Agenda 05/24/2011 Item #16C55/24/2011 Item 16.C.5. EXECUTIVE SUMMARY Recommendation to approve a work order in the Amount of $235,283.56 to Quality Enterprises USA Inc., for Lift Station 310.01 Rehabilitation under contract 08 -5011 — Annual Contract for Underground Utility Contracting Services, Project 70046. OBJECTIVE: The public purpose for this Work Order is to remain in compliance and meet demand by rehabilitating lift station 310.01. CONSIDERATIONS: On June 24, 2008, as Agenda Item 10G, the Board of County Commissioners (Board) adopted the 2008 Wastewater Master Plan Update that identified the requirement for rehabilitating lift stations. The proposed scope of work for Project 70046, "Lift Station/Sub- Master Pump Station Technical Support," is consistent with the 2010 Wastewater CIP Update, page 2 of 4, line 66, as identified in the 2011 User Fee Rate Study. This lift station is located in the Southwinds Mobile Home Park (Radio Road and Regan Street), and is approximately 20+ years old. Rehabilitating this high - priority lift station is part of a multi -year program that addresses approximately 10 stations per year within the installed -base of 750+ locations. Included is the replacement of the wet well, pumps, piping, and electrical controls that are beyond their useful life. Fencing and odor control are included to meet standards of security and the Good Neighbor Policy. Because the wet well is undersized, this lift station is susceptible to overflowing in the event of a power failure. The wet well size is being increased to provide greater response time for technicians and pumper trucks. Request for Quotation No. 08- 5011 -39 "Lift Station 310.01 Refurbishment" was posted on April 8, 2011, and distributed to all vendors of the Fixed -Term Underground Utilities Contract 08 -5011 via the County's electronic bid process. Of the five vendors notified, four submitted quotations by the April 27, 2011 deadline. The quotations received are summarized in the table below. Vendor Quotation Quality Enterprises Inc $235,283.56 Haskins Inc. $239,292.00 Douglas N. Higgins $244,851.00 Mitchell and Stark $294,636.00 Kyle Construction Inc No quote Staff reviewed the proposals and found it fair and reasonable and concluded that Quality Enterprises USA Inc. has submitted the lowest, qualified and responsive proposal. This contractor has a satisfactory performance record on previous projects involving similar work. The design professional's recommendation letter dated April 29, 2011, is attached. The Engineer's estimate for this project is $226,198.00. The low bidder was approximately 4% higher than the estimate. The increase in the bid price is due to the Packet Page -1369- 5/24/2011 Item 16.C.5. Executive Summary Award Work Order to Quality Enterprises USA Inc. Page 2 recent and continued market fluctuations /adjustments in material and labor unit price. The Purchasing Department has reviewed the information in this Executive Summary. FISCAL IMPACT: Funding is available in and is consistent with the FYI Capital Budget approved by the Board on September 23, 2010. The source of funding is the Wastewater User Fee Fund (414). LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for Board approval —SRT. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to insure the viability of public facilities. RECOMMENDATIONS: That the Board of County Commissioners, as Ex- officio the Governing Board of the Collier County Water -Sewer District: 1. Approve award of the work order in the amount of $235,283.56 for Lift Station 310.01 Rehabilitation to Quality Enterprises USA Inc., as provided attached hereto. 2. Authorize the County Manager or his designee to sign the work order. Prepared By: Zamira Del Toro, Project Manager, Public Utilities Planning and Project Management Department. Packet Page -1370- COLLIER COUNTY Board of County Commissioners Item Number: 16.C.5. 5/24/2011 Item 16.C.5. Item Summary: Recommendation to approve a work order in the Amount of $235,283.56 to Quality Enterprises USA Inc., for Lift Station 310.01 Rehabilitation under contract 08-5011 — Annual Contract for Underground Utility Contracting Services, Project 70046. Meeting Date: 5/24/2011 Prepared By Name: DeltoroZamira Title: Project Manager,Public Utilities Engineering 5/6/2011 11:23:49 AM Submitted by Title: Project Manager,Public Utilities Engineering Name: DeltoroZamira 5/6/2011 11:23:51 AM Approved By Name: PajerCraig Title: Project Manager, Senior,Public Utilities Engineering Date: 5/6/2011 11:36:25 AM Name: ChmelikTom Title: Project Manager, Principal,Public Utilities Engine Date: 5/6/2011 11:39:47 AM Name: YilmazGeorge Title: Director - Wastewater,Wastewater Date: 5/6/2011 11:58:33 AM Name: ParkerNicole Title: Contracts Specialist,Purchasing & General Services Packet Page -1371- Date: 5/6/20112:47:06 PM 5/24/2011 Item 16.C.5. Name: CarnellSteve Title: Director - Purchasing /General Services,Purchasing Date: 5/6/20115:35:49 PM Name: Amysue Benker Title: Executive Secretary, Date: 5/10/2011 8:58:21 AM Name: DeLonyJim Title: Administrator - Public Utilities, Date: 5/10/2011 10:11:55 AM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 5/11/2011 5:01:14 PM Name: KlatzkowJeff Title: County Attorney, Date: 5/12/2011 3:35:58 PM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 5/16/2011 11:07:32 AM Name: IsacksonMark Title: Director -Corp Financial and Mgmt Svs,CMO Date: 5/17/20112:20:48 PM Packet Page -1372- 5/24/2011 Item 16.C.5. WORK ORDER Contract # 08 -5011 Underground Utility Contracting Services Dated: May 3, 2011 This Work Order is for General Contractor's Services, subject to the terms and conditions of the Contract referenced above, for work known �� //as: Project: Improvements for LS 310.01 �- '? O () Ll6 -'Z. - T The purpose of the work order is to provide underground utility services related to mechanical and electrical upgrade for the LS.310.01. In accordance with Terms and Conditions of the Agreement referenced above this Work Order is assigned to Quality Enterprises. Scope of Work: A complete replacement of the pump station is required, and the Contractor will be responsible for bypass pumping as described in the specifications and drawings. The Contractor is responsible for all required bypassing and shall provide power to lift station throughout construction. Task I — Generals: (Pre and post construction videos, record drawings and project sign). - . - . .............. ........ .......... Task II - Demolition, Relocation and Temporary Facilities.......... Task III — Mechanical. . .................... ____ ........... ......... Task IV — Civil_ ........... _-_ ....... ........................ ...... TaskV — Electrical .............................. ............................... Task VI - Site Restoration ..................... ............................... Task VII — Mobilization/ Demobilization ................... ............. ... Total Task I, 11, 111, IV, V, VI and VII ....... ............................... $ 1,500.00 $28,500.00 $52,124.40 $31,020.00 $69,850.00 $ 9,600.00 $12,000.00 $204,594.40 Lump Sum Task VIII - Owner Directed Allowance for Geological or Corrosion Unforeseen Conditions...... .... ........................... $ 30,689.16 Time and Materials Total Task 1, ft, lll, IV, V, VI, VII and Vill ...............$235,283.56 Liquidated Damages: Per RFQ letter from Collier County and per contract 08-5011. Schedule of Work: The scope of work defined herein will commence upon notice to proceed, and are estimated to be completed within 240 days after all materials are received. Compensation: The County will compensate Quality Enterprises an amount not to exceed $235,283.56.00 as noted above, and as provided in the attached hereto. PREPARED BY: Zamira Del Toro, Project Manager Planning and Project Management Department APPROVED BY: Craig P r, .E.. Principal Project Manager Planni� nd Project Management Department APPROVED BY: tom Chmelik, P.E., Director ,i?xanning and Project Management Department Packet Page -1373- t� Dat Date Date 5/24/2011 Item 16.C.5. APPROVED BY., SWe Naqy, ColWigns Manager — WW Deparunent Date APPROVED BY: —WW Department APPROVED B#16 Johnssen,)Wastewater Operations Manager 6ate APPROVED BY REVIEWED BY: APPROVED BYE George Yilrnaz, PhD. Wastewater Department Director Parker, Purchasing Jim De4ony, P.E., Public Utilit*s Administrator QUALITY ENTERPRISES USA INC., B Louis .!.Gaudio, Vice President- Project Management Witnesses (2) (Print Name) v ' - xs�' (2) "pature Pr Packet Page -1374- (Print Name) 'Date Signature r o (Print Name) v ' - xs�' (2) "pature Pr Packet Page -1374- (Print Name) 'Date Project Manager: Zamira DelToro Posted 4/8/2011 Opened 4127/2011 BID TABULATION COLLIER COUNTY PS 310.01 IMPROVEMENTS 5/24/2011 Item 16.C.5. 1'acKages uownioaoeo 5 Quotes Recieved 4 Item No DESCRIPTION Quality Haskins Higgins Mitchell 1 Videos $300.00 $1,500.00 $1,430.00 $500.00 2 Record Drawings $600.00 $1,700.00 $900.00 $1,000.00 3 Project Si $600.00 $750.00 $715.00 $1,000.00 Demolition Relocation and Tentgorary Facilities 4 Demolition of Existing Wetwell, Valve Vault, and Piping $3,000.00 $4,500.00 $3,960.00 $9,000.00 5 Demolition of Fencing and Bollards $600.00 $500.00 $500.00 $2,000.00 6 Clearing and Grubbing $2,100.00 $4,000.00 $8,635.00 $6,000.00 7 Demolition of Electrical Panel and Relocation of Antenna $4,800.00 $500.00 $891.00 $2,160.00 8 Tempo Bypass Piping and Pumping Operations $18,000.00 $11,500.00 $34,000.00 $30,000.00 Mechanical 9 Install County Supplied 300 gpm Submersible Pumps $2,400.00 $2,800.00 $2,640.00 $7,000.00 10 Install County Supplied Model CAP 20 Odor Control System $4,200.00 $2,200.00 $4,935.00 $27,000.00 11 6 -inch Tee Fitting $738.00 $400.00 $550.00 $800.00 12 6 -inch Plug Valve $3,360.00 $650.00 $2,100.00 $1,400.00 13 6 -Inch 45o Bend $672.00 $200.00 $460.00 $800.00 14 6 -Inch 90o Bend $752.40 $200.00 $1,501.00 $800.00 15 6 -Inch 90o Bend $690.00 $300.00 $871.00 $800.00 16 6 -inch Check Valve $5,280.00 $600.00 $3,458.00 $1,400.00 17 6 -inch Wye $914.40 $600.00 $600.00 $900.00 18 6 x 8 -inch Reducer $717.60 $300.00 $461.00 $700.00 19 8 -inch Plug Valve $2,160.00 $800.00 $1,624.00 $1,700.00 20 Wetwell IET Lining $5,040.00 $7,500.00 $1,200.00 $4,000.00 21 Combination Air Valve $2,040.00 $1,800.00 $2,371.00 $2,000.00 22 8 -inch DIP Force Main $3,720.00 $4,000.00 $2,075.00 $3,400.00 23 6 -inch PVC Internal Wet Well and Valve Vault Piping $3,570.00 $35,000.00 $4,588.00 $23,365.00 24 6 -inch DIP Piping $7,680.00 $2,200.00 $16,060.00 $4,000.00 25 4 -inch PVC Vent and Fittings $510.00 $300.00 $1,567.00 $1,000.00 26 Link Seals $2,520.00 $100.00 $220.00 $1,000.00 27 2 -inch PVC and Fittings $360.00 $200.00 $275.00 $1,000.00 28 Miscellaneous Appurenances and Pipe Supports $4,800.00 $3,000.00 $660.00 $1,500.00 Civil 29 Dewatering, Excavation, and Backfill $7,200.00 $7,000.00 $15,950.00 $5,000.00 30 8 -Foot Wet Well and Concrete Top $9,120.00 $61,000.00 $21,571.00 $36,000.00 31 Site Work (Asphalt, Slab, Bollards) $14,700.00 $9,000.00 $34,228.00 $4,000.00 Electrical 32 Utility Meter $550.00 $1,500.00 $396.00 $1,360.00 33 S.E.R. Main Disconnect $3,300.00 $2,800.00 $3,993.00 $3,630.00 34 Install County Supplied Control Panel $4,400.00 $2,000.00 $660.00 $600.00 35 Seal Offs $1,100.00 $300.00 $638.00 $580.00 36 NEMA 4X -SS Junction Box $1,650.00 $1,100.00 $968.00 $880.00 37 Floats $220.00 $400.00 $10.00 $500.00 38 Fence Grounding System $5,500.00 $180.00 $1,837.00 $1,670.00 39 Test Well Grounding System at Main $4,400.00 $500.00 $814.00 $740.00 40 Antenna $27,280.00 $2,000.00 $5.00 $25,000.00 41 Concrete Posts and Unistrut $2,200.00 $2,000.00 $1,265.00 $1,150.00 42 Conduit and Wire to Utility Meter $7,700.00 $800.00 $10,912.00 $9,920.00 43 Conduit and Wire to Main Disconnect $2,200.00 $2,000.00 $462.00 $420.00 44 Conduit and Wire to Mini Power Zone $2,200.00 $3,200.00 $0.00 $0.00 45 Conduit and Wire to Odor Control System $1,650.00 $1,800.00 $1,078.00 $980.00 46 Conduit and Wire to Mini Power Zone $2,200.00 $3,500.00 $1,298.00 $1,180.00 47 Conduit and Wire to Odor Control System $2,200.00 $2,000.00 $286.00 $260.00 48 Conduit and Wire to Mini Power Zone $1,100.00 $1,800.00 $121.00 $110.00 Site Restoration 49 Watering $9,600.00 $100.00 $3,190.00 $11,000.00 Subtotal $192,594.40 $193,080.00 $198,929.00 $241,205.00 50 Mobilization/Demobilization $12,000.00 $15,000.00 $13,985.00 $15,000.00 Subtotal $204,594.40 $208,080.00 $212,914.00 $256,205.00 51 lOwner Directed Allowance for Geological or Corrosion Unforseen Conditions (15 %) $30,689.16 $31,212.00 $31,937.10 $38,430.75 TOTAL 1$235,283.561 $239,292.001$244,851.001 $294,836.00 Packet Page -1375- Co)er Cowtt eve Servioes Division Purchasing COLLIER COUNTY FLORIDA REQUEST Quote #08- 5011 -39 Lift Station 310.01 Refurbishment PROPOSALPAGE DUE DATE: 2:00 p.m. April 27, 2011 5/24/2011 Item 16.C.5. The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this Proposal is accepted, to furnish same in full, according to the following: PLEASE SEE SEPARATE BID FORM FOR SCHEDULE OF VALUES IN WITNESS WHEREOF, WE have hereunto subscribed our names on this 27th day of April , 2011 in the County of Collier , in the state of Florida Quality Enterprises USA, Inc. Firm's Complete Legal Name 239- 435 -7200 Telephone Number 239- 435 -7202 FAX Number LGAUDIO@QE -USA COM Email Address 3894 Mannix Drive, Suite 216 Address Naples City Florida State 34114 -5406 Zip F95000002550 Florida Certificate of Authority Document Number (www.sunbiz.orq /search /html) 54- 0947002 Sigbature Vice President Title Louis J. Gaudio 4/27/11 Print Name Date RM— ContractDriven_10152010 5 Packet Page -1376- .+ 5/24/2011 Item 16.C.5. Quality Enterprises USA, Inc. BID FORM COLLIER COUNTY PS 310.01 IMPROVEMENTS Item No DESCRIPTION Unit Total Cost 1 Pre- Construction Video and Post Construction Video LS $300.00 2 Record Drawings LS $600.00 3 Project Si LS $600.00 IDemolition. Relocation and Temporary Facilities 4 IDemolition of Existing Wetwell, Valve Vault, and Piping LS $3,000.00 5 Demolition of Fencing and Bollards LS $600.00 6 Clearing and Grubbing LS $2,100.00 7 Demolition of Electrical Panel and Relocation of Antenna LS $4,800.00 8 Temporary Bypass Piping and Pumping tions LS $18,000.00 Mechanical 9 1 Install County supplied 300 gpm Submersible Pumps LS $2,400.00 10 1 Install Con supplied Model CAP 20 Odor Control System(]) LS $4,200.00 11 6 -inch Tee Fitting FL LS $738.00 12 6 -inch Plug Valve (FL) LS $3,360.00 13 6 -Inch 45o Bend FL LS $672.00 14 6 -Inch 90o Bend L LS $752.40 15 6 -Inch 90o Bend M LS $690.00 16 6 -inch Check Valve FL LS $5,280.00 17 6 -inch Wye FL LS $914.40 18 6 x 8 -inch Reducer LS $717.60 19 18-inch Plug Valve FL LS $2,160.00 20 Wetwell IET Lining LS $5,040.00 21 Combination Air Valve LS $2,040.00 22 8 -inch DIP Force Main LS $3,720.00 23 6 -inch PVC Internal Wet Well and Valve Piping LS $3,570.00 24 6 -inch DIP Piping LS $7,680.00 25 4 -inch PVC Vent and Fittings LS $510.00 26 Link Seal LS $2,520.00 27 2 -inch PVC and Fittings LS $360.00 28 Miscellaneous Appurenances and Pipe Supports LS $4,800.00 Civil 29 Dewaterin , Excavation, and Backfill LS $7,200.00 30 8 -Foot Wet Well and Concrete Top LS $9,120.00 31 Site Work halt, Concrete Slab, Removable Bollards LS $14,700.00 Electrical 32 Utility Meter LS $550.00 33 S.E.R. Main Disconnect LS $3,300.00 34 Install County supplied Control Panel") LS $4,400.00 35 Seal Offs LS $1,100.00 36 NEMA 4X -SS Junction Box LS $1,650.00 37 Floats LS $220.00 38 Fence Grounding System LS $5,500.00 39 Test Well Grounding System at Main LS $4,400.00 40 Antenna LS $27,280.00 41 1 Concrete Posts and Unistrut LS $2,200.00 42 Conduit & Wire to Utility Meter LS $7,700.00 43 Conduit & Wire to Main Disconnect LS $2,200.00 44 Conduit & Wire to Mini Power -zone LS $2,200.00 45 Conduit & Wire to Odor Control System LS $1,650.00 Packet Page -1377- 1 .e 5/24/2011 Item 16.C.5. 46 Conduit & Wire to Control Panel LS $2,200.00 47 Conduit & Wire to Pumps LS $2,200.00 48 Conduit & Wire to Floats LS $1,100.00 Site Restoration 49 watering LS $9,600.00 Subtotal 1 $192,594.40 50 Mobilization/Demobilization LS $12,000.00 Subtotal $204,594.40 51 Owner Directed Allowance for Geological or Corrosion Unforseen Conditions 15% LS $30,689.16 TOTAL BID $235,283.56 Notes: (1) Collier County will pre - purchase the odor control unit, pumps, and the control panel (see quotations). Contractor is responsible for receiving, unloading, verifying condition, storage, protecting and installing these materials and equipment. The Contractor will be responsible for the warranty of the installation. See the exclusion items on each manufacturer's quotes. Contractor will be responsible for any items required during the installation and system start up that are excluded in manufacturer's quotations. Contractor to coordinate with the County and install odor control unit, pumps and control panel. (2) The Contractor is responsible for all required bypassing and shall provide power to lift station throughout construction. A bypassing plan needs to be provided by the Contractor and be approved by the County and Engineer. (3) Weekly progress meetings will be held for the project. The Contractor shall have his Project Manager and Job Superintendent at all progress meetings. The Contractor shall provide an update of all work in the past week and a two (2) week look ahead. The Contractor on a weekly basis shall provide an updated project schedule. The Contractor will need to supplement with additional crews as necessary to remain on schedule for timely completion. (4) All Contractor Personnel (including subcontractors) shall complete a Collier County Facilities Contractor background check. Only those personnel passing this security check shall be allowed on the Project Site. All personal shall wear the issued badge at all times while on the project. The Contractor shall be responsible for all costs of obtaining the background checks and issued identification badge. Badges shall be reissued annually as required. (5) All excavation shall be unclassified with no additional payment to be made for rock, muck or other materials. Contractor will be responsible for all replacement fill material. (6) Pre- Construction/Post- Construction Video recording in accordance with the County Specification (022200) shall be completed. (7) The Contractor shall designate a representative, such as their Superintendent who will be on -site during all work to assist the County in responding to customer questions or needs. (8) The Contractor is responsible for preparation of a safety program /risk management program. This document should not only address daily activities but also required actions for tropical storms and hurricanes. (9) All quotes to be per the Utility Underground Contract, plans, standards, specifications and all documentation provided within the Bid Package. Packet Page -1378- 5/24/2011 Item 16.C.5. TETRATECH April 29, 2011 Ms. Zamira DelToro Project Manager Collier County Public Utilities Planning and Project Management Department 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 Subject: Lift Station 310.01 Improvements Recommendation of Contract Award Dear Ms. DelToro: We have completed our review of the bids submitted for the above - referenced project. The bid tabulation is attached. The lowest apparent bidder was Quality Enterprises USA, Inc. with a bid of $235,283.56. The engineer's estimate for this project was $226,198. The apparent low bidder was approximately 4 % higher than the estimate, but three (3) of the four (4) bids received for the project were within 5% of each other. We recommend that the contract be awarded to Quality Enterprises USA, Inc. in the amount of $235,283.56. If you have any questions regarding this project, please do not hesitate to contact me. Sincerely, Tetra Tech, Inc. ., I. V�,,ka nnifer L. Woodall, P.E. ice President Packet Page -1379- Tetra Tech, Inc. id 239,29n,�,46_7 Fax 5/24/2011 Item 16.C.5. OPINION OF PROBABLE CONSTRUCTION COST COLLIER COUNTY PS 310.01 IMPROVEMENTS Item No DESCRIPTION Quali ty Haskins Hggins Mitchell 1 Videos $ 300 $ 1,500 $ 1,430 $ 500 2 Record Drawings $ 600 $ 1,700 $ 900 $ 1,000 3 Project Sign $ 600 $ 750 $ 715 $ 1,000 Demolition Relocation and TempoLla Facilities 4 Demolition of Existing Wetwell, Valve Vault, and Piping $ 3,000 $ 4,500 $ 3,960 $ 9,000 5 Demolition of Fencing and Bollards $ 600 $ 500 $ 500 $ 2,000 6 Clearing and Grubbing $ 2,100 $ 4,000 $ 8,635 $ 6,000 7 Demolition of Electrical Panel and Relocation of Antenna $ 4,800 $ 500 $ 891 $ 2,160 8 Tempoma Bypass Piping and Pumping Operations $ 18,000 $ 11,500 $ 34,000 $ 30,000 Mechanical 9 Install County Supplied 300 gpm Submersible Pumps $ 2,400 $ 2,800 $ 2,640 $ 7,000 10 Install County Supplied Model CAP 20 Odor Control System $ 4,200 $ 2,200 $ 4,935 $ 27,000 11 6 -inch Tee Fitting $ 738 $ 400 $ 550 $ 800 12 6-inch Plug Valve $ 3,360 $ 650 $ 2,100 $ 1,400 13 6 -Inch 45o Bend $ 672 $ 200 $ 460 $ 800 14 6 -Inch 90o Bend $ 752 $ 200 $ 1,501 $ 800 15 6 -Inch 90o Bend $ 690 $ 300 $ 871 $ 800 16 6 -inch Check Valve $ 5,280 $ 600 $ 3,458 $ 1,400 17 6 -inch Wye $ 914 $ 600 $ 600 $ 900 18 6 x 8 -inch Reducer $ 718 $ 300 $ 461 $ 700 19 8 -inch Plug Valve $ 2,160 $ 800 $ 1,624 $ 1,700 20 Wetwell LET Lining $ 5,040 $ 7,500 $ 1,200 $ 4,000 21 Combination Air Valve $ 2,040 $ 1,800 $ 2,371 $ 2,000 22 8 -inch DIP Force Main $ 3,720 $ 4,000 $ 2,075 $ 3,400 23 6 -inch PVC Internal Wet Well and Valve Vault Piping $ 3,570 $ 35,000 $ 4,588 $ 23,365 24 6 -inch DIP Piping $ 7,680 $ 2,200 $ 16,060 $ 4,000 25 4 -inch PVC Vent and Fittings $ 510 $ 300 $ 1,567 $ 1,000 26 Link Seals $ 2,520 $ 100 $ 220 $ 1,000 27 2 -inch PVC and Fittings $ 360 $ 200 $ 275 $ 1,000 28 Miscellaneous Ap urenances and Pipe Supports $ 4,800 $ 3,000 $ 660 $ 1,500 Civil 29 Dewatering, Excavation, and Back811 $ 7,200 $ 7,000 $ 15,950 $ 5,000 30 8 -Foot Wet Well and Concrete Top $ 9,120 $ 61,000 $ 21,571 $ 36,000 31 Site Work (Asphalt, Slab, Bollards) $ 14,700 $ 9,000 $ 34,228 $ 4,000 Electrical 32 Utility Meter $ 550 $ 1,500 $ 396 $ 1,360 33 S.E.R. Main Disconnect $ 3,300 $ 2,800 $ 3,993 $ 3,630 34 Install County Supplied Control Panel $ 4,400 $ 2,000 $ 660 $ 600 35 Seal Offs $ 1,100 $ 300 $ 638 $ 580 36 NEMA 4X -SS Junction Box $ 1,650 $ 1,100 $ 968 $ 880 37 Floats $ 220 $ 400 $ 10 $ 500 38 Fence Grounding System $ 5,500 $ 180 $ 1,837 $ 1,670 39 Test Well Grounding System at Main $ 4,400 $ 500 $ 814 $ 740 40 Antenna $ 27,280 $ 2,000 $ 5 $ 25,000 41 Concrete Posts and Unistrut $ 2,200 $ 2,000 $ 1,265 $ 1,150 42 Conduit and Wire to Utility Meter $ 7,700 $ 800 $ 10,912 $ 9,920 43 Conduit and Wire to Main Disconnect $ 2,200 $ 2,000 $ 462 $ 420 44 Conduit and Wire to Mini Power Zone $ 2,200 $ 3,200 $ - $ - 45 Conduit and Wire to Odor Control System $ 1,650 $ 1,800 $ 1,078 $ 980 46 Conduit and Wire to Mini Power Zone $ 2,200 $ 3,500 $ 1,298 $ 1,180 47 Conduit and Wire to Odor Control System $ 2,200 $ 2,000 $ 286 $ 260 48 Conduit and Wire to Mini Power Zone $ 1,100 $ 1,800 $ 121 $ 110 Site Restoration 49 Watering $ 9,600 $ 100 $ 3,190 $ 11,000 Subtotal $192,594 $ 193,080 $198,929 $ 241,205 50 Mobilization/Demobilization $ 12,000 $ 15,000 $ 13,985 $ 15,000 Subtotal $ 204,594 $ 208,080 $ 212,914 $ 256,205 51 JOwner Directed Allowance for Geological or Corrosion Unforseen Conditions (15 %) $ 30,689 $ 31,212 $ 31,937 $ 38,431 TOTAL $ 235,284 $ 239,292 $ 244,851 $ 294,636 Packet Page -1380-