Loading...
Agenda 06/26/2018 Item #16A 306/26/2018 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Winding Cypress Phase 3, (Application Number PL20170003951) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. _____________________________________________________________________________________ OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Winding Cypress Phase 3, a subdivision of lands located in Sections 2 and 3, Township 51 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Winding Cypress Phase 3. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Winding Cypress PUD. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of Winding Cypress Phase 3 be approved for recording. FISCAL IMPACT: The project cost is $3,365,440.51 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $1,188,410.76 b) Drainage, Paving, Grading $2,177,029.75 The Security amount, equal to 110% of the project cost, is $3,701,984.56 The County will realize revenues as follows: Fund: Growth Management Planning Services Fund (131) Agency: County Manager Cost Center: Land Development Services (138327) Revenue generated by this project: Total: $102,388.21 The Fees are based on a construction estimate of $3,365,440.51 and were paid in February 2018. 16.A.3 Packet Pg. 533 06/26/2018 The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,425.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $ 8,913.08 c) Drainage, Paving, Grading (.75% const. est.) $ 16,327.72 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $ 26,739.24 e) Drainage, Paving, Grading (2.25% const. est.) $ 48,983.17 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Winding Cypress Phase 3 (Application Number PL20170003951) for recording with the following stipulations: 1. Approve the amount of $3,701,984.56 as performance security for the required improvements; or such Lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a.To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b.To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney’s office and the Board of County Commissioners or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Plat Map (PDF) 3. Opinion of Probable Cost (PDF) 16.A.3 Packet Pg. 534 06/26/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.3 Doc ID: 5719 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Winding Cypress Phase 3, (Application Number PL20170003951) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 06/26/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 05/18/2018 9:11 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 05/18/2018 9:11 AM Approved By: Review: Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 05/18/2018 10:40 AM Growth Management Development Review Chris Scott Additional Reviewer Completed 05/21/2018 1:47 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 05/22/2018 8:25 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 05/22/2018 8:48 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 05/22/2018 4:39 PM Growth Management Department Matthew McLean Additional Reviewer Completed 05/23/2018 4:31 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/23/2018 5:48 PM Growth Management Department James French Deputy Department Head Review Completed 05/24/2018 3:27 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 05/24/2018 3:46 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/25/2018 9:50 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/25/2018 1:48 PM Office of Management and Budget Allison Kearns Additional Reviewer Completed 05/29/2018 11:46 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/14/2018 2:41 PM Board of County Commissioners MaryJo Brock Meeting Pending 06/26/2018 9:00 AM 16.A.3 Packet Pg. 535 WINDING CYPRESS PHASE 3 LOCATION MAP 16.A.3.a Packet Pg. 536 Attachment: Location Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 537Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 538Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 539Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 540Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 541Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 542Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 543Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 544Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) 16.A.3.bPacket Pg. 545Attachment: Plat Map (5719 : Final Plat - Winding Cypress Phase 3) (S) SANITARY SEWER SUB‐TOTAL $749,168.76 (W) POTABLE WATER SUB‐TOTAL $439,242.00 ESTIMATED UTILITY CONSTRUCTION COST $1,188,410.76 (D) STORM DRAINAGE SUB‐TOTAL $996,247.44 (P) PAVING AND GRADING SUB‐TOTAL $1,028,083.71 (L) LIGHTING SUB‐TOTAL (3)$96,550.00 (L) LANDSCAPING & IRRIGATION SUB‐TOTAL (2)$56,148.60 ESTIMATED SITE CONSTRUCTION COST $2,177,029.75 Due at  Submittal Due at  Permit  Approval $8,913.08 $26,739.24 $16,327.72 $48,983.17 $25,240.80 $75,722.41 Note: Keisha M. Westbrook, P.E. #65023 Winding Cypress Phase 3 Preliminary Engineer's Opinion of Probable Costs SUMMARY State of Florida Business Certificate No. EB‐0007663 1. This Engineer's Opinion of Probable Cost represents the estimated cost for constructing the above listed  infrastructure for Winding Cypress (RWA, Inc. File No. 020054.00.02 ). PPL Fee Calculations for Utility Construction 0.75% for Construction Document Review 2.25% for Construction Inspection PPL Fee Calculations for Site Construction 0.75% for Construction Document Review 2.25% for Construction Inspection TOTAL PPL FEE BASED ON OPC 2. Landscaping & Irrigation Cost Estimate provided by Outside Productions Inc 3. Lighting Cost Estimate provided by Land Consult, LLC RWA, Inc. 6610 Willow Park Drive, Ste 200 Naples, Florida 34109 4983 Royal Gulf Circle Fort Myers, Florida 33966 Phone: (239) 597‐0575 Fax: (239) 597‐0578 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 546 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3) Project: Winding Cypress Phase 3 Date:  April 13,2018 Estimated By:  RLJ Checked By:  KMW GENERAL DESCRIPTION UNIT QUANTITY UNIT COST TOTAL G‐1 Mobilization LS 1 $155,000.00 $155,000.00 G‐2 Clearing & Topsoil/Vegetation Removal & Stockpile AC 59.0 $4,000.00 $236,040.00 G‐3 Staked Silt Fence LF 10,012 $1.25 $12,515.00 General Sub‐Total $403,555.00 State of Florida Business Certificate No. EB‐0007663 Preliminary Engineer's Opinion of Probable Costs K:\2002\020054.00.02 Winding Cypress PH 3 PPL, ERP\001 Engineering Design, Plan & Permit Approvals\Calculations\Quantities\2018‐04‐13 OPC General 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 547 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3) Project: Winding Cypress Phase 3 Date:  April 13,2018 Estimated By:  RLJ Checked By:  KMW EARTHWORK DESCRIPTION UNIT QUANTITY UNIT COST TOTAL E‐1 Lake Excavation (Topsoil & Sand, can be used in berm areas) BCY 311,511 $1.50 $467,266.50 E‐2 Lake Excavation (Rock) BCY 133,505 $2.00 $267,010.00 E‐3 Dewatering LS 1 $75,000.00 $75,000.00 E‐4 Rock Blasting AC 25.3 $75,000.00 $1,896,750.00 E‐5 Load & Haul Lake Excavation to Lots (Includes rock bury) BCY 422,500 $1.25 $528,125.00 E‐6 Place, Compact & Fine Grade BCY 422,500 $0.50 $211,250.00 Earthwork Sub‐Total $3,445,401.50 State of Florida Business Certificate No. EB‐0007663 Preliminary Engineer's Opinion of Probable Costs K:\2002\020054.00.02 Winding Cypress PH 3 PPL, ERP\001 Engineering Design, Plan & Permit Approvals\Calculations\Quantities\2018‐04‐13 OPC Earthwork 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 548 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3) Project: Winding Cypress Phase 3 Date:  April 13,2018 Estimated By:  RLJ Checked By:  KMW SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT COST TOTAL S‐1 8" PVC Sanitary Sewer Main (0'‐6' Cut) LF 1,435 $35.00 $50,227.80 S‐2 8" PVC Sanitary Sewer Main (6'‐8' Cut) LF 1,472 $45.00 $66,243.15 S‐3 8" PVC Sanitary Sewer Main (8'‐10' Cut) LF 1,553 $55.00 $85,404.00 S‐4 8" PVC Sanitary Sewer Main (10'‐12' Cut) LF 1,380 $65.00 $89,709.10 S‐5 8" PVC Sanitary Sewer Main (12'‐14' Cut) LF 414 $75.00 $31,027.50 S‐6 8" PVC Sanitary Sewer Main (Over 14' depth) LF 949 $76.00 $72,130.08 S‐6 4' Diameter Manhole (0'‐6' Depth) EA 5 $5,000.00 $25,000.00 S‐7 4' Diameter Manhole (6'‐8' Depth) EA 6 $5,500.00 $33,000.00 S‐8 4' Diameter Manhole (8'‐10' Depth) EA 4 $6,500.00 $26,000.00 S‐9 4' Diameter Manhole (10'‐12' Depth) EA 5 $8,000.00 $40,000.00 S‐10 4' Diameter Manhole (12'‐14' Depth) EA 2 $9,000.00 $18,000.00 S‐11 4' Diameter Manhole (Over 14' Depth) EA 4 $9,001.00 $36,004.00 S‐11 Drop Manhole Connection EA 1 $4,000.00 $4,000.00 S‐12 Sewer Lateral (Double) EA 92 $900.00 $82,800.00 S‐13 Sewer Lateral (Single) EA 17 $600.00 $10,200.00 S‐14 Television Inspection LF 6,254 $2.50 $15,634.48 S‐15 Rock Excavation LF 1,876 $34.00 $63,788.66 Sanitary Sewer Sub‐Total $749,168.76 State of Florida Business Certificate No. EB‐0007663 Preliminary Engineer's Opinion of Probable Costs K:\2002\020054.00.02 Winding Cypress PH 3 PPL, ERP\001 Engineering Design, Plan & Permit Approvals\Calculations\Quantities\2018‐04‐13 OPC Sanitary Sewer 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 549 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3) Project: Winding Cypress Phase 3 Date:  April 13,2018 Estimated By:  RLJ Checked By:  KMW POTABLE WATER DESCRIPTION UNIT QUANTITY UNIT COST TOTAL W‐1 8" PVC Water Main (C‐900, DR 18, PC150) LF 3,876 $22.00 $85,272.00 W‐2 8" PVC Water Main (C‐900, DR 14, PC150) LF 445 $25.00 $11,125.00 W‐3 10" PVC Water Main (C‐900, DR 18, PC150) LF 3,235 $25.06 $81,069.10 W‐4 10" PVC Water Main (C‐900, DR 14, PC150) LF 35 $30.00 $1,050.00 W‐5 8" Gate Valve w/Box EA 5 $1,300.00 $6,500.00 W‐6 10" Gate Valve w/Box EA 5 $1,700.00 $8,500.00 W‐8 Fire Hydrant Assembly w/Valve EA 16 $4,200.00 $67,200.00 W‐9 Permanent Sample Point EA 4 $2,000.00 $8,000.00 W‐10 Connect to Existing 10" Valve EA 2 $3,487.95 $6,975.90 W‐11 Water Services (Double) EA 76 $1,300.00 $98,800.00 W‐12 Water Services (Single) EA 49 $750.00 $36,750.00 W‐13 Air Release Valves EA 2 $4,000.00 $8,000.00 W‐13 Automatic Flushing Device EA 3 $4,000.00 $12,000.00 W‐14 Temporary Gap Configuration EA 2 $4,000.00 $8,000.00 Potable Water Sub‐Total $439,242.00 State of Florida Business Certificate No. EB‐0007663 Preliminary Engineer's Opinion of Probable Costs K:\2002\020054.00.02 Winding Cypress PH 3 PPL, ERP\001 Engineering Design, Plan & Permit Approvals\Calculations\Quantities\2018‐04‐13 OPC Potable Water 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 550 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3) Project: Winding Cypress Phase 3 Date:  April 13,2018 Estimated By:  RLJ Checked By:  KMW STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT COST TOTAL D‐1 10" HDPE Yard Drain Pipe LF 3,728 $28.68 $106,919.04 D‐2 15" RCP Pipe LF 1,661 $35.00 $58,135.00 D‐3 18" RCP Pipe LF 1,439 $45.00 $64,755.00 D‐4 24" RCP Pipe LF 637 $67.00 $42,679.00 D‐5 36" RCP Pipe LF 1,611 $100.00 $161,100.00 D‐6 24" RCP Pipe LF 99 $57.00 $5,643.00 D‐7 FDOT 'C' Inlet EA 8 $3,700.00 $29,600.00 D‐8 3' x 4' Valley Gutter Inlet EA 25 $4,000.00 $100,000.00 D‐9 FDOT Type 9 Inlet EA 5 $3,700.00 $18,500.00 D‐10 Yard Drain EA 33 $1,100.00 $36,300.00 D‐11 Control Structure (CS‐1) EA 1 $4,200.00 $4,200.00 D‐12 Control Structure/Tideflex and pipes at preserve (TF‐2) EA 1 $20,000.00 $20,000.00 D‐13 15" FES EA 2 $1,000.00 $2,000.00 D‐14 18" FES EA 7 $1,200.00 $8,400.00 D‐15 24" FES EA 4 $1,250.00 $5,000.00 D‐16 36" FES EA 8 $1,750.00 $14,000.00 D‐17 Box Culvert (8'W x 4'H) EA 14 $13,500.00 $189,000.00 D‐18 Box Culvert (10'W x 5'H) EA 1 $15,000.00 $15,000.00 D‐19 Wildlife Crossing (7'W x 5'H) EA 1 $9,000.00 $9,000.00 D‐20 Spreader Swale LF 85 $30.00 $2,550.00 D‐21 Rock Excavation LF 2,723 $38.00 $103,466.40 Storm Drainage Sub‐Total $996,247.44 State of Florida Business Certificate No. EB‐0007663 Preliminary Engineer's Opinion of Probable Costs K:\2002\020054.00.02 Winding Cypress PH 3 PPL, ERP\001 Engineering Design, Plan & Permit Approvals\Calculations\Quantities\2018‐04‐13 OPC Storm Drainage 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 551 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3) Project: Winding Cypress Phase 3 Date:  April 13,2018 Estimated By:  RLJ Checked By:  KMW PAVING AND GRADING DESCRIPTION UNIT QUANTITY UNIT COST TOTAL P‐1 12" Stabilized Subgrade (LBR 40) SY 30,539 $2.50 $76,347.50 P‐2 8" Limerock Base (LBR 100) SY 23,519 $9.70 $228,134.30 P‐3 3/4" Type S‐III ACSC (1st Lift) SY 23,519 $5.20 $122,298.80 P‐4 3/4" Type S‐III ACSC (Final Lift) SY 23,519 $7.85 $184,624.15 P‐5 Concrete Valley Gutter LF 12,166 $9.50 $115,577.00 P‐6 Type 'D' Curb LF 1,013 $10.70 $10,839.10 P‐7 Type 'F' Curb LF 2,002 $15.00 $30,030.00 P‐9 5' Sidewalk (common areas) LF 12,773 $14.50 $185,208.50 P‐10 ADA Curb Ramps EA 10 $286.00 $2,860.00 P‐11 Sod (Inside ROW) SY 10,499 $1.99 $20,893.01 P‐12 Signing and Striping LS 1 $15,071.35 $15,071.35 P‐14 Transition Curb (Valley Gutter to 'F' Curb) LF 10 $20.00 $200.00 P‐15 Rip‐Rap CY 120 $300.00 $36,000.00 Paving and Grading Sub‐Total $1,028,083.71 State of Florida Business Certificate No. EB‐0007663 Preliminary Engineer's Opinion of Probable Costs K:\2002\020054.00.02 Winding Cypress PH 3 PPL, ERP\001 Engineering Design, Plan & Permit Approvals\Calculations\Quantities\2018‐04‐13 OPC Paving & Grading 4/13/2018 4:22 PM 16.A.3.c Packet Pg. 552 Attachment: Opinion of Probable Cost (5719 : Final Plat - Winding Cypress Phase 3)