Agenda 06/08/2010 Item #16F 1 Agenda Item No. 16F1 June 8, 2010 Page 1 of 33 EXECUTIVE SUMMARY Recommend action to authorize the Chairman to execute a Florida Department of Environmental Protection Agency and Army Corp of Engineers joint permit application to continue maintenance activities in the Clam Bay system on behalf of the Pelican Bay Services Division. OBJECTIVE: That the Board of County Commissioners authorize the Chairman to execute a FDEP and ACOE joint Permit Application to continue maintenance activities in the Clam Bay system. All proposed activities will be done manually on an as needed basis following the same practices conducted within the Clam Bay system the previous ten years. Spoil material removed will be dispersed on the adjacent mangrove areas as previously practiced. All cut branches and trimming debris will be removed. CONSIDERATION: In order to maintain and improve the Clam Bay ecosystem, a permit is required to be obtained from the FDEP and ACOE. 1. At a PBSD Board meeting on March 3, 2010 the Board authorized the administrator and the cost ofthe permit, by motion, second and with unanimous approval to do what is required to move forward to obtain the channel flusing permit. 2. A copy of the Permit Application has been prepared and is attached for the Board's review and requires the permit to be executed by the Chairman. 3. All necessary work will be requested and supervised by Pelican Bay Services Division. FISCAL IMPACT: The funds for this service are estimated at $26,810.00 and available in the Pelican Bay Services Division Clam Bay Fund 320. GROWTH MANAGEMENT IMPACT: There is no Growth Impact associated with this Executive Summary. LEGAL CONSIDERATIONS: This Agreement has been reviewed by the County Attorney's Office and is legally sufficienct for Board consideration and approval. - CMG RECOMMENDATION: That the Board of County Commissioners authorize the Chairman to execute a FDEP/ACOE Permit Application to continue maintenance activities in the Clam Bay system. .'-t';"--~.:~,':'.:;;-':.____;~-_ __ --::.' --'. _--._ Prepared By: Mary McCaughtry, Operations Analyst, "Pelican"Bay Services DIvision- Agenda Item No, 16F1 June 8, 2010 Page 2 of 33 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS Item Number: Item Summary: 16F1 Recommendation to authorize the Chairman to execute a Florida Department of Environmental Protection Agency and Army Corps of Engineers joint permit application to continue maintenance activities in the Clam Bay system on behalf of the Pelican Bay Services Division, Meeting Date: 6/8/20109:00:00 AM Approved By OMB Coordinator Date County Manager's Office Office of Management & Budget 5/26/201012:41 PM Approved By Colleen Greene Assistant County Attorney Date County Attorney County Attorney 5/28/20104:50 PM Approved By Randy Greenwald Management/Budget Analyst Date Office of Management & Office of Management & Budget 5/28/20105:51 PM Budget Approved By Leo E. Ochs, Jr. County Manager Date County Managers Office County Managers Office 5[31/20103:08 PM "! '", '~ t'\~~ - [~ ",::!,~.;.c.:~ . TuRRELL, HALL & ASSOCIATES, INC. MARINE & ENVIRONMEmAL CONSULTING- ~ 3584 Exchange Avenue, Suite B. Naples, Florida 34104-3732. (239) 643-0166 . Fax (239) 643-6632 May 4,2010 Mr. Mark Miller Florida Department of Environmental Protection 2295 Victoria Ave. Ft. Myers, Florida 33901 33965 RE: Clam Bay Proposed Maintenance Activities #0128463-001-JC Dear Mark, Please find enclosed the original and four (4) copies of an ERP application for continuing maintenance activities within Clam Bay, located in Naples, FL. The site is located in Naples, Collier County, Florida, Latitude N 260 13' 49" and Longitude W 81048' 59". The site is more specifically located in Section 32, 33, 4,5,8, and 9, Township 48 and 49 South, and Range 25 East. This application is a request to continue maintenance activities of the Clam Bay system by continuing maintenance practices from the original permit #0128463-001-IC that have been practiced for the past ten years. The proposed work includes continuing to improve the hydrodynamics of the Clam Bay ecosystem by conducting activities in association with and specified by the original Clam Bay Restoration and Management Plan (CBR..\1P). Proposed activities include manual c1eaing on an as needed basis of the interior channels to maintain design depths, maintain created network of small flushing channels throughout the system in order to alleviate ponding within the mangrove forest, conduct periodic mangrove trimming activities along the canoe trail, berm, and boardwalks to maintain waterways, pedestrian accesses, and stormwater areas. New flushing channels maybe proposed according to the designed specifications included in this submittal ifponding of water or new areas of stress area obseIVed during the ongoing monitoring efforts. Spoil material removed will be dispersed on the adjacent mangrove areas as previously practiced. All cut branches and trimming debris will be removed. All proposed maintenance activities will be done manually on an as needed basis following the same practices conducted within the Clam Bay system the previous ten years. Regards, .4/1 z.... _ 5 '"-':_, '. ~ irr 'rrP< .... ... ~ Jeff Rogers Staff Biologist Turrell, Hall & Associates FORMII: 62-343.900(1) Section A FORM TIT1.E: JOINT ENVIRONMENTAL RESOURCE PERMIT APPUCATION DATE: OcIober3.199S SECTION A FOR ACrr'NCY l:SE Om. y DEP'WMD Appucath.mt Date Applicatinn Rec:ei"eJ Fee Received $ Fw Receipt if. AC'OE Appli:ldl)tl # Date AppJic3tion R=ce1'iied Propos<<( Project Ltt. PJI Prl). Lon. PART 1: Arc any of the activities described in this application proposed to occur in. on, or over wetlands or other surface waters? ~ yes 0 no Is this application being filed by or on behalf of a government entity or drainage district? Dyes ~no A. Type of Environmental Resource Permit Requested (check at least one). See Attachment 2 for thresholds and descriptions. o Noticed General- include information requested. in Section B. o Standard General (Single Family Dwelling) - include information requested in Sections C andD. o Standard General (all other Standard General projects) - include information requested in Sections C and E. o Individual (Single Family Dwelling) - include information requested in Sections C and D. 181 Individual (all other Individual projects) - include information requested in Sections C and E. D Conceptual - include information requested in Sections C and E. o Mitigation Bank: Permit (construction) - include information requested in Sections C and F. (If the proposed mitigation bank involves the construction of a surface water management system requiring another permit defmed above, check the appropriate box and submit the information requested by the applicable section.) o Mitigation Bank (conceptual) - include information requested in Sections C and F. B. Type of activity for which you are applying (check at least one) o D D l'8I Construction or operation of a new system, other than a solid waste facility, including dredging or filling in, on or over wetlands and other surface waters. Construction, expansion or modification of a solid waste facility. Alteration or operation of an existing system which was not previously permitted by a WMD or DEP. Modification of a system previously permitted by a WMD or DEP. Provide previous pennit numbers:O1 28463-001-JC o Alteration of a system 0 Extension of permit duration o Abandonment of a system 181 Construction of additional phases of a o Removal of a system system C. Are you requesting authorization to use Sovereign Submerged Lands? l8Jyes Dna (See Section G and Attachment 5 for more information before answering this question.) D. For activities in, on, or over wetlands or other surface waters, check type of federal dredge and fiU Lemrit requested: ~I:1dividual DProgrammatic General DGeneral DNationvlide []Not Applicable E. . Are you claiming to qualify for an exemption? Dyes I8Ino If yes, provide rule number if known. FORM#: 62-343.900(1) ScctionA FORM TITLE: 1O.INT ENVIRONMENTAL RESOURCE PERMIT APPUCATION DATE: October 3, 199' PART 3: B. ENTITY TO RECEIVE PERMIT (IF OTHER THAN A. OWNERlS\ OF LAND OWNER) , Nmne Name Pelican Bay Foundation. Inc Title and Company Title and Co1llpllly' Pelican Bay Services Division Address Address 801 Laurel Oak Dr. Cil;y. State, Zip City, State, Zip Naples FL 34108 Telepbone and Fax Telephone and Fax (239) 597-1749 Fax (239) 597-4502 C. AGENT AUTHORIZED TO SECURE PERMIT D. CONSULTANT lIJi' DIFFERENT FROM AGENTI Name Name JeffRo2e1'S Title and Company Title and Company Turrell. Hall & Associates. Inc Address Address 3584 Exchanlre Avenue City, Slate:, Zip City, State, Zip Naoles FL 34104 Telephone and Fax Telephone and FIIX 239-643-0166 Fax 239-643-6632 PART 4: (please provide metric equivalent for federally funded projects): A. Name of Project. including phase if applicable: Clam Bay Maintenance B. Is this a~lication for part of a multi-phase project? Dyes no C. Total applicant-oWoed area contiguous to the project? 772 ac.; _ ha. D. Total area served by the system: _ Be.; _ ha. E. Impervious area for which a permit is sought: _ Be.; _____ ha. F. Volume ofwatcr that the system is capable of impounding: _ ac.ft.; _ m G. What is the total area of work in, on., or over wetlands or other surface waters? Dependant on required mQint~s:e 8e.; _ ha. _ sq. ft.; _ sq. m. H. Total volume of material to be dredged: Dependant on required maintenance yd;_m 1. Number of new boat slips proposed: Q wet slips; Q dry slips , ~ ..~.-:.-..._._~ '..-.,.._,:--:- - FORM#: 62-343,900(1) SectianA FORM TITLE: .IOJNT ENVIRONMENTAL RESOURCE PERMIT APPLICATION DATE: October 3, 1995 PART 5: Project location (use additional sheets if needed): County(ies )Collier Scction(s) 32,& 33 Section(s) 4,5,8, & 9 Section{s} Township 48 South Township 49 South Township Range 25 East Range 2S East Range Land Grant name, if applicable: Clam Pass Natural Resource Protection Area Tax Parcel Identification Number: Folio #00239480006 Street AddrcssRoador other location:80 1 Laurel Oak Drive. Suite 605 (on-site management offices) City, Zip Code, if applicable: N~les. FL 34108 PART 6: Describe in general terms the proposed project, system, or activity. The site is located in the City of Naples, Collier COWlty, Florida, Section(s) 4, 5, 8, 9, 32, & 33 Township 49 South, Range 25 East of the Naples, Florida, United States Geological Survey 7.5-minute series quadrangle map. This application is a request to continue maintenance activities of the ClaII1 Bay system by continuing maintenance practices from the original permit #0128463-001-JC that have been practiced for the past ten years. The proposed work includes continuing to improve the bydrodynamics of the Clam Bay ecosystem by conducting activities in association with and specified by the original Clam Bay Restoration and Management Plan (CBRMP). Proposed activities include manual cleaing on an as needed basis of the interior channels to maintain design depths; maintain created network of small flushing channels throughout the system in order to alleviate ponding within the mangrove forest, conduct periodic mangrove trimming activities along the canoe trail, berm, and boardwalks to maintain waterways, pedestrian accesses, and stormwater areas. New flushing channels maybe proposed according to the designed specifications included in this submittal if ponding of water or new areas of stress area observed during the ongoing monitoring efforts. Spoil material removed will be dispersed on the adjacent mangrove areas as previously practiced. AIl cut branches and trimming debris will be removed. All proposed maintenance activities will be done manually on an as needed basis following the same practices conducted within the Clam Bay system the previous ten years. - .'?'-"'":... FORM#: 62-343.900(1) Section A FORMTIILE: JOINTENVIRONMENTAL RESOl;RCE PERMIT APPUCA nON DATE; October 3. 1995 PART?: A. If there have been any pre-application meetings, including on-site meetings, with regulatory staff, please list the date(s), location{s). and names ofkey staff and project representatives. FDEP ACOE B. Please identifY by number any MSSW/Wetland ResourcelERP/ACOE Permits pending, issued or denied for projects at the: location. and any related enforcement actions. Agency Date No.\Type of Application 01 284(j3-00I-JC 199602789 OP-CC) Action Taken 1998 1998 C. Note: The following information is required for projects proposed to occur in, on or over wetlands that need a fc:dml dredge and till permit or an authorization to use state owned submerged lands. Please provide the names, addresses and zip codes of property owners whose property directly adjoins the project (excluding application) and/or (for proprietary authorizations) is located within a 500 ft. radius of the applicant's land. Please attach a plan view showing the owner's names and adjoining property lines. Attach additional sheets ifneccssary. 1. 2. 3. 4. 5. 6. 7. 8. FORMi/: 62-343.900(1) SedionA FORM TITI.E: 10lNT ENVIRONMENTAL RESOURCE PERMIT APPLICATION DATE: Oclober3, 1995 PART 8: A. By signing this application fonn, 1 am applying. or I am applying on behalf of the applicant, for the permit and any proprietary authorizations identified above, according to the supporting data and other incidental information f1ted with this application. I am familiar with the information contained in this application and represent that such information is true, complete and accurate. I understand this is an application and not a permit, and that work prior to approval is a violation. I understand that this application and any permit issued or proprietary authorization issued pursuant thereto, does not relive me of any obligation for obtaining any other required fedcra~ state, water management district or local permit prior to commencement of construction, I agree, or I agree on behalf of the applicant, to operate and maintain the permitted system unless the permitting agency authorizes transfer of the permit to a responsible operation entity. I understand that knowingly making any false statement or representation in this application is a violation of Section 373.430, F.S. and 1 g U .S.C. Section 1001. Typcd/Printcd Name of Applicant (If no Agent is used) or Agent (If one is so authorized below) '/:.. ..6// R~~LA- .:;, -I{ -10 I ~ t;Z;r; ~ij;ant/Agcnt Date (Corporate Title if applicable) AN AGENT MAY SIGN ABOVE QMLX IF THE APPLICAl\l COMPLETES THE FOLLOWING: B. I hereby designate and authorize the agent listed above to act on my behalf, or on behalf of my corporation, as the agent in the processing of this application for the pennit and/or proprietary authorization indicated above; and to furnish, on request, supplemental infonnatlon in support of the application. In addition, I authorize the above-listed agent to bind me, or my corporation, to perform any requirements which may be necessary to procure the permit or authorization indicated above. I understand that knowingly making any false statement or representation in this application is a violation of Section 373.430. F.S. and 18 D.S.C. Section 1001. f Typed/Printed Name of Applicant Signature of Applicant Date (Corporate Title if applicable) Please .otE: The aDplic:ant's oril!inal slmlature (not a eoDY) Is reoulred above. PERSON AUTHORIZING ACCESS TO THE PROPERTY MUST COMPLETE THE FOLLOWING: C. I either own the property described in this application or I have legal authority to allow access to the property, and I consent, after receiving prior notification, to any site visit on the property by agents or personnel from the Department of Environmental Protection, the Water Management District and the U.S. Army Corps of Engineers necessary for the review and inspection of the proposed project specified in this application. I authorize these agm.ts or personnel to enter the property as many times as may be necessary to make such review and inspection. Further. I agree to provide entry to the project site for such agents or personnel to monitor permitted work if a permit is granted. ~ TypedlPrinted Name of Applicant Signature of Applicant Date (Corporate Title if applicable) Environmental Exhibits _. . . -...,. --. . .... -- -- -~-- --~ --'-~-.---'-"-...~. '---'-- - - .Y'T . . . '" :.. i= ; .;" - ~r":~ :.' t .:H '" _~...:o...-.. ~~~ _:::, r "ZZ tit :_,_._~. .. 11_, ,..... '.. . -'- '~;..:: .;,;:;n,...jj:;,....."i ~;:::.T,:.;,;~ ,.;' . f ....:...,"- - ..I ! ".<' ... -~' ~ D- ..,' I. "~. , , ' ::' ; :.'~ or,... . ~ ",:.-. ~. -. ." -.:..,' 0 - > ( C - a: o .J IL. U. o W I- ~ (j) ,--',. ," -- '", -.. --'~----...__.. '-~_._-'--- -----~----_._._----,..._- ------ --- ~ (]Ul.1' ()\1~ ~ P:\lIlMS CIIm a.,I2lHe~o_~_...... .J ( - a: w <( >- t- Z :J o U " j\ ~ ~ Z :J o U a: w - .J 8 .J ~.__. 0 !S 0 ~ D~ ~~ iSf ~ Z o lBuJ ~~ ::)0 CL~ 0::) Zj!: ~ftJ ~~ IIIU CLa: 11:0 011. II.Q 11I11I a:c CZ ftJj!! Oz Z- -~ j~ ~~ .. (,Q Q ~wz oi:c zO . . -- ---_.~----_._--,--------- ~ z_~ ~ I I "'at "f'1Q ~iI ~~ ~; en ~ c ~c iElII~;j li~~d Occ~ O"'atCD UQa:t~ III ~ ~Ct w..::I:~ !(~~~~ ~QO en"lZ 000 0 .. nW :!~ ~~ Sg 00 i ~ j z: . III I'll . .. g i oil I Ci .. ! i i ~ .. ! 1;111 i g . .. ~ I!f ; i I o ~ ~ : : . '. G Ilil= > ( m ~ z o ~ ~ ..J ( ~ J o ~f~; .ao~o;' C1;iU ~ 'gs~; "'-I 5 i-r.<. <~z ~.~~~ ~tii";':;2; ==~~o;' -0 <~ ~.rrfi ~~~ vii 1 u: ....: ....i III 0 ....i III N ~ 0 lit 0; ~ G .... aj i ~ ~ a= a: D- o. ~ ~ II '" 0 . ij ... P'tp;i I 1-::" i I~~i e I i ~ = ~ m ~ ;:) (,) ~~ < 5 J o . ":- c..... ~,...."'IIGIJt12lI1O.~_fElll.WCE""'" ~.JE1 ~ rn-- 11 ~ ~ .B 5;:1; 0;;- .5S!u liE! o]j = ! B Jg. '_'V~~~ -w. s- = .!!I.... C'iS~0':I~ ~~!:is: ~j <.... ~.Ji ~ Ji"'- t\er; r~:-l~ '1 ~, IIi, lit c' I '",I ~1 (; J .~ ~ Y Ji TV' 'II .. = . S'~ii .. 0 ~~ai~ Ili~~ ~ ~ , i m ~ Q: {.i;~ ~~ ~ ~,,:~~ =;~j'''; ...-,.?j :E: /~~ \ ' \ ) riLl,,: fa ~ ~ ~\. \ ?..=c-ri' ": <c '- - ,.~ ......;::r.;~ · z ....' '" 'l~ a:: -,~ to ~ ~ ~~ : fW) ~ ~ ffi~ ~ ~u.u.u.ilt ffi ..J-J..J ;I. ::t: ~~~~~~ 5i :I(~cDgi: ~ ~~~~il- 51 ilfltltc;sP.i f{! .~~~1I~ If ~ ~~ 5 ~ ~m II '<f~""'r""i~ ~ II ~~~~5 ~:3'ide.dz ~ ::.l:~~iil~o ~ ~ililn~I!~ j~HUh'~ OA^^^O v Z'vvvv iiI !ill elli III iiI IZ ~I utls II! f,:!. !~ l!lw l>Q CJ z ~ >< w , J~ L. Z <( :I:f'( t) or- w Q.l;) i:: ELJIAIN1EIWlCE..... _"Il2lIfG_CHoUIlol -1IIr\2018 ..-. ~ C\I . II C ! lfl III :i! It '! !;iii i II o $!P""'" ~~~~ -~ _;t a'jo~~ ~U....:l~ .us ~ i;l ~ ~J'"" < ~ .~ ~.~i~ =;;l ~ <n ! ::Ca'el~~ <~ - ::::::f~' g. .. cu.5 j j ~~ JS'" E- ;;& " .... El ! [- jB \~,I' '\ Al 15 ~ ffi5 ~ ~~~u.ili! ; ~~~i~~ ~ ~~~~i~ ~ ;::li:Ci:a::B!!i I ~~"1Il~ c ~ ~~ - C) c lQ im III ~Bti~~2 ~ ~--'~5 ~ ::!!lIllIlllfw5 ii: ~!~~16~~~ d~inhu zOoooo 0 i .1 .. :t UI III l'f iii ", 1 Iii I Iii tV ! . ~ lit 01' :;;;6 111I a QrQl&. d 1;1&. 11I0 IDII.I ~i IDa:: I~ QiiJ " s · , 11111 z ~ e It o . .. ..,: ~ s ~~~i :i o >: 0 w III iI ., ~ Ilil!!~ u Itl l!l1U 6 l:l ... 10 C!J~ z ~ en ~ ....J w.... Z ~ J:~ U N W Q..o ~ Q~ W en o Q.. ~ 0.. ...J W Z Z ~~ U N Wo a. ~ > z ( ~ m ~ ~: ( ~ J ! o z . N .. P_CIomIlloJlZltl._1Wnu1lDt1l,.~ 0'01:, w C!J~ Cf) 0 z a. i= 0 (/) a:: iii a. ..J w "I- Z .,~ Z Z <"'I <( :c :I: "'I CJ t) C") C") we> W a. Q..Q ~ ~ f.. ~ . fD IL o . 5: l:!f ~ aio fij ~~~~i~ m ~i~sdil; I- o:r~oi'~l:3~ iiJ .~"'Gll5 ~ 1~~~8ffi I ~i~~lII~ ~ ~ ~~ is 1ft om UJ ~ --r-"'~~ ~ ~ II'" N N I- 5:i15...o; ~ J ;If;;r e (.) ffi .. z ~ Iii ~ ~ z .... :ii~~Z~go~..J ~~~~~~g~1 e~~~~18~~6 ~ooooo 0 IIIdlll2D1' C_~1IANCE.thOt P_CllIIla.,\Zlll.'.... _ Iii ~z ~a utl!s III! ~1I il ~iii ~~ ~,.>;j ~-:~ "-.. "~~~ t~~,.,~'g', ' '.'.N"".a'''.'. ' . . . . . . ..~ oJ i)~ mi;v-<! i~ wU IIIIr. 00 I-W utO i!ii5 m~ Q! ?- m I ~ I i ~ ~ ! i ~ II III l"l . III C Z ~ .. ~ ! I:II~ Ii · fO ~ 41 CI .. . , . ~N-~O ::::::e. z ): 0 i-Ii ~ Ili~ ~ ~ ~ , ~ m ~ a::: -' ~ I ~ ~ J ~ o ~ . N ~ r3-J~i ~ ..s~1! ~~ ~g~c;- ~U..Ja.. "g 1 i:~ ~ G) .... <~:Z::g c>.J.~ i C? ~.a .....~ ::::::=~~~ ~ G) ~ c:!. :::::::l S .... U lU.:; Iii II ~;:s~'"' ~ ~ ~ ~ rq l u. o ~ ii~ ~ ~~~~~~ ffi ;~~i~~ ffi I fH~aig~ 0 li~~~~ f- ~u'd I is 1"-" is ... ~m ~ .: "~t;'~ 15 ~ s:;"'....'j II: ~ j ;rl;;r~ (J :i~~~~~z~ ~~~~zbQIu:i ..a~~li~~g~i ~~~~~i8~m~ zOoooo 0 Ii C1! II ~I ij!: 21 110 'l:~ .'.~~ en z o i= c z o u C.!) Z<<-I I- en >< WQ P:\IIMa CIono a.,\ZU'Io,.,..",-.__~~.dwg """"" 1.1 II ~ I .. I ~ : ~ ! .. III IJ ft iii " ! OlIO W en o ll. ~ a. ...J w Z Z <ei :c C,) s · , I'-li z I . o .. ~~jl ~ .. 0 1=~~6 IIII = > ( i m 5 C) z - ~- ::i u. ( ~ .~, J ~ \-.-..~;. \ ... 0 0. \" .... . . J ( ,,'~> = . OI)N '" '~' - /~)( ~~~; ~, ,m~';:',j ~~~- ~ /fl".; ~a ~ ~ " ../ ,/ ~ ,;~ . u '3 ~ .. ~~ o=~~ ~ ---- '~~~'~~:J ~ ~ ~ '0 ~ .~ ~ '.) <>'d.~ = ~ (, ,,,\' = = .~ <:;- c- ":~1 - c:d ~ ~ ~ .;{ 1 =:t::: <ll! u_ ~ii l;lil m i ~~:~ E- - ; ~ i ~ III " ~~ ,V I . n ~:AI 05 Al d Ih. lK~ ei WllC IW 1IIj!: om -r- WQ D.. ~ l5 ~ ~~; z~~~iit iii ~it'illillD~ c ~"I;.~..t.lQ Iii n~~<D':si f2 I~~~~ffi 6) g~~~w~ I : ~~! .; __t;'i~ ~ ~ ~~~~~ ~ "'irlule.d 30 iuuhlm el~~~~li~l~ i^^^^^ ^ _vvvvv v Ii o! W..l I~ COo a:w 01 liL ~j!: 2!i I>\) en z o i= Q ... .J C) (!) Zt'{ I-- en >< w~ P:\IMS c.... a.,\2D'ID ........,.n___~~.cIwQ iiI IZ 0.1 lrJt; II! ~iIJ II ow 01>\) w en o Q. o 0::: Q. -I W Z Z <C~ J: U N w~ Q. ~ I~I · :t iii 1 Iii .. !iB III ~ C'lI III c:I i 10 ! ; . f L ~ ! III Z ~ . o .. o ~~ii ; 51 ~ 5 .. J:: ZIl!!dU 11II I ~~ m ~ e" z ~ ~ ~ ( ~ J ~ o a. . N ...UbON.... ..s ..Ej E; ~ ~:;<!~ ~8!~6:' - ........ . SS! ti:! !::!. g- rf ~ ~i;f.. <~a:i:g ~ -s: .8 q :::::ll;l ~.... =r::L1 ,;:2; = cI/! ~ 6\' ~.~ < ::l ~~ S'J ~ l ~~~ i'rt::c'" .j 'r j \If\j W ~~! IL o ~ ~~ a ~~~IL~~ ffi i:l !2...lcil. ffi ' p;:iIDi !j?!~"I:13~ II N-Gla ~ I~~~e~ ~ ~"'lKi I ~ ~~ 0 rn ~r9 w ~ ZI= ill ~tib"~$~ ~ 3:: --. ~ 3! irdm!?CJ~ ffi ,ZZuI~o .... ~~~i~g~~uf cs(JCJow~o;z e~~~~15~~~ ~ooooo 0 !I I~ -I ~I fil_ Ii "I) Cf) Z o ;:: o z o u (!) Zl'f i= en x We;) o ClWlNI!1...~ceAwv P_~a.,\2010~ _ ...I il .L wO 11I11I el "'III: I~ aiil 1.1 llJ ~ I ~u ! II.. II I) III W o I : i! · . i~.i. Ii ~ i ~ I .. ..,: ~ i I iiid ~ ~ m ~ (!) z - ~!: ~ ~ J ~ o Do ~ gf~~ ~ -- a;5: I:tI) ~O\" B_Q t'l'\f'rI =U-.Jc. 'O]1'd-lii ~ 5 -;.'"" < ~ Z:::g ~'~i~ =a~ ~! ::c~ ,.."" -8 <8- ~";j t .. ~~JSJ E- ~ I' ~ ~ ~;-;-' "j ,( ~, c\j A'] Q~ W CI) o a.. ~ a. ....J w Z ~Oi :J: C) C'I') We;) a. >- ~ ! I !Ii · III Z .. ~ III ~~ I N Iii I III ~~ Iii III z !':l:!: ~ .0 ! ~I- a In I :!:Q I :z:1II ::Ez e Iltfi i:!S m ~QI- fBl~ II z 'iir~ ~ ~ II I- :!:W:z: fit .. ...jCllC) 0 ~~i5 ::I .. .. !I t-: .. I :::l!rntt: ~,n I ~~~ o >= . ~~n ~I i i ~ i ~ ^ ^ 5a Qil; = y y > !I < w U f;j1 Z CJ m ~ z i= w t- en Z ~ ~ ~ en U) w u < (.) c( W 0 J z 4( u 0 . iN.... c:.> ...., ..., ~. ::;:;l _'3t~ a'S ~ ~ 0;- .......u....~ .as ~':":' gall! -< l g ':8 ~. ~- - E; ~~ =~ ;z ::Cd/:! }Jei\' - <I.l! !:? =i "'':":' ~- =0 ~:5 ~~ E- ~ '. o:!; " ~ ~ fl ..- Cloom ~D -lI'JO'IO_CHANNEL...1IAINTI!IWIcE.d ' J - w = I UI ~ ; l I) . .. iii.. . liil' II ... II I .. B . ij ;; ::E !it ~ I 0 iili ~ miil = ~ m ~ ~~ ~ 0 J o .tlO....~ J3..g ~~ _"3<t~ ",-,!i_-<> B 5 ~c;::- ~u ~~ "g ~ j; g ~~l Cl .~ ~.~ ~~ ~&3~~ ::c:~~c;::- --11) <: :::l !JJJ ~",r\.r~ ! i ~ II' . ii I '" ~. "- . f~ W IP~ ] Sections "c" FORM#: 62-343.900(1) ScctioD C FORM TITLE: JOINT CNVlRONMENTAL RESOURCE PERMIT APPLICATION DAlE: OciDber3, 1995 SECTION C Environmental Resource Permit Notice of Receipt of Application Note: this form does not need to be submitted for noticed general permits. This information is required in addition to that required in other sections of the application. Please submit five copies of this notice of receipt of application and ail attachments with the other required information. Please submit all information on 8 1/2" x 11" paper. Project Name County Owner Applicant: Applicant's Address: Clam Bay Collier Pelican Bay Foundation PcIcan Bay Foundation 801 Laurel Oak Drive, Naples, FL 34108 1. Indicate the project boundaries on a USGS quadrangle map. Attach a location map showing the boundary of the proposed activity. The map should also contain a north arrow and a graphic scale; show Scction(s), Township(s), and Range(s); and must be of sufficient detail to allow a person unfamiliar with the site to find it. 2. Provide the names of all wetlands, or other surface waters that would be dredged, filled, impounded, diverted, drained, or would receive discharge (either directly or indirectly), or would otherwise be impacted by the proposed activity, and specify if they are in an Outstanding Florida Water or Aquatic Preserve: Clam Bay 3. Attach a depiction (plan and section views), which clearly shows the works or other facilities proposed to be constructed. Use multiple sheets, ifnecessary. Use a scale sufficient to show the location and type of works. 4. Briefly describe the proposed project (such as "construct dock with boat shelter", "replace two existing culverts", "construct surface water management system to serve 150 acre residential development'1: Manually maintenance cleaning of all existing flushcing channels within the Clam Bay mangrove forest as well as trim mangroves in order to maintain pedistrain access through the canoe trail, along the berm, and boardwalks all on an as needed basis. 5. Specify the acreage ofwettands or other surface waters, if any, that are proposed to be filled, excavated, or otherwise disturbed or impacted by the proposed activity: filled _ ac.; _ excavated ac.; other impacts _ ac. 6. Provide a brief statement describing any proposed mitigation for impacts to wetlands and other surface waters (attach additional sheets ifnecessary): fOR AGENCY GSE ONLY <\.pplicatron Namcr. ApphcatiOD Number: Office where the appllcatlou can be inspected: Pi.. .. ~ nc:1pIetati TheiDf~ 111 ml(, lWli.:e "a~'~ 1<Ub'JUUEd by tfl~ arpitcarl,. anJ~nOi ~een ~'Oftfil:l.l b) ttV:~y It mal be ineorret1, 11I1.00lp:.M Or aw:- be ~i: tv 1.han30 _. Sections "E" FORM#: 62-343.900(1) Section E FORM I1TLE: JOINT ENVIRONMENI'AL RESOURCE PERMIT APPIlCA TION DA~ Ocm~3.199j SECTION E INFORMATION REQUESTED FOR STANDARD GENERAL, INDIVIDUAL AND CONCEPTUAL ENVIRONMENTAL RESOURCE PERMIT APPLICATIONS NOT RELATED TO A SINGLE FAMILY DWELLING UNIT Please provide the information requested below if the proposed project requires either a standard general, individual, or conceptual approval environmental resource permit and is not related to an individual, single family dwelling unit, duplex or quadruplex. The information listed below represents the level of information that is usually required to evaluate an application. The level of information required for a specific project will vary depending on the nature and location of the site and the activity proposed. Conceptual approvals generally do not require the same level of detail as a construction permit. However, providing a greater level of detail will reduce the need to submit additional information at a later date. If an item does not apply to your project, proceed to the next item. Please submit all information that is required by the Department on either 8 1/2 in. X 11 in. paper or 11 in. X 17 in. paper. Larger drawings may be submitted to supplement but not replace these smaller drawings. I. Site Information A. Provide a map(s) of the project area and vicinity delineating USDAlSCS soil types. Please see attached soil map B. Provide recent aerials, legible for photo interpretation with a scale of 1" = 400 ft, or more detailed, with project boundaries delineated on the aerial. Please see attached environmental exhibits C. Identify the seasonal high water or mean high tide elevation and normal pool or mean low tide elevation for each on site wetland or surface water, including recc:iving waters into which runoffwill be discharged. Include dates. datum, and methods used to determine these elevations. Please see attached environmental exhibits and associated Notes D. Identify the wet season high water tables at the locations representative of the entire project site. Include dates, datum, and methods used to determine these elevations. n. Environmental Considerations A. Provide results of any wildlife surveys that have been conducted on the site, and provide any comments pertaining to the proj eel from the Florida Game and Fresh Water Fish Commission and the U.S. Fish and Wildlife Service. B. Provide a description of how water quantity, quality, hydroperiod, and habitat will be maintained in on- site wetlands and other surface waters that will be preserved or will remain undisturbed. The proposed work is to ensure the overaU quality oftbe mangrove forest by improving fillShing. C. Provide a narrative description of any proposed mitigation plans, including purpose, maintenance, monitoring, and construction sequence and techniques, and estimated costs. D, _ Describe how boundaries of wetlands or other surface waters were determined. Ifthere has ever been a-c----~- - -- jurisdictionaldecIaratory statement, a formal wetland determination, a formal dclcrmination,lI.validated informal determination, or a revalidated jurisdictional determination, provide the identifying number. E. Impact Summary Tables: - 1. For all projects. complete Tables 1, 2 and 3 as applicable. 2. For docking facilities or other structures constructed over wetlands or other surface waters, provide the information requested in Table 4. FORM#: 62.343.900(1) ScctionE FORM ffiLE: JOINT ENVIRONMENTAL RESOURCE PERMIT ~PUCAnoN DATE: October 3, 199!l 3. For shoreline stabilization projects, provide the information requested in Table 5. HI. Plans Provide clear, detailed plans for the system including specifications. plan (overhead) views, cross sections (with the locations of the cross sections shown on the corresponding plan view), and profile (longitudinal) views of the proposed project. The plans must be signed and scaled by a an appropriate registered professional as required by law. Plans must include a scale and a north arrow. These plans should show the following: A. Project area boundary and total land area, including distances and orientation from roads or other land marks; Please see attached environmental exhibits B. Existing land use and land cover (acreage and percentages), and on-site natural communities, including wetlands and other surface waters, aquatic communities, and uplands. Use the Florida Land Use Cover & Classification System (FLUCCS)(LeveI3) for projects proposed in the South Florida Water Management District. the St. Johns River Water Management District, and the Suwannee River Water Management District and use the National Wetlands Inventory (NWI) for projects proposed. in the Southwest Florida Water Management District. Also identify each community with a unique identification number which must be consistent in all exhibits. C. The existing topography extending at least 100 feet off the project area, and including adjacent wetlands and other surface waters. All topography shall include the location and a description of known benchmarks, referenced to NGVD. For systems waterward of the mean high water (MHW) or seasonal high water lines, show water depths, referenced to mean low water (ML W) in tidal areas or seasonal low water in non-tidal areas, and list the range between MHW and ML W. For docking facilities, indicate the distance to, location of, and depths of the nearest navigational channel and access routes to the channel. D. If the project is in the known flood plain of a stream or other water course, identify the following: 1) the flood plain boundary and approximate flooding elevations; and 2) the 1 aD-year flood elevation and floodplain boundary of any lake, stream or other watercourse located on or adjacent to the site; E. The boundaries of wetlands and other surface waters within the project area. Distinguish those wetlands and other surface waters that have been delineated by any binding jurisdictional determination; F. Proposed land use, land cover and natural communities (acreage and percentages), including wetlands and other surface waters, undisturbed uplands, aquatic communities, impervious surfaces, and water management aress. Use the same classification system and community identification number used in III (B) above. G. Proposed impacts to wetlands and other surface waters, and any proposed connectionsloutfalls to other surface waters or wetlands; Manual maintenance cleaning/excavation activities of the existing flushing channels H. Proposed buffer zones; 1. Pre- and post~development drainage patterns and basin boundaries showing the direction of flows, including any off-site runoff being routed through or around the system; and connections between wetlands and other surface waters; 1. LOcatioIi-ofaIlwater management"areas with detailS of siZe,'sideslbpes, and rlesigiiedwaiei depths; K. Location and details of all water control structures, control elevations, any seasonal water level regulation schedules; and the location and description of benchmarks (minimum of one benchmark per structure); L. Location, dimensions and elevations of all proposed structures, including docks, seawalls, utility lines, roads, and buildings; M. Location, size, and design capacity of the internal water management facilities; FORMJI: 62-343.900(1) Section E FORM TITLE: JOINT ENVIRONMENTAL RESOURCE PERMIT APPIlCATION DATE: ~tobcr3. J99S N. Rights-of-way and casements for the system, including all on-site and off-site areas to be reserved for water management purposes, and rights-of-way and easements for the existing drainage system, if any; O. Receiving waters or swf'ace water management systems into which runoff from the developed site will be discharged; P. Location and details of the erosion. sediment and turbidity control measures to be implemented during each phase of construction and all permanent control measures to be implemented in post-development conditions; Q. Location, grading, design water levels, and planting details of all mitigation areas; R. Site grading details, including perimeter site grading; S. Disposal site for any excavated material, including temporary and permanent disposal sites; All excavated material wiD be spread out on eitber side of flushing chanDeI T. Dewatering plan details; U. For marina facilities, locations of any sewage pumpout facilities, fueling facilities, boat repair and maintenance facilities, and fish cleaning stations; v. Location and description of any nearby existing off site features which might be affected by the proposed construction or development such as stormwater management ponds, buildings or other structures, wetlands or other surface waters. W. For phased projects, provide a master development plan. IV. Construction Schedule aDd Techniques Provide a construction schedule, and a description of construction techniques, sequencing ll.'1d equipment. This information should specifically include the following: A. Method for installing any pilings or seawall slabs; B. Schedule of implementation of temporary or permanent erosion and turbidity control measures; C. For projects that involve dredging or excavation in wetlands or other surface waters, describe the method of excavation, and the type of material to be excavated.; All excavation wlll be done manuaUy on an as needed basis and the material to be removed is a muck mud D. For projects that involve fill in wetlands or other surface waters, describe the source and type offill material to be used. For shoreline stabilization projects that involve the installation of riprap, state how these materials are to be placed, (Le., individually or with heavy equipment) and whether the: rocks will be underlain with filter cloth; E. If dewatering is required, detail the dewatering proposal including the methods that are proposed to contain the discharge, methods of isolating dewatering areas, and indicate the period dewatering structures will be in place (Note: a consumptive use or water use permit may by required); c,F. ,.~' . MethodsforJransporting equipment and materials to andJromJh~w~r.k~~!e."Jfbarg~ are requi!ed.fo~, access~ proVide the ~ow water d~ths iind draft of the fully loaded barge; -' , . ,- y ..,. , ", '. G. , Demolition plan for any existing structures to be removed; and H. Identify the schedule and party responsible for completing monitoring. record drawings, and as-built certifications for the project when completed. - v. DraJnage Information A. Provide pre-development and post-dcvelopment drainage calculations, signed and sealed by an appropriate registered professional, as follows: I. Runoff characteristics. including area, runoff curve number or runoff coefficient, and time of concentration for each drainage basin; 2. Water table elevations (normal and seasonal high) including aerial extent and magnitude of any proposed water table draw down; 3. Receiving water elevations (normal, wet season, design storm); FORMa: 62-343.900(1) Section E FORM T1TLE: JOINT ENVIRONMENTAL RESOURCE PERMIT APPllCATION DATE: October 3, 1995 4. Design storms used including rainfall depth, duration, frequency, and distnbution; 5. Runoffhydrograph(s) for each drainage basin, for all required design storm event(s); 6. Stage-storage computations for any area such as a reservoir, close basin. detention area, or channel, used in storage routing; 7. Stage-discharge computations for any storage areas at a selected control point, such as control structure or natural restriction; 8. Flood routings through on-site conveyance and storage areas; 9. Water surface profiles in the primary drainage system for each required design storm event(s); 10. Runoffj>eak rates and volumes discharged from the system for each required design storm event(s); 11. Tail water history and justification (time and elevation); and 12. Pump specifications and operating curves for range of possible operating conditions (if used in system). B. Provide the results of any percolation tests, where appropriate, and soil borings that are representative of the actual site conditions; C. Provide the acreage, and percentages of the total project, of the following: 1. Impervious surfaces, excluding wetlands; 2. Pervious surfaces (green areas, not including wetlands); 3. Lakes, canals, retention areas, other open water areas; and 4. Wetlands. D. Provide an engineering analysis of floodplain storage and conveyance (if applicable), including: 1. Hydraulic calculations for all proposed traversing works; 2. Backwater water surface profIles showing upstream impact of traversing works; 3. Location and volume of encroachment within regulated floodplain(s); and. 4. Plan for compensating floodplain storage, if necessary l and calculations required for determining minimum building and road flood elevations. E. Provide an analysis of the water quality treatment system including: 1. A description of the proposed stormwater treatment methodology that addresses the type of treatment, pollution abatement volumes. and recovery analysis; and FORM#: 62-343.900(1) Sedion B FORM nn.E: JOOO BNVIR.ONMENTAL RESOURCE PERMIT APPUCATION VA TB: October 3, 1995 2. Construction plans and calculations that address stage-storage and design elevations. which demonstrate compliance with the appropriate water quality treatment criteria. F. Provide a description of the engineering methodology, assumptions and references for the parameters listed above, and a copy of all such computations, engineering plans, and specifications used to analyze the system. If a computer program is used for the analysis, provide the name of the program, a description of the program, input and output data, two diskette copies, if available, and justification for model selection. VI. Operation and Maintenance and Legal Documentation A. Describe the overall maintenance and operation schedule for the proposed system. B. Identify the entity that will be responsible for operating and maintaining the system. in perpetuity if different than the permittee, a draft document enumerating the enforceable affirmative obligations on the entity to properly operate and maintain the system for its expected life, and documentation of the entity's financial responsibility for long- term maintenance. If the proposed operation and maintenance entity is not a property owner's association, provide proof of the existence of an entity, or the future acceptance of the system by an entity which will operate and maintain the system. If a property owner's association is the proposed operation and maintenance entity, provide copies of the articles of incorporation for the association and copies of the declaration, restrictive covenants, deed restrictions, or other operational documents that assign responsibility for the operation and maintenance of the system. Provide information ensuring the continued adequate access to the system for maintenance purposes. Before transfer of the system to the operating entity will be approved, the permittee must document that the transferee will be bound by aU terms and conditions of the permit C. Provide copies of all proposed conservation easements, storm water management system casements, property owner's association documents, and plats for the property containing the proposed system. D. Provide indication of how water and waste water service will be supplied. Letters of commitment from off-site suppliers must be included. lE. Provide a copy of the boundary survey and/or legal description and acreage of the total land area of contiguous property owned/controlled by the applicant. vn. Water Use A. Will the surface water system be used for water supply, including landscape irrigation. or recreation. B. If a Consumptive Use or Water Use pennit has been issued for the project, state the permit number. C. IIno Consumptive Use or Water Use permit has been issued for the project, indicate if such a permit will be required and when the application for a permit will be submitted. D. Indicate how any existing wells located within the project site will be utilized or abandoned. _. ~ ~~~~ 5i 0" ffoS 0'"'1::- '" ~~ 'y~<.... .g u'- .", U:s ~ ~~ -:z;:l.D S =0::".9 ,- it oel""" ~ =e ~ <0 ~ .. .. ..;>'"'~ 0 .sle ;;,;i5S ii '3& ~~~~ 0 .r I s. .. j2., - 1$- ..o~ ~ .. 01 ~"'u ...... 0 ~~~ Ii ~I:I - ~ ~ ,a it E<Il i] '!;! 8 <Ii ~ ~ ~ ~ 5 ii~ . 0 ;> ~ii .& .. ~8. f- ,9 ..~ U>=.1 "0 ]1 i8 X ~ .z ~ .!!l 05-= .. ~H ~ ~ oScs -= .- ~O ;J 11 ~l <f- - ~.~ rI.l 81 ~sn f- ~8 2~~ U___ '- 0 ~ 0 ~~ ~~ ~ [ ~~rI.l ~ Ii .~] f- ~ "-' jl" ~... -8 01_ :a-s ,~ I t)w ~ .8& u I; ._ .:Eb <0 ~~ j1 l:l..0 ~U .. U -=1) ],!,! u..c - - "<:1) "ill ~ ~. IJ.!:! !l 0 ~ ~"O 'oe- ffi~ ._ ..s .,Po "0 [; C . .... ._-~ rI.l ~t t) ~ 0 OJ II c"O <- ..co !!8 ~~~ ~f c .. '=~ W r.f.l al lff >'1>0 0.. 0(:1 ....... · it ~,s ..- u - u ~~;; fi ! ~ ~. o!2 tj 8.~ u~ .. -ual Q 6 ~-s 'if ';~~ B.~ I ,~ ~s .s",.", .~]~ . Iii .- j~~ :i-.!l . tl.~ ~";]O ~~i c ~.e w g =2 .5 '2.:E Nw ,- Sl .. --g if~ bQ ~t: I; ~ i "B ii's.c: ~rI.l '0: ~ '5 _ ~ri= 6:/11;,:: ."0 . ooZ .:gc;:tj '8:30 0(:10 !lgZ II 'C .. C -.-I "'t:J ~i SL~ i.E cs =-; ell '_ kiullj! _ell !It;.. - 8;~ "'jlu-l . ~ sj.5l - ._-. , .. !l'..c ,co __-.lo _ ~_~-c-_--'-_~-'-__ ~'~ ". ~:!]'8 ="il'g <;.:4..o""QI~ e~ 6 00 .. :l I :3 ",...."" ~w JlrlClIl 8:-: ~ ~~ Ii.. "0 fl-a ~ ~~.8 'S !1i1 ~? t: f! fl li "0" I; -a6il: I ] Co"_ ~ .p"G::: 'J:: ~-= U '='!l "3 '8 rI.l ~"CIU_ ~i... ~ IIji~ .!.E~ e ...lo ...:l~ t~ Q ~ 8.~ U ~- :s: ..... ~ .. ~..JZ"" ... ,~~8~ .s " C:S... 6 ~z~j ".0 ~ ~~~8 S ... ~~~~ ... cd U ~~ i:5 S u .~-~ ~ "'o~ O~ ~~co: ~Q., ] ~~~ ~~ .. ~~ 0 ~ < 6 ~ ~ ~ til ~ 0 = .9 ~ B P.C: ~ie .~ Q~ E-<~ U 1 ~~ ~ 11 iga ~ "B OQ., < ~ ~ :g til ~~ u ~ <>- ; Q~ E-<E-< ~ z> <g] <J:l ~ .....:1m < u a. 0 ~~ ;J ~ m N~ < ~..... .....:IE-< ~ 1Xl< E-< ~o Z o~ E ~ ~Q., -<>- ~ w (-<E-< ~ U ~ ~ tI.l , ffi z 0 < ~ 6 ~w ~ E-<~ 0 -( E-< m ~ gz E-< w Ow ~ ~~ ..... E-< -< :1i, ~-' ~~---~,--- ... % .2 = U .!:l 0 d.Jj U '" .!!.~ - c.._ ~ '.;j S Vi t...,.. "3'"Q E-< ..... , tI.l 5 i z (-< u~ '-'- ~ -< C:::! m'4) 0 or-< w~ ~ 1== ~O Q. ~e ~!-< 0= u8 u r.<!..Jz.... 13~92; J~5~ '"'z:l~ ~~~ "'_ d ~~~~ ~~ ~ ~ " .... "or.<! o~ ~...t,; ~tl., ..~ ~~ ~~ ~~ ~ ~ -< ~ i2 ~ ~ f-< ~ O~ ~tl., C~ ~~ ~~ ~ ~2 ~j:l,. f-< U.l OU.l >- ~~ e.:: QU.l ~ ~~ <: ..Jl;I'J ;:J E-gJ ~ t.r.l ~ t'1~ ~j:l., ~- ..J~ E- lIlC E- t.Ll ~- ffi OU.l !:: ~ ~~ ~ ~ ~E- ~ U t: ~ ~ v.J I ::r: ~ r.... Z 0 U.l f-< ~ ~ c~ ~o.., - ~~ f-< ~ 0 ~ t:i ~ <( ~ OU,l ~j:l,. 5 ~~ - E- ~~.__... -------~-..-,--.__o_.,... ,-. _.._:_~. ;5~ ~ u G1:ii ::;~ ~E; tl.,!- = o .i ,~ .~ ~ ~ 5 = oS 5 ..;:1 B !l:l 'r;; "" '" - y u '" ::l ] ... o ~ tiS ~ = o '~ t+= .~ U "0 !il i ~ "'0 U ..d i fa s ~ ~ ^s -g ,- ~~ o..d -~ "i = ..".::= o '" =..... :::l~ u ... y 0 ~- 8. i-~,~"--"'-,-~-=,_-~--~-cc,-,--~-~,- ~ a '5 ]; 5~ u!- -a.. ._ u -3~ SE- rJ:l U.l Cl o u FORM#: 62-343,900(1) Section E FORM 1ITLE: JOINT ENVIRONMENTAL RESOURCE PERMIT APPLICATION DAlE: OctobIll'3,l99~ Type of Structure. Type of Number of Length Width (feet) Height Total square Number of Wod'. Identical Docks (feet) (feet) feet over slips water TOTALS: Existing Proposed .Cock. Pier, Finger Pier, or other structDre (please specify what Number of Slips type) ..New, Replaced, Existing (unaltered), Removed, or Square Feet over AltercdlModified the water TABLE 4 DOCKING FACILITY SUMMARY Use of Structure: Will the docking facility provide: Live-aboard Slips? If yes, Number: Fueling Facilities: If yes, Number Sewage Pump-out Facilities? If yes, Number: Other Supplies or Services Required for Boating (excluding refreshments, bait and tackle) o Yes ONo Type of Materials for Decking and Pilings (i.e., CCA, pressure treated wood, plastic, or concrete) Pilings Decking Proposed. Dock-Plank Spacing (if applicable) Proposed Size (length and draft), Type, and Number of Boats Expected to Use or Proposed to be Mooring at the filci1ity) :.._'---._._----....,.-.-,---,. -'-"-'-c,~ . ..-.... . ..... ,- .-. .. -, FORM#: 62-343.900( I) Section E FORM TInE: JOINT ENVIRONMENTAL RESOURCE PERMIT APPUCATION DATE: October 3. 1995 Table 5: SHORELINE STABILIZATION IF YOU ARE CONSTRUCTING A SHORELINE STABILIZATION PROJECT, PLEASE PROVIDE THE FOLLOWING: Type of Stabilization Length (in Length (in Length (in Length (in Slope: Width of Being Done feet) of feet) of feet) of feet) of H: the: Toe (in New Replaced Repaired Removed V: feet) Verocal Seawall Seawall plus Rip- Rap Rip-Rap Rip-Rap plus Vegetation Other Type of Stabilization Being Done: Size of the Rip Rap: _ Type of Rip Rap:_ COMMENTS: FOIl:MI: 61.343.900(\) 5ccdanA l'ORMnn.E: JOINt IiNVIRONMENTAL JtESODRCE naMlT N'I'UCIt.noN DAm 0cI0ber J. 19!!S PART 8: A. By signing this application form. I am applying. or I am applying on behalf of the appliCllllt, for the permit and any proprietary authorizations identified above, according to the supporting data and other incidc:ntaJ iDformatiol1 filed with this application. r am familiar with the information contained in this application and represettt that such information is true. complete and accurate. I understand this is an application and not a permit, and that work prior to approwl is a violation. I understand that this application and any permit issued or proprietary authorization issued pumumt thereto, doc:s not relive ~ of any obligation for obtaining any other required federal. state. water management district or local permit prior to commencement of CODStn.lction. I agree. or I agree on behalf ofthc app1icaat, to operate and maintain the permitted system unless the permitting agency authorizes transfer of the permit to a responsible operation entity. I understand that knowingly making any fillse statement or repn:scntation in this application is a violation of Section 373.430, F.S. and 18 U.S.c. Section 1001. Typed/PriDtcd Name of Applicant (If no Agent is nsed) or Agent (If one is so authorized below) "t. ..,6// R""~-LA- 5-'1-10 I' ~~ :i?APPl~t!Agcnt Date (Corporate Title if applicable) AN AGENT MAY SIGN ABOVE ONLY IF THE APPLlCMl COMPLETES THE FOLLOWING: B. I hereby designate l!Ild authorize the agent listed above to act on my behalf; or on behalf of my emporatiol1, as the agent in the processing of this application for the permit and/or proprietary authorization indicated above; and to furnish. on request, supplemental information in support of the application. In addition, I authorize the abovo-listed agent to bind me, or my corporation. to perform any requirements which may be necessary to procIII'l:: the permit or authorization indicated above. I understand that knowingly making any fillse statement or representation in this application is a violation ofScction 373.430, F.S. and 18 U.S.C. Section 1001. 'f Typc:cilPrintc:d Name of Applicant I Signature of Applicant I Date (Corporate Title ifapplicable) PIc:ue 11011:: The .DDIla.t'r Orip.llIn&tRe (IIOt. _1 u reo.lred above. PERSON AUfHORIZING ACCESS TO TIlE PROPERTY MUST COMPLETE THE FOLLOWING: c. I either own the property described in this application or I have legal authority to allow access to the property, and I consent, after receiving prior notification, to any site visit on the property by agents or personnel from the DepartmcZlt of Environmental Protection, the Water Management District and the U.S. Army Corps of Enginec:rs necessary for the review and inspection of tile proposed project specified in this applicatioD. I authorize these agents or personnel to enter the property as many times as may be necessary to make such review and inspection. Further, I agree to provide c:ntIy to the: project me for such agents or P=fSOnnel to monitor permitted work if a permit is granted. ~ Typed/Printed Name of Applicant , Signature of Applicant I Date (Corporate Title ifapplicable) ... ':....,_--=-_e'._ roved as to form & legal sufficiency ATTES" DWlG" - :>\., Clerk Coll€:",rl Greena. AssIstant County Attorney By ,,_'__'__"''-__'_''