EXECUTIVE SUMMARY
Recommendation to approve a $296,621.99 work order under Request For Quotation 14-6213-121
to Quality Enterprises USA, Inc., for the Manatee Road Potable Water Storage Tank - Upgrades
Project No. 70187 and authorize the necessary budget amendment.
OBJECTIVE: To maintain water quality standards, meet regulatory compliance and ensure reliability of
the Manatee Pump Station.
CONSIDERATIONS: The proposed scope of work under Project 70187, “Manatee Road Potable Water
Storage Tank - Upgrades Project” is consistent with the Capital Improvement Program (CIP) contained in
the 2014 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan
approved by the Board of County Commissioners (Board) on November 10, 2015, Agenda Item 9C, as
Appendix III of the 2015 AUIR/CIE. Funding is available in, and is consistent with, the FY2018 CIP
Budget.
The Manatee Pump Station provides water service to approximately 35,000 residents in the southern
service area, including the Isles of Capri. The station includes a 110-foot diameter, 31-foot-high 2 MG
above ground water storage tank, pump and control building. Tasks include adding a tank mixer, tank
sediment removal, adding a tank parallel fill line, valve replacement and adding a tank level indicator.
Water inside the tank is losing its chlorine residual faster than expected. A water quality consultant
reviewed existing conditions and recommended a tank mixing system. The tank will be drained to install
the tank mixing system thereby allowing sediment removal.
The tank has one single fill point and cannot operate continuously if maintenance or feed valve
replacement is needed. A second parallel fill line will be installed to allow for continuous operation and
maintenance. Fill line improvements include replacement of a 16” valve used to fill the tank, originally
installed in 1982. Work includes installation of an orifice plate to prolong the life of the new 16” valve.
The original tank level indicator no longer functions due to age and will be replaced as is required by the
Manatee Pump Station operating permit.
Request for Quotation 14-6213-121, “Manatee Road Potable Water Storage Tank - Upgrades Project,”
was posted May 4, 2018, and distributed to the six vendors approved for underground utilities the Fixed-
Term Underground Utilities Contract 14-6214 via the county’s electronic quote process. Three vendors
submitted quotations by the May 18, 2018, deadline. The quotations are summarized below:
VENDOR QUOTE
Quality Enterprises USA, Inc. $296,621.99
Douglas N Higgins, Inc. $392,000.00
Mitchell & Stark Construction Co., Inc. $415,000.00
Staff and local engineering consultant, Hole Montes, Inc., determined the lowest quote is fair and
reasonable, and recommend awarding the work order to Quality Enterprises USA, Inc. The Quality
Enterprises USA, Inc., quote is consistent with the project consultant’s $313,000 opinion of probable cost.
The Procurement Services Division concluded the quote was competitive and representative of market
conditions.
There may be unforeseen conditions associated with the project. The solicitation incorporated an
allowance of $25,000 that included, but was not limited to, additional repairs that were not identified
06/26/2018
during the initial inspections, but may be discovered during construction. The price for any additional
work shall be negotiated prior to commencement in accordance with the county’s Procurement Ordinance
and the terms of the agreement.
FISCAL IMPACT: A budget amendment is needed to transfer funds in the amount of $300,000.00 from
“Warren Street WM Looping”, project 70180, and “Trail Blvd. WM Replacement”, project 70181, to the
“Manatee Road Potable Water Storage Tank - Upgrades Project”, Project 70187, to cover construction
costs. The source of funding is the Water User Fees Fund (412). This is a repair/replacement project;
therefore, operating costs are not expected to change.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority
vote for Board approval. -SRT
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of
the Collier County Water-Sewer District, approves a $296,621.99 work order under Request for
Quotation 14-6213-121 to Quality Enterprises USA, Inc.; authorizes the Chairman to sign and execute the
attached work order; and authorizes the necessary budget amendment.
Prepared By: Shon Fandrich, Senior Project Manager, Public Utilities Engineering & Project
Management
ATTACHMENT(S)
1. Attachment No 1 - RFQ 14-6213-121 Quote Tabulation (PDF)
2. Attachment No 2 - RFQ 14-6213-121 Quote Analysis (PDF)
3. Attachment No 3 - RFQ 14-6213-121 Request for Quotation and Quote schedule (PDF)
4. Attachment No 4 - Low Quote Recommendation Letter (PDF)
5. Attachment No 5 - Work Order (PDF)
06/26/2018
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.10
Doc ID: 5853
Item Summary: Recommendation to approve a $296,621.99 work order under Request For
Quotation 14-6213-121 to Quality Enterprises USA, Inc., for the Manatee Road Potable Water Storage
Tank - Upgrades Project No. 70187 and authorize the necessary budget amendment.
Meeting Date: 06/26/2018
Prepared by:
Title: – Public Utilities Planning and Project Management
Name: Shon Fandrich
06/07/2018 2:18 PM
Submitted by:
Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management
Name: Tom Chmelik
06/07/2018 2:18 PM
Approved By:
Review:
Water Pamela Libby Additional Reviewer Completed 06/07/2018 2:50 PM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 06/07/2018 3:22 PM
Water Beth Johnssen Additional Reviewer Completed 06/07/2018 3:28 PM
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 06/07/2018 3:59 PM
Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 06/07/2018 4:34 PM
Procurement Services Ted Coyman Additional Reviewer Completed 06/07/2018 6:20 PM
Public Utilities Planning and Project Management Oscar Martinez Additional Reviewer Completed 06/12/2018 8:47 AM
Procurement Services Swainson Hall Additional Reviewer Completed 06/12/2018 5:02 PM
Public Utilities Department Sarah Hamilton Level 1 Division Reviewer Completed 06/13/2018 8:58 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 06/13/2018 9:01 AM
County Attorney's Office Scott Teach Level 2 Attorney Review Completed 06/14/2018 3:22 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/18/2018 10:40 AM
Budget and Management Office Mark Isackson Additional Reviewer Completed 06/18/2018 11:34 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/18/2018 1:19 PM
County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/18/2018 3:04 PM
Board of County Commissioners MaryJo Brock Meeting Pending 06/26/2018 9:00 AM
Item Estimated
Quality Ent
USA
Higgins Mitchell &
Stark
SW Utility Kyle Const Haskins
No.Description Unit Quantity Total Total Total Total Total Total
1 Mobilization (Maximum of 6% of total All Bid Items) LS 1 $17,664.00 $ 23,500.00 $ 23,000.00 No Quote No Quote No Quote
2
Modifications of existing Altitude Valve Assembly No.
1 and New Butterfly Valve and Actuator LS 1 $19,514.40 $ 30,500.00 $ 28,000.00 No Quote No Quote No Quote
3 New Parallel Altitude Valve Assembly No. 2 LS 1 $29,915.65 $ 52,500.00 $ 54,000.00 No Quote No Quote No Quote
4 Existing Site Piping Modifications and Extension LS 1 $43,527.92 $ 15,500.00 $ 79,500.00 No Quote No Quote No Quote
5 Tank Mixing System w/Cleaning and Disinfection LS 1 $68,510.40 $ 95,000.00 $ 78,000.00 No Quote No Quote No Quote
6 Tank Liquid Level Indicator LS 1 $14,100.00 $ 15,000.00 $ 15,000.00 No Quote No Quote No Quote
7 Electrical & Instrumentation and PLC/HMI Hardware LS 1 $51,600.00 $100,000.00 $ 75,000.00 No Quote No Quote No Quote
8
All other Contract Work including miscellaneous and
site work. LS 1 $15,029.62 $ 23,000.00 $ 25,000.00 No Quote No Quote No Quote
9
Demobilization, Project As-Built Drawings, As-Built
Survey and Digital Files (Minimum of 3% of Total All
Bid Items) LS 1 $11,760.00 $ 12,000.00 $ 12,500.00 No Quote No Quote No Quote
10
Allowance Fund for Owner’s use as directed. This fund
will be used only at the Owner's direction to accomplish
work due to unforeseen conditions. Inclusion of the
Allowance Funds as part of the Contract Price is not a
guarantee that the Contractor will be paid any portion or
the full amount of any Allowance Fund Item.LS Refer to Contract $25,000.00 $ 25,000.00 $ 25,000.00 No Quote No Quote No Quote
TOTAL PRICE FOR ITEMS 1 THROUGH 10 296,621.99$ 392,000.00$ 415,000.00$ No Quote No Quote No Quote
COLLIER COUNTY QUOTE TABULATION:
COLLIER COUNTY QUOTE UNDER ARGREEMENT: 14-6213-121
QUOTATION OPENING DATE: MAY 18, 2018
MANATEE ROAD POTABLE WATER STORAGE TANKS - UPGRADES
H:\_PUD Capital Project Files\412 ‐ Water User Fee Fund\70187 Manatee GST Upgrade\70187.1 Manatee GST Upgrades Constr\Executive summary\Working\RFQ 14‐6213‐121 Quote
Tabulation.xlsx
Attachment 2$0$50,000$100,000$150,000$200,000$250,000$300,000$350,000$400,000$450,000$500,000Quote AnalysisRFQ 14‐6213‐121 (Manatee Road Water Storage Tank ‐ Upgrades)KEY:Dashed Green‐AVERAGE BIDDashed black‐+/‐ 1 std devof avgbidDottedred‐+/‐ 20% of engestimate forhorizontalconstruction
COLLIER COUNTY QUOTE NO. _#14-6213-121__________
QUOTATION OPENING DATE _5/18/18________
MANATEE ROAD POTABLE WATER
STORAGE TANKS - UPGRADES
Item Estimated
No. Description Units Quantity Total
1 Mobilization (Maximum of 6% of total All Bid Items) LS 1
$17,664.00
2 Modifications of existing Altitude Valve Assembly No. 1 and New
Butterfly Valve and Actuator
LS
1
$19,514.40
3 New Parallel Altitude Valve Assembly No. 2
LS
1
$29,915.65
4 Existing Site Piping Modifications and Extension
LS
1
$43,527.92
5 Tank Mixing System w/Cleaning and Disinfection
LS
1
$68,510.40
6 Tank Liquid Level Indicator
LS
1
$14,100.00
7 Electrical & Instrumentation and PLC/HMI Hardware
LS
1
$51,600.00
8 All other Contract Work including miscellaneous and site work.LS 1
$15,029.62
9 Demobilization, Project As-Built Drawings, As-Built Survey and
Digital Files (Minimum of 3% of Total All Bid Items)LS 1
$11,760.00
10
Allowance Fund for Owner’s use as directed. This fund will be used
only at the Owner's direction to accomplish work due to unforeseen
conditions. Inclusion of the Allowance Funds as part of the Contract
Price is not a guarantee that the Contractor will be paid any portion
or the full amount of any Allowance Fund Item.
LS
$25,000.00
TOTAL PRICE FOR ITEMS 1 THROUGH 10 $__296,621.99___
H:\_PUD Capital Project Files\412 ‐ Water User Fee Fund\70187 Manatee GST Upgrade\Construction Bid Package Received\Quality\Copy of 2. RFQ 14‐
6213‐121 Quote Schedule.xlsx
IRM
HOLE MONTES
ENGINEERS • PLANNERS • SURVEYORS
950 Encore Way • Naples, Florida 34110 • Phone 239.254.2000 • Fax: 239.254.2099
May 29, 2018
Shon Fandrich, Senior Project Manager
Collier County Public Utilities
3339 Tamiami Trail East Suite 303
Naples FL 34112
RE: EVALUATION OF. QUOTATIONS
MANATEE ROAD POTABLE WATER STORAGE TANK UPGRADES
HM File No. 2017.062
Dear Shon,
We have reviewed the three quotes received by the County for the Manatee Road Potable Water
Storage Tank Upgrades for County Quote No. 14-6213-121. The bidders and their quoted price
are identified below as provided by the County Procurement Services Division. The apparent
low quote is from Quality Enterprises USA, Inc. in the amount of $296,621.99.
Quality Enterprises USA, Inc. has successfully completed other construction projects in Collier
County and has completed other similar projects. The engineer's estimate is $313,000.00.
Therefore, we recommend award of this construction contract to Quality Enterprises USA, Inc.
in the amount of $296,621.99 subject to a final review by the Procurement Services Division of
the quotation documents.
Please contact us if there are any questions about this quote evaluation.
Thank you,
HOLE MONTES, INC.
AdvidW. Schmitt, P.E.
Vice President
DWS:dlh
C: Alicia Abbott, Collier County
Pamela Libby, Collier County
Jerry Taricska, Hole Montes
HA2017\20170MEN\C Correspondence\Cl Client Cortspondence\20180529 SF Award Letter DWS.docx
Naples • Fort Myers
Bidder
Bid
1
Quality Enterprises USA, Inc.
I $296,621.99
2
D.N. Higgins, Inc.
I $392,000.00
3
Mitchell & Stark Const. Co. Inc.
$415,000.00
Quality Enterprises USA, Inc. has successfully completed other construction projects in Collier
County and has completed other similar projects. The engineer's estimate is $313,000.00.
Therefore, we recommend award of this construction contract to Quality Enterprises USA, Inc.
in the amount of $296,621.99 subject to a final review by the Procurement Services Division of
the quotation documents.
Please contact us if there are any questions about this quote evaluation.
Thank you,
HOLE MONTES, INC.
AdvidW. Schmitt, P.E.
Vice President
DWS:dlh
C: Alicia Abbott, Collier County
Pamela Libby, Collier County
Jerry Taricska, Hole Montes
HA2017\20170MEN\C Correspondence\Cl Client Cortspondence\20180529 SF Award Letter DWS.docx
Naples • Fort Myers
WORK O ER/PURCHASI ORDER
Contract 14-621 `Underground Utility Con� �tActors"
Contract Expiration Date: July 7, 2020
This Work Order is for General Utility services for work known as:
Project Name: Manateeoad Potable Water Storage Tank — Upgrades RFQ 14-6213-121
Project No: 70187.1/
The work is specified in the proposal dated May 18, 2018 which is attached hereto and made a part of
this Work Order. In accordance nth Terms and Conditions of the Agreement referenced above,
Request for Quotation #146213421, and addendum 1, this Work Order/Purchase Order is assigned
to: Quality Enterprises USA, Inc.
Scope of Work• As detailed in the attached proposal and the following:
Task I Manatee Road Potable Water Storage Tank — Upgrades RFQ 14-6213-121,
Task II Task Allowance/
Schedule of Work: Complete work within 90 days from the date of the Notice to Proceed which is
accompanying this Work Order, The Copt�ultant agrees that any Work Order that extends beyond the
expiration date of Agreement ## 14-6213/will survive and remain subject to the terms and conditions of
that Agreement until the completion or termination of this Work Order.
G( ensition: In accordance with the Agreement refe enced above, the County will compensate the
Firm in accordance with following met od(s): [RNe'tiated Lump Sum (NLS
Reimbursable Costs LS+RC ) ❑Lump Sum Plus
( ) NTim Material (T&.M) (established hourly rate — Schedule A) ❑
Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the
attached proposal,
Task I $ 271,621,99 L�
Task I[ 1 25 000,00 T&
TOTAL FEE $ 296,621,99/
PREPARED B
�Iandrii, Senior Project Manager
�3 ZZo/8
Date _
RFP# 146213.121
APPROVED BY: } t i) 1.
Pa e!a Libby, Distribution ani,. ollfteld Manager � date
APPROVED BY; ' 8
Osev Martinez—,Y, Pr'i Project Manager Date
APPROVED BY: I�J�41t,
Tort0fimclik, PA., Director ata
AX!J
PPROVED RYA, jP IP>
Stcsv�,61Vicasn , Water Director Date
APPROVED BY:
Joe 0.vi one, Utilities Operations Support Director Tate
APPROVED BY: {.-=s_-��.�
—a'.— /w/,--)
George Yilmaz, Publie Utilities AdmInistrator
By the signature below, the Firm (including employees, ofiioers and/or agents) certifies, and hereby
discloses, that, to The best of their knowledge and belief, all relevant facts concerning past, present, or
currently planned interest or atitivity (financial, contractual, organizational, or otherwise) which relates
to the proposed work, and beer on whether the Firm has a potential conflict have been fully disclosed.
Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours ofleaming
of any actual orpotentlat conflict of interest that arises during the Work Order and/or project duration.
ACCE>'MD BY: Quality Entc rises USA, Inc.
�J// 6/4/18
Name (Si & Pr nt &- mile Of AuthorInd Officer 'Date
A 114on A. Nurxell, Corpordt e 'Offtear,
(RmalnAr of page inteWtonally lqft blank)
6* T
1
P40 .2 of 3
(1)
RFP# 14-6213-121
IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or
agent, have executed this Work Order on the date and year first written below.
ATTEST:
Dwight E. Brock, Clerk of Courts
By:
Dated:
(SEAL)
Hrst W itney'
Margarita Ne ron
TType/print witness nameT
�I �.
Second Witness
Marcie Cohen.
TType/print witness nameT
Approved as to Form and Legality:
Assistant County Attorney
Print Name
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
LN
Andy Solis, Chairman
Quality Enterprises
By:
icer
4
Page 3 of 3
COLLIER COUNTY QUOTE TABULATION:
COLLIER COUNTY QUOTE UNDER ARGREEMENT: 14-6213-121
QUOTATION OPENING DATE: MAY 18, 2018
MANATEE ROAD POTABLE WATER STORAGE TANKS - UPGRADES
Quality Ent
Higgins
Mitchell S
SW Utility
Kyle Const
Haskins
Estimated
USA
Stark
FNo.
Description
Unit
Quantity
Total
Total
Total
Total
Total
Total
1
Mobilization (Maximum of 6% of total All Bid Items)
LS
1
$17,664,00
$ 23,500,00;
$ 23,000,00
No Quote
No Quote
No Quote
Modifications of existing Altitude Valve Assembly No.
2
1 and New Butterfly Valve and Actuator
LS
1
$19,514.40
$ 30,500.00
$',28,000.00
No Quote
No Quote
No Quote
3
New Parallel Altitude Valve Assembl No. 2
LS
1
$29,915.65
$ 52.500.00
$ 54,000.00
No Quote
No Quote
No Quote
4
Existing Site Piping Modifications and Extension
LS
1
$43,527.92
$ 15,500.00
$ 79,500.00
No Quote
No Quote
No Quote
5
Tank Mixing System w/Cleaning and Disinfection
LS
1
$68,510.40
$ 95,000.00
$ 78,000.00
No Quote
No Quote
No Quote
6
Tank Liquid Level Indicator
LS
1
$14,100.00
$ 15,000.00
$ 15,000.00
No Quote
No Quote
No Quote
7
Electrical & Instrumentation and PLC/HMI Hardware
LS
1
$51,600.00
$100,000.00
$ 75,000.00
No Quote
No Quote
No Quote
All other Contract Work including miscellaneous and
8
site work.
LS
1
$15,029.62
$ 23,000,00'
$ 25,000,00
No Quote
No Quote
No Quote
Demobilization, Project As-Built Drawings, As-Built
Survey and Digital Files (Minimum of 3% of Total All
9
Bid Items)
LS
1
$11,760.00
$ 12,000.00
$ 12,500.00
No Quote
No Quote
No Quote
Allowance Fund for Owners use as directed. This fund
will be used only at the Owner's direction to accomplish
work due to unforeseen conditions. Inclusion of the
Allowance Funds as part of the Contract Price is not a
guarantee that the Contractor will be paid any portion or
10
the full amount of any Allowance Fund Item.
LS
Refer to Contract
$26,000.001
$ 25,000.001
$ 25,000.00
No Quote
No Quote
No Quote
TOTAL. PRICE FOR ITEMS 1 THROUGH 10 ;$296,621.49 1 $ 992 OMOO $ 415,000.00< No Quote lNoQuote NQucit,