Agenda 01/12/2010 Item #16B 8
"
"",,,'
Agenda Item No, 16B8
January 12, 2010
Page 1 of 22
EXECUTIVE Sml!MARY
..._...............~...~ -
,,_.
Recommendatit1n to approve Change 01'(1(''' Iii F,,,, iillccn Enterprises, Inc. for #09-5189
"Forest Lakes MSTU Projects F45!F50 Drainage Swale Repair & Restoration" in the
amount of $37,924.43
- _.._,,--
OBJECTIVE: To approve Change Order #1 to remove "Cap Rock" found during excavation,
adjustment du~ ~0 uLil~tY ~or~ft;c;ts, and compkk: "'./a1u~ add\:...u w'ork items.
CONSIDERATiONS: On April 14, 2009, the Board of County Commissioners (BCC) awarded
Contract #09-5189 to Earthtech Enterprises, Inc. in the amount of $122,450,00 {Agenda Item
16(B)(7)}. Notice to Proceed was given on Wednesday, May 20, 2009.
On October 14, 2009, the Forest Lakes MSTU Committee, during its regular meeting, approved
an initial change order request from Earthtech in the amount of $37,924.43, Per Staffrequest for
additional explanation for the change, the engineer consultant on November 20, 2009, provided
detailed explanation for Change Order # I for removal 0 f "Cap Rock" found during excavation,
adjustment due to utility cont1icts, and value added work items,
Per recommendation from the engineer consultant, Malcolm Pirnie, staff concurred with the
installation of an additional 2,335 linear feet of curbing for $21.598,75 (represents 56% of this
change) to accommodate a future sidewalk project which was not a consideration during the
bidding phase of Contract #09-5189; but, however, was a 'value added item' done in the interest
of public safety, health, and welfare.
-
The cumulative total of Change Order #1 is $37,924.43, which is 30,97% above the BCC
approved contract amount. The County Purchasing Policy requires that any change order
amount above 10% of the BCC approved contract amount must be approved by the Board of
County Commissioners.
FISCAL IMPACT: Funds in the amount of $37,924.43 are available in Forest Lakes MSTU
Fund 159.
LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County
Attorney's Office and is legally sufficient for Board action--SRT.
GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated
with this Executive Summary.
RECOMMENDATION: Recommendation to approve and authorize the County Manager, or
his designee, to sign Change Order #1 for Emihtech Enterprises, Inc, for #09,5189 "Forest Lakes
MSTU Projects F45!F50 Drainage Swale Repair & Restoration" in the amount of$37,924.43.
Prepared by: Darryl Richard, RLA, Project Manager, A TM Department
-
Attachment: (I) Copy of Change Order #1 Contract #09,5189 Earthtech Enterprises, Inc.
..._."._-_..,~- -~..
,~. ..,.",. "'''0' , ...."..
Agenda Item No. 1668
January 12, 2010
Page 2 of 22
COLLIER COUNTY
.,_.
BOARD OF COUNTY COMMISSIONERS
Item Number:
Item Summary:
16B8
Recommendalion to approve Change Order #1 Earthlech Enterprises, inc, for #09,5189
Forest Lakes MSTU Projects F45/F50 Drainage Swale Repair & Restoration in the amount of
$37,924.43,
1/12/20109:00'00 AM
Meeting Date:
Prepared By
Darryl Richard Project Manager Date
Transportation Division Alternative Transportation Modes 12/22/20094:37:24 PM
Approved By
Darryl Richard Project Manager Date
Transportation Division Alternative Transportation Modes 12/22/20095:17 PM
Approved By
Scott R. Teach Deputy County Attorney Date
County Attorney County Attorney 12/28/2009 1 :17 PM
Approved By
Jeff Klatzkow County Attorney Date
12/28/20093:10 PM
Approved By
Pamela J. Lulich Manager - Landscape Operations Date
Transportation Division Alternative Transportation Modes 12/29/2009 8:08 AM
Approved By
Caroline Soto Management/Budget Analyst Date
Transportation Division Transportation Administration 12/29/20099:02 AM
Approved By
Therese Stanley Manager - Operations Support - Trans Date
Transportation Division Transportation Administration 12/29120099:39 AM
Approved By
Rhonda Cummings Contracts Specialist Date
Administrative Services
Division Purchasing & General Services 12/29120099:47 AM
Approved By
Michelle Edwards Arnold Director ~ Alt Transportation Modes Date
-
Transportation Division Alternative Transportation Modes 12/29/2009 10:30 AM
"......_.."._"-,,,~---_.-
-- - -_._"-~
--_.._~.- ,
..,
Agenda Item No. 16B8
January 12, 2010
Page 3 of 22
Approved By
Steve Carnell
Director. Purchasing/General Services
Date
Administrative Services
Division
,
Purchasing & General Services
12/29/2009 2:45 PM
Approved By
Norm E. Feder, AICP
Administrator. Transportation
Date
Transportation Division
Transportation Administration
12/30/20091:10 PM
Approved By
Pat Lehnhard
Executive Secretary
Date
Transportation Division
Transportation Administration
12/30/20091:12 PM
Approved By
OMS Coordinator
Date
County Manager's Office
Office of Management & Budget
12/3112009 9:43 AM
Approved By
Mark Isackson
Management/Budget Analyst. Senior
Date
Office of Management &
Budget
Office of Management & Budget
1/41201010:22 AM
, -
January 12, 2010
Page 4 of 2L___
.
CONTRACTIWORK ORDER IlIIODIFlCATION
CHECKLIST FORM
'l'ransportatJOD
.
COHTRACTORIFIRM NAME:
0rIgI... ConInIct Amount:
$ ..JZZ.fJUO
(~ PoInt)
$~(BCC _~1""; ItIm 1887)
(La8I TOIlII Amount ~ by the BCC)
CuINIlt Bee All...- Amount:
CUII.nt Cantnct Amount:
.
RECEIVED
NOV3 0 2009
.~
ea. or lMt see """'......_ Agenda ItIm 1I-.JlIm.1UZ
............ or... chang. -.mder cu-.t_ ....ount~
FormuIII: (R- Amount I La BeC llPlXOVed amount)-l
CURRENT COMPLETION DATE (S): ORIGINAL: ~CURRENT:
Th18 c:hoInge order wUl: Add nme 10 Conlnoct and Add money 10 Bid ~18t F_ ~ IISTU Projecta F-45IF-SO
~ Swale R-" & RIIlDrallon"
C.lcrt... tile c"'nge(I):
IUm
Number
UnIt Scheduled Chllnge
Vllue
F'dl Materlal- Additional 364 CY $11,00 $4,004.00
Justification for Chllnga: Additional fill requiAld for Woodshire Road
ROW, filii in of old swale behind new valley gutter,
Grading 1232 SY $3.25 $4,004.00
Justification for Change: Additional gAlding of ROW due to elimination
of old swale back of valle utter.
Sodding - Belllluda419 -16.83 SY $2.50 (-$42.08)
Justification for Chan .: Quantities exceed required amount for Job.
Drop Curb Inst&Uatlon (Miami)
2335 LF $9.25 $21,598.75
Justification for Chllnge: Additional curb requested by engineer to improve
- drainage of Woodshire Lane.
Revised 6 18 09
,-. .-......-.... -""..."'._',._<._-'--'-""--
,_ _"_"_".'~' _____...~'"__.m_
, -,,--~
- "'-.---.-.---..-
Agenda Item No. 16B8
JdllQary 12,2010
Page 5 of 22
-700 LF $9.25 (-$6,475.00)
: Qu8l1lltles ex.:oed required amount far job,
$50,00
(-$400,00)
Irrigation Pipe Adjuetmenta for Woodshire Ln,
. 5SS LF. $7.50
Juatlflcatlon for Chlln...: AddllIonallmgetlon pipe adjlllllmem. due to
addltiona' to in chlnage 01 Wood8hlre lane.
$4,162.50
RECEIVED
NOV 3 0 2009
Justification for C
"l'raneportlltlon
ATM Dupt.
73 LF $15,00 $1,095.00
JuatlnCBtlon forC::hange: Additional underdrain ......... from Clubhouse,
. Iiltfe short .
6 EA $500,00 $3,000.00
Juatlllcation for Chllnge: Uodlflcatlon of drainage system along
WoodshIre Lane required the abandonment 01 culverts under the road.
746 SY $2.00. $1,496.00
JustlflCBtlon for Change: Addition" sod uaed to atabillz8 ROW,
AOm;D 1leII.;zo Rock P"cava1ion
245 LF $20.00
Juatlllcatlon for Change: Excavation of swales along the golf coam
encounterod rock fer 245 Unll8l' feel,
AD E Junction Box Demo in Golf Course
1 LS $450.00
J uatlflcatlon for Change: Demolition of junction box In golf ..... so '-due
to abandonment of outtal pipe to lake (outfall pipe wes no longer required).
ADDS! ~ m Modlftcatlon of HMdwaIl
, LS $250,00 $250.00'
Justification for Change: Modification to headwall to improve safety of the installation
DD T Additional Drainage Inlet
1 EA $5,500.00
J uatlflcatlon for Change: Additional drainage Inlet required to Improve
drainage on Woodshire Lane. .
ED I M DebrIs Remova' fI"... Stonn Pipe
8 HR $135.00
Justification for Ch.nge: Cleaning out of debris from drainBge pipe 10
improve drainage along Woodahlre Lane.
CUrb Removal
$4,900,00
c..-.;;"'V~
$450.00
../
$5,500.00
$1,080,00
85 LF $12,00 ,$1.020.00
Justification for Change: Removal of broken curb along WoodahJre lane
and replaced with new curb.
Total Chanlle Order '11
ReviSed 6 18 09
$37.924,43 (NET CHANGE)
l
I
"-
Agenda Item No. 16B8
January 12, 2010
Page 6 of 22
Specify the r...a... for the change(.) e1. .....ned or EieI:tIY, e2. ~ CondIIIon8 e3. Quantity
AdJ- C ... CorreclIOn or ErI'OlS C........ SpecIfIc*Iona or Scope or Work) e&. V..... Added
C I. Schedu" AdJ_nta Nota: One or -IMY be chllCbd, depending on the -.. or the cIlange(.).
Identify all negative ImpKtll liD .... proJKt If III" change order _ not fI.uC,,"d: ~tilm impad would !le
t~ Bid 09-51~9 Forest lake: ~~TU ~,~~.50 I2rainaa.e Swale Bgjr & R~qn' woulsj ~ .
c;om~ for 100% "Oll8rat!911". Utmtv co!llliJa! noted in the field would ~ dral.olge Qf.JbI
~:~~~=~bedone.thysreayiringadd.i!i9nal
This change ..... rwqueatM by: - ContnlctortCOMultllnl: - Own., n Using DepIIrtment I: CDES
_ DMlgn ~Jonal nRegulatory Agency (Specify) rOther (SpecIfy)
CONTRACT SPECIAUST PARTICIPATION IN NEGOTIATIONS: r Yes
This fonn .. liD be 81gned and d
APPROVED BY: Date:
-No
'3o.~
.
~
,
,
,
,
I
.,'.
RECEIVED
NOV 3 0 2009
'!-,..nsportatlon
ATM Dapt.
.~',.
Revised 6 18 09
...
,_._.__n_
,_ ''''"'._, .. _<~__""".._~,__,w."~ ,,_
....'"---
---
GUIDELINES FOR COMPLETING THE
CONTRACTIWORK ORDER MODIFICATION CHECK LIST FORM
Agenda Item No. 16B8
January 12, 2010
Page 7 of 22
1. Document circumstances prompting the changers) request by...
a Identifying who initiated the change request: Change is related to additional work to be performed
(Total $52,560,25 ADDED Value): and also deletes in project scope items (-$14,635.83 Total
DELETES), Net Change to project is $37,92443 - Total ADD to project (PO 4500106959)
Changes are related to: (1) Removal of "Cap Rock" found during excavation; note: previous site
investigation did not indicate presense of cap rock, however, during construction large Iimerock stones were
found; these rocks had to be removed in order to grade the swale according to project specifications (2) utilitv
conflicts (utilities were installed by third party and not properly recorded with Collier County and found during
project. thus requiring field adjustments); and (2) Value added work items related to the project which are at
the request of Forest Lakes MSTU/Collier County due to Contractor mobilization for project and proximity of
related work items to existing project work/scope; These value added items are: a. Additional Curbing; b.
additional fill material; c. additional drain Inlet
Detailed explanation of each change items is tabulated below
Change Order #1 TABULATION WITH ITEM DESCRIPTION/CHANGE
Item Description Quantity Unit Unit Scheduled Change
Number Price Value
~iiliiQ~[I;!iQQAtlI1T~1lil6JI!;M~
19"X30" Elliptical ERCP ,50 LF $68,00 (,$3,40000)
Justi!~cation for Change: Quantities exceed required amount for job,
. ,.,..
Fill Material- Additional 364 CY $11,00 $4,00400
Justification for Change: Additional fill required for Woodshire Road
ROW, filling in of old swale behind new valley gutter,
. ,-, "-~-'~ij'.',1.,..,.._~..>,..-......t"''''''''--'' '~'''-'--i.~Ealf''''''''''
AnSu"lIic<ilU"!"'''''''''''lI.~ml6
,', :-'f:_':'_,:,,,~;.A,,,_~_"' _;aJ31'fl'l~.~t.,', ;:... ".,~,_L,..._
Grading 1232 SY $3,25 $4,004.00
Justification for Change: Additional grading of ROW due to elimination
of old swale back of valle utter.
RECErVED
ur..v 'j fI '"'I",",;
.,'J;) J' I' i,I,',j
...... '" - "
Tra nspon ~:l t 10 11
XfM Dcpt.
,
Sodding - Bermuda 419 -16,83 SY $2,50 (,$4208)
Justification for Chan e: Quantities exceed required amount for job,
.. .
Drop Curb Installation (Miami)
2335 LF $9,25 $21,598.75
Justification for Change: Additional curb requested by engineer to improve
draina e of Woodshire Lane,
,
. .
High Back Curb Installation -275 LF $10,25 (,$2.81875)
Justification for Chan e: Quantities exceed required amount for job.
.,....." .... --. ,
,",
-700 LF $9,25 (,$6A75 00)
e: Quantities exceed required amount for job.
~" -',
Valley Curb Installation
Justification for Chan
~
Density Testing -8 EA $50,00 (,5AOO,00)
Justification for Change: Not required,
A' OJusiQUA:i\lniX:!i,EM"13
'..^,'..'" ",j "j~,',.,c';":,L,,_.,.\~t!li_::':rd_ .if:."", ,~jl!.,_
Irrigation Pipe Adjustments for Woodshire Ln.
555 LF $7,50 $4,16250
Justification for Change: Additional irrigation pipe adjustments due to
Revised 6 18 09
,.,,"
~...
,..::,,';'
- :;I .~. _
Agenda Item No. 16B8
January 12, 2010
Page 8 of 22
"
-"
"" " '- "c__
"',_.." ..c,
"',.- '.'"
-,. ,~..,+"
;,_. "..,.",,!~
,-.....,,'
,,-
,
.~~-
.. .n'
. 73 LF $15.00 $1,095.00
Justification, f~r C~";,,. Ac;lditional underdrain across from Clubhouse,
oAginal qUilAtit~,e8"little1ll1!prt,., .
~' ,,""!J
c"
.,...., .'. .......1... ....... ..____.'1...'
Pipe Plug - Add' ional to Contraet "'" ,'"" ," ' .
6 EA' $50til, oe, ',,' sa P/ilO,0Q", '" "
Justification for Changm : . Modification of drainage system al~~~", L.;, 'S~:t?~E C E lVE D
Woodshlre Lane requlrerHt\e abandonment of culverts I:lnderthel$iid:i':~,,"'<"'~';''':'''''' ,;. " ,,,'
_', .' ". "':":--:':~:. _'. ". .'. ........ ..,:-':"',-':':;"'" _-::r';~:':~J.i!/:,1,~:I~'~_-~'i~OV,:;Q~I!~lml~I'
. "', - i,- ", . ;" .' '. 1JAI.I:rIJYJtEM:i-19 . '--. ,,': , ",,, ,ti~~i:~.':;~:~~,'b'~:;,J'~"'" "I., ---, -, ,- ''';;!...,'~"~::~11:',';,,,~I':I:.i
_, .. .c,'. ,~\f.~.J:.-'l'"""",-.,_,_......",;""..,...I!t -. ":""':C"l""",rq:-;..",,,,".";" ' ~" '~, 1'ransportRI.Hy'n
MISC" 0 ding, 748" Sy'li~$Z~&~I'~::~~,-496,OO .'ITMDi"l{
. J~~ati~n ~or Chan{!e: AddlHonal S&dused:tCl ::stabilize RqW,
ADO'l:O ITEM't/iM' " ROll;Jt E~~ati~..tl,
, 245 LF", '$20,06"", .
Ju~tificatlon for Change: ExcavatIon tll swales aIOnltl~Ii)l!,,"illl,,!l,e;Oafl;~.:
encounterecf'roCk for 245J~oJeel.",," ,:~'il",,~' .::1,,,, .
" ADDED ITEM #21 Junctio'n Bol( Demo in Q.~f,e6ur$e
, .' ......" '." -I"':~t.:..:'::l,'I'" ,,"'~:':.. '
t. ',,:', l.:S $450,00 ,,$450,00
Justification for Change: Demolition of jun:Gtion "bo~ In golf c;pam!' due c::c ;;....... ~ e. .
to abandonment of outfall pipe",to, lake, (wtfalt Jillp'8 was no longer required), :
ADDED iTEM #22 Modiftca1Iol:lC:lf 'Headwall '
"'..'(:Ibij'...._,.'.' "'''''.,''
, ."," "", 1 LS $250,00 $:.250,00
JuJ,tlflcationfor''Gtlal'lge-: Ma.!l,iflCationto headwall to improve safety of the installation
. " , . . ..
..,,.
'c ~
- ""_ ,,--.Ic:";-"-":__
,
",
,
-,. ".....,
,
$4,900.00'
,,-,.' ",
...-';,'
,-e,"::;,""",-
" ,
ADDED IT~'~ Additional Drainage Inlet
, 1 EA $5 50lil:OO"" .
, ,', . I
Justification Tor Chan~~Additional drainage inlet required"lo-imp1ove ' ,
" ~-"
drainflge on Woodshire Lan.e, ' ':' "'" "'", ,;",
ADDEDITEM#2f' DebriS Removal trom8 Stoiml:RlPil", ~~~~bo
.Justification for Change: Cl~i(lL;jt..df""/dllbris from drainage pipe to :
imprCllllI"",nqe along Woods hire Lane, ' ." , ",
ADDEO ITEM 1hIP Curb RllmQval
$5,500.00
,.,'
,,$,1,080,00
',.,~,.",,-),, .-
, ......".,
- ''- .!. ~,;..-
"",
,'....c.,.
,
,.-.\"
-"
'--'....' .-
,'1, )'...: '",i';'Iii'~ .j,,:;:,:,
.,.::;--"';,",:r--:<,:""
, '''''''',;;'
" "
,,' ., 85 Lf" $12,00$1'''.:,00,
Justificatlolf"l!lr~:litange: Removal of broken curb alor:tg::WOQdshi'~I!i,,,'Lane
and' rep/aeeP .with new curb. ' ",'
0',
To",! Change Order #1
-"'$";'" ,. '
$37.924A3 (NET CHANGE)
" ~. ''" - ~_., ---
b: t~Eintifying the nature of the c;hang~: ~hange is to ADD TIME AND. MONEY'TO CONTRA T.
Z; . Ana/i:'e the change,req~l.p-deterllllne....;i.:d;i:::' < . ..... . . . '.
a, Theihard and soft costs of the change and the appropna\e~ss:,of .lIc!1: Change has no soft cost;
. . change is per terms and cOhd~ions per BjdOS,51.~!1,fore$ttMsMSTU Proj~,'tl51F-50 Brainage
swale' Repair & Restoration" " '. .', '. " ' ...... .... .' . ., .;,h".' '.,..'" .
b. The benefits of the change: Change is beneficia1 jRJhat aeeitionai !irrteamJI1011ey allocation ~lIoWSfor
the additiooo! services from Contractor per F()re~\ L!lkes'MS'fU1Staff re(ll.!e~!" '..
c,T'he i""paet(s) of the change on tl:ieproject: Change" results in provision ofservicestoM~TU Committee
-''-:,:::'",'
".-.
"
-
',,~ -
, ,
,',c ."f"'"
:::,."",
;'i''-'-'",
","
,
Revised 6, 13 09
" "1,1.,,,,,
___,_,~_~_..___.-'-, ",~:6v.M!:ip:';:'-,'
'-""':
.,' ,-
,
'.'
-".','
,;1:" ,-.!','-'-
'"
....."',
,_o"__~.,~_",,~,,,,~ ..,
d, The impact of the change on the overall success/failure of the project: Change is~lIeyriillJordeB!O
provide contracting services per Bid 09-5189 Forest Lakes MSTU Projects F-45/F-50 ~e~wal@
Repair & Restoration" - . -Page 9 of 22
3. If the change is deemed Justified, review the original contract to determine or verify..,
a, Whether the change is consistent with existing project scope: Change is consistent with project scope
in that the services are necessary per Bid 09-5189 Forest Lakes MSTU Projects F-45/F-50 Drainage
Swale Repair & Restoration"; added items are per negotiated price quotient
b. The existing tenns and conditions (e,g,; price and schedule): Change is consistent with terms and
conditions per Bid 09,5189 Forest Lakes MSTU Projects F-45/F-50 Drainage Swale Repair &
Restoration";
c, That the proposed change is not included within the existing scope: Change is consistent with Bid 09-
5189 Forest Lakes MSTU Projects F-45/F,50 Drainage Swale Repair & Restoration";
d, The protocol for authorizing changes to the agreement: Change Order protocol is confirmation of
additional services requested per Bid 09,5189 terms and conditions; review and approval by
Committee/Staff with third party (Engineering Consultant) oversight.
4. Document the analysis of and the Justification(s) for the change. Justification for the change is that the
services are specifically requested by MSTU Committee and 'required' for project completion,
5. Identify the consequences to the project by not processing the change order. Consequence would
be that Bid 09-5189 Forest Lakes MSTU Projects F-45/F-50 Drainage Swale Repair & Restoration" would
not be completed for 100% "operation"; Utility conflicts noted in the field would impede proper drainage of
the roadway; "Field Changes" required due to existing site conditions would not be done, thus requiring
additional cost to address in separate project at a later date (under a new Bid),
B. Obtain preliminary review and input from one of more of the following...
a. Other project managers: Jerry Kurtz, Principal Project Manager, Storm water Dept.
b. Immediate supervisor; Pam Lulich, Manager Landscape Operations, ATM Dept.
c, Appropriate 3'" party consultants: Malcolm Pirnie Engineering
d, Purchasing Contract SpeCialist: Rhonda Cummings, Contracts Specialist
e, County Attorney Office: n/a
f, Risk Management Department: n/a
g. Other County departments materially impacted by the change: n/a
'~) ~'/-~~7'I\TT'T'\
./;_l,Ji-J\.....'l....; , ~I l.....LJ
i ;r,\, .-'\ n 00"'
., .. /' "'.I
! l~ \ .} (,i .:-' [)J
1 T an.'~, port~ll,l(ln
ATlvllJcpl.
7. Certify the appropriateness of the change based on the information gathered in steps 1-B.Change is
appropriate and in accordance with contract terms and conditions,
8. If the change is not deemed justified, notify the appropriate parties and include the documentation
gathered to date in the project file, Change is justified,
9. If the change is deemed justified, identify the appropriate contract instrument and clearly state the
benefit or value that the change has to the project. . (Change Order, Amendment, Work Orders or
Supplemental Agreement), Change Order is appropriate instrument; Benefit to project is continued
services per Committee request. .
10. Prepare and process the change document in accordance with...
a. The terms and conditions of the existing agreement.
b, The County's Contract Administration Procedures:
c. Check the numbers and percentages for accuracy,
d. Sign the Contract Modification Form
e, Submit the form with back up documentation attached to Purchasing for review
Form can be retrieved from the Purchasing Intranet Web Site:
hnp: //ncc in tranet/ s i tcs/purc- has in l! ,.Ide (aut t. ~I:-iD:-:
Revised 6 18 09
-
Procurement Administration Guidelines
Changes Reported to the BCC Adminlzt:atively or Agenda Items
Agenda Item No. 1688
January 12, 2010
Page 10 of 22
_. Contracts: If the change exceeds 10% of the current BCC amount, then BCC approval is required. If the
change is equal to or less than 10%, the change is reported to BCC by the purchasing department.
CCNA Work Orders: For all work orders where the change does not exceed 10% or $10,000 of the original
work order amount, these changes are reported by the Purchasing Department to the BCC administratively,
Changes to these work orders that exceed those thresholds require prior BCC approval.
NON-CCNA Work Orders: If the change exceeds 10% of the current BCC amount, then BCC approval is
required. If in doubt, contact your contract specialist. For more specific information regarding work order
thresholds, please refer to the Procurement Administration Procedures, Section IV.3,d.
Categories of Change Orders
1. Planned or Elective: Include, but not limited to, work or actions generally identified or referenced in the
agreement, but not specifically authorized or elected at the time of contract execution. Examples include, but
are not limited to:
. Implementing phased scope or tasks that are contingent upon the outcome of preceding work
(performed within or apart from the agreement) or that are pending budget appropriations,
. Selectively implementing direct purchase procedures for the purpose of legitimately avoiding the
incurring of state sales tax (and other taxes) where permitted by law or applicable administrative code.
. Granting increases and/or decreases in costs/prices that are generally permitted or specifically
contemplated under the terms of the agreement.
,-
2. Unforeseen Conditions: Include, but not limited to:
.
Unforeseen working or site conditions that are discovered or arise during the performance of the work.
.
Changes in regulatory and permitting requirements,
.
Changes in design and/or construction to address the impact of newly-approved devel~~\ ., 7 ~. '.
proximate to the project, and K1:'j I.; L1 J v 1': lJ
.
Address citizen concerns raised subsequent to the completion of the original design,
NOV 3 0 20Q1
.
Addition of personnel categories to fee and price schedules.
'1";'3n.sportntlO[;
"j'"''
.d,. lYJ. ;,ept.
3. Quantity Adjustments: Includes increases or decreases to specific quantities based upon established unit
prices, a bid schedule, or a schedule of values,
4. Correction of Errors (Plans, Specifications or Scope of Worle): Includes instances where the contract
must be changed to remedy errors in the contract documents that have a material impact on the delivery of the
work. In instances where an independent third party is responsible for the errors (e.g,; design professional), the
project manager and the contract specialist shall seek recovery of the appropriate portion of any resulting
additional costs from the responsible party(ies).
5, Value Added: Includes instances where the County realizes added value (e.g,; product substitution, better
quality for the same cost, same quality for less cost, reduction in time, etc.) through the approval of a
change(s) to the contract,
6. Schedule Adjustments: Includes extensions or reductions in time granted to complete the work under the
agreement.
Revised 6 18 09
"""'_".n._,._.M_"_
-_.. "--.--
,'- ..~_..__.._..~.. ,-....
,..."..,_.........,0
,
Agenda Item No. 16B8
January 12, 2010
Page 11 of 22
CHANGE ORDER
CHANGE ORDER NO, CO #1 (one)
CONTRACT NO. Bid#09-5189
BCC Date: BCC date 4114/09
Agenda Item: _ item 16B7
FROM: ATM Department
TO: Attn: Michael Hueniken
Earthtech Enterprises, !nc,
5475 Golden Gate Pkwy
Suite 5 West
Naples, Florida 34 116
RECF~IVF;D
NOV 3 0 2009
DATE: November 23,2009
'J'ransportati(l! "
;''I'M 1),,>'1.
ROJECT NAME: Bid #09-5189 "Forest Lakes MSTU Proiects F451F50 Drainage Swale Repair & Restoratio~
PROJECT NO.: 4500106959 (dated 05112/2009)
Under our AGREEMENT dated May 5. 2009.
You hereby are authorized and directed to make the following changers) in accordance with terms and
conditions of the Agreement:
Changes are related to: (I) Removal of "Cap Rock" found during excavation; note: previous site investigation
did not indicate presence of cap rock, however, during construction large limerock stones were found; these
rocks had to be removed in order to grade the swale according to project specifications (2) utility conflicts
(utilities were installed by third party and not properly recorded with Collier County and found during project,
thus requiring field adjustments); and (2) Value added work items related to the project which are at the request
of Forest Lakes MSTU/Collier County due to Contractor mobilization for project and proximity of related work
items to existing project work/scope; These value added items are: a, Additional Curbing; b. additional fill
material; c, additional drain inlet
Additional work to be performed is Total $52,560,25 ADDED Value; and also deletes in project scope items in
the amount of -$14,635,83 Total DELETES, Net Change to project is $37,924.43 total ADD to project (PO
4500106959)
Change Order #1 TABULATION WITH ITEM DESCRIPTION/CHANGE:
ADJUST QUANTITY ITEM #3
19"X30" Elliptical ERCP -50 LF $68,00 (-$3,400,00)
Justification for Change: Quantities exceed required amount for job,
ADJUST QUANTITY ITEM #4
Fill Material- Additional 364 CY $11.00 $4,004,00
Justification for Change: Additional fill required for W oodshire Road
ROW, filling in of old swale behind new valley gutter,
ADJUST QUANTITY ITEM #6
Grading 1232 SY $3,25 $4,004,00
Justification for Change: Additional grading of ROW due to elimination
of old swale back of valley gutter.
ADJUST QUANTITY ITEM #7
Sodding - Bermuda 419 ,16.83 SY $2.50 (,$42,08)
Justification for Change: Quantities exceed required amount for job,
ADJUST QUANTITY ITEM #8
Drop Curb Installation (Miami)
2335 LF $9,25 $21,598,75
Justification for Change: Additional curb requested by engineer to improve
,,-
drainage of Woods hire Lane,
ADJUST QUANTITY ITEM #9
High Back Curb Installation -275 LF $10.25 (.$2,818.75)
Justification for Change: Quantities exceed required amount for job.
ADJUST QUANTITY ITEM #10
Valley Curb Installation-700 LF $9.25 (-$6,475.00)
Justification for Change: Quantities exceed required amount for job,
ADJUST QUANTITY ITEM #12
Density Testing -8 EA $50.00 (,$400.00)
Justification for Change: Not required.
ADJUST QUANTITY ITEM #13
Irrigation Pipe Adjustments for W oodshire Ln.
Agenda Item No. 16B8
l;::lnll~ry 1?, ?Q.1D
Page 12 of 22
RECEIVED
NOV 3 0 2009
'l'ransportatlOn
ATM Dept.
555 LF $7.50
Justification for Change: Additional irrigation pipe adjustments due to
additional curbing to improve drainage of Woods hire Lane,
ADJUST QUANTITY ITEM #14
Misc. Cart Path Restoration -15 LF $100,00(.$1,500,00)
Justification for Change: Quantities exceed required amount for job,
ADJUST QUANTITY ITEM #16
Underdrain with Yard Drain - Additional
$4,162.50
73 LF $15,00
Justification for Change: Additional underdrain across from Clubhouse,
original quantity a little short.
ADJUST QUANTITY ITEM #18
Pipe Plug - Additional to Contract
$1,095.00
6 EA $500.00$3,000.00
Justification for Change: Modification of drainage system along
W oodshire Lane required the abandonment of culverts under the road.
ADJUST QUANTITY ITEM #19
Misc. Sodding
$2.00
$1,496.00
748 SY
Justification for Change: Additional sod used to stabilize ROW,
ADDED ITEM #20 Rock Excavation
245 LF $20.00 $4,900,00
Justification for Change: Excavation of swales along the golf coarse
encountered rock for 245 linear feet,
ADDED ITEM #21 Junction Box Demo in Golf Course
I LS $450.00$450.00
Justification for Change: Demolition of junction box in golf course due
to abandonment of outfall pipe to lake (outfall pipe was no longer required),
ADDED ITEM #22 Modification of Headwall
I LS $250.00$250.00
Justification for Change: Modification to headwall to improve safety of the installation
ADDED ITEM #23 Additional Drainage Inlet
$5,500,00
$5,500,00
.-
I EA
Justification for Change: Additional drainage inlet required to improve
drainage on W oodshire Lane,
ADDED ITEM #24 Debris Removal from Storm Pipe
8 HR
Justification for Change: Cleaning out of debris from drainage pipe to
improve drainage along W oodshire Lane,
ADDED ITEM #25 Curb Removal
$135,00$1,080.00
85 LF $12.00
Justification for Change: Removal of broken curb along W oodshire Lane
$1.020,00
",0-,0-,,--
T _,_w,,____
,-----~
Agenda Item No. 16B8
, January 12, 2010
Page 13 of 22
and replaced withn"""c'C~tb,.
Total ChIl:IIP~#l (NET CHANGE)
, '
$37,924.43
FOR 1"HE (Ad(fI~~(BediletiYe) Sum of: 3hirty seven thousand dallllI1l nine hundred twenty four dollars and
f<>rty,tllfeecents '. ($37.924.43), - '
.;.,
OJil!linalAgteement Amount
SI!C2ASQ.00
,'0'
',' "C". "
.;"." "
..-',...... , '
. sum of Previous Changes
$ 0
RECEIVED
, < ,;::,.,:"" ,:,'-;',"
I ,." ,,,'
NOY 3 0 20Q:;
,C'-,
This Change Order to ADD
$37.924.43
";'II( "
Tr~nsportatton
AIM Dcpl, .....
. .
Present Agreement Amount
. $160.374.43
c '-'''.
The time for completion shall be (iIllCiease) by 27 calendar days due to this ChBl1&e Order, Accordingly.
the Contract Time is now eighty SlWen . - (87 ) calendar dayS:, The substantial completion date is
"""',."",, , '
Julv 20, 2009 and the final compl'l!!pn date is _ July 20. 2009 . Your acceptance of this Change Order
shall constitute a modification to OUl::Agreement and will be performed ,subject to all the same terms and
Cl11llditions "'s contained in our A~G<lIlent indicated above. as fully as. if the same were repeated in this,
acceptance,' The adjustment, if any. to the Agreement shall constitute a full and final settlement of any and !ill'
c1a,ims of the Contractor arising out of or related to the change set forth heliein, including;',c1aims for impact and
delay costs,
Accepted: 1/ - 2-3 - 0'1 ,20 0'1
CONTRACTOR:
Earthtech~terp~f /--J I
,I" /
/~/; --/j ,
' f', ~ /
Corporate 0 lcer, Ea . te",
. //.
'/('.
.'--'.,.',.,.,,,
OWNER:
BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA
PROJECT GER
r--
,
IF~o.o"'l.
ichan:!. Project Manager
By:
! "
, L~J;lfDSC:",E O~TlO]!lSMANAGER
B;-:f~. . .
Pam Lulich, RLA
.."
,';'
AR.1"MENl:DtREl';;rOR.
B . ~.
"' ,. .... ,.,. ..
1'__.,-,'-,0<:,0'':,1:. >:,';,~;.>,,~:"{. ... .
MiilDlI.l!!'Eawm-lfs"PUnold. Director
D"i'~tpent of A1lernalive Transportation
Modes
;;""
.......... ................,
~//12~~
....yCOullly AUwMy
TRANS
~~
By:
RTATION DIVISION
o
;,."
..
,'", """",.
v."
,', 'rH;'1;""
.. _ ,.i!'i!I.'.~'L
-""
.""
.
,
, ..,
-.,."--
"',-
'....,,:;,., "
- :-.;:,,';~; -
or",'"'_",._
'.-'
Agenda Item No, 16B8
January 12, 2010
Page 14 of 22
Malcolm Plrnie. Irle.
4315 Metro Pkwy, Suite 520
fort Myers, FL33916
Pllone (239) 332.1300
Fax (1391332.1789
-www.pirnie.com
-'-.
/'v\^LCOIM
JIRNlf
INOfPlND!HT tl\lV1RONNENT AL
&NG1HltRS. a:C;IENTISTS AND
CONSULTANTS
November 20, 2009
Mr. Darryl Richard, RLA
Project Manager
Collier County Department of Alternative Transportation Modes
2885 Horseshoe Drive South
Naples, Florida 34104
Re: Forest lakes MSTU Bond Issue Project No. F-4S/F-SO
Change Order 111
Dear Mr, Richard:
.-".
Per your request, this letter provides a detailed explanation of each line item in Change Order 111 from
Earthtech related to the work done on the above referenced project. Please note that after this scope
was submitted for bidding the MSTU Committee added a sidewalk project to their mission, The field
direCted changes for additional curbing and fill in the Woodshire lane area were made to accommodate
the future sidewalk project, taking advantage of the very low bid prices and saving thousands of future
dollars. The items on this Change Order #1 were approved by the MSTU Committee during their meeting
on October 14, 2009. Malcolm Pirnle has reviewed all of these line items and their associated costs, and
determined that the costs are reasonable. Explanations of each line item added (see attached line Item
spreadsheet) in Change Order 111 are as follows:
line ItE\!!l 3 -19"x30" EIJjDtlcal RQ
This line item represents a credit for unused piping quantities.
Lin~ Item 4 - Fill Material - AdditiQnal
This line item accounts for additional fill material required along Woodshire lane to fill in existing
depressional areas to align with new curbing and correct drainage issues,
Line Item 6 - Gradln,!
This line item accounts for additional grading required behind the new valley gutters for secondary swales
and slope corrections for proper stormwater runoff. HE C E; rVE D
Line It.em 7 - Sodging
This line item represents a credit for unused sod quantities.
NOV 3 0 200:1
.......
.~; :1nSpon.3lJ0T'
Line It,!!m 8 - Drop Curb Installation .\TM lie pi.
This line item accounts for additional curbing to improve drainage across existing parking area entrances
and to make "sidewalk ready" areas along Woodshire Dr. The additional curbing also was utilized to
connect to existing drainage structures that were found buried during construction. The curbing to the
new inlets improved the roadway drainage efficiency,
line Ilel'(l 9 - Hig~ fla~k Curbing
This line item represents a credit for unused high back curbing quantities.
J.intJ1llm 10 - Vallev Curb 1~$tllllatiQn
This line item represents a credit for unused valley curb quantities,
_e*_.~
.___L.....~,.____._~..._. ,__
''''''-'-'..,.
__'_""M,__ ~_.._
Agenda Item No. 16B8
January 12, 2010
Page 15 of 22
;'\AI ( 01,' i
'Iw\n
Mr. Darryl Richard. RLA
Fort!st lakes MSTU Bond Project No. F4S/F.50
Change Order III
November 20, 2009
Page 2 of 3
line Item 12 - Densitv Testing
This line item represents a credit for unused density testing quantities.
lin~ I!em 13 -lrriWiQn Pipe AIljustmenls for Woodshlr~ Lane
This line item accounts for additional irrigation pipe that was required to be adjusted or relocated along
Woodshire Lane. The County had no records available showing the locations of irrigation lines in the
project area, and during the course of the construction we discovered that most of the irrigation lines
were in direct conflict with curbing installations or other project items and had to be relocated,
jjne I1M' 14 - Mise, cm Path RestQration
This line item represents a credit for unused cart path restoration quantities.
line Item 16 - Underdrain with Yard Drain - Ad.ditional
This line item accounts for the additional length of underdrain installation aiong the west side of Forest
Lakes Drive, The original plan was to connect the underdrain to an inlet just south of the cart path on the
9th hole, but the Quail Run Golf Course requested coverage of a larger area, which necessitated rerouting
the discharge of the underdrain to the inlet on the southwest corner of the intersection of Forest Lakes
Blvd and Forest Lakes Drive to provide positive drainage efficiency.
~ine It~m 1,8 - Pille PluJ! - Additional to Contract
This line item accounts for pipe plu8S required to reroute stormwater back into the original drainage
system in accordance with the final SFWMD ERP Permit,
line Item 19 - Mi~c. Sodding
This line Item is related to Line Item 6 and accounts for additional sodding required to stabilize regraded
areas along Woodshlre Lane. The adjustments made to allow for a "sidewalk ready" area.
Line Item 20 - Rock Excavation
This line Item accounts for the additional costs associated with the removal of very large rocks
encountered during the excavation of the swale section on the east side of Fairway No, 5, Although we
did anticipate finding some cap rock during excavations on site, the sheer size of the rocks found in this
area required the Contractor to use larger equipment to complete the work.
line Item 21- Junction Box Demo in Golf Course
This line item is related to line Item 18, and account for costs associated with the demolition of~ C F IVF I)
existing drainage structure on the south side of Fairway No, 14, The removal of the structure was.J c.J c.J -
necessary for the system to conform with the requirements of the SFWMD ERP permit.
NOV 3 0 20G:)
line Item 22 - Modification of Headwall ']"TcnsportBWJr
This line item accounts for the sawcutting of the precast concrete headwall installed at the west end'Of ',: ',. : :
Lake No, 14,
line Item 23 - Additional Dr'!.inaJ!e Inlet
This line item accounts for the addition of a drainage Inlet on the north side of Woodshire Lane, During
excavations for the new curbing, we discovered an unused culvert in a critical drainage location and
added this inlet structure to integrate the existing culvert into the drainage system. The new inlet solved
Agenda Item No, 16B8
January 12, 2010
Page 16 of 22
-~
~\'\I( 01 i~ 1
'lIlNlr
Mr. Darryl Richard. RLA
Forest lake. MSTU Bond Project No. F-4S!F.SO
Change Order 1t1
November 20, 2009
Page 3 of 3
several drainage issues for that area of woodshire lane,
Lin'1ltero 24 - Depris Re,moval from Storm Pil!.!l.
This line item accounts for emergency pipe cleaning and debris removal services, During construction, an
intense storm event occurred at the site, resulting in severe flooding of Woodshire lane. We observed
the flooding and discovered that several existing pipe sections and inlets along Woodshire Lane were
clogged with debris. Quickly correcting the drainage was critical, as the flooding represented a health and
safety hazard to drivers, County staff authorized requesting the Contractor to clean the pipes and inlets,
Line Item 25 - Curb Rel'(lpval
This line item accounts for removai of broken curb along Woodshire Lane, This curbing was found buried
after start of construction and was found to be so damaged as to be unusable In the new drainage system.
Malcolm Pirnie, as the Engineer of Record for this project, certifies that the work contained in Change
Order #1 was completed by the contractor, was necessary for the project, and the prices for that work
were reasonable, The additional work on this project was done with the full knowledge and approval of
the County's Project Manager and the MSTU Committee. We would also like to point out that the County
received great value on this project, even with this change order, the total project cost was more than
$40,000 below the next lowest bid amount. If you have any questions regarding this letter or need any
additional information, please feel free to contact Christopher Tilman, P .E. or me at(239) 332-1300,
Sincerely,
MALCOLM PIRN INC.
,
C ri top er C. Tilman, P ,E.
Senior Consultant/Project Manager
RECEIVED
NOV 3 G 2009
Attachment
'"
'...."'n<p()'r'. .."
: _ ....~. .. (. " ...1 '.J ,.
,,-p', r ,_,
, ~ .r.l'/j ..:..' '~; [.) ~ _
4037,118
'-
"','_ ,,_,"_,__~_','~'~".'"",'r"__' .
-'"",,-- ,
Agenda Item No. 16B8
January 12, 2010
Page 17 of 22
, I' -
i I I I I I E
I ...................... ...01....... -'...:.. .... ... Iii
,~ . ~ N .... O!~ DO ~,.'w .... C ~ ~,~ ~ . ~
i i*. -i-..j 1 i '
f !~ltlll'~ !I~! {llflU j H Ii f ~ -
1-1- ~.~ ~ ~'[ ~ ~ ~ g I~ " f i" .. ~ II
I~I'~ ~'g e I',!; i; l'l'i"! ~ [r ~f
~ -'-pn HI~I:'!Hrli ,.;:
!II II~ ~ n ii"~.ltlll f! gle, if ~
...! s: i I &' is sr g ,I ! i \G i f_ '"
3 - I~ S'.. it 1& Ii I'
Ii - i ;a~!" I ! . i
,; Ii i i I
I i 1-" I
! i i I~ I,
Iii l'lr T
I ~ " ' I I
II 1'1 II' ..~~~ I
....... I ,,:'" =t ....1... c:... ~ '
I~ DO'" ....~? :: .,,;;;: ~_I~ ..1e-'i11 ~ II> ~ l.: ~
. : I I I I I
. il~ .I,~!~I~ ~II~ ~i~ ~!~ ~ ~ ~I~ ~ ~
, II I.
----1 '-..
I 'I ' , 'I -
: ! : Ii' I ~
! ,),1<' ~ d~!lrn!'1aI~'1<'1 ~ ~ i : I~ ~ H i
! I;:; ~!S o~I~'lC l5:; 8i~ ~~lo~~I"":: &:
_: Isig g ~ gi8 g 8 8: 8i~~8 t::lb: ~ lSi~18 8
, I I, I I, I I
, : I 'I ' , I I
~ h~q~ ~.,. ~ ~ ~!~ ~ pI):" l~ipi~ , ~i)Zl~ i
f, :~iBlg ~ ~ ~ ~I~,~ Ii ~ i;~I~ ~I~ ~I~'~
~18,8!8 81818 818tg 8 ~ 8 8'V(lVlli gig 8
-0 'fm ~~itfi[:[t~i
=.!.. ~~u, II
~!g~p~~n. ~.~P
"~ ~~~~.~~d!!~~~~!
-.. ooll1'!!l!" "':...n.....::lI..
~o. ""-~ '"~ "'~ '";""lil
IiI li'i~11 11!lii(
,go ..~.,., i'li-o~'
'" ..';; ~.. '0 .. !!I l:l "CI 1! l:l ... z..J:l
.wi .~.~.\. .t~-I
OI~~ ~ilt...~lt" "'a.lt ~a..
!.i 'f~~!-~ i.~i~~~
~j~ ii~!ll~ ~iii.~i
t;; ~~~Iei~ irail:'i
.f~ -~ ~gti ol.t~~~
_.~ " 85 _ ..3'.l.
.. Q.. 15 ~ ..... 0 "CI g:ll
, 3.... .. 'II ~ 0
ill il Ii I !~:
l!i g! !! ~ I l~
; S:l: g a. ~ ~:J. .. go ~
i!s ~~ [~! a ~~
~ !'t ...,.... ........ :E~ 0
'< ~ I:a ::r or> 0 ..... i
'I .i: ~. "''' i! 3 ~ ..
n~~ _[ i= ~ ~ f~
;~~"g-"'&.[1 ~~'!:
:g. !i' g' 9- i;~
;;; 0:'" '3 . ;""':>
;; ~ a i ~
~ .. 2." t.i
g g ~ !
; ~ l ~
".il g ~ ~
I ~ ~
, . '
<;I " !l'
. .
, .
~ ~
,
.
!
c
.
~
-
i:
i~
~
~ f
-
.
il~1
i~1
i[!
, ~ ~
~~
1
<; ~
. i
,
Agenda Item No, 16B8
January 12, 2010
Page 18 of 22
-
FOREST
LAKES
ROADWAY AND DRAINAGE M.S.T.U.
ADVISORY COMMITTEE
2885 HORSESHOE DRIVE SOUTH
NAPLES, FL 34104
October 14,2009
Minutes
I. Call to order
Meeting was called to order at 10:09 a.m. by Robert Jones.
A quorum was established.
II. Attendance
Members: Harold Bergdoll, William Seabury, George Fogg, Robert Jones,
Virginia Donovan (Excused)
County: Tessie Sillery-Operations Coordinator, Darryl Richard-Project
Manager, Caroline Soto-Budget Analyst, Pam Lulich-Manager Landscape
Operations, Michelle Arnold-Director ATM
Other: Chris Tilman-Malcolm Pirnie, Thomas Roadman-Malcolm Pirnie,
Scott Windham-Windham Studios, Jim Carr.ABB, Darlene Lafferty-
Mancan
III, Approval of Agenda
Add: V. C. BVO (Best Value Offer) Report
VII. A. Golf Course and Resident Items
George Fogg moved to approve the agenda as amended. Second by
Harold Bergdoll. Motion carried unanimously 3-0.
IV. Approval of Minutes - September 9, 2009
George Fogg moved to approve the September 9, 2009 minutes as
submitted. Second by Harold Bergdoll. Motion carried unanimously
3-0.
V. Transportation Services
A. Budget Report - Caroline Soto reviewed the following: (See
attachments)
September 30. 2009 end of FY09 Report
o Available Operating Expense $221,219.48
o Available Improvements General $1,673,359.06
o Open P,O, $429,675.92 were rolled into FY10 Budget
-,
1
"..-..,-,,-----..-.-. ~ '--
".._-,.--,_.-----,--~.. .
Agenda Item No, 16B8
January 12, 2010
Page 19 of 22
October 14, 2009 Budqet Report
o Projected Ad Vaiorem Tax $205,500.00
o Anticipate Investment interest will be higher than Budgeted
amount of $30,000,00
o P.O, paid to date $67,605.17 (Operating Expense and
Improvements General)
BVO (Best Value Offer) Report
~ BVO #8-5060-3 Project (F-58) Sidewalks, Lighting
Improvements, and Roadway Tree Plantings
o Windham Studios was chosen by the BVO Selection
Committee
o Sub Consultant Engineer Services by ABB and TR
Transportation were included in the Proposal
Scott Windham stated creating an experience for Residents in
addition to functionality and safety is the goal.
William Seabury arrived 10:25 a,m.
Darryl Richard noted Windham Studios BVO $74,946.00 for
Consulting Design Services is an acceptable bid according to Contract
rates,
George Fogg moved to approve up to $80,000.00 for Design
Services for sidewalks, lighting, and tree planting. Second by
William Seabury.
George Fogg noted additional items may be needed for the (2)
entrances during the Project.
Motion carried unanimously 4-0.
.. BVO #8-5060-3 Project (F-60) Forest Lakes Blvd. cul-de-sac
Improvements
o Project was awarded to Windham Studios by the BVO
Selection Committee
George Fogg announced a revised Scope is forthcoming due
additional prototype solutions for Cul-de-sacs was requested during
the BVO selection,
Darryl Richard requested approval for additional funds (above
$11,256,00 BVO Proposal) for the revised Scope,
George Fogg moved to allocate (funds) not to exceed $19,000.00
for Cul-de-sac development plans. Second by Harold Bergdoll.
Robert Jones questioned if restricting iarge trucks in Cul-de-sacs was
possible,
2
Agenda Item No. 16B8
January 12, 2010
Page 20 of 22
--
Darryl Richard will advise Waste Management of large vehicle
restrictions in Cul-de-sac area within Forest Lakes,
After much discussion it was suggested to hold a Public meeting to
advise Residents of large vehicle (delivery truck) restrictions in Cul-de-
sac area.
Motion carried unanimously 4-0.
Michelle Arnold requested status on Project (F-53) Quail Run Lake
Shoreline Restoration and Stabilization.
Chris Tilman reported the following:
o Anticipated receiving Geotechnical Report (bore samples) by
10/21/09
o Structural and CAD personnel are drafting standard Wall cross
sections and composing Engineering notes
o Survey is complete
o Out to bid target date-end of October 2009
-
Discussions developed on the AMIL Gate and the following information
was given:
o Corp of Engineers approval is not required
o An exemption was requested to conduct work as Maintenance
Project
o Historical data on the Gordon River extension was supplied to
the SFWMD (South Florida Water Management District) as
requested
o Draft Easement documents were submitted to Royal Poinciana
and Country Club of Naples-negotiations are underway
o ABB Engineer-Royal Poinciana is amiable to opening the
channel
Harold Bergdoll expressed dissatisfaction with RWA field crews. He
noted the required check in procedure is not followed. Additionally
field crews are setting up equipment in the middle of the fairway.
Darryl Richard and Chris Tilman will meet with RWA crew leaders
and field crews.
B. Project Manager Report - Darryl Richard I Chris Tilman - Malcolm
Pirnie - The Forest Lakes Master Project List was distributed, (See
attached)
Project No@) 3b, 3c. and 5
o Items are closed
o Completed cost $160,374.00
o Proposed Storm Water System Naming Convention -Aerial Map
was distributed and reviewed (See attachment)
o Lakes and Swales were named for adjacent fairways
o Direction of water flow is indicated on the map
-.
3
d' ~._._,_."",_,_,______'_ _. rr .__.__._,.'_
,--~-,_.~,,_.. '-'-'
_M_'_~
Agenda Item No, 16B8
January 12, 2010
Page 21 of 22
Discussions ensued concerning excessive water in front of 145
spreading onto the fairway. It was concluded the installation of a yard
drain to direct water from 145 to Lake 14 was the solution.
Project (F-53) Quail Run Lake Shoreline Restoration and Stabilization-
Previously discussed under V, A
Discussions developed concerning rip rap and sod installation along
Lake(s) edge Installation of sod down to DHW (design high water) is
preferred by the Committee.
Project iF-52) Maintenance Dredgk1.g of Lake 9 & 14
o BVO (Best Value Offer) due 10/16109
o Expanded Scope to include Installation of mixing aerators (due
change over to reclaim water)
o Suggested future installation of aerator in Lake 5 once power is
established
Project (F-53) Property Line Wall Along Woodshire Lane
o 15 ft. easement was granted by Naples Bath and Tennis
o Wall will be installed within 15 ft. easement of Naples Bath and
Tennis allowing ample room for sidewalk installation (Forest
Lakes)
o Wall height 8 ft,
o After initial painting (by MSTU) Naples Bath and Tennis will
maintain wall
Change Order Proiect No, (F-53J-for Malcolm Pirnie Bulkhead design
and additional field time $67,550.00 was distributed and reviewed.
(See attached)
George Fogg moved to approve Malcolm Pimie Contract addition
for (Project) F-53 not to exceed $70,000.00. Second by Harold
Bergdoll. Motion carried unanimously 4-0.
Darryl Richard reviewed Project No (F-45 & F-50) Earth Tech Change
Order $37,924.43, (See attached)
It was noted majority of the cost was due curbing fill and installation of
catch basin.
George Fogg moved to authorize additional Project cost (F45 & F-
50) $37,924.43 to Earth Tech. Second by William Seabury.
Motion carried unanimously 4-0.
Draft Master Facilities Maintenance ScoDe-1 year Maintenance
Contract with up to 3 renewals, (See attached)
,
Harold Bergdoll reported the sign lighting (by the clubhouse) is
inoperable,
4
Agenda Item No. 16B8
January 12, 2010
Page 22 of 22
George Fogg suggested including Landscape Maintenance for both
entrances of Forest Lakes in the Maintenance Contract.
George Fogg moved for the MSTU to assume Landscaping and
Maintenance of the two entrances to (Forest Lakes) development.
Second by Harold Bergdoll. Motion carried unanimously 4-0.
Chris Tilman requested Committee comments on the Maintenance
Contract.
C. BVO (Best Value Offer) Report-Previously discussed under V. A
VI. Old Business
A. Drainage Structure between MSTU and Downstream Golden Gate
Structure - AMIL Gate - Chris Tilman distributed a letter sent to Bill
Foley-SFWMD (South Florida Water Management District.) (See
attached)
B. November meeting date-Scheduled for November 18, 2009,
VII. New Business
A. Golf Course and Resident items
Harold Bergdoll distributed a letter submitted by a Forest Lakes
resident concerning standing water between (2) homes on Forest
Lakes Blvd, (See attached)
VIII. Public Comments - None
IX. There being no further business to come before the Committee, the
meeting was adjourned by the Chair at 12:39 A.M,
Forest Lakes Roadway and Drainage
MSTU Advisory Committee
Robert Jones, Chairman
These minutes approved by the Committee on
as presented or amended
,
,."...-.
Next meeting is November 18, 2009 at 10:00 a.m,
CC Transportation Building
2885 Horseshoe Drive South
Naples, FL 34104
5