Loading...
Agenda 06/26/2018 Item #16A 106/26/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Winding Cypress Phase 2A, PL20160001891 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Winding Cypress Phase 2A, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on September 1, 2016. At that time, the value of these potable water and sewer utility facilities (assets) was $317,230.71 and $424,596.18, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5315, at Page 16, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on May 9, 2018 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4,000. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water-Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $741,826.89 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.1 Packet Pg. 507 06/26/2018 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Winding Cypress Phase 2A, PL20160001891 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.1 Packet Pg. 508 06/26/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.1 Doc ID: 5657 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Winding Cypress Phase 2A, PL20160001891 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 06/26/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 05/11/2018 9:19 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 05/11/2018 9:19 AM Approved By: Review: Wastewater Steve Nagy Additional Reviewer Completed 05/11/2018 9:41 AM Wastewater Beth Johnssen Additional Reviewer Completed 05/11/2018 9:42 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 05/11/2018 10:11 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 05/11/2018 10:19 AM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 05/11/2018 11:21 AM Water Steve Messner Additional Reviewer Completed 05/15/2018 9:16 AM Water Pamela Libby Additional Reviewer Completed 05/15/2018 3:58 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 05/22/2018 4:13 PM Growth Management Department Matthew McLean Additional Reviewer Completed 05/23/2018 4:28 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 05/23/2018 5:47 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 05/24/2018 3:25 PM Growth Management Department James French Deputy Department Head Review Completed 05/24/2018 3:25 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/24/2018 4:42 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/25/2018 9:11 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 05/25/2018 11:03 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/14/2018 2:35 PM 16.A.1 Packet Pg. 509 06/26/2018 Board of County Commissioners MaryJo Brock Meeting Pending 06/26/2018 9:00 AM 16.A.1 Packet Pg. 510 WINDING CYPRESS PHASE 2A LOCATION MAP 16.A.1.a Packet Pg. 511 Attachment: Location Map (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2016342347 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.1.b Packet Pg. 512 Attachment: Exhibit A (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A) VERIFICATION OF FINAL COST (SEWER) PROJECT NAME Winding Cypress Phase 2A LOCATION Sections 26/35, Township 50 South, Range 26 East NAME & ADDRESS OF OWNER Divosta Homes, L.P. 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS AND LABOR) TOTAL $532,255.85 $36,148.75 $74,580.07 |JT|M SIZE QUAN. UNIT COST PVC (SDR 26) Single Services w/ Cleanouts Double Services w/ Cleanouts CL 200 PVC (DR 14) CL 150 PVC (DR 18) HDPE Plug Valve Air Release Valve Pump Station Manhole 8" 8.953 LF $5945 $657 25 $697.01 $21 78 $20.53 $28 21 $2,477 98 $7,261.95 $191,298 00 $4,721.58 6" 55 EA 6" 107 EA 6" $2,874.96 $44,098.44 $2,567.11 $4,955.96 $7,261.95 $191.298.00 $160,533.72 132 EA 6" 2,148 LF 6" 91 LF 6" 2 EA N/A 1 EA N/A EA 1 N/A 34 EA TOTAL COST $1,056,574.81 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: Jayson O/esfihnick OF: Haleakala Construction 5758 Taylor Road, Naples, FL 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this c^9 day of ZKXy . Io.^%\ % 2016 by Jayson Oreschnick who is personally known to me and who did not take an oath. | * % 2 + \ \ \ 044507 : = 16.A.1.b Packet Pg. 513 Attachment: Exhibit A (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A) VERIFICATION OF FINAL COST (WATER) PROJECT NAME: Winding Cypress Phase 2A LOCATION. Sections 26/35, Township 50 South, Range 26 East NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM POTABLE WATER (MATERIALS AND LABOR) TOTAL | SIZE QUAN. UNIT COST ITEM |CL 150 PVC (DR18) CL 150 PVC (DR18) CL 150 PVC (DR18) CL 200 PVC (DR14) CL 150 PVC (DR14) CL 200 PVC (DR14) $32 75 $69,495.50 $25.04 $32,777.36 $19.20 $113,011.20 $34.62 $2,977 32 $29.63 $1,007.42 $21.14 $5,348.42 $64.90 $5,905.90 $2,42063 $14,523.78 $2,003.80 $8,015.20 $1,926 04 $32,742.68 $4,534.56 $104,294.88 $79648 $27,08032 5989.95 $114,834.20 $6,256.66 $18,769.98 $1,852.70 $5,558 10 $1,714.37 $6,85748 12" 2122 LF 10" 1309 LF 8" 5886 LF 12" 86 LF 10" 34 LF 8" 253 LF 12" LF 91 DIP 12" 6 EA Gate Valve & Valve Box Gate Valve & Valve Box Gate Valve & Valve Box Fire Hydrant Assembly PVC Single Service w/ Meter Double Water Service, Complete Automatic Flushing Device Permanent Sample Point Air Release Valve 10" EA 4 8" 17 EA N/A 23 EA N/A EA 34 N/A EA 116 N/A 3 EA N/A 3 EA N/A EA 4 TOTAL COST $563,199.74 CERTIFYING: J ay son (predchnick OF: Haleakala Construction 5758 Taylor Road, Naples. FL 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 2 f day (tf''ij/Ctft/ 2016 by Jayson Oreschnick who is personally known to me —' "•*—• and who did not / \ 11 a • — -!</)« « = '£* • rFFO+150/ • ^ :* = • • m SEAL: : 5 16.A.1.b Packet Pg. 514 Attachment: Exhibit A (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2016342347 Transaction Number:2016-048985 Date Paid:08/09/2016 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 0090201526 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:Pulte Group South Florida Division 3350 Peachtree Road NE Suite 150 Atlanta, GA 30326 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Utility Performance Refundable Bond PL20160001891 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:AlinaHarris Batch Number:5548 Entered By: tamibuchan 16.A.1.b Packet Pg. 515 Attachment: Exhibit A (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A) CERTIFICATION OF CONTRIBUTORY ASSETS (WATER) PROJECT NAME Winding Cypress Phase 2A LOCATION Sections 26/35, Township 50 South, Range 26 East NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM:POTABLE WATER (MATERIALS ONLY) QUAN. UfJFF COST TOTAL | $13.65 $28,965.30 $11.52 $15,079.68 $9.10 $53,562.60 $15.10 $1,298.60 $13.85 $470.90 $11.64 $2,944.92 $38.65 $3,517.15 6 EA $1,875.14 $11,250.84 4 EA $1,531.70 $6,126.80 17 EA $988.98 $16,812.66 23 EA $3,074.00 $70,702.00 34 EA $447.32 $15,208.88 116 EA $603.14 $69,964.24 3 EA $5,106 02 $15,318.06 3 EA 5970.96 $2,912.88 $773.80 $3,095.20 ITEM SIZE LF 12" 2122 CL 150 PVC (DR18) CL 150 PVC (DR18) CL 150 PVC (DR18) CL 200 PVC (DR14) CL 150 PVC (DR14) CL 200 PVC (DR14) LF 10" 1309 8" 5886 LF 12" LF 86 10" LF 34 8" 253 LF LF 12" 91 DIP 12" Gate Valve & Valve Box Gate Valve & Valve Box Gate Valve & Valve Box Fire Hydrant Assembly PVC Single Service w/ Meter Double Water Service, Complete Automatic Flushing Device Permanent Sample Point Air Release Valve 10" 8" N/A N/A N/A N/A N/A N/A EA 4 $317,230.71 TOTAL COST I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: Jayson mick OF: Haleakala Construction 5758 Taylor Road, Naples. FL 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 2016 by Jayson Oreschnick who is personally known to me and who did £ 5 *; Q % <V\ % •4 (P ' — :* = = : 5 5%: *FF 044507 . 16.A.1.c Packet Pg. 516 Attachment: Assets Sheet (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A) CERTIFICATION OF CONTRIBUTORY ASSETS (SEWER) PROJECT NAME: Winding Cypress Phase 2A LOCATION: Sections 26/35, Township 50 South, Range 26 East NAME & ADDRESS OF OWNER: Divosta Homes, L.P. 24311 Walden Center Drive, Suite 300 Bonita Springs, FL 34134 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONLY) TOTAL | QUAN. UNIT COST | ITEM SIZE LF $5.25 $249.10 $291.50 $6.10 $4.96 $12.85 $1,410.86 $4,725.48 $168,546.30 $4,234.70 $47,003.25 $13,700.50 $31,190.50 $805.20 $10,654 08 $1,169.35 $2,821.72 $4,725.48 $168,546.30 $143,979.80 PVC (SDR 26) Single Services w/ Cleanouts Double Services w/ Cleanouts CL 200 PVC (DR 14) CL 150 PVC (DR 18) HDPE Plug Valve Air Release Valve Pump Station Manhole 8,953 8" 6" 55 EA 6" 107 EA 6" 6" 132 EA 2,148 LF 6" 91 LF 6" 2 EA N/A 1 EA N/A 1 EA N/A 34 EA TOTAL COST $424,596.18 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system. CERTIFYING: Jayson $re4chnick OF: Haleakala Construction 5758 Taylor Road, Naples, FL 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me thisoT^day of XTL/LV . 2016 by Jayson Oreschnick who is personally known to me and who did not.t#herap/oath. r,/»c>\) ,-ki 0}Usjiuik K M) SEAL: = • •FF 044507 i. i: t J 16.A.1.c Packet Pg. 517 Attachment: Assets Sheet (5657 : Final Acceptance of Utilities - Winding Cypress Phase 2A)