated costs and revenues identified in Table 6 -4A and Table 6 -46, additional service cutbacks may occur in the short -term or additional resources will be needed to maintain the current service levels. Collier County ATM TDP Annual Progress Report 7 -1 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 118 of 120 Section 7 Farebox Recovery Report In Compliance with Section 341.071, F.S. ANNUAL FAREBOX RECOVERY RATIO REPORT— 2008/2009 COLLIER AREA TRANSIT FIXED -ROUTE SYSTEM, NAPLES, FLORIDA MAY, 2009 CURRENT FAREBOX RECOVERY RATIO The farebox recovery ratio for Collier Area Transit (CAT), the public transportation provider for Collier County, was 18.5 percent in FY 2008. The background with regards to the farebox recovery ratio includes the following: Prior Years Fare Studies and Changes Collier County implemented a fare increase on March 1, 2009 due to increasing operating costs. The current fare structure is shown in Section 2 of this report. The base fare is $1.50 and a weekly pass was introduced. Most fares increased by 25 cents. Fares for youth (under age 17) and for riders who are elderly and /or disabled is 75 cents. There is a new transfer charge which is 75 cents for full base fares and 35 cents for reduced fares. Prior to March 1, 2009, riders received one free transfer with each paid fare. Children age five and under continue to ride all CAT buses for free. The new weekly pass is $15.00 for full base fare passengers and $7.50 for reduced fare passengers. Daily pass and monthly pass rates did not change. The monthly pass for full fare remains at $35.00 and for reduced fare the rate remains at $17.50. Daily pass rates remain at $4.00 for full fare and $2.00 for reduced fare riders. Rates for the Marco Express did not change. Proposed Fare Changes for the Upcoming Years No additional fare changes are anticipated in FY 2009. Collier County ATM TDP Annual Progress Report 7 -2 September 2009 Agenda Item No. 16A21 July 27, 2010 Page 119 of 120 STRATEGIES THAT WILL AFFECT THE FAREBOX RECOVERY RATIO The 2009 Collier Area Transit Annual Progress Report to the Transit Development Plan identifies several strategies that will be used to maintain or increase the farebox recovery ratio, including the following themes: • Monitoring key performance measures for individual fixed- routes. • Ensuring that transit serves major activity centers, which can increase the effectiveness of the service. • Increasing ridership through marketing efforts such as: • Handing out bus schedules in high traffic areas, • Updating bus maps and schedules, as needed, • Updating website, as needed, • Meeting with groups of potential riders, Working with local employers to provide incentives for transit use, and • Researching ways to improve customer communication. Additional transit improvements are planned and discussed within this report. The improvements will allow CAT to provide more service to Collier County residents. In addition, frequency will be improved in order to make transit more convenient for potential riders. While these improvements may temporarily reduce the farebox recovery ratio, the long -term increases in ridership will allow for more efficient service and a greater farebox recovery ratio in the long - run. Collier County ATM TDP Annual Progress Report 7 -3 September 2009 PW t 55 Conceptual Renderings COUnty