Loading...
Agenda 09/13/2011 Item #16A279/13/2011 item 16.A.27. EXECUTIVE SUMMARY Recommendation to approve Change Order #1 for the Work Order with Bonness,'inc. for the Construction of the Progress Avenge at Livingston Road Intersection Improvements, Project No. 60188 -2, in the amount of $40,906.26; O To. rceive Board approval for additional contract services associated with the construction of the. above referenced project. Change Order #1 for the Work Order with Bonness, Inc., Purchase Order No. 4500/24143 for the Progress Avenue at Livingston Road Intersection Improvements,; Project No. 60188 -2, in the amount of $40,946.26. CONWPERATIONS; On November 10, 2010, the Growth Management Division Administrator executed a Work Order under Contract # 09- 5197with Bonness, Inc., Purchase Order No. 4500124143 for the Progress Avenue: at Livingston Road Intersection Improvements, Project No. 60188 -2, in the amount of $210,663.74. During construction, it was deemed necessary by the County and Contractor to modify the existing traffic signal system at the intersection of Progress Avenue and Livingston. Road, for proper operations, and to improve the existing Progress Avenue and Commercial Boulevard intersection. ,.� Those items were unforeseen during the design phase. The change order is required to provide payment for the extra work performed. There is no need for a time extension since all of the improvements were constructed within the contract time. This price proposal request submitted by the Contractor has been reviewed and accepted by the Transportation Engineering Department and is deemed fair and reasonable. FISCAL IMPACT: Funds in the amount of $40,906.26 are available in the Naples Production Park MSTU Fund (138). LEGAL CONSIDERATIONS: This is an after -the -fact change order, as the work was already performed this summer while the project was fully mobilized. It is staff's opinion that $40,906.26 represents a fair cost for the work performed, so that the contractor in any event would be entitled to such payment as a matter of quantum meruit. This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval —SRT. GROWTH MANAGEMENT IMPACT: The Progress Avenue -Roadway Improvements project has no impact on the Growth Management Plana RECOIL ZN }ATION: That the Board of County Commissioners approve Change Order #1 in the amount of $40,406.26 with Bonness Inc., authorizing final payment on this project. Packet Page -2011- 9/13/2011 Item 16.A.27. COLLIER COUNTY Board of County Commissioners Item Number: 16.A.27. Item Summary: Recommendation to approve Change Girder #1 for the Work Order with Sonness, Inc. for the Construction of the Progress Avenue at Livingston Road intersection Improvements, Project No. 60188 -2, in the amount of $40,906.26. Meeting Date: 9/13/2011 Prepared By Name: LynchDiane Title: Administrative Assistant 8/25/20112:42:29 PM Approved By Name:OrdonezJulio Title: Project Manager, Principal,Transportation Engineer Date: 8/29/2011 9:51:28 AM Name: KhawajaAnthony Title: Engineer - Traffic Operations ,Transportation Engineering & Construction Management Date: 8/29/2011 3:02:10 PM Name: BetancurNataii Title: Executive Secretary,Transportation Engineering & C Date: 8/30/2011 8:26:08 AM Name: CummingsRhonda Title: Contracts Specialist,Purchasing & General Services Date: 8/30/2011 1:34:51 PM Name: Ahmadlay Title: Director - Transportation Engineering,Transportation Engineering & Construction Management Date: 8/30/2011 1 :59:37 PM Name: NauthRookmin' Title: Management /Budget Analyst,Transportation Administr Date: 8/30/20113-13:54 PM Packet Page -2013- 9/13/2011 Item 16.A.27. Name: CarnellSteve Title: Director - Purchasing/General Services,Purchasing Dater 8/30/20115:07:21 PM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 8/31/20117:06:47 AM Name: FederNorman Title: Administrator - Growth Management Div,Transportat Date: 8/31/2011 1 3 5 :11 ' PM Name: KlatzkowJeff Title: County Attorney, Date: 9/1/2011 2:25:27 PM Name: IsacksonMark Title: Director -Carp Financial and Mgmt Svs,CMO' Date: 9/2/20112:30:03 PM Name :OchsLeo Title: County Manager Date: 9/2/2011, 4:21:01 PM I Packet Page - 2014 - 9/13/2011 Item 16.A.27. CHANGE ORDER TO WORK ORDER ` TO: Bonness, Inc. FROM: Transportation Engineering 1990 Seward Avenue 2885 Horseshoe Drive South �•� Naples, FL 34109 Naples, FL 34104 /-IN 10-111. Prooress Avenue at Livingston Road Intersection Improvements Project #: 60188.2 Order Date: November 10, 2010 PO # 4500124143 ae Order Number: 1 Order Description: AdO and increase some of the contract work items in order to modify the existing traffic signal system at thel intersection of Progress Avenue and Livingston Road to provide proper operations, and increase contract paving work items to improve the existing Progress Avenue and Commercial Boulevard intersection. These changes were unforeseen during the design phase of the project. Q;nal agreement amount ............................. ............................... $210,663.74 Su of Previous Changes ..................... ..............................$ 0.00 Thib Change Order No. 1 Amount (add 9F Stib fasi) ........................ $ 40,906.26 Revised Agreement Amount .......................... ............................... $251,570.00 Original contract time in calendar days .................... ............................150 days Adj isted number of calendar days due to previous change orders .................. 0 days This change order adjusted time is ....................... ............................... 0 days I Re1fsed Contract Time in working days .................... ............................150 days Completion Notice to Proceed date ................. ............................... March 7`h, 2011 date based on original contract time .............................. August 411, 2011 Re�ised completion date due to change order .............................. August 4'h, 2011 i Your acceptance of this change order shall constitute a modification to our Agreement and will be pe ormed subject to all the same terms and conditions as contained in said Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, to this Agreement shall constitute -a full and final settlement of any and all claims arising out of, or related to, the change set orth herein, including claims for impact and delay costs. Prepared by x ; ` Wi Dates 1t Julio F. Ordonez' P nncipal Pf ac r Transportation Engine �aing06" 'iiri ent � f Accjepted by: ^ ^ Date: 8/16/2011 Jane Baratta, Corporate Secretary- Treasurer Bonness, Inc. I I I /r� Approved by: G; r:.�- C.`v' Date:l ! Eugene Calvert, P.E., Principal Project Manager Transportation Engineering Department I t�- Ap�roved by. Date: j; a Ahm , P,E., Director Transportafiion Engine ng Department 'I Approved by: Date: Norman E. Feder, AICP, Administrator Growth Management Division Approved by*dda Date: mings, Contract S pecialist partment Packet Page -2015- 9/13/2011 Item 16.A.27. Total Price for above Additional Signalization Items: $23,332.52 120 -1 Excavation ,; 4 CY $13.65 $273.00 120-6 Embankment 1990 Seward Avenue CY $26.41 $528.20 520 -1 -10 Concrete Curb And Gutter, Type F Naples. Florida 34109 LF $9.18 $1,147.50 522 -2 Concrete Sidewalk, 6" Thick (239) 597 -6221 • (239) 597 -7416 Fax SY $27.98 I www.bonnessinc.com Total Price for above Additional Sidewalk & Curb (UPS Addition) Items: $3,823.36 I Proposal 7/5/2011 Asphalt Commercial Dr Instersection Overbuild) Superpave Asphaltic Concrete Traffic B (SP 9.5) 56.11 TON Submitted To: Oilier County Growth Management Division Estimate Number: 90232011 334 -1 -22 Address: 2185 S Horseshoe Dr Bid Title: Change Order - Contract Additions $7,884.80 N�pies, FL 34104 Total Price for above Additional Asphalt Commercial Dr Instersection Overbuild) Items: $12,426.34 Additional 07063 Pavement Markings Reflective Pavement Markers 40.00 Project Location: Progress Ave & Livingston Rd Contact: I Julio Ordonez Project City, State: Naples, FL LF Phone: (739) 252 -8192 Fax: (239) 252 -2726 Engineer /Architect: 0711 11123 Thermoplastic, Standard, White, Solid, 12" 17.00 LF $1.52 $25.84 Item # Item Description Estimated Quantity Unit Unit Price Total Price Additional 102 -1 Signaliation Maintenance Of Traffic 1.00 LS $4,084.40 $4,084.40 555 -1 -2 Directional Bore (Utility Conflicts) 45.00 LF $30.90 $1,390.50 630 -1 -12 Conduit (Utility Conflicts) 200.00 LF $7.54 $1,508.00 635 -1 -11 Pull Box! 4.00 EACH $305.91 $1,223.64 660 -2 -106 Loop Assembly (Type F) (30 Foot) 3.00 AMBY $773.25 $2,319.75 NEW ITEM Repair Conduit At Southeast Comer (Existing 1.00 LS $958.51 $958.51 Conduit At Mastarm Foundations) NEW ITEM Relocate Conduit & Wire For Street Lighting 1.00 LS $2,672.08 $2,672.08 NEW ITEM Belden For Loops (Belden Wire For System Loops 1.00 EACH $9,175.64 $9,175.64 Not Shown On Plans) Total Price for above Additional Signalization Items: $23,332.52 120 -1 Excavation 20.00 CY $13.65 $273.00 120-6 Embankment 20.00 CY $26.41 $528.20 520 -1 -10 Concrete Curb And Gutter, Type F 125.00 LF $9.18 $1,147.50 522 -2 Concrete Sidewalk, 6" Thick 67.00 SY $27.98 $1,874.66 Total Price for above Additional Sidewalk & Curb (UPS Addition) Items: $3,823.36 Additional 334 -1 -12 Asphalt Commercial Dr Instersection Overbuild) Superpave Asphaltic Concrete Traffic B (SP 9.5) 56.11 TON $80.94 $4,541.54 334 -1 -22 Superpave Asphaltic Concrete Traffic B (SP 12.5) 79.54 TON $99.13 $7,884.80 Total Price for above Additional Asphalt Commercial Dr Instersection Overbuild) Items: $12,426.34 Additional 07063 Pavement Markings Reflective Pavement Markers 40.00 EACH $4.40 $176.00 0711 11121 Thermoplastic, Standard, White, Solid, 6" 566.00 LF $0.64 $362.24 0711 11123 Thermoplastic, Standard, White, Solid, 12" 17.00 LF $1.52 $25.84 8/5/20112:45:35 PM Page 1 of 2 Packet Page -2016- 1990 Seward Avenue Naples, Florida 34109 (239) $97 -6221 • (239) 597 -7416 Fax www.bonnessinc.com 9/13/2011 Item 16.A.27. - Item # Item Description Estimated Quantity Unit Unit Price Total Price 0711 11125 Thermoplastic, Standard, White, Solid, 24" 52.00 LF $3.67 $190.84 0711 11221 Thermoplastic, Standard, Yellow, Solid, 6" 429.00 LF $0.64 $274.56 0711 11224 Thermoplastic, Standard, Yellow, Solid, 18" 92.00 LF $3.16 $290.72 0711 11251 Thermoplastic, Standard, Yellow, Skip, 6" 4.00 LF $0.96 $3.84 Total Price for above Additional Pavement Markings Items: $1,324.04 Total Bid Price: $40,906.26 Payment Terms: Payment due within 30 days of date of invoice, regardless of when payment is made by Owner ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Buyer Signature: Date of Acceptance: 8/5/2011 2:45:35 PM CONFIRMED: Bonness InG Authorized Signature: Estimator: Al DeMartino _: __: Packet Page -2017- Page 2 of 2 9/13/2011 Item 16.A.27. ir ' I date: U i Number of days added (if unit extension, must atte ch current Department insurance certificate(s) from Livingston Road, for proper operations and to improve the existing Progress Avenue and SAP or obtain from Purchasing P.dministraVve Sevic6s Dmsion phase. The change order is required to provide additional funds for the extra work i Change Modification Form curchasirg j constructed within the contract time. ❑ C i ontract Change Request Z Change task(s) Delete task(s) ' Q Other (specify): Q Work Order Modification Contract #:09- Mod #: 1 POIWork Order M Project Name: Progress Avenue at the existing traffic signal system at Progress Ave. and Livingston Rd. intersection to better handle 5197 4500124143 rationale for the requested change: Improvement of the existing traffic signal system. ; Livingston Road Intersection why change was not anticipated in original scope of work: The additional work was not identified during, the design phase, it was required by signal staff. 4. Describe the impact Improvements signal system at Project M 60188.2 Project Manager: Julio ' Department: Transportation Contractor /Firm Name: Bonness, Inc. E Ordot)ez Engineering Original Contract/Work Order Amount $ 210,663.74 N/A Original BCC Approval Date; Agenda Item # Current BCC Approved Amount #NfA N/A Last BCC Approval Date; Agenda Item # Current Contract/Wgrk Order Amount $ 210,663.74 Dollar Amount of this Change $40,906.26 #WA Change from Current BCC Approved Amount Revised New Contr�ct/V1/ork Order Total $ 251,570.00 1 Cumulative Changed 1 $40,906.26 11 19.427% Change from Original Amount { Completion Date, Description of the Task(s) Change, and Rationale for the Change i Original notice to proceed March 7th, 2011 date: Last approved date: August 4th, 2011 i Revised date (includes this change): August 4t', 2011 i Number of days added (if i This change order is prepared to add /increase some of the contract work items in order to extension, must atte ch current modify the existing traffic signal system at the intersection of Progress Avenue and insurance certificate(s) from Livingston Road, for proper operations and to improve the existing Progress Avenue and SAP or obtain from vendor): 0 Commercial Boulevard intersection. These items ware unforeseen during the design } phase. The change order is required to provide additional funds for the extra work i performed, there is no need for a time extension since all of the improvements were constructed within the contract time. Add new task(s) Z Change task(s) Delete task(s) ' Q Other (specify): I Increase quantities and extend time 1. Provide a detailed i and specific explanation of the requested change(s) to the task(s): Most of the changes were I required to improve the existing traffic signal system at Progress Ave. and Livingston Rd. intersection to better handle traffic in the future. i 2. Provide detaileld rationale for the requested change: Improvement of the existing traffic signal system. 3. Provide explanation why change was not anticipated in original scope of work: The additional work was not identified during, the design phase, it was required by signal staff. 4. Describe the impact if this change is not processed: The County will have to go back in the future and upgrade the signal system at a more expensive cost and potential traffic delyas j Type of Change / Modification j 0 1. Planned / Elective I Q 2. Unforeseen conditions /circumstance 1 Q 3. Quantiy or price adjustment 1 Lj 4 Correction of �rror(s) 5 Value added 6. Schedule adjustment i Change Requested By ❑ Contractor /ConsWItant I p9 Owner I Lc u sinq ve aitii =IL I I C31 IQPVJ LOUVII Design Professional Regulatory Agency (specify): I E.Other (specify): Traffic Signal Section Purchasinq.Professional Participated in Negotiation of Change / Modification' LJ Yes No Packet Page -2018- I