Agenda 03/22/2011 Item #16D5 Agenda Changes Board of County Commissioners Meeting March 22, 2011 Item 16A8: The following should be added to the Executive Summary under the Recommendation portion: Additionally; direct County Manager or his designee to provide the required annual report prior to the scheduled sunset so that the Board of County Commissioners may consider further extending the Program (Staff's request) CONTINUE ITEM 16D3 TO THE APRIL 12'1 2011 BCC MEETING: RECOMMENDATION TO APPROVE AND AUTHORIZE THE CHAIRMAN TO SIGN AGREEMENTS WITH: THE DAVID LAWRENCE CENTER, NATIONAL ALLIANCE ON MENTAL ILLNESS OF COLLIER COUNTY, INC., AND THE COLLIER COUNTY SHERIFF'S OFFICE TO OPERATE THE CRIMINAL JUSTICE, MENTAL HEALTH AND SUBSTANCE ABUSE REINVESTMENT GRANT AND ASSOCIATED BUDGET AMENDMENTS. FUNDING HAS BEEN PROVIDED THROUGH MEMORANDUM OF UNDERSTANDING #LHZ25 FROM FLORIDA'S DEPARTMENT OF CHILDREN & FAMILIES. (STAFF'S REQUEST) Note: Item 16F2: Requires that ex parte disclosure be provided by Commission members. Should .1 ;learing be held on this item, all participants are required to be sworn in. (Staff's request) Time C"rtain Items: Item 1 G. \ to be heard at 9:00 a.m.; followed by Item lOB Item 8A to be heard at 10:00 a.m. Item 9I: to be heard at 11:00 a.m. Item 9C to be heard at 11 :30 a.m. 3/22/2011 Item 16.D.3. EXECUTIVE SUMMARY Recommendation to approve and authorize the Chairman to sign Agreements with the David Lawrence Center, National Alliance on Mental Illness of Collier County, Inc., and the Collier County Sherifrs Office to operate the Criminal Justice, Mental Health and Substance Abuse Reinvestment Grant and associated budget amendments. Funding has been provided through Memorandum of Understanding #LHZ25 from the Florida Department of Children and Families. OBJECTIVE: To approve and authorize the Chainnan to sign Agreements with David Lawrence Center, National Alliance on Mental Illness of Collier County, Inc., and the Collier County Sheriffs Office to operate the Criminal Justice, Mental Health and Substance Abuse Reinvestment Grant and associated budget amendments. Funding has been provided through Memorandum of Understanding #LHZ25 from the Florida Department of Children and Families. CONSIDERATIONS: The Criminal Justice, Mental Health and Substance Abuse Reinvestment Grant was created within the Department of Children and Families by the 2007 Legislature (Section 394-658, Florida Statutes). The purpose of the program is to provide funding to counties to plan, implement, or expand initiatives that increase public safety, avert increased spending on criminal and juvenile justice, and improve the accessibility and effectiveness of treatment services. The program serves persons who have a mental illness, substance abuse disorder, or co-occurring mental health and substance disorders and who are in, _. or at risk of entering, the criminal or juvenile justice system. On February 8, 2011, agenda item ]6D2, the Board of County Commissioners approved a Memorandum of Understanding with the Florida Department of Children and Families to accept a sum of $548,490 over three (3) years with $182.830 of that total grant amount being awarded for state fiscal year 2010-20] 1. Collier County's Housing, Human. and Veteran Services department will act as the fiscal agent for the grant and has been allocated sufticient grant funds to pay operating costs. The following table details the first year allocation of the grant funding provided. Organization FY 2010-2011 Budl!'ct Collier County Administration $18.000.00 David Lawrence Center $94.495.00 National Alliance on Mental Illness of Collier County. Inc.,-- $32.068.00 Collier County Sheriffs Office $38.267.00 I TOTAL FY 2010-2011 $182,830.00 .----- .-. Implementation of the grant activities will be achieved through partnerships with three agencies: the Collier County Sheriff s Office and its contracted health care provider, Prison Health Services; the David Lawrence Center, the local comprehensive behavioral health care provider; and the National Alliance on Mental Illness of Collier County, Inc. All required matching funds are being provided by the partnership agencies. plus Florida Gulf Coast University, in the form of in-kind services and cash. Packet Page -996- 3/22/2011 Item 16.0.3. Approval of this item will authorize the Chairman to sign the attached three (3) Agreements with the aforementioned agencies to implement the Criminal Justice, Mental Health and Substance Abuse Reinvestment Grant and approve associated budget amendments. FISCAL IMPACT: The total three (3) year grant award is $548,490. Of this total amount, $182,830 has been awarded for state fiscal year 2010-2011. No general funds are associated with this project. GROWTH MANAGEMENT IMPACT: There are no growth management impacts associated with this item. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office and is legally sUfficient. This item requires a majority vote. - JBW RECOMMENDATION: To approve and authorize the Chairman to sign Agreements with David Lawrence Center, National Alliance on Mental Illness of Collier County, Inc., and the Collier County Sheriffs Office to operate the Criminal Justice, Mental Health and Substance Abuse Reinvestment Grant and associated budget amendments. Funding has been provided through Memorandum of Understanding #LHZ25 from the Florida Department of Children and Families. PREPARED BY: Frank Ramsey, Housing Manager, Housing, Human, and Veteran Services Packet Page -997- COLLIER COUNTY Board of County Commissioners 3/22/2011 Item 16.0.3. Item Number: 16.D.3. Item Summary: Recommendation to approve and authorize the Chairman to sign Agreements with the David Lawrence Center, National Alliance on Mental Illness of Comer County, Inc., and the Collier County Sheriff's Office to operate the Criminal Justice, Mental Health and Substance Abuse Reinvestment Grant and associated budget amendments. Funding has been provided through Memorandum of Understanding #LHZ25 from the Florida Department of Children and Families. Meeting Date: 3/22/2011 Prepared By Name: RamseyFrank Title: Manager, Housing, Human and Veteran Services 3/3/201] 4:52:13 PM Submitted by Title: Manager, Housing, Human and Veteran Services Name: RamseyFrank 3/3/20 I ] 4:52: 14 PM Approved By Name: KrumbineMarcy Title: Director - Housing & Human Services,Housing, Human & Veteran Services Date: 3/4/201] 10:22:0] AM Name: AlonsoHailey Title: Administrative Assistant,Domestic Animal Services Date: 3/7/2011 8;29:58 AM Name; AckermanMaria Date: 3/8/2011 1:] 0: 11 PM Name: FoordMarlene Packet Page -998- Title: Grant Development & Mgmt Coordinator, Grants Date: 3/8/2011 1: 1 0:25 PM Name: WhiteJennifer Title: Assistant County Attorney,County Attorney Date: 3/8/2011 4:33:12 PM Name: RamseyMarla Title: Administrator, Public Services Date: 3/9/2011 11 :36:50 AM Name; WhiteJennifer Title: Assistant County Attorney,County Attorney Date: 3/10/2011 ] 1 :30:58 AM Name: KlatzkowJeff Title; County Attorney, Date; 3/11/20113:37:03 PM Name: PryorCheryI Title: Management! Budget Analyst, Senior,Office of Management & Budget Date: 3/14/2011 11 :23:52 AM Name: SheffieldMichael Title: Manager-Business Operations, CMO Date: 3/] 5/2011 8:39: 15 AM Packet Page -999- 3/22/2011 Item 16.D.3. r'L~ ::,earcn Kesurts EPLS 3/22/2011 Item 16.D.3. Excluded; Jrmes. ILiSt S~stemt Search Results Excluded By Firm, Entity, or Vessel: Collier County Sheriff's Office Classification: Entity or Firm State: FLORIDA Country: UNITED STATES as of 04-Mar-2011 8:21 AM EST Your search returned no results. Packet Page -1000- ~L~ ~earcn Kesults E',..'.'..}l'...}L..,'."Si... f' t_ ":....... l ; I . ..... . '. l . ., ..... :. .... ~, .' , ., ': ...... .' f'" c" 3/22/2011 Item 16.0.3. ExcludediPGUlties: lLiSt Systel1l1' Search Results Excluded By Firm, Entity, or Vessel: David Lawrence Center Classification: Entity or Firm State: FLORIDA Country: UNITED STATES as of 04-Mar-2011 8:18 AM EST Your search returned no results. Packet Page -1001- ~L:> ::,earcn Kesults EiPLS" , i ' ! , '/, i, ~" 3/22/2011 Item 16.D.3. Excluded Parties LiSt S~stem Search Results Excluded By Firm, Entity, or Vessel: National Alliance on Mental Illness Classification: Entity or Firm State: FLORIDA Country: UNITED STATES as of 04-Mar-2011 8:20 AM EST Your search returned no results. Packet Page -1002- 3/22/2011 Item 16.D.3. AGREEMENT FOR CRIMINAL JUSTICE, MENTAL HEALTH AND SUBSTANCE ABUSE REINVESTMENT GRANT THIS AGREEMENT, made and entered into on this 22nd day of March 2011, by and between the National Alliance on Mental Illness of Collier County, Inc., EIN 65-0047747, (d/b/a NAMI), authorized to do business in the State of Florida, whose business address is 6216 Trail Boulevard, Building C, Naples, Florida 34108, hereinafter called the "Contractor" (or "Consultant") and Collier County, a political subdivision of the State of Florida, Collier County, Naples, hereinafter called the "County": WITNESSETH: 1. COMMENCEMENT. The contract shall be for a one (1) year period, commencing on March 22, 2011, and terminating on March 21, 2012, The County may, at its discretion and with the consent of the Contractor, renew the Agreement under all of the terms and conditions contained in this Agreement for three (3) additional one (1) year periods, The County shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK. The Contractor shall provide services in accordance with the Scope of Services, attached as Exhibit "A", and the County's application submitted to, and approved by, the State of Florida Department of Children and Families referred to herein and made an integral part of this agreement. This Agreement contains the entire understanding between the parties and any modifications to this Agreement shall be mutually agreed upon in writing by the Contractor and the County project manager or his designee, in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. 3. THE CONTRACT SUM. The County shall pay the Contractor for the performance of this Agreement a total amount of Ninetv Six Thousand Two Hundred Four and 00/100 Dollars ($96204.00) over three (3) years with Thirtv Two Thousand Sixty Eight and OO/1DO Dollars (532.068.00) of that total amount being awarded begimling with state fiscal year 2010-2011, subject to Change Orders as approved in advance by the County. Payment will be made upon receipt of a proper invoice and upon approval by Housing, Human and Veteran Services, or his designee, and in compliance with Chapter 218, Fla. Stats., otherwise known as the "Local Government Prompt Payment Act". Page 1 of7 Packet Page -1003- 3/22/2011 Item 16,D,S. EXECUTIVE SUMMARY Recommendation to approve grant related expenditures in excess of $50,000 for three (3) properties acquired under the Neighborhood Stabilization Program to fund rehabilitation activities. Funding will ensure compliance with Collier County building code regulations and furtber the goals and objectives of the Housing Element of the Growth Management Plan. (estimated fiscal impact $172,500) OBJECTIVE: To approve grant related expenditures in excess of $50,000 for three (3) properties acquired under the Neighborhood Stabilization Program to fund rehabilitation activities. Funding will ensure compliance with Collier County building code regulations and further the goals and objectives of the Housing Element of the Growth Management Plan. CONSIDERATIONS: Collier County has purchased three (3) single-fanlily residential dwelling units under the Neighborhood Stabilization Program. Prior to purchase, Housing, Human and Veteran Services conducted pre-purchase inspections of each dwelling and has estimated rehabilitation expenses to be in excess of $50,000. L"_ Rehabilitation projects located on Gilchrist Street and 51 st Terrace SW have been competitively procured and the lowest, most qualified, and responsive bids received were in excess of $50,000. The rehabilitation project locatcd on 19th A venue SW had a pre-purchase inspection in excess of $50,000 by Housing. Human and Veteran Serviccs. In order to ensure that the units are safe and decent, as well as in compliance with code and building regulations, all units will require extensive repairs. Additionally, all units will require an appliance package. Supporting documentation is attached to this item. According to Section VIII(C)(x) of the Neighborhood Stabilization Program Administrative Plan, approved by the Board of County Commissioners on March 24, 2009 and amended on October 27,2009, rehabilitation costs shall not exceed $50,000 and any expenditures in excess of this limit must be specifically approved by the Board of County Commissioners. Approval of this item will authorize grant related expenditures in excess of $50,000 and payment of all invoices received from the lowest, qualified and responsive vendors procured. Staff recommends approval of rehabilitation expenditures in excess of $50,000 for the following three (3) projects: Site Address Purchase Price Estimated Rehabilitation Costs' 4440 19th Avenue SW, Naples, FL 34117 $58,500.00 $57,500.00 5230 Gilchrist Street, Naples, FL 34112 $59,538.00 $56.000.00 1853 51 st Terrace SW, Naples, FL 341 ] 6 $59,382.00 $59,000.00 *lnc/udes estimated cost qf appliances. FISCAL IMPACT: Approval of this itcm will result in Neighborhood Stabilization Program ~ expenditures in excess of $50,000 on the three (3) projects detailed above. Funding has been provided by the U.S. Department of Housing and Urban Development in the fonn of a federal Packet Page -1055- 3/22/2011 Item 16,D.5, grant authorized by the Housing and Economic Recovery Act 2008, as amended. Federal grant funds provided are sufficient to fund all operations of the Neighborhood Stabilization Program. No general funds are associated with this project. GROWTH MANAGEMENT IMPACT: Implementation of the Neighborhood Stabilization Program will further the goals and objectives of the Housing Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office and is legally sufficient. This item requires a majority vote. - JEW STAFF RECOMMEND A TION: To approve grant related expenditures in excess of $50,000 for three (3) properties acquired under the Neighborhood Stabilization Program to fund rehabilitation activities. Funding will ensure compliance with Collier County building code regulations and further the goals and objectives of the Housing Element of the Growth Management Plan. PREPARED BY: Frank Ramsey. Housing Manager, Housing, Human & Veteran Services Packet Page -1056- 3/22/2011 Item 16,D,S, COLLIER COUNTY Board of County Commissioners Item Number: 16.D.5. Item Summary: Recommendation to approve grant related expenditures in excess of $50,000 for three (3) properties acquired under the Neighborhood Stabilization Program to fund rehabilitation activities. Funding will ensure compliance with Collier County building code regulations and further the goals and objectives of the Housing Element of the Growth Management Plan. (estimated fiscal impact $172,500) Meeting Date: 3/22/2011 Prepared By Name: RamseyPrank Title: Manager, Housing, Human and Veteran Services 3/4/2011 ] :23:39 PM Submitted by Title: Manager, Housing, Human and Veteran Services Name: RamseyPrank 3/4/2011 1 :23:4] PM Approved By Name: KrumbineMarcy Title: Director - Housing & Human Services,Housing. Human & Veteran Services Date: 3/4/20] 1 2:54:07 PM Name: AlonsoHailey Title: Administrative Assistant,Domestic Animal Services Date: 3/4/2011 3 :05 :09 PM Name: Carnell Steve Title: Director - Purchasing/Gcncral Services, Purchasing Date: 3/4/20113:36:50 PM Name: WhiteJennifer Title: Assistant County Attorney,County Attorney Packet Page -1057- Date: 3/7/2011 2:48:34 PM Name: RamseyMarla Title: Administrator, Public Services Date: 3/9/2011 10:46:45 AM Name: WhiteJennifer Title: Assistant County Attorney,County Attorney Date: 3/10/2011 11 :30:35 AM Name: KlatzkowJeff Title: County Attorney, Date: 3/11/2011 3:36:07 PM Name: PryorCheryl Title: Management! Budget Analyst, Senior,Office of Management & Budget Date: 3/14/2011 9:42:39 AM Name: IsacksonMark Title: Director-Corp Financial and Mgmt Svs,CMO Date: 3/15/2011 8:36:32 AM Packet Page -1058- 3/22/2011 Item 16,D.5, 3/22/2011 Item 16,D.5. NSP Preliminary Cost Estimate Address: 4440 19th Ave SW IDate: 11-02-2010 Zip: 34117 IH&HS Contact: Chris or Tammy '.. .... .t. i.... ". '... .... . .... . >" ..... .:' .. Task I Item Cost I Amt I $Amt I Details IOK S, ........;' "'Yi' "';i' ",."" "'" ,,',' .;,i,' .... ,'y,S'< i'C,< i... , Roof Replacement: $7,000.00 1 $7,000.00 Structural damage Exterior Doors: $750.00 1 $750.00 2 Impact Glass Windows: $7,500.00 2 $15,000.00 Sliders Shutters: $8,000.00 $0.00 AIC Unit Replacement: $5,000.00 1 $5,000.00 Improper conversion Water Pump and Well: $2,500.00 $0.00 Septic System: $7,500.00 $0.00 Misc Exterior: $1,500.00 3 $4,500.00 Major soffit and fascia damage Convert Back: Demo: $5,000.00 $0.00 Garage Door 1 car: $1,200.00 $0.00 Garage Door 2 car: $1,800.00 $0.00 Repair Carport $1,800.00 1 $1,800.00 Floor Replacement: Whole House: $8,000.00 1 ",1!$8,000.00 Many broken tiles Per Room: $800.00 $0.00 Kitchen Remodel: $7,000.00 1 $7,000.00 Appliances: $2,500.00 1 $2,500.00 Water Heater: $750.00 1 $750.00 Water heater is outside RO System: $500.00 0 $0.00 Bath Remodel: $4,500.00 2 $9,000.00 Interior Doors and Trim: $2,000.00 1 ..$~;OOO;QO Electrical Issues: $1,000.00 1 !!IS.:l.',OOO}OO Fans and Lights: $1,500.00 1 1\1'$1';500\00 Plumbing Issues: $1,000.00 1 $1,000.00 Drywall Repair: $2,500.00 1 $2,500.00 Paint Interior: $2,200.00 1 $2,200.00 Paint Exterior: $2,800.00 1 $2,800.00 Total: $74,300.00 $57,500.00 Reasons to Not Acquire: n...,..I,.....+ n................. 1 ncn '- ~ 3/22/2011 Item 16.D,5, . Page 1 COLLIER COUNTY NEIGHBORHOOD STABILIZATION PROGRAM BID SPECIFICATION Name: Collier County Housing Human & Veteran Services (HHVS) File No. NSP 08-05 Site Address: 5230 Gilchrist St Naples. FL 34112 Mailing Address: 3301 E. Tamiami Trail Bldg. H. Suite 211 Naples, FL 34112 General Rehab Specs Phone: 239-252-HOME (252-4663) Revised 8/19/2010 TH Special Notes: Non Occupied / Refer Questions of color or textures to choices to rehab specialist assigned. NOTE: All work by any contractor(s) and their subcontractor(s) must conform to the requirements of the following: 1. 2007 Florida Building Code (includes Energy Efficiency Code) 2. 2007 Florida Building Code/Fuel Gas 3. 2007 Florida Building Code/Mechanical 4. 2007 Florida Building Code/Plumbing 5. 2007 Florida Building Code/Americans with Disabilities 6. 2008 National Electric Code 7. 2002-01 Building Construction Administrative Code Contractor: J-+-eQ + h~rWo~ SY 80 Terre.n<2.. Lo(.,L(-t p .\ ~' '/4/- City/Zip: UJl'\i11\. \f'l\\~S ,'/ 3S Phone: TOTAL BID AMOUNT: ~S5 oS "2 , - I ~o 1\.':, fr (A c.+ ;0 i\ tv rrf~A\ Y CJ.3~ 94q - bg 55' Address: "il/( The bid due date is August 26, 2010 before 4:00 pm. Bids shall be submitted in a sealed enyelope and marked "DO NOT OPEN, Bid NSP 08-05" to Attention: Tammy, Housing Human & Veteran Services. 3301 E. Tamiami Trail Bldg H. Suite 211 Naples, FL 34112. Bids will be opened the next business day at 9:00am in the HHVS. It is the contractor's responsibility to ensure that all required permits and/or approved plans are obtained and made available to the appropriate inspecting authorities at all times during the rehabilitation process and copies must be provided to the Collier County Housing Human & Veteran Services. Further, the owner and contractor will defend, indemnify and hold harmless Collier County, its officers and employees from liability and claim for damages or loss and expenses arising from any operations related to the rehabilitation process. Created 8-19-2010 Revised 1 Packet Page -1060- ,......, "......., 3/22/2011 Item 16,D,S, , Page 2 . 1. Exterior Entrv Doors (2): Replace Exterior doors. Doors shall be 1-3/4" thick Fiberglass insulated, raised panels, to fit existing openings, Miami Dade approved wind rated, Include keyed entry lock, weather-strip, door stop or safety chain as applicable, 1-1/2" pair hinges, and single cylinder dead bolt keyed alike, threshold, and security "peeps." Ensure exposed wood and fasteners are protected from the elements. MATERIALS: -1"2. ~ LABOR: 4"'2 '3 =TOTAL ~5'c' 2. Impact Glass! LOW-E Windows (All): Remove, package and dispose of all window and slider components. Field measure, fabricate and install white, single hung, one-over-one, single glazed, enameled aluminum replacement window including all necessary panning, caulk, trim and removable screen, Use frosted glass in bathroom. Includes patching of interior and exterior wall surfaces as needed, Replace broken marble sills, and re-install existing serviceable marble sills. Clean glass. Provide permitting department the Miami-Dade / Notice of Acceptance (NOA) when pulling a permit. Note: Make sure that the bedroom windows are egress. MATERIALS: q $'"1 \ LABOR: 7 'j-'7 CO' = TOTAL ~ ., 'is 9- ( , I 3. Interior Doors (all): Replace all interior doors and door frames with raised panel Colonial style doors, Replace interior door locksets on each door. Replace attic door with a piece of smooth plywood, primed and painted white. Ensure all interior doors have door stops. MATERIALS: ~ (, ~ LABOR: S-I '9- = TOTAL ..J. "1- 17 , "'- 4. Interior Closet Door: Replace existing closet doors with similar, six panel doors and necessary hardware for proper operations. Replace any other doors throughout the house with similar doors. MATERIALS: -S 2. , LABOR: 3'05"' = TOTAL ID0> (i......I: '\ 5. Closet ShelvinE: Install shelving in all closets where needed, Replace with white plastic coated wire shelving to include mounting brackets and all necessary hardware, MATERIALS: Ie.. t LABOR: /-zI$ =TOTAL L c:a.'l 6. Kitchen Cabinets! Counter! Sink and faucet: Replace base and wall cabinets, counter tops, backsplash, sink and faucet. Install wood cabinets with doors including all hardware. Drawers shall be made of wood or metal boxes. Field measure and screw to base cabinets a post formed, plastic laminate counter top. Counter tops should be 25" in width with a 4" backsplash or mica "curve a top" style. Install a 33"x22"x8" double bowl, stainless steel, self-rimming kitchen sink, sealed and caulked. Install a steel, metal body faucet with a 15-year drip-free warranty, trap, supply lines, and shut-off valves. All hardware will have 3/8" supply lines, aerator and 1" 0.0. tailpiece. Installation shall comply with FBC. New metal, not plastic, shut-oft's will be supplied on all supply lines to sink. Ensure all gaps at seams, edges, joints are sealed / caulked to provide a finished look. Rehab Specialist will determine flat or raised panel style of doors and types/finish of knobs. MATERIALS: I 1L." LABOR: , L... I <f D = TOTAL I ::, 4(. 7 ... SUBTOTAL Pg 2 15."781- , Created 8-19-2010 Revised 2 Packet Page -1061- "....., -- 3/22/2011 Item 16,D.S, , Page 3 7. Interior Paint: Walls. Ceilin2S. All Doors and trim: Note: this bid item included repairing drywall holes/damage throughout home. Repair minor drywall holes by patching walls and ceilings. One coat primer and paint all interior walls and ceiling with neutral color egg shell or satin paint. All interior and exterior doors / trim / casing / base molding painted using white- semi gloss finish. The finish coat in kitchens and baths shall provide a durable and washable surface and be mildew resistant. Paint should have an even coloration after drying and no blotching or drips. MATERIALS: 5:,~ LABOR: 1,'?>'1/ . = TOTAL I 'il ~ I 8. Bathroom #1 Guest Replacement: Vanitv. Moo cabinet. and mirror (left): Install new vanity/cabinet and sink with faucet. Top will be cultured marble. Plumb and level, no visible gaps at seams/joints, Replace plumbing hardware in sink with new quality faucet with pop-up drain and new supply lines. Metal chrome handled hardware with single lever/flow type faucet. Installation will comply with (FBC) plumbing code. Also, install new medicine cabinet, new mirror same width as new vanity (clear caulked at bottom to prevent water damage). Add two new 30 inch towel bars. MATERIALS: G I "T LABOR: ~c;'7 = TOTAL I 5' 78 , 9. Bathroom #2 Master Replacement: Vanitv. Moo cabinet, and mirror (ri2ht): Install new vanity/cabinet and sink with faucet. Top will be cultured marble, Plumb and level, no visible gaps at seams/joints. Replace plumbing hardware in sink with new quality faucet with pop-up drain and new supply lines. Metal chrome handled hardware with single lever/flow type faucet. Installation will comply with (FBC) plumbing code. Also, install new medicine cabinet, new mirror same width as new vanity (clear caulked at bottom to prevent water damage). Include towel bars here also. MATERIALS: c./ 'I LABOR: 9.'1, = TOTAL { <:;"")8 I 10. ADA Toilets (2): At both bathrooms replace existing toilets with ADA type elongated toilets complete with new valves, lines, donut, wax ring, and toilet seat. MATERIALS: L. I 4- LABOR: I Dt =TOTAL 2.::L 11. Master Bath: Repair any plumbing leaks. Replace faucet with single lever shower diverter and a massage low flow showerhead and include ann. All should be chrome finish to match other items. MATERIALS: /67 LABOR: I ( I = TOTAL L I '0 12. Bathroom # 2: Repair any plumbing leaks. Replace faucet with single lever shower diverter and a massage low flow showerhead and include ann. All should be chrome finish to match other items. MATERIALS: {Of LABOR: /t>i = TOTAL ?. \ <f- 13. Trim and Dnowall: complete. MATERIALS: Replace all Base board and door casing after minor drywall repair is 4-z.Q LABOR: (,,<1- L = TOTAL SUBTOTAL Pg 3 \ '67 D I &1 ~ c,,<; -- Created 8-19-2010 Revised 3 Packet Page -1062- -- -- 3/22/2011 Item 16,D,S, , Page 4 14. Shintde Re-roof: TBD at walk through, if determined, Remove existing roof system to legal dump. Complete any carpentry repairs as needed. (Note: Change order must be filled out for cost of carpentry work, before work is completed), Include Rooimg permit. Pitched Roof area install: -Minimum 4 inch wide strip of self -adhering polymer modified bitumen tape (all joints), covered with approved underlayment. -26ga. Factory painted Evedrip, -26ga. Galvanized Flashing. -New plumbing stacks and goosenecks as needed, -30 Year dimensional shingles, ore-nail sheathing per new code, -nail shingles per code. -Aluminum ridge vent(s) MATERIALS: '7 "71-<::;- LABOR: I /./OL- , = TOTAL s; 1"4(P : IS. SeDit BDd 'UeiB replae_eatl TBD at wBlk thFeugh, if detel'llliBed, Replase fassia ana sefHt eIl whele heuse Mf.TERlALS: LABOR: -TOT.u.. 16. Gutter Install: house, MATERIALS: Install New aluminum pre-painted "seamless" gutter system on whole LABOR: <::f-2.g = TOTAL '8 S- G, 4'29 17. Minor Electrical and low voltal!e: - Replace missing wall switch cover in whole house. - Replace missing outlet cover in whole house. - Replace broken cable cover. - Add GFCI duplex outlets at both bathrooms and Kitchen per code. - In all bedrooms replace existing with new 52" fan with light kits (include bulbs). - In garage (after converted) replace existing and install new 4ft florescent ceiling fixture. - Install 5 new UL approved smoke detectors, run on existing circuit. To include I in hallway I in living kitchen area and in each bedroom, -Replace kitchen lighting with standard contractor grade light - Replace any broken or missing bulbs on property with energy saver florescent bulbs. - Properly install any exposed cable TV lines throughout home. - Notify HHS of any additional electrical items found during repairs, MATERIALS: "7 '3 5 LABOR: C;"7~ = TOTAL J""31 b . SUBTOTAL Pg 4 , L,"L- I Created 8-19-2010 Revised 4 Packet Page -1063- .......... -.. 3/22/2011 Item 16,D,S, . Page 5 18. Stucco Repair: Repair all damaged stucco, Stucco shall be a mixed of cement, lime, sand and potable water or premixed and applied either with standard equipment or by hand. Apply per manufacturer's specs for three (3) coat system (3/8" scratch coat, 3/8" brown coat and 1/8" color coat). Wire shall be a 16 gauge. Dowels shall be metal. When applied to masonry, shall consist of at least two (2) coats. Cement shall comply with ASTM C150, Type I or II having less than 15% water-soluble alkali by weight in the combination of lime and cement. Lime to comply with ASTM C207 Types, hydrated lime for masonry. Sand (Mortar Aggregate) to comply with ASTM CI144. Water to be clean and free from impurities and alkalis. Finished surface shall be uniform, free from excessive build-up, runs, sags or defective materials. Contractor shall take care to maintain continued alignment of all surfaces and profiles. The contractor shall remove all spilled, splashed or splattered stucco from all surfaces. Remove and replace all damaged lumber before applying Stucco to existing T -III areas. Repair existing Stucco areas as needec1. MATERIALS: I Di LABOR: 3'55- =TOTAL "t9<... 19. Exterior Paint: After stucco repair is fully cured, prep and paint exterior walls and trim. Contractor shall paint exterior with quality mildew resistant exterior paint. No paint shall be applied until any cracks / holes been puttied and all defects on exterior have been repaired. All of the surfaces will receive 2 coats of paint (wait 24 hours between coats). Any damaged items shall be repaired to match original condition. All exterior doors shall be primed and painted on all edges (6 sides). Proper paint for Florida climate to be used on exterior and paint to be used on trim, soffits, fascia, jambs, and casings. All exterior doors and windows shall be cleaned and excess paint removed upon completion. NOTE: add new 4 inch black address numbers: 4471 at front elevation visible from the street. MATERIALS: -:;S-G, LABOR: 1 Ct..' , = TOTAL --1 '5~-:> . 20. HV AC unit Replacement: Replace with new HV AC system. Install at a minimum of 3 ton, 16 SEER, R410A, central heating (8 kw heat) and cooling system. Includes all electrical for unit install, digital thermostat, condensing unit, drains, refrigeration piping, air handler, re-use ductwork as much as possible. Replace all grilles vented to all living areas and install hot air returns in all bedrooms. New system will be adequate for all living areas to be cooled / heated. Condenser secured on cement pad include pad in price. System will be installed to manufacturers' specs. No exposed interior ductwork. Warranty info: Units must have 1 O-year warrantee on compressor, coil, condenser parts, evaporator coil, air handler parts. I-year labor warrantee on entire system. ---, MATERIALS: 4 ~G'L LABOR: "2.., ,(",)- =TOTAL E. t>2i . . 21. Secure all outside equipment: We are asking to have all outside equipment including HV AC, water system and any other items that could walk, to be secured in a fenced in area that has easy access for service and is lockable with 3 sides and top secured. MATERIALS: S->> LABOR: SsS- =TOTAL I DID r Install new Hot water heater same sizes as currently 22. Install New Hot Water heater: exists in house. MATERIALS: 21'1- LABOR: 2/'7- =TOTAL "tL~ SUBTOTAL Pg 5 j 0, <e D6 I Created 8-19-2010 Revised 5 Packet Page -1064- .- .- 3/22/2011 Item 16,D,S. . Page 6 23. Post Construction Cleaninl! Service: After punch list items are completed, ensure home is ready for new homeowner by having a professional cleaning crew enter home, Clean all construction related dust, sweep, mop, vacuum, floors as applicable, Complete kitchen and bathroom cleaning, Windows cleaned inside and outside. Window screens washed. Exterior and exterior of home must have all cob-webs removed, Ceiling fan blades cleaned. MATERIALS: 0 LABOR: 'L 11- =TOTAL "2-/1- 24. Permits: (smoke detectors. windows/doors. BY AC and minor electricaO MATERIALS: I,.. c..1.. '" r?o.r;? LABOR: na = TOTAL na 25. NOC and termination of NOC filine Fees: We in the office will no longer be filing the NOC's for construction projects you as the chosen contractor will be required to file the NOC, a copy of the recorded NOC will be required with your first pay request application. At the close of a project you will be required to file a termination of the NOC before final payment will be issued. MATERIALS: na LABOR: I..... (..,-","",,,,,,,,, na = TOTAL 26. Whole House floor renlacement: Remove existing tile throughout house install new l6xl6 or larger ceramic tile. Til\an:.fout colors will be determined at a later time. ~ "'l B'O MATERIALS: ~ LABOR: C: G 31- = TOTAL f 27. Demo Shed and Back room area: Demo the shed and remove to proper dumping area, Remove all walls, roof, plumbing and electric from illegal build back room, Return to original open slab patio. MATERIALS: '2..,4- '-. c.. 7 r- f = TOTAL '- , B f?'7 I LABOR: SUBTOTAL Pg 6 /"Z,D9/ , Created 8-19-2010 Revised 6 Packet Page -1065- I..'" '.> . i ..(...~.--: I'; . ...11-1 . . - ---- .- 3/22/2011 Item 16,D.5. , Page 7 SUBTOTAL Pg 2 -1 c;- 78"1- I SUBTOTALPg3 (" 9(,~ . SUBTOTAL Pg 4 7 (, t'l., I SUBTOTAL Pg 5 1 0, (,,00 , / SUBTOTAL Pg 6 I-z. oCj! "'5~ 0)2. /' TOTAL I HHVS Acceptance: Signature below indicates that Collier County HHVS has reviewed and accepted the contractor's bid. HHVS R rese live Signature lY-1t l'\ '( Ltl. r\t1& 'f)/'/ Created 8-19-2010 Revised 7 Packet Page -1066- Page 1 3/22/2011 Item 16.D.5, COLLIER COUNTY NEIGHBORHOOD STABILIZATION PROGRAM BID SPECIFICATION I'"'. I'"'. Name: Collier County Housing Human & Veteran Services (HHVS) File No. NSP 09-39 Site Address: 1853 51't Terr SW Naples, FL 34116 Mailing Address: 3301 E. Tamiami Trail Bldg. H. Suite 211 Naples. FL 34112 I General Rehab Specs Phone: 239-252-HOME (252-4663) Pencil Bid Special Notes: Non Occupied / Refer ouestions of color or textures to choices to rehab specialist assigned, Prooertv ~ shows house to ~ 1218 sfw/ 319sf 1 car I!lIllIllC """,. 2SO ..ddiriMt NOTE: All work by any contractor(s) and their subcontractor(s) must conform to the requirements of the following: 1. 2007 Florida Building Code (includes Energy Efficiency Code) 2, 2007 Florida Building CodelFuel Gas t q 8~ 3. 2007 Florida Building Code/Mechanical 4. 2007 Florida Building CodeIPlumbing 5. 2007 Florida Building Code/Americans with Disabilities 6, 2008 National Electric Code 7. 2002-01 Building Construction Administrative Code Contractor: (,J W\ - J. V A1u4,... ~ ~ J r- <- Address: B~ I ({) "t4.../Wu N S;-o\. '"4' q City/Zip: AJ~s I"=I.-- 3'{lO~hone: /' ~ 2-3C:; $14. Dtt13 TOTAL BID AMOUNT: f)c" O~? ~ / The bid due date is August 26, 2010 before 4:00 pm. Bids shall be submitted in a sealed envelope and marked "DO NOT OPEN, Bid NSP 09-39" to Attention: Tammv. Housing Human & Veteran Services. 3301 E. Tamiami Trail Bldg H, Suite 211 Naples. FL 34112. Bids will be opened the next business day at 9:00am in the HHVS. It is the contractor's responsibility to ensure that all required permits and/or approved plans are obtained and made available to the appropriate inspecting authorities at all times during the rehabilitation process and copies must be provided to the Collier County Housing Human & Veteran Services, Further, the owner and contractor will defend, indemnifY and hold hannless Collier County, its officers and employees from liability and claim for damages or loss and expenses arising from any operations related to the rehabilitation process. Created 8-19-2010 Pencil Bid 1 Packet Page -1067- ..-.. ..-.. 3/22/2011 Item 16,D.S, Page 2 1. Exterior Entrv Doors: Replace all exterior doors. Doors shall be 1-3/4" thick Fiberglass insulated, raised panels, to fit existing openings. Miami Dade approved wind rated, Include keyed entry lock, weather-strip, door stop or safety chain as applicable, 1-1/2" pair hinges, and single cylinder dead bolt keyed alike, threshold, and security "peeps." Ensure exposed wood and fasteners are protected from th~ elements. I -"-f. C7'\ MATERIALS: 4'(q2-: LABOR: /q1.S-u =TOTAL (pf&i' v'-' 2. Impact Glass / LOW-E Windows (All): Remove, package and dispose of all window and slider components, Field measure, fabricate and install white, single hung, one-over-one, single glazed, enameled aluminum replacement window including all necessary panning, caulk, trim and removable screen. Use frosted glass in bathroom, Includes patching of interior and exterior wall surfaces as needed. Replace broken marble sills, and re-install existing serviceable marble sills, Clean glass. Provide permitting department the Miami-Dade / Notice of Acceptance (NOA) when pulling a permit. Note: Make sure that the bedroom windows are egress. MATERIALS: LI.?>/O.z.) LABOR: 15'17. ~=TOTAL ~ 8' ~/'ro 3. Interior Doors: Replace all interior doors and door frames with raised panel Colonial style doors. Replace interior door locksets on each door. Replace attic door with a piece of smooth plywood, primed and painted white. Ensure all interior doors have door stops. MATERIALS: t;;~ LABOR: '37~ =TOTAL 70s 4. Interior Closet Door: Replace existing closet doors with similar, six panel doors and necessary hardware for proper operations. Replace any other doors throughout the house with similar doors. MATERIALS: 151, ro LABOR: /'-t'7. =TOTAL ~P'~, SV 5. Closet Shelvine:: Install shelving in all closets where needed. Replace with white plastic coated wire shelving to include mounting brackets and all necessary hardware, MATERIALS: uS LABOR: ('7. ~.) =TOTAL IS4.2.r 6. Kitchen Cabinets / Counter/ Sink and faucet: Replace base and wall cabinets, counter tops, backsplash, sink and faucet. Install wood cabinets with doors including all hardware. Drawers shall be made of wood or metal boxes. Field measure and screw to base cabinets a post formed, plastic laminate counter top. Counter tops should be 25" in width with a 4" backsplash or mica "curve a top" style, Install a 33 "x22"x8" double bowl, stainless steel, self-rimming kitchen sink, sealed and caulked. Install a steel, metal body faucet with a IS-year drip-free warranty, trap, supply lines, and shut-off valves. All hardware will have 3/8" supply lines, aerator and I" O.D, tailpiece. Installation shall comply with FBC. New metal, not plastic, shut-offs will be supplied on all supply lines to sink. Ensure all gaps at seams, edges, joints are sealed / caulked to provide a finished look. Rehab Specialist will determine flat or raised panel style of doors and types/finish of knobs. MATERIALS: 3Iv'6)'~ LABOR: 117(, .- = TOTAL Lf '5 '3 Go. sc:> /7.., 1& 7. 'd-S-/ SUBTOTAL Pg 2 Created 8-19-2010 Pencil Bid 2 Packet Page -1068- -.. ,-..., 3/22/2011 Item 16,D,S, Page 3 7. Interior Paint: WaDs. Ceilinl!S. All Doors and trim: Note: this bid item included repairing drywall holes/damage throughout home. Repair minor drywall holes by patching walls and ceilings, One coat primer and paint all interior walls and ceiling with neutral color egg shell or satin paint. All interior and exterior doors / trim / casing / base molding painted using white _ semi gloss fInish, The finish coat in kitchens and baths shall provide a durable and washable surface and be mildew resistant. Paint should have an even coloration after drying and no blotching or drips, MATERIALS: 31J LABOR: /2UJ - = TOTAL IS3~ 8. Bathroom #1 Guest Replacement: Vanity. Med cabinet. and mirror: Complete Rehab, Install new vanity/cabinet and sink with faucet. Top will be cultured marble. Plumb and level, no visible gaps at seams/joints, Replace plumbing hardware in sink with new quality faucet with pop-up drain and new supply lines. Metal chrome handled hardware with single lever/flow type faucet, InstalIation will comply with (FBC) plumbing code. Also, install new medicine cabinet, new mirror same width as new vanity (clear caulked at bottom to prevent water damage), Add two new 30 inch towel bars, "l ,__ MATERIALS: 105'7. "V LABOR: I02:~, ?J- = TOTAL ~ 9. Bathroom #2 Master Replacement: Vanity. Med cabinet. and mirror: Complete rehab, Install new vanity/cabinet and sink with faucet. Top will be cultured marble, Plumb and level, no visible gaps at seams/joints, Replace plumbing hardware in sink with new quality faucet with pop-up drain and new supply lines, Metal chrome handled hardware with single leverlflow type faucet. Installation will comply with (FBC) plumbing code, Also, install new medicine cabinet, new mirror same width as new vanity (clear caulked at bottom to prevent water damage), Include towel bars here also, ...- .,....- / /V\ t:> ~ MATERIALS: '/Lft), ~ LABOR: dID!, 7..> =TOTAL vvo 10. ADA Toilets: At both bathrooms replace existing toilets with ADA type elongated toilets complete with new valves, lines, donut, wax ring, and toilet seat, MATERIALS: '3.vct - LABOR: ~'l.{- = TOTAL fa '73 .,g.. 11. Master Bath: Complete Rehab standard on other NSP houses assume a shower tub package with tile. Repair any plumbing leaks, Replace faucet with single lever shower diverter and a massage low flow showerhead and include ann, AII should be chrome fInish to match other items. .- MATERIALS: 'i'lf.> LABOR: j 15S- ~ = TOTAL '2...\ DO - 12. Bathroom # 2: Complete Rehab standard on other NSP houses assume a shower tub package with tile. Repair any plumbing leaks. Replace faucet with single lever shower diverter and a massage low flow showerhead and include ann. All should be chrome finish to match other items. MATERIALS: I ot11, ~ LABOR: I02-~.7.r=TOTAL Zl2-\ - 13. Trim and Drvwall: Minor drywall repair due to normal wear and tear, Repair and replace all areas that need drywall work. MATERIALS: ~~ LABOR: Created 8-19-2010 Pencil Bid 1&7.S-o =TOTAL SUBTOTAL Pg 3 '2...tC) ~ ~'1~g -- V 3 Packet Page -1069- ~ r'\ 3/22/2011 Item 16,D.5. Page 4 14. Shinele Re-roof: Remove existing roof system to legal dump. Complete any carpentry repairs as needed. (Note: Ch8ngc cxdct must be fiIJed out for cost of C81})aatry work. before work is completed). Inelllde"- ..pemUt Pitched Roof area install: -Minimum 4 inch wide strip of self -adhering polymer modified bitumen tape (all joints), covered with approved underlayment. -26ga. Factory painted Evedrip. -26ga. Galvanized Flashing, -New plumbing stacks and goosenecks as needed. -30 Year dimensional shingles. ore-nail sheathing per new code. -nail shingles per code. -Aluminum ridge vent(s) MATERIALS: (p :5 Sd...9> LABOR: ~'9 'd-3 ,~ = TOTAL Cf, 7'S'.7 S- 15. Soffit and Fascia replacement: Replace fascia and soffit on whole house MATERIALS: (P-SD LABOR: CP'30 = TOTAL /21eo".!- 16. Gutter Replacement: Install New aluminum pre-painted "seamless" gutter system on whole house. MATERIALS: 2..lo LABOR: 2\2) = TOTAL 42..0 17. Minor Electrical and low voltaee: - Replace missing wall switch cover in whole house, - Replace missing outlet cover in whole house. - Replace broken cable cover. - Install electric for over the range microwave on separate breaker - Add GFCI duplex outlets at both bathrooms and Kitchen per code. - In all bedrooms replace existing with new 52" fan with light kits (include bulbs). - In garage (after converted) replace existing and install new 4ft florescent ceiling fixture. - InstallS new UL approved smoke detectors, run on existing circuit, To include I in hallway I in living kitchen area and in each bedroom. -Replace kitchen lighting with standard contractor !,'fade light - Replace any broken or missing bulbs on property with energy saver florescent bulbs. - Properly install any exposed cable TV lines throughout home. - NotifY HHS of any additional electrical items found during repairs. MATERIALS: I~~ LABOR: I?'~- = TOTAL 14'10 SUBTOTAL Pg 4 12., P;;S. '7S- ./ Created 8-19-2010 Pencil Bid 4 Packet Page -1070- ~ ........ 3/22/2011 Item 16,D.5, Page 5 18. Stucco Repair: Repair all damaged stucco, Stucco shall be a mixed of cement, lime, sand and potable water or premixed and applied either with standard equipment or by hand. Apply per manufacturer's specs for three (3) coat system (3/8" scratch coat, 3/8" brown coat and 118" color coat), Wire shall be a 16 gauge. Dowels shall be metal, When applied to masonry, shall consist of at least two (2) coats. Cement shall comply with ASTM C 150, Type I or II having less than 15% water-soluble alkali by weight in the combination of lime and cement. Lime to comply with ASTM C207 Types, hydrated lime for masonry. Sand (Mortar Aggregate) to comply with ASTM CI 144, Water to be clean and free from impurities and alkaJis, Finished surface shall be uniform, free from excessive build-up, runs, sags or defective materials. Contractor shall take care to maintain continued alignment of all surfaces and profiles, The contractor shall remove all spilled, splashed or splattered stucco from all surfaces, Remove and replace all damaged lumber before applying Stucco to existing T-III areas, Repair existing Stucco areas as needed. MATERIALS: I fJS- - LABOR: JDS - =TOTAL ""24u. 19. Exterior Paint: After stucco repair is fully cured, prep and paint exterior walls and trim. Contractor shall paint exterior with quality mildew resistant exterior paint. No paint shall be applied until any cracks / holes been puttied and all defects on exterior have been repaired, All of the surfaces will receive 2 coats of paint (wait 24 hours between coats), Any damaged items shall be repaired to match original condition. All exterior doors shall be primed and painted on all edges (6 sides). Proper paint for Florida climate to be used on exterior and paint to be used on trim, soffits, fascia, jambs, and casings, All exterior doors and windows shall be cleaned and excess paint removed upon completion. NOTE: add new 4 inch black address numbers: 4471 at front elevation visible from the street. MATERIALS: ~I S-. LABOR: 777.:r?J =TOTAL 1512.. .\t:J 20. HV AC unit Reolacement: Replace with new HV AC system. Install at a minimum of 3 ton, 16 SEER, R4l0A, central heating (8 kw heat) and cooling system, Includes all electrical for unit install, digital thermostat, condensing unit, drains, refrigeration piping, air handler, re-use ductwork as much as possible. Replace all grilles vented to all living areas and install hot air returns in all bedrooms, New system will be adequate for all living areas to be cooled / heated. Condenser secured on cement pad include pad in price, System will be installed to manufacturers' specs. No exposed interior ductwork. Warranty info: Units must have 10-year warrantee on compressor, coil, condenser parts, evaporator coil, air handler parts. I-year labor warrantee on entire system. MATERIALS: ?'t~.- LABOR: "Z-lC'O.- =TOTAL .>d-SO' 21. Secure all outside equipment: We are asking to have all outside equipment including HV AC, water system and any other items that could walk, to be secured in a fenced in area that has easy access for service and is lockable with 3 sides and top secured. MATERIALS: I OS"."" LABOR: ~ = TOTAL zv,~.~ 22. Install New Hot Water heater: Install new Hot water heater same sizes as currently exists in house. MATERIALS: L-l1..O .'- LABOR: /':>t.SD =TOTAL SUBTOTAL Pg 5 57'/.r;v / tteIZ.H) Created 8-19-2010 Pencil Bid 5 Packet Page -1071- r'\ I"".. 3/22/2011 Item 16,D.S, Page 6 23. Complete floor Replacement: Remove existing floor throughout house and replace with standard 16x 16 or larger ceramic tile. MATERIALS: ::Si..ll2. ' ~ LABOR: '373P. ,.. = TOTAL II 4'Z..<;Z) 24. Drain Field Svstem: Pump out existing drain field system and inspect for serviceability, Provide inspection report with condition and location of existing system. MATERIALS: LABOR: 44~. Z-~= TOTAL '-tlf~. 2j- 25. Post Construction Cleanin!! Service: After punch list items are completed, ensure home is ready for new homeowner by having a professional cleaning crew enter home. Clean all construction related dust, sweep, mop, vacuum, floors as applicable, Complete kitchen and bathroom cleaning, Windows cleaned inside and outside. Window screens washed. Exterior and exterior of home must have all cob-webs removed, Ceiling fan blades cleaned. MATERIALS: LABOR: UO =TOTAL 210 26. Permits: (smoke detectors. windows/doors. MY AC and minor electrical. roof) 908.~ MATERIALS: na LABOR: na = TOTAL 27. NOC and termination of NOC filin!! Fees: We in the office will no longer be filing the NOC's for construction projects you as the chosen contractor will be required to file the NOC, a copy of the recorded NOC will be required with your first pay request application, At the close of a project you will be required to file a termination of the NOC before final payment will be issued. MATERIALS: na LABOR: na = TOTAL 13Ctt ~ 28. Garage Door I car: Remove and replace existing garage door system. Miami Dade Approved, Minimum 25 Ga. Galvanized steel skin, non insulated, raised panel design. Include any necessary Torsion Springs, White PVC-vinyl door stop molding, and Bottom weather seal. White factory finish OK. All completed to current County codes. To include Electric opener installed. Include electrical work needed to install opener and outside key pad, (Option price: Please price out a garage door with windows if they make one that is Miami Dade approved) /~...".... ~ MATERIALS: (P?>D LABOR: l...\'2.D = TOTAL _ <.0'--' 29. Water System (Complete replacement): Reinstall complete new exterior water system to include any pump(s), salt and/or potassium tanks, tannin tank(s), sand filters, aerator tanks hoses, minor electrical components/connections etc. for a complete new system to operate as originally designed. MATERIALS: LABOR: I b@ . = TOTAL 5"18>0 2-730 . SUBTOTAL Pg 6 / 13,l,.'73J2J Created 8-19-2010 Pencil Bid 6 Packet Page -1072- ..--. ..--. .' Page 7 SUBTOTAL Pg 2 SUBTOTAL Pg 3 SUBTOTAL Pg 4 SUBTOTAL Pg 5 BID TOTALS: SUBTOTAL Pg 6 TOTAL - v Contractor's Signature .J 'I~.J- 3/22/2011 Item 16.D.5. I 2.11 ~7. ~S- C;,~~8-- l 2..., g ~S"'.1.f" I(&)(?..~ 1~/4'7~~ / ~, Or7 cV' . HHVS Acceptance: Signature below indicates that Collier County HHVS has reviewed and accepted the contractor's bid. HHV:evr::e:I:igna= :.rr~J\ t ~~1 Created 8-19-2010 Pencil Bid 7 Packet Page -1073-