Loading...
Agenda 06/22/2010 Item #16A19 EXECUTIVE SUMMARY Agenda Item No. 16A19 June 22, 2010 Page 1 of 14 Recommendation to Award RFP No. 10-5456 for "Verification Testing Services for Oil Well Road," for an estimated cost of $200,000 Project # 60044. OBJECTIVE: To award RFP No. 10-5456 for use by the Transportation Engineering Department, Growth Management Division for Verification Testing in the construction of Oil Well Road. CONSIDERATIONS: Two seb'l'nents of Oil Well Road are under construction. The first segment is a four lane urban section with curb, gutter, sidewalks and bicycle lanes. It will be constructed frorn Immokalee Road to just east of Everglades Boulevard. Thc second section is being constructed as a six lane urban section with curb, gutter, and a twelve foot trail on the north side. This section extends from Oil Well Grade Road to Ave Maria Blvd. The Transportation Engineering Department is seeking a firm who can provide Verification Testing services for the Oil Well Road construction project. Verification is a process of comparing test data for determination of compliance with the contract requirements. This will be performed at the plant and in the field on split samples or independently obtained samples depending on the particular material specifications. RFP No. 10-5456 for "Verification Testing Services for Oil Well Road" was posted on March 30, 2010. A total of709 notices were sent and 77 vendors requested solicitation packets. Four (4) firms submitted proposals (AIM Engineering & Survey, Inc., GFA International, Inc., Tally Engineering, ._ Inc., and T.Y. Lin International) by the April 22, 2010, due date. The Selection Committee reviewed the four proposals received and met on May 7, 2010, to rank the firms. The Committee selected AIM Engineering & Survey, Inc., as the best qualified firm to perfonn the tasks required. FISCAL IMPACT: The cost of awarding this RFP should not exceed $200,000, which funds are available from Gas Tax. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office and is legally sutlicient for Board action-SRT. GROWTH MANAGEMENT IMPACT: There is no Growth Management impacts associated with this item. RECOMMENDATION: That the Board of County Commissioners award RFP No. 10-5456 for "Verification Testing Services fi)r Oil Well Road" to AIM Engineering & Survey, Inc. and authorize the Chairman to execute the standard contract after review by thc County Attorney's Office. Prepared By: Kevin H. Dugan, Project Manager, Transportation Engineering Department, Growth Management Division, Capital Construction and Maintenance - Attachment: Contract Agenda Item No, 16A19 June 22. 2010 Page 2 of 14 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: Item Summary: 16A19 Recommendation to Award RFP No.1 0-5456 for Verification Testing Services for Oil Well Road. for an estimated cost of $200.000 Project # 60044, 6/22/20109:00:00 AM Meeting Date: Approved By Steve Ritter Manager ~ Road Construction Transportation Engineering & Construction Management Date Transportation Division 6/4/201011 :04 AM Approved By Lisa Taylor Management/Budget Analyst Date Transportation Division Transportation Administration 6/7/201010:23 AM Approved By Norm E. Feder, Alep Administrator ~ Transportation Date Transportation Division Transportation Administration 6/8/20109:33 AM Approved By Nick Casalanguida Director - Transportation Planning Date Transportation Division Transportation Planning 6/8/201010:08 AM Approved By Scott R. Teach Deputy County Attorney Date County Attorney County Attorney 6/8/20103:06 PM Approved By Najeh Ahmad Director - Transportation Engineering Transportation Engineering & Construction Management Date Transportation Division 6/9/20109:50 AM Approved By Rhonda Cummings Contracts Specialist Date Administrative Services Division Purchasing & General Services 6/9/2010 1 :03 PM Approved By Natali Betancur Administrative Assistant Date Transportation Division Transportation Road Maintenance 6110/2010 11 :00 AM Approved By Jeff Klatzkow County Attorney Date Agenda Item No 16A19 June 22. 2010 Page 3 of 14 6/10/2010 11 :48 AM Approved By OMS Coordinator Date County Manager's Office Office of Management & Budget 6/10/20101:34 PM Approved By Steve Carnell Director. Purchasing/General Services Date Administrative Services Division Purchasing & General Services 6/11/20107:26 AM Approved By Susan Usher Management/Budget Analyst, Senior Date Office of Management & Budget Office of Management & Budget 6/11/20108:54 PM Approved By Leo E. Ochs, Jr. County Manager Date County Managers Office County Managers Office 6/12/201011:26 AM SCHEDULE A SCOPE OF SERVICES Agenda Item No. 16A 19 June 22, 2010 Page 4 of 14 1. Brief Description of Project To provide Verification Testing services for the Oil Well Road construction project. Verification is a process of comparing test data for determination of compliance with the contract requirements. This will be performed at the plant and in the field on split samples or independently obtained samples depending on the particular material specifications. 2. Background The Collier County Transportation Engineering and Construction Management Department (TECM) is currently constructing the Oil Well Road project Segments 2 and 4A. Segment 2 is being constructed to four-lanes from Immokalee Road to 1500 feet west of Everglades Boulevard, and six-lanes from 1500 feet west of Everglades to 1500 east of Everglades Boulevard. Segment 4A is being constructed as six-lanes from 1500 feet west of Oil Well Grade Road to 1500 feet east of Ave Maria Boulevard. Both segments contain pile supported bridges. 3. Detailed Scope of Work and Specifications The Consultant must be familiar with the FOOT Standard Specifications for Road and Bridge Construction, 2007, and in particular Section 105, Contractor Quality Control General Requirements. The Consultant must provide FOOT certified personnel and facilities to provide all necessary inspection to assure effective Quality Control of the operations related to materials acceptance. This includes but is not limited to sampling and testing production, storage, delivery, construction and placement. Ensure that the equipment used in the production and testing of the materials provides accurate and precise measurements in accordance with the applicable Specifications. Maintain a record of all inspections, including but not limited to, date of inspection, result of inspection, and any subsequent corrective actions taken. The Consultant shall perform geo-technical engineering field and laboratory testing services. The Consultant must be able to demonstrate a consistently high level of performance, and timely, comprehensive and accurate reports and invoicing. Professional services for material testing to be provided shall include field and laboratory tests, material evaluation and related reports involving sub-surface and construction material at construction sites in Collier County. Tests and services shall be performed in accordance with established professional standards and shall comply with requirements contained in applicable construction documents. Tasks may include, but are not limited to, the following: 1. Roadwav Field Investiaations PSA A-I Agenda Item No. 16A 19 June 22, 2010 Examples - Field drilling, auger borings and soundings, rock cover, percolationFll!!lllltSj of 14 monitor wells, turbidity analysis; 2. Roadwav Laboratory Tests Examples - Grain size analysis, organic content, compression test, chemical tests; 3. Construction Qualitv Control Examples - Pile driving analysis and monitoring, geo-textile monitoring. Serve as technical expert on geo-technical problems during construction; 4. Bituminous Examples - Measurements, coring, sampling of material; 5. Aaareaate and Base Material Examples - Inspection, sampling, proctor tests. Inspection of backfill material, Portland cement, concrete, plant inspection for quality assurance, aggregate, cement, fly-ash, chemicals, core testing, slump, air content, temperature control; 6. Precast or Prestressed Concrete Products Examples - Concrete pipe, beams, precast products 7. Miscellaneous Examples - Timber products, corrugated sheet metal and pipe, structural members, bridges. rSA A-2 Agenda Item No. 16A 19 June 22. 2010 Page 6 of 14 PSA A-3 Agenda Item No. 16A 19 June 22, 2010 Page 7 of 14 SCHEDULE 8 BASIS OF COMPENSATION DIRECT LABOR COSTS PLUS REIMBURSABLE EXPENSES 1. MONTHLY INVOICING B.1.1 The County shall pay the CONSULTANT for the performance of this Agreement the aggregate of the units actually ordered and furnished at the unit price, together with the cost of any other charges/fees submitted in the proposal. 81.1.1 All invoices shall be mailed to the attention of Kevin Dugan, Senior Project Manager, 2285 South Horseshoe Drive, Naples, FL 34104. 2. COMPENSATION TO CONSULTANT 8.2.1. For the Basic Services provided for in this Agreement, OWNER agrees to make monthiy payments to CONSULTANT based upon CONSULTANT'S Direct Labor Costs and Reimbursable Expenses in accordance with Attachment 1, attached to this Schedule 8, Laboratory Testing services shall be in accordance with the unit pricing amounts set forth in the table below. ITEM LABORATORY TESTING SERVICES NOT TO EXCEED AMOUNT/COS (PER UNIT: 1. Oraanic Content IFM T267l $ 85.00 2. Sieve Analvsis lAASHTO T27l $ 75.00 3. Sieve Analysis for Classification (FM $ 75.00 T88) 4. Plastic Limit (AASHTO T90) $ 68.00 5. Liquid Limit IAASHTO T89) $ 68.00 6. Standard Proctor (AASHTO T99) $ 90.00 7. Modified Proctor IFM T180l $ 90.00 8. Limerock Bearina Ratio $290.00 9. Specific Gravity and Absorption of Rip $125.00 Rao (FM T85) 10. Percent Fines (FM T11) $ 41.00 11. pH (FM5-5501 $ 42.00 12. Sulfate Content (FM 5-551) $ 42.00 13. Chloride Content IFM 5-552) $ 42.00 14. Resistivitv IFM 5-553) $ 42.00 15. Compressive Strength of Concrete $ 21.00 Cvlinders IASTM C39) 8.2.2. Direct Labor Costs mean the actual salaries and wages (basic, premium and incentive) paid to CONSULTANT'S personnel, with respect to this Project, including all indirect payroll related costs and fringe benefits, all in accordance with and not in excess of the rates ~ forth in the Attachment I to this Schedule 8. PSA B-1 Agenda Item No, 16A19 June 22. 2010 B.2.3. With each monthly Application for Payment, CONSULTANT shall submit detailBd3 tifrl~ records, and any other documentation reasonably required by OWNER, regarding CONSULTANT'S Direct Labor Costs incurred at the time of billing, to be reviewed and approved by OWNER. B.2.4 For Additional Services provided pursuant to Article 2 of the Agreement, OWNER agrees to pay CONSULTANT a negotiated total fee and Reimbursable Expenses based on the services to be provided. The negotiated fee shall be based upon the rates specified in Attachment 1 to this Schedule B and all Reimbursable Expenses shall comply with the provisions of Section 3.5.1 below. There shall be no overtime pay on Basic Services or Additional Services without OWNER'S prior written approval. B.2.5. The compensation provided for under Sections 2.1 of this Schedule B, shall be the total and complete amount payable to CONSULTANT for the Basic Services to be performed under the provisions of this Agreement, and shall include the cost of all materials, equipment, supplies and out-of-pocket expenses incurred in the performance of all such services. B.2.6 Notwithstanding anything in this Agreement to the contrary, CONSULTANT acknowledges and agrees that in the event of a dispute concerning payments for Services performed under this Agreement, CONSULTANT shall continue to perform the Services required of it under this Agreement, as directed by OWNER, pending resolution of the dispute provided that OWNER continues to pay to CONSULTANT all amounts that OWNER does not dispute are due and payable. 3. SCHEDULE OF PAYMENTS: B.3.1. CONSULTANT shall submit, under Section 1.1 of this Schedule B, an invoice for fees earned in the performance of Basic Services and Additional Services during the subject billing month. Notwithstanding anything herein to the contrary, the CONSULTANT shall submit no more than one invoice per month for all fees and Reimbursable Expenses earned that month for both Basic Services and Additional Services. Invoices shall be reasonably substantiated, identify the services rendered and must be submitted in triplicate in a form and manner required by Owner. Additionally, the number of the purchase order granting approval for such services shall appear on all invoices. B.3.1.1 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non-payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. B.3.2. Invoices not properly prepared (mathematical errors, billing not refiecting actual work done, no signature, etc.) shall be returned to CONSULTANT for correction. Invoices shall be submitted on CONSULTANT'S letterhead and must include the Purchase Order Number and the Project name and shall not be submitted more than one time monthly. 8.3.3 Notwithstanding anything herein to the contrary, in no event may CONSULTANT'S monthly billings, on a cumulative basis, exceed the sum determined by multiplying the applicable unit price by the number of units provided, as set forth in the table in Section PSA B-2 Agenda Item No. 16A 19 June 22. 2010 2.1 and by the applicable hourly rates by the number of units provided as 8al9fd/t# 1~ Attachment 1, attached to this Schedule 8. 8.3.4 Payments for Additional Services of CONSULTANT as defined in Article 2 hereinabove and for reimbursable expenses will be made monthly upon presentation of a detailed invoice with supporting documentation. 8.3.5 Unless specific rates have been established in Attachment 1, attached to this Schedule 8, CONSULTANT agrees that, with respect to any subconsultant or subcontractor to be utilized by CONSULTANT for Additional Services, CONSULTANT shall be limited to a maximum markup of 5% on the fees and expenses associated with such subconsultants and subcontractors. 8.3.5.1 Reimbursable Expenses associated with Additional Services must comply with section 112.061, Fla. Stat., or as set forth in the Agreement, be charged without mark-up by the CONSULTANT, and shall consist only of the following items: 8.3.5.1.1. Cost for reproducing documents that exceed the number of documents described in this Agreement and postage and handling of Drawings and Specifications. 8.3.5.1.2. Travel expenses reasonably and necessarily incurred with respect to Project related trips, to the extent such trips are approved by OWNER. Such expenses, if approved by OWNER, may include coach airfare, standard accommodations and meals, all in accordance with section 112.061, F.S. Further, such expenses, if approved by OWNER, may include mileage for trips that are from/to destinations outside of Collier or Lee Counties. Such trips within Collier and Lee Counties are expressly excluded. 8.3.5.1.3. Permit Fees required by the Project. B.3.5.1.4 Expense of overtime work requiring higher than regular rates approved in advance and in writing by OWNER. 8.3.5.1.5 Expense of models for the County's use. 8.3.4.1.6 Other items on request and approved in writing by the OWNER. 8.3.5.2 Should a conflict exist between the dollar amounts set forth in Section 112.061, F.S., and the Agreement, the terms of the Agreement shall prevail. rSA B-3 SCHEDULE B - ATTACHMENT 1 CONSULTANT'S EMPLOYEE HOURLY RATE SCHEDULE 10-5456 Agenda Item No, 16A19 June 22. 2010 Page 10 of 14 "Verification Testing Services - Oil Well Road" Title Hourly Rate Inspectors $ 58.00/hr Asphalt Plant Inspectors $ 65.00/hr Senior Project Engineer/Project Administrator (if required) $120.00/hr Contract Support Specialist $ 80.00/hr Senior Inspectors (if required) $ 75.00/hr END OF SCHEDULE B PSA 8-4 Agenda Item No, 16A 19 June 22. 2010 Page 11 of 14 I'SA B-5 Agenda Item No. 16A19 June 22, 2010 Page 12 of 14 SCHEDULE C PROJECT SCHEDULE 1. Verification Testing Services - and Field Inspector To be determined by Project Manager PSA c-I Agenda Item No. 16A19 June 22, 2010 Page 13 of 14 PS/\ c-2 Agenda Item No. 16A19 June 22. 2010 Page 14 of 14 PSA c-3