Loading...
Agenda 05/25/2010 Item #10AAgenda Item No. 10A May 25,2010 Page 1 of 17 EXECUTIVE SUMMARY Recommendation to approve the combination of the Annual Update and Inventory Report (AUIR) and the Capital Improvements Element (CIE) annual amendment of the Growth Management Plan (GMP). OBJECTIVE: To request approval from the BCC in regard to the proposed combination of the AUIR and the CIE amendment into one process. The proposal would condense a continuous twelve month process to a standalone eight month process, resulting in the elimination of inconsistencies between the two documents; reduction in duplicative staff preparation and analysis, as well as advisory board and BCC time allocations. CONSIDERATIONS: Section 163.3177 (3), Florida statues requires that Collier County amend its CIE annually to ensure the availability of public facilities and the adequacy of those facilities including acceptable levels of service. Chapter 6.02.02 of the Collier County Land Development Code requires the County Manager or designee to complete an annual update and inventory report (AUIR) on public facilities, which includes an analysis of the existing conditions of all capital potable water, capital sanitary sewer, capital solid waste, capital drainage, capital park, and capital road public facilities; summarize the available capacity of these capital improvements (public facilities) based on their LOS; forecast the capacity of existing and planned public facilities identified in the 5 year capital improvement schedule for each of the 5 succeeding years, and 10 succeeding years for solid waste landfill capacity; and identify new projects needed to maintain or restore adopted LOS. Currently, the CIE and the AUIR are separate processes, but concentrate upon the same subject matter, the schedule of capital improvements for the County. The AUIR is initiated in March with the distribution of the population projections from the University of Florida Bureau of Economic and Business Research (BEBR) and concludes in November with the BCC special meeting adoption, an eight month process. The CIE is initiated in December with the distribution of updated impact fee and revenue projections from the Collier County Office of Management and Budget and concludes in March with the BCC adoption hearing, a four month process. There are a number of negative ramifications associated with the separate timing of these two capital improvement processes: 1. Section 162.3177 Florida Statutes requires that the County adopt the annual CIE amendment by December 1st 2. Inconsistency between the financial basis of the two processes and the corresponding inconsistency between the projects contained within each. 3. The CIE is adopted with 10 month old population projections and 10 month old seasonally adjusted transportation factors. The proposed combination of the two processes, with completion in December will allow for: 1. CIE amendment in compliance with the Florida Statutes December 1st adoption requirement. Page 1 of 1 Agenda Item No.1 OA May 25, 2010 Page 2 of 17 2. A decision making process for capital improvements based upon the same financial basis. 3. One document to the CCPC and the BCC. 4. Elimination of data changes and revenue projections inconsistencies between the AUIR and the CIE processes. 5. Fewer CCPC and BCC meetings related to capital improvement programming. 6. An eight month, rather than a continuous 12 month capital improvement cycle. 7. Eliminates redundant preparation process across the County organization. FISCAL IMPACT: The elimination of the stand alone AUIR and CIE process and the corresponding reduction in estimated staff preparation hours within each participating division/department will save approximately $23,700 in staff time, as well as the advertising cost of each meeting. Additionally, the removal of one set of CCPC and BCC meetings would further reduce support staff and board room hours for all participating entities. LEGAL CONSIDERATIONS: This Executive Summary has been reviewed and approved by the Office of the County Attorney. -(HFAC) COLLIER COUNTY PLANNING COMMISSION (CCPC) RECOMMENDATION: The CCPC reviewed the AUIR/CIE combination initiative at their May 6, 2010, public hearing and motioned unanimously (6 to 0) to the BCC a recommendation of approval of the overlapped AUIR/ClE proposal. STAFF RECOMMENDATION: Recommendation to authorize the County Manager or his designee to initiate the steps to combine the AUIR and the CIE within one process to be initiated in March and completed in December of each calendar year. It should be noted that based upon the BCC's direction upon this item, that the current year, 2010 would initiate the combined or overlapped CIE/AUIR process. PREPARED BY: Mike Bosi, AICP, Comprehensive Planning Manager Collier County Engineering, Environmental, Comprehensive Planning and Zoning Services Department Attachments: 1) ClE/AUIR combination PowerPoint 2) CIE/AUIR PMP Page 2 of2 ,--- Item Number: Item Summary: Meeting Date: Agenda Item No. 10A May 25, 2010 Page 3 of 17 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS 10A Recommendation to approve the combination of the Annual Update and Inventory Report (AUIR) and the Capital Improvements Element (CIE) annual amendment of the Growth Management Plan (GMP). (Mike Bosi, AICP, Comprehensive Planning Manager, Growth Management Division) 5/25/2010900:00 AM Date Prepared By Mike Basi, AICP Community Development & Environmental Services Manager ~ Planning Comprehensive Planning 4/12/20103:49:56 PM Approved By Date Judy Puig Community Development & Environmental Services Operations Analyst Community Development & Environmental Services 4/23/20103:41 PM Approved By Date r- William D. Lorenz, Jr., P.E. Community Development & Environmental Services Director - COES Engineering Services Engineering & Environmental Services 4/23/20104:45 PM Approved By Date Jeff Klatzkow County Attorney 4/28/20102:33 PM Date Approved By Nick Casalanguida Transportation Division Director - Transportation Planning Transportation Planning 4/29/20104:51 PM Date Approved By Heidi F. Ashton County Attorney Section Chief/Land Use-Transportation County Attorney 5/12/20109:30 AM Date Approved By OMS Coordinator County Manager's Office Office of Management & Budget 5/12/201010:10 AM Date Approved By Leo E. Ochs, Jr. r-- County Managers Office County Manager County Managers Office 5/18/20101:35 PM - ro u e- o. ~ ,Vl >- ro -C ~ Vl Vl (]J U o '- a... ,o2l 0.. oC: '" ~ "'-..... 0..... OJ'.... c: ~ Qj ~ ~ , .0 Vl :> --;::: ..... ~ .;:l OJ OJ ,.J U w, u :> . 0 ~ a 1) .~'QJ o..s~8~ ..... 0.. 0::: -c OJ C .- ..c E o u V) V) OJ u o !.... CL Vl (]) b.O ro ~ c ro > -C <( ~ ](:1~ -1-1 ro 0 (:1 .!9 0=::; ...... ro QJ _ en~ en (:1 en ~ :::hEu ~o [j 15 << (:1 en ~..g u u ~ 0 (:1 ~ IIJ 0 ~ U 0 .;::; c ~ ~ QJ...... j:::; j:::; ~ ~ ~ ~ t ...... ~ -1-1 ;> .::: QJ OJ c.8 ~ QJ -1-1 .....-I .......... -1-1 ...0 QJ ~ ~ "'0 . S 0(:1 ~ ...0 ~ a (:1 "'0 c.8 en ...... ro ~ S "'0 .....-I -1-1 >-. ~ QJ en ro en~ QJ ro + ~ ~ U Tj ~ ~ S en ~.S ~ u ~ ~"'O ..o.~ (:1 ~ u ~ ~ ~ (:1 ~.....-I ro ~ ~ ...... ro ro ~ dj "'0 e.c S ro en -1-1 (:1 -1-1 en bO (:1 o~dj bO en ro ~ ro "'0 ro -1-1 QJ bO (:1 en 4-. QJ ~ ;::l U QJ QJ "'0 ...... QJu 0 ~ __ ...0 ~ -1-1 ~;::l -1-1 -1-1 ..... "'0 U ~ c.8 ...0 ~ ..g s ~ ~ (:1 U ~ QJ '" C QJ...... en N ro 0 ;::la;~ j:::; ~~ [j..... ~bO~ ~~u~tj]a~E u . s (:1 . S "'0 0=::;'" 1= ~ ro QJ ~ "'0 --~ QJ ~ (:1 - -1-1 '" en ~ QJ ~ ~ S QJ ro~= ~ ~ ~~ dj ~~;::l ~en.......ro~ ~~ ~o.. ~ ~ U -1-10 ~ (:1 (:1 U -1-1 ro 0 C ....... ~ 0 U I'll I'll U (:1- C ~ en.9 "'0 (:1 >-. a; a; ~ QJ ~ ~ 0 ~. ~ ~ [j u ~ ~ ~ U;::l t'- U ...... U Z 0 ~ -1-1 -1-1 ;> (:1 "'0 I ~ <~ 0 QO~~ & 8 ~ \0 0 . III II . . . . U') c o e_ ......., e_ C tlO o u OJ 0:: rJj ~ ~ .~ ~ '""CJ rJj rJj aJ U o ~ ~ 8 V'J !:: o ...... ..j...l U QJ ......... o ~ 0.. ~ ~ ~ ~ ~ QJ ~~ QJ'"O ........ QJ ..o..j...l ro V'J :-;:::: ;:j ro ......... >'"0 ro ro '-''"0 ~ ~ .9 ~ ..j...l ro U QJ .~ ~ O...r::= ~ U o..ro QJ QJ ~b ..j...l QJ ~ !:: o..;:j c-., ~....,,-..... . S t:::: ...... :-;:::: ...... o ~ ........t rI.. ...... 0.. \J ,,~ ..j...l,......-ol !:: 0.0 --- .r9 ~ ro !:: ~ ~ ~ QJ...... 0.. 0..0 U ~ .QJ 0.. QJ .> QJ U V'J........ ~...r::= QJ !::..o QJ..j...l ~ ~..!S V'J QJ ~ ..j...l...... ..j...l 0.0 \\J 8~~~t ~'-'l---l"Oro --- ~ ~ '-' --- ~ V'J ro ~ QJ 0 ~ ..j...l U ~ ~ ro '"0 QJ QJ 4-; ..j...l o V'J ........ ;:j .~ .......... ~ '"0 ~~ ........ QJ ro ........ !:: ..0 0 ..!S V'J ...... ro ro QJ ~ V'J '-' .. . en ........ t"j .,..; ~ iJ) -!-l S ~ en ""C:j en ~ ~ iJ) t"j 0 r::j en ~ l:; . ,..; 0.. ,-...,..; en ~ -!-l :>-- ~ rtl b,O........ - QJ ~ t"j u .........,..; ~ -c ~ t"j ""C:j 'J) t"j 4-; ~ ~ iJ) 0 t"j ;::J ~ ~ ~ O""C:jO- ...c:: ~..o ~ :"t't"j~< t"o..t"j~ -::t-~0..iJ) '-" 0.. iJ) iJ) ;0 b,O ~ .c Q,) . S ~ ....oiJ) :> -!-l t"j rtl~""C:j~'"'C:l 'J) r::j ~ ~ Q,) Q) .~ l:; ;::l 0 ~ ~ ~ ""C:j f ..0 U E cS~~~ ~~ ~: ..0'. I) V) b.O C -- > ro V) 'J) ~ o .~ ~ u ~ ~ 0\0 ~ c-l-l o~ '.jj 'i:l ro ::l -1-1..0 8 ~ ~ '"'C:l 0.."- en Q,) en ~ (Jj '"'C:l c ::l ;... '"'C:l ~ S~ rtl -1-1....... 0 ..- '7 If'\ QJ en N v.l- ;::J ;... -- -1-1 - ::l en ro rtl O(Jjen :> ....c:~ ~ 0 as -1-1 0 ~ __ ~....c: '"'C:l gfSit ~ ...... .......3 rtl c ~ u @ (i;'(i;' ..9 ........;...;...- o..::l::l rtl I"'IS 0 QJ 6....c:~ o ~;r ~ u ---- ....... ~ u C ~ (i;' (Jj ...... - ;... .... a IV ::l'i:l U .a ~ ] @~ ~ o 0... oenV)~ (Jj 0... O-i 0 ~ ~ - 0.. O\~~~Q..8 ~ :x: ~ en o..U '>wi '--- ......... O-i . ~ ..-::..-:: ~ ....... ~ .....enen- ro U ......... ~ ...... ;...;... IV 'i:l O-i Q ~ ::a ::l ::l ~ .....U .....~::Joo 0 ~ ....c:....c: 0 · U · C/) · ['-.. . rA. . N ~ ..- en ;... ::l o ....c: o '7 -- I) Agenda Item No.1 OA PROJECT MANAGEMENT PLAN May 25, 2010 Page 10 of 17 2010 ANNUAL UPDATE & INVENTORY REPORT! CAPITAL IMPROVMENT ELEMENT AMENDMENT 1. PROJECT SPECIFICS: Project Title: 2010 Annual Update Inventory Report (AUIR)/Capital Improvement Element (CIE) amendment on Public Facilities Number: N/A County Staff Project Manager: Mike Bosi, AICP, Comprehensive Planning Manager, Comprehensive Planning Department; Assistant County Staff Project Manager, Corby Schmidt, Principal Planner Funding Source: Cost Center I I 1-1383 I 7 Commissioner District and Number(s): Countywide 2. PROJECT SCOPE of WORK: A. Concise Project Description: The AUIR is a technical staff analysis and report to the Collier County Board of Commissioners (BCC) on the available and projected future inventory of both Category "A" and Category "B" capital public facilities. Category "A" facilities are subject to concurrency regulations and comprise the Capital Improvement Element (CIE) of the Growth Management Plan (GMP). Category "B" facilities (non-concurrency) are funded with impact fees and are not subject to concurrency management scrutiny. The process are being combined to eliminate financial discrepancies between the two docurnents and bring the capital improvement programming of the County in better synchronization with the County's budget process. B. Location of Work: Community Developrnent and Environmental Services Division (CIE/AUIR/LDC); Transportation Services Division (Roads/Transit/Drainage); Public Utilities Division (Water/Sewer/Solid Waste); Public Services Division (Parks/Libraries); Management Offices (EMS); Jail and Law Enforcement (Sheriff); Dependent Fire Districts (Isle of Capri Fire and Rescue District and Ochopee Fire Control District), Administrative Services (Public Buildings) and Collier County School Board (Schools). C. Customer: Board of County Commissioners (BCC) D. Project Background. The Florida Growth Management Act of 1985 required Collier County to adopt levels of service standards (LOSS) for key capital facilities and infrastructure (Category "A") necessary to support future development. The Category "A" facilities include: roads, storm water drainage, potable water, sewer, solid waste, public schools and parks. The county adopted land development regulations to ensure that the adopted LOSS for each facility was available concurrently with the approval of final local development orders (SDPs, plats and building permits). The county adopted the Adequate Public Facilities Ordinance (.4.PFO) in March 1990, which has been codified into the 1 Agenda Item No. 10A PROJECT MANAGEMENT PLAN May 25, 2010 Page 11 of 17 2010 ANNUAL UPDATE & INVENTORY REPORTI CAPITAL IMPROVMENT ELEMENT AMENDMENT Land Development Code (LDC). The LDC provides for both a public facility monitoring and a regulatory program to ensure concurrency of Category "A" facility services at the adopted LOSS at the issuance of final local development orders. Sections 163.31 777(3)(a) and (b) and 163.3184 (l5)(a), Florida Statutes and Rule 9J-ll.006, Florida Administrative Code, requires that Collier County armually update the Capital Improvement Element (CIE) of the Growth Management Plan (GMP) through submittal to the Department of Community Affairs, the formal updating of concurrency management system. Maintenance of LOSS on Category "B" facilities is advisory to, but not binding on, the BCC, with the exception that the LOSS provided by Category "B" facilities can not fall below the level established within their respective Impact Fee Ordinances, The monitoring program, the AUIR and the CIE: I. Summarizes the available inventories of both Category "A" and Category "B" facilities. 2. Identifies new capital projects for addition to the adopted Schedule of Capital Improvements needed to rnaintain LOSS. 3. Provides capital project and adjustments to LOSS alternatives when/if practical 4. Presents the annual population projections per the adopted methodology. 5. Outlines revenue enhancement options, 6. Denotes regulatory timing for concurrency determination for each Category "A" facility, which is currently the armual determination of concurrency (except for roads). The AUIR provides the armual audit and update of capacity balances in the Transportation Concurrency Management System. 3. QUALITY and CUSTOMER EXPECTATIONS: In 2003, the BCC adopted a real-time "checkbook concurrency" system for roadways. This system examines the total trip capacity available for new development and includes provisions relative to vested traffic. As part of the process of establishing the checkbook concurrency system, the county has also adopted amendments to the Transportation Element, Future Land Use Element and Capital Improvement Element that establish two Transportation Concurrency Management Areas (TCMAs) and a Transportation Concurrency Exception Area (TCEA). The AUIR is relied upon to provide the BCC with an accurate point in time portrayal of the status of facilities inventories (current and projected), revenues and LOSS maintenance strategies. In the case of roads, the AUIR will provide an audit of the ledger balance of trips within the TCMAs and TCEA and for each road segment outside of the TCMAs and TCEA for operation of the Transportation Concurrency Management System during the calendar year following the AUIR. 2010 will be the second year in which school concurrency will be evaluated for all local development orders with the adoption of the Public Schools Facilities Element within 2 Agenda Item No.1 OA PROJECT MANAGEMENT PLAN May 25,2010 Page 12 of 17 2010 ANNUAL UPDATE & INVENTORY REPORTI CAPITAL IMPROVMENT ELEMENT AMENDMENT the OMP in 2008. The concurrency management systems ofthe County are formalized within the CIE of the OMP. In addition to the updating of the checkbook for the transportation concurrency and the newly implemented school concurrency, the AUIR serves as a safeguard for the Category "B" facilities in that their LOSS do not fall below the established level within their respective impact fee studies. Like the 2009 AUIR, this year's process will include a number of additional steps based upon specific recommendation from the PC/CCPC/BCC to continue reviewing the current adopted LOSS contained within the AUIR measured against the dernand numbers experienced by each AUIR Division/Department. 4. ACOUlSITION: A. Strategy: Distribution of the Comprehensive PI arming Department's official armual population projections on June I, 2010 will occur in conjunction with impact fee and debt service projects provided by the OMS. After distribution, Comprehensive Planning staff will coordinate and assist the departments in preparation of each respective component of the AUIRJCIE for a scheduled August 20, 2010, briefing with the County Manager. Based on modification and direction from the County Manger, the AUIR/CIE will then be delivered to the Collier County Planning Commission (CCPC) and the Productivity Comrnittee (PC) on September 6, 2010 for their scheduled Special Meeting! Adoption Hearing September 20, and 24, 20]0. The CCPC and PC will make recommendations to the Board of County Commissioners for its November 15, 20]0, AUIR Special Meeting/Adoption Hearing. B. Type of Contract if Outsourced: County staff C. Estimated Contract Amount: Current staffing and appropriations D. Period of Performance: 283 business days 5. PROJECT TIME: A. Project Scheduled Start Date: April I, 2010 (distribution of BEBR population within existing Traffic Analysis Zones, T AZs) B. Actual Start Date: On schedule C. Project Scheduled Completion Date: December 4,2010 D. Current Scheduled Completion Date: December 4,2010 E. Current Schedule and Project Status: On schedule 3 Agenda Item No.1 OA PROJECT MANAGEMENT PLAN May 25,2010 Page 13 of 17 2010 ANNUAL UPDATE & INVENTORY REPORTI CAPITAL IMPROVMENT ELEMENT AMENDMENT 6. TASKS and STATUS: A. COMPREHENSIVE PLANNING STAFF PARTICIPATION IN THE SCHOOL BOARD STAFF PREPERATION OF THE REVISED SCHOOLS CAPITAL IMPROVEMENT ELEMENT Target Date: February 15 Status: Complete B. RECIEPT OF BEBR POPULATION PROJECTIONS BY COMPREHENSIVE PLANNING AND DISTRIBUTION OF POPULATION TO INDIVIDUAL TAZS AND PLANNING COMMUNITIES Target Date April 1 Status: Complete C. FINALIZE POPULATION PROJECTIONS AND IMPACT FEE AND DEBT SERVICE PROJECTIONS Target Date: May 15 Status: On schedule D. AUIRICIE PREPARATION WITH MEMORANDUM & ATTACHMENTS (TO THE DIVISIONSffiEPARTMENTS WITH INSTRUCTIONS) Target Date: June 1 Status: On schedule E. COMPREHENSIVE PLANNING AUlRlCIE TEAM MEETING WITH INDIVIDUAL DEP ARTMENTSffiIVISIONS Target Date: June 1-15 Status: On schedule F. DEADLINE FOR SUBMITTAL OF DRAFT AUlRlCIE CAPITAL IMPROVEMENT PLAN Target Date: July 16 Status: On Schedule G. SIGN-OFF FROM ALL DIVISIONSffiEPARTENTS & AUlRlCIE ASSEMBLY AND CONSOLIDA TION BY COMPREHENSIVE PLANNING Target Date: July 30 Status: On Schedule H. AUlRlCIE BOOKS TO AUlRlCIE TEAM Target Date: August 13 Status: On Schedule I. REVIEW OF THE 2010 AUlRlCIE WITH DIVISION ADMINISTRATORS AND THE COUNTY MANAGER Target Date: August 20, 2010 Status: On Schedule 4 Agenda Item No.1 OA PROJECT MANAGEMENT PLAN May 25,2010 Page 140117 2010 ANNUAL UPDATE & INVENTORY REPORT! CAPITAL IMPROVMENT ELEMENT AMENDMENT Policy I~sue: Staff to request direction from the County Manager as a result of this meeting regarding policy issues and related discussion points for preparation of the annual update and amendment to the ClE. I. 2010 JOINT COLLIER COUNTY PLANNING COMMISSION AND PRODUCTIVITY COMMITTEE SPECIAL WORKSHOP/ADPOTION HEARING Target Date: September 20 and 24, 2010 Status: On Schedule 2010 CCPC CONSENT AGENDA Target Date: October 21,2010 J. 2010 BCC AUlR/CIE SPECIAL WORKSHOP/ADOPTION HEARING Target Date: November 15, 2010. Status: On Schedule K. COMPREHENSIVE PLANNING DEPARTMENT PREPARATION OF FINAL REVISED AUlR/CIE INCORPORATING BCC POLICY DIRECTIVES AND CHANGES AND TRANSMIT ALL TO DCA. Target Date: December 4,2010 Status: On Schedule 7. PROJECT COSTS: A. Fund Types: General Fund, MSTD General Fund, Utilities Operations & Administration, Transportation Operations & Administration and Emergency Management Services. B. Budget: There are no appropnatlOns or contracts specific to the AUIR/CIE process. Divisional/Departrnental budgets shall absorb the costs of the facilities through the approved annual budgets and related cost centers. 8. PROJECT DELIVERY TEAM: Leo Ochs, County Manager Michael Sheffield, Assistant to the County Manager Winona Stone, Assistant to the County Manager Judi Bodine, Executive Secretary to the County Manager John Yonkosky, Budget Director Susan Usher, Budget Analyst JeffKlatzkow, County Attorney Heidi Aston-Cico Assistant County Attorney Nick Casalanguida, CD&ES Interirn Administrator Amy Patterson, Impact Fee/EDC Manager Mike Bosi, (Coordinator) Cornprehensive Planning Manager Beth Yang, CDES Operations David Weeks, Growth Management Plan Manager 5 Agenda Item No. 10A PROJECT MANAGEMENT PLAN May 25, 2010 Page 15 of 17 2010 ANNUAL UPDATE & INVENTORY REPORTI CAPITAL IMPROVMENT ELEMENT AMENDMENT Michelle Mosca, Comprehensive Planning, Principal Planner Corby Schmidt, Comprehensive Planning, Principal Planner Norman Feder, Transportation Division Administrator Brian Hancock, Transportation Division, Operations Support Manager Michael Greene, Transportation Division, Planning Manager Jay Ahmad, Transportation Division, ECM Director Jerry Kurtz, Transportation Division, Storm Water Director Phil Tindall, Transportation Division, MPO Director Jim DeLony, Public Utilities Administrator, PUED Director Tom Wides, Director, Public Utilities Operations Department Paul Mattausch, Director, Water Department Dr. George Yilmaz, Director, Wastewater Department Dan Rodriguez, Solid Waste Director Kevin Dugan, Compliance Manager, Solid Waste Phil Gramatges, Interim Director, Planning & Project Management Department Nathan Beals, Project Manager, Planning & Project Management Department Marla Ramsey, Public Services Administrator/Parks & Recreation Barry Williams, Director, Parks & Recreation Sidney Kittila, Operations Analyst, Parks & Recreation Dan Summers, EOC Director Len Price, Administrative Services Administrator Amy Taylor, Collier County School District, Principal Planner Skip Camp, Facilities Management Director Hank Jones, Facilities Management, Principal Project Manager Chief Emilio Rodriguez, Isle of Capri Fire and Rescue Dept. ChiefMcLaughin, Ochopee Fire Control District Jeff Page, Emergency Medical Services Director Deborah Chester, Sheriffs Department Kevin Rambosk, Sheriff Greg Smith, Chief, Sheriffs Department Jean Myers, Finance Division, Budget Manager, Sheriffs Department Marilyn Matthes, Library Director 9. PROJECT COMMUNICATIONS: A. Project Initiation - Memoranda to respective directors and administrators with guidance and source reference document sets - June 1, 2010. B. Preparation in Process - Follow-up - Comprehensive Planning staff meets with individual facility managers as needed. The Project Delivery Team will coordinate departmental responses and administrator briefings - June 1 through July 30,2010. C. AUIRJCIE Assembly and Consolidation - Comprehensive Planning staff assesses AUIR/CIE submittals and meets with Project Delivery Team and designated project staff - August 1 through August 10, 2010. 6 Agenda Item No. 10A PROJECT MANAGEMENT PLAN May 25,2010 Page 16 of 17 2010 ANNUAL UPDATE & INVENTORY REPORT! CAPITAL IMPROVMENT ELEMENT AMENDMENT D. Project Delivery Team/County Manager Pre-workshop Briefing - Presentation of AUIR/CIE to County Manager - August 20, 2010. E. Delivery of AUIRJCIE Notebooks to CCPC and PC - September 13, 2010. F. AUlRJCIE CCPC/PC Special Meeting/Adoption Hearing Advertising - Notice to the public (paid advertisement) of the September 20 and 24, 2010, CCPC and PC AUIR special meeting/adoption hearing appears in the NDN on September 6, 2010. G. AUlRJCIE CCPC/PC Special Meeting/Adoption Hearing - The CCPC/PC provide recommendations to the BCC on the AUIR/CIE decision points. September 20 and 24, 2010. H. CCPC Regular Hearing- Consent Agenda review- October 21,2010. I. AUIRJCIE BCC Special Meeting/Adoption Hearing Advertising - Notice to the public (paid advertisement) of the November 15, 2010, special meeting appears in the NDN on October 29, 2010. J. AUlRJCIE BCC Special Meeting - The BCC provides policy direction to the County Manager on the AUIR/CIE decision points. As directed, staff modifies the CIE submittal package before transmittal to DCA- November 152010. K. Comprehensive Planning Department Preparation of Final Revised AUIRJCIE incorporating BCC policy directives and changes within adoption transmittal package to the Department of Community Affairs (DCA) - December 4, 2010. 10. RISK MANAGEMENT: A. Project Scope Management - The AUIR/CIE projects are well defined and concise in the objective to provide a summary on policy decision points for public facilities to the BCC, but specific recommendations from the Planning Commission and the Productivity Committee relating to the proposed capital improvements and projected available revenue sources cannot be determined at this time. Risk is high. B. Quality and Customer/Staff/BCC Expectations - The AUIR/CIE is the recognized annual litmus test of the county's ability to provide public facilities in a timely manner and account for impacts on new development approvals. Inventories, costs, revenues, projections and regulatory recommendations must be reliable for the planning horizon, which varies per facility from 5 to 10 years. The Capital Improvement Element is the formal establishment for concurrency 7 Agenda Item NO.1 OA PROJECT MANAGEMENT PLAN May 25.2010 Page 17 of 17 2010 ANNUAL UPDATE & INVENTORY REPORTI CAPITAL IMPROVMENT ELEMENT AMENDMENT management for the County, which takes the work of the AUIR and formalizes the Category "A" facilities and the planned improvements. Risk is high. C. Project Acquisition Management - The staff and resources are internal and covered by current appropriations. Risk is moderate. D. Project Time Management - The preparation, data collection and analysis window is very tif!ht from project initiation to the BCC workshop. The Project Delivery Team is experienced in the AUIR/CIE process, but as noted there is a high degree of uncertainty related to potential changes to the process related to the CCPC and PC recommendations upon modification to individual components of the AUIR/CIE, as well as modification to the overall process and with the combination of the AUIR and CIE processes, the allowance for mistakes is further constrained. Risk is medium to high. E. Project Cost Management - There are no contracts for outside services. Risk is low. F. Project Delivery Team - Experienced and professional staff with proven reliability. Risk is medium. G. Project Communications Communication and public notification institutionalized within the County Manager's office. Risk is low. 8