Loading...
Backup Documents 06/12/2018 Item #16A17 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 6 A 17 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office CMG 06/12/18 4. BCC Office Board of County PS Commissioners 1 (9 -15-5 �S 5. Minutes and Records Clerk of Court's Office PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Gail Hambright/Coastal Zoning 239-252-4059 Contact/ Department Agenda Date Item was June 12,2018 Agenda Item Number 16A17 Approved by the BCC Type of Document Work order with Humiston&Moore Number of Original One Attached Engineers,Inc.to provide professional Documents Attached engineering services for Ann Olesky Park Erosion Control Project PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP OK CMG 2. Does the document need to be sent to another agency for additional signatures? If yes, CMG provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be CMG signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's CMG Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the CMG document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's CMG signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip CMG should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC June 12,2018 and all changes made during CMG the meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes,if applicable. 9. Initials of attorney verifying that the attached document is the version approved by the BCC,all changes directed by the BCC have been made,and the document is ready for the ak Chairman's signature. I:Forms/County Forms/BCC(� Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 ifPr,nyka 't'tflYY1 1 'r ilak T 4- 1 6 A 1 7 MEMORANDUM Date: June 18, 2018 To: Gail Hambright, Accountant Coastal Zone Management From: Teresa Cannon, Deputy Clerk Minutes & Records Department Re: Work Order for Contract #13-6164CZ "Ann Olesky Park Erosion Control Project" Contractor: Humiston & Moore Engineers Attached for your records is one (1) copy of the original of the document referenced above, (Item #16A17) approved by the Board of County Commissioners Tuesday, June 12, 2018. The original document has been kept by the Board's Minutes & Records Department as part of the Board's Official Records. If you have any questions, please call me at 252-8411. Thank you. Attachment 1 6 A 1 7 MEMORANDUM Date: June 18, 2018 To: Stephanie Cales, Purchasing Technician Procurement Services From: Teresa Cannon, Sr. Deputy Clerk Minutes & Records Department Re: Work Order for Contract #13-6164CZ "Ann Olesky Erosion Control Project" Contractor: Humiston & Moore Engineers Attached for your records is a copy of the referenced document above, (Item #16A17) adopted by the Board of County Commissioners on Tuesday, June 12, 2018. The Board's Minutes & Records Department has kept an original as part of the Board's Official Records. If you have any questions, please feel free to contact me at 252-8411. Thank you. Attachment 1 6 A 1 7 WORK ORDER/PURCHASE ODER Contract 13-6164CZ" Contract Expiration Date: March 8,2019 V This Work Order is for professional Architect and Engineering services for work known as: Project Name: Ann Olesky Park Erosion Control Project Project No: 195-80268 ✓ The work is specified in the proposal dated April 23,2018cwhich is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Humiston& Moore Engineers/ Scope of Work: As detailed in the attached proposal and the following: * Task 1 Peer Review Lake Trafford Shore Erosion Schedule of Work: Complete work within 90 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement No. 13-6164CZ will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above,the County will compensate the Firm in accordance with following method(s): QNegotiated Lump Sum (NLS) :lump Sum Plus Reimbursable Costs(LS+RC) ®Time& Material (T&M) (established hourly rate—Schedule B)Q Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task I $13,931.00(T&M),,/ TOTAL FEE $13,931.00(T&M),/ PREPARED BY: r 43,0/ a10/3 Cary M Aloin,CZM analer Date APPROVED BY: 510211 O Ant Pa 0 e n.Department Direct,r Date 411 A/ APPROVED BY: _A •� f 1 I Thaddeus L. Cohen, Department Head GMD Date By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief,all relevant facts concerning past,present,or Page 1 of 3 S i 16A1a7 currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates to the proposed work;and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Finn agrees to notify the Procurement Director,in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Humiston& ,oore `veers a r 6 /l3 Brett D. Moore,P.E.,President Date Page 2 of 3 1 6 A 1 7 ATTEST: BOARD 0 0 ►' Y COM RS Dwight E. Brock-Clerk Collier C, i ty, 'orida B,• .v�- eS as (T airman's By A 3" ^!Y An•y Solis,Chairman ATTEST: B . (Print Name/Title Approved as to Form and gality: ,) /1 , As County Attorney Item# b /7- A2,enda /10.11e6Date Date `j Reed Deputy Clerk Page 3 of 3 CS 1 6 A 1 7 CAC May 10,2018 VIII-4 New Business 1 of 2 HUMISTON $MOORE ENGINEERS COASTAL 5679 STRAND COURT ENGINEERING DESIGN NAPLES,FLORIDA 34110 FAX 594 2025 AND PERMITTING PHONE 239 594 2021 April 23,2018 Gary McAlpin,Manager Coastal Zone Management Collier County Government 2685 South Horseshoe Drive Unit 103 Naples,FL 34104 Re: Collier County Contract 13-6164CZ HM File No 23-065.2018-60%plan review Peer Review Lake Trafford Dear Gary: As requested,we are providing a proposal to review the 60%plans for Anne Olesky Park Erosion Control Project.Scope of Work will involve the following: • Conduct site visit and review historic changes along area of study. • Review potential wave conditions relative to design criteria and objectives for shoreline stabilization. • Meet with design professional at RWA, Inc. regarding project design, assumption, design goals and wave criteria. • Meet with subconsultant biologist on design. • Contact provider of shoreline stabilization matt for design criteria for matt. • Provide written summary with recommendations. • Provide a preliminary cost estimate of recommendations. Task I—Peer Review Lake Trafford RATE/UNIT HOURS/QTAMOUNT PRN2 Principle Engineer 206./ 16 3,296.00 SEN Senior Engineer 157✓ 10 1,570.00 SDS Engineer 1231/ 15 1,845.00 GIS Senior Scientist 118/ 10 1,180.00 SIN Environmental Specia 109 / 20 2,180.00 SRT Senior Technician 85 V 28 2,380.00 Environmental Sub 185 / 8 1,480.00 TOTAL 13.931.00 CAC May 10,2018 1 6 A 17 VIII-4 New Business 2 of 2 This task will be billed on a time and materials basis.A draft copy of the report will be provided prior to the final. Draft report will be provided within 60 days and final product within 90 days of Notice to Proceed. The budget may therefore be considered a not-to-exceed amount with the understanding that in the event requests from County staff result in Additional Services exceeding the estimated budget amounts, a budget amendment will be requested. Please call if you have any questions. Sincerely yours, HUMISTON&MOORE ENGINEERS Brett D.Moore,P.E. President 1 6 A 1 7 ✓ TURRELL HALL & ASSOCIATES, INC. MARINE& ENVIRONMENTAL CONSULTING 3584 Exchange Avenue•Naples,Florida 34104-3732•239-643-0166•Fax(239)643-6632•Tuna@THAnaples.com May 3,2018 Fxhihit"A" Mr.Brett Moore Humiston&Moore Engineers 67q Strand C'rnirt Naples,FL 34110 Re: Proposal for Environmental Subconsulting Services Peer Review Lake Trafford Shore Frnainn Dear Brett, Turrell,Hall&Associates is pleased to provide you with this proposal for environmental services. Pursuant to our conversations it is my understanding you will require some environmental review of the shoreline stabilization design and recommendations at Lake Trafford's Anne Olesky Park. We estimate there will be 8 hours of time required by Tim Hall,our Senior Ecologist and Principal, at a rate of$185.00($1,480.00 total). Please let me know if you have any questions. Sincerely, Mar-idle Kitchener Operations Manager 1 6A11 SCHEDULE 8: RATE SCHEDULE Standard Hourly Title Rate Principal $ 206.00 Senior Project Manager $ 172.00 Project Manager $ 147.00 Senior Engineer $ 157.00 Engineer $ 123.00 Senior Inspector $ 96.00 Inspector $ 76.00 Senior Planner $ 139.00 Planner $ 110.00 Senior Designer $ 114.00 Designer $ 94.00 Environmental Specialist $ 109.00 Senior Environmental Specialist $ 134.00 Scientist/Geologist $ 93.00 Senior Scientist/Geologist $ 118.00 Marine Biologist/Hydrogeologiist $ 110.00 Senior Marine Biologist/Hydrogeologist $ 138.00 Senior GIS Specialist $ 139.00 GIS Specialist $ 102.00 Clerical/Administrative � $ 62.00 Senior Technician $ 85.00 Technician $ 72.00 Surveyor and Mapper $ 120.00 CADD Technician $ 81.00 Survey Crew-2 man $ 130.00 Survey Crew-3 man $ 161.00 Survey Crew-4 man $ 189.00 Senior Architect $ 154.00 Architect ~ $ 121.00 This list is not intended to be all inclusive. Hourly rates for other categories of professional, support and other services shall be mutually negotiated by Collier County and firm on a project by project basis as needed. B-1