Agenda 09/13/2011 Item #16C 99/13/2011 Item 16.C.9. EXECUTIVE SUMMARY Recommendation to approve the purchase and installation of two motorized strainers and return activated sludge and waste activated sludge pumps from Mitchell and Stark Construction Company, Inc., in the amount of $267,720.00 and $245,728.00 respectively for the North County Water Reclamation Facility Technical Support Project Number 73968; and, authorize a budget amendment in the amount of $513,448 from Project Number 70050, Master Pump Station Technical Support, to Project Number 73968. OBJECTIVE: The public purpose of this rehabilitation project is to increase reliability of the clarification operation at the North County Water Reclamation Facility (NCWRF), to meet operational and reliability needs, to meet the demand for Irrigation Quality (IQ) water, and to stay in compliance with regulatory requirements. CONSIDERATIONS: On June 24, 2008, Agenda item 10(G), the Board adopted the 2008 Wastewater Master Plan Update that identified the requirement for performing various Technical Support Projects at the NCWRF. The proposed scope of work for replacing two motorized strainers and the return activated sludge (RAS) pumps and waste activated sludge (WAS) pumps for oxidation ditch number two is consistent with the 2008 Wastewater Master Plan Update, Project 73968, "NCWRF Technical Support Projects ", Section 8, Table 8 -2, page 3 of 5, line 100, and the 2010 Wastewater CIP Update, Page 2 of 4, Line 79, as identified in the 2011 User Fee Rate Study. This project rehabilitates two motorized strainers by replacing the devices and the Return Activated Sludge and Waste Activated Sludge pumps for oxidation ditch number two, with a robust reliable design. Replacement of the motorized strainers will assure that IQ water will meet regulatory and customer quality requirements. Rehabilitating the Return Activated Sludge and Waste Activated Sludge pumps will result in the ability to operate oxidation ditch number two to treat wastewater more reliably. Furthermore, overall plant reliability will be upgraded. Request for Quotations No. 08- 5011 -49, "NCWRF Motorized Strainers" and "NCWRF RAS /WAS Pump Replacement" was posted on June 27, 2011, and distributed to all vendors of the Fixed -Term Underground Utilities Contract 08-5011 via the county's electronic bid process. Of the five vendors notified, five submitted quotations for the Motorized Strainers Replacement and four submitted quotations for the RAS /WAS Pump Replacement by the July 21, 2011 deadline. The engineer's cost opinions for these two projects are $290,000 and $280,000 respectively. The quotations received are summarized in the table below. Motorized Strainers Replacement Vendor Quotation Mitchell & Stark Construction Company, Inc. $267,720.00 D.N. Higgins, Inc. $268,697.50 Kyle Construction $281,000.00 Quality Enterprises USA, Inc. $319,511.40 Haskins, Inc. $320,286.50 Packet Page -2395- 9/13/2011 Item 16.C.9. RAS /WAS Pump Replacement Vendor Quotation Mitchell & Stark Construction Company, Inc. $245,728.00 D.N. Higgins, Inc. $267,350.00 Kyle Construction $302,000.00 Quality Enterprises USA, Inc. No Quote Haskins, Inc. $345,677.00 Staff determined the lowest quote to be fair and reasonable and recommends awarding the project to Mitchell and Stark Construction Company, Inc., the lowest responsive and qualified vendor. The quote received for the Motorized Strainers Replacement was $22,280 (7.7 %) less than the engineer's cost opinion and the quote received for the RAS /WAS Pump Replacement was $34,272 (12.2 %) less than the engineer's cost opinion. The design professional, Hole - Montes Associates, in the attached letter dated August 23, 2011, recommends award to Mitchell and Stark Construction Company, Inc. Mitchell and Stark Construction Company, Inc. has a satisfactory performance and warranty record on previous wastewater utility- related projects. FISCAL IMPACT: A Budget Amendment is required to transfer funds from Project Number 70050 Master Pump Station Technical Support to Project Number 73968 NCWRF Technical Support Project for the implementation of this project. The source of funding is the Wastewater User Fee Fund (414). LEGAL CONSIDERATIONS: This item is legally sufficient and requires a majority vote. - JBW GROWTH MANAGEMENT IMPACT: This project meets current GroxAlh Management Plan standards to insure the viability of public facilities. RECOMMENDATION: That the Board of County Commissioners, as the Ex- officio Governing Board of the Collier County Water -Sewer District, Approve the two quotes in the combined amount of $513,448 from Mitchell & Stark Construction Company, Inc., for the purchase and installation of two motorized strainers and the RAS and WAS pumps for oxidation ditch number two; authorize the Chairman to sign and execute the work order; and, • Authorize the necessary Budget Amendment to transfer funds in the amount of $513,448 from Project Number 70050, Master Pump Station Technical Support, to Project Number 73968, NCWRF Technical Support Projects. • Approve the extension of the Master Agreement until March 10, 2015 to coincide with the work order. Prepared By: Craig J. Pajer, P.E., Principal Project Manager, Public Utilities Division. Attachment 1: Engineer's letter of award recommendation — Motorized Strainers Attachment 2: Engineer's letter of award recommendation — RAS WAS Pumps Attachment 3: Quote tabulation - Motorized Strainers Attachment 4: Quote tabulation - RAS WAS Pumps Packet Page -2396- 9/13/2011 Item 16.C.9. Attachment 5: RFQ 408-5011-49 Multiple RFQs for Craig Pajer Attachment 6: Timeline for RAS +WAS Pump Replacement Attachment 7: Timeline for Motorized Strainers Attachment 8: Signed Work Order — Motorized Strainers Attachment 9: Signed Work Order -RAS WAS Pumps Packet Page -2397- COLLIER COUNTY Board of County Commissioners Item Number: 16.C.9. 9/13/2011 Item 16.C.9. Item Summary: Recommendation to approve the purchase and installation of two motorized strainers and return activated sludge and waste activated sludge pumps from Mitchell and Stark Construction Company, Inc., in the amount of $267,720.00 and $245,728.00 respectively for the North County Water Reclamation Facility Technical Support Project Number 73968; and, approve a budget amendment in the amount of $513,448 from Project Number 70050, Master Pump Station Technical Support, to Project Number 73968. Meeting Date: 9/13/2011 Prepared By Name: PajerCraig Title: Project Manager, Senior,Public Utilities Engineering 8/19/2011 12:06:10 PM Submitted by Title: Project Manager, Senior.Public Utilities Engineering Name: PajerCraig 8/19/2011 12:06:11 PM Approved By Name: Steve Messner Title: Plant Manager,Water Date: 8/23/2011 3:24:06 PM Name: HapkeMargie Title: VALUE MISSING Date: 8/24/2011 10:46:50 AM Name: ChmelikTom Title: Project Manager, Principal,Public Utilities Engine Date: 8/24/2011 3:38:51 PM Packet Page -2398- Name: ParkerNicole Title: Contracts Specialist,Purchasing & General Services Date: 8/25/2011 10:22:55 AM Name: ParkerNicole Title: Contracts Specialist,Purchasing & General Services Date: 8/25/2011 10:23:16 AM Name: CarnellSteve Title: Director - Purchasing /General Services,Purchasing Date: 8/26/2011 7:11:09 AM Name: JohnssenBeth Date: 8/26/2011 9:30:14 AM Name: Steve Messner Title: Plant Manager,Water Date: 8/26/2011 10:05:08 AM Name: WidesTom Title: Director - Operations Support - PUD,Utilities Fina Date: 8/26/2011 12:36:34 PM Name: WhiteJennifer Title: Assistant County Attorney,County Attorney Date: 8/26/2011 5:04:43 PM Name: YilmazGeorge Title: Director - Wastewater, Wastewater Date: 8/28/2011 10:40:17 PM Name: KlatzkowJeff Title: County Attorney, Date: 8/29/2011 2:28:43 PM Name: UsherSusan Title: Management/Budget Analyst, Senior,Offlce of Manage Date: 9/2/2011 5:08:32 PM Name: OchsLeo Title: County Manager Date: 9/3/2011 11:31:00 AM Packet Page -2399- 9/13/2011 Item 16.C.9. 9/13/2011 Item 16.C.9. HOLE MONTES E:NO'.t:EERS' I LW,*ERS SURlnE ORS LANDSCAPE ARCHITECTS 950 Encore Way - Naples. Florida 31110 -Phone, 239.254:2000 • Fax 239.254.2099 August 23, 2011 Craig Pajer, Project Manager Collier County Public Utilities 3339 Tamiami Trail East Suite 303 Naples FL 34112 RE: EVALUATION OF QUOTATIONS NCWRF OPERATIONAL READINESS — MOTORIZED STRAINERS HM File No. 2010.075 Dear Craig, We have reviewed the five bids received by the County on June 27, 2011 for the NCWRF Operational Readiness Motorized Strainers, County Quote No. 08- 5011 -49. The five bidders and their quoted price are identified below as supplied by the County Purchasing Department. The apparent low quote is from Mitchell & Stark Company, Inc. in the amount of $267,720.00 Mitchell & Stark Company, Inc. Naples, FL $267,720.00 D. N. Higgins, Inc Naples, FL $268,697.50 Kyle Construction Naples, FL $281,000.00 Quality Enterprises, USA, Inc. Naples, FL $319,511.40 Haskins, Mc. Naples, FL $320,286.50 Mitchell & Stark has successfully completed other construction projects for Collier County and is on the County's list of approved Litility contractors. Therefore, we recommend award of this construction contract to Mitchell & Stark in the amount of $267,720.00 subject to a f real review by the Purchasing Department of the quotation documents. Please contact us if there are any questions about this quote evaluation. Thank you, 1 E MON IS.l�r'� c erry // aricska, Ph.D., P.E., B.C.E.E. sso?}tfte /Environmental Engineering Manager JRT:dlh H:1201012010075\EN\H Conslnledon Bidding & ContractM Bidding120110822 CP Nlotorized Strainers Award Recommendation Itr HCP.doc Packet Page -2400- 9/13/2011 Item 16.C.9. SWIIIIIIIIII HOLE MONTES ENG',NEERS - PLA%NERS SURVEYORS LM4055CAPE ARCH❑ECTS 950 Encore Way - Naples, Florida 34110 - Phone: 239.254.2000 -Fax: 239.254.2099 August 23, 2011 Craig Pajer, Project Manager Collier County Public Utilities 3339 Tamiami Trail East Suite 303 Naples FL 34112 RE: EVALUATION OF QUOTATIONS NCWRF ELECTRICAL ENHANCEMENTS — RAS/WAS PUMP REPLACEMENT HM File No. 2010.076 Dear Craig, We have reviewed the five bids received by the County on June 27, 2011 for the NCWRF Electrical Enhancements RAS /WAS Pump Replacement, County Quote No. 08- 5011 -49. The five bidders and their quoted price are identified below as supplied by the County Purchasing Department. The apparent low quote is from Mitchell & Stark Company, Inc. in the amount of $245,728.00. Mitchell & Stark Company, Inc. Naples, FL $245,728.00 D. N. Higgins, Inc Naples, FL $267,350.00 Kyle Construction Naples, FL $302,000.00 Quality Enterprises, USA, Inc. Naples, FL NO QUOTE Haskins, Inc. Naples, FL $345,677.00 N4itcheil & Stark has successfully completed other construction projects for Collier County and is on the County's list of approved utility contractors. Therefore, the recommend award of this construction contract to Mitchell & Start: in the amount of $245,728.00 subject to a final review by the Purchasing Department of the quotation documents, Please contact us if there are any questions about this quote evaluation. Thant: you, E MONTE , INC. y R. icska, Ph.D., P.E., B.C.E.E. socia e�Environmental Engineering Manager JRT:dlh H:\2010\2010076\ENVI Construction Bidding & Contract\H2 Bidding\20110822 CP RAS WAS PUMPS Award Recommendation hr IICP.doc Packet Page -2401- 9/13/2011 Item 16.C.9. QUOTE TABULATION 08- 5011 -49 MULTIPLE RFQ'S 07 Motorized Strainer Mitchell & Stark Quality Enterprises DN Higgins Kyle Construction Haskins, Inc. Lump Sum $232,800.00 $277,836.00 $233,650.00 no breakdown provided $278,510.00 115% Allowance $34,920.00 $41,675.40 $35,047.50 $41,776.50 $267,720.00 $319,511.40 $268,697.50 $281,000.00 $320,286.50 Packet Page -2402- 9/13/2011 Item 16.C.9. v Packet Page -2403- QUOTE TABULATION 08- 5011 -49 MULTIPLE RFQ'S 08 RAS / WAS Pumps Mitchell & Stark Quality Enterprises DN Higgins Kyle Construction Haskins, Inc. 1 Lump Sum $215,728.00 $237,350.00 no breakdown provided $315,677.00 Allowance $30,000.00 $30,000.00 $30,000.00 $245,728.00 $267,350.00 $302,000.00 $345,677.00 v Packet Page -2403- 9/13/2011 Item 16.C.9. From: ParkerNicole To: ParkerNicole; "Belwell ": Ryan MacPhee; "Kyle Construction Inc "; "Brian Penner ": "Mike Westhafer "; "Lou Gaudio" "Marcie Cohen": Brandy Bartolone: 'Tammy Ludwig" Cc: PakE raig: Pr n; SchaltPeter Subject: RFQ #08- 5011 -49 (Multiple RFQ "s for Craig Pajer) Date: Friday, July 29, 20119:07:08 AM Attachments: Quote Tabulation 08- 5011 -49 Multiple RFO.xlsx Good morning — please see the attached quote results. Each project is broken out on the lower tabs on the spreadsheet. Thank you for your participation! PROJECT LOWEST QUOTER COST 01 SLUDGE CONVEYOR MITCHELL & STARK $84,870.00 02 BLEACH PIPING DN HIGGINS $24,322.50 03 KNIFE GATE VALVES DN HIGGINS $128,972.50 04 CHANNEL MIXERS DN HIGGINS $120,750.00 05 CLARIFIERS DN HIGGINS $220,800.00 06 POTABLE WATER INTERCONNECT MITCHELL & STARK - DN HIGGINS $16,098.85 07 MOTORIZED STRAINERS MITCHELL & STARK $267,720.00 08 RAS / WAS PUMPS MITCHELL & STARK $245,728.00 Nicole Parker Procurement Strategist Collier County Purchasing Depa; trnent 3327 Tamiami Trail East Naples, FL 34112 Tel: 239- 252 -4270 Fax: 239 - 252 -6549 Email: nicoleparker0colliergov.net l.;n a F� ��' -� as - -. e-r�,.i�.v.. :i. •- c---d: if , ro_ v:)u' ^-jai idn' ': eaa' -ed ir do no � m tc r -cie rd i'i.. :d. z:0 eau, tt' e �"y �...k �.;e� �,� r Packet Page -2404- Co tD O Al Ca i. CL CL U- z CD Z 0 (L 11 �5 �5 27, 45 77 15 C, E Packet Page -2405- 9/13/2011 Item 16.C.9. EM w LO .... ......... . . ........... .. .. . ..... .... ... ..... . C14 Lf) ........... . .... I ... ................. . ... ....... . ...... LL CY et ...................... .............................. .............................. 04 C4 ...................... .... . .. . .................... .................. . ....... .. .... ....... . .. . .. . .... .. ...... ................... .. .............................. Ci .... ... . .. . .. . ........ .... ........ ........... .. ..... . ................... ........... . -,,, ....... ........... Cf ..................... .......... ............ .................. CJ .......... ........... ............................ ................. . ...... 11 �5 �5 27, 45 77 15 C, E Packet Page -2405- 9/13/2011 Item 16.C.9. EM w 9/13/2011 Item 16.C.9. ca >= -2 Ell CL LL 7, cs T, mt A CR Packet Page -2406- Z 0 Ci ........... ...... . ......... .................... ........................... LO .............. . ...... . .................... ........................... 00 to ..................... . ............................. .......................... C; Z Cn CJ 0 ...................... ............................. ............ — N .............. ....... ............ . ............... ............................ Ci N C7 .... ............................... ........... .......... ........................ .......... ............. ............ Q1 C .... . .. .. .... ............................... ...................... .............................. ..................... O O cc ca >= -2 Ell CL LL 7, cs T, mt A CR Packet Page -2406- Z 0 ca >= -2 Ell CL LL 7, cs T, mt A CR Packet Page -2406- 9/13/2011 Item 16.C.9. WORK ORDER/PURCHASE ORDER Agreement for "Fixed -Term Underground Utilities Contract" Dated: March 11, 2008 (Contract 08 -5011) This Work Order is for underground construction services for work known as: Project Name: NCWRF Motorized Strainers, Project No. 73968.43.27 The work is specified in the quote dated July 21, 2011 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order is assigned to: Mitchell & Stark Construction Company, Inc. Scope of Work: As detailed in the attached proposal and the following: • Task 1 $ 232,800.00 Install Two Motorized Strainers • Task 2 $ 34,920.00 Owner Directed Work Schedule of Work: Complete work within 1,200 days from Date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Article Five of the Agreement, the County will compensate the Firm in accordance with following method(s): ❑Negotiated Lump Sum ®Lump Sum Quote Z Time & Material (established hourly rate — Schedule A) ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 $232,800.00 Lump Sum Task 2 S34.920.00 Time and Materials Total Fee $ 267,720.00 Any change made subsequent to final department approval will be considered an additional service and charged according to Schedule "A" of the original Contract Agreement. Prepared By: Craig P Authorized By: To PE;)Pri4acipal Project Manager Chmelik, PE, PPMD Director Approved : - -�'., =__ --- Betf� Johnssenp, )Vastewater Operations Manager Approved By: Steve Messner, Interim Wastewater Director r/ Approved By:�/� 7G-' Nicole Parker, Purchasing Agent Packet Page -2407- 2 1:5 @ Date Z. 4rx /Date Date Date � '/ t Date 9/13/2011 Item 16.C.9. Approved By: c---- e 5,/-2- -> 1I Dr. George Yilmaz, Interim PUD Administrator Date Accepted By: Mitchell & Stark Construction Company, Inc. I . A---LOV ( J9-- S Z) -u 1, (Michael P. West afer, Vice President) Dale ATTEST: Witness: o, Wit ess: Signature ire ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk Collier County, Florida By: Deputy Clerk Approved as to Form and Legal Sufficiency: Assistant County Attorney By: Chairman Packet Page -2408- C V; C VC C O v 3 C O u LO Z L�L v O � c Z J 'r O Q a J ul Q C N_ F O V) O Q � � L Cr o t-- �n o Cu 0 c w O O a Y N 06 C7 L v w 0- O Lq l.o C* N O N M V). O O O O O r-i 00 N V's- 0 lD 00 N tn O IT r-i rn M O O O N n tD N Packet Page -2409- 9/13/2011 Item 16.C.9. 9/13/2011 Item 16.C.9. M I f c'Ile COLLIER COUNTY FLORIDA REQUEST FOR QUOTATION RFQ 013- 5011 -49 Multiple Projects Separately Awarded PROPOSALPAGE DUE DATE: July 21, 2011 at 2:30 pm The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this Proposal is accepted, to furnish same in full, according to the following: See separate Bid Schedules This firm has submitted a quote for the individual stand -alone project (check all that applies): Packet Page -2410- 01 — Sludge Conveyor 02 — Bleach Piping 03 — Knife Gates Valve 04 — Channel Mixers 05 — Clarifiers 06 — Potable Water Interconnect 07 — Motorized Strainers 08 - -IZAS /WAS Pumps - - Packet Page -2410- 9/13/2011 Item 16.C.9. _ IN WITNESS WHEREOF, WE have hereunto subscribed our names on this 28th day of July, 2011 in the County of`Lee. m t e state of lorida. Mitchell & Stark Construction Company, Inc. Firm's Complete Legal Name 239- 332 -1632 Telephone Number 239- 332 -2819 FAX Number mwesthafer@mitchelistark.com Email Address 9009 High Cotton Lane Address Fort Myers City Florida State 33905 Zip 845897 Florida Ce � Cerbficate 0Authori Document Number www unbizor w !sear un Signature �l Vice President Title Michael P. Westhafer 7/29/2011 Print Name Date RFQ_ContractDriven RevisedSeptember20D9 6 Packet Page -2411- 9/13/2011 Item 16.C.9. COLLIER COUNTY QUOTE NO. RFQ #08- 5011 -49 QUOTATION OPENING DATE 07/28/2011 REPLACE AUTOMATIC STRAINERS - REUSE PUMPS 5 AND 6 NORTH COUNTY WATER RECLAMATION FACILITY COLLIER COUNTY PUBLIC UTILITIES DIVISION Item No. Description Estimated Quantity Total 1 Perform all Contract Work described in the Contract Documents Lump Sum $232,800.00 2 Allowance Fund for Owners Use as Directed. This fund will be used only at the Owner's direction to address unforeseen work associated with the existing underground piping and to direct the SCADA- related work associated with integration of the new strainers into the existing SCADA system. Inclusion of the Allowance Fund as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance Fund. Insert 15% of cost. Lump Sum $34,920.00 TOTAL PRICE FOR ITEMS 1 AND 2 Packet Page -2412- 9/13/2011 Item 16.C.9. WORK ORDER/PURCHASE ORDER Agreement for "Fixed -Term Underground Utilities Contract" Dated: March 11, 2008 (Contract 08 -5011) This Work Order is for underground construction services for work known as: Project Name: NCWRF RAS /WAS Pump Replacement, Project No. 73968.43.28 The work is specified in the quote dated July 21, 2011 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order is assigned to: Mitchell & Stark Construction Company, Inc. Scope of Work: As detailed in the attached proposal and the following: • Task 1 $ 215,728.00 Install RAS /WAS Pump Replacements • Task 2 $ 30,000.00 Owner Directed Work Schedule of Work: Complete work within 1,200 days from Date of the Notice to Proceed which is accompanying this Work Order, Compensation: In accordance with Article Five of the Agreement, the County will compensate the Firm in accordance with following method(s): ❑Negotiated Lump Sum ZLump Sum Quote Z Time & Material (established hourly rate – Schedule A) ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 $215,728.00 Lump Sum Task 2 S 30.000.00 Time and Materials Total Fee S 245,728.00 Any change made subsequent to final department approval will be considered an additional service and charged according to Schedule "A" of the original Contract Agreement. Prepared By:°' Craig P je P Prixi.ciPA. Project Manager Authorized By: Toxin Chmelik, PE, PPMD Director Approved B= Betli Johnssen, 44stewater Operations Manager Approved By:—. Steve Messner, Interim Wastewater Director Nicole Parker, Purchasing Agent Packet Page -2413- 0,1z:5-A, Date fZt Date Date z1, \i Tate Date 9/13/2011 Item 16.C.9. Approved By: Dr. George Yilmaz, Interim PUD Administrator Date Accepted By: Mitchell & Stark Construction Company, Inc. (Michael P. Westhafer, Vice President) Dat ATTEST: Witness: � Witne Signature S' ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk Collier County, Florida By: Deputy Clerk Approved as to Form and Legal Sufficiency: Assistant County Attorney By: Chairman Packet Page -2414- c �C h m S c 0 U 7 c 0 0 L; d' m O 0 O O O N O M Y i f6 V1 t V O O Co N n LA N Packet Page -2415- 9/13/2011 Item 16.C.9. O O N Cf O m C) o O m z LL CL = Z M O ko W E O N tn- V} N /} Q �' d Co Z) Q d LU In N v O = a O W Q i Y 0 0 W L d Y i f6 V1 t V O O Co N n LA N Packet Page -2415- 9/13/2011 Item 16.C.9. 9/13/2011 Item 16.C.9. COLLIER COUNTY FLORIDA REQUEST FOR QUOTATION RFQ #08- 5011 -49 Multiple Projects Separately Awarded PROPOSALPAGE DUE DATE: July 21, 2011 at 2:30 Pm The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this Proposal is accepted, to furnish same in full, according to the following: See separate Bid Schedules This firm has submitted a quote for the individual stand -alone project (check all that applies): Packet Page -2416- 01 -- Sludge Conveyor 02 — Bleach Piping V 03 — Knife Gates Valve 04 — Channel Mixers 05 — Clarifiers 06 — Potable Water Interconnect 07 — Motorized Strainers 08 — RAS / WAS Pumps Packet Page -2416- 9/13/2011 Item 16.C.9. IN WITNESS WHEREOF, WE have hereunto subscribed our names on this 28th day of July, 2011 in the County of Lee, in the state of Florida. Mitchell & Stark Construction Company, Inc. Firm's Complete Legal Name 239 -332 -1632 Telephone Number 239 - 332 -2819 FAX Number mwesthafer @mitchelistark.com Email Address 9009 High Cotton Lane Address Fort Myers City Florida State 33905 Zip 845897 Florida Certificate 91 Authorik Document Number (www.sunb!z.ora/swchrhtm1 Signature Vice President Title Michael P. Westhafer 7129/2011 Print Name Date RFQ_ ContractDriven _RevisedSeptember2OO9 6 Packet Page -2417- 9/13/2011 Item 16.C.9. COLLIER COUNTY QUOTE NO. RFQ #08- 5011 -49 QUOTATION OPENING DATE 07/28/2011 RAS/WAS PUMPS - CLARIFIERS 2 & 3 NORTH COUNTY WATER RECLAMATION FACILITY COLLIER COUNTY PUBLIC UTILITIES DIVISION Item No. Description Estimated Quantity Total 1 Perform all Contract Work described in the Contract Documents Lump Sum 215,728.00 2 Allowance Fund for Owners Use as Directed. This fund will be used only at the Owner's direction to address unforeseen work associated with modifications to existing ductile iron piping and valves and existing electrical conduits. Inclusion of the Allowance Fund as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance Fund. Lump Sum 30,000.00 TOTAL PRICE FOR ITEMS 1 AND 2 Packet Page -2418- $245,728.00