Agenda 07/24/2018 Item #16F1D 07/24/2018 EXECUTIVE SUMMARY Recommendation to approve the Administrative Reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. OBJECTIVE: To promote accountability and provide transparency to the public and gain the Board's approval/ratification for various procurement-related transactions. CONSIDERATIONS: In accordance with the Board's Procurement Ordinance 2017-08 and the Procurement Manual,the Procurement Services Division produces a regular Administrative Report which provides for Board approval of the following transactions: • Change Orders that do not exceed ten (10%) of the current Board approved aggregate amount, and/or require change in schedule(number of days); • Amendments to contracts; • After the fact memos from various County Divisions, as requested by the Clerk's Finance staff for the timely process of invoices. • Other items as determined by the County Manager or designee that require Board approval. This administrative report includes the following: • Thirteen (13) change orders that in aggregate modify contracts by -$28,423.70 and add 623 business days to completion periods, see attached summary and backup for details; and • One(1)amendment this period, and; • Three(3)after the fact memos with a fiscal impact of$100,397.70 Approval of the following documents by the County Manager is subject to formal ratification by the Board of County Commissioners. If the decision by the County Manager is not ratified by that Board,the document(s) shall be enforceable against Collier County only to the extent authorized by law in the absence of such ratification by that Board. FISCAL IMPACT: The net total for the seventeen (17) items is $71,974.00 LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: To ratify/approve change orders and/or contract amendments and other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08. Prepared By: Sara Schneeberger, Procurement Strategist, Procurement Services ATTACHMENT(S) 1. 0724 Amendment Report-FY 18 (PDF) 2. 0724 Amendment Backup (PDF) 07/24/2018 3. 0724 After the Fact Report-FY18 (PDF) 4. 0724 After the Fact Backup (PDF) 5. 0724 Change Order Report-FY18 Revised (PDF) 6. 0724 Change Order Backup Revised (PDF) 07/24/2018 COLLIER COUNTY Board of County Commissioners Item Number: 3.1 Doc ID: 6189 Item Summary: Recommendation to approve the Administrative Reports prepared by the Procurement Services Division for change orders and other contractual modifications requiring Board approval. Meeting Date: 07/24/2018 Prepared by: Title: Business Technology Analyst, Senior—Procurement Services Name: Sara Schneeberger 07/12/2018 3:34 PM Submitted by: Title: —Procurement Services Name: Ted Coyman 07/12/2018 3:34 PM Approved By: Review: Administrative Services Department Paula Brethauer Level 1 Division Reviewer Completed 07/12/2018 3:39 PM Procurement Services Ted Coyman Additional Reviewer Completed 07/12/2018 4:01 PM Facilities Management Linda Best Additional Reviewer Completed 07/12/2018 4:14 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 07/12/2018 4:23 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 07/16/2018 9:06 AM Administrative Services Department Len Price Level 2 Division Administrator Review Completed 07/24/2018 1:28 PM Office of Management and Budget Allison Kearns Additional Reviewer Completed 07/24/2018 2:38 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Skipped 07/20/2018 4:20 PM Office of Management and Budget MaryJo Brock Additional Reviewer Skipped 07/24/2018 1:44 PM County Attorneys Office Jeffrey A.Klatzkow Level 3 County Attorneys Office Review Completed 07/24/2018 2:48 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 07/24/2018 3:32 PM Board of County Commissioners MaryJo Brock Meeting Pending 07/24/2018 9:00 AM C O a p o X w E E N 7 tr.; c� Q a o E z a a a o Q o z a e o c E V G � E E Ea .E3 0 t LL 2 t n a w 4 6 o O c U o m m 0 0 > H C m o Emea 0 d E E Z`o rn c m c R E ¢ o C- mg c E mn p Z d o m m a o 0a y 0 o c a C2co 0 a;ed #luawpuawy 'ON `n tue.19/pe.quoj #aged wall Co ler County Administrative Services Department Procurem nt Services Division CONTRACT AMENDMENT REQUEST FORM (oll the Information before below must be completed before submitting to Procurement) REQUESTOR INFORMATION Requestor Name: Debrah Forester Phone: 643-1115 Division Director: Debrah Forester Davison Name CRA CONTRACT INFORMATION Project/Contract Title: Bayshore Triangle CRA Plan Contract Ii: 17-7050 Proposed Changed Divison Contract Manager ❑Yes❑No If no,why: Approved Company Name TOA Design Group Vendor(s)Point of Contact Name(s): E-Mail(s): Phone(s): Ej Single ❑Multiple Evan Johnson EJohnson@tindaleoliver.com 813-224-8862 FINANICAL IMPACT Original Approved Original Board 01/09!18 Contract Value: Contact Value $142.730.00 Date Current Board Approved $142,73a00 Agenda Item 16.8.1 Amount Dollar Amount of Cumulative Dollar Amount Increases 0 0 • this Change without Board Approval $ Is the proposed change 0 Yes ❑No within the scope of the original contract? MODIFICATION TYPE AND JUSTIFICATION Time Extension-New End Date: March 27,2019 ❑Renewal Term-New End Date: Modification Type: ❑Scope or Service Change p g ❑ Terms&Conditions ❑ Exhibit/Attachment El Other Describe the proposed change(s)and identify the page(s)and section(s)in the contract that require the modification. Task 1 Extended to 240 days Task 2 Extended to 370 days Task 3 Extended to 370 days Reimbursables and Meetings Extended to 400 days Indicate reason for amendment change/s and any other pertinent Information as It relates to amendment request. Task 3 includes final plan adoption which will require two public hearings. Due to community outreach and summer recess by the Bayshore Gateway Triangle CRA Advisory Board in August and September an extension is requested. Describe the impact if this amendment is not processed. Without the extension,the public comment opportunity will be shortened and will not allow for sufficient time to review and comment prior to required public hearings. Proposed Language to i1 Provided Exhibits/Attachments: ❑Not Provided(Procurement cannot begin drafting the Amendment without proposed language or exhibits/attachments.) R y'�Requestor Signature �r���(_�� •�e�~^�yYl. ► �, �`—r Date /2_1. j 21/ Requestor's Director Signature 'ttikNincryDate lat r Procurement Strategist Date (print name) HerreraSandra dp °° .4 .WW4w.wReviewed rset Contract Amendment Request Form(Version 3111/9/2017 FIRST AMENDMENT TO AGREEMENT #17-7050 FOR "Bayshore Gateway Triangle CRA Redevelopment Plan Update" THIS AMENDMENT, made and entered into on this ;: J "day of2018, by and between TOA Design Group, LLC., authorized to do business in the State of Florida, whose business address is 1000 North Ashley Drive, Suite 400, Tampa, Florida 33602 (the "Consultant") and Collier County, a political subdivision of the State of Florida,(the"County"or"Owner"): WHEREAS,on January 9,2018, Item 16.B.1,the County entered into an Agreement with Consultant to obtain the professional Planning Consulting services concerning the Bayshore Gateway Triangle CRA Redevelopment Plan Update;and 'WHEREAS, the parties desire to amend the Agreement to revise Schedule C- Project Milestone Schedule to allow for a time extension from the original completion date of November 27, 2018 to March 27, 2019,in order to allow staff sufficient time to review and comment prior to required public hearings. NOW,THEREFORE, in consideration of the mutual promises and covenants herein contained,it is agreed by the parties as follows: Words&melt Through are deleted;Words Underlined are added * * * * * SCHEDULE C PROJECT MILESTONE SCHEDULE Cumulative Number of Calendar Days For Completion from Date of Task Description Notice to Proceed for Services under this Agreement Task 1 Evaluate Existing Conditions -1-20 240 Days from NTP Task 2 Redevelopment Plan Preparation TN 370 Days from NTP Task 3 Redevelopment Plan Approval 210 370 Days from NTP Reimbursables and Meetings 2-80 400 Days from NTP SIGNATURE PAGE TO FOLLOW • Pagelof2 O`1 IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or agent,have executed this Amendment on the date and year first written above. Consultant's Witnesses: CONSULTANT: TOA Design Grou ,LLC. "„ 6,....•. C.ishighist. By: 0 " .f le Fi t itness v % V Signature Angel P.Acey-Hayden William L.Ball,Chief Operating Officer TType/print witness nanneT TType/print signature and titlet f t/ r.,_:. ,L AV f.;'_I 6-25-2018 Second Witness Date Enisha Jamison TType/print witness nameT BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY,FLORIDA By: {J.. /m L -L->,, ,, J,,.a e' Edward F.Coyman,Jr. Procurement Division Director Appr ved s to Form Le,,ality: Deputy County At.S14 �Jorney Print Name Page 2 of 2 o +65 E \ \ \ oca { { t , _ \ t2k2w Ta Ta 0 co E \ \ )` 0 / o ) \ < o \ \ 00 m c / `>, 2 / }( {\ ) 01 E°= k } (o / -T°! 3 03 03 CO ~° \ \ \ _o —_d cN § § J ®p~) ( ( ( ._, - : a _, - , , 1 CIL County Collier County AAhvnntstrativeServices Department After the Fact Form Procurement Services Dom,on Instructions As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such `After the Fact Procurements"will be reported to the County Manager. Requester Name:Paul Mattausch Division:NE Utilities Division Director:Paul Mattausch Vendor Name: LA Apiaries Amount:$425.00 Contract#:n/a Purchase Order:4500188061 Why is this deemed a non-compliant purchase? Choose one. Contract Ordinance f Manual P-Card Other Details of Purchase: Explain the circumstances behind this purchase. Bee removal was needed at an outbuilding located at Northeast Service Area. The Division contacted Facilities Management for a recommendation on who to use for this type of service. Facilities recommended the vendor LA Apiaries. Staff was under the impression that a valid purchase order was in place and contacted the vendor to perform services. Action Required: What are you asking to be done to remedy the situation,include list of invoices if applicable? Request payment of LA Apiaries invoice #1869 dated 5-3-18 in the amount of $425.00 for the services performed. Work was performed satisfactorily and approved by the division. Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring? Staff has been directed to ensure that a valid, approved Purchase Order is in place prior to the acquisition of any goods or services from any vendor. The requestor affirms that to the best of their knowledge the information provided in this document is true. Requested by: Paul Mattausch Signature: mattausch Dlge 20/ly 80625ned 33404 p Date: Date:2018.06.25 13:34:04 04'00' Digitally signed by ntattausch_p Division Director: Paul Mattausch Signature: mattausch_p Doaooate 20180625133416 Date: 2 INVOICE PM, Box 990453 L.A. 1 1869 Naples, FL 34116 *----, 239.384. 1580 tuis@laapiaries.com i!,1•C"--,'' ''') _ www.laapiaries.webs.com II ESTIMATE (Valid - 30 days) APIARIES NAME ed/CSC . . . PHONE 252 -4/1'7 CELL 2, 7 2 - 2,8'd ADDRESS ,_,....- CITY 1-34- 114S> STATE r(...- ZIP ..3 LI I WORK i -71 doe Aaf ( c 5 .. - /er ;ir:.': . 2-1L-te‘d bir ....ye -0b , , ,ww'.-- :----,-,,wztz:„,.i, i, ,, , , 1:::4 '!' :'., ',4-': --: s',',.-ei`'i''''''' ,'AjA ,, ,,,,,,,,,-,-%. „.. ,-.11,.„,,,„t„4.,,, , ,..,.. ,... . . ite mut et) epi- ,a,rze s croeq s kei e.eyetgl aii4 254 -....,%..... 4 3 47// e„,,/,' 4tit 1-e--- of2S / .., ... 1 e:N/4.47.1 -44.t.ri •1‘.0' .0444.74 ‘..., , , .., ... 1 1 ,P,.)* ,20/(P.3 il, 22.5 1 .,. ,... i 1 1 4aprLcJ ,7177-y 3: zotii:r ri,s /27e,41 114 e, `/44 1,S 7 i S;,4et....c./ i TOTAL 4". -- -- - i FORM OF PAYMENT: CASH S CHECK# $,050,d ;1107(ct..— b a- el-44 "'/G*14"(5 CREDIT CARD #____ _ ' EXP DATE _ CCV i ...___ 16;e) -clod 1-9 A 4111k ik , 1 CUSTOMER SIGNATURE ..... , Estimates are good for 30 days only. We lit NOT be responsible for toss or damage caused by bees, wasps or yettow ! jackets or any other causes beyond our con rot. L.A. Apiaries thanks you for your business and saving the bees! 3 2 Coder County Collier County Administrative Servioss Department After the Fact Form Psi orerrien?Services urns Instructions As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such `After the Fact Procurements"will be reported to the County Manager. Requester Name:Amanda Condomina Division:Facilities Management Division Director:Miguel Carballo Vendor Name:B&I Contractors Inc. Amount:$92,975.00 Contract#: Purchase Order:4500186144 Why is this deemed a non-compliant purchase? Choose one. Contract Ordinance f Manual P-Card Other Details of Purchase: Explain the circumstances behind this purchase. Collier County Facilities Management, following the previous Emergency Purchase Order process, did not obtain three quotes for the emergency requisition for the emergency replacement of two 30-ton Split Systems at the Immokalee Sports Complex. The requisition was converted to Purchase Order 4500186144 for proposal 18-0356. Action Required: What are you asking to be done to remedy the situation,include list of invoices if applicable? Staff requests payment of$92,975.00 for the attached. Corrective/Preventive Action: What action is being taken to prevent this violation from re-occurring? Follow section 11.8 of the Procurement Ordinance. Staff has also implemented preventative measures in-house to ensure compliance to all applicable ordinances and policies. The requestor affirms that to the best of their knowledge the information provided in this document is true. CondominaAman ye Requested by:Amanda Condomina Signature: nY da Date 2013 6261 Date: Date 06261�.38'.3b-0700' Miguel Carballo �'�'`�''�'�°�°°� °�"°""���' Division Director: Signature: CarballoMiguel�„e,e zo,BOE�s,,00s_o,��� Date: Proposal#: 18-0356BI* Respectfully Submitted by: I Mihai Marian Established 1960 a Employee Owned Quote Date:03/22/2018 SERVICE SMARTER.SERVICE BETTER' Service Site: Immokalee Sport Complex Contact: Hemantha Ranatunge Site Address: 505 Escambia St. Phone: (239) 252-8380 Immokalee, FL 34142 US Customer: Collier County Facilities Management Work Scope:Two 30TON Split Systems Replacement B&I Contractors will provide labor,tools and materials necessary to replace the two existing 30-ton Carrier split systems units servicing at Immokalee Sport Complex as part of the Collier County Facilities.The new units will be Carrier 30 TON splits with E- coat condenser coils,2 speed ahu fan controller. Owner to temporary remove the sprinkler piping underneath the air handlers. The work scope will include the following: Recover the refrigerant per EPA regulations -Remove and discard per EPA regulation existing 30-ton units -Provide and install new Carrier 30-ton air handler and condenser units with using existing piping,concrete pad and supports -Pull vacuum and leak check the system -Connect the units to existing thermostats -Remove and replace the disconnects for the condensing units -Remove existing motor starters for the air handlers and install new disconnects to connect to the two speed drive controller -Schedule and supervise factory start-up procedure -Confirm proper operation Work will be performed during B&I Contractors normal business hours of 8:00 AM -4:30 PM M-F and the work areas will be accessible during the project.We will work with the management team at Collier County Facilities Management and Immokalee Sports Complex. If additional work is found outside the scope of this proposal another will be presented for approval. Notes: -Include rigging -Owner to temporary remove the sprinkler pipe underneath the two air handlers Signature: Date: Flat Price Title PO#: Price Total:$92,975 Acceptance of proposal-the above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Payment will be made as outlined on the last page of the proposal. Broward County Lee County Manatee County 954.726.2744 239.332.4646 941.7273437 bandiflorida.com Page 1 of 2 MECHANICAL I SERVICE I ELECTRICAL I PLUMBING AAGM-i.0 e<4 CF.0 74k34 r FC- ,Ii L ii'A,I CG.Ci F;:7478 Proposal#: 18-0356Respectfully Submitted by: BMihai Marian Established 1960 a Employee Owned Quote Date:03/22/2018 SERVICE SMARTER.SERVICE BETTER.' [ERmS&CONDITIONS OF PROPOSAL I Acceptance of this proposal by the party to who it is submitted,("Owner"),shall be acceptance of all terms and conditions recited herein or incorporated by reference.Allowing B&I Contractors,Inc.("CONTRACTOR;to commence work or preparation for work will constitute acceptance by Owner of the proposal and all its terms and conditions.Quotations herein,unless otherwise stated,are for immediate acceptance and subject to change if not accepted within thirty(30)days of submission. 2.Contractor shall be paid 100%of amounts due upon completion In the absence of terms agreed to in advance by the contractor.Sales of materials are payable in cash on delivery of goods. 3.Contractor may allow for terms of 10,15 or 30 day payment terms N selected In writing In advance of ant'work or purchase of materials Included In the acceptance of the proposal. 4.No back charges or claim of the Owner for services shall be valid except by the agreement in writing by Contractor before work is performed. 5.AB sums not paid when due shall bear Interest at the rate of I Soper month from due date until paid or the maximum legal rate permitted by law whichever Is more;and all costs of collection,including a reasonable attorney's fee,shall be paid by Owner. 6.ARBITRATION:All controversies or claims arising out of or relating to this agreement,or of a breach of n,shall be submitted to binding arbitration pursuant to Section 682.01 et seq.of the Florida Statutes(Revised Florida Arbitration Code)as amended from time to time and not under the rules of the American Arbitration Association. (a)The parties agree that the Arbitrator shall be granted the power to award reasonable attorney's fees to the prevailing party.All arbitration proceedings shall be held in Lee County,Florida. (b)Any award rendered in the arbitration shall be binding and conclusive upon the parties and shall not be subject to retrying or appeal before any court.The arbitrator shall have the right to decree specific performance.Judgment upon the award rendered in the arbitration may be entered in any court having jurisdiction. 7.If the owner fails to make payment to Contractor as herein provided,then Contractor may stop work without prejudice to any other remedy It may have. 8.Owner is to prepare all work areas so they are acceptable for Contractor's work under the contract.Contractor will not be called upon to start work until sufficient areas are ready to insure continued work until job completion.The Owner represents and warrants that it shall coordinate the work and performance of Its own forces and any other contract on the site or related to Contractor's work so as not to delay,hinder or interfere with Contractor's performance thereof,and so as not to create additional costs to Contractor.If the work of Contractor is delayed,interfered,suspended or otherwise Interrupted by Owner,Owner's architect or by any person or act within the power of Owner to control,then Owner shall be liable to Contractor for any increased or extended costs. 9.After acceptance of the Proposal as provided,Contractor shall be given a reasonable time in which to snake delivery of materials and/or labor to commence and complete the performance of the contract.Contractor shall not be responsible for delays or defaults where occasioned by any causes of any kind and extent beyond Its control,including but not limited to:delays caused by the owner,architect,or engineers;armed conflict or economic dislocation resulting there from;embargoes,shortages of labor,equipment or materials production facilities or transportation;labor difficulties,civil disorders of any kind;action of civil military authorities;vendor priorities and allocations,fires,floods,accidents and acts of God. 10.All workmanship and materials are guaranteed against defects for a period of one year from the date of installation,except those items carrying a manufacturer's warranty which are warranted to the extent of the manufacturer's warranty.THIS WARRANTY IS IN LIEU OF ALLOTHER WARRANTIES EXPRESS OR IMPLIED,INCZUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.Contractor will not be responsible for special,Incidental,or consequential damages.Contractor shall not be responsible for damage to Its work by other parties.Any repair work necessitated by caused damage will be considered as an order for extra work and in no event shall Seller be liable for damages exceeding the purchase price to be paid to Seller here under. 11.In no event shall B&I be liable for: a."Bodily injury"or"property damage"which would not have occurred,in whole or in part,but for the actual.alleged or threatened inhalation of, ingestion of,contact with,exposure to,existence of,or presence of,any"fungi""mold"or bacteria on or within the building or structure,including its contents,regardless of whether any other cause,event,material or product contributed concurrently or in any sequence to such injury or damage. b.Any loss.cost or expenses arising out of the abating,testing for,monitoring,cleaning up,removing,containing.treating,detoxifying,neutralizing, remediating or disposing of,or in any way responding to,or assessing the effects of,"fungi""mold"or bacteria,by any other person or entity. 12.Owner or Owner's architect shall advise Contractor in writing of any defect or deficiency in the work at the time same are observed.After completion of the work called for by this contract,Owner shall provide a written list of any construction defects or deficiencies to Contractor within fifteen(15)days of receipt of notice of completion from Contractor.Contractor shall remedy those deficiencies within fifteen(15)days unless a longer time is reasonably necessary. 13.All materials shall be furnished in accordance with the respective industry tolerance of color variation,thickness,size,finish.texture and performance standards. 14.The Owner shall make no demand for liquidated damages for delays or actual damages for delays In any sum in excess of such amount as may be specifically named in the proposal and no liquidated damages may be assessed against Contractor for delays or causes attributed to other contractors or arising outside of the scope of this Proposal. 15.We specifically exclude lead based paint teaiuuar<ils+'s.disposal.containment and/or mitigation. Initials: Broward County Lee County Manatee County 954.726.2744 239.332.4646 941.727.3437 bandiflorida.com Page 2 of 2 MECHANICAL I SERVICE I ELECiRICAL R PWMBINS • "i .. r +ait05022 I CG-Ct507478 6 3 C o.lier County Collier County AdniintstrativeServices Department After the Fact Form Procure,, n1 Services Dmson Instructions As per section 21 of the Procurement Manual, all purchases shall be consistent and in compliance with the Procurement Ordinance (2017-08). Should work be authorized or purchases made that is inconsistent with County policy, procedure, or contract terms, an After-the-Fact Procurement Form is required. This includes purchases made in advance of a Purchase Order, when a Purchase Order is required to authorize such activity, and purchases made under an expired contract, or for goods and services not covered by the current contract or purchase order. All such `After the Fact Procurements"will be reported to the County Manager. Requester Name:Amanda Condomina Division:Facilities Management Division Director:Miguel Carballo Vendor Name:Carrier Rentals Amount:$6,997.70 Contract#: Purchase Order:4500184920 Why is this deemed a non-compliant purchase? Choose one. Contract Ordinance Manual P-Card Other Details of Purchase: Explain the circumstances behind this purchase. Collier County Facilities Management, following the previous Emergency Purchase Order process, created emergency requisitions for the emergency rental of HVAC air cooled chiller units located at the Central Library. The unit at the location had failed. The requisition was converted to Purchase Orders for the following invoices: 001805402 and 001805707. Action Required: What are you asking to be done to remedy the situation, include list of invoices if applicable? Staff requests payment of $6,997.70 for the attached invoices. CorrectivelPreventive Action: What action is being taken to prevent this violation from re-occurring? Follow section 11.8 of the Procurement Ordinance. Staff has also implemented preventative measures in-house to ensure compliance to all applicable ordinances and policies. The requestor affirms that to the best of their knowledge the information provided in this document is true. CondominaAman s.g,Pd Requested by:Amanda Condomina Signature: da Date 20180 271 Date: Date 201B 06 27 1344.4.3-0400 Division Director: Miguel Carballo Signature: CarballoMiguel rpte''°s'9"Vd°` °�"°""9�0' Date: Date 2018.0E 27 45 03 41-p4'np' 7 Carrier INVOICE R CEIVED 24 INVOICE NO: 001805402 COLLIER COUN i Y. FLORIDA INVOICE DATE: June 13, 2018 RENTAL DUE DATE: July 13, 2018 PAYMENT SYSTEMS I019 JUN 18 PH 12: 32 CUSTOMER NO:TERMS. ICDA 69 NET DEPOT NO: 013 CUSTOMER SHIP TO REMIT TO COLLIER COUNTY BOARD OF COUNTY 650 CENTRAL LIBRARY CARRIER RENTAL SYSTEMS COMMI 35961 EAGLE WAY 3299 TAMIAMI TRAIL 650 CENTRAL AVENUE CHICAGO, IL 60678 NAPLES FL 34112-5746 NAPLES FL 34102 800-586-8336 US SALESPERSON:ROB COX AGREEMENT: C437338 PO NO: 4500184920 DESCRIPTION CHARGE TYPE INV PERIOD QTY DUR U/M PRICE TOTAL AIR COOLED CHILLER RENTAL CHARGE 051618 — 061218 1 1 Periodic 3,498.85 3,498.85 PACKAGE RENTAL SALES LABOR FREIGHT OTHER TAX AMOUNT DUE 3,498.85 3,498.85 0.00 0.00 0.00 4.00 0.00 CURRENCY USD Invoice not paid within terms may be subject to finance charge DUE DATE July 13, 2018 A Division of Carrier Corporation,a United Technologies Company Page: 1 of 1 8 (Carrier) INVOICE INVOICE NO: 001805707 INVOICE DATE: June 18, 2018 DUE DATE: July 18, 2018 RENTAL PAYMENT TERMS: 30 DAYS NET SYSTEMS CUSTOMER.NO: NC11269 DEPOT NO: 013 CUSTOMER ` SHIP TO REMIT TO COLLIER COUNTY BOARD OF COUNTY 650 CENTRAL LIBRARY CARRIER RENTAL SYSTEMS COMMI 35961 EAGLE WAY 3299 TAMIAMI TRAIL 650 CENTRAL AVENUE CHICAGO. IL 60678 NAPLES FL 34112-5746 NAPLES FL 34102 800-586-8336 US SALESPERSON:ROB COX AGREEMENT:C437338 PO NO: 4500184920 DESCRIPTION CHARGE TYPE INV PERIOD QTY DUR U/M PRICE TOTAL AIR COOLED CHILLER RENTAL CHARGE 061318 - 071018 1 1 Periodic 3,498.85 3,498.85 PACKAGE. c> r- m r— L rn Cji c :r2G ,, :i W oR1 D A RENTAL SALES LABOR FREIGHT OTHER TAX AMOUNT DUE 3,498.85 3,498.85 0.00 090 0.00 0,00 0.00 CURRENCY USD Invoice not paid within terms may be subject to finance charge DUE DATE July 18, 2018 A Division of Carrier Corporation,a United Technologies Company Page: 1 of 1 c C O• M OM O CO O O O m to L L o O M O O O O O N N V m C O t0 L O LO aC C N g N M M co M co 6 6 co C V N 7 V C C C L ON G oO 0 0 N 0 0 0 CO N CNC NLw F• m 0 to U • m O t0 O O N O O m N m m CO O y N M N N trc) 4- co M to coo C M Q u 7, c e e e e e e ee e e ° ° ° O O O 8 O O O O r N O O O p O O O O O O O O O O O e m Q Q 0 O 6 O O O O O N O O o• rO O co lo o O O 0 t O V 0 m coW O LO N O m CO rC C O 6 C 0 yN C(J to mV O CI o r o Ooo Oi O) [ co Nv E hr O OON t 4 cV V a ur mm pco rr R N to ,- to to N` to f9 to 6 m C o to to to (0 « N O 0 0 P- F., O O O O OO O mm OO OO OO O O) M in C NOoO CO O O O O O r V O O OL Co oo to co co oo to c-, os to tU NW Y ' co to to oo VO <r O O 5 O o O o t0 O C O O O C C to C O O q O c4 O O p O N T r v O N N c7 W N p N W co o O m 'COI r C E rC ) p O) m v m m 6 C A 6. co W ¢ O OO O g ^ 1. r NjV y 9 b9 N 430t9 to m 679 99 N to O O o N O O co co C coO o O o 0O ON I CD m c ° .3 O (▪ 7, . E ° ` wc Co Y Y d vLL c ' o r N Y 2 OE 2+ cOW 2 t 1 o 0 u E -.0. �L m >. m o 'o N cE• i a°2Eyi °t w0de0 1,E0 m ° um NL y° oE 2 w `� o ❑ c a ' 8 U a AE ❑ c0. °a o 2 w z a Vs CL s e d d c oE 3 3°C v mU w d x C m m ] mo < Ua 5 1- a a to 2 U U a f v 0 E w a c 2 m m m o m ` c - 0 0 E _ °o x c c c 0) 2 L' E« °) Z as c Q v 0 0 c d = .5 0 0 2 iS E E ° m EC s Y o v r, « 2 N ¢ f0 t0 2 $ y m = J w C U n _ m E- w _ ~ w ¢ c L5 m _ 0 16 2 c m c aX.- c a T. m KS am 3o U Eto m c avE, y4 Zc.E L" E"mt a 2.015 mU 3g5 .- E t0) oU d a V m w N co 0 0 m N N H N p c) U,O O) N a 5.`0_ 2m a0g JN w. K o. 0 E° vo m o vm Yo a o ro (7,-,8- aQ' t2o ac mm m 't-iv m9 ES)c oEn E❑` Ja y n o. a L^w a10i> E n WE �a d .5 2 m a y 5- !<- to w� 2 80 mw EE Zr,IT; O N xw 3E 2Ki m .w �a 0 o f `0 a' u 3 w ❑ U U m co co m m m m m m m co m co N N N N N N N N N N N O N dJea N N N N N N N N N N M 0) m t3 t3 t3 - c3 t3 t3 c3 m ^ to q a8uey3 - - - N to 4- to - 4- 4- to M ' N w CO 0 N N CO N N •ON lueJg ao roM m 'No n coo t�'o t� n or /Aelluo3 m M m v _ _ #abed to to 4- N N N N m m C co Wail - N M C to CO r CO O) 5 N CI Co .ounty .1 Procurement Services 1 I Change Order Form ❑Contract Modification ®Work Order Modification ❑Amendment Contract#: 14-6213-98 Change#: 1 Purchase Order#: 4500179824 Project#: 70184.1 Contractor/Firm Name: Haskins, Inc. Contract/Project: PS 312.35 Rehab Zamira Del Toro Engineering and Project Management Project Manager Name: Division Name: Original Contract/Work Order Amount $ 175,550.00 7/8/2014;16010 Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $ 175,550.007/8/2014;16010 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 175,550.00 7/7/2018 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 175,550.00 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 5/30/2018 Original 2/24/2019 Last Approved N/A Revised Date N/A Date Completion Date Date (Includes this change) #of Days Added N/A Select Tasks ❑Add new task(s) ❑ Delete task(s) ❑Change task(s)s( ) ®Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract; and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. The general use of allowance funds for unforeseen conditions is included in the original contract. See attached Work Order Directives for additional detailed explanation. 1. WD#1-This change order is to construct the driveway apron of asphalt material as opposed to grass.County operations requested a more durable asphalt material to reduce maintenance. Also,this change order is to purchase and install 2"Schedule 80 PVC ARV discharge piping into the wetwell. County operations requested that the ARV be piped into the wetwell, as it was not shown in contract documents. WD#2-This change order is to replace the existing pump flushing valve,the existing base elbows and resurface the pump discharge flange face of both wet well pumps. 2. WD#1-The change being requested was not included in the original contract because grass is more pervious.Also,operations staff has noticed cases of previously installed ARVs dripping,when ARV manufacturers are specified to be drip tight. Therefore, piping the ARV discharge pipe into the wetwell was requested by operations staff as a precautionary measure. WD#2-The Engineer of Record was tasked with developing a design to:raise the wet well,the ancillary faciliies on site,and the site; provide new discharge piping to meet the County's new pump station standards; the re-line the wet well; and improve site access. The County also had a limited budget for the design and construction of the project. Additionally, the condition of the existing equipment was unknown to the Engineer of Record, nor were any issues of concern reported to the Engineer of Record by the County.Therefore, replacement of the pumps or base elbows were omitted from the design and contract documents. 3. WD#1- If this modification is not processed, County operations is concerned that the grass material will lead to additional maintenance efforts at MPS 312.35. Also, the ARV discharge pipe should be piped into the wetwell to avoid dripping of raw wastewater exposure to the environment. WD#2-If this modification is not processed: • The pump with the flushing valve will continue to operate inefficiently, which will unnecessarily increase pump run times and power consumption. • The base elbows are at the end of their service life. Replacing the base elbows under a separate future project would require placing the station in bypass again,which would be costly and creates a greater potential for wastewater spills. • If the pump discharge flanges are not resurfaced when the elbows are replaced, then water leaking between two mating flange faces will cause the base elbows to prematurely wear at an accelerated rate. 2 Available Allowance $12,000.00 Work Directive#1 $ 105.00 Work Directive#2 $11.783.86 Total Directives this CO $11.888,86 Remaining Allowance $ 111.14 Prepared by: PU Engineering and Project Management Date: It Ckat.2 (Zamira DelToro,Project Manager) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/wont order indicated above,as fully as tithe same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor t Consultant/ Design Professional arising out of or related to the change set forth herein,including daims for impact and delay costs. 4711,,M. SUM OAS, OVAGGYK .c1r+'RMw* ara.Mme,...u.w+.ss4-.� Accepted by: •".'•'�` 2018-06-19 Date: (Marc Lean,P.E.Project Manager-Stantec) Accepted by: ,,��,, Date: 419/1 L3 (Rya. 1r5La'nee,Estimator-Haskins Inc.) vms Approved by. (2C) f j8 - Date: (Craig Pajer. Principa t"roject Manager-PU Engineering and Project Management) Approved by: r _._ s>•!"- .__.�.-- Date V I f (To elik,P.E.Director-PU Engineering and Project Management) Digitally signed by saraschneeberge saraschneeberger@colliergov.net DN: r@colliergov.net cn=saraschneeberger@colliergov.net Date:2018 07.02 11:07:07-04'00' Approved by: Date: (Sarah Schneeberger,Procurement) Revised:10/28/2014 (Divisions who may require additional signatures may Include on separate sheet_) PROCUR:MEAT use ONLY BCC AdminRPt BCC ES Collier County Engineering &-Project Management Division WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: WORK DIRECTIVE# 1 #14-6213-98 PS312.35 Rehab PURCHASE ORDER#: 4500179824 DATE OF ISSUANCE:December 11,2017 OWNER: Collier County Board of Commissioners PROJECT#: 70184.1 (Wastewater) CONTRACTOR: Haskins Inc. ENGINEER/DESIGN PROFESSIONAL: Stantec You are directed to proceed promptly with the following change(s): Description: To construct the driveway apron of asphalt as opposed to grasspave. Also, to purchase and install 2"Schedule 80 PVC ARV discharge piping into wetwell. Purpose of Work Directive Change: The change being requested was not included in the original contract because grasspave is more cost effective and it was unknown of the County's grasspave maintenance issues during design. Also, operations staff has noticed cases of previously installed ARVs dripping, when ARV manufacturers are specified to be drip tight. Therefore, piping the ARV discharge pipe into the wetwell was requested by operations staff as a precautionary measure. Attachment: PS312.35 CO#1 -Asphalt Drive & ARV Piping Quote. If a claim is made that the above change(s)have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: ❑ Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record ❑ Time &Material D Other ® Other Estimated increase(decrease)in Allowance: Estimated change in Contract Time:None $105.00 Increase or decrease by calendar days. RECOMMENDED: AUTHORIZED: Gy., B : Linds y arten,P. By: Zamira Del Toro, Project Manager-PUEPMD PrQjec Engineer Owner's Representative 12/11/17 11:37 AM Collier County Engineering &4 Project Management Division WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: WORK DIRECTIVE#2 #14-6213-98 PS312.35 Rehab PURCHASE ORDER#: 4500179824 DATE OF ISSUANCE: June 13,2018 OWNER: Collier County Board of Commissioners PROJECT#: 70184.1 (Wastewater) CONTRACTOR: Haskins Inc. ENGINEER/DESIGN PROFESSIONAL: Stantec You are directed to proceed promptly with the following change(s): Description: To avoid any interruptions to existing service,the Contractor's Scope of Work includes bypassing the Pump Station (PS) system while is performing the rehabilitation. Part of PS 312.35 Scope of Work is to inspect and report any deficiencies of the system such as piping, pumps and valves while the system is being bypassed. During the inspection of the pump station system, it the following deficiencies were reported: • The flushing valve is malfunctioning. The valve is supposed to open for approximately 15—20 seconds, beginning when the pump is initially called to run. It was observed that the valve continued to stay open indefinitely, allowing a portion of the flow that should have been pumped out of the wet well to be re- circulated instead. Collier County decided that replacement of the valve is necessary. • After both existing pumps were removed, it was observed that the discharge flange face on each pump was exhibiting signs of leakage between the pump's discharge flange face and the mating base elbow flange face. This is typically caused when the base elbow flange face,the pump discharge flange face,or both have surface defects that interfere with the two mating faces making a proper seal with each other. Collier County has decided that replacement of the base elbows and resurface pumps discharge flange are necessary. Purpose of Work Directive Change: The purpose is that contractor: • Replace the existing pump flushing valve to ensure the proper operation of the PS system after it's placed back in service. If the flushing valve is not replaced, the pump with the existing malfunctioning flushing valve will continue to operate inefficiently, which will unnecessarily increase pump run times and power consumption. • Replace the existing base elbows (Per current Collier County Standards) and resurface each pump's discharge flange face. If the existing base elbows and discharge flange faces on each pump are not replaced and resurfaced, respectively, then the pumps will continue operate inefficiently. Additionally, the base elbows appear to be at the end of their service life. Replacing the base elbows under a separate future project would require placing the station in bypass again, which be costly and creates a greater potential for wastewater spills. If the pump discharge flanges are not resurfaced when the elbows are replaced, then water will continue leaking between two mating flange faces and will cause the base elbows start to prematurely wear at an accelerated rate. Attachment: Haskins Quote. If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: ❑ Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record ❑ Time& Material ❑ Other ® Other Estimated increase (decrease)in Allowance: Estimated change in Contract Time: None $11,783.86 Increase or decrease by 0 calendar days. RECOMMENDED: AUTHORIZED: By: Marc Lean, P.E. By: Zamira Del Toro, Project Manager-PUEPMD Project Engineer Owner's Representative 06/19/18 10:28 AM 6 2 - Procurement Services Seeks—s-&,,�,,.� Change Order Form A.:kr+rxs�baL�rrs S�iakkay Lku�scv� Pr*,,,vto curt ❑Contract Modification ®Work Order Modification ❑Amendment Contract#: 13-6164-CZ Change#: 1 / Purchase Order#: 45-179085 Project#: 195-90073 Contractor/Firm Name: Humiston&Moore Inc. Project Name: Doctors South Jetty Rebuild&Erosion Structure Project Manager Name: Clint Perryman Department: Coastal Zone Management(GMD) Original Contract/Work Order Amount $ 104,626.00 6/27/17 16.Al2 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $ 104,628.00 6/27117 16.Al2 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 104,626.00 SAP Contract Expiration Date(Master) Dollar Amount of this Change 0 00% Total Change from Original Amount Revised Contract/Work Order Total $ 104,626.00 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0,00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 7.7.17 Original 7.7.18 Last Approved 7.7.18 Revised Date 1,3,19 Date Completion Date Date (Includes this change) #of Days Added 180 Select Tasks ❑Add new task(s) ❑Delete task(s) ❑Change task(s) ®Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and I or the additional clays added(if requested); 2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor If needed. 1.)This change order will increase the contractual time duration by an increase of 180 days. The current project completion certification process is contingent upon the completion of the Doctors Pass Dredging Project that is currently being executed under a separate contract by other vendors. The final certification process of both projects combined will be executed as a single complete certification report for the compliance requirements as per the DEP permitting conditions. 2.)The change being requested was not included in the original contract due to unanticipated conflicts with the permitting compliance requirements of dual projects being simultaneously performed by different vendors. The final completion certification process will be a Joint effort incorporating two separate projects. 3.)If this modification is not processed the DEP permitting compliance requirements will not be met according to the stipulated permitting conditions. Prepared by: Date:6-/ • /8 Clint Perryman,CGC,Project Managelv,, Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor I Vendor/Consultant/ Design Professional arising put of or rglated to the change set forth herein,including claims for impact and delay costs. Accepted by: t, Date: 6/19/2018 Steve Foge for Brett Moon/ .E P estde ,Humiston&Moore Engineers Approved by: Date:(n-).D-15 Approved by: I t y' 'v ( ,i Date r,/Z 1 f Si 1,Ga M-"n r ^7 A cortinn Map'ager Amy ' i ors.n,Division Director saraschneeberger "v °Y O �,r n-ne ' �k � Approved by:.lacolliPr rni Pt_ a� �s�,� 63g`a4�oo�9,�t�,. Approved1 �" � t Date: r �\\'‘,".. g r��,- o by: � � +�(�- Procurement Professional Thaddeus L.Cohen,Departmen sad (Divisions who may require additional signatures may include on separate sheet.) Revised:10/28/2014 7 t. , HUMISTON &MOORE ENGINEERS COASTAL 5679STRANDCOURT : c ENGINEERING DESIGN NAPLES,FLORIDA 34110 a r FAX 239 594 2025 AND PERMITTING PHONE 239 594 2021 June 13, 2018 Sent via E-mail MEMORANDUM To: Gary McAlpin, Collier County From: Steve Foge Regarding: Request for Time Extension PO 45-179085 Doctors Pass Rock Jetty HM File No. 24-018/23-065 This memo represents a time extension request for the referenced PO. The post construction survey of the beach south of Doctors Pass (for the dredging project) is anticipated to be conducted in September 2018. This survey will be used in the post- construction report for the referenced project. The report is due within 90 days of the survey date; therefore this time extension request is for 180 days or changing the July 7, 2018 end date to January 3, 2019. HUMISTON &MOORE ENGINEERS Steve Foge Engineer 8 3 Procurement Services Cower County Change Order Form I . LI Contract Modification El Work Order Modification U Amendment -,-L- Contract#, 15-6382-2 Change#: 1 I Purchase Order 4:F500183054 j Project#: 33 ContractortFirm Name: AVCON, Inc Contract/Project: Seaplane Ramp at E vergiades Airpark Ai Project Manager Name: Justin Lobb rport Authority Division Name: Original Contract/Work Order Amount $ 79,212 00 10/13/15 1601 Original BCC Approval Date Agenda Item # Current 8CC Approved Amount $ 79.212 00 Last 8CC Approval Date: Agenda Item # Current Contract/Work Order Amount $ 79,212 00 10/12/2020 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 15,838 00 -: 19 99% Total Change from Original Amount Revised Contract/Work Order Total $ 95,050 001: 19 99% Change from Current 8CC Approved Amount Cumulati.e Chan es $ 15,838 00 ' 19.99% Chan•e from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change -- _ — I 1)/18,19 Last Approved 5/181,19 Revised Date Notice to Proceed 11/14/1 I Original [ 0518/19 1 1,..., Date Completion Date ' Date ____ (Includes this change) #of Days Added N/A Select Tasks E Add new task(s) 1_1 Delete task(s) Li Change task(s) [j Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and I or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed r 1 Add Task 2 Interim Airport Layout Plan(ALP)Update and associated expenses as detailed in the attached scope of work anci detailed below,as required by the Federal Aviation Administration(FAA) i 1 Task 2. intermin ALP Update $14.188 l Expenses $ 1 650 Total Increase , $15.838 2 This task was not initially includein the work order because it had not yet been determined if the FAA would require an update of • ..._. the ALP in this phase of the project 3. If this change order is not processed. the Airport Authority will be unable to comply with FAA requirements or obtain FAA approval of airfield design changes that are being proposed as part of this project Prepared by 'Pre.• Date 6/2 1/2018 Justin Li‘bb Airpr* s/Project Manager,Airport Authority Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance The adjustment.if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs i Accepted by / kz .. ,, ¼ ,, , e' . , . Date ,, / Mapi So9rstrum Senior Project Manager AVCON Approved by 411,..je_______44L __ _ Date 67:25/a. Gene Shue Division Director Growtn Mana ernent Department Approved by Date 4 le Thaddeus Cohen Departmen`.1.1 Cad Growth Management Department saraschneeberger@collie sars'elhnetegbnee[dgebrYpcollierigov net ON:enesaraschneebergenacolhergov.net Approved by rqov.net Date;2018.07 02 11:5532-0400' Date Sara Schneeberger, Procurement Specialist Revised. 10/2812014 (Divisions who may require additional signatures may include on separate sheet i PROCUREMENT USE ONLY r-- BCC Ad.".n BCC ES 9 . , , AVCON, INC. ENG!"ill RS& I'l ANN! Rs 55,55 I Michigan St..Stine 200 June 21, 2018 (Kindo,It. 12X22 :''.779 l'honc:(407)50'i 1112 I",ix(107) 590-I I;1 Via ernaif DebraBrueogemanAcolliergov.net v.10.% 11%.c1)iilth l 0111 Ms Debbie Brueggeman, Operations Coordinator Collier County Airport Authority 2005 Mainsail Drive, Suite 1 Naples. FL 34114 • • Reference Letter Proposal for Additional Services Seaplane Base Focused Environmental Assessment)- Interim ALP Update X01 Everglades Airpark ,•• .•• Dear Ms. Brueggeman: :• In accordance with your request on this subject, AVCON, INC. (AVCON)is pleased to provide this letter proposal for professional services to provide additional planning services for the Seaplane Base Focused Environmental Assessment(EA)at the Everglades Airpark (X01) The additional services would entail the development of an Interim Airport Layout Plan (ALP) Update in accordance with the request made by the Federal Aviation Administration. Specific details on the Scope of Work can be found in Attachment A to this letter AVCON proposes a Lump Sum additional fee of$15,838 With the previous amount of$79,212, the total for this project will now equal $95,050. Specific details for the additional fee can be found as Attachment B to this letter. We will complete this additional work within the 18 months (547 days)from the original Notice to Proceed for this project We appreciate the opportunity to serve Collier County Airport Authority and look forward to supporting you and your staff with this and future assignments, If you should have any questions, please do not hesitate to contact us at your earliest convenience Sincerely, AVCON, INC. ... , ., z., ., ary-S erstrum, AIA, NCARB Senior Project Manager Accepted By Date Cc File ^� �� � �� Scope of Work Interim ALP Update an Airport Data Sheet and an Exhibit A' Airport Property Inventory Map The Runway 15-33 Approach arid Protection Zone Plan will be divided Into two sheets that will show the plan and profiles of the inner portion of the approach surface for Runways 1 5 arid 33 respectiveli TASK A: PROJECT INITIATION, SCOPING, AND MANAGEMENT AVCON will communicate and coordinate with the SPONSOR via telephone, |ettam, fax and email requesting the authority to proceed with the proposed project pending the execution of the Consulting Services Agreement prepared by AVCON. The Consulting Services Agreement will include a detailed scope of work narrative and itemized fee schedule for submission to the SPONSOR and the FAA/FDOT for review and approvalAVCON will coordinate the preparation of the contract with the SP0w8UR'n staff. AVCON will make changes to the scope of work narrative and the fee schedules of the selected proposal Project Initiation Scoping. and Management will include 1 Opening the project inside ofAVCUN'n system and prepare internal financial project initiation forms for the charging of time 2 Preparing an agenda for, aueng/ng and conducting an initial scoping session meeting with the SPONSOR to discuss the major elements of the project. oohedula, and take notes for the development of the scope and fee proposal. 3. Preparing draft man-hour breakdown, scope of work proposal, and fee and transmitting via errai to the SPONSOR for review and approval. 4 Receiving SPONSOR comments and incorporating into the final scope and fee version. 5 Preparing letters of transmittal and distributing copies of the final contract to the SPONSOR and AVCON's executive management for original authorized signatures. Preparing letters of transmittal and distributing to the SPONODR. FOOT, and FAA. as applicable. 6. Transmitting one (1) paper copy of the fully-executed contract to the SPONSOR and one POF version. 7. Preparing and submitting monthly invoices and schedule updates and FOOT reports of progress achievement—unlimited POF copies 8. Preparation and submittal to the SPONSOR of the narrative portion of the FAA Prolect Quarterly Reports TASK B AIRPORT LAYOUT PLAN DRAWING SET An approved Airport Layout Plan serves as the blueprint for future Airport development and is legally required for the Airport to receive financial assistance under the terms of the Airport and , Everglades Airpark 2 AVCON, INCJune 2018 11 Scope of Work Interim ALP Update will include, but not be limited to the physical layout of the Airport and of the physical facilities developed thereon. Also, to be incorporated on the ALP sheet will be the building and facilities data runway protection zones, taxiway systems, navigational aid critical areas, building elevations, topography, roads, and parking areas, and the Airport boundary Object, building and any other obstruction heights will be taken from existing sources of information. Task 8.4 - Part 77 Airport Airspace Drawing - The Airport Airspace Drawing will depict all obstacle clearance surfaces associated with the currently planned ultimate Airport configuration, and approaches will be generated and superimposed on existing aerials. Fifty (50) foot contour intervals will be shown for all sloping imaginary surfaces This sheet will depict objects that violate the obstacle clearance surfaces that have not been identified on the ALP or the inner approach sheets The top elevation of each known obstruction will be identified as will the disposition of the obstruction. The dimensions of the approach surfaces and transitional surfaces will be charted. The Airport Airspace Drawing will depict the full length of all approach surfaces All known obstructions to navigable airspace off-Airport will be identified using the current FAA Digital Obstacle File and the FAA Obstruction Evaluation and Airport Airspace Analysis(OE/AAA) System. Task B.5 - Inner Portion of the Approach Surface Drawings - An Inner Portion of the Approach Surface Drawing will be prepared for each runway end (four runway ends) depicting the area out to where the approach surface reaches a 100-foot height above the runway end. The drawings will depict the Airport property, location of roadways, structures, natural ground elevations, and other man-made or natural features within the limits of inner portion of the approach surface. The drawings will also detail known objects that penetrate approach surfaces or violate obstacle clearance criteria. The drawings will depict the configuration of required safety areas off each runway end. Plan views will be superimposed on aerial photos or a detailed line drawing. Task B 6 - Exhibit 'AAirport Property Inventory Map - This drawing will be prepared in accordance with FAA ARP Standard Operating Procedure No. 3.00, FAA Review of Exhibit "A' Airport Property Inventory Maps, and will depict the existing Airport property boundary, as well as any known proposed future acquisition areas Task 8.8 Narrative Report. Included as part of the Interim ALP that explains in narrative form the changes that have been made to the ALP set. Task 8.9 - QA/QC. An internal Quality Assurance/Quality Control (QA/QC) review will be performed by a senior person on the AVCON staff that has not been previously associated with the project. This review, performed in conjunction with the FAA ARP SOPs 2.00 and 3 00, will ensure that drawing set and narrative report meet the standards of the FAA as well as the desires of the Collier County Airport Authority. Everglades Airpark 4 AVCON, INC June 2018 12 7.15 18 AITACMMEN78 PRQECS5IUNAL.SERV4CES COMPS 4R 1W24 l+Irtvral't1 MsM8v+s E VER121A22€5 A12211155$ AIRPORT L AY 2111 PLAN UP)Ai k 7 -y—�Y T .. :m.....,' 6.',odeNany. 4,...7.04,e'.417 a.7Nne ie +� -'An .i _... i ALL.s. C, ..., ...1. __. 16.667+6,161.61q 56-61 11+6 6 64 66 T.Mn.d 5 P.tottnottatt .4puN.and airottofte. ... r.,:+. L„. qua . U. z t +xsx _ a }v s a.. }.. a r =S 3wi 4'Ta.kA 6} 19} gum, ! ** YIYt y✓ ..9* if t - 61 7 1 14*2 S.y 7Y t.Ltil/ 5Y11M 55555-Rny4nl..ywd.*5.454 t•. ..__._ .p @,Gr.6*4471 *4 +4 tlit r5N 4 f 9 1 44 ÷g' t - i *414 VAC' J_._.._.._e...M...r . a .��.._. to.3+G "" iF `} itl. a Y'3R .+3 6} 4. 9 1 „„ F=.6 i'k.W _, 82.2.... , .__.__- �.... .�... _....- 66_ r1-21--.2 _ ._w :.7w o- w .rs W i r. 44 T _ ' w �, ' .....�__ Si 3'Ywa , w ' >.. .a. 7± ..»-. .v Wn i as. :: lx JO .4.w.._ >%i xi }+.431: 16iis re.-474 b d 4 b..$ t r�r..rty yaa-.Mary MW ._........_ 99 W i t .ar .w x.trn $_ W :c t :di: a FC 1 C 3 Q.... = W 4 Eu4+tl YJ $Y A 44),5 f; tau Odd BC, m. a }t 6*6 ...,,.�. o} ,r , .-..— ;......_._ 0.i t w _..,__. i "."_ .4 4+4_40 i C+K. *.pr.W tta*AA ...__ a i 4,66.6a to t f.Mt " OB} € t 9 n__ • 0.t P 0 _mm 7 i 190 x47 i ttSM y/tldd4 WW1 WAG RU.Ulat* t.. *1 1,000 .1 if 4 4317* �" 44} 31,95 77-a 4 • 4 i - 4 4 4 4 a.. u1` , 4 Qnci ttp.46414 i ..zap w0 t,.-..;... _ _ n _.'x,. a 13 BrueggemanDebra From: system@flonda-aviation-database corn Sent: Friday: June 22, 2018 8 18 AM To BrueggemanDebra Subject: JPM - Change Ode' Airport: Everglades Airpark Project Description: Everglades Airpark Seaplane Base item Segment:441815-1 Contract 4: G0051 Firm Name:AVCON, Inc. Change Order: 1 We have reviewed the above referenced Change Order for the subject project We concur the changes indicated and the change order is approved Approval of this change of der is not a cormnitment for funding above the amount allotted in the Joint Participation Agreement or an extension of the expiration date. Please click the link below to review the project. http://www.flonda-aviation- dabjbase com/Eacilitv/JACIP/default:aspx?settion,:projects&upin-PI-100109468,Jpm,-IF,IJAID:,r1.00001,8 Approved by Wendy Sands h/22!2018 8:17 AM Thank you, IACIP Support Team JPM.5-v1 14 4 Procurement Services C+o ?eY C. aci ty Change Order Form ❑Contract Modification ®Work Order Modification ❑Amendment Contract#:/13.6164(SS) Change#: 2 I Purchase Order#/ 4500182740 Project#: 60143.1 Contractor/Firm Name:JRobau and Associates J Contract/Project: ✓'mmokalee Stormwater Improvement Project Robert Wiley Capital Project Planning,Impact Fees and Project Manager Name: Division Name: Program Management Original Contract/Work Order Amount $ x/103,720.00 2-25-14; 16E5 'Original BCC Approval Date; Agenda Item#1 Current BCC Approved Amount !Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 103,720.00 ISAR Contract Expiration Date(Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 103,720.00 #DIV/01 Change from Current BCC Approved Amount Cumulative Chang__. es $ 0.00 0.00% 1 Change from Current Amount • Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed/11-2-17 Original p3-2-18 1 Last Approved ✓6-30-18 Revised Date 4-28-18 Date 1/C mpletion Date J Date (Includes this change) It of Days Added�g0 Select Tasks ❑Add new task(s) ❑Delete task(s) ®Change task(s) 0 Other(see below) Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(If requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1. This change order will provide additional time for the consultant to perform additional modeling work to address staff concerns Identified after reviewing the deliverables Incorporated into the Immokalee Stormwater Master Plan Update and presenting to the Immokalee CRA. 2, The change being requested was not included in the original contract because the deliverables did not demonstrate a resolution of flooding concerns for a portion of the Immokalee area. Change Order#2 will shift funding from tasks that were not heavily used into Task#3(Project Analysis)as well as provide additional time to complete the expanded modeling.The results will be Incorporated into the Immokalee Stormwater Master Plan Update and presented to the CRA Advisory Board. The consultant has completed the original tasks ahead of schedule and within budget. 3. if this modification for a zero-dollar time extension and shifting of allocated funding is not processed,the work order will expire and the consultant will not be available to develop a resolution of the modeled flooding concerns for the Immokalee Stormwater Master Plan Update, Prepared by: /t u16vro2 ' Date: 6-22-18 Robert Wiley,Prin.Projec anager,Stormwater Mgmt.Section Capital by: Pro ct tanning mpact Fees,and Program Mgmt.Division Prepared ��Jy�. � ) t )� Date: -2. Gerald Kurtz,P.E.,Prin.Project Manages,Stormwater Mgmt.Section C tat Project an I g,Impact Fees,and Program Mgmt.Division t Approved by: -�h-i Dater d`�-1 Amy Patte n,Division Director 40.4 C5 Capital ect Planning,/ inImpact Fees,a d Prog,-m Mgmt.Division Approved by: Date: e Thaddeu71225 ohen,Department Heap Growth Management Department Revised:10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin RP1 BCC Es 15 Acceptance of this Change Order shall constitute a modification to contract/work order Identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall co titu a full and final settlement of any and all claims of the Contractor I Vendor/Consultant I Design Professional arising ou or rel a set forth herein,Including claims for Impact and delay costs. Accepted by: Date: ../14.7. L/6%-.5 d) Emilio an ging Me ber Robau and ssocl s,LLC Approved by: N/A Date: assign Profess!, a =i == ems of Firm,if project applicable) Approve, by: I <t / Date Procurement Services Division Revised:10/28/2014 (Divisions who may require additional signatures may Include on separate sheet.) I PROCUREMENT USE ONLY BCC LAdminRpt BCC Es 16 ROBAU &ASSOCIATES June 20,2018 Mr.Robert Wiley, P.E. Collier County Growth Management Department Stormwater Management Section 2685 South Horseshoe Drive, Ste. 103 Naples,FL 34104 Re: Proposed Change Order-Professional Services Proposal Water Management Planning- Immokalee Stormwater Improvement Program Scenarios Collier County Professional Services: Architectural and Engineering Stormwater Study, Planning and/or Design#13-6164 Robert, Please find below our recommendations on how to shift money from project tasks that were not fully utilized to project tasks that require additional effort,and associated fees to fulfill you objectives of further developing solutions to the Madison area flooding by developing a bypass channel around the Immokalee airport. We will also be able to update the Madison area project write up to include not only the water quality benefits, but hopefully include downstream improvements to reduce flooding and associated costs represented in an updated opinion of probable cost. The work is iterative as you know and it takes time modifying the model,and running different scenarios. /Task 01 General Consultation and Coordination. Currently budgeted at$10,736. We recommend V shifting$3,000 to Task 03 Project and Subproject Analysis. This leaves some of the budget for meetings and consultations. //Task 02 Existing Conditions LOS Analysis. This task is not affected by this change order request. /Task 03 Project and Subproject Analysis. This task is the recipient of a$17,060 additional budget allocation from other tasks as outlined herein. /`1"ask 04 Harvey Harper Water Quality Analysis. Currently budgeted at$21,964. We recommend shifting ✓ $4,000 to Task 03 Project and Subproject Analysis. This leaves some of the budget for any additional modifications needed to the Harvey Harper Calculations. We don't believe there are any modifcations /needed,but left some money in the budget just in case. Task 05 Opinions of Probable Cost. This task is not affected by this change order request, f-V-. Task 06 Tech Support of Stormwater Master Plan. Currently budgeted at$9060.00. The task has not been utilized to date. We recommend shifting$9060 to Task 03 Project and Subproject Analysis. Task 07 Reimbursable Expenses. Currently budgeted at$2,200. We recommend shifting$1,000 to task 03 Project and Subproject Analysis. Rohau and Associates,LLC 2770 Horseshoe Drive S.Suite 7• Naples,FL 34104•(239)206-8000 CIVIL ENGINEERING—PROJECT MANAGEMENT—PERMITTING-CONSULTING 17 ce* ROBAIJ &ASSOCIATES In summary,the above change order with no net change in the overall contract will allow us to run additional scenarios for primarily the Madison area project, and also tweak other scenarios we have run, or new scenarios you desire to review with the limits of scope generally set forth in the time and material fees. We will update the Madison area report. However,the proposed budget shifts will not include updating other reports on projects and subprojects. We think the money is better spent running the scenarios and summarizing them by a three or four page summary of results showing inundation maps in the before and after scenario and also showing a summary of what changed in excel spreadsheet format. The updated budget for task 03 is$17,060. We plan to run the scenarios in house and utilize Lago Consulting and Services to create the flooding maps out of the GIS database. Please also accept a request for an additional 90 days to run alternative and new scenarios and allow time for reviews and follow-up meetings. I have left a small amount of money in task 01 and task 05 as noted above. If you have any questions or need additional information,please feel free to contact me. Sincerely, Coco� Reda* Emilio J. Robau,P.E. President, Managing Member Robau and Associates,LLC 000 • , 000 - OH t, 00000 (} , 060 0 , 1 , 000 • 00 -I" + I1 u Page 2 of 2 Hshared\p\017-00-017 immokalee stormwater projects\psa\change orders\change order docx 1 8 5 PrncurennentServ�wa Co ler County Change Order Form Contract Modification El Work Order Modification []Amendment Contract#: 17-716* v/ Change#: 6 / Purchase Order#: 4500179317 Project#: 8020612 Contractor/Firm Name: Harinula Landscaping and Irrigation Contract/Project: Collier Boulevard Landscape and Irrigation Installation Protect(US41 to Marino Cir,) Katherine ChacherePLA Project Manager Name: Division Name: Road Maintenance Original Contract/Work Order Amount $ 1.087.5Q0.21~ 7/11/17 11 D^ nal BCC ApprovaDate; Agenda Item # Current BCC Appro.ed Amount 1.120.312.51' 6/12/18 Last BCC Approval Date. Agenda Item # Current Contract/Work Order Amount $ 1.120.31251 1"1"' "-u/ -- /SAP Contract Expiration Date (Master)as�(Master) Dollar Amount of this Change � 0.00 3.01% Total Change from Original Amount Reised Contract/Work Order Total $ 1.12O.31251 ' 0.00% Change from Current BCC Approved Amount Cumulative Changes 32,722.30\ 0.00% Change from Current Amount Cwnp|e�nnDa�. o=schpNonufthe Taok(s)Change.and Rationale for the Change Notice muProceed 7-24-17 Original 12'21'17 Last Approved 7'31-18 Revised Date 8'5-18 w- Date Completion Date Date (Includes this change) 5 ~� #of Days Added - Select Tasks OAdd new task(s) Delete task(s) Change tasW ) OOther(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested); 2.)why this change was not included in the original contract;and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed A. Days added for FPL delays (5): 1) The additional days are requested due to the need to install a new meter by FPL for irrigation controller C for the project. FPL was contracted to install a handhole, riser, and transformer at this locationFPL installed the all of these Items in May 2018, but added a defective meter that requires a replacement. Collier County staff is working with FPL to add the new meter at this location, but the installation will take an additional three (3) business days per FPL staff. This event includes a weekend, so the total days added is five (5). 2) The additional days were not included in the oriinal contract because these power issues were not apparent at the beginning of the pjectThe irrigation will not function without power and the landscape contractor cannot install the plantings without irrigation. / 3) Without thii oUihcaton, the contractor may not be able to complete the project on time. Prepared - ).� ` Date. � A\- ' mument4C»acxere. PLA, Project Manager Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to allU`ooano terms and conditions as contained in the contract/work order indicated above. as fully as if the same were staled in this acceptance, The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs. Ac:eptauuy: / Date: Ua�Hannu|o. Hannu�Landscaping and|nigaUon ^ ' Approved by: . w' Date. 4^ .^4719 Mi :el A. McGee, RLA, Associates Revised 10/28/ 014 (Divisions who may require additional signatures may include on separate sheet) PROCUREMENT USE ONLY BCC ^omi" Rpt BCC ES ^ -- <,- 19 . ' (-r----p . l PP by ._.._ 1 � � Date: ��/:2>/A roved rJot Delate, X,Principal Project Manager,Growth Management Department Approved by �L-n- -�' , ,, _..�.�_-``t Date:4` ,.L !� , P mels Lulich, PLA, Landscape Manager, Growth Management Department t' 4 11111 s�� Approved by: Date: �! '�� Travis D. Gossard, Sr., Road Maintenance Director, Growth Management Department ,fit-C'3 J Approved by: + ..Y y Date �` Thaddeus Cohe ', Department Head, Growth Management Department sa rasch neeberge Digitally signed by sarasshneeberger@kolliergoy.net DN:cn=saraschneeberger@colliergov.net r@colliergov.net Date 2018.07.0215:0814-04'00' Approved bY.._._.___...__. ,� _ Date Sara Schneeberger, Procurement Strategist, Procurement Services Division Revised 10/28/2014 (Divisions who may require additional signatures may include on separate sheet) _PROCUREMENT USE ONLY Admin 1 Rim BCC ES 20 ChachereKatherine From: Parrish, Brandon <Brandon,Parnsh@folcom> Sent: Friday, June 22, 2018 8:05 AM To: ChachereKatherine Cc: LulichPamela Subject: RE: Meter check A ticket was put in for our meter shop to replace the meter.Typically this gets taken care of within 1-3 business days. Thank you, 13riindiin Parrish Associate Engineer Florida Power & Light 4105 15Ave SW. i Naples. FL 34116 Office: (239) 353-6085 Brandon.Parrish a fpLcorn Visit the new FPL Project Portal at FPL.com construction to manage your FPL Residential and Commercial construction projects. Get information on construction services and project types,apply for your construction project,track project milestones, manage your project team and more. From: ChachereKatherine [mailto:Katherine.Chachere@colliercountyfi.gov] Sent: Friday, June 22, 2018 7:57 AM To: Parrish, Brandon Cc: LulichPamela Subject: Meter check CAUTION-EXTERNAL EMAIL Brandon, What is the time frame for getting a crew out to check the meter at 9119 Collier Blvd? We are nearing our project completion date and our timeline is getting shorter every day! Thank you, Katherine Chachere, PLA Project Manager fr Co ie County r Road Maintenance Division Exceeding Expectations Everyday 1 21 2885 Horseshoe Drive South,Naples Florida 34104 Phone:239.252,8924 Fax:239,774.6406 — — . Under Florida Law, e-mail addresses are public records If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity Instead, contact this office by telephone or in writing 2 Procurement Services ci " � �� Change Order Form 6 ❑Contract Modification ❑Work Order Modification ❑Amendment Contract#: 14-6213 Change#: 1 Purchase Order#: 4500180032 Project#: 70166.6 Contractor/Firm Name: Haskins Contract/Project: IQ Meter Replacement Project-Phase 5 Project Manager Name: John Eick Division Name: PUD-EPMD Original Contract/Work Order Amount $ 44,985.00 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount ,41 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 44,985.00 7/7/2020 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 44,985.00 0.00%, Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 10/31/17 Original 4/29/18 Last Approved 4/29/18 Revised Date Date Completion Date Date (Includes this change) #of Days Added 0 Select Tasks ❑Add new task(s) ❑ Delete task(s) ❑Change task(s) ❑ Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract; and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. This is a zero dollar change request which will enable the Contractor to invoice$2,515.16 of the Owner Directed Allowance established on the project.The current amount in the Allowance is$5,000. The effect of this change will be to reduce the Allowance to $2,484.84. 1. Detailed Description of the Changes—The reason for the change is to compensate Contractor for additional time spent in properly locating the IQ line in Glades to be equipped with a new meter. 2. Why Was This Change Not Included in the Original Contract?—The area in question contains a variety of utility lines, including two IQ mains, a force main and private irrigation lines. There was confusion as to the location of the correct IQ line to be tapped. As-build drawings and field locates were not definitive as to the location. No exploratory excavations were performed during the design phase because it would have been more costly than taking some extra time immediately prior to construction as was done in this case. To account for these uncertainties, an Owner-Directed Allowance was established. 3. Describe the Impact if this Change is Not Processed—Without the exploratory excavations,the Contractor would have risked cutting into the wrong pipeline and causing a sanitary sewer overflow into nearby surface waters. Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin Rpf BCC ES 23 Prepared bL PU Engineering and Project Management Dale: /is-- • n - , Project Manager) Acceptance of his Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same wore slated in this acceptance The adjustment,if any,to the Contract shall constitute full sod final sett/emote of any and all claims of the Contractor!Vendor/Consultant/ Design Profosslonal arising out of or related to the change set forth herein,including claims for impact and delay costs. p. Accepted by: It" (Con •r- arne-FOTO Date:144 g Approved by: Date._6,/i‘j/ (Design Poll ;ign:to Name_Firm A —Tirinlec 1111F Approved by: Date: A (Craig Pajer,P P .`• Manager PU Engineering and Project Management) Date: Approved by: / Etvradii (Tom Chmel , *. •.7or PU Engineering and Project Management) Digitally signed by saras hneeberge saraschneeberger@colliergov.net D N: r@colliergov.net Z:=.0n7e.eold3eire2Ticoollo4ietg000tt.net Approved by: Date: (CaLaigalcwir•OporadonsManager,Procurement Services Dh4sion) Sara Schneeberger Revised:10/28/2014 (Divisions who may reciutre additional alonalures may Include on separate sheet.) .11t0e91101._c1.11.9**Y Adirle I la I meta Procurement Services 7 4hieo Coil t4tity Change Order Form E Contract Modification 0 Work Order Modification 0 Amendment Contract#: 17-7170 Change#: 01 Purchase Order#: 4500182455 Project#: 61001 Contractor/Firm Name: Haskins Inc Contract/Project: Tree Farm Rd phase 2 Christopher WoodrumTransportation Engineering Project Manager Name: Division Name: Original Contract/Work Order Amount $ 2,421,251.40 2,421,251,40 Original BCC Approval Date; Agenda Item #' Current BCC Approved Amount Current Contract/Work Order Amount Dollar Amount of this Change r $$ 22:442211:225511.44(301 11/26/17; 11C Last BCC Approval Date; Agenda Item# $ 0 00 1/11/2019 SAP Contract Expiration Date(Master) 0,00% Total Change from Original Amount Revised Contract/Work Order Total $ 2,421,251.40 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0,00 000% Change from Current Amount i Completion Date,Description of the Task(s)Change,and Rationale for the Change ,./ / Notice to Proceed 1/16/2018 Original 1/11/2019 Last Approved 1/1 1/201 9 Revised Date 1/13/2019 Date %C/ompletion Date Date (Includes this change) #of Days Added 2 Select Tasks C Add new task(s) 0 Delete task(s) 04$ Change task(s) 0 Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and I or the additional days added(if requested); 2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed This zero-dollar change order will reduce the Roadway Allowance by a total of$1,281. Reductions to the allowance include a new line item, "526-1-2B Brick Pavers, Architectural" and an increase in the quantity of line item, "285-709 Base (10" Lime rock". However, increases to the allowance will come by deleting two line items, "400-1 Class 1 Concrete" and "523-1 Patterned/Textured Concrete (Collier County Pattern and Color)." Additional increases in the quantities of"430-175-230 Pipe Culvert 24" x 38" RCP", 430-175-124 Pipe Culvert 24" RCP", and "425-2-4 Manhole/Junction Box (P-7)" are also necessary. Two days will be added for county holidays - (Memorial Day and President's Day). „ Addition of 272 SY Brick Pavers, Architectural (80 mm thickness), (NEW Item No. 526-1-2B) 272 SY at $97.75 per SY = $26,588 Addition of 272 SY of Base (10" Lime rock), (Item No. 285-709) 272 SY at $10 per SY = $2,720 Deletion of 45.3 CY of Class 1 Concrete (Item No. 400-1) 45.3 CY at $640,00 per CY = ( $28,992,00) Deletion of 285 SY of Patterned/Textured Concrete (Collier County Pattern and Color), (Item No. 523-1) 285 SY at $60.00 per SY = ($17,100.00) 1.) County Landscape Operations requested a plan change adding brick pavers (with necessary base material) in lieu of stamped and colored concrete called for in the contract plans.. This change to contract plans will be more aesthetically pleasing and require less maintenance. 2.) The use of brick pavers is an improvement over the original design. It provides a better appearance, requires less maintainence and the uniform and maintainable surface is more practical for landscape operations. 3.) If this change is not processed, the county would not realize a cost savings and would incur more maintenance time and expense. Revised. 10/28/2014 (Divisions who may require additional signatures may include on separate sheet) PROCUREMENT USE ONLY TI Admin B-- --FTSC—C—E; RiDt 25 Addition of 12 LF of Pipe Culvert, 24" x 38" RCP (Item No. 430-175-230) (12 LF at $175.00 per LF = $2,100.00). Addition of 100 LF of Pipe Culvert, 24" RCP (Item No. 430-175-124) (100 LF at $115.00 per LF = $11, 500.00) Addition of 1 EA of Manhole/Junction Box (P-7), (Item No. 425-2-4) (1 EA at $4,465.00 = $4,465.00) 1.) The quantities of pipe on the plans were estimates and field conditions required additional pipe and an additional junction box. 2.) As -built plans by the developer did not convey field conditions. 3.) If the change is not processed, the drainage system could not be completed. SUMMARY OF CHANGE ORDER ROADWAY ALLOWANCE(INCREASES Total AND DECREASES) Proposed Proposed Revised Revised Unit of Unit Original Quantity Quantity Total Quantity Revised Items Measure Cost Quantity Change Cost Quantity Cost 526-1-2B PAVERS, ARCHITECTURAL(80 mm) SY $97.75 0 272 $26,588.00 272 $26,588.00 285-709 BASE(10" LIMEROCK) SY $10.00 15,471 272 $2,720.00 15,743 $157,430.00 ' 400-1 CLASS 1 CONCRETE CY $640.00 ( 112 (45.3) ($28,992.00) 66.7 $42,688.00 523-1 PATTERNED/TEXTURED CONCRETE SF $60.00 285 (285) ($17,100.00) 0 $0.00 430-175-230 PIPE CULVERT(24"x 38" ERCP) LF $175.00 82 12 $2,100.00 94 $16,450.00 430-175-124 PIPE CULVERT(24" RCP) I IF $115.00 2,029 100 $11,500.00 2,129 $244,835.00 425-2-4 ( MANHOLE/JUNCTION BOX(P-7) EA $4,465.00 4 1 $4,465.00 5 $22,325.00 Total Additions $1,281.00 Original Allowance- ROADWAY ALLOWANCE $150,000.00 Previous CO Increases/Decreases $0.00 Increase/Decrease This Change ($1,281.00) Total Revised Allowance $148,719.00 Revised:10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY BCC Admin BCC ES 26 , , / / - Prepared by: Date: ' (Projec(Manager, * .• Woodrum,Sr.Inspector.Transportation Engineering) Acceptance of this Change Order shell constitute a mod to contract/work order identified above and will be subject ball the same terms and conditions as contained in the contract/work order indicated above,as fully eel the same were stated in this acceptance. The adjustment.if any,to the Contract shell constitute a full and final settlement of any and all claims of the Contractor I Vendor I Cons / Design Professional arising out of or related to the change set forth herein,Including claims for impact and delay costs. 0/ II. * Accepted by: k li'lak. f i Date:ifili t j Le (Ryan ,44.2* , =•"` • ,Raskin Inc) - - , -- Approved by: —5 ' *1:04r/ Date: (Steve Ritter,Road Construction Manager,Cdlier County Transportation Engineering Division) APPrnv.d bif Dee .2i,p : (Jay Ahmed,P E. lyrector, • - County Tranuportarion Engineering Divon) ' r A 01 Approved by: i i 40, 0 vie Gi i• Li ." , (Thaddeus 1.Cohen.Department z.,..d, Collier County Growth Management Department) 4 — Digitally signed by saraschneeberge saraschneeberger@colhergov net DN Approved by:r@COI lie rgov.netcn=saraschneeberigiez.lcool_nlie;gonoiv net Data: (Gaterine-SigeieverProorire;;1!;1671 ,Procurement SWIM'S Division) Sara Schneeberger,Procurement Strategist Revised:10/2812014 (Divisions who may require additional sionatures may include on separate street.) erroouitatewouse ota.v .. ICC /dumb DOC U Skle 1 27 ;-leavy Construction Servings W Florida for over 3l years .skins Inc. 10956 Enterprise Ave. Bonita Springs, FL 341.3: Ph 239-947-1846 Fox.239-947-3857 Water,Se vvef Drainage,Excavation Proposal Date: 6/6/2018 Bed Title: Tree Farm Rd.Phase 2 Submitted To: Collier County Project Location: Naples,FL Engineer: CH2MHIU. Plan Date: Contact: Estimated Item Description Unit Quantity Unit Price Total Tree Form Rd.Phase 2 change order adder I 180MM Architectual Brick Pavers SY 1 272 $ 97.75 $ 26,588.00 Subtotal $ 26,588.00 Stipulations; Exclusions: The Items listed below ere excluded from this quote unless toectfiallty called out In the OM Items above. Bond Is not Included(Add 2%if hood is required) Accepted: By: Haskins Inc. Date: Uate: 288 Procurement Services co 7E1' Comity Procurement Order Form ❑Contract Modification III Work Order Modification 0 Amendment Contract#: 13-6164 Change#: 1 Purchase Order#:' 4500167126 Project#: 70050 6 Contractor/Firm Name: Tetra Tech,Inc Contract/Project: Heritage Bay MPS—Construction Engineering and inspection Services Project Manager Name: Wayne Karlovich Division Name: PUD-Engineering and Project Management Original Contract/Work Order Amount $ 75,852.00 NA Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $ 75,852.00 NA Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 75,852.00 3/8/2019 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 75,852.00 0.00% Change from Current BCC Approved Amount Cumulative Changes _ $ 0.00 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 10/12/2016 Original 10/12/17 Last Approved 7/7/2018 Revised Date 11/4/2018 Date Completion Date Date (Includes this change) #of Days Added 120 Select Tasks 0 Add new task(s) 0 Delete task(s) 0 Change task(s) ®Other(see below) Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and I or the additional days added(if requested); 2.)why this change was not Included In the original contract;and,3.) describe the Impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1 This change order will extend the completion date of this construction engineering and inspection work order by 120 days so that it aligns with the completion schedule for the construction project 2 This additional time was not included in the original work order because it was not anticipated that the construction project would be delayed due to Florida Power and Light's schedule to provide power to the site 3 If this modification is not processed,the engineer providing inspection services for the project will not be able to provide services through final completion of the project This includes inspection and monitoring to verify that the work is completed in accordance with the contract documents Prepared by 1,1Wayne Karlovich, PUD-EPMD Date 6/14/18 (Project Mena er Name and Division) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance The adjustment,if any,to the Contracjsflall constitute a full and final settlement of any and all claims of the Contractor/Vendor I Consultant/ Design Professional arising o f•ar related to the change set forth herein,including claims for impact and delay costs. Accepted by: i Tetra Tick Inc. Date. & 11,57 r (Contra joipTI V)ii dor/Consultant/Design Professional and Name of Firm,if project applicable) Approved by: 41.' LC—WA Date _ (Design Professional and Name of Firm,if project applicable) saraschneeberger@°;'°;",a':°;;,,"_,,,,r,,,,., Approved by: eollicrgov.net �We „�,,„e,y.,. Date (Procurement Professional) Revised 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Adnin � BCC Es 29 Procurement Services 9 ? ... ty Change Order Form ®Contract Modification ®Work Order Modification El Amendment Contract#: 16-6652 L. Change#: 11111111 Purchase Order#: 4500174518 Project#: 70142.1 Contractor/Firm Name: BLDM USA LLC Contract/Project: \MN Basin 306 Duplex Pump Stations-Group 1 / / Project Manager Name John Eick Division Name: PUD-Engineering and Project Managent V Original Contract/Work Order Amount $ 2,013,000.00/ 9/13/16/11G/ Original BCC Approval Date;Agenda Item # Current BCC Approved Amount $ 2,013,000.00/ 9/13/16/11G/ Last BCC Approval Date;Agenda Item # Current ContractAAiork Order Amount $ 2,013,000.00/ 6/17/2018 SAP Contract Expiration Date(Master) Dollar Amount of this Change $ (53,710.20),/ -2.679V Total Change from Original Amount Revised Contract/Work Order Total $ 1,959)289.80/ -2.67%7 Change from Current BCC Approved Amount Cumulative Changes $ (53,710.20) -2.67o`41 Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change / Notice to Proceed 12/12/16 Original Last Approved 6/17/18 Revised Date 6/17/18 v Date Completion Date Date (Includes this change) #of Days Added 0 /Select Tasks ❑Add new task(s) ❑ Delete task(s) ❑Change task(s) ®Other(see below) Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract;and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Summary The project includes the complete rehabilitation of nine individual wastewater pump stations in residential neighborhoods while providing uninterrupted wastewater service and maintaining vehicular and pedestrian traffic. This is a contract close-out,zero dollar change request that includes work directives and contractor time and material estimates for various increases and decreases in the scope of the work. Funds are moved from the two allowances in the contract to cover the changes. The changes outlined in this document result in net decreases to the contract allowances as follows: Status of Owner-Directed Allowance Status of Landscape Allowance Original Balance $100,000.00! Original Balance $50,000.00„ Previous Draws from Allowance $ 24,356.80 ) Previous Draws from Allowance 0 Current Balance $ 75,643.20) Current Balance $50,000.00 Cost of these Changes $ 61,354.05 v, Cost of these Changes - $10,578.95 v; Unused Allowance Balance $ 14,289.15 , Unused Allowance Balance $39,421.05 , The unused allowance balances,which total$53,710.20,will be subtracted from the contract/work order amount, resulting in a final cost 2.7 percent less than the original contract/work order amount. Chanes Covered b°Owner-Directed Allowance Affected Change Reference No. Pump Description of Change Amount Station(s) $ 1-A 306.03 Drivewa modifications re.uired b SDPi comments 4,778.13 1-B 306.02 Additional 20 feet of 4 foot high chain link fence 933.45 1-C 303.04 Increase in size of foundation for diesel pump 2,823.93 1-D 303.04 Increase fence hei•ht from 6'to 8' 2,144.10 1-E 306.02 Eliminate earthern berm-Credit -308.70 1-GF 303.01 Provide fence around .urn. station 5,407.20 1-K All Material costs for sur.lus/unreturnable ex tension'oints 5,984.80 1-L All Re.lace electric meter boxes 3,902.01 1-M All Deletion of se•arate, external RTU boxes-Credit -6,512.20 Continuation of Table—Changes C 5nd by Owner-Directed Allowance Affected Change Reference No. Pump Description of Change Amount Station(s) ($) 1-N 303.07 Cosmetic damage to electrical enclosure-Credit -825.00 / 1-0 303.04,306.02,.03, .04 Conduit changes from FPL to meter can(1-4"conduit). 6,482.39 1-P 303.04 Reroute underground electric to new point of connection 3,432.96 , 1-R All Eliminate electrical handholes-Credit -3,884.02 7 1-T All Service disconnect switches to be breaker type 5,207.01 1-11 All Change conduit materials between wet well and electrical panel 16,055.61 / 1-W 303.01 and 303.02 Extend electrical grounding systems for future fences 5,437.40 1-X 303.02 Increase size and cross section of retaining curb 8,111.91 1-Z 303.01,303.02 Change GrassPave2 to Gravel for pump station sites-Credit -1,974.13 / 1-AA 303.04 _ Add stilling well to wet well for pressure transducer 4,157.20 f Net Total $61,354.05 Changes Covered by Landscape Allowance Affected Change Reference No. Pump Description of Change Amount Station(s) ($) 1-F 303.07 Landscape around pump station 4,868.30 ✓ 1-GL 303.01 Landscape around pump station 5,710.65 ✓ Net Total 10,578.95 Detailed Discussion of Change Orders Covered by Owner-Directed Allowance For each individual change below,three key issues are addressed: 1. Provide a detailed and specific explanation/rationale for the requested changes. 2. Why was this change not included in the original contract? 3. Describe the impact if these changes are not processed. 1-A--Driveway Modifications at PS 306.03 required by SDPi comments $4,778.13 / 1. The project bid period ran concurrent with the Site Development Plan-Insubstantial Change(SDPi)review. Comments from this review directed that changes be made in the driveway design,including upsizing a culvert under the driveway. 2. The original design assumed a replacement in kind with no upgrades,and would have functioned well. The GMD review comments, received after bids were received, were based upon bringing the installation up to current County standards. 3. Failure to resolve all SDPi comments would have resulted in a project out of compliance with applicable regulations. 1-B—Additional 20 feet of 4-foot high chain link fence at PS 306.02 $933.45 i 1. The design plans called for relocation of the owner's private gate about 20 feet up into its driveway. When the gate was relocated, an opening in the perimeter security of the site was created. The owner requested that additional fencing be provided to close the opening. 2. The approach on this project was to set aside allowances to cover post construction fencing and landscaping rather than to design every such detail ahead of time. Dealing with this after completion of the pump station enabled us to evaluate this"on the ground" with the property owner and tailor a solution, rather than making an educated guess in advance of construction. 3. Failure to fill in this gap in the fence created by the County's project would diminish the value and security of this citizen's property. 1-C--Increase in size of foundation for diesel pump at PS 303.04 $2,823.937 1. The pump foundation detail in the design drawings showed dimensions of 12'X 6' (72 sf)as shown in Utility Standards Manual Detail WW-7B. This area would have been too small to accomodate the diesel pump and provide sufficient maintenance area around the pump. The dimensions for the pad were not shown on the plan view.The as-built dimensions are 15.25'X 8.5' (130 sf) providing the necessary space around the pump. This change compensates Contractor for the additional 58 sf of concrete foundation. 2. The 12'X 6'dimensions shown on the design drawings were based upon a County standard detail that should be reevaluated, 3. If this change is not approved,the foundation of the diesel pump will be inadequate for its intended purpose. __ajV \ k 2 Nf. 31 1-D--Increase fence height from 6'to 8'at PS 303.04 $2,144.10+7 1. The perimeter fence height was increased from 6'to 8' in order to better screen an elevated diesel pump in a residential neighborhood. 2. The original design included the County's standard 6' high fence. However,once it became clear that the diesel pump would extend well above the 6'fence,a work directive was issued extending the fence 2' higher. 3. With the standard 6' fence,much of the diesel pump would be visible over the fence, and this would detract from the aesthetics of this residential neighborhood. 1-E--Eliminate earthern berm at 306.02 Credit of$308.70__✓ 1. The project bid period ran concurrent with the SDPi review. Comments from this review directed that the small earthen berm around the pump station should be removed to promote sheet flow of drainage towards the street. 2. The original design incorporated Collier County's utility standard of a small berm to contain a minor wastewater spill on the site. Offsite stormwater would have flowed around the outside of the berm to the street. The stormwater reviewer at GMD preferred a more direct route for the flow of storm drainage. 3. Failure to resolve all SDPi comments would have resulted in a project out of compliance with applicable regulations. 1-GF—Provide fence around PS 303.01 $5,407.207 1. The bid documents did not include a fence around this pump station. Once vegetation was cleared and the new pump station components were constructed, local residents raised concerns about the visual appearance of the equipment. A fence was proposed as a means of screening the equipment from view. 2. The original design did not include a fence,since a pump station had existed on this site for 25 years without a fence,and it was felt that it could be an unwanted feature in the neighborhood. This turned out not to be the case. 3. If a fence is not constructed, residents will continue to be concerned with the visual impact of the upgraded pump station. 1-K—Material costs for surplus/unreturnable flanged expansion joints $5,984.80/ 1. The Contractor incurred additional costs because the original flanged expansion joints that it ordered were not compatible with the discharge piping at the pump stations. The bolt pattern in the flanges did not properly align. 2. An error by the design engineer resulted in the Contractor ordering the incorrect materials. The flanged expansion joints were specified incorrectly and the mistake was further compounded in the submittal review process. The design firm has agreed to pay the cost of this change order by means of a deduction in a future invoice. 3. The incorrect flanged expansion joints are incompatible with the discharge piping at these pump stations,so the project could not be constructed if the correct materials were not substituted. 1-L--Replace electric meter boxes $3,902.01/ 1. During construction,the existing electric meter boxes were inspected. Inspection revealed the interiors to be badly corroded. The design engineer and the Wastewater Power Systems Section recommended the replacement of all of the electrical mete boxes. 2. Only when the power was disconnected at the pole by FPL to allow the construction work was it safe to open the meter boxes to inspect their condition. It was not possible to open and inspect these boxes during the design phase. 3. If the aging meter boxes are not replaced,some will likely fail within the next 10 years, interrupting power to the pump stations and requiring expensive emergency repairs. 1-M—Delete separate,external remote telemetry unit(RTU)boxes Credit of$6,512.20/ 1. RTU's facilitate communications between the the pump stations and the County's SCADA system. During design,the RTU vendor _.. advised the design engineer to place the RTUs in separate boxes to maintain the warranty.Only a few of our pump stations have RTUs located external to the control boxes. Eventually, Data Flow Systems withdrew its recommendation that the RTUs be in a separate box. By this time the project had been bid, so the County should receive a credit for elimination of the separate boxes. 2. The design engineer accepted Data Flow System's initial recommendation in good faith and the project was awarded with separate RTU enclosures. It was only after this issue was reevaluated within Data Flow and the County that a more practical and less expensive solution was developed. 3. If this change is not processed,the County will have paid for an item it did not receive. , 32 1-N—Cosmetic damage to electrical enclosure at PS 303.07 Credit of$825.00 1. The electrical enclosure at PS 303.07 had a slight dent in the sheet metal when it was delivered to the site. While the functionality was not impaired,the County should be able to expect no defects,even cosmetic defects. The Contractor was given a choice, either replace the electrical enclosure or leave it in place but we would not pay for it. The Contractor choose the latter. The Contractor has been paid for the enclosure in the normal course of progress payments,so it is appropriate that a credit to the County be issued. 2. Not applicable. 3. If this credit is not processed,the County will be paying for merchandise that falls short of our standards,even though the shortcoming is cosmetic. 1-0—Conduit changes to accomodate meter boxes at PSs 303.04,306.02,306.03 and 306.04 $6,482.39/ 1. The new meter boxes(Change 1-L)could only accommodate 4-inch conduit rather than the 2-inch conduits that had existed at these four sites. 2. Since the replacement of the meter boxes could not be foreseen without interrupting electrical service(See Change 1-L,above) the need for 4-inch conduits for the replacement boxes could not be foreseen either. 3. The new meter boxes will not accommodate 2-inch conduits, so the installation would not comply with the National Electrical Code. 1-P—Reroute underground electric to new point of connection at PS 303.04 $3,432.96✓ 1. The design drawings showed power being fed to this pump station from a pole on Weeks Avenue. When FPL installed a new hand hole to accommodate this project,it was installed on a pole on Pine Street. As a result, significantly more conduit had to be installed by the Contractor 2. FPL decided which pole would serve this pump station after the design was completed and the project was bid. Neither the design engineer nor the County had control over this issue and had to accommodate FPL's decision on how best to provide power to the pump station. 3. Failure to process this change order would mean that there would be no electricity to power the pump station. 1-R Eliminate electrical hand holes from the project Credit of$3,884.02/ 1. The design drawings showed electrical hand holes on each pump station site. The intent was to provide a splice point for the conduit and conductors. FPL hand holes were already located at the base of the poles providing power to the respective pump stations. The Contractor suggested that the new conductor be brought from the base of the poles to the pump station control panel without any splices and that the conduit could be joined with couplers, less expensive than the hand holes. 2. The original design would have functioned satisfactorily. However,the electrical contractor,with the benefit of more practical,local field experience, made this suggestion to provide the same functionality at a lower cost. 3. Failure to process this change order and accept this credit would result in the County incurring a cost with no commensurate benefit. 1-7--Change from fuse-type disconnect switches to enclosed circuit breakers $5,207.01 / 1. The design drawings showed four electrical disconnect switches to be retained and five to be replaced;the switches to be retained were the fuse type.After the contract was awarded,the Wastewater Power Systems Group directed that all disconnect switches be breaker type,our current standard, rather than fuse type. This meant that all nine disconnect switches would be replaced and with breaker-type switches.The dollar value of this change includes the credit for the original five fuse-type switches. 2. The original design,while meeting all code requirements,was not consistent with Collier County's Utility Standards Manual. This was communicated to the design engineer subsequent to completion of design and the change to breaker-type disconnects was made. Had this change been incorporated into the original contract,the bid prices would have been commensurately higher. 3. If this change order is not processed,we will have equipment that is inconsistent with the County's Utility Standards Manual. 1-U—Change conduit materials between wet well and electrical panel $16,055.61 / 1. The conduit materials between the wet well and the electrical panel were specified in the bid documents as aluminum. This met the requirements of the National Electrical Code(NEC), but was inconsistent with the County's Utility Standards Manual that specifies Schedule 80 PVC. 2. While the original design met all code requirements, it was not consistent with the County's Utility Standards Manual. This concern was expressed to the design engineer and the contractor subsequent to bidding and award. The design engineer determined that the PVC conduit should be encased in concrete and that the last 24 inches closest to the junction box be PVC-coated metal. 3, If this change order is not processed,we will have installed materials that do not meet the requirements of the County's Utility Standards Manual (1/7 1\\\A \,.4 33 1-W-Extend electrical grounding systems for future fence at PSs 303.01 and 303.02 $5,437.40/ 1. The bid documents did not include fences for pump stations 303.01 and 303.02. Subsequent to construction start, and in response to resident requests, a decision was made to add fences at each of these pump stations.As as a result,the grounding systems needed to be extended and connected to the proposed fences. 2. Pump stations had been at these sites for 25 years without perimeter fences. Therefore, the contract documents did not contemplate fences. The new construction, built to current standards, has a greater visual impact than what had formerly existed at the sites. This resulted in resident complaints and the decision to screen the equipment with a fence. 3. Failure to process this change will result in non-compliance with the National Electrical Code and present an unsafe environment for our workers. 1-X-Modifications to retaining curb at PS 303.02 $8,111.91 / 1. PS 303.02 is adjacent to a small canal connected to Haldeman Creek. Therefore,a low concrete wall was designed around the perimeter of the site to contain an inadvertent wastewater spill. The decision to install a fence at PS 303.02 prompted the need for a larger and thicker containment wall surrounding the site,since the fence will be mounted on this wall. 2. The original wall contained in the contract documents would have functioned as a means of containment. When the need to support a fence became apparent,the design of the wall needed to change. 3. Failure to provide a wall that adequately supports a fence would lead to premature failure of the fence and the wall and the County would incur excessive repair expenses. 1-Z-Change GrassPave2 to gravel at PS 303.01 and 303.02 Credit of$1,974.13/ 1. Once the decision was made to install fences at these two pump stations, it was no longer necessary to provide the more expensive GrassPave2 as the surface material. Four inches of gravel was substituted with a resulting credit to the County. 2. The decision to fence these two pump stations was made after the project was bid and based upon residents' concerns with the appearance of the stations once they were built. 3. Failure to process this change order would deprive the County of a credit it deserves. 1-AA--Add stilling well to wet well for pressure transducer $4,157.20 1. During construction, it was determined that a stilling well be added to the wet well at PS 303.04 to protect the pressure transducer which is mounted on a cable extending the depth of the wet well. 2. It appears to have been an oversight that the stilling well was not detailed in the design drawings. However, had the stilling well been incorporated into the original design,the bid price would have been commensurately higher. 3. Failure to approve this change will result in premature damage to the pressure transducer and excessive costs incurred by the County. Detailed Discussion of Change Orders Covered by Landscape Allowance 1-F-Landscape around PS 303.07 $4,868.30 / 1. Landscaping was provided around PS 303.07 to screen it from the nearby residence approximately 40 feet away from the pump station. 2. Landscaping around the pump stations in this project was specifically excluded from the bid documents. A landscape allowance was provided with the knowledge that some landscaping would be necessary and that it would be best to tailor the landscaping plan to the as-built conditions, rather than trying to anticipate the requirements in advance. 3. Failure to process this change and provide this landscaping would result in a fenced pump station in close proximity to a residence that would be visually incompatible with the residential character of the neighborhood. 1-GL-Landscape around PS 303.01 $5,710.65 / 1. Landscaping was provided around PS 303.01 to screen the equipment from the nearby residences. 2. Landscaping around the pump stations in this project was specifically excluded from the bid documents. A landscape allowance was provided with the knowledge that some landscaping would be necessary and that it would be best to tailor the landscaping plan to the as-built conditions, rather than trying to anticipate the requirements in advance. 3. Failure to process this change and provide this landscaping would result in a fenced pump station that would be visually incompatible with the residential character of the neighborhood. \(\ �l tffl 5 34 Prepared by: dik,r Li! 4 PU Engineering and Project Management Date: G/?/1 8 (Joys- ok,P E,Senior Project Manager) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and wiN be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as If the same were stated In this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant! Design Professional arising out of. related . •,iiiir- - set forth herein,including claims for impact and delay casts. Accepted by: .I/ ‘/DSt / 2 Date: 6 t .7.t4 itr ontra • 8 s SA,LLC, /1 - Approvedby: ter' Christian Colarusso - AECOM Date:6/4/2018 (Design Professional—AECOM / Approved by: _ Date: `svl t t (IR (Craig Pajer,P . 4,- anger-PU Engineering and Project Management) jf . 0 jam,,(i3fiV Approved by: t.se Date:�+Fc' (To Chmelk P.E.Director-PU Engineering and Project Mlanagement) • l G7 /g .., . by: - Airillar Date: (Beth • ,•. =n, f .. Inground Services) . ,e Approval by: r , -....v-.-- -- Date: /7')? (Josep9Beliont,C'ifector-Utility Finance Operations) Approved by: p- Q1. ,... '_ I3 Date: 6i�f 2 (G. Yilmaz,Ph.D Admini -Public-UMNflles Deparrnent Digitally signed by sa ra s c h n ee be rg e saraschneebergeracoiliergov.net DN: r@colliergov.net cn=saraschneebergeracolliergov.net Approved by: Date:2018.07 03 i l:oa:oa-04'00' Date: ( ,Procurement Services Division) Sara Schneeberger,Procurement Strategist 6 t. ,_„ ... . 35 io 1 Procurement Services G3 t r County Change Order Form ,..„.........--1......----.......-.....,....------ 0 Contract Modification 4 Work Order Modification [i]Amendment Contract if: 14 6322 I Change if;ri Purchase Order if: 45.00184582 1 Project it 33482 Contractor/Firm Name: Hole Montes i Contract/Project: F Iciscvnun and Wlosns Pus tfrS41 Hots Siop Imprconmanis I Omar De Leon ...] Public Transit and Neighborhood Enhancement Project Manager Name: Division Name: Original ContractNVork Order Amount $ 55,521 00 4/14/2015 Original BCC Approval Date;Agenda Item# `.1 Current BCC Approved Amount $ 55,521.00 3122/2016 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 55,521.00 4/13/2018 SAP Contract Expiration Date(Master) Dollar Arrount of this Change $ 9.448.50 17.02% Total Change from Original Amount Revised Contract/Work Order Total $ 64,969,50 17.02% Change from Current BCC Approved Amount Cumulative Changes I $ 9,448.50 17.02% Change from Current Amount i Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 1/15/2018 Original 1/15/2019 Last Approved 1/15/2019 Revised Date 1/15/2019 Date Completion Date Date (Inctudes this change) [ 0 if of Days Added L--- Select Tasks 0 Add new task(s) n Delete task(s) n Change task(s) Cg Other(s.ee ---- oelow) Provide a response to the following:1.)detailed and specific.explanation/rationale of the requested change(s)to the task(s)and I or the additional days added(if requested);24 why this change was not included in the original contract;and,3,) describe the impact if this change is not processed, Attach additional information horn the Design Professional and/or Contractor if needed 1.) The change Order will consist of additional engineering design work necessary to complete the project.the additional work was unforeseen as the force main was deemed to be unaffected by the poled upon its initial design.The change order,s necessary as design of a force main was not part of the original scope of work The project consists of designing a pad for two shelters as a well as a bus pull out,which is an area for the bus to pull off the main through lane for passengers to safely board arid alight the bus 2.) During Utility Coordination review,the City of Naples staff identified the need to replace a force main because of its condition and its location under the project site.The possibility of relocating the stop and bus pull out to alternate sites were evaluated with all alternatives requiring additional design work as well 3.) If this change order is not processed the project will not proceed and a permit will riot be granted Also,the designer will be unable to complete the tasks required in the Work Order -- ____......J I Prepared by. , ..i ,A, -1--L -----:::.-.7- ---- Date' / (Omarbe Leon,Senio Planner-Public Triff§t-t41.(olgborhood Enhancement) Acceptance of this Change Order shall constitute a modification to contract/work order identified above arid will be subject to et the same terms and conditions as contained in the contract/work order indicated above,es fully as if the same were stated in this acceptance The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractcr I Vendor I Consuliant/ Design Professional arisin.out of or reh. .d to try change set forth herein,including claims for impact and delay coals. 3 0 Accepted by: 4 .a. ---- Date: ? -." 42 Hole Monte , Rob rt L. Mu . P.C., Vice tiresident/Principal Approved by: i Date, / / i J: Mich- II me ,Division Dire-• -Pubic rat ITNeighborhood Enhancement 4l Approved by .1:e1 '#1l / ii .../ - """ Date ..-Si7eve ,a aT,0 4r, ant Head-Public Services saraschneeberger@ Approved by rnitiergnv net ',-l".''',:ri'l-'.'=',":-:,:iltr"'"' Date' Procurement Professional Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ORLY Admin °CC BCC ES Apt 36 HOLE MONTES City of Naples Force Main Design During the Utility Coordination — First Contact, the City of Naples Utility department has requested a segment of an existing 8 inch force main to be replaced that is under the proposed bus stop pull out pavement for BS ID 50 along Fleischmann Blvd. Approximately 300 LF of 8 inch force main is anticipated to be replaced. Due to the location and condition of the force main, Hole Montes will need to replace the portion of the force main under the proposed asphalt, plus 10' beyond the construction limits. Design includes meetings, 90% Design Phase, Final Design Phase, and a Construction Cost Opinion at the 90%and Final submittal. Bidding includes up to (3) pre-bid meetings and Q&A only. Construction Phase includes a pre-construction meeting, shop drawing reviews and submittals, pressure test witness,final connection witness, up to (2) site visits, and record drawings. The Force Main Design assumes project will be construction with the Bus Stop Improvements and that site restoration and MOT will be included under the Bus Stop Improvements. In addition, Force Main design does not include additional isolation valving for the system or permitting. Naples Fort Myers 37 FEE ESTIMATE.FLEISCHMANN BLVD BUS STOP ID 50-ADDITIONAL SERVICE-FORCE MAIN DESIGN s,Prisied Manager Erigineei Senioi Designer Senior Inspector AtimintiMrative Asst Total Actiyits 72 Ritte $121 Rate W Rate $34 Rate $62 kns $ tat it $ Nis S tins s tir, $ . . Optional Service 1-Task 1.DESIGN , . , . itteelings wit Ott ot 40es 6; $1,0321 T S 1184 51 $0 SC 0 5't $31 .. ,....., °repare 90%DeNgn 2 $344 2 $246 i 8 $912 5' i. $62 13 $1,564 , i 90%Submittat Packazi10 Countyttrd pi!) 1 si2, • $123 $0 SO 0 51 $31 2.5 $326 , —. . _ OXiton of Cost 0 5, $86; 1 $123 $0 $0 i $0 1 5 $209 6inakze Plans 1, al2, 1 $123 I $228 SC AT Sa1 4 6 $55 TO 5 51 806'f S - <ubtotal ' 6 5 5799 50 10 $1140 , 0-, 5e 2 51 $155 295 33 900.5, Optional Service 2•Task 2-Eint Phase Services . : t , Balding 33,4,only 2 ,t, $0 $0 1 562 7 $996 -a. Subtotal 4 ; 2 S2461 0 0 li $62 7 $996- $688i- $0 • $0 Optional Service I-Task 3,Construction Phase Services , v ..., Pre-Con stmckon kiiikatinikilti CountN mNi city 2 S344, SO SO 2 SIR $0 4 $53 a i' Submittal;Shop Draintings 2, $344 2 S246 $0 $0 1 $62 5' g52 Presstre Test-%Mess 1 $172' $3, $0 4 $376 1! $62 6 $6101 , . Final Conne,okon-Witnesz .1, $172 ..,tv' SO 4. S376 4WE Sae Visit.(21 41' ssi3A1 SO, $123 8 S752 - — i 14 $1,625 1 1 $62 ° , Record Drawings 1 $1721 1 5123 2 $228 SC li $62 5 $585. Subtotal 11 $1 892, 4 5432 2 $228 18 :o'. 4 $248 39_,. $4652 Na Permitting Anticipated Total Fee 2E,, 4 386: 13 1 1.368 18 1.692 8! 465 7.5 5 S9 448 5 6/1312018 1 cf 1 Procurement Services ° 7 County 3 V Change Order Form 1 1 ❑Contract Modification ®Work Order Modification ❑Amendment Contract#: 16-6618 Change#: 1 Purchase Order#: 4500187284 Project#: 80194 Contractor/Firm Name: EBL Partners, LLC Contract/Project: Barefoot Beach North Access Parking Improve. Project Manager Name: Felicia Kirby Parks&Recreation Division Name: Original Contract/Work Order Amount $ 77,578.24 6/28/16;16E5 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 77,578.244 6/28/16;16E5 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 77,578.24 12/24/2018 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 77,578.24 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 6/4/18 Original 7/19/18 Last Approved N/A Revised Date N/A Date Completion Date Date - (Includes this change) #of Days Added 0 Select Tasks 0 Add new task(s) 0 Delete task(s) 0 Change task(s) ►'4 Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and 1 or the additional days added(if requested); 2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1) There are two allowance lines associated with this work,Allowance for Unsuitable Soil Removal and Allowance for Unforseen Conditions.This Change Order draws from allowances. A)Water ponds on the parking lot instead of draining towards the swale. Since survey elevations of surrounding grades were taken at the beginning of the project, landscapers at the park added a large landscaped section of soil and crushed shell,which raised the elevation of the natural drainage flow.The elevation of the surrounding area is now higher than the original survey and needs to be removed to restore the designed drainage flow.This area needs to be excavated around plants,remove silt material, and restored to prevent ponding.To address this,allowance is requested for removing the soil and added material at the corner of the lot at a cost of$2,185.70 of the Allowance for Unsuitable Soil Removal. This will leave$814.30 remaining from the$3,000 of Allowance for Unsuitable Soil Removal. B)The south corner of the parking lot is experiencing ponding that was not accounted for. Installing a path of rip rap with fabric will correct this issue.This will use$959.75 of the available$1,000 Allowance for Unforseen Conditions and leave$40.25 remaining for Allowance for Unforseen Underground Utilitities or Conditions. 2) A)Design began August 1,2017 and construction did not start until June 4,2018. Since this area is very low and is prone to severe flooding,the added material needs to be removed to eliminate ponding and jeportiziing the new asphalt. B)The rip rap and fabric was not a part of the original design,however additional rip rap with fabric will alleviate flooding and add additional water retention. 3) A&B)If these changes are not processed,water will pond before reaching the swale during the rainy season.The pooled water will create a soft spot on the new asphalt and require the section to be sawcut and replaced. If a soft spot forms in the asphalt due to ponding,the warranty will be void and the section will not be replaced under the one year warranty. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs. Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin RPt BCC ES 39 Procurement Services Change Order Forrn Change Order Contract 0118-6818 NJ rchase Order#45-187284 Project#80194 . , l:1 _Cei Prepared by. )i ,,.. k61 if\.1 ( t ''e, _ Date:1"..12.11 FeHge Kirby/FectIt'Oes Management Division Acceptance of this Change Order shall c\ms atute a modification to contract I work order identried auove and wilt be subject to at the same terms and conditions as contained in the contract/work order Indicated above,as fully as If the same were stated In this acceptance. The adjustment.If any,to the Contract shall constitute a full and final settlement of any and elf clams of the Contractor/Vendor 1 Consultant/ t)estgn Prate . -. r. •;sing a .of or re-ted •,‘h'‘change set forth hgren,Including darns for impect and delay costs. .•-• _ __,/ k g Approved by' /4041 iL _ Vele: 2 T)a—yni.r. ki o.,Plk,c1Maireger,Public Utilities Logisece 8 Operations ,..., .2_ ,,,N j Approved by: ar-tr-et....-39:C.:03-e-, e2.4.4-4 Date' Margaret A.I op,Pk,Princ;pal Project M ger,Facilities Management / Accepted by. >4--- /..... II l' Dale, Z-4 ///1,..,.. --tin,rr 7.'1:,•Sr. •aerations Analyst,Facilities Management " — : — .% • Approved by: . , ... __.. TA)reb, Dale ‘/21h De. E 07Grady Minor 8Alucteles.PA _ I ....--2......------- Accepted by. 8 • e'' Date fi,424411 _ _ -- Fate Benson/881.Partners.LLC \ .. ...- -- Approved by. . .... .1...., •"" Dan Rodriguez.Deputy D ;- -r e,..$.' irc Utilities. 1/4,74;,?:>. A cceptati by:.. ' Drile.. ,1• 74/..( (P Rec ,on Divition)Bar • his:Division Director ----------- , 0 6(1c7.21:6? Approved by. . „1,... - _______L/f (Public Se'ice s Deport cont2,41enCarnell,Deportment Head saraschneeberge Approved by:__C@COilienpv.net rnate-'22'1'..."1 US 09 2P C.?Yo _ ,.,_ Date (Procurement ProTessrOnal) 40 FACILITIES MANAGEMENT DIVISION/PUBLIC UTILITIES DEPARTMENT WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME:Barefoot Beach CHANGE#1 North Access Parking Improvements DATE OF ISSUANCE:6/13/18 EFFECTIVE DATE:6/13/18 OWNER:Collier County Board of Commissioners PROJECT#:80194 CONTRACTOR:EBL Partners,LLC ENGINEER/DESIGN PROFESSIONAL:Q Grady Minor&Associates,PA You are directed to proceed promptly with the following change(s): Description:To remove unsuitable soil and install rip-rap with fabric at the corner of the circle turn around at the parking lot. Purpose of Work Directive Change:Shell and gravel was added around a section of the parking lot by landscapers after the design and survey was taken.The added material caused an erosion buildup when draining at the low spot in the corner of the lot.The buildup will cause a ponding issue during rainy season and could jeopardize the integrity of the new asphalt. Attachments: If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ® Unit Prices ❑ Contractor's records 0 Lump Sum 0 Engineer's record El Other ig Other:Number'of days prior to anticipated start date Estimated increase(decrease)in Contract Price Estimated change in Contract Time: $4,000 Increase or decrease by 0 calendar days. RECOMMENDED:, pAUTHORIZED: JVL By: fielate By: `10h Engineer Owner's Representative 06/13/18 3:43 PM 41 12 ter County Procurement Services Change Order Form 0 Contract Modification fl Work Order Modification C Amendment ) Contract tt: 17-7128 • Change#: 1 Purchase Order#: 45-179399 1 Project*: 195-90548 LI Contractor/Firm Name: Aptim Environmental&InfrastructureProject Name: Wiggins&Doctors Dredging Project Clint Perryman Coastal Zone Management(GMD) Project Manager Name: Department: Original Contract/Work Order Amount $ 149,988,94/7/11/17 16 A 20 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount 149,988 94/7/11/17 16 A 20 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 149,988 94 SAP Contract Expiration Date(Master) Dollar Amount of this Change 0 00% Total Change from Original Amount Revised Contract/Work Order Total 149 988 94 0 00% Change from Current BCC Approved Amount Cumulative Changes 0 00 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 7/20/17 f- Original 7/20/18 Last Approved 7/20/18 Revised Date 10/18/18 V Date Completion Date Date (Includes this change) of Days Added 90 Select Tasks 0 Add new task(s) U Delete task(s) 0 Change task(s) iro Other(see below) Provide a response to the following:1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and I or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1.)This change order will provide a time extension increase to the contract in order to afford the necessary time for the project close out and final engineering certification. The contractor encountered frequent delays during construction due to inclement weather conditions and the project duration was extended. The final engineering certification process is a mandatory FDEP permit stipulated condition and requirement upon completion. 2.)The change being requested was not included in the original contract due to unforeseen conditions that the contractor encountered during the course of construction. 3.)If this modification is not processed the final close out and engineering certification process will not be performed as required according to the FDEP stipulated conditions and requirements. Prepared by: Date: ?-5245, Clint Perryman,COC, Project Manager Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above.as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor!Consultant/ Design Professional ansing out of or related to the change set forth herein,including claims for impact and delay costs. Accepted by Alf/4-1..11.Vde- f.ftcad /3/.4,Afr Date: 7fir Thomas P Plea° P E,,0 CE.Dir/Ops Nairn Environmental 8.Infra rucitee,Inc Desien Enreer Approved by M-leal? Dale (r1/*/* Approved by: Date' 4-71.2-/AS-1 J y McAl n P CZ 'eclion Manager Amy Patii;son,Division Director saraschneeberger Approved by; @colliergov.net Date: Approved by: Date: Procurement Professional 10/18/18Thaddeus L.Cohen,Department Head (Divisions who may require additional signatures may include on separate sheet) Revised 10128/2014 AMIN/ 42 APTIM 2481 NW Boca Raton Blvd. Boca Raton,FL 33431 Tel +1 561 391 8102 APTIM Fax: 1-1 581 391 9116 June 29, 2018 Clint Perryman Collier County Coastal Zone Management 2685 S. Horseshoe Drive Naples, Florida 34104 RE: Modification to PO#45-179399—Wiggins/Doctors Dredging (Contract No. 17-7128) Dear Mr. Perryman: Aptim Environmental & Infrastructure, Inc. (APTIM) would like to request a 90 day time extension modification to PO #45-179399. Dredging of Wiggins Pass is nearly complete, and the contractor will soon mobilize to Doctors Pass to perform maintenance dredging. It is anticipated that APTIM's engineer of record services will be required for approximately one month post-construction to finalize permit compliance tasks and certifications. Based on the contractor's current schedule, all work should be completed by October 18, 2018. This will be a zero dollar change order. If you should have any questions, please call me at 561-361-3150 or email at Thomas.Pierro( aptim.com. Sincerely, 2 77() Thomas P. Pierro, P.E., D.CE. Director Aptim Environmental & Infrastructure, Inc. ccTara Brenner, P,G., APTIM 43 Procurement Services 13 " CountyChange Order Form ®Contract Modification El Work Order Modification ❑Amendment Contract#: 17-7092 Change#: 6 Purchase Order#: 45-177388 Project#: 80286 Contractor/Firm Name: DEC Contracting Group, Inc. Contract/Project: Eagle Lakes Community Park Aquatic Center Project Manager Name: James K Morton, PE Division Name: Facilities Management Original Contract/Work Order Amount $ 9,230,657.63 3/28/17 1 1.0 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 9,230,657.60 3/28/17, 11 C Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 9,230,657.63 6/8/2018 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 9,230,657.63 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00, 0.00% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 5/15/17 Original 5/15/18 Last Approved 8/16/18 Revised Date 12/30/18 Date Completion Date Date (Includes this change) #of Days Added 136 Select Tasks ®Add new task(s) ❑ Delete task(s) ❑Change task(s) ❑Other(see below) Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested); 2.)why this change was not included in the original contract; and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1. This Change will move $27,483.80 from Line 33"Owner Allowance"to a new Line 41 "CO#6 WDC Nos 28-38" in order to provide new, unforeseen, or requested items including these listed below. Substantial Completion is unchanged and is June 17,2018(Aquatic Facility opens to the public). The Completion Date is revised by 136 days to December 30, 2018, in order to complete punch lists and close out items. Changes to plans for unforeseen conditions and requested by Stakeholder include: • Inclusion of an admissions windows countertop to process patrons'admissions when entering the facility. $4,122.44 • Addition of irrigation to maintain new landscaping around the basketball court. $2,257.25 Utility revisions are required due to added requirements for features requested by the stakeholders: • Addition of a Main Pool dewatering tube to establish and control ground water during maintenance/repair operations. $2,759.96 • Add a demand electric meter in Panel DPA to determine actual costs for operating the Aquatic Park Geothermal equipment versus the main park area. $3,149.67 • Repair the Water Slide damage caused by a rock propelled by soccer field lawn mower. $3,288.66 • Replace old inoperable fire hydrant. $5,474.67 Plan revisions to increase safety as requested by the stakeholders: • Upgrade ceiling fans to meet outdoor wet rated conditions. $3,224.15 • Add a fence and service access gate at storm drain located inside the Wading Pool area. $1,966.50 • Add a gate on the north side of the fenced basketball court to provide code required two points of egress.$1,240.50 Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin Rp! BCC ES C:\Users\SaraSchneeberger\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A97E5T6B\80286 ChangeOrderForm#6 WDC Nos 28-38 05-30-2018 rev2.docx 44 Procurement Services Change Order Form Change#6 Contract#17-7092 Purchase Order#45-177388 Project#80286 This work will be paid for with approved contract Item No. 33—Owner Allowance funds. Substantial Completion remains the same at June 17,2018(Aquatic Facility opens to the public),and the Completion Date remains at August 16, 2018. Current allowance amount is$559,886.80 minus this change of$27,483.80 = new allowance total of$532,403.00 2.As construction on this complex project progressed,site unforeseen conditions and unknowns including safety concerns, equipment changes requiring electrical upgrades, and requested revisions by owner, required changes and additions to the plans. The decision to provide these items and make these changes will allow for better operation of the park and enhance safety and convenience, maintenance, and operability. These items were unforeseen and not anticipated. 3. If the CO is not processed, safety issues will not be addressed one of which includes supplying and installing a gate at the basketball court to provide a second emergency egress. A second safety item will protect children from getting hurt at the storm grate located inside the Wading Pool area. Stakeholder input regarding park operation items will not be addressed including adding an electric meter to the Geothermal Equipment to allow for determining budgets for this park and future parks being designed. The dewatering site tube is necessary to determine and control the level of the ground water during any dewatering for Main Pool maintenance or repairs. Stakeholder input regarding safety and park operation items will not be addressed.These are items included in the Project Plans that were to be addressed using Project funds by outside agreements under separate contracts that are no longer available. The Project could not be completed and without these items the Aquatic Facility cannot be opened and operated. Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin RPS BCC ES C:\Users\SaraSchneeberger\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A97E5T6B\80286 ChangeOrderForm#6 WDC Nos 28-38 05-30-2018 rev2.docx 45 Pr000romortl 8orvlcee Change Onlor Porn) Chonpo t18 Contract 017-7002 Ptlrolins0 Ordor H48.177398 ProJoct 080290 • Praparodby: / Polo:_05/J9/2010___ Jona K. o • ,PC,D• .• Project Monegsr,Frioa.Mnn000menl Acceptenco of Ina Chang*Order shall constitute n modlecnam to contract/work order ldondsod ebovo and wtll bo aublect to oU Uro sorro taints end condlitono no conlolnad k)rho contract/work order Inriceledobovo,as(44 no litho acme wore;toted In this octopi onto. Tho edjuslmoni,If ony,to the Contract shall contUtuto n fol and Gnol tellomenl of any end of crow of lho Cool/WW1 Vendor l Consuhnnt l Dolton Protontonot oMtng out of or rotated to Ills chango eat forth heron,Inetudtn0 clolmo for Impact and delay cools. e- Approved by; I rt,a, Xi). r Pate: _/-C--/b' Margaret A. ihep,P.E,Principal Project =mot,FatllUn Management Accoptad by — ��I' 4ed--- (04 --, Date: �'"! (�/(1 oa gBr.OpswfonsMl,� Otto sManagenwnl /� � Approved by: A.��► '•� Gi 001016"7;:61 r�1 Dan ltodriguar,Dor yDeportment Bad,Rr• • ales Accepted by: / /Rid . Delo: (Conti or)'0N*glee ado ,DEO Conlricdng Mow,Ina. Accoplod by: •• Delo:— /.,://(5--//s7 (.6,.= 11 ff• onion Aston)Dirty lame .Dkador Approvodby: .a .A')ihnrJIr Pato: [ y (Pubo' •a'opsrl'rnt)Steve Come= 'r apartment feed '1 Approved by: 5r u/"- !kilo: 6-1J--/8 (0Wan PoQselonal) clot J.Lc sly ArdrhadPA Cg ily .god by saraschneeberge�z ,—,,,,,,,,,i ,,,,'" DN. Approved by:_r_ecolliergov.neto,,3zonii¢r- •eebergeo" ";lergovnxt � (Procurement Prole Worm)) 5 .oaz r..o.icooa,ee mite:. . �__ _ . Rota td;1tv11rlala (OMdanar.1.onrsyre. 4aedd3'rnHalpnew.imayl ci4deonsopna:a,Ai,l.) raocaetuurluraneon Wane Nf *nota 0:1ConrtrucUar I Csp1sl llama PAW 8 firAiOr P4tit ctotelee Nit teat P4444 Coe Owctce'.C*Mn{AMA;No Ordsr,V't;HOM04O fe CM/81 CA aroaOrdarCoVII TO WOO Ro a N-^d 0530.201 .dace 46 CHANGE ORDER#6 05/30/2018 EAGLE LAKES AQUATIC FACILITY PROJECT 80286 CONTRACT# 17-7092 PURCHASE ORDER#45-177388 * Work covered by Owners Allowance DEC WORK INCREASE IN Construction DIRECTIVE CONTRACT WORK ITEM RCO No. CHANGE No. PRICE * 28 28 $2,759.961 DEWATERING SITE TUBE CEILING FANS- UPGRADED & ADJUST WITH 29 29 $3,224.15 CREDIT FOR BASIC FAN 30 30 $3,149.67 DEMAND METER -GEOTHERMAL PANEL 31 31 $0.001 GEOTHERMAL SHADE STRUCTURE- On HOLD 32 32 $3,288.66'REPAIR WATER SLIDE DAMAGE 33 33 $0.001 DIVE STAND ANCHOR - DENIED 34 34 $5,474.67;FIRE HYDRANT REPLACEMENT 35 1 35 $4,122.441ADMISSIONS COUNTERTOP 36 36 1 $1,966.50 FENCE & GATE AT WADING POOL 37 37 $2,257.25;IRRIGATION AT BASKETBALL COURT 38 38 $1,240.504GATE AT BASKETBALL COURT TOTAL* $27,483.801 CO# Amount in CO Co#3 Revised Completion Date is:6/8/2018 1 $30,498.06 CO#4 Revised Completion Date is:6/29/2018 2 $7,000.00 CO#4 Revised Substantial Completion Date is:5/30/2018 3 1 $138,580.50 CO#5 Revised Completion Date is:8/16/2018 4 $246,698.80 CO#5 Revised Substantial Completion Date is:6/17/2018 5 $117,335.84 Subtotal $540,113.20 6 $27,483.80 Notes:Memorial Day is Monday,May 28,2018 Total * $567,597.00 Father's Day is Sunday,June 17,2018(Substantial Completion) Owner Saturday before Independence Day is June 30,2018 Allowance $1,100,000.00 Independence Day is Wednesday,July 4,2018 Allowance Balance $532,403.00 G:\Construction&Capital Items PARKS&Rec\Major Projects\80286 Eagle Lakes Poo1\04 Construction\Contracts\Change Orders\PENDING\CO No 6\80286 CO No 6 RCO&WDC Summary 05-30-2018