Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 10/25/2011 Item #16A10
1025@011 Item 16.A.10. Rscommendal n m approve for recording Me Goal Plat of Faith Uniting Phase One, approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance sseudty. OBJECTIVE: To approve for recording the final plat of Faith Unding Phase One, a sutbivision of larks located In Section 32, Township 46 South, Range 29 Past, Collier Count', Florida, following the attemaffm Procedure Mr approval of subdivision Plata pursuant to Resolution 99 -199. This procedure provides for the continent approval of Me construction plans and plat, and approval for recording of the final plat CONSIDERATIONS: Land Davebpment Services Department has completed the review of Me construction drawings, specifications, and Mal plat of Faith Lending Phase One. These documents are in compliance with the County Land Development Corte and Fonds State Statute No. 177. All fees have been paid. Security in the amount of 10% of the total met of Me required improvements, and 100% of the cost of any remaining Improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by Me County Manager or his designee and the County A6omWs office prior b the recording of the final plat. This mud be In conformance with the County Land Development Code — Section 10.02.05 AA.b. Land Development Services Department recommends that the Mel plat of Faith Lending Phase One be approved for recording. FISCAL IMPACT: The project cost is $662,022.20 (saturated) to be borne by Me developer. The coal breakdown Is as follies: a) Water &Sewer $142,592.00 b) Drainage, Paving, Grading $519,430.20. The Security amount, equal to 110% of the pro)ect cost, is $726,224.42 The County will matins revenues as follows: Fund: Growth Management Fund 131 Agency. County Manager Cost Canter: 131327 — Und Development Services Revenue generated by this project: Total: $16,932.91 Parfet Page -1297. 10/25/2011 Item 16.A.10. Fees are based on a construction estimate of $51R430.20 (does not include Immokalee Water & Sewer District improvements) and were paid in December, ^ 2007 and August, 2011. The breakdown is as follows Plat Review Fee ($1,000.00 +$5. /ac) $1,350.00 Construction Drawing Review Fee Water 8 Sewer (75% const. est.) $r1ha Drainage, Paving, Grading (.75 %const. est.) $ 3,895.73 Construction Inspection Fee Water 8 Sewer (2.25% Forst. est.) $n /a Drainage. Paving, Gnoing(2.25 %constei $11,687.18 GROWTH MANAGEMENT IMPACT: The developer must receive a Deal to of Adequate Public Facilities prior to the issuance of the construction plan final approval letter. LEGAL CONSIDERATIONS: The County Attorney's Office has reviewed and approved the plat and associated legal ^ documents for legal sufficiency. This item requires a majority vote. This hem is ready for Board consideration and approval. STW RECOMMENDATION: That the Board of County Commissioners approve the final plat of Faith Landing Phase One for recording with the following stipulations: 1. Approve the amount of $728,224.42 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Land Development Services Department. 2. Approve the standard form Construction and Maintenance Agreement, and a. That no Certificates of Occupancy be granted until the required improvements have received preliminary acceptance. b. That the plat not be record" until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Manager or his designee and the County Attorney's office. PREPARED BY John Houldsworth, Senior Site Plans Reviewer, Land Development Services I Engineering Review, Growth Management Division, Planning and Regulation Attachments: 1) Location Map, 2) Plat Map, 3) Engineer's Opinion of Probable Cost Packet Page -1298- 10/25/2011 Item 16.A.10. COLLIER COUNTY ^ Board of County commissioners Item Number: 16.A.10. hem summary : This item requires that ex pane disclosure be provided by Commission embers. Should a hearing be held on this item, all participants are required to be sworn in Recommendation to approve for recording the final plat of Faith landing Phase One, approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 10/25/2011 Prepared By Name: HouldswonlJaM1n Title: Site Plans Reviewe45wior,Engineering &Envnonm 10/612011 9:05-08 AM Approved By Name: McKennalack Title: Manager- Engineering Review Services.lengineering ea Environmental Services Date: 1011.20119:37:08 AM Name: Paigludy Title: Operations Analyst COTS Date l 10/70011 10:11'49 AM Name: LonoWilliam Title'. Director - CDES Engineering SmimaCompreheni Date: 10/7 /2011 12:5302 PM Name: FederNorri Title: Adminismator - Growth Management Div,Transponati Date ae /11/2 0119111:22 AM Name WllllamsSteven Title Assistant County Attomey,Couch Attorney Dater 10111/2011 11:29:20 AM Name: Marcellaleanne Packet Page -1299- 10/25/2011 Item 16.A.10. Tmc. Exentive Seotein,Tramponatlon Planing Date: 10/12/2011 2.4055 PM Name: Klatekowlef£ Title: County Amil DaN 10/14/2011 11:51 07 AM Name: IaacleorMark Title: Diremar -Cory Financial and Mgmt Svs.CMO Date'. 10/19/2011 814719 AM Name l OchsLeo Title: County Manager Dan: 10/1]2011 9:3]:04 AM Packet Page -130P OL d =c IL w a z O Oi O J w J o �wr a � Y jma � I T �. �$ L � luau i 1 mmnni IL w a z O Oi O J \ GK%R :Q$ \R /r4 ` gk$§ @ \r §! NA, ( | q / ©t EL 6 �& , -� IN | (� iN 1 JEW, 01 vl)� wall ! ( ./ , l8 \@ It $ \)) ( Egg /\ �\)( /\ A 10/25/2011 Item 16.A.10. Rat IN s _; :i3s4�� g I '� o 4T I ppi S �Y v p lk �p .art PL I 1-okiii l8TI Tfwa,CF - . a�' Packet Page -1303- 102S/i Ifilim I A.1 Packet Page 1304- 9g IAA 10I b%2U11 Item ib.H. lu. 4.Pk { Packet Page -1305- 6e ep :Q W S ea �„ : \ \) ^ \,_ /,_,6.A.1 : - -- _ -% & @_ � \. * ` . . \ (| Packet Page 1306- � (\ 1¥ l' 10125/2011 Item 16.A.10. Faith Landing Fheae 1 EnOHena b,' Humanly Of CAGOO FORA. JEERUFOO�990�11 \ "M m�l� UNIT Mucarr COW, OF RUNBC IF BUT (4 "Uno A 6 UNFROCK ROD LEE Be 61 M 1 31 ED 10 5. 5461 CO"FRIFTE TYPE 6 A, 32,1 4 JMERTAnANULFR4*CInCU�1 By OR, 310 SIDAREEMOSTRIFING US RURAL "M m�l� UNIT Mucarr COW, 6 UNFROCK ROD LEE Be 61 M 1 31 ED 10 5. 5461 CO"FRIFTE TYPE 6 A, 32,1 4 JMERTAnANULFR4*CInCU�1 By OR, 310 SIDAREEMOSTRIFING US RURAL "M m�l� UNIT Mucarr COW, D� AM,NRY TO 310 PROJ�E FAITH a FNOINREV, InSE ONE meIFN O TUG" E CN Ire OR Op M1 of Pmmel. wsn PEA, I Of a Packet Page -130]- bi'��c NqE rF9�� *E' No atzO r IF ` 'l0/ E OF AV AV 'DIT.. t e'c ' Bt�NA, EL•••••`� 14 ' 9: 10/25/2011 Item 16.A.10. 14114. MME "N O p e emuaimw ,IC �y EIPI Eagmeera Oplrbn of PmpxbeCm6 Gepe3 If (Y (/ Packet Page -1308- UNIT QUART UNICUST E-�CIITERWN(DR14) LF 74 111 $1 628 W I Discwac[ sIIEU IE) M MIKEDW V VI JW4�W J�NCTOPMCX V VA 4 4 P PI J �PLIROPOWM$WULY EA 2 $1 MIX "I �TCFWSHlNQDfPCI�MPPI EA I III 24 WE I IF M MI O p e emuaimw ,IC �y EIPI Eagmeera Oplrbn of PmpxbeCm6 Gepe3 If (Y (/ Packet Page -1308- ARE) I Discwac[ sIIEU IE) M MIKEDW V VI JW4�W J�NCTOPMCX V VA 4 4 P PI J 24 WE I IF M MI £#. IKI Pi PTc,tPvnanem cowMEI LF Se' ,IC �y EIPI Eagmeera Oplrbn of PmpxbeCm6 Gepe3 If (Y (/ Packet Page -1308- 10/25/2011 Item 16.A.10. \to 11WINre .,. Pk1 '�ENgE.,Qy KK^ „k4':�aR maeel eI R�/ Q 'IPS810NA E.��e, IPT I oil IIIIII0 Engles!, Opnon of P,4 &Cosa Pee 3013 Packet Page -1309- = f = r: y 1Y WATER MIN Mc I, �PW 10 WANVRWNH(DRU� 1 LS VIIV� IN, !MW wo In lcQATENAMT IN 2 IMM 1I 107,6 nvnwAWIMIN� UPI \to 11WINre .,. Pk1 '�ENgE.,Qy KK^ „k4':�aR maeel eI R�/ Q 'IPS810NA E.��e, IPT I oil IIIIII0 Engles!, Opnon of P,4 &Cosa Pee 3013 Packet Page -1309- LS VIIV� \to 11WINre .,. Pk1 '�ENgE.,Qy KK^ „k4':�aR maeel eI R�/ Q 'IPS810NA E.��e, IPT I oil IIIIII0 Engles!, Opnon of P,4 &Cosa Pee 3013 Packet Page -1309-