Agenda 05/10/2011 Item #16E6 5/10/2011 Item 16.E.6. EXECUTIVE SUMMARY Recommendation to accept reports and ratify staff-approved change orders and changes to work orders. OBJECTIVE: To enable the Board to oversee the execution of administrative change orders and changes to work orders and promote accountability in the use of staff authority. CONSIDERATIONS: On April 22. 2003, the Board approved a recommendation to implement a plan to enable changes to BCC-approved contracts (Section XV.C, Collier County Purchasing Policy) of not greater than 10 percent of the current Board approved amount or $10,000 (whichever is greater) to be authorized by staff. Also included in the report are changes to Work Orders. These include work orders issued under CCNA Contracts that are less than or equal to $200.000 (Section VII.C, Collier County Purchasing Policy). and changes to work orders for all other contracts (Section XV.G, Collier County Purchasing Policy) that are not greater than 10 percent of the current Board Approved amount or $100,000 (whichever is greater). The Administrative report identifies the percentage changes to contracts or work orders that have occurred since the prior BCC approved amount which are below the threshold limits as referenced above. The plan calls for staff to submit a monthly report listing these change orders from the previous reporting period. Enclosed is the monthly report of the Administrative Change Orders and Administrative Changes to Work Orders. These reports cover the period of March 25, 2011 through April 19, 2011. FISCAL IMPACT: The total change to contracts is a deduction of $441.779. The total change to work orders is $59.433.59. LEGAL CONSIDERATIONS: This item raises no legal issues and requires majority vote for approval. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: That the Board of County Commissioners accepts the enclosed Administrative Change Orders Report and Administrative Changes to Work Orders Report and ratifies the listed change orders and changes to work orders PREPARED BY: Diana De Leon, Contract Technician, Purchasing Department Packet Page -875- 5/10/2011 Item 16.E.6. COLLIER COUNTY Board of County Commissioners Item Number: 16.E.6. Item Summary: Recommendation to accept reports and ratify staff-approved change orders and changes to work orders. Meeting Date: 5/10/2011 Prepared By Name: DeLeonDiana Title: VALUE MISSING 4/27/201 I 8:21 :43 AM Submitted by Title: VALUE MISS]NG Name: DeLeon Diana 4/27/2011 8:21:45 AM Approved By Name: SmithKristen Title: Administrative Secretary.Risk Management Date: 4/27/20] 1 8:38:22 AM Name: CarneliSteve Title: Director - Purchasing/General Services,Purchasing Date: 4/27/20 II 9:53 :09 AM Name: Price Len Title: Administrator - Administrative Services. Date: 4/28/2011 I :27:33 PM Name: KlatzkowJeff Title: County Attorney. Date: 4/29/20 II 9:41 :57 AM Name: StanleyTherese Packet Page -876- Title: Management/Budget Analyst. 5enior,Office of Management & Budget Date: 5/2/2011 9:07:29 AM Name: SheffieldMichael Title: Manager-Business Operations, CMO Date: 5/2/2011 ] :05:56 PM Packet Page .877- 5/10/2011 Item 16.E.6. ;: ~ ~ CllCal Cl ~ e ~ 1ii ~ Q. 0 .c: () 0. E (,) E III <( ~e8" -Cll . . '" g';Qj .~" BC;o ~~ " 1! ell :il ::: III .= 0 ':;: c E . 0" ""~ 1! . - 0 "'.0 :; 'E E ~o" " ~ ~ " o ~ w " " w o " o w ~ " . c e ; ~ ~ ~ o ." (,)8... Cll c u ;; ~ ~ 0 :; c E u8:; w > ~ ~ ~ '" z " o ~ 1ti -g1:: .E ~ ~ g '~c:I ~~ o ,,~ 1! . . E u ;;;;; t: e.~ . - " Q. 0 . . 0 Q. 0"", o eo ci ci Zz . ;;; ~ ci ~ zz," <5 u ~ "C 1IJ,):; ;; E g >~" . .. o E 0 ~z ~ (.";1 ,~ a ~ '" o o "' ~ ~ <D "' N ~ o a <0 N m " "' ~ '" a o "' '" " ~" " ~ o a "' '" " ~" ;:: ~ o o "' '" '" ;;" " ~ " Q: CECI- l!! OlZ 0.", => 0. . . " E o~ . - "'" o . ~ 'e ,,0. ~ ~o ~CL ~G "6 (f gj C 1IJ 2: ~ ~ 0 ::: w () ill (J) C 25 2 ~ ~M ~~~ 8 ~ ffi ~~ ~ D'fffia:::~ 3.....a.curo <.')r--....uz> . . <i . z co " o '" "' '" N '" "' " N o o '" m o '" o '" ~ o o ;;: ~" ~ x " . . " . " . .. 0; " ~ c o o " . " . . > . . ~ " E . C . E Q. .5 ~ . "0 . . . ~ u " ~ ~ " 1ii E 1:3 ~ i5 ro .9 . o " C o o E ro 1:3 ~ C o u . u o " ~ o e- o o <ri "' m <D ro "' ~ o o <ri "' m <ri ro "' ~ o o <ri "' m "," ro "' ~ " ",,, " " w.2 e-o. z 1:3 . U'l;:O 5' t:'a; Q 2(0 .....~ &~~~~ s: co ~ ~ (jj u~~G~ ;; '" o ro ~ " '0 . . .~ . > o ~ o N . " ro E ~ u E . . c ~ ~ > . . ~ .9 . o " U o E TI C . ro . TI ~ % u <Il~ ~ 5 .g 8 i5 ~ TIn roTI TI . ~ E o a e-ai ~ Cb w g>~ . ~ "5 0 '0 · . 05 .TI .~ Bi . 0 C;g 5/10/2011 Item 16.E.6. 0; " . . " . 1ii " . E ~ ~ ro ~ 1 o o ?;' C ro o ~ . " " o U ro .9 " o ro C ~ '6 .2 " " " . ~ o .9 a 1:3 ~ C o u . " 2 '" Q .,; " ~. ;;: ~ '" '" . . . . u . o ~ , eO " , c ~ Packet Page -878- eotrer County ~ A:Jr.inistative Services CMsb:1 5/10/2011 Item 16.E.6. P;"U"C."1OlSlng Q Contract Change Request Purchasing Department Change Modification Form LJ VVork Order Modificaticn Mod#: 1 PO/Work Order #: 450C1257;8 Department: PPIv1D Project Name: NGRWI" HSP VFDs Contract #. 1 C~5563 I Project #: 71053.1.3 Projectlll:anager: Tam Chmelik Contractor/Firm Name: Gulf CDast Construction of Naoies inc. Original ContracliWorK Oder Amount S 714;765.00 12/14/10: 16G1 Original BGG Aoproval Date; Agenda Item # Current BCG Approved Amount $ .714,765.00" 12114/1'(1;. 16G1 Last BGG Approval Date; Agenda Item # Current Cantract'Vvcrk Order Ar:1oL:nt S 714.765.00 Dollar AmQu.'It of this Change ($457,920.00) -64,O7O;~ Change fmm Original Amount Revised New Gontract'Work Order Total I $256,845.00 I -64.07% Change from Current BGG Approved Amount Cumulative Changes I ($457,92000)1 -64 07% Ghange from Gurrent Amount :.. .:...:' .".,....... ".:: ,". i:"::" ,';'C:' Completion Date, Description of the Task(s) Change, and Rationale for the Change Original notice to pr::;.ceed completi:m date: 2!21.'2CJ~2 I' Last approve':! ::::omple:Jon date' 2"'21/201~ ! Revised completion date (includes this , -h ). ^'21.-0.... : ,~.a:1ge . L, ..L JII-,. Number of days a.jae:: (if ! EX:r:'ial;1 why addltlonai 0ays are needed (:Jetailed/s:)scifi:--!: exiensi(y\ must ata-:;:l ::;u,rer;: i:1sura:1ce cer:lf\:ateiS) f,or;", S,.CP < y. or octa:n fro:': ven::i::;rl 0 o A:1d new :ask(s,: U Chan;?8 taskls) o Delete task:s) i ~ Other i.specify): I Direct Material Purer,ase 1. Provide a detailed and specific explanation of the requested change(s) to the task(s}: This deductive change is to allow a direct material purchase of six (5) VFDs from Rexel/Allen-3radley/Rockwell. 2. Provide detailed rationale for the requested change: 10 realize a savings of $25,920.00 In sales tax, 3. Provide explanation why change was not anticipated in original scope of work: \/r=Js COJJd have ~een pur:hase-j separately, but then there would be 10 sooromation ond warranty through the cont:-actJr. ': 4. Describe the impact if this change is not processed: :=.xpen: an additionai $25,92000 per the Contrac.t. i {2] I. Planned I Eiective i 04. Correcrio:". of error~s) Type of Change f Modification I ! 2 Ur:forese'?n G:::naitionsic:i~:ur;:stance :1:) 3 OL.:antltv or price adll-lst:ilent o 5~221ue added _________1-~?~ Sc:,edule adiuSlme~t Change Reguested By ,1l,PP:-O\;8C by' Purcr,asi.'iq P:-::fessiona: PaiLic;paied in Necoriatbn ::f Cnan:Je ;' M"Jc:ificatl:J~_.__". "7 :"'0,0.0 ,/'"'I, ~'I,' : ,,' ! ~. ';'I~' '\ I ,., (,,, / r) .'\-----1<-_:.,.L.-~:--~_~ .---.----~- :_~sin.~_2~_;:~G~~n~=~_~____ n Othe,' s::>ecifvL JSL~s [J NJ U Co...,t~a,...tor!r-""'n<::Jlr~"',' r7i OW:lCl-~ -~~_._--~---_.,-----~------ L__ i D~~i;n-- Pr~~;~;o;,:;:! ~-i~ ~,e~L1~~I-D:'\:~!\-ce;lc\:-'s~~:i\:; Date' .-; r' I/"! r\ail~= anc iiti~. i:):~ Chr~EF,'_Pii'2::t:lr F.?t....~C ?'2W?W~j :"/: ~-~- ......c;:,~. - /);:.-:;;:-7--;';;;~~~'C--- ~~---.:;I;-;;: / I Pur:::he:Sin~ ?:-Jles3l:Jnais Na:-T,e Revised: 2:21/11 Packet Page -879- 5/10/2011 Item 16.E.6. .cJt.. Cowdy ~ _SeMcesQvisiOr. P~ontract Change ReQuest Contract #: 10- Mod#: 1 5495 i Project It: 60087, i 68081 Purchasing Deparbnent Change Modification Fann '0 Work Order Modification Project Manager: Dan Hall POM/ark Order #: 4500'19045 Department: Transportation ::norneerino ! Project Name: Greenway ProJe::t I' ContractorfFirm Name: C.W. Roberts ,Contractm Inc I Current BCe Approved Amount Current ContractlVVork Order Amount Dollar Amount of this Change Revised New Contract/Work Order Total Cumulative Chances $ 565,955.00 S 566.956,00 $16.14.1.00 $603,097.00 $16,141.00 6-22~10' 16Ai6 Last Bee Approval Date: Agenda Item" 2..75010 Change from Original Amount 2.75% Change from Current Bee Approved Amount 2.75% Chanoefrom Current Amount Completion Date, Description of the Task~c) Change, and Rationale for the Chang.,. , Original notice to proceed completion date: August 2, 2010 I N.umber of oays added (If extension, must attach current insurance certificate(s) from SAP or obtaIn from vendor): N/A I '--....i Aad new taSK[s) i Chanae task(sl 1 . I 11, Provide a detailed and specific exolanatlon of the reauested chanaelsl to the tasktsl: i Tbs change order is for quantity adjustment The largest change to the project was the adciirional seed and rnul::h quantities (Item 570-2, Performance :-u::i:' Seed and Mulch). The constuction cfthis project st<:.."'ted ir.. August and heavy :-ains created difficult cO:1ditions TO pe:rorm work. These conditions ;nade it n:cessary for ille contractor to use a wid::r footprint to construc: the greenway. Tne additior..a1 seed and muld: qua.'1tity was so :nuch larger than the plan qUarltiry that a ne:v.' price was negotiated with the contractor. This newly negotiated price is 42 cents! Squa.-e Yard instead of 50 cents/ Square Yard. Two oftb: pay items, signs ane: guy wire prote:::tion, were less than t.'-1e contract amount sine:: some of the sigr..age was perforr::1ed by County crews and the guy wire protection was not n:cessary. I Last approved completion date: Revised completion date (includes this December H, 2010 . . Change); December 17, 2010 Explain why addi~ional days are needed (detailed/specific): N/A I U Deiete tasic(s) ~ Other (spe.:ify); 2. Provide detailed rationale for the requested change: I The wet conditions of the project during construction necessitated the additional area for seeding and mulch. In addition, the additional seeding ane! mulch substantially improved the visual aspect of t.l,.is new addition to the . Coumy Parks and Recreation system, 3. Provide explanation why change wall not anticipated In original seope of worl::: 1},.e exm::nely mud.dy conditions were not anticipated on this project. 14. DescrIbe the Imp8cllf this change is not processed: , lfthe aadilional seed and mulch was no: ins-..aUed, me pi:'.rl; are2- would no; appear to be proper:~ ITlaL.1.tained. i U 1, Planned I ::.ie::tive i U 4 Corre,;tion :Jf erTor:s) Type of Change f Modification 2:,' 2. Un;oreseen conditlOrlsJcircumsrance I [Z 5. Value ~:jaec,___,_, Xl 3 Quantity or on::e adiustment ~ 5 S~heduje adiustment Change Requ&cted By , Usino Deoan:men: ~ Other! soeciM: Yes ' No , -----j , I i J I Contra::tor/C::msultant 8) Jwner Desian Professional ReQuiatorv Aaenev Ispecifvl Pur:::h2sInO Professional Participated In Neootlali::m ::.f Chanae i Modificati:m' A~pr;\led by /, /; /)I/Ji/,Ct <<..:....-' C'.~~~ ",",~J : Name and Tllie' Dc,..; e ( G- ~.-:' ~:.-/ :;".. i Reviewed b~t ' ~ ;"i Pl1rc~asing Protessio~aI's Name, Y1 ~ :)a:",: 3/ L 2..- / / [' P",,'.,e--+ - ----:-- ~."".........~....-I ^ /J i U.A V",,- Date: , l' '-i/(I//; I ,1 I R.e~ee';!.'2j!11 , \\ , \ ,\ " ,:\,..," \1\' " ':'-'" , "\ f",;~) , ' \ Packet Page -880- ;: ~ Gl ! ~ ~ ~ <5 ~tlI(,)"" " E 0' ....,g~ ~ ~ .. , o 0 Gl'- ~ ~.~O ~ I'll 0 "" .c: E :s u,g~ "C-eg :: 0 0 ';: "'" E IV 0 <( ~5:~ o . - '0 0 ~O g o ~ E ~ 0 <( u5:~ ~ ~ o ~ w ~ ~ w o ~ o ~ ~ o ~ o ~ w w " z $ G w > ~ ~ no w Z ~ " o '0 0 ~ S ~ :::i 0 <( u5:~ '0- o 0 e U e ~ ;; ~ :i~ u ,,~ o "'i "C ~ .S 0 0 .!:i "" E 00<( 5:~ o E u ~ ~ ~ "'iij I'll _ 'u Q. ::: Gl . 0 0 ou"' o z o . Z '0 ~~ <5 0 5:8 o Z QI Gl <1>1 >= 'C C I ~ ~ O~, o 0 ~ u: l! 5 t' . .. o E ~~ '" " o o '" o o o o o o o '" ~ o o " ~ o o " o '" ~ " z o o o o '" ~ o ~ '0 C '" U 5&;1Y. N ~u ,- N w 0:;; ~ do .0 o e " € <IJ <.2 ro'<lOW 0g~~ Olouo- ~ N '" o . E i= ID " . E o ~ '" ~ ~ E . > o ~. ~ o o > " o '0 o o ~ o D ~ ~ . C D o " -ii 2 ID '0 o e x o . c . E o u m " ~ c " E ID " . E . ..>< TI o ,u~ 3= ~~) ID " :: 7F, E _ o <U " "6 ~ 9 ~ ~ 8 OJ ~;; o " ~ ;;: ~ ~~ ro ~- c ~ o o U 'J" 2 " '0 o X o ,~ . . E 2 ~ m " '0 t 6;'~ ~ ~ ~ ~ 1~ ~ 6 ~ u - 0 -g Q -5~ ] ro ~ ~ ~ m ro <:i o '0 >_ ill ." Qj ~ ~ 0 ~ ~ ~ 8 '0.9 . '0 o . "'E -g ~ g' o ^ <f- o o o '" " o o o o o m w N m ~ o o o ~ o o a m w N m ~ " z o a ~ w N m ~ " U wU ~no W W 8~ g'1 w .0 " ro . e o u; . ~ ~ ~ C <II ~ I~ ~ '- ('.; 8 M g, g: ~ < 0 c ili 0 ~~6~t W N '" a N .e .e '0 '0 Q) "C ~ ~ ffi :i (ll -'" ~ f; 0 <II 13:: <ll '0 > . o . . ~ ~ ~ : ~ ~ ~ ~ ,g ~g:g -= :g ttI .l!l 1II~ ~ t!! ~ > <1J u:: . > . .., E u g> en OJ.;O ~ -~ ~ E ~ ~ <;( "O,~ o 0 ",.;:.c -g ~ 2 .2 III 0 Ql '0 g, m'E Ql u . '0 ~ E 'Uj <Ii 011'5 ~ ~ 0 .9 ccal " ~ 3 ~ ~ ~ Q ~ 11 tl 0 L ::' E :: "'g! Q) <ll 8 ~ ~ en Q Ql C . U ~ ~ ~ ",-0 i7:: ~ ffi ~ ~ E III E ~ =? ~ ~ :€ -~ u .:: cr.. "0 di ~ ~ . c . * ~ C We o U (5 1: ffi ~ :t :l 0- OJ! " . ~ ~ Qj ~ iii ~ .s ~ ~ " ~ ~!!? "0 s: " 2 i5 ;;;.0 ID '0 b m ~ -0 g ;;: ro fj ~ Q ~ - tl"D .8 ~ 0> ~ U S ~ ltl 0 TI '0 - - . > ;g 0 ~, ,.., -'? - ~"O Q > c ~~~i ~ ;-g ill ] ~ ~ ~ U'';::=' ill ClJ <l! n ::; ~'t2 S- ~ ~ .Is ~ ~.s~! ill " - (j, ~ 0 a; 5: 0>- C\ t >-.~ ~ ~~ ~ '-' 5l::"-- o 9' ;: .E: 3' ::: 0 OJ .; a: '~ ~ a; ~ ~ o ~ ~ ~ <f- o a o <f- a a a o a o W N oj , ~ o a a ~ a a o W N 00 . ~ " z o o a W N o . ~ " U wU ,_no ~() wN Nw ON OW W d> , a . s: c U) ~ iii ~ '0 0 g ~ ~ c 5' Q -0 ill cii U '" w 9' <l! 2( (; gs rn -", n; cffi6~E g ~ " ~ ;; '0 ~ "E"E . 0 E ~ ~ c . 0 is.. Iii ~ -g o 0 E'O . 2 U U 0 . - e'~ 00 ID U =515 l ~ aD . . o ;; .., . '0'" ~ 8 . 0 5 ~ a1 l1 ~ $ D 0; " '0 . C U 0 > '0 * ~ ~ m g, ~ ~ '0 '0 m _ c g~ - . o " ;5 2 ~ U . 0 5 e' '0 0 '0 . f3 * o ~ oc- , ~s ~ ~ ~ ~ g U5 6 '0 U '" 2 N ii _ E Ii; ~ '0 0 o Ci x , <5 > , m E~ .s ~ . " i~ _ c ro U .- '0 ~ C - ro " ill 00 (lJ :-g ~n OJ ~ > . * ~ a1'O ~ Q ~ ~ ~ ~ :g 8 . ill C :S I- i" W di o~ c " ~..o o " 'Om ~ ~ .~ ~ o~ Packet Page -881- . <f- o o o <f- o o o o a o o ~ m' ~ o o " ~ a o a o ~ oj ~ o o o o ~ '" ~ o o o o ~ '" ~ ~ , " 0" g-:;;; ,,~ ~ :: 0::: ~;! .0 . " 1ii " ~ :jl " " " ~ ~ .0 ow 6 e-'Ii .:(i:: .. . :5 ~ 0, e o > '" c "w ." ill 'Ii = g'ti * III E III 6Eii " o " o , 5/10/2011 Item 16.E.6. . o . o o . " c o ~ -ii '0 . . " o o o o s; 2 . . ~ c . ~ U C ~ " . '0 $ " . :0 " "' o o . ~ " > . 2 '0 ]5 C o , o o c . D ;; . " 0. 2 ~ '0 " '0 o X <5 . . ;; 2 "' > . '0 0; ~ " " '0 . ;, c i' o ~ '0 '0 m o ~ ;; o o . ~ o '0 . o .~ . > o '" ro ~ '" N W o o W. :;; oj ;;; o o o N ~ " ;;; o W :;; ~ '" o ;;; o W m ~ '" o ~ o W N N M w' o ~ E .i' - [5: , " " ~ ro ~ o W m a W g ~ ~"' , 0 t o " " ~ III .~ c'o Q '5 go ~:;; ~ . U (I)'liU ~ 0 cr>-"-d:: o 6 ~ ~ 55 O*uE~ g " ro ~ o W ~ ~ . ;; ~ , '0 "' " " x ill " . '0 o o s: ID '0 o ~ o . . ;; 2 ~ . '0 0; '" > x " '0 '0 . 2 l' m "' " .~ m c ;; E 0; o 2 . o '0 '0 ~ . " '0 m c " D . . . ~ o c o TI ~ c o U a ~ o . . . . . '0 o '0 . . c ~ o ~ Q u . " " '0 '0 ro o >.. .. :., . ill C\"" C \i; . D o o 7,": . . '; i ID " o g ~ or o ~ w 0' or w o or o ~ or o " ..".., ~ ~ III ! -! ~:;o ~ III 0.11: t3 E 0 O~ "'~ .. . c . (II .- "C ~.~O ~I\IO..... = E . O,g~ . c " 1! , : 0 0 '> of E . 0" o:,,~ . o . c ; 'E :s '" 0 0 c ~ E ~ 0 ot ""~ . " c ~ c5 5 - ~ E = 0 <C ",,~ c: 1l c " > , ~ 0 0 0 = ell ~ ~ " ,,~ z " I U W > >= g; " ~ Z ~ o ~ . ia " :; .= 0 0 .2':.:. E o 00:( ,,~ c ~ u .!!! ~ ~ '; III _ 'u ~ c . . 0 ~ CO'" o z o . Z ,,~ ~~ <; c ,,8 . .. E "E ~~o~ o ti ~ ti ".!,c: III c: 0 ~.O' ~a:uQ: .. . C E ~~ " o o o " o o o o o " ~ ~" ;;; N ~ o o o ~ o o o ~ ~" ;;; N ~ o o " ~ ~" ;;; N ~ o o o ~ ~" ;;; N ~ "'E :,; ~ 0:" =:. en. ~"-z M ;f!l ~;; o ~ ~ '" , 0 o z . o " , -~ '"' ~~ m ~g ii5 .Elii O/l,<!- <1)'0 <I) ] ffi g>-;o ~ .B m '" 0.. <\l ~~6&o:: a; o " o ~ 0; u " ~ " . -. c " " . " E .e e 0; s u ~ E o " ]j 0; .. E u . " " u c . . o . o ro ;; " . o . , o o -" u u . o " ;; '" o . = u '0 . . .~ . > o " o o " " o o o o o ~ ~ N ," v ~ o o o ~ o o "' ~ N -i v ;;; '" z o o ~ ~ N -i , ;;; "'E :,; 0 0:" ::>ea.. "-"-z N M ;; N:;j ON o ~ ~ ~ , 0 g B . -,; or " .. 0; o . " ro " .0 . .,; Ol",,-g ~~] g: ~ <:t:I'--U~::> " o . u o , os '" 0; ~ v o m iB o " o ~ . " n . o o o ~ '6 jJ ~ g . o o " . u -. o E '6 u . ,; ~ E =2 o ~ o " ~ ~ c 0 . ~ u ~ . u -6'0 . 1:, . 0; " 0 E ;; ,g~ 'g !!! ~~ -. . o " g E '6 . u . . " o , ro ~ :g,9 .8 go :u.:a "3 " = ~ " ~ ~ . . 0 5 :g, jJ . " . ~ 0 jJ . 00 &5, o " " . -u -g-ro -0 c c ,g , '6 ~u o . z~ u. -g f':' o ;; ~~ it) ..:=- o c o , . 0 =0 u . '05 . jJ . n '; Q) 0; 0 > 0 08 " ~ ro '" u o . E * ~ " " o = ~ . " oR m m ~ . ~ " " o n 2 " o o u ~ s 5 u o o "- "- -. o " 'g "6 . " ~ -" "8 jJ . , u <- . ~ . u . o _ 00 .~ ~ .9- v 0.. 0; -. .2t: .:a c u " . C "0 ii, u " 1lI 0, jJ 0 "0 U! o ~ :- ~ ~~ -. .2 ~ -6 l' "'O~ . " ~ x "c r]) c= -OlE o ~ E 6 ,...-.0<. ,9 ~..., ro <, > "*% ~.. -. " . . . > u 0 iii 0.. ~ ~ ~9 , u ~ ~ , " = 0 .9.2 1:-6 . g E U c u . -,; .Do.::: E u . . ro ro c ~ g [3 -6~ -g 5 :g .9 . . o , "u ~ '" Qj :::: '" . o u . " ~ 0 u . '0 w . . . " "E :g, . :,; 0"5 Packet Page -882- E .e o o ~ " ~ ro ~ M N ,: m M ~ N m N ~ ~ oj M ~ ~ N M ro N .. M M ~ ~ N M ro N ,. M M ~ ~ N M ro N ,. M M ~ o or ~.E w"- "Z ~ ro ~ ro~ m ~ ~ v 0 ~ -. . . u ~!Q ~ ~ ~o'" ~ ';;; ~ (0 c (L> 0 Co jg g. 5.. &;ffiUZE " o " o m m oR o m m ;; " ro m v" ~ ;;; ~ m '" m ~ "' ;;; , ~ '" N m" ~ ;;; '" z , ~ m N '" ~ ;;; o or " " 0- w"- " z C:' ro ~ t;j ~~ , 0 " " ~ gg 3;; m~ o o n " " .. E . , o " " > C ~ " & E <I)';:: Q) o ~ > lij 2 K B~E ~ o m , = ~ " . "6 " ~ o u " -. o " -g " " u " u , ~ - " ~ j rn Q) " - " ~ if, " ~ t ~ a' nO.' " ] he "6 8 o c g 2! " o..~ -. c ~ -2 -g ifj r::: ~ . o > ~ m ,.1 1:>--':,' ~ . o f- t a; (j; ~~ o " 1~ u 0 '0 ~ ~ -E .~ .8 . ~ > ro o~ 5/10/2011 Item 16.E.6. '" "- o ~ -t J1 u u . jJ u o ro 0" o n , '" " o 8 '" c ~ u u ~ o . ~ o o o ~ ~ o . ;; u jJ " , u u " u u ro " . . s oR o o o oR o o o o o '" :! '" ~ ~ o o o ~ o o o N '" ~ ~ '" z o o '" N '" ~ ~ o or ~.E w"- "Z ro ro ~ N ~ ON o ~ ~ ~ v 0 ~ ~ ~ o ro " '" ~55 . c " 0 , E o ID " > > 0 ~ a. g,*s ~ ~] o~or N " o so c " > o "- jJ <- . ~ o u o o . " :E " n o o "- o " "6 o " . = ~ o o " o ~ " " '" o .~ u " ~ "3 ~ ~ x " " . o o .. c '6 " S W IV ~ :S 'ai >- s = ~ if ~ ~ '" 0' ~ 0 ~ [i 1:> rc .8 ~ ~ ~ ~ ~ 1 o __ --g ,~ ?; i: o :S a, B -~j gc ro ~ u 0 -" ~ :; 2-':': Oll ~ > '" ~ 0 x Q ;;:; U a: 2 1 ~ ~ ~ ~ f;u ~ " u " . 0 o u "1' ro a; ~ o ro o -,; 1 ~ u 0 '0 ~ :: .2 01 .~ .~ c . " > "6 o ~ E Ql ! ~ g':;c5 ~ III (,).:0: ~ E 0: '-',g~ ~ .. . o . Ql .- 'tI ~ g' .~O .O~ r. E (5 U,g;: Ci "C 'tI'E ::J :: 00 'S: oW. E !II 0: <C a:;:~ .s ~ ~ . . c '" 0 0 o ~ E ]! (54: ,,;:~ ~ a: o ~ w a: a: w o a: o ~ a: o ;: o ~ w w " 2 " U w > " g; ~ w Z " o ~ 0; c "'E! ;; ~ ~ ~ c3 ::; <C ;:~ '0 ~ ~ () ~ ~ = al ~~ " <( . 0 ~ 'E ::J ._ 0 0 .91.:0: E o (5 <C ;:~ o ~ u .~ ;~~ co. . 0 c 0"", o 2 .8~ S~ 0: 0 ;:" o z E ~ EI ~ ~ 0 ~I o ~ & t;1 'E.~ ~ '!:.I' Iii e .s= e >Q..(,)Q... , I I I J!l . o li 0 "Z '" o o 0; ~ o o o o o o M W '" ~ ~ o o 0; ~ o o g w '" , ~ <( Z o o o M W '" , ~ "'" ~ c, ~ " ~ e a.. CLCLZ M ~ ~ ON NW " N OW ~,., a, , 0 . '" . ~ o c CiS '" a, n ro ro o ~ o ~ "'N ~ ~ <l; o " o " " . C . " N . . ~ . tJJ<"'l ~ ~ ~ ~ ""00 ~ ~ ~ 12 "' "' a, U 3 " >=' o o '=- o Q " o c " . io "6 . E t . o . o . " " 0: ~ o ,g E . c ~ ~ . U ~ . 5 '" o E . n o E ~ . OJ ~ B ~ ~ n . OJ or , ~ o ~ o . J: 2 ~ ~ ,:- "- w ~ ~ ~ ~ . .g ~ o o Z ~ ~ . o ~ . '" ~ .~ ~ ~' :t :; . > 0; > o '" " o o '# o o o o o ~ , , .; , ~ o o o ~ o o ~ , , .; ~ ;; ~ z o o ~ , , .; , ;; "'" ~ 0, ~" ~ 20.. 002 ,- ~ ~ ~N W o~ ~ d, ~ 0 . o . ~ o c CiS '" ~ n ro ro "5 ~ o ~ ON ~ ,. <l; o " o ~ . U o . ~ . N a:;:; C 0", 0 1 a.. * U"O > 5 iii ~ . 0 ~ Q g iii " o " u " '" " o o W 2 "0' '# o o o OJ 0 " . . . o n C 0 e ~ ~ 1 ~ ~ " E . ~ E . t . . . c~ Ii ~ . . 11 g " . u::: a; . " -E: ffi Qi .; . 0 i . ~ g' <1l '5 E ~ ~ E ~ 'i: g 3: Q. E C> III Q> 5:._ "' - - OJ ~ ~ .Q g> 5'..c: Cl! ~ ~ .9 ~ g' ~ 2iii o III Qj " ~ - ~ ~ ~ UJ g:; ~ ~ ~ ~ E <1l E ,g";;;f- <1l ~ ~ c c U Q.l Q 0.> E ro ~ ~ 0> III :> € c ~~~ g'E u; ~ (:; g ~ ;;: .Q . W 0 CL 0 ~ .9 E .!!! -g g ~ iicj'g "' . . ~ E ~ .s ~ ~; ~ lli j'g "'0 C -"2 o Q ~ t ~ c:: ;:: ,g J; '" ro " ~ ~ o "' 2 ~ ~ o ~ S Ci <1l 1:9 0. ~ n ~ "' 0 c;:, .8 ~ :::: c ~ a; E ili..' ..-; (l) --: f ~ g ~ ~ ~ ~ ~ ~ ~ 0. r:: Cl! .-{ ~ ~ € 1 ~ 8 ~ 0. ~ ~ oW uo C; U E g' i6 0. ~ n:--;;; "0 W ro -o~ o ;- ,9 ~ ~u' ~ '; fl) ~ ~ -0 ~ On::; , "' i' . E , o " o o o o N W " ~ ~ Packet Page -883- ii, ,. ~ , L ~ , -r ~ "' ", 1: o o o ~ o o o N W " ~ ~ 5 o ~ E g "' E Oi ~ ~ ~ . u w c w 5 '" c co ro 15 o o "' . "' t 2 . , ~ ~ ~ " ~ " . 5 g "' > o ~ " z o o o N W ~ ~ ~ " or G.2 W 0 1-- Z ~ ~ w ~ o ~ o ~ ~ J:, ~ 0 Q "- ~ u w U E ~ u ~ rn 0 ~ ~ & ~ ~;; ~ E B, ~ B0~ c i ~ ~ . o , . '" . ~ " a . . .~ > o N " o " o o '" " o o o o o o ~ 0; ~ ~ o o 0; ~ o o o o ~ 0; ~ ~ " z o o o o ~ o "' ;;; u or ~.E Wo ~ 2 ~ N o m ~ 0, o ~ o ~ ~ ,;, , 0 -< 0 ~ ~ ~ "' o " ~ ,;- ~ N ~ g vet:: >. g' ,S v rn :::: ~ iSt'5UJ ii ~ o :' 5/10/2011 Item 16.E.6. E Ji 'E g 4i ..Q c~ <(~ C'" o c , 0 o " "0 ~~ " E ~,g ffi $ o rn w~ oB . '0 :S ~ o . ~ 15 i 0 . 0 n lli t n go . c 1:: ~ Q...c . C "' ~ " . . "' 0' ~ ~ . . ~ ~ ~ ~ . o " " :. " " ~ c "' ro ~~ f ~ <fJ .s 13 .8 E c: <fJ ~ E ~ ~ E ~ ~ 4i '" '" - '" o 00 ~ 5 ~ E :s ~ g';: ~ .8 g>.8 "S! -@ ~ 8.."0 ~ ~ ~ ~ .8 ~ ~ rrro CiJ ~ .c: ~ u o !!! <fJ xxi: o 0 l- . . J: ~ 2 ~ rn . .8 ,g>;} ~ 'E ~ ~ . . ~-E-E ~ 0 CiJ ~ - 0 ~oc OJ w .2 .If- 0 c >- r"" ~ ~ g ~ ~ ~ ~ ~ E ~ c . . ~ ~ ~ . . "' ~ ~ ~ :g ~ ~ ~ ~ I- 0 g u "' . "' Q.; > ~ 0 c ~ . ~ -;; <( ro 15 o B '0 13 ~ ~ E ::g .~ ~ ~ ~ 0" it; o ~ E 'J'. o o o '" " o o o o o o ~ .; 00 ~ o o 0; ~ o o o o , .; 00 ~ <( z o o o o , " 00 ~ ~ E :. '" ~" :) eo. ooz ~ ~ :ON m o~ ~ d, , 0 "' ~ <3 . ~ 1; "' . "' !] (lJ ~ 12 o <") V i..L. ~ :2:", 0l0:::,::. <lJ ~ ffi S: u o<").c:uo I r--U Ul:2: a; " o '" B o o n c ~ e o ); . . " c E . . ~ c . ~ u o " .E ;; o o .Q o o . o . E 1; > o rn " "' . E ~ ~ . ~ "' ~ " '~ " E ~ o rn o w E c " rr . ~ . '0 o . X . ); c c ~ @ ~ rn ~ .2 di " ~ ~'" o m x ,2: " . . 0 We ~ . .8 ~ ~~ u . ~~ , 0 m rn N~ ';:'.!!! i5 2 ~ E x . " u ~ c w 0 -0 ~ c ~ c " ~ rr o " ~ v :g ro . ~ o u ~ e ~ Q.; - 00 o 2 . 3 ~ "' '" c: '08 . .~ g- 0i-5 > ro o u /" :;::: ~ " o ~ ~ " " ~ o " o ~ " ~ .D L '" r u ~ > ~ ~ ~ W Z " o '" ~ ~ < . 41 f 'C ....0 ~ = <5 ..~ l'II to) ..: ~ E 0 '-J,git .. . < . .-'" g"~O ~fIIO"" ~ e . u 0 ~ .. 'C .g C : <5 5 );.If: E f>> 0 < ";:~ s.g c . . , =00 < ~ e 100( u;:~ .g < ~ c5 5 . ~ e :::l (5-< u;:~ c i c ~ to) ~ is :::l a1 ~~ u "'~ . < flit! :::l "5, 0 0 "_ oX: E <500:( ;:~ ! "~ = Eft fII _"u ~ < . . 0 ~ OU'" 0 z ;;; 0 z " 'U i5 ~ ~ " < 0 ;: u 0 z . ;;; . e " e . 0 i5 . z z z " 'U . - = " " . < . < .~ ~ .0' . Ii. > ~ u $ . o E ~;@ 5/10/2011 Item 16.E.6. m ~ ,.; M ~ .,; :;: g '" " ~ o ~ 2 " ~ ~ G " '5 Packet Page -884- 5/10/2011 Item 16.E.6. I a& Cmmty ~ --~-- - 1>.1,;' ~.~ Servb!s CIM!ion Purchasilll D Contract Change Request I Mod#: 1 I T Project Manager: Jerry Kurtz ! POlWork Order #: i 4500117602 TDepartment: Land Develo ment Services Purchasing Department Change Modification Form IZJ Work Order MOdlfiC~ ) ) 'Project ame: Palm Springs , Stormwater 1m rovements Contractor/Finn Name: Q Grady Minor Contract # 09- i 5262 Project #: 60094 #NlA Original BCe Approlal Date; Agenda nem # '4#!UA Last BCe Approlal Date; Agenda Item # Original ContractIWork Order Amount $ Current BCC Approled Amount Current ContractNvork Order Amount . $ Dollar Amount of this Change .,' '" Revised New ContractIWork Order Total I Cumulati\le Changes I 9.100.00 #N1A . 9.100.00 '$Q,OO S9. 1 00.00 SO.OO 0.00% Change from Original Amount #N/A Change from Current BCe Approwd Amount 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change I Last approved completion date: I August 6,2010 (90 days trom May 6. ! 2010 - NTP date) I Exolaln why additional days are neeDed (Detailed/specific): Schedule adjustment Revised completion date (inciudes this change) March 8. 2012 i Original notice to pro:eej I' completion date: .--; i r .! ,- '1', '" IV 1 Num~er of days added ;if extension, must attach current insurance certifk:a!e(s) from SA? or obtair. from vendor): 599 ~ Acd new task(s) , L Change taskls) I D Delete lask(s) , , IS) Other (specify): add time only ! 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): nla , I 12. Provide detailed rationale for the requested change: Addition of time only. Original duration specified In WO (90 I days) is insufficient. WO is tor design and construction phase engineering support of a stormwater effort associated with a watermain r6p~acement project. More time is needed to caver extended planning and pre::::::mstruction effeorts. 3. Provide explanation why change was not anticipated in original scope of work: Original Duration (90 cays) necessary to c:Jordinate integration of stormwater work with water main work was underestimated at time of WO generation: tried to extend cont;-act oerioe by stating modified du;-ation (355 days) in NT?; subsequently informed that NTP canat extened du;-ation specified in exec~ted \'VO. AlsD, thiS work is ;::l\anned to be included in the ?UED Paim Springs water main reolacement pro.iect so the neighborhood wili De dlstrurbed oniy once. More time is need to intergrate ::'oth error:s 8:iC impiement work as ene nf:Jje::::t 4. Describe the impact if this change is not processed: PO tecr,r"~ally expired, pay due vendoe wouid be delayed. ....J Type of Change / Modification _ _.--....: 2 Unforeseen cond;::or:sl~ircums~ance ' L' 3, Quantity' or ;Jrice adjustment ,I ::: Vai:.J8 added ~ LSJ 6. Schedule adjustment ! I : ; ?lanne::.' :::.iecrive L COTe::tior- of e~ro~: s ; Change Requested By o C::mtraswr/Cor:sultan: [J Design Professiar;ai [8j Owner I i Reaulat:::Jrv .A.genc~y (S06'c:fy) , 0 Using Department , U Other (specIM: Revised: 2./2~ii 1 1 Packet Page -885- i Purchasing Professional Participated in Negotiation of Change I Modification: [gj Yes 5/10/2011 Item 16.E.6. U '''10 Approved by: I Name and Titl . Reviewed by: Purchasing Professional's Na c'; , './ Date: 7. 1'1 }J ~ Revised: 2.'21/,1 2 Packet Page -886- 5/10/2011 Item 16.E.6. 2'~~ Adrrinisllalive Servtces ClVisbn PLlrd1asmg o Contract Change Request Purchasing Department Change Modification Form X Work Order Modification [ Contract #: I 07-4112 Project #: 51803 Mod#: '2 i Project Manager: S~ane i Cox Project Name: Gateway Tnangle Stormwater Imorovements Contractor/Firm Name: RWA Consultin Original ContracVWork Order Amount Current BCC Approved Amount Current ContracVWork Order Amount Dollar Amount of this Change Revised New ContracWllork Order Total Cumulative Chan es $ -:192.690.00, : NIPi;::::;;~'~:" ", , $" 192.690.00" ;4:' ~~~!Y$D~OO~ $192.690.00 $0.00 '. j~jNrA Original BCC Approval Date; Agenda Item # "cNIA Last BCC Approval Dale; Agenda Item # 0.00% Change from Original Amount ~. A Change from Current BCC Approved Amount 0.00% Chan e from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Orig:nal notice to proceed (".'...: ,<j completion date: 12,' 3 .' Dc . Number of da,'s aaoee' (if , exte::.sion, must atta:::h ::urrent i:lsurance certific8te(s) fr-~m Sl.P or ob:ain fromven:J:Jr)" 340 Last approved completion date: Revised completion date (includes this 10/24/10 : change): 9/29/2011 Exolain why additional days are needed (detailed/soecific): I) Scrivener's e:Tor was made on the Notice to Proceed that affected total time authorized. This chEL.~ge order is to correct the initial time allo,ved (300 days per work order rather than 365 days as stated in the NTP). The work order also had extel1Sions granted by the Feb 16.2010 Zero Dollar Change Lettcr (150 days) and by theJune 6, 2010 Change Order (235 days). 1be total of/50 days is incorrect. Correction of the initial time period brings the previous total to 685 days. 2) This change order is also to request an additional 340 days to be added to time allowed for this work order. R W A Consulting Inc is the civil engineering design consulTant on this project and the construction has encountered many unforeseen circll.'11stances. On December 8. 2008 the subject work order (#4500103156) was entered into v,rith RV\"A Consulting to provide various Surveying and Engine~ring Services \vhich inCluded SU;1port during Consrructio:1. i On December 15. 2009 the 30ard of County Commissioners awarded Contract # 10-5366 to Steve;::s and Layto:1. inc. for LJ.,e construction of the Phase 2 Impro\'emen:s:o :h~ Gatewzy Irian.gle Storrnwater prcject (Project #51803. CJ:.1Srruc.:iJn hcg2.n (\n :--eo:-~JI: 1:. :2C1 O. Severa! events have extended the need for engineering support during COr..St:""J21ion. A Char:ge Ord~:- 10 tbe cDr~s'JUction contract Vi'2.S approved. on D~ce!l1~er ~S, :CllC,1 to cha.."'1ge 1T0::1 2..iack-and-borc:o a directio~ai drill under ! T)"\ri,, :'::'ou,I"\."r.4 {\1.';"I'"h r"50]\"""0' "O-+1I'"t< \\1';-}, ut;li~;F''' .."t ~hat ;n'"rs"c"I'~n) 1.-.. h.1 .... Q...:c,J..,.'~1_'~", .... ..........!.~~...... '-'.. ~.u_:>......~ H~.... ... ''-_'',~ site improVell1e.:1t plan c}uLTlges a1 the stoffil\\'ater pwnp station caused by I permit aIld site development requirem:;nts, IniscellaT1eous cha:lges including i \'i'ater ma~4i\'ersi()~s, 7'cmo\'al and re~lacemen: of existi~g failing culverts. Revised: 2/2~ 111 1 j Packet Page -887- ~itional roadway work, installation of !iiiety grate and brick bulkhead due to .cems from the Brookside community. to allow for 22 days of additional contract time for the project. 5/10/2011 Item 16.E.6'l Subsequently, the project encountered more issues that require time be extended to complete the work soundly. The directional bore under US 41 at Palm Street is in an area of tenuous subsurface strata. The Contractor has attempted 11 bores there. to no avail, in crossing under US 41 with a drainage outfall pipe for the project. Additionally, the County has had to bring in an outside materials geotechnical testing firm to test bore the strata on the south side of US 41 to determine what is causing the complications with the directional bores. This new test bore substantiated the test bore information provided in the original design plans and showed weak soils below the caprock ! which explains the difficulties witl: the boring operation. This additional testing, and the uncenainty of the timing of the placement of the directional bore and subsurface piping, requires the County to provide adequate time for the Contractorto safely complete this critical work. RWA Consulting's professional engineering support services have been necessary throughout these events. Utility issues have also resulted in the need for additional time for the project. The City of Naples Utilities department has required additional permitting for the installation of a fire hydrant which is causing additional time requirements for the design and permitting of this issue. I No addit] anal funds are being allocated with this Ch,mge Order. This time , request is for an additional 340 days to ensure whatever project obstacles that i remain have sufficient time to be dealt with. This extension allows services during construction and post.construction to be allowed until the end of fiscal year 201 I (Sept 29. 2011). 3) Additionally this change is to reallocate funds as noted: Reduce Tasks 1.0,2.0,3.2,8.0,10.0. 11.0. 13.0. and 15.0 by a total amount of $9621.48 and transfer this amount to Task 12.0. The tasks to be reduced are tasks wherein the work is known to be completed. Task 12 is a general scope " consisting of surveying and engineering support during construction. This consultant is making a good faith efIorl to perform the full scope as well as additional work for no additional fees. FtL"lher details are in the Task i reallocation request attached. i I , D Add new task(s) ! ! U Change taskts) i C Delete task(s) ! 0 Other (speciiy) 1. Provide a detailed and speCific explanation of the requested change!s) to the task(s): N/A 2. Provide detailed rationale for the requested change: See above I 3. Provide explanation why change was not anticipated in original scope of work; : See above 14. Describe the impact if this change is not processed: No enqineerino SUPDort for remainder of difficult cOr':...strucrion oroject Revised 2121,'11 2 I Packet Page -888- 1. Planned / Elective X 4 Correction of error(s Type of Change I Modification X 2. Unforeseen conditionsJcircumstance 5. Value added Change Requested By Approved by: o CO:1tractorfConsuitant X Des; n ProfeSSional 0 Re ulato Purchesin Professional Participated in Ne If Name and Titie: ?~anl7Cox Revlewea by: /' 'J'...{,"I. /'//,,,11/>1,., A. \ vl-" /'/./1/1 F'j/- Purchasing Professional's Name: Rhonda Cummings Packet Page -889- ,'.. I 5/1 0/2011 Item 16.Et '] 3. Quanti or price adiustment X 6. Scheduie adiustment I USing Department Other (specifv): DYes 0 No i Date J Sr Project Date: Revised 2/2-i/'; I o 5/10/2011 Item 16.E.6. . '. ~1t. County ~ Acrmst<1filoe 5erk!s or.sion P:.r.:hasing o Contract Cnange Request Purchasing Deparbnent Change Modification Form ~ Work Order Modification I Co ntract #: 09- 5262 .(1'" Project #: 66066 Mod#: 1 PONVork Order #: 45- 00126051 Department: Transpo,1abon Enolneenna Project Name: White Bivd. & 23 St. SW Intersection Imorovements Contractor/Firm Name: Q. GradyMinor Project Manager: Marlene Messam ;;;:;' Origir.ai '-' #10C Last sce Approval Date; Agenda item # Original Contra:t!\Nork. Order Amount CuC'ent BCC Approved Amount Current Cor.tracWv'ork Order Am~unt Dollar Amount of this Change Revised New ContractIWork Order iota.! CUMulative Chanoes .~~ ;" $ 48.250.00 ,:4 ...,e;....3v.oQ )$ ..~, 48.250.00' ',;It:,;~,: ::;, $O.OOt~' $48,250.00 $0.00 319/2010- 0.00% 0.00% 0.00% Change from Original Amount Change from Current BCe Approved Amount Chance from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Number of:iays adoed (If extension. must attac~ cUirent insuian:e ::;ertificate(s) f;om SAP or obtain from vendor): ~ '" Driginai notice to orocee:l I' Last approved compleflo. n date: +-aslE. R.evised completion cate (in::iudes this completion dar8: October 14, 2012 t4o;....I~1 & \! O"'+-o?M2r' "In~1 .:hange): Aprii 10.2013 Task..J~8 fC- r....{- (~ :=xplaln why ad.:iitlor.aJ da~'s are needed i ::ietaHedispeclfi::;: i he additlcnal cays Er~ I needed in order to complete postdesig;'l se~i:es. This is task IV of:he :ontia:::. Task I IV was given a date t:: be determine- (TBOj In the ongmal co;-:tract I.A. tA.. Change task:(s) Ad::l new task( 5) Delete task(s) Other (specify): 1. Provide a detaHed and specific explanation of the requested cMange(s) to the task(s): . This time extension is to allow the consultant to provide post design services for the construction improvements t:J the White Blvd. and 23rd Street SW intersection. This w:Jrk order i5 part of the overall improvements that include the replacement of the White Blvd. Bridge, :onstructing a new bridge at 23l'C Street SW and roadway ir.-Jprovements to 23t'd St SW ::or.i:lor which are being oesigned under separate contracts. . The NT? provided a comPletion date for this deSIgn as 10/20/2011; and, a final completion oate of 10/'14/2012. This final cO:T1pietior. date does not albt e:1ough time Tor the expe::ec duration of pest design se,'.vices based on I k ^ J the soheoules of the ether projects l~' '". I."\" ~h:: :JOn:~::::::: dur:~i::~. o~ :::- :i~as-aaccd ZlA ::1 anti:::ipot:.:: 1;7:-' dQ~: c.rl' :'':2::~:::: ho/:::'/:r, :~:. ::1:::":::1' ~ j-p v;:;:; n:J~ ;:"::r. u:-:ti: ? '23,'::::--: ~; ~, tr:. ~!-~ ~:::::s Ie j:::; :.::;-~:::::~:.:' t: :--:F1:::c: in:. :.:...rrcR: :t:Jtc 3~ th: prc.;::::t 2. Provide detailed rationale for the requested change: The CO:Jnty wouid like to let the construction for the Bridaes and 23"j St SW co:-ridor impr:JVements ulder one contra:::, T:'erefore: the s::hedules for post design servi:es TJr all the separate desiq:'"':s need to :"Iapoen sim:.JltaneJusly This c~an~e o:-jer will make the pest design ser\il:::es coin::::ideiital with the comracts for the other ir7l::Jrovements. I I 3. Provide e;;pianation why change was not anticipated in original scope of wor'~: 7M2 aVG!:.r:bn of ali hese 1n-:;:;rDVeri1snts 15 c result .::d staf~enO!:9rs a:,c ;:;rODS;;y owners concer,s that neejsd t:> t:oe a,:Jdresse:: as well as ",'"Ie avaiiability of funding for t16 improvements. Stru::turmg the s.::heduie for the different pii8ses of the ir:;provements re~uired tnrs chBnge. i 4. Describe the impa=t if this change is not processed: -:,e fees far thE: se:vi:::es a~e aiready pr;:.v~.:jed ir, tn~ :;:J:1t,a:::~. if this c:',ang'2 is ;lot a;::p,~Gve::i, t:;e c::J:1t-a:r I,I.!iL expF"S an: .3 '"lew cant:-a::t wil: b~ lleeced Ie enga;e the co;!s~i:ant tc ::J.'1:;nue to ;:;~::v:ae sen'!:::es post oes'9n ReVise::: 2;'::-J~- . Packet Page -890- __=J ....,~-. i ~ . 5/10/2011 Item 16.E.6. 1. Planned i ~lective .4 Correction of s'-,:Jr(s) Type of Change / Modification 2 Unforeseen =ondjtio~s(circumstan::e rE:l 5 Value adoed 3 Quantitv or Drice adjustment x 6 Schedule adiustment Change Requested By I u Contra:::tor/Consul:a~t i @ Owner Design Professional U_J Re~JL.ilatorv L.O€:i::V .:soe:ifv)' I Purcnasinq Professional Particioated in Neaotlation ot Change / Modifica:lon: Name and /' , L) --.-------- Packet Page -891-. l Date; Revise':: 2-'21!~i 5/10/2011 Item 16.E.6. f eolrer Cmmty ~ Admnistalive Sel\lices CAvision ?u~aslng o Contract Change Request Purchasing Department Change Modification Form 1ZI Work Order Modification " Contract # 07 ~ Project #: 50074 Mod#: Project Manager: Thomas Ver 0 POlWork Oreler #: 4500117071 I' Department: Airport Authori I Project Name: Phase IiA ERP at IMM Contractor/Firm Name: Passarella & Associates. I nc, Ongmal ContractlWork Order Amount $ 9.700.00 3-23-10 16G4 Onglnal BCC Approval Date; Agenda liem # Current Bee Appro~d Amount $ 9.700.00' Last BCC Approval Date; Agenda Item # Current ContractfWork. Order Amount $ 9,700.00 Dollar Amount of this Change $0.00 0.00% Change trom Origmal Amount Revised New ContracVWork Order Total I $9.700.00 I 0.000/0 Change from Current BCC Appro\oed Amount Cumulative Changes r $OOOl 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Original notice to proceed Last approved completion date: I Revised completion date (includes this completion date: 4-8-10 4-15-11 : change): ~ -{("ri;::1 I Number of days aaded (if Explain why additional days are needed (detailed/specific)' , ,_' iextenslon, must atach current 7C ;;-:... ( I) I~ InsUran.c9. certifiGate(S~ fr~m SA? Airport Authority placed project on hold to evaluate bOH::ibl-:>ite design modifications. or obtain Trom vendor). 300 Add new task( s) -, Change task( s) [J Delete task(s) I' 2J Other (specify): Extend Scheduie i r 11. ( I : 3. Provide a detailed and specific explanation of the requested change(s) to the task(s): Extend schedule by 360 days, Provide detailed rationale for the requested change: Airport AuthOrity has put project on hold to evaluate possible site design changes tQ incorporate additional acerage. One year extension being requested to ensure project CQmpletion once project resumes. (:",..; C .-,( "'-,) <-- Provide explanation why change was not anticipated in original scope of work: Foilowing review and discussion of the proposed site design with new management, modifications were made to the original site design. I , I [' 4. Describe the impact if this change is not processed: Al~port Authority will not be able to continue development at the '-_ lm~oka;ee Airport beyond the alreadY oermitted area. _ i I j D 1. Planned / Eiective ~-- . LJ 4, Correction of error(s'j Type of Change / Modification I 81 2. Unforeseen conditions/circumstance i 0 5. Value added _______ o 3 Quantitv or pric;e _adjustment I!SJ 5, Schedule adjustment Change Requested By 2J ContractoriConsultant 0 Owner o Destgn Prefesstonal I 0 Reauiatory Aaen=y ispeclfy;: Purchasinq Professional Participated in N~.flotiatior: of Chance / Modification: ! ! ,~~~~~=d by:-".-e:::.-- //' i.~'~9Y1."~Q 1~~~_,/Z) I Name 2.nc! Title: T~omas Verga, AIrport MaAager o Usina Det:ia~ment o Other isoeclTyl: DYes 0 ND Date: ""7 /-, _--:'..- t 1 ,'?.... 7' f -- ::.' ! I I-Ji -L/7-;~~~n i Date: ------1-- 7- - c;-- // K.evised :':21/11 Packet Page -892- 5/10/2011 Item 16.E.6. 7' eo1N:r County ~ A'lmnislralWe Services DivlSIOfl Pu~aslng Contract Change Request '--~ iJj , Contract #,-e~ Modil: 4 Project II: 46040 I Project Manager: Thomas Veroo - Purchasing Department Change Modification Form [2J Work Order Modification POlWork Order iI: 4500106078 Department: Airport 1 Authoritv Pro'ect Name: IMM USDA-CCAA Bid Contractor/Firm Name: a. Grady Minor & Associates, PA Original Contractf\N ::lrk Order Amount $ 105.322:50 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 1 05;1'91:50 Last BCC Approval Date; Agenda Item II Current ContractiWork Order Amount $ 105.791:50 Dollar Amount of th,s Chacge $10;720.00 10.62% Change from Onginal Amount Revised New Contractl\f\lork Order Total r $116.511.50l 10.130(';:, Change from Current BGe Approved Amount Cum:...<:ative Chances I $11,189.00 I 10.13% Chanae from Current Amount Completion Date, Description of the Task(s} Change, and Rationale for the Change I Original notice to proceed I Last approved completion date: I Revised completion date (includes this completion date: 4/3/09 I 07/30/11 . change): 09/30/11 Number of days added (it ; Explain why addItional days are needed (detailed/specific): Project start delayed by I extension, must attach current ;Jerrmtnng Issues and USDA approval af change Order for pn:e Increases. i::sL.:.rance certifk:ate(s) trelm SAP ! or obtain from veneo:-): 60 i Add ~ew taskiS 1 o Chanae :esk(s\ U Delele ;askls) [2Sj Other (specify): Exteno Sche::lule 1- ,1, Provide a detailed and specific explanation of the requested change(s} to the task(s): Increase amount by $10.720 andextends::,'1eaule50daysJ..c (.-~4~~":'-' i-i.1....rj!,0 ;, "'tle- /!' '/C-"'7 ", /, i~ "(; - . - ~ C J' I ' (?L-.e ... '-"' k CJ;"'LL - ' - . 2. Provide detailed rationale for the requested change: Grant Agency (USDA) requested ajditionai inspection hours than pr::)Vded telr ir, the Q;-iginal project scope. C:Jnstructi:Jn ::>hase 01 project was delayed because of permitting issues and waiting tor final aooroval OT pric~ ;ncreases :0 tr-:e constru:tion c:mrract. I 3. Provide explanation why change was not anticipated in original scope of work: Did not anticipate grant agency reouestin;: additionallr.spection hours dUr::1g cDr:structian phase_ : 4. Describe the impact if this change is not processed: Constru:;ti:::>n of manufacturing facility at IMM will not comply wit:-: CLa~t assura:1ces/reauirements. , I , : 0 1. Pi5.nned / Ele::::~ive I 04. Correctior. of errons) Type of Change J Modification i 02. Unf::)feseen c::J:lditlons/Glf::::L.:rls:arlCE I [2J 5. Value added ~ 3. Quantity or Dnce adius:msm I2l 6. Schedule adiustment Change Requested By Q Contra:::tcr/Consultant ~ Owner i [8) Desicn ?r:Jfessionai I I Reau:aT:):"v !.,aencl" soeclt\; ! Pur::hesinc P"':::,iessl:Jnq,J ;Jartici::::.ate:: ir, N~:J:J:,atlor: ::.t 8han:J8 'M::.d:fIC3.:IO!"i: IJ..- A~ _____ , AO,lfovec by: =-;:1:.' /f'/' , , _,,?1-' ~~ , ~?-1a , N~"'"'c -n' . I+I~. '....",,..,..,::><:;. \!;:l"'~"\ ",rO:'"'1'" ~ r "ao-[ , C1,,,~_:::....., ,,_. ""_""__ '~':::-'''' ,"" '-...../IVk", ~'.::: LJ USlnq Deoartment [g: Other (s:Je::::;rvi: ~SDA (Gran: Aaencv) !"i Yes I! N:: Date: q- 7-/0// Reviewed DY: ._;}-:";./ . P~:::h2.sl"g Pr:-'~essi:J~5.!'s 1\:2.'7I~ -./ . " ,I ,,--/----' , =:latE: ., .- // Revise:::: 2/2",,", ~ 1 Packet Page -893- ~~ Comer County ~ Admnistatllle S;)r./ices Divisb1 Purthaslng o Contract Change Request 5/10/2011 Item 16.E.6. Purchasing Department Change Modification Form 4-} [gJ Work Order Modification I Contract #08- Mod#: 1 1 POlWork Order Project Name: Repair of (4) Sludge i 5011-20 #:4500120413 Presses at SCWRF Project #: 73969.4 Project Manager: Oscar i Department: PUPPMD ContractorlFirm Name: Mitchell & Stark ! Martinez Original ContractIWork Order Amount $ 281.550.00 nla Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 281,550.00 nla Last BCC Approval Date; Agenda Item # Current ContractIWork Order Amount $ 281.550.00 Dollar Amount of this Change $0.00 0.00% Change from Original Amount Revised New ContractIWork Order Total I $281,55000 I 0.00% Change from Current BCC Approved Amount Cumulative Changes I $0.00 I 0.00% Chanee from Current Amount Completion Date, Description of the Task/s) Change, and Rationale for the Change I Original notice to proceed I Last approved compietion date: i Revised completion date (includes this , completion date: June 10. 2011 , June 10, 2011 change): June 10. 2011 i Number of days added (if I Explain why additional days are needed (detailed/specific): extension, must attach current , N/A - not a time extension I insurance certificate(s) from SAP I : or obtain from vendor): 0 'I 0 Add new task(s) i 0 Change task(s) 1 0 Delete task(s) I' [gJ Other (specify): i Add retainaee and stored materials. .'-1. Provide a detailed and specific explanation of the requested change(s) to the task(s): Add contract language to Work Order as Exhibit A for stored materials and retainage. 2. Provide detailed rationaie for the requested change: Change necessary to accept pay application from Contractor. 3. Provide explanation why change was not anticipated in original scope of work: Wnen original work order was written, the stored matenals and retainage was omitted in error. 1 4. I Describe the impact if this change is not processed: it will not allow the Contractor to have his pay application approved for payment. 1 I 0 1. Planned! Elective I [29 4. Correction of error(s) Type of Change / Modification I LJ 2. Unforeseen conditions/circumstance i 0 3. Quantitv or price adiustment I IJ 5. Value added I 0 6. Schedule adiustment Change Requested By o Contractor/Consultant : 0 Own9r ! 0 Design Professional i 0 Regulatory Aoency (specify): l. PUichasin:j PrJfessbnal Participated in Ne:Jotlation of Chanos ;" fviodificati:xl I 0' Using Deoartment I 0 Other (specify): iZ! Yes 0 No I Data: ':;^ /:; ",./// i I Date OJ I .;' ;/7 /1 I .Ap::>rovec by: t:./:-.,--~-->:.:'~ _<.~ ../':<:-<....----<-__~--___ I Name an.:! Title: ./~ ',' ,-:;- [/, --', ,--~---". L' ~''''hL ,- /-"r/C-//.,~- i. Reviewej by: ~. -. ',- ~ . urchasing Professional's Name: ?/:-{'.i:e /--}:..../I/.I:2'L......... ---: /~: ':"r- E~'?/ ./_:';rf"'---'~{~;e/t. Revised: 2/2'1.'11 1 Packet Page -894- eo1rer County ~ Admr-,iS1l'ative Services DMsion ?UrcnaElilg [J Contract Cr,ange Request 5/10/2011 Item 16.E.6. Purchasing Department Change Modification Form ~ Work Order Modification Contract # 09- 5262 I Mod#: 1 Project Name: MPS 308 Generator Reliability Upgrades Project Manager: Peter Schalt, PMP I' POlWork Order #: 4500125132 I I Department: PPMD i Project #: 1725491.1.4 Contractor/Firm Name: ABB, Ine Onginal Contract/Work Order Amount $ 144.26500 N/A Onglnal BCC Approval Date; Agenda Item # Current SCC Approved Amount N/A N/A Last BCC Approval Date; Agenda Item # Current Comra::/Vvo:-k Order Amount $ 1.14.265.00 Dollar Amount of thiS Cr,ange $0.00 0.00% Change from Original Amount Revised New ContraetIWork Order Total I $144.265.00 I O.OOi, Change from Current BCC Approved Amount Cumulative Changes I $000 I 0.00% Change from Current Amount . Completion Date Description of the Task(s) Change, and Rationale for the Change Last approved compleTion aate' Revised completion oate (Includes thiS D4/13/2011 . change): 12/09/2011 Exp!alf; whY' additional da\'s are ne::eded (detailed/specific) This change order is to add time. It wi]] add 240 days to the last approved completiO:l date to accommodate: I]) Obtaining additional land from the adjacent Schoo] Board, 12) Taking 110ws from the School sewer syslem resulted in additional design effo:-ts 10 discormect the lift station from the school systen,,: and c01ll1ecting it to the County system, and (3) Additional design erforts for a ne\\' generator building tD house a more reliable emergency po\ver system. I :,~e:~ ~\.jll...~,~~u1t in a more reiia':Jle, compliant., and sustainable facility to serve l}".r \"Ll::;lorr,v' ~,. , I LJ Cnange tasKi,S) Original notice to proceed c~mpletlon date: 01,'1312D11 f\lumber of :::ays addej i,if extension, must atta:::n current insuran:8 c:ertfftcate:s::, from SAP :Ji :btain fro:;j V8.'1:1;:)r)' :&to LJ ,';0:1 nevv task(s) LJ Oeiete tasK\S) j ~ Other (specify): Time Extension 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): This change order is to add time 1t will add 240 da"s \0 the last apDroved completion date to accommodate: (1) Obtaining a::kiitionalla.,'}d from the ad.iace::il School Boa:-d~ C:?) Ta1:ing flows fro::n the School se\ver system resulted in additional design efrorts to disc:m.Tlect the Jd~ station rro:~1 the school system and connecting it 10 the County syste1n, and (3) Additional design efforts Jor a n::"w generator huilding to house:1 more reliable emergenc},' poyver systenl. These \\"iJl result in 3. :-::10n: r::Ii2.tJle, cOTI1plianL and sustainable facility to serve our custom=rs. _. Provide detailed :-a.tionale for the requested change: OnlY 27-ISr t~s ten:e D fence stud):' and staffs resL:Jtant Inpu: dlj ii c.e:::J'"':l2 a::';:-,3r'2::t t~a.: tns a~:JV'2 ::::oan;Jss arE: nee:ie: ::leretc;re, Irn~ler:l'3ntatiG;: :3 DiJdent:c :lave 3 reiia8le, sustalnabls, and compliant fa::iiity br YS8rs to CD:-:1e. 3. Provide ex.planation why change was not anticipated in original scope of work: There was :10 vv'ay' :0 jeter-mine t"ia: the a::>ove :r.anges WOJIc.; ::e ne::essary ~..Jr;:i, a d'2taiied fen:e t:: fence StlJY was :::;ordJ::::teo anj 4. D2scribe the impact if this change is not processed: \\'jtnoJ: the li:-TIS eX1S;-;SiO;:, \11"8 \".'oula ;jQt je a:lle tc dSSIJl ai::' :::.'e:~:t tne ;::;:-oiect 8\/aiL;2te':1. LJ 1 Plan:lecj Elective [] 4 Correctio1 of e:Tor:'s': Type of Change / Modification =-L ~. ~-~~~;e:;~~o?_"':)1 sc":crTO~tan.c= U 3. Quantit\! or price adiustment ~___LSJ__ 6~_~c~edule adjustment r':::evIS~G_ 2':::'; ,., Packet Page -895- .ame and Title: Reviewed by: . Purcr,asing Profess Change Requested By / als Name: -;//C-C",,--e /-- , ?(/~ Packet Page -896- I I Date :l if 0 I If Revised: 2!2'i:~' 2 5/10/2011 Item 16.E.6. . ~CowHtY -- --'"'-- - AdnrisInltive SeoIices IlMsicn P""",,,,, :.a COntract ChangE Request Purchasing Department Chan~ Modification FOl1l1 3Work Order Modification I. Contract #: 09- 5197 Project #: 69031 Modi: ~ ! POlWorK Order #: 450(:1 i~ ':.~ Project Name: Naples ParK Sioewalk I i Imcrovements i Department: Trans:xmalion i ContractorlFirm Nome: Bonness, tnc. ! EnOlneennq Project Manager: Dan Hall $ 334.283.27 $ 334.283.27 $ 334.283.27 $32.952-;62 $367.235.89 $32:952..62 Onglnal BCe Aoproval Date: Agenda Item # 6-22-10: t5A15 Last BCe Approval Date: Agenda Item # I Ongina! ContractNVork Order Amount I Current BCe Approved Amount I Current ContractflNort<. Order Amount _ Dollar Amount of this Change I Revised New ContractNJork Order -;- etal ICumulative Chanoes 9.86% Change from Onginal Amount 9.86% Change trom ::un-ent BCe Approved Amount 9<86% Ch"anae from Current Amount I I Driginal notice to proceed I completion date: July 19, 2010 Number of days added (if extension, must .attach current :nsuran:::e certmcate(s) from SAP or :Jbtain from vendor;' NJA i:J Add ne.....lask(s'i 3.J :::'hange lasl((sj Completion Date, Description of the TUk(S) Changi8, and Rationale for the Change I Last approved completion oate RevIsed completion aate (inc;uoes thIs i November 16, 2010 : :::hange): NJA I Explain why aOdltionai Clays are neeaed (detaiied/spe:::ific): N/A - --r=-Delete- taSK(S: I ~roYide a detaHe-d and specific explana.tion of the reouested chance/sl to the task'sl: i This :::hange order is ror qua.'1tity adjusanent. The jarg~st change to the proj::::::t was the additional :::mbankment : quamities. Du:ing construction a larger quantity of embankmerl'! was required for the p:-oject than the contra.::t I o...'11O'Jnt to build up to the siciev.alk el~Yatia~. .A.:1.ather ::nange wa.~ t.'1.e modificat:on of existing inlets, Dur:ng I :::ons:ruction, it v,'as n~::ssa'''V to modif... nL'"le additional inlets not sho\'.TI on the ;1ians to be modified so tha.t the I sidewalk would meet design "criteria fo~ allowable d:op-orrs and i~p:'"Dve tne ov~r<ill project. Aaditional piping ! W:2.!: necesssr)' due to a collaps:: of the existing pip~ng during cor:s:ructicr:. Eig.~ty sever: reet of corrugat::c metal ! ,:JiPL'g was replaced with c:mcretc: piping since ?a.'1.S of :he pipe colla?sed and was found to be unsafe. Additional 'I. changes were m.a~e to ~jan ouan:ities as snO\.'\-T. in the attached subr.utta\ from Bonness, Inc., to match actual field : :neasu."'ed quant:t1es. _ Other ~specifyJ i 2. Proylde detailed rationale for the requested change: The changes made produced a finished product that improved the s.afety and aliowed for the sidewalk construction .,.,'i.6out he.v:.n; to add m::>re expe~siv:: hand:ai] oc:he prDie:::!.. 3. Provide explanation why chan~e was not anticipated in original scope of work: Tm desig.n didn't adcqllil.t~ly addi~SS the e::r::bankmenl ne:::es:sary 4. Des::rl.be the lmpa::t jf this change is not processed: 7ne sidewclk would not have beer:: built. COTIS!t'Jctlon \',:oulC ::ave ended prior 10 rinishinE the projel.::. i ~ 1_ Planned,' Elective UTCOiTedionor-~--- Type of Change / Modification 2:J 2. unforeseen condillons/clr.:::~msta.'1ce ! ~ 3 Quantity or price adiustmer;l - :ZI.JaiUe M..ce-d-------- -~-6~ SchedUle aciiustment Change Keque~tec Elr .";:_9ormSctOriconsultant ! ~ Owner G....J Deslon ProfeSSIonal I' Reaulatorv _tl,aen::v IS;Je::ify:' : pur:nasln:: Prcfessiona: P2~:::!pated in NeQo~iation oi;:h2noe Mooil1::a:::::c'1 LI '-lstrla Depa:cment : I Ot,er ~spe::lfvl; ..... Yes_ cz: No j ~ , , .. Ao~rove2-b~: ",,' - --;-- I ). ':...) ~-.c.J ~:'1' "..i>J c:L) ~t-,z~e ar1::l ~.~~~ . -;;_'vo"'i~_-;",=_i~E: J~. Dale c, , :--r::..... e:..-,_ _ __~~~_~,.. (, ~=:'~_r 3. /2-::-/ /! ~',eVlewec Cy' :;alE: ! ;;'U~:::~2Slng Prc"eSsi::ma['S ,....ame V?i/I~:r;;-r~ U/ I, t;r- I I R..vi5lta_ ;"'2~r, , ':_~' ;' Packet Page -897- 5/10/2011 Item 16.E.6. 'i II , Co~ County ---- -~ - .I.dl, ~ ;.Q..;l;... SeNices 0visi::r1 Puf01asing Purchasing Department Change Modification Form o Contract Change Request [gJ Work Order Modification i Contract #:09-5197 Project #: 60188.1 I Mod#: 1 Project Manager: Julio Ordonez I POlWork Order #: 4500120872 . Department: TE&CM I I Pro' ect Name: Enter rise Avenue Contractor/Firm Name: Bonness. Inc. Onginal ContractlWork Order Amount Current BCC Approved Amount Current Contract'Work Order Amount Dollar Amount of this Change Revised New ContracllVVork Order Total L $ Cumulative Chanoes I ;'$-,,:t5Q.21's.54 .., .... . #NfA.- $ .159.219.54 $t5.760.97 I 174.980.51 I $15,76Q.97 II NlA Ongmal BCC Approval Date: Agenda Item # NlA Las: BCC Approval Date; Agenda Item # #NfAI Change from Current BCC Approved Amount 9.90%j Chanoe from Orioinal Amount Completion. Date, Description of the Task(s) Change, and Rationale for the Change I' Original notice to proceed aate: I Last approved date. January 17th, 2&!-fl ~ Revised date (includes this change)' , October 4th, 2010 I ,,-,. ,i I !'ebruary 28m. 2011 Numb~r of days added (If i Tnis change order is to change some of the contract work items i., order to have an extension. m.rtu~fit attta(ch) cfurrent additional area on Enterprise Avenue re-paved. Road & Bridge Department staff [. Insurance cs I lea e s rom . . ~.' SAP or obtain from vendor): 45' made t.."e reques: to fe-pave the ponlOn of ;:.nterpnse Avenue between. '-I.'), CornlnerciaJ Boulevard and Livingston Road during the construction phase of the project. TIlls request resulted in changes to pro,ide additional funds and time to do it. U Add new task(s) U Change task(s) : U Delete task(s) Other (specify): Increase Quantities and extend time I I , 3. I 14. , 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): Changes requsted by Road & Bridge Department staff . 2. Provide detailed rationale for the requested change: The need to add extra time to the contract time was due to additional work requested by Road & Bridge Deparunent staff Provide explanation why change was not anticipated in original scope of work: The additior.al work. were outsIde the limits of the project Describe the impact jf this change is not processed: The County will have to go ba:;k and still get t.,e additional work at a more expensive cost. Type of Change / Modification 1 ~ 2. Unforeseen conditions/cIrcumstance I r : 3. ! l i 5. Value added i (6) 0, ....... ..' Quantity or price adjustment Schedule adiustment : u 1. Planned! Elective i [J 4. Correction of error(s) i I : Contractor/Consultant OWner [LJ Deslon Professional I 0 Regulatory Aaency (speclfVI: Pu:-:hasina Professional ?arti~loated in Neootiation ot Chance;' ModificaTion: Change Requested By "--'-'., i i I USlno Deoartment I 0 Other (soecify): Road {, Sndoe Deom!. !Yes LS No ~ ..l.,;Jprovea by (Name an:: TitJe):J:.mc.= "tx~~~,~~::;-i;;?ipa~e~.Manager , .-I~" ---'-~:..~ I R.,eviewe;:: DY (Purc:;,aSln:tl~feSSIO~!v;J~Q~-:Jfflffi[:1i1:/x:om~t SpeCialist l/ --11 U'~ f'r;v U---' '.! , , I Date: ~ /t.--:/!. --'"./ -- ,I j Date: i 'i //1 /1/ ( / Revised: 1 !12'20~ 1 1 Packet Page -898- 5/10/2011 Item 16.E.6. - ,- ~Cmmty ~ --~-- - AJ I;' isb.e.e SeM:es CMs01 p~ Purchasing Department Change Modification Fonn = Contract Change Request i Contract #:09-5262 I Mod#: 1 I Project #: 60188.3 I Project Manager: Julio Ordo~ez 18: Work Order Modification i POlWork Order #4500117881 I Department: TE&CM Project Name: Proaress Ave. Road Imp. Contractor1Flnn Name: WilsonMiller, Inc. Original Contract/Wor1< Order Amount $ Current BCC Approloed Amount Current Contract/Work Order Amount $ Dollar Amount of this Change Revised New Contract/Wor1< Order Total I $ Cumulati\le Changes I NI.A Original SCC ApplO\lal Date; Agenda Item # NlA Last BCC App"""" Date: AgendS.li~m.#' #NIA I Change from Current BCC Approloed Amount 50.120.00 #NIA 50.120.00 $0.00 I 50,120.00 I $0.00 II 0.00% I Change from Original Amount Completion Date, Description of the Task(s) Change, and Rationale for thaChanll.,:':':':;""; , ;',...".';.,."",,..,, """.;,.',.., , ';-";:i: i;~;,;; I I I:: I 13. I 14. I Add new task(s) I Last approved cate: 'I Revised date (incluces thiS change): I August 18". 2010 August1S".2011 1 This change Is to extend the contract time for the Work Order with WilsonMiller due to I delays caused by the coordination with existing utilities during the design phase of the project The consultant delivered the 100% plans on January 17. 2011 and staff is starting the bidding phase of the project during March. 2011, The consultant will be providing the County with post-design services during the bidding and the construction phases of the project Change tasK( s) Onginal notice to proceed date: , May 20th. 2Q10 Number of days added (if extension, must attach current insurance certmcate(s) from SA? or Obtain from vendor): ~ Delete task(s) Ot,er (specify): Time Extension Provide a detailed and specific e"planation of the requested changa(s) to theta&k(s): There were no changes to the original tasks. the consultant spent extra time in the utility coordination part of the project Provide detailed rationale for the requested change: The need to add extra time to the contract time was due to delays caused by the coordination with existing utilities during the design phase of the project and !he need to have the consultant assisting the Count)' during the bidding and construction phases of the project. Provide explanation why change was not anticipated in original scope of work: The original work order made provison for the services during the bidding and construction phases of the project. Utilities. however. needed more time than originally estimated. Describe the impact if this change is not processed: The County cannot construct the project Without addressing and resoiving all of the utility conflicts, it may result in further delays and costs during construction. The Count)' could not start the bidding and construction phases of the project wilhout the support from the design consultant ! I 1. Planned I Eiective 4. Correction of error s) Type of Change I Modification 2. Unforeseen conditions/circumstan=e 5. Vaiue added 3. Quanti or pnce ad'ustment 6. Schedule adjustment Change Requested By o ContractorlConsul~nt : [g1 Owner Desicn Professional Reoulato Aoency (soeci ): Purchasino Professional Particioated in Neaotiation of Chanoe I Modification: A=,proved tly (Name and T!t1 ... u' - Ord~n E:, p;;;:~ I :~ ...er . "'-------- '\ , [8l Usin Depenment i Other (soed U Yes No I Date: I 3/'2--/ (( I Date:' : I I ':;//Z/I/ ! R9::;;!.6cn~~ fi~Y ~7:;lc ntrac\,SoecIalist ","","'= I /1Jr K,; r~ Revised: 1/12,':20-: 1 1 Packet Page -899- r ColN'er County __.~_.-o'-"_,_~ ';~~llnls..~l;'e 5ervl:.es Dr~'lSI:Jn ";Jr:f1JSlng [J CDntract Change Request 5/10/2011 Item 16.E.6. ! Purchasing Department Change Modification Form [2'J WDrk Order MDdificatiDn CDntract #: 09- I Mod#: 1 POlWork Order #: I Project Name: MPS 312 GeneratDr ! 5262 4500120873 Reliability Upgrades I ! I PrDject #: I Project Manager: Peter Department: PPMD I CDntractor/Firm Name: ABB. Inc. I 72549 1.1 I Schalt. PMP I : ! Onglnal ContracVWork Order Amount $ 43,63000 N/A Onglnal BCC Approval Date; Agenda Item # Current BCC Approved AmDunt N/A N/A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 43,630.00 Dollar Amount Df this Change $0.00 0.00%1 Change from Onglnal AmDunt Revised New CDntracUWork Order TDtal I $43,630.00 I 0.00'/0 Change from Current BCC ApprDved AmDunt Cumulative Changes I $000 I 0.00%1 Change from Current AmDunt Completion Date, Description of the Task(s) Change, and Rationale for the Change ! Last approve:j completlon date: I Revised completion date (Includes thIs . 12/27/2010 I change): 08/01/2011 I Explain why addltlDnal davs are needed (detailed/specific) This change order is to add time. It wi!! add 2] 7 days to the last approved completion date. The design package was submilled to the Florida DepL of TranspoJ1ation to obtain the necessary permit(s). The long delay experienced in this process has invoked the need for the ,ime extension. It is an unforeseen condition and is out of the County's control. ! Onglnal notice to proceed completion date: 09/28/2010 Number of days added (If extenSion. must attach current Insurance certiflcate(s) from SAP or o~tal:l from vend:Jr)' z::rJ _ ..1 [J Add new task(s) Change task!s) , 0 Delete task(s) ! [SJ Other (specify): Time ExtenSion I i I 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): This change order is to add time. It will add 217 days to the last approved completion date. The design package was submitted to the Florida Dept. of Transportation to obtam the necessary pemlitls). Tbe long delay experienced in tbis process has invoked the need for the time extension It is an unforeseen condition and is out oftbe County's control. 2. Provide detailed rationale for the requested change: OutSide agency's timetrames tor permit approvals are out of our control. The permit is needed to construct the proJe::t. Therefore, tne time extension IS prudent and necessary 3. Provide explanation why change was not anticipated in original scope of wort::: There IS no way to determine an ~utslje agen:y's timeframe Tor permit appr~val 4. Describe the impact If this change is not processed: Without the lime extension, we WDuld not be able to obtain the permit and therefore wDuid not be aDle to construct the prol8c! I" 1. Planned / Elective [J 4 C~r:-ecrl:m of er:-orls'l Type of Change I Modification ~ 2, Unbieseen :ondltl:)ns/clr:umsran:e i [J 3 Quantity:x ;)r1ce adiusrment I I 15 Value added ! [2J 6 Schedule adlustment Change Requested By -[] Cont;-ac:tor/Consultant i [gJ Owner ! [3] Usinq DeDartmem ilSJ DeSIO:'. Professional i Ii Regulatory Aaency (soe:::ifv) ~:D Other (specify) PurChasin:; ProfeSSional Pa:tl::ipated in Neaabation ::;f Chanoe / l~difl~atlon ____ :: Yes __._ [2J No " ,':',:JPOO,ved Dy: _~ r L /-'-1- ,'-' .__, :late: 03/31/201 '1 I-N~.3me-and Title: -Peter S::halt. ?M~~e::t r~ar)8gern ~) J.' ,if' " _'~,/ I ReVIewed by: '70, '<.~~' (;',,1,' - \p'.J-?- -rbate'c ,'/_,/,~ ' ,/;;~.--.L - " i---.!.. ~ Revlsej 2':21'1 Packet Page -900- -"- corN;.,. Count)' ------"-....-.,~ ~'iI;:i!~~tive SerVlc....:s }!~.iSlJn 5/10/2011 Item 16.E.6. - :'5::r.J!;10q Purchasing Department Change Modification Form o Contract Change Request L:J Work Order Modification Contract # 09~ 5262 Mod#: 1 i POlWork Order #: ! 4500118857 Project Name: MPS 312 Fence to Fence Study Design Incorporation Project #: 72549.1.1 ! Project Manager: Peter , Schalt, PMP I . , Department: PPMD Contractor/Finn Name: ABB, Inc. Original Contract/Work Order Amount Current BCe Approloed Amount Current Con:ractfVVork Order Amount Dolla~ Amount of thIs Change Re\llsed New ContractlVVork Order Total i Cumujati~ Changes I $ 144,445.00 N/A $ 144,445.00 $0,00 ! $144,445.00 I ! $0.00 I ! , NIA Onginal BCC Approval Date; Agenda Item # NIA Last BCC Approval Date; Agenda Item # 0.00% Change from Onglnai Amount ;).00',. Change from Current BCC Appro'-"d Amount 0.00% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Ongmal notice to proceed completion date 07/07/201' Number of Gays added (if extension. r.lus1 atta::h :;Jr~ent l;1su:-ance certificate(s; rr:Jm SA? :)f o:)t3ln rror.-: v~njor; 2,10 Last approved completion date" I Revised completion date (inclu::Jes this 01/03/2011 ohange) 08/01/2011 I Explain why aaditional days are neede(l iaetailed/sDe:ifl:l: ! This change order is to add time. It will add 210 days to the last approved completion date, The design package was submitted to the Florida Dep\. of Transportation to obtain the ne~essary permil(S). The iong deb:' experienceJ in this process has invoked the need for the time extension. ]', is an unforeseen condition and is OUl of the County's control. iD Aod new task( s) o Change task(s) I 0 Delete task( s) I CSl Other (specify) Time ExtenSion I 1. Provide a detailed and specific explanation of the requested change(s) to the task(sl: This change order is lCl add time, It will add 210 days To the last approved completion date. The design package was submitted w the Florida Dep\. of Transportatior. to obtain the necessar\' permitls) The long delay experienced in this process h2~ invoked the need for the time ext:;;~;}sion. It is an unforeseen condition and is out of the COUllt).'s control. Z. Provide detailed rationale for the requested change: OutSide agency's tlmeframes for permit approvals are out of ou~ :ontrol The permlt!5 needed to :;onstruct the pro,ie:t Therefore, the time extension IS pru:!ent and necess3,Y. 3. Provide explanation why change was not anticipated in original scope of work: There is no way to determine a" J:JtSI'J8 agen~ys :Imerrame fo~ perrrut approva: 4, Describe the impact if this change is not processed: V\llthout the time extenSion, we would not be able to oj:aln ~~__,~~~_2~~1 an,j therefore w~~~_t2?t :Je abie to cor~~ct_t:'e p~~::::::_____~___ ~________.., __..______~ Type of Change / Modification @ 2 'Jnroreseer: -:on::JitIO,'1siclrc~ms:ai',:e 0 3 8uantitv or orlce adlustmenl C 5 -\/alue addeC!.______~,--=-~:,=~~ 6 Schedule adjustment Change Requested By , i ':;O:l~~a::to,ICOrls~t:an: [Z! Owner ___ __~_ _ ___ _ _ ___b Usina DeDarrment 3J,5esiOn--P;;'resslona: 0 ReQulaTOr,! L..q~n:,' IsoeClr\ _____ ~_~_ _1-D Other (SDe~I!tL_____ _~ __ ..__._~ Du:"ch.eslna :::":,,;)fessional ?artlclDatec in Ne:Jo:latio~ :Jf Chan;]::: I fvbdik:at::::l [J Yes _JE't~?_________ '-A:;pr~~~-j Dy- ,'~ ("e-7~J+---------~~---------------'-~! Date 03,'31.'20"": -----"--------~--~ -~ ------! ~;;;~~:;leZ~:;:~a~tt=~?nlor-~~~'=c'm~=r=dr~~;Qc~-_=-i-Da,e- ~/rL ~~-~~~-______ . i ---..:~~?lan:1e::: Ei2ctlve ___._....___ . L....~!, C:yr~_~l~O~ OT err:J:rs: Revise: 2i2i/' Packet Page -901- Co~er County ~~-. Admmslialive Sel\lices DNlsion Purchasing o Contract Change Request 5/10/2011 Item 16.E.6. -' Purchasing Department Change Modification Form [gJ Work Or<Jer Modification I COlliraci#:~ 06.3969 1--- . ___ , Project #: 51101.1 Project Manager: ..iJ'1~i}!"-"l!tJ3ish_~L_. Mod#: 2 PO/Work Order #: 4500106193 -I" Department: - T rans port~!~!1_E ngihee ri n9 -- r Project Name: . '1 Griffin Road Filter Marsh _ ''--'-''',j,~ I Contractor/Firm Name: - 1- Atkins (fka PBS&JL_~___ Original Contract/Work Order Amount $ 197,620.00 N/A Original BCC Approvai Date, Agenda Item # Current BCC Approved Amount . #N/A N/A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 1B7.620.00 Dollar Amount of this Change $0.00 0.00% Total Change from Original Amount Revised New ContractIWork Order Total I $197,620.00 I #N/A Change from Current BCC Approved Amount Cumulative Chanqes I $000 I 0,00% Chanqe from Current Amount /----. Completion Date, Description of the Task(s) Change, and Rationale forthe Change l I Original notice 10 proceed ! Last approved completion date:' Revised completIOn date (includes thiS .---1 I-~~::;':~ :::::a:~~~S~ilL.201(]-- f:;~~ii;-~~; aaaiiionaldays-are need'ed~~:~~~;::~~~~3.012 "'-- - _.______._1 , extension, must attach current . 365 days are needed to respond to permitting requirements trom the SFWMD, The I Insurance ccrtificate{s) from SAP project is a jOint effort between DEP ancJ Collier County. A permit requirement to i or obtain from vendor): 365 days obtam a conservation easement from D::P for the mitigation work is requested along with long term monitoring and maintenancE. The easement has not been obtained to I' date from DEP along with long term maintenance. Approvals from Tallahassee have I taken longer than expected. IoMdnew-iask(S)------fDC~e task(s)---'-I D-bel,,!e task(s).-------T@"other(Speclfy) : i i Time extension I---------_...._.._--"-~~-----.._---------------_.._---_. 11. Provide a detailed and specific explanation of the requested change(s) to the task(s): A request for information was received from the SFWMD for granting a Gonservation easement over the DEP parcel DEP is proViding the I easement and their negotiations between the local and Tallahassee offices has been very slow. I 2. Provide detailed rationale for the requested change: The permit wil! not be issued uniess the D:::P conservation I easement is granted and monitoring and maintenance is establ:shed. I 3. ----j I I Provide explanation why change was not anticipated in original scope of work: in our Initial meetings with DEP as a partner In the project, It was decided that DEP would donate tile land as pan of their participation, The SFWMD request was not anticipated since HIe property is state owned land i 4. Describe the impact if this change is not processed: If !tit' easernent is not acquired the permit from SFVv'MD will not be issued and the project will nct move forward '---_.._,,~_.~-,-_.~~-~_.._._--,-,-,-,--~--._~- ..- --_...~.,-_._._-- -- ~....._.__.- _.'-_.__._.__.._-_..._.._._--~-~-~_._---- I i rTI 1 L~:, iD4 -~--..------.-----~..--~-.--.------.--___c__:_.--,.---.----.--.-~-I Type of Change / Modification . i I.. -------- ------------.------------F];;"-------------.-...J Planned,.. Elective [2j 2, Unforeseen condi1innslclrcumst8nc~; ...! LJ ;1_._9U?~_t!ty ~(Pfl~~_?_dJ~jS!T!:[~f.l1______.._J '.99 ~r_~~j~.~ ~j;_~~)~(S) _. ~~-==~~=-~=TJ-~-~.~~?I u'e-~gjJ~9________:'.=~:.-~~=:~,_-~,~' ..-_~~:~..rQ~.,_g~.~j:.d~I~_:~_~~~~...e.nt.:~:_: r" -~~--'-'-----"'._-'- --....-..---.--____._~.__.__..____. -------'--~.-.----l i Change Requested By i CijB~~tci~~b~~~~~--1 B~;;~~()f~ncy (SDecIfE~_- "'=--=:~18 ~~~~~~~~0:"~t- ...:.~~~~-. ... --.=1 , l:>lJr'-:I~~~ssionalf'aJtll::ipate(JJrl NegotlationDt~tJange /1V1()dlf,-catIQf1__. JSJ:r,,~__.o_i'Jo_____ ..______..1 ~(evlsed' ij/6:11 Packet Page -902- 5/10/2011 Item 16.E.6. -- f I; ~-/J--L -- Date: ! ---"-_.. Date: " :1/;;2 // / ----- A" J .,./'l-- !,pproved by '/rla~f~ } u Name and Title': Mar;at A Bishop. PE, ~ Project Manager Reviewed by: /1 Purchasing Proiesslonal's-Name: Nicole Parker 7"/ _~. / -~ 4//'~/ .7',</~ Revised: 416/11 2 Packet Page -903- c~~ County ~ Admnislralive SeNices DMsion Purchilsing o Contract CtJange Request 5/10/2011 Item 16.E.6. Purchasing Department Change Modification Form IZl Work Order Modification Contract Ii: . I Mod#: 2 . , 06-~ 'l/! '-! 't Project #: 51101.1 Project Manager: Ma'!lareti:lish()p POlWork Order #: ----IProject Name: I 4500106024 Griffin Road Filter Mars~-_,:.::J , Departme-nt:-'----T Contractor/Firm Name: '-1 I TransportatIon Engineering.J RWA, ine Original Contract/Work Order Amount $ 150.500.00 iN/A Original BCC Approval Date; Agenda Item # Current BCC Approved Amount #N/A ",N/A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 150;500.00 Dollar Amount of this Change $0.00 0.00% Total Change from Original Amount Revised New Contrac1lWork Order Total I $150.500.00 I #N/A Change from Current BCC Approved Amount Cumuiative Changes I $0.00 I 0.00% Change from Current Amount 1-0 Add new task(s) ....... .....~'.':;:::".;,;.">.:'..;:.'O:- ':':-:':':"::"':..'."::'::::'.:":'.':':':.':""..,'.:......:.";:.;::.'. -':"'.':..". "'.::"".:.:'.'::':"".:.' "","i',:,,:-,:,:,.,.:::,::,::,:,:":.'."';::.:':::.:.':." ':'::":::::'::::":':'::':";"::.':,:,.:,':'::- ::". '_ '-'::::.'::':',-. ',,:,:,',::,':::,: ,':: '. '.':'.' ""-.:":'.':'."'.;';::::'i-." ,,' -':':;':-'.-:"..:".:;;':'. (<....F< ....",,', >".' '. ':.:"':.'" -...;:1 . <... . ...comPhilionDate,DescriptionoftheTaSk(S)Change;andRlllionalef()r the Change ..\. .... ..1 Original notice to proceed i Last approved completion date: ! Revised completion date (inCILJdes-t~ I completion date August 1, 2010 May 1 2011 I change). April 30, 2012 I I Number of days added (If I Explain why additional days are needed (detailed/specific): --l ! extension, must attacl1 current . 365 days are needed to respond to permitting requirements from the SFWMD. The insurance certificate(s) from SAP I pmject is a joint effort rJetween DEP and Collier County. P. permit requirement to or obtain tom vendor): 365 days I obtain a conservation easer-Hent from DEP for the mitigation work is requested along ~I With long term monJtonng and maintenance The easement has not been obtamed to date from DEP along With long term maintenance Approvals from Tallahassee have taken longer than expecteo 1-0 Change iask(S)- - --- ;1-0 Delete task(s) IIZl Other (specify) : , _..l Time ~~~!1slon 1 , 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): A request for information was received from the SFWMD for granting a conservation easement over the DEP parcel. DEP is providing the easement and their negotiations between the iocal and Tallahassee offices Iras been very slow. RWA is providing the survey for the project. 2. Provide detailed rationale for the requested change: The permit will nol be issued unless tl18 DEP cnnservatlOn easement is granted and monitoring and maintenance is established. 3. Provide explanation why change was not anticipated in onginal scope of work: In our Initial meetings with DEP as a partner in the oroject, il was rtecided that DEP wouid donate the land as part of their particlpaUon. The SFWMD requesl was not anticipated since the property is stale owned land 4_ Describe the impact if this change is not processed: If the C-i8sement is not acqUired the permit from SrVVfviD will no~ De issued and the project will not move forward. -----.-'.------'. - ----__ __'__. _ ____'__"__m_m.'~___,_,,'-_,___ __,,,__,_ ----~-l . Typeot Change! Modification , ,i--01DTarlll 8(j -; ::I,~-ctive----.------ -----1., }?r2--Unfon~.see.~" corldTtT(;rIS!CirC\JmsfiJrl-C;;-TD~."6uan..tity Orr1rice adJl!stmellt--. -l [-LI 4, Correction- Ofem;rcs)~'-------T O-=s-\,farlle add-ed-------~----"-- - ~-r2J~_~_~!eaUle adL~~~~e~ _._~-_~~==:J r~___,___"_~___,__~__~_"_,____ ..____~_"_____~._"__,_"__"__ i_c_, . _~ _. Change Requested By __~__ o Contractor/Consultant ----r-1Zl Owner =n::-::J USing Department - [2J Design Professiona~J.oR-"-gulatQIY_AJL,,,:'cy{sjJ"-c;itY2:=-=-==--=~J:D Other (sl1eCify)u-- _ Purchasl~g Professro~,"!al Par1icip?~~~~__tiegotiatio!]_~~t.@nge il09diiic:~tlo~~____."~__y~s 0 No J -~ ReVised: 4j6i11 ; Packet Page -904- 5/10/2011 Item 16.E.6. Approved by: ;i/l Name and Title: Margar dM A Bishop, PE, Sr. roJect Manager Reviewed by. I P - f I' N N I - k 7/:-:' ,;p---H-:;P' ~urchasing r-'ra esslona same ico e t-'ar er (u-r~m~-1"'-- Date. ---j- L;/;p~-- I I Revised: 4/6/11 Packet Page -905- Co~ Cmmty Adrrinisllali;e SeMes Division Purchasi"ll ~ {X 'Contract Change Request 5/10/2011 Item 16.E.6. Purchasing Department Change Modification Form r ~ Work Order Modification , I Contract #09-52G2 Mod#: 1 I POlWork Order #: Project Name: SCWRF Bleach Faciiities 4500116137 Modifications Project #: Project Manager: Oscar I Department: PUPPMD Contractor/Firm Name: Hole Montes 73969.31.6 P. Martinez Original ContracVWork Order Amount $ 84,400.00', ~:"5';.:~\:; );",?t<i:,"'NA Onginal BCC Approval Date; Agenda Item # Current BCC Approved Amount ;,$ . ..e~,~Og.g!r: ;'.',,.. ,';"""f'~';(;;i'lllA Last BCC Approval Date; Agenda Item # " , Current ContracVWork Order Amount ':$' '!(;8~i40b. ODD Doliar Amount of this Change 'i::: if~ib~;;$O :00 i 0.00% Change from Original Amount Revised New ContracVWork Order Total I $84,400.00 I 0.00% Change from Current BCC Approved Amount Cumulative Changes I $0.00 I 0.00% Change from Current Amount "-"",'- . '" .:' "",:';"":::::;"!":':"':':-:~'~'.' " .. ,::\1:-/::1 <~:.k\~_\" . " ;, ::9?fIlpletion Date, D:.~~riPfiOl'1i~~~Il~.aSk(S) Change, and~~tioriale for lh:SI1:inge Original notice to proceed Last approved completion date: Revised completion date (inciudes this ! completion date 2l2~10 3p~l,c 5/8/11 i change): 1/27/12 Number of days added (if Explain why additional days are needed (detailed/specific): Additional time is required extension. must attach current to account for extended equipment and material delivery insurance certificate(s) frqm SAP , or abta," from vendor): 26.0 ;:. 'i Add new task(s) i Change task(s) Delete task( s) X Other (specify): . Time extension I 2. I Provide a detailed and specific explanation of the requested change(s) to the task{s): Extend project completion date 26lfdays to 1/27/12 to account for extended equipment and material delivery. Provide detailed rationale for the requested change: Additional time is required to account for additional equipment and material delive'Y times. Provide explanation why change was not anticipated in original scope of work: When this project was bid out, the required equipment and materials had much shorter deiivery times; many items are no longer in stock and we must wait for production. Describe the impact if this change is not processed: If this change is not processed, the design engineer's application for payment of work associated with construction services will be delayed. 13. I I : 4. I ! I n 1 Planned / Elective I I I 4. Correction of erron s) Type of CI1:ir!!~iLM()ciification .,.. I 0 2 Unforeseen conditions/circumstance I 5 Value added Change Requested By U Contractor/Consultant X Owner Desl n Professional I Reoulatorv Aaencv (specify . i ;:>urchasino Professional ?articloated in Neaotiation of C an:Je / Modificatior.: ~_\" flil I Approvec Py /;/~/:f'/~;/:.~' lL-XfU:J...e...--> Name and Titie: Oscar P Martinez Seniilr Project Manaaer , - , Date: .3./<-;:- / Date: I B..~viewed by: chasing ProfessIonal's Name: -,,-, ./ /(-;.':--~> -: '7,/ / ',~: / :~ Revised: 2/2'1/11 " Packet Page -906-