Agenda 11/08/2011 Item #16B3Agenda Changes
Board of County Commissioners Meeting
November 8, 2011
Continue Item 9D to the December 13.2011 BCC Meeting Recommendation to
approve a Resolution acknowledging the Board of County Commissioners' support of Senate
Bill 192 pertaining to amending the procedures for merger and dissolution of two or more
independent special districts. (Commissioner Henning's request)
Continue Item 16A13 to the January 24.2012 BCC Meetingy; Recommendation to accept
a Speed Limit Study Report and adopt a Resolution of the Board of County Commissioners of
Collier County, Florida, authorizing a speed limit decrease from forty-five miles per hour (45
mph) to forty miles per hour (40 mph) on Vanderbilt Drive (CR 901) from 9th Street to
Bonita Beach Road at a cost of approximately $500. (Staffs request due to speed limit study
report)
Withdraw Item 16A21: Recommendation to award Bid #11 -5700 for "Devonshire
Boulevard Landscape & Irrigation Refurbishment Project" to Hannula Landscaping &
Irrigation, Inc. in the amount of $278,818.46; and reject the bid from Ameri- Pride, Inc.
Improvements will be funded by residents of the Radio Road Beautification MSTU. (Staffs
request due to formal notice of intent to protest award)
Move Item 16131 to Item 13133 Recommendation that the Community Redevelopment
Agency (CRA) approve the CRA staffs submission of amendments to the Bayshore Gateway
Triangle Mixed Use Overlay to County staff for incorporation into the BCC - approved Land
Development Code Amendment Cycle. If this request is approved, the specific amendment
language will be reviewed by County staff and incorporated into their submission to be
brought forth to the BCC for review in 2012. (Fiscal Impact $3,000) (Commissioner Hiller's
request)
Move Item 16133 to Item 13136: Recommendation
for the Community Redevelopment Agency (CRA)
to approve and execute a Site Improvement Grant
Agreement between the CRA and a Grant Applicant
within the Bayshore Gateway Triangle area. (2705
Shoreview Drive - Fiscal Impact: $2,607).
(Commissioner Hiller's request)
Move Item 16134 to Item 13134: Recommendation for the Community Redevelopment
Agency (CRA) to approve a zero dollar change and modification to a Commercial Building
11/8/2011 Item 16. B.3.
EXECUTIVE SUMMARY
Recommendation for the Community Redevelopment Agency (CRA) to approve and
execute a Site Improvement Grant Agreement between the CRA and a Grant Applicant
within the Bayshore Gateway Triangle area. (2705 Shoreview Drive - Fiscal Impact:
$2,607.00).
OBd ' J;M: To approve and execute a Site Improvement Grant Agreement between the
Community Redevelopment Agency (CRA) and a Grant Applicant within the Bayshore Gateway
Triangle Community Redevelopment area. (2705 Shoreview Drive - Fiscal Impact: $2,607.00).
CONSIDERATIONS: The Site Improvement Grant Program (SIG) is a redevelopment initiative
funded and administered by the CRA as partial reimbursement for exterior improvements to
buildings for residents and non -profit organizations within the Redevelopment Area. The CRA
provides a project cost -match of 33% from Tax Increment Funds (TIF) capped at $8,000.
Remaining project dollars are provided by the applicant. The CRA FY -2012 TIF Grant budget is
funded at $426,600.00. That includes $261,817.00 carried forward from FY- 2010/FY -2011 to
cover the encumbered TIF Grants allocated by the Board in those years. The remaining
$164,783.00 is allocated for CRA Board approved FY -2012 TIF Grant programs.
The Site Improvement Grant application (Exhibit A) submitted by Kevin and Sheila Dugan,
owners of the residential property at 2705 Shoreview Drive, Naples, Florida, 34112, for driveway
upgrades including removal and replacement of the existing concrete driveway and walkway was
/'*N recommended for approval by the Bayshore/Gateway Triangle CRA Local Advisory Board.
LEGAL CONSIDERATIONS: This item requires a majority vote for approval. It has been
reviewed by the County Attorney Office and is sufficient for Board consideration and approval. -
STW
FISCAL IMPACT: Sufficient budget exists within Fund (187) FY -2012 budget to satisfy this
application Of the $164,783.00 in the FY -2012 budget, zero dollars have been awarded by the
CRA Board. This project totals $7,900.00, and the request is for up to $2,647.00 (with a 671%
grantee match) for a total fiscal CRA impact of $2,607.00.
GROWTH MANAGEMENT IWACT: None.
RECOMMENDATION: That the CRA Board approves and authorizes the Chairman to execute
the Site Improvement Grant Agreement between the Community Redevelopment Agency and
Kevin and Sheila Dugan, owners of the residential property at 2705 Shoreview Drive, Naples,
Florida, 34112 in the amount of $2,607.00.
Prepared by:
Ashley Caserta on October 17, 2011
Grants Coordinator, Bayshore Gateway Triangle Community Redevelopment Agency
-1-
Packet Page -789-
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.8.3.
11/8/2011 Item 16. B.3.
Item Summary: Recommendation for the Community Redevelopment Agency (CRA) to
approve and execute a Site Improvement Grant Agreement between the CRA and a Grant
Applicant within the Bayshore Gateway Triangle area. (2705 Shoreview Drive - Fiscal Impact:
$2,607).
Meeting Date: 11/8/2011
Prepared By
Name: CasertaAshley
Title: Grants Coordinator,
10/24/2011 11:18:21 AM
Submitted by
Title: Grants Coordinator,
Name: CasertaAshley
10/24/2011 11:18:23 AM
Approved By
Name: JacksonDavid
Title: Executive Director, CRA,
Date: 10/24/20112:25:49 PM
Name: WilliamsSteven
Title: Assistant County Attomey,County Attorney
Date: 10/25/2011 1:19:04 PM
Name: FinnEd
Date: 10/26/2011 11:48:47 AM
Name: KlatzkowJeff
Title: County Attorney,
Date: 10/26/20112:18:48 PM
Packet Page -790-
11/8/2011 Item 16.13.3.
Name: StanleyTherese
Title: Management/Budget Analyst, Senior,Office of Management & Budget
Date: 10/28/2011 12:41:54 PM
Name: IsacksonMark
Title: Director -Corp Financial and Mgmt Svs,CMO
Date: 10/31/20119:29:56 AM
Packet Page -791-
11/8/2011 Item 16. B.3.
GRANT AGREEMENT BETWEEN CRA AND GRANTEE FOR
SITE IMPROVEMENTS FOR BAYSHORE GATEWAY TRIANGLE
COMMUNITY REDEVELOPMENT AREA
THIS AGREEMENT ENTERED this 8th day of November, 2011 by and between the
Collier County Community Redevelopment Agency (hereinafter referred to as "CRA ") and
Kevin and Sheila Dugan (hereinafter referred to as "Grantee ").
WITNESSETH:
WHEREAS, in Collier County Ordinance No. 2002 -38, the Board of County
Commissioners delegated authority to the CPA to award and administer CRA grants including
contracts with Grantees for CRA grants; and
WHEREAS, Grantee has applied for a Site Improvement Grant in the amount of
$2,607.00 dollars; and
WHEREAS, the CRA has determined that Grantee meets the eligibility requirements and
was approved for a grant award in the amount of $2,607.00 dollars on November 8, 2011, ( "CRA
Approval "), which is 33 % of the costs to construct the site improvements.
NOW, THEREFORE, in consideration of the mutual covenants contained herein and
other valuable consideration, the parties agree as follows:
1. Grantee acknowledges to the CRA that Grantee has received a copy of the Collier
County Community Redevelopment Agency Site Improvement Grant Program Information and
Application (hereinafter referred to as "Grant Program "), that Grantee has read the Grant
Program, and that Grantee has had ample opportunity to discuss the Grant Program with
Grantee's counsel or advisor. Grantee further acknowledges to the CRA that Grantee
understands and agrees to abide by all of the terms and conditions of the Grant Program.
2. Grantee is the record owner of property described as 2705 Shoreview Drive,
Naples, Florida 34112.
1 Grantee has agreed to make certain improvements to the property pursuant to the
grant application submitted to the CRA dated. September 19, 2011 attached hereto as Exhibit A
and incorporated herein by reference.
4. Grantee agrees to complete the construction of the Site Improvements within one (1) year
of CRA approval. Grantee also agrees to fund at least 67 % of the costs of the site improvements.
Grantee is prohibited from paying contractors and/or vendors with cash; all payments for
approved projects must be in the form of a check or credit card drawing on funds from Grantee's
accounts.
Site Improvement Grant Agreement FY 2011
Packet Page -792-
11/8/2011 Item 16. B.3.
5. CRA has approved a grant to Grantee in the amount of $2,607.00 to be
administered pursuant to the terms of this Agreement based on an estimated cost of $7,900.00.
If the actual costs are less than the estimated costs to construct the site improvements and less
than $7,900.00, the grant amount shall be reduced dollar for dollar in matching CRA funds as
determined by ratio of matching private funds required.
6. Unless prior disclosure is included in the grant application, no Grantee, or any
immediate relative of Grantee, shall serve as a contractor or subcontractor for the construction of
the Site Improvements and no Grantee, or any immediate relative of Grantee, shall receive
compensation for labor for the construction of the site improvements. An immediate relative of
Grantee shall include mother, father, brother, sister, son, daughter, aunt, uncle and cousin or
family member by marriage to include mother -in -law, father -in -law, brother -in -law and sister -in-
law. Grantee has verified that all contractors who have provided bids for the approved work are
actively licensed by Collier County. Grantee acknowledges that the total grant award shall not
exceed the sum of lowest bids /price quotes for all projects. Grant funds for work performed by
contractors shall only be disbursed upon verification that said contractors are actively licensed by
Collier County.
7. Grantee agrees to obtain all necessary permits and submit any required plans to
the County's Growth Management Division. Upon completion of the work, Grantee shall submit
to the CRA staff a project summary report, two (2) 8 inch by 10 inch photos of the project after
improvements are completed, a list of materials and construction techniques used, a list of
architects and/or contractors, and any other information specific to the project or requested by
the CRA staff. The CRA, through its staff, shall confirm that the site improvements were
constructed pursuant to the terms of the application approved by the CRA.
8. Within forty -five (45) days after confirmation that the site improvements were
constructed pursuant to the terms of the approved application, Grantee shall be issued a check in
the amount of the grant. However, if Grantee fails to make the improvements pursuant to the
terms of the approved application, or if the project is not completed within one (1) year of CRA
approval, or if Grantee fails to fund at least 67% of the cost of the Site Improvements, the grant
shall be deemed automatically revoked and Grantee shall be entitled to no funding.
9. This Agreement shall be governed and construed pursuant to the laws of the State
of Florida.
10. This Agreement contains the entire agreement of the parties and their
representatives and agents, and incorporates all prior understandings, whether oral or written.
No change, modification or amendment, or any representation, promise or condition, or any
waiver, to this Agreement shall be binding unless in writing and signed by a duly authorized
officer of the party to be charged.
11. This Agreement is personal to Grantee, and may not be assigned or transferred by
Grantee or to Grantee's respective heirs, personal representatives, successors or assigns without
the prior written consent of the CRA.
Site Improvement Grant Agreement FY 2011
Packet Page -793-
11/8/2011 Item 16.B.3.
IN WITNESS WHEREOF, the parties have, executed this Agreement on the date and year
first written above,
Witness Signature
Printed.lTyped Name rf
J4,
Witness Si-arUture
04
Printed/Typed Name
ATTEST:
DWIGHT E. BROCK, Clerk
, Deputy Clerk-
Approved as to form and
]-.gal sufficiency:
Steven T. Williams
Assistant County Attorney
Site Improvement Grant Agreement FY 2011
GRANTEE:
BT-
Printed.[Typed Name
COLLIER COUNTY COMMUNITY
REDEVELOPMENT AGENCY
By:
JIM COLETTA, Chairinan
Packet Page -794-
RECEIVED
S P "q 1011
' 7..0112,oiz
11/8/2011 Item 16.13.3.
x; s,. Y 5 F i ORE
E
Fai;�; G� StiO Y
, 77 R®
SIG Annlication m,-.fAA, rind cn},mit-fn rV A Mr— 1
Project Information
Describe the existing conditions of the site attach additional sheets if necessary).
Concrete driveway and patio are cracked. Painted coating on concrete
surfaces has chipped/worn away and some surfaces are pitted.
Outline the proposed improvements in detail (attach additional sheets if necessary).
Concrete is to be removed and replaced with pavers. Two connecting
walkways are to be removed and replaced with pavers. Once concrete is
removed, at least 4" of limerock will be put in and compacted. A 1" layer
of sand will be placed on top of the Emerock prior to installing the pavers.
REQUIRED ATIACHAUNTS FROM APPLICANT:
listecl in the online ctataf)asc- ho )-/h
2) Non-itesideniiil,Al)l)lic,,,its: cop), ofocciip,,ttional license.
CRA STAFF:
1) Attach two color photos of each project to be performed:i,/
2) Attach Property Appraiser ID. V
3 Attach proof of payment of property taxes.l%
1) Estimated cost of improvements: $
2) Maximum grant award:$
CRA Staff Signature: -64— ,{ 4 — � Date: 9.3t). 11
Packet Page -795-
Applicant Information
Grantee Name
Grantee Address
,S hr, r_ 0 C Lt--
k tilt
Site Address
Daytime Phone
/
Alternate Phone
E -Mail Address
Do you own or lease the property?
Project Information
Describe the existing conditions of the site attach additional sheets if necessary).
Concrete driveway and patio are cracked. Painted coating on concrete
surfaces has chipped/worn away and some surfaces are pitted.
Outline the proposed improvements in detail (attach additional sheets if necessary).
Concrete is to be removed and replaced with pavers. Two connecting
walkways are to be removed and replaced with pavers. Once concrete is
removed, at least 4" of limerock will be put in and compacted. A 1" layer
of sand will be placed on top of the Emerock prior to installing the pavers.
REQUIRED ATIACHAUNTS FROM APPLICANT:
listecl in the online ctataf)asc- ho )-/h
2) Non-itesideniiil,Al)l)lic,,,its: cop), ofocciip,,ttional license.
CRA STAFF:
1) Attach two color photos of each project to be performed:i,/
2) Attach Property Appraiser ID. V
3 Attach proof of payment of property taxes.l%
1) Estimated cost of improvements: $
2) Maximum grant award:$
CRA Staff Signature: -64— ,{ 4 — � Date: 9.3t). 11
Packet Page -795-
11/8/2011 Item 16. B.3.
�B S H 0 R E
G;.TEW Y
E Applicant Commitment of Resources
I / we, iu //4�144 1116A171 , owner(s) / tenant(s) of the
property located at 27vS- _tlr,cu /�cz= , /�,ij� , have the funding and ability to begin the
site improvements listed above and have the ability to complete all improvements within one year of
the approval of the improvement grant by the Collier County Community Redevelopment Agency.
I / we further affirm that payment for all work on approved improvements will come from accounts
in my / our name(s) or the name(s) of entities registered in the State of Florida which I / we have
registered with the state (verification is required). Payment for improvements by from persons or
entities not a party to this Grant Application is grounds for disqualification.
Signature of Tenant (if leased)
Signature of Tenant (if leased)
(if jointly leased)
Signature of ry er `-
Signature of Owner
(if jointly owned)
Packet Page -796-
Date
Date
r
l-
Date
Date
i43 -4422 FAX. 776 -9845
11/8/2011 Item 16.13.3.
^710 �M3F--CT AV611 E
3''1APLES, 1.O" IDA -,314 r D4,
,239) 7,93 -4422
(23;'jq}7r,75/�- 9Sn 45 0M
We hereby submit specifications and estimates for: Driveway
I. Tear out existing concrete and dispose of offsite
2. Remove additional 4" of soil (this includes front been) and dispose of offsite
3. Supply and install 4" Iimerock over subgrade
4. Supply and install I" sand over compacted base
5. Supply and install 2 318" concrete pavers - std color and pattern
6. Cut, compact, sand and clean total job site
7. Approx 1500 sq ft
Options: 1.20' stone order @ front of home TBD
2. PVC sleeve [50 -60] - for gas line NC
3. Widen driveway torn around by 18" towards street
Owner /Contractor acknowledges and agrees that the agreed upon price is contingent upon Keyestone commencing work within 15 days of Otvner ?Contractor signing
this proposal. In the event Keyestone does not corn mence work within said time for any reason other than delays caused by Keyestone, Keyestone may increase the
contract price in accordance with any price increases incurred by Keyestone for labor, materials, and supplies.
Unless preparation of subgrade is specifically mentioned above, all work is to be done over owner's stabilized subgrade which shall be well compacted and properly
graded to within one -half (I/2) inch ofproper subgrade elevation. Any machine work required to bring owner's subgrade to acceptable tolerances or PVC sleeve
installation may be done by KEYESTONE for an additional charge which will be at flat hourly rate for machine with operator. Unless installation and preparation of
base material is specifically mentioned above, it shall be the responsibility of the Owner/Contractor to warranty total installation. Any fill or stabilizer required to raise
elevation of subgrade maybe supplied by KEYESTOATE for a reasonable charge. Owner /Contractor is responsible for all engineering, permitting traffic control,
marking all underground utilities and for providing water, electric and dumpsterto the job site. Any excavation into the compacted Iimerock base will result in
settlement and Ktil] not be covered under KEYESTONE'S warranty.
Upon acceptance of this contract and in the event that it shall become necessary for KEYESTONE to retain the services of an attorney for lane purposes of collecting all
or any part of monies owed or to compel performance to KEYESTONE or any of its suppliers, the defaulting party shall be responsible for the payment of reasonable
attorney's fees and cost without regard to whether or not litigation shall have been commenced.
The parties agree that they shall mediate any disputes prior to either party initiating litigation. The costs of the mediation shall be equally split between the parties.
We hereby propose to furnish labor and materials - complete in accordance with the above specifications, for the sum of
(Might thousartd one hundred and f; y dollars and 00 /100x1 dollars_i�8350.00� paymertto be made as
foIIows: 50% due upon completion of base work; balance due upon completion of job.
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices.
Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will
become an extra charge over and above the estimate. All agreements are contingent upon strikes, idents o lays beyond out-
control.
This proposal subject to acceptance within 15 days and is void thereafter at the option the nd sign, . 12
Authorized
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be
made as outlined above. Signature will guarantee all payments in full.
Accepted: Signature:
Date: Signature:
Overdue Accounts are Subject to a 1 %a% per Month Set-vice Charge. (18% Annual Interest Rate)
Purchaser agrees to pay all costs of collection, including reasonable attorney's fees, should collection service be required.
"WE Ii'JSTALL CONRDEM ""E"
Packet Page -797-
PROPOSAL SUBMITTED TO:
DATE: REVISED
8125/11
EMAIL:
sdllgaii@flyiiaples.com
PHONE:
280 -9793
NAME:
Shelia Dugan
JOB NAME:
Du an Residence
STREET:
2705 Shoreview Dr
STREET:
2705 Shoreview Dr
Naples, x134112
Off Bayshore- Na les
We hereby submit specifications and estimates for: Driveway
I. Tear out existing concrete and dispose of offsite
2. Remove additional 4" of soil (this includes front been) and dispose of offsite
3. Supply and install 4" Iimerock over subgrade
4. Supply and install I" sand over compacted base
5. Supply and install 2 318" concrete pavers - std color and pattern
6. Cut, compact, sand and clean total job site
7. Approx 1500 sq ft
Options: 1.20' stone order @ front of home TBD
2. PVC sleeve [50 -60] - for gas line NC
3. Widen driveway torn around by 18" towards street
Owner /Contractor acknowledges and agrees that the agreed upon price is contingent upon Keyestone commencing work within 15 days of Otvner ?Contractor signing
this proposal. In the event Keyestone does not corn mence work within said time for any reason other than delays caused by Keyestone, Keyestone may increase the
contract price in accordance with any price increases incurred by Keyestone for labor, materials, and supplies.
Unless preparation of subgrade is specifically mentioned above, all work is to be done over owner's stabilized subgrade which shall be well compacted and properly
graded to within one -half (I/2) inch ofproper subgrade elevation. Any machine work required to bring owner's subgrade to acceptable tolerances or PVC sleeve
installation may be done by KEYESTONE for an additional charge which will be at flat hourly rate for machine with operator. Unless installation and preparation of
base material is specifically mentioned above, it shall be the responsibility of the Owner/Contractor to warranty total installation. Any fill or stabilizer required to raise
elevation of subgrade maybe supplied by KEYESTOATE for a reasonable charge. Owner /Contractor is responsible for all engineering, permitting traffic control,
marking all underground utilities and for providing water, electric and dumpsterto the job site. Any excavation into the compacted Iimerock base will result in
settlement and Ktil] not be covered under KEYESTONE'S warranty.
Upon acceptance of this contract and in the event that it shall become necessary for KEYESTONE to retain the services of an attorney for lane purposes of collecting all
or any part of monies owed or to compel performance to KEYESTONE or any of its suppliers, the defaulting party shall be responsible for the payment of reasonable
attorney's fees and cost without regard to whether or not litigation shall have been commenced.
The parties agree that they shall mediate any disputes prior to either party initiating litigation. The costs of the mediation shall be equally split between the parties.
We hereby propose to furnish labor and materials - complete in accordance with the above specifications, for the sum of
(Might thousartd one hundred and f; y dollars and 00 /100x1 dollars_i�8350.00� paymertto be made as
foIIows: 50% due upon completion of base work; balance due upon completion of job.
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices.
Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will
become an extra charge over and above the estimate. All agreements are contingent upon strikes, idents o lays beyond out-
control.
This proposal subject to acceptance within 15 days and is void thereafter at the option the nd sign, . 12
Authorized
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be
made as outlined above. Signature will guarantee all payments in full.
Accepted: Signature:
Date: Signature:
Overdue Accounts are Subject to a 1 %a% per Month Set-vice Charge. (18% Annual Interest Rate)
Purchaser agrees to pay all costs of collection, including reasonable attorney's fees, should collection service be required.
"WE Ii'JSTALL CONRDEM ""E"
Packet Page -797-
��
11/8/2011 Item 16. B.3.
2
7
1717 PINE RIDGE ROAD • NAPLES, FLORIDA 34109 • 239- 597 -4414 • Fax 239- 597 -7444
WORKING AGREEMENT
I hereby contract with WIZZARD LAKE NURSERY, INC. ( LN) to perform services, as detailed below. In
exchange for these services, 1 agree to pay (WLN) $ (gar according to the following payment
schedule at the bottom of is agreement.
JOB DESCRIPTION: �� �� f� al
Description of work: Landscape D Lrri anon O L'1 !�
p p g Tree U Pest O andscape Design O
- -jam --� :r .
-Al - I,- "4%v- /`.o^.& /'/- - - Al --24--. J-1. . `. f e ` f s/1 _ . - V-7 -1-i—
I expect thesdservices to begin no sooner than or later than . l am
aware that more detailed information regarding this contract for services is printed on the reverse side of this contract.
I agree to pay (WLN) according to the following payment schedule: / I
DOWN PAYMENT f�
INTERIM PAYMENT
I have read and accept all of the Terms and Conditions. initials "RD "' "" "DA" "" Fm- ,-
FINAL "////
�1 J
x�nu��r "nrtxM�tE
JOB TOTAL
Ir
In the event this pro I is for a sign, the f towing will appl : I ex t to an 'm:P. ney payment of
$ i tiffs pr *sal r ipt of t ' esign. �ndera I the r, t for 1� a.) ontract (WLN) erform ds oin servideslas n se a ains w ich Ar
payment will apply. 1, f � � v .
b.) of co /ract (WLN`7 services and own arts Vhe p sal r an a bona) $
DATE: �! DATE:
-(WLN) Signature - ''�. -- ! t Client Signature
Packet Page -798-
N
11/8/2011 Item 16. B.3.
N
` . N,
N
Packet Page -799-
11/8/2011 Item 16.B.3.
Packet Page -800-
11/8/2011 Item 16. B.3.
Packet Page -801-
11/8/2011 Item 16. B.3.
Packet Page -802-
Search Results
Collier County Tax Collector
3291 E Tamiami Trail
Naples FL 34112 -5758 2010 Tax Roll Inquiry
System
Print this page
11/8/2011 Item 16.13.3.
NON AD VALOREM INFORMATION
Type ---] Auth # 71Auth Name Per IjAmount
Garbage � 9013 Garbage Dist 1
173.49
COMMENTS
* Non Ad Valorem Amount Included in Gross Tax.
New Search
Back To LISt
2003 Parcel Information 12004 Parcel Information 12005 Parcel Information 12006 Parcel Information
2007 Parcel Information 12008 Parcel Information 12009 Parcel Information
Last Updated: 10/11/2011 5:OOpm
Packet Page
http://www.colliertax.com/search/view.php? 10/12/2011
Details
11/8/2011 Item 16.13.3.
Property Record Sketches I Trim Notices
Current Ownership
i
Parcel No.I 48170880002 11 Property Address 2705 SHOREVIEW DR
Owner Namell DUGAN, KEVIN H =& SHEILA A
Addresses 2705 SHOREVIEW DR
Cityll NAPLES Statell FL 11 Zipll 34112.5813
Legaill GULF SHORES BLK 2 LOT 10
Section Township Range Acres Ma No. Strap No.
�- 11 50 25 J1 0.17 J 5A11 391600 2105A11
n1 Millaae Rates
Sub No. 391600 GULF SHORES wit Millaae Area School Other Total
Use Code 01 SINGLE FAMILY RESIDENTIAL 111 5.6990 9.4380 15.137
2011 Preliminary Tax Roll Latest Sales History
(Subject to Change)
If all Values shown below equal 0 this
parcel was created after the Final Tax Roil
Land Value $ 115,280.D0 Date Book - Page r- Amount
m Improved Value $ 83,242.Q0 06 / 1995 2064-823 $ 145,000.0(
(_) Market value $198,522.00
( -) SOH Exempt Value& Other Exemptions $ 73,502.00 02 t 1894 1910-17 $ 0.0(
(_) Assessed Value $ 125,020.00 06 J 1990 1634-26 $ 0.0(
{ -) Homestead and other Exempt Vatue $ 50,000.00 0271968 1326-1718 �- $ Q.O(
f ( =) Taxable Value 1E $ 75,020.00
4 ( =) School Taxable Value (Used for Schaal Taxes) $ 100,020.0Q
SOH = "Save Our Homes" exempt value due to cap on assessment
increases.
The Information is Updated Weekly.
http:// www .collierappraiser.com/RecordDet Packet Page - 804- :olioID= 0000048170880002 10/12/2011