Loading...
Agenda 02/22/2011 Item #13A1 2/22/2011 Item 13.A.1. EXECUTIVE SUMMARY Recommendation that the Board of County Commissioners, acting as the Airport Authority, approves and authorizes the Chairman to execute Change Order No.1 to DeAngelis Diamond Construction, Inc. Contract No. 09-5234 in the amount of $104,797.20 for the construction of a 20,000 Square Foot Manufacturing Facility at the Immokalee Regional Airport, pending United Stated Department of Agriculture (USDA) approval OBJECTIVE: To obtain approval of Change Order NO.1 so that the Contractor can begin ordering materials and mobilizing to begin construction. CONSIDERATIONS: Bid 09-5234 was approved by the Airport Authority on November 20, 2009. This construction is being funded in part by a grant from the United States Department of Agriculture (USDA), with the USDA providing thirty-three percent (33%) of the funding. Grant requirements specify that the USDA must concur with the award of the bid and approve the final contract documents. The USDA concurred with the Authority's recommendation to award the bid to DeAngelis Diamond Construction, Inc. on January 14, 2010. Due to USDA contracting issues, requirements and procedures, the contract documents were not approved by the USDA until October 6, 2010. Several commodity markets and subcontractors have experienced price increases over the last year. The total amount of these price increases is: $104,797.20. Sitework/Utilities Concrete/Re-bar Steel (metal building) Overhead doors Electrical Contractor's fee - 5% Total Change Order No.1 $ 36,812.00 $ 24,650.00 $ 27,483.00 $ 4,275.00 $ 6,587.00 $ 4.990.20 $104,797.20 It is anticipated that the USDA will fund $34,699.74 of this Change Order, and the County will fund $70,098.46. Change Order NO.1 increases the total amount of the contract from $752,244.80 to $857,042. Original contract amount This change order amount Revised contract amount $752,244.80 $104.797.20 $857,042.00 The design professional for this project, Q. Grady Minor, has opined that: ~ The economic downturn resulted in very competitive prices for construction in the original bidding process. ~ DeAngelis Diamond relied on bids from subcontractors that are no longer in business due to the economic downturn and replacement subcontractors are unable to match the original bid. Packet Page -568- 2/22/2011 Item 13.A.1. ~ The new subcontractor bids are 10% to 15% higher than the bids relied on by DeAngelis Diamond when they submitted their proposal for this project. ~ The price increase reflects current low bids from new subcontractor and is outside the control of DeAngelis Diamond. ~ The consultant has confirmed the cost of the steel structure increase. ~ Further delay of the project would most likely cause the prospective user to look elsewhere for space. ~ Rebidding the project would most likely result in bids similar in cost to DeAngelis Diamond's proposed total cost. During the review process for this item, the Clerk of Courts Finance Department requested that the Board ratify the previous award decision of the Airport Authority Board. Accordingly, a copy of the original bid tabulation and an itemization of the adjusted prices are attached. The adjusted prices notwithstanding, the revised contract amount remains well under the authorized grant amount of $495,000. Further, the USDA has not indicated whether it will authorize the County to re-bid the project. FISCAL IMPACT: Funds are available for this Change Order to project number 46040, Immokalee Development USDA Bldg., in Collier County Airport Authority Fund 497. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's Office, requires simple majority vote, and is legally sufficient for Board action. - CMG GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with the Executive Summary. ADVISORY BOARD RECOMMENDATION: At the December 13,2010 meeting, the motion to recommend that the BCC approve Change Order No. 1 to DeAngelis Diamond Construction, Inc. Contract No. 09-5234 in the amount of $104,797.20, increasing the total amount of the contract from $752,244.80 to $857,042.00, pending USDA approval was approved by a majority vote of 6-1. RECOMMENDATION: That the Board of County Commissioners, acting as the Airport Authority, ratifies the previous award of ITS 09-5234 to DeAngelis Diamond Construction Inc. in the amount of $752,244.80 and approves and authorizes its Chairman to execute attached Change Order NO.1 to DeAngelis Diamond Construction, Inc. Contract No. 09-5234 in the amount of $104,797.20, increasing the total amount of the contract from $752,244.80 to $857,042 for construction of a 20,000 square foot manufacturing facility at the Immokalee Regional Airport, pending USDA approval. Prepared By: Chris Curry, Executive Director, Airport Authority Attachments: Change Order, back-up information provided by contractor Packet Page -569- 2/22/2011 Item 13.A.l. COLLIER COUNTY Board of County Commissioners Item Number: B.A.l. Item Summary: Recommendation that the Board of County Commissioners, acting as the Airport Authority, approves and authorizes the Chairman to execute Change Order No.1 to DeAngelis Diamond Construction, Inc. Contract No. 09-5234 in the amount of $104,797.20 for the construction of a 20,000 Square Foot Manufacturing Facility at the Immokalee Regional Airport, pending United Stated Department of Agriculture (USDA) approval Meeting Date: 2/22/2011 Prepared By Name: BrueggemanDebra Title: Operations Coordinator, Airport Authority 1113/20111:09:17PM Submitted by Title: Executive Director - Airport Authority,Airport Authority Name: CurryChris 1/13/20111:09:18 PM Approved By Name: CurryChris Title: Executive Director - Airport Authority,Airport Authority Date: 1/14/2011 1 :43:35 PM Name: CarnellSteve Title: Director - Purchasing/General Services,Purchasing Date: 1/19/2011 8:16:00 AM Name: WoodLyn Title: Contracts Specialist,Purchasing & General Services Date: 2/11/2011 9: 11 :02 AM Name: KlatzkowJeff Title: County Attorney, Packet Page -570- 2/22/2011 Item 13.A.l. Date: 2/15/2011 2:00:28 PM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 2/15/20114:43:15 PM Name: K1atzkowJeff Title: County Attorney, Date: 2/]6/2011 9:16:05 AM Name: IsacksonMark Title: Director-Corp Financial and Mgmt Svs,CMO Date: 2/16/20] 1 9:28:35 AM Packet Page -571- 2/22/2011 Item 13.A.1. FORM APPROVED OMS NO. 0515.0042 ORDER NO. Change Order #1 DATE 1:Z-20-2010 STATE Florida Form RD 1924-7 (Rev. 2-97) UNITED STATES DEPARTMENT OF AGRICULTIJRE RURAL DEVELOPMENT AND FARM SERVICE AGENCY CONTRACT CHANGE ORDER OWNER USDA-CCAA Mftg. Bldq. at IMM coJ.lier County Airport Authority COUNTY Collier CONTRACT FOR y OaAngel.i.s 01amond Construc:t.i.cm., ine. hcrohy requested :to comply with the foll~k from the CClDtrlIcl plll%lll anclJpec11ications: To ouare Dclaiption ofClwlgcs .D~~_ INCREASE ental Pla:l:Ia and ~ficatlons At1acbl!d\ in Contnlct Price sieework/a~ilit~e8 $ $ 36,81.2.00 Conerete/Re-bar 24,G50.00 Steel (meed bui1ding'~ 27,48'3.00 overhead doors 4,275.00 lUectr.ica,l 6,58'7.00 Contractors Fee - n 4-,990~20 Extend schedule by .sixty (60) day. TOTALS $ 0.00 104,79'7.20 NETCHAN(;E IN CONTRACT PRICE oS 0.00 10',797.20 JUSTIFICATION: Bid documents require prices in :bid bill held for 120 days from bid opet1ing. Bid opening was 10/6/09. Final contract documents were apprCVBd 10/6/10. Over last yea.r, seYe%a.l. cOIllll1OC1ity t'll8.:kets have experienoed price increases. N'J.lP issued for 12.-15-10. Project start: delayed. whi1e centracter -awaits aI)}>:e-oval of ch.az1ge order for 'Dri.ce :l.ncrease$ be~ ~rbq bu.;!.lcl:l.nq and materials. D The amount otthc Conuactwill btt (l)ecr:eased) ~ By The Sum Of: On!! linndrad "our ~anc1 Seven Hundred Ninety Seven. Dollars Ii:i:l.~ Twenty Cents Dollars {$ 1.04. 7~7.20 ). ......lI'............ . The Contract Total Including this and pr.eviO'QS Change Ordm Will Be; Eight Rundred P'ifty Seven ThOUSand Fotty '!'wo Dollars. and. Zero Cents !>Q11ars($ 857,042.00). The Contract Period Provided for Completion Will Be' (In~ed.) (Deereased) (Unchanged): Sixty ( 6'0 ) Dll)!s. This dccumentwill beco e supplement to the cornract and all pt'OYisiol1S will apply hereto. Requested ':--{ Ie., C. hCt \ ,\"1---' cA.. \"1 (OvIMr) (DaUt) 't \"l. \\\0 (DaIs) 10/ 2fI:: lit) (Olmt!r'ld~r) ~) fN_1II1lI. nlk) rn.-) I",. ih:Ilf! 199$, ... f1I'DICl'__ t:rI1IIirtt:t ",.............. _..,..... h_I'IIIpiraJ,,, ,.,.",..,..tUHI~ f/fW_IIItl_I1~. WIIId OMS _,.......... n.. WIlId ~--.fiw"'ull!lo_ClIIl<Oall>n IrOS"S-tJ!O.Q. 71ro-/f_ """""",,, CGMpW. _""__ ",;u_.",.-",_ u_ JW'~"""" IndtuIIn/tIM Ii1Mf""mMvbrg~ ~o:r&Iliogd__Il"'''''''''''__Dqr lire_~ -~K---''''_t>f bfformtl/Itu. Cl OItJGl:NAL-BOlUl.OWEJl'S CA.St1; FOl.J)E'R Cl COPY..cmmtACTm. CJ CQPV-BOIUlOWER Form RD 1924-7 (Rev. 2.97) posrrl0N 6 'lI-'" ~:.... proved as to form & legal sufficiency Colleen Greene, Assistant County Attorney ATTeST: DWIGHT Eo BROOKe Clerk By: Packet Page -572- . GradyMinor Civil Engineers · Land Surveyors · Planners · Landscape Architects 2/22/2011 Item 13.A.l. December 20, 2010 Ms. Ada Rivera Area Specialist USDA Rural Development West Palm Beach Area Office 750 S Military Trail, Suite J West Palm Beach, FL 33415 Re: CCAA/USDA Manufacturing Building Immokalee Regional Airport Contractor's Change Order #1 Dear Ms. Rivera: Please see the attached Change Order #1 for the above referenced project from Deangelis Diamond, the approved contractor. This change order is warranted due to the extended period of time from the award of the contract to the actual date of construction. The contractor has provided back up for the additional charges that have resulted from increased material prices. i J ,f f ark Minor, P.E. esident Mr. Chris Curry, Collier County Airport Authority QGMA File Q. Grady Minor & Associates. P.A. 3800 Via Del Rey Bonita Springs. FL 34134 Ph. 239-947-1144 · Fx: 239-947-0375 EB 0005151 · LB 0005151 · LC 26000266 G:\PROJ-ENG\C\CCAASAZSDPI08CDocs\02Signed Contract-Approved COslL- Cover Ltr - Ada Rivera- 12-20-IO.doc www.gradyminor.com Packet Page -573- 2/22/2011 Item 13.A.1. FORM APPROVED OMB NO. 0575-0042 Form RD 1924-7 (Rev. 2-97) ORDER NO. Change Order #1 DATE ~2-20-2010 STATE Florida UNITED STATES DEPARTMENT OF AGRICULTIJRE RURAL DEVELOPMENT AND FARM SERVICE AGENCY CONTRACT CHANGE ORDER CONTRACT FOR USDA-CCAA Mftg. Bldg. at IMM COUNTY Collier OWNER Collier County Airport Authority To DeAngelis Diamond Construction, inc. (ConlraCftJr) You are hereby requested to comply with the following changes from the contract plans and specifications: Description of Changes DECREASE INCREASE (SunnJemental Plans and Snecifications Attached) in Contract Price in Contract Price Sitework/Utilities $ $ 36,812.00 Concrete/Re-bar 24,650.00 Steel (metal building) 27,483.00 Overhead doors 4,275.00 Electrical 6,587.00 Contractors Fee - 5%' 4,990.20 Extend schedule by sixty (60) days TOTALS $ 0.00 104/797.20 NET CHANGE IN CONTRACT PRICE $ 0.00 104,797.20 JUSTIFICATION: Bid documents require prices in bid be held for 120 days from bid opening. Bid opening was 10/6/09. Final contract documents were approved 10/6/10. Over last year, several commodity markets have experienced price increases. NTP issued for 12-15-10. Project start delayed while contractor awaits approval of change order for price increases before orderinq buildinq and materials. D The amount of the Contract will be (Decreased) (Inc~ed) By The Sum Of: One Hundred Four Thousand Seven Hundred Ninety Seven Dollars and Twenty Cents Dollars ($ 104,797.20 ). The Contract Total Including this and previous Change Orders Will Be: Eight Hundred Fifty Seven Thousand Forty Two Dollars and Zero Cents Dollars ($ 857,042.00 ). The Contract Period Provided for Completion Will Be (Inc~sed) (Decreased) (Unchanged): Sixty (60) This document will beeo. e supplement to the contract and all provisions will apply hereto. Requested Days. (Owner) (Date) 11 \"t1.\\~ - (Date) ,~/ UJ-A, I ~ ale) (Owner's Architect/Engineer) (C OnlraCftJr) (Name and Tille) (Dale) Accarr/ilJg 10 the Paperwork Redu ion Act of 1995, an agency may 1101 conc/uCI or sponso'/'. alld a persQn t.\" not required to re.\pond 10 a colJecn01J ofinfomlo,ion vnle:r.....;, di']Jlay:; a .,alid OMB control mmJber. The valid om control number for thi.f injonnoti011 collection J.'; 05":'5-0/0./2. The lime required 10 complete 'hi:; infornJaI;on collect;otJ if e.\1;n1Qled 10 average 1.j minutes per ~."po"se. illcluding the lime for reviewing iIJ.J:JrucliD/Lf, searching exi...ling dalo SOJlrces, gathering and main/oining the data needed, and co"'p/~ling mJt/ review;1rg the collection of illjonllutioll. o ORlGINAL-HORROWER'S CASE FOLDER o COPY-CONTRACTOR o COPY-BORROWER Form RD 1924-7 (Rev. 2-97) POSITION 6 Packet Page -574- 2/22/2011 Item 13.A.l. ~!'.oJ:~_f'_"''>:\.. ..:!.;...""",~~ . ;' .\":. :,/.... -~7;\ .v'. :..~ ... IJ:EA..~~'ELI S 0 lAMO N D CONSTRUCTION,INC December 3,2010 Mrs. Lyn Wood, C.P.M. Collier County Purchasing Bldg. G, 3301 Tamiami Trail East Naples, FL 34112 RE: Material Increases - Metal Building CCAAlUSDA Dear Lyn, As previously discussed, the bid documents on the above referenced project required us, our subcontractors, and material suppliers to hold our pricing for 120 days from the date of opening. The bid opening date was 10/6/09; therefore the 120 day duration expired on 2/3/10. Since receiving the fully executed contract on 11/01/10 we have contacted our subcontractors and attempted to hold all pricing; however we have incurred several price increases that we cannot avoid. As discussed, we request that this increase be added to our contract via a change order. Several commodity markets and subcontractors have experienced an increase in pricing over the past year. The steel increase alone is approximately 20% or $27,483 as previously discussed. Other cost increases include but are not limited to; electrical fixtures and wiring, limerock, fill dirt, and sub grade; insulation, re-bar, and general labor costs. Original Contract Sum Project Increase/Change Order Amount $752,244.80 $104,797.20 Revised Contract Sum $857,042.00 As commencement of the project nears, we request that a fonnal change order be approved based on the information and dollar figures above. Should you have any questions or comments, please do not hesitate to call. We look forward to working with you on this project. cc: Norm Gentry ~ . " I, t I ',; i I ; J ; - . 6635 WIllOW PARK DRIVE. NAPLES. FLORIDA 34109 T:239.594.1994 F:239.594.1995 WWW.DEANGElISDlAMOND.COM Packet Page -575- SCOPE SiteworklUtilities Concrete/Re-bar Steel (metal bldg) Overhead doors Electrical Subtotal 5% O&P TOTAL INCREASE $36,812 $24,650 $27,483 $4,275 $6,587 $99,807 $4,990 $104,797 2/22/2011 Item 13.A.l. Packet Page -576- 2/22/2011 Item 13.A.l. Bid Cost 5% Bid Fee Bid Amaun New Cost Difference Schedule A - Sitewark $20,186 $961 $19,225 $31,507 $12,282 Schedule B - Drainage $30,370 $1,446 $28.924 $33,519 $4,595 Schedule D - Water Sys $45,623 $2,173 $43,450 $48,626 $5,176 Schedule E - On-Site Canst (excluding E-10/E-11) $93,718 $4,463 $89,255 $104,014 $14,759 TOTAL $36,812 Packet Page -577- 2/22/2011 Item 13.A.1. Page 1 ofl David Kovalik ~.... _.'_". ,.__,.. ___"..._._..,_..,.__,._...__~_.__..___....._._.._____.._.,___~',M~' ..~..' .._..~h..~....,~. .._.........._,. "___'.' .._.~ ...-.........'_,.___,'".._..~.. - _..~... '.~. .'-,- .. - ........ ..-...... .._.... .-.,.. ....... ........... ~~. From: Alex DeMarco (alexd@cityexcavating.com] Sent: Monday, December 06,20108:29 AM To: David Kovalik Cc: James DeMarco; Gino Campobasso; Jason DeMarco Subject: CCAAlUSDA Manufacturing Building Importance: High Attachments: image001.jpg Good Morning Dave, Please find our revised pricing below for the USDA Immokalee Airport project. Some of the materials and sub pricing has increased since Feb. Please call me to discuss. Schedule" A" - Sitework Schedule "B" - Drainage System Schedule "0" - Water Distribution System Schedule "E" - Onsite Roadway Construction $31,508.00 $33,519.20 $48,625.60 $104,014.49 TOTAL BID $217,667.29 Thanks, City Excavating, LLC Fl >:,';'i);.hu: ,." p.' ~<~r~-,i:;;'- 1. Alex DeMarco Managing Partner City Excavating, LLC 239-225-0619 P 239-225-0914 F '.. . :... ,: t :. ~ f ;! .~ ~ thi"" bdore you print. 12/6/2010 -- Packet Page -578- 2/22/2011 Item 13.A.1. November 19, 2010 Deangelis Diamond 6635 Willow Park Drive Naples FI34109 594-1994 Fax 594-1995 Re.: USDA Manufacturing Subj.: Price (ncrease Attn.: Dave Kovalik From the 3rr:1 Quarter of 2009 to the present, we have experienced across the board price increases. These are most notable in reinforcing material and general labor prices. Additional increases of approximately 10% for concrete, block and accessories are scheduled for Jan 1&1, 2011. Due to these increases, we need to raise our price for this project by $24.650.00. . NCM OF COLLIER COUNTY, INC. Phone: 239-566-1601 5770 SHIRLEY STR.EET, NAPLES, FL34109 Fax: 239-566.3994 State Uc: #CGC038345 em ail: estimating@naplesconcrete.com Packet Page -579- 2/22/2011 Item 13.A.1. '''11)'' : .... .... .,.J ~ DEANGELIS DIAMOND CONSTRUCTION.INC March 29, 2010 Mrs. Lyn Wood, C.P.M. Collier County Purchasing Bldg. G,3301 Tamiami Trail East Naples, FL 34112 RE: Steel Increases - Metal Building CCAAlUSDA Dear Lyn, As previously discussed, the bid documents on the above referenced project required us to hold our pricing for 120 days from the date of opening. The bid opening date was 10/6/09; therefore the 120 day duration expired on 2/3/10. Since receiving our contract on 2/12/1 0 we have contacted our subcontractors and attempted to hold all pricing; however we will incur an increase in structural steel that we cannot avoid. As discussed, we will sign the contract and anticipate this increase will be added to our contract via a change order. Based on a start within the next 6 weeks we will incur a 20% increase in steel costs. I have attached a letter from our steel supplier which references this increase. The breakdown of this increase is detailed below: 20 % increase in structural steel: Overhead/Profit: Total Increase $27,483 $ 1.374 $28,857 As commencement of the project nears, we request that a formal change order be approved based on the information and dollar figures above. Should you have any questions or comments, please do not hesitate to call. We look forward to working with you on this project. ....-~-"J Sin~erelY:-"_,,.,::'" ,'---;/;::~:~;;~,' ,i'";'" Dave Kovalik EstimatorlProject Manager cc: Jay Waltbillig N arm Gentry 6635 WI LLOW PARK DRIVE. NAPLES. FLORIDA 34109 T:239.594.1994 F:239.594.1995 WWWDEANGELlSDlAMOND.COM Packet Page -580- 2/22/2011 Item 13.A.l. II ACTIOIII AUTOMATIC I.DOOR.GATE November 22, 2010 Deangelis Diamond Construction 6635 Willow Park Drive Naples fL 34109 Re: USDA Manufacturing Bldg 165 Airpark Rd ImmokaJee FL 34142 Estimate # 44682 Dave: The above bid is now over a year old. Prices on steel and labor have increased during that time frame. In addition, the UL-325 standard has been revised as of 2010, affecting all garage door operators. SUbsequently there is an increase in the cost of the operatDrs. The tDtal additional cost for this bid is $4275.00. Please contact me directly at 707-4723 with any questions. Thank you. Paul Couto Naples Manager 11360 Metro Parkway Ft Myers, FL 33912 (239) 768-6263 Fax (239) 768.3740 GARAGE DOORS GATE SYSTEMS 275 Airport Rd N Naples, FL 34104 (239 )643-3667 Fax (239)643-4467 Packet Page -581- 2/22/2011 Item 13.A.l. WM ROBERTS ELECTRICAL & MECHANICAL INCm P.O. BOX 416 MARCO ISLAND, FLORIDA 34146 TELEPHONE: 239-649-6060 FPJ(: 239~9-6363 EC13004506 Nov. 22,2010 DeAngelis Diamond Construction Inc 6635 Willow Park Dr. Naples, FI 34109 AUn: Dave Kovalik Ref: CCAAlUSDA Manufacturing Building, Airpark Blvd., Immokalee, Florida Since bidding this project 14 months ago, there have been significant price increases for materials, equipment, and labor. This has resulted in a price increase of $6,587.00 Packet Page -582- 2/22/2011 Item 13.A.l. ;.,,'y....;... D EANG ELlS DIAMON D CON STRUCTION, INC January 13,2011 Mrs. Lyn Wood, C.P.M. Collier County Purchasing Bldg. G, 3301 Tamiami Trail East Naples, FL 34112 RE: Material Increases - Metal Building CCAAlUSDA Dear L yn, As previously discussed, the bid documents on the above referenced project required us, our subcontractors, and material suppliers to hold our pricing for 120 days from the date of opening. The bid opening date was 10/6/09; therefore, the 120 day duration expired on 2/3/10, approximately 11 months ago. Since receiving the fully executed contract on 11/01110, 7 months after the bids expired, we contacted our subcontractors and asked them to hold all pricing; nevertheless, we have incurred several price increases that we cannot avoid. As you know, we began our correspondence regarding potential cost increases in March 2010. It was and is our understanding that due to the delay in starting the project any cost increases we would incur as a result of this delay would be added to our contract sum. Without a change order we will not be able to commence work on the project as we will incur monetary damages. Several factors have caused an increase in our pricing and prices in general since the time of the bid. At least two subcontractors that we used and relied upon to calculate our original bid are no longer in business. We have secured the next lowest competitive subcontractors in their place; however this resulted in an overall increase to the original price. Other factors resulting in increase stem from commodity and labor increases. Steel, petroleum products, copper, and various other products have increased and are projected to increase further in price. Please keep in mind, as I have previously communicated to you, if we do not deliver the metal building before the end of the first qmuier of 20 11, we have been notified by our subcontractor may experience another increase in steel increases. Should you have any questions or comments, please do not hesitate to call. We look forward to working with you on this project. ~2?.cef~1~ ~. ~ //J .~/ 0/1; /1/// " Dave Kovalik / Estimator/Project Manager cc: Nonn Gentry 6635 WILLOW PARK DRIVE, NAPLES, FLORIDA 34109 Packet Page _583_F:239.594.1995 WWW.DEANGELISDLAMOND.COM S::Qb'~iS::b' !!;.m'3~~~3 clll:r"Eno3"E l1IS'::Io'C!!l::l 3::1::C~3n< gb'5'2gg ""a!"'~.rtq ..... -. 5' C 2 g fI !:I- !:I- -. o' g ::I IlO IlO .... .... .... o~ E n g !!!. >cf 3 :r III !!; Zsb' 3 . c-5' ~n .... .... :J: 11I II> ;::I. b' ::I '" 2 !:I- 6" :? ~ .... ~ a ;' '" '" o' ::I !!!. ar 5. a: 5' ClQ ~ 11I 3 ::l ... II> ::I C 3 m ::I ... 11I -a ::L '" 11I !!' 5' fI .... .... ~ (!) ~ 0.....-1 ~ (!) ~ 0.....-1 ~ (!) ~ (!) ~ (!) l!; :r.....:r ::r.....:T :T.....::r.....:T...:r ~~~~~!!!.~~~~~;;~~~ ~.~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ [ [ [ [ [ ~. [ [i; .... -II> \D N o ....... .... .... en "'" -< -< -< -< -< -< -< [i; .... -II> \D N o ~ co j... VI -< -< -< -< -< -< -< [i; .... z o ::I I ~ 11I '" "C o ::I '" <' 11I [i; .... z o ::I I ~ 11I '" '8 ::I '" ~. [i; .... -II> co co 0'1 00 0'1 \D iD .... -< -< -< -< -< -< -< [i; .... -II> co .... ,"'" co "'" en o o -< -< -< -< -< -< -< [i; [i; b' ... !!!. III II> ::I 0. '" b' ::I ~ !:I- o' ::I E .... (!}l!; .....:r II> 11I -0. =l'c o - 3 11I c- o: .... ,... ~ iii" n !D 5' n .... narn ~ i g '8iD~ "CE2 ii n a o' g g ::I '" ' 2 ,... ~ Fi o' ::l G)ar ~ 8 '" ~ ~p;o ..... N ..., 5";;; '" C ..... ::l ~Q. ..... o' ::I !!!. b'g'b' ::I iil 3 ~::l'C 2 nil> ~iil~ o' ciQ p;o ::Iararb' b' II> 5. ::l ~ g-a:~ -~,,~ ~m;lfi . cil 5' o' I!. fI ::l .... .... 2/22/2011 Item 13.A.1. Ob'o ill ::I !:. III ~ ::I g 2 c:;: fil a. ~ o 0 ::I -. II> 3 o ::l a.. .... .... ;:; ~ [i; .... -II> co w VI .... W co j... .... -< -< -< -< -< -< -< SJ6~~.p~ .....a!~8~i r-c~<> ~(J)>~~ x~~i: l5 f" a! "" ~ __ r-zr-z "'-G):aO Ut ~ en ", :tJ: ... Z - -< l2D ~;!! ~ z~ ~ Pi g i a ~ . .... .... -II> I.:. co .... o 00 "'" w :... 0'1 -< -< -< -< -< -< -< -< -< -< -< -< -< -< .... .... (!) l!; (!) l!; at l!; (!) l!; (!) ~ (!) ~ (!) l!; ...(!) r+::r.....::rr+:I'"r+::rf"'t:rr+:rr+::r D !!!.._~!!!..~!!!..~!!!.~!!!..~!!!..~!!!..~!!!.- .. C=I'oCo=l'c-c-c-c-c l!: OiD iD iDOiDOiDOiDOiDO::l. 3 3 3 3 333 3 ~ c- c- CT CT CT CT c- c- 6" 0: c: c: 0: 0: 0: 0: 0:::1 [i; .... -II> co w VI e 0'1 i.u N -< -< -< -< -< -< -< [i; [i; .... .... z o ::I ~ 11I '" "C o ::I '" ~. -II> co .... 0'1 ....... i o o -< -< -< -< -< -< -< ~r (\ ~ ::- ,.. ~2 ~ .~ Packet Page -584- . I . . [i; [i; .... .... -II> -II> .... co :-I \D III "'" 8 .... co .... 'i.u .... .... in \D -< -< -< -< -< -< -< -< -< -< -< -< -< -< [i; .... -II> .... .... .... 'i.u o VI o o -< -< -< -< -< -< -< -< -< -< -< [i; C ::I ;:; .... a -II> .... VI N N "'" "'" 00 o ';} ..... !!. -< ~ O'~ ~ '1z ~~ ~~ . "..... ~.". ~~ J'<o 0.... '1z ~<)! ~Q %. ~~ .r: ~i.l'" It ~i.l~ ~:~(q ~~ I~~~~~"O"~ O'~ ~ "fa .~ .->; ~(q ."0 ~ ~-" . O'~ v.". 0.,0' 'f~ ~ ~Q', "'./. '" -< -< 00'" !t~.2. II II II o ." A- c 51 , ~ ; : ...a.::1 o .. DI Ch".::!',I ~N:"l 1O.e.;. ~ ~ II III DI ~ o ~ ~ ~ C III :I 0 :I > ar os::=- ~ III - !!. ::I III: II C 0 lliit'P ~!:I-l::l -a ~ w o - "'" ~.; · ar 5. a: 5" ClQ III ..... ." III n ~ III ClQ II III aroz a: ~ ~ ~ ::l if .. 6" III n DI III II a.. 11I ~ .. ::l E-f!-~ NCIO Nenen ION"'" :E ;::;: ::J III lit !'! "l:I c: ;:; '::1' III lit :r OQ ~ III ::J rt z S' 9 ::J lit c: ;:;' III ::J " r- n ~ ~ ~ ~ ~ "" 'j.... en DO ~ \D en b en DO \D U'I ;... iD !'oJ en -< -< -< -< -< -< -< -< -< -< -< -< -< "l:I ::i 3 III ::J 9 a ... III ~ :i' CIll 5' !" ~ 0' l!: 0' l!: ,..:rr1":r ~~!!!.~ :rc:=:-c:' 0-0- 3 III 3 III C" C" c: c: [;; [;; [;; ~ ~ ~ ~ ~ 'j.... U'I Ul '" 8 8 -< -< -< -< -< -< -< -< c o c: CIll Dr II' 12: :z: g'f :r !!' 5' !" ~ ~ ~ 'j.... "" en 'iD U'I o o o -< -< -< -< -< -< -< 3: III 0.. 0.. o >C 9 ::J lit " 2 ~ o' ::J ~ ... c: 0.. lit o ::J 9 ::J. ~ ... c: ~ o' ::J G) ... o c: -g "l:I III " 8 ~ 9 ::J lit 2 ~ 0' ::J g~g' ::J ::J ::J ~0..::J 2 ~ III a;;:s- o _ n :' Ai . 5'< !" 2/22/2011 Item 13.A.1. C~~ ~ "l:I.a 6" ;- 5. -g l': 9 ~ 9 51 a ::J " r- ~ 2 n 2 a. a. g o VI ::J III R<> < r;' III 0.... l!: .... '::1' III III -0.. -c: a - 3 III C" c: " m o'l!: o'...l!: o'l!: o'l!: o'l!: o'l!: 0' a'::1'~;i;a'::1'"'::1'ai;i O:r ~ o:r go o:r go - ~ ~ ~ - go :;; lI: 3 iD3 ii'3 iD~ iD~ iD~ iD~i C" C" C" C" C" C" C"O c: c: c: c: c: c: C:::1 ~ ~ rn p ~ '::1' n o ::J lit 2 ~ o' ::J -~-.€ ~ ...., I~ ~ ~ I~ .~o'l!: - '-=... '::1' """:::::7""II.!Y ~ ~ 7' I~ =: c: OiD I'U 3 :>-- ~ ~[;; ~ [;; [;; ~ ~ z o ::J . :D III lit -g o ::J lit ~ -< -< -< -< -< -< -< ~~~~~i ~ ~~~~~z-- ;~~~i~ -z' -<Qa ~~ ~~ ~~ >. w ;;I ~ M Packet Page -585- > I ~ [;; ~ ~ ~ b DO "" 'j.... U'I ~ 00 DO -< -< -< -< -< -< -< ~ [;; ~ ~ ~ b U'I "" en w ~ o en -< -< -< -< -< -< -< ~ [;; ~ ~ ~ 8 !'oJ 'iD DO !'oJ o U'I -< -< -< -< -< -< -< ~~ t ~ t' (0 r1 -;. ~ ~ , ;J - ~ ... ~ [;; ~ ~ \D \D DO en o w in DO -< -< -< -< -< -< -< ~ [;; c: :. .. ~ i ~ \D !'oJ DO i.n ~ .... 00 !'oJ tj .. !!. -< ~ O'~ ~ "0-", lilt! \'I .->-; ijI;~ ~", liI~ ~ 0,.. ~ ~c>. ,,~~ <-" ~~o... .... ~ ;'i"~~~ ~ ~i' ~, o...~ 0<< ... to \'1-:.. \'1",= ~~ ~('. ~ 'f", 0'(2 v", o~ -< -< -< -< -< -< '10.: Of! " "", CO"l:l =~s. II II ID O"l:l~ II: ~ , !! ;- : ... D. ::I 00011 c;:.-~':ll c;-"':1 \O~;I li~ II II !;' o ~ { c: III 3 0 3>tJ1 03:c: ~!! II I: ta :il'~ -~'" ... I: W -g :!. .... ;;i · tJI 5- g: :r OQ III .. "l:I III n =- CIll ID lit ll:lCZ ~~~ :6-11 n III en II D. CD C ID ::I lI~rt ~"'1lO "'CI'len \0"''''' 2/22/2011 Item 13.A.1. II GradyMinor Civil Engineers · Land Surveyors · Planners · Landscape Architects October 23, 2009 lIel"e 1I'l'/J OCI ~ (J <'0009 Ms. Theresa Cook Collier County Airport Authority 2005 Mainsail Drive, Suite 1 Naples, FL 34114 RE: CCAAlUSDA Manufacturing Building Immokalee Regional Airport Bid #09-5234 Dear Ms. Cook: We have reviewed the bids submitted by General Contractors to construct the project. There were 23 bids ranging from $729,000.80 to $1,261,669.12. We found some errors in the two (2) lowest bidders. DeAngelis Diamond Construction bid was low at $729,000.80. They had an error in bid items E-5 and E-6. These items are for 5' wide concrete sidewalks 4" and 6" respectively. Their bid unit cost was $2.75 and $3.25 per unit The bid tab unit was square yards however their unit cost is for square feet The result is an additional $23,244.80 bringing their total bid to $752,244.80. This is very close to the second lowest bidder OneSource Construction's total bid of $754,455.00. We reviewed One Somce's bid and they also have an error in addition of line items in their bid schedule 'E'. The correct total for schedule 'E' results in an increase in their total bid of $22,850.00 bringing their correct total bid to $777,305.00. They remain second lowest bidder and DeAngelis is clearly the low bidder. We have worked with DeAngelis Diamond Construction in the past and they are competent contractors. end awarding the contract to DeAngelis Diamond Construction in the correct total 52,244.80. \\\\'\\~ c: . Q. Grady Minor & Associates. P.A. Ph. 239-947-1144- Fx: 239-947-0375 3800 Via Del Rey EB 0005151 - LB 0005151 - LC 26000266 Bonita Springs, FL 34134 G:\PROJ-ENG\C'CCAA20KUSDA\08CDocslOlBidding-Addcnda-COs-Con Bid Ccrt & Rccommcnd(2) 10-23-09.doc www.gradyminor.com Packet Page -586- 2/?2/2011Item 13.A.l. DEANGELIS DIAMOND CONSTRUCTION,INC February 7, 2011 Mrs. Lyn Wood, C.P.M. Collier County Purchasing Bldg. G, 3301 Tamiami Trail East Naples, FL 34112 RE: Material Increases - Metal Building CCAA/USDA Dear Lyn, As requested, please allow me to explain the reason for increases over 100% on the USDAlCCAA project. · A-2 - Fill, haul, spread, shape and compact in place - The original subcontractor's bid we used on this activity is no longer in business and as a result the overall price increased. The original subcontractor may have had excess fill material in a yard or had a deal to purchase it cheaply. · B-1 - Control structure - Again, the original subcontractor we used is no longer in business. · D-2 - 2" PYC water service - The original subcontractor we used in no longer in business. · D-IO - Fire Hydrant Connection - The original subcontractor we used is no longer in business. · E-5/E-6 - In our original bid turned in October 2009, we inadvertently used SF in lieu of SY to compile our bid. This was an error. Should you have any questions or comments, please do not hesitate to call. We look forward to working with you on this project. aye Kovalik Estimator/Project Manager cc: Jay Waltbillig 6635 WILLOW PARK DRIVE. NAPLES. FLORIDA 34109 Packet Page -587-F:239.594.1995 WWW.DEANGELISDIAMOND.COM ri~~ ~ 2/22/?011Item 13.A.1. DEANGELIS DIAMOND CONSTRUCTION, INC CCAA/USDA Manufacturing Building Irnrnokalee Regional Airport Unit Price Increase Table Feburary 7, 2011 I DESCRIPTION I QTY I UNITI Oril!inal I Current I % Cbanl!e I Oril!inaJ I Current I Difference A-I Grubbing 2.6 AC $850.00 $840.00 -1.2% $2,2JO.OO $2,175.60 -$34.40 A-2 Fill Haul, Smead Shane, & Comnact In Place 4.150.0 CY $3.00 $6.67 122.3% $12,450.00 $27,670.13 $15,220.13 A-3 Bahia Sod (dry detention area) 1,050.0 SY $1.70 $1.84 8.]% $1,785.00 $1,929.38 $144.38 A-4 Erosion Control-Silt Fence 1,245.0 LF $1.80 $1.05 -41.7% $2.24100 $],307.25 -$933.75 A-5 Testing Services 1.0 LS $1,500.00 $0.00 -100.0% $1,500.00 $0.00 -$1,500.00 B-1 Control Structure I EA $995.00 $2,205.00 ]21.6% $995.00 $2.205.00 $1,210.00 B-2 15"RCP 448 LF $17.60 $19.85 12.8% $7,884.80 $8,890.56 $1,005.76 B-3 18"RCP 280 LF $22.00 $23.15 5.2% $6.1 60.00 $6.482.70 $322.70 B-4 18" Flared End Section 1 LF $1,J90.00 $1,J68.65 -1.8% $1,190.00 $1,168.65 -$21.35 B-5 Catch Basins 9 EA $1,010.00 $1,349.25 33.6% $9,090.00 $12.143.25 $3,053.25 B-6 Construct Dry Detention Area, SwaJes and Perm iter Berm ] LS $2,500.00 $2,100.00 -16.0% $2,500.00 $2.1 00.00 -$400.00 B-7 Clean-un of drainage svstem & insnection I LS $2,000.00 $1.653.75 -J7.3% $2000.00 $1.653.75 -$346.25 B-8 Remove 35 LF of 18" RCP and mud uo inlet I LS $550.00 $551.25 0.2% $550.00 $551.25 $1.25 D-I 1" PVC Water Serv.ice 78 LF $11.00 $13.23 20.3% $858.00 $1,031.94 $173.94 D-2 2" PVC Water Service 220 LF $7.00 $14.33 104.8% $1,540.00 $3,153.15 $1.6J3.15 D-3 2" Gate Valve w/ Box I EA $425.00 $493.50 16.1% $425.00 $493.50 $68.50 D-4 6" Jumper w/ Backflow Assembly (temn) 1 EA $7.500.00 $2.205.00 -70.6% $7,500.00 $2.205.00 -$5.295.00 D-5 Water Main Connection (cut-in) 1 EA $2,585.00 $2,646.00 2.4% $2,585.00 $2.646.00 $61.00 D-6 Directional Bore 8" Water Main 105 LF $60.00 $66.15 10.3% $6,300.00 $6,945 75 $645.75 D-7 8" PVC Water Main (CL 150) 460 LF $17.00 $18.38 8.1% $7,820.00 $8,452.50 $632.50 D-8 8" Gate Valve w/Box 2 EA $945.00 $J,165.50 23.3% $1,890.00 $2,331.00 $441. 00 D-9 8" Compact Detector Check Assembly Comolete I EA $7.000.00 $10,701.60 52.9% $7,000.00 $10,701.60 $3,701.60 0-10 Fire Hydrant Connection Complete 1 EA $1,000.00 $2,079.00 107.9% $1,000.00 $2,079.00 $1.079.00 0-11 Post Indicator Valve Comlete ] EA $1,345.00 $2,079.00 54.6% $],345.00 $2,079.00 $734.00 D-12 Fire Hydrant (Comnlete Assemblv) 2 EA $2,925.00 $3,570.00 22.1% $5,850.00 $7,140.00 $1.290.00 D-13 8" Air Release Valve I EA $] ,0]0.00 $1.323.00 31.0% $],010.00 $1,323.00 $313.00 D-14 Hydrant Bollards 4 EA $125.00 $1 ]8.86 -4.9% $500.00 $475.44 -$24.56 E-l Tvoe "0" Curb 865 LF $6.00 $7.19 19.9% $5.190.00 $6,221.51 $1,031.51 E-2 I 1/2" Asphaltic Concrete ( Type S-II!) (2 lifts! 4,585 SY $9.00 $7.93 -11.9% $41,265.00 $36,347.59 -$4,9] 741 E-3 8" Limerock Base (compacted and mimed) 5.015 SY $5.00 $6.14 22.9% $25,075.00 $30,804.64 $5,729.64 E-4 12" Stabilized Subgrade 5,620 SY $175 $1.04 -40.6% $9,835.00 $5,841.99 -$3,993.01 E-5 5' Concrete Sidewalk (4" Thick) 528 SY $2.75 $21.00 663.6% $1.452.00 $11,088.00 $9,636.00 E-6 Concrete Sidewalk (6" Thick) 445 SY $3.25 $26.25 707.7% $] ,446.25 $11.681.25 $10,235.00 E-7 Signing & Pavement Markings 1 LS $5,810.00 $4,374.24 -24.7% $5.810.00 $4,374.24 -$1,435.76 E-8 Construct handican ramps 4 EA $325.00 $362.25 ]1.5% $1,300.00 $1,449.00 $149.00 E-9 Install Wheel Stops 67 EA $35.00 $21.00 -40.0% $2,345.00 $1,407.00 -$938.00 E-I0 Loading Ramp Complete 1 LS $17.510.00 $17,5] 0.00 0.0% $]7,510.00 $17,510.00 $0.00 E-I] Provide and install conduit for streetlights & irril!ation 1 LS $2,000.00 $2,000.00 0.0% $2,000.00 $2,000.00 $000 1 ConcretefRe-bar 1 LS 19.0% $130,000.00 $154650.00 $24,650.00 2 Steel (Metal Building) 1 LS 21.2% $]29,78000 $157.263.00 $27.483 00 3 Overhead Doors 1 1.S 22.6% $18,875.00 $23,] 5000 $4.275.00 4 Electrical 1 LS 16.3% $40.493.00 $47.080.00 $6.58700 5 Overhead & Profit of items ]-4 1 LS $3,]50.00 $3,15000 - Remaining .tems for construction ofbUlldmg - no charge I LS $223.68975 $223.68940 $752,24480 $857.04200 Total Chanoe Order $104,797.55 UNIT COST TOTAL PRICE Original bidding subcontractor no longer in business/not qualified 6635 WI LLOW PARK DRIVE. NAPLES. FLORIDA 34109 Packet Page -588-~:239,S94.1995 WWWDEANGELlSDlAMOND.COM