Agenda 01/11/2011 Item #16D14 Aqenda Item No. 16D14 - January 11,2011 Page 1 of 4 EXECUTIVE SUMMARY Recommendation to reject solicitation (ITB) 11-5611 for East Naples Community Center Roll Down Shutters and the associated proposals that were submitted and authorize the Purchasing Department to re-solicit for the services. The FY 2011 impact associated with this solicitation is $166,954. OBJECTIVE: To identify a vendor who is able to provide the service for installation of roll-down shutters and waterproofing, utilitizing FEMA dollars. CONSIDERATIONS: The Parks and Recreation and Purchasing Departments prepared bid documents to solicit (1) supply and install of roll down shutters for East Naples Community Center and (2) waterproofing East Naples Community Center and Senior Center in an effort to select one vendor to provide both services. ITS 11- 5611 was issued on October 21, 2010, soliciting contractors to supply and install roll down shutters and waterproofing for the two buildings. Notices were forwarded to 88 contractors, 38 downloaded the solicitations and only two bids were received. The two bidders are: Boulton Construction Rolling Shield Shutter 46,446 94,720 Waterproofing 120,508 164,000 Total Bid 166,954 258,720 Parks and Recreation staff have reviewed the bids and determined that the bids are very high with the low bidder being approximately 60% above the engineer's estimate. Staff believes that reformatting the bid invitation and re-issuing a separate solicitation for roll down shutters and a separate solitation for waterproofing may reduce the overall price of the project. FISCAL IMPACT: There is no fiscal impact in the approval of this Executive Summary. GROWTH MANAGEMENT IMPACT: There is no growth management impact in approving this Executive Summary. LEGAL CONSIDERATION: This item has been reviewed by the County Attorney's Office, requires simple majority vote, and is legally sufficient for Board action. - CMG. RECOMMENDATION: That the Board of County Commissioners 1.)reject ITB 11-5611 for East Naples Community Center Roll Down Shutters and the associated proposals that were submitted, and 2.) and authorize the Purchasing Department to re-solicit two separate solicitations for roll down shutters and waterproofing. Prepared by: Vicky Ahmad, Parks and Recreation Department Item Number: Item Summary: Meeting Date: Aqenda Item No. 16D14 - January 11, 2011 Page 2 of 4 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS 16014 Recommendation to reject solicitation (ITS) 11-5611 for East Naples Community Center Roll Down Shutters and the associated proposals that were submitted and authorize the Purchasing Department to re-solicit for the services. The FY 2011 impact associated with this solicitation is $166,954. 1/11/2011 9:00:00 AM Prepared By Vicky Ahmad Public Services Division Project Manager Date Parks & Recreation 12/28/20109:01 :45 AM Approved By Rhonda Cummings Administrative Services Division Contracts Specialist Date Purchasing & General Services 12/28/2010 2:11 PM Approved By Joanne Markiewicz Administrative Services Division Manager - Purchasing Acquisition Date Purchasing & General Services 12/28/20103:17 PM Approved By Tony Ruberto Public Services Division Project Manager Date Parks & Recreation 1212912010 8:05 AM Approved By Marlene J. Foard Administrative Services Division Grant Development & Mgmt Coordinator Date Administrative Services Division 12/29/20105:14 PM Approved By Sherry Pryor Office of Management & Budget Management/ Budget Analyst, Senior Date Office of Management & Budget 114/201110:48 AM Approved By Leo E. Ochs, Jr. County Managers Office County Manager Date County Managers Office 1/4/20113:06 PM Project Manager: Vicky Ahmad Vendor Price Sheet 11-5611 East Naples Community Center Roll Down Shutters Agenda Item No. 16D14 January 11~~~1~ Sent: 88 Solicitati8mg!:}Q1.\oftdaded: 38 Bids Received: 2 No Bids: 1 Rolling Shield Boulton Constructioh Item Description Miami, Fl Ft. Myers, Fl Total Material and Total Material and labor labor Cost Cost 1.1 Install motorized roll down shutters in Building 1, including all connections to the main box and back-up battery to be secured with lock - 1 window 120 Ix 82 $ 3,457.00 $ 2,122.00 1.2 Install motorized roll down shuttersin Building 1, including all connections to the main box and back-up battery to be secured with lock - 1 door 151 x 108 $ 4.990.00 $ 3,032.00 1.3 Install motorized roll down shutters in Building 1, including all connections to the main box and back-up battery to be secured with lock - 1 window 74 x 38 $ 1,918.00 $ 1,179.00 1.4 Install motorized roll down shutters in Building 1, including all connections to the main box and back-up battery to be secured with lock - 1 vent 24 x 24 $ 1,410.00 $ 590.00 1.5 Install motorized roll down shutters in Building 1, including all connections to the main box and back-up battery to be secured with lock - 1 window 157 x 82 $ 5,310.00 $ 2,422.00 1.6 Install motorized roll down shutters in Building 1, including all connections to the main box and back-up battery to be secured with lock - 1 door 75 x 82 $ 2,590.00 $ 1,617.00 1.7 Install motorized roll down shuttersin Building 1, including all connections to the main box and back-up battery to be secured with lock - 10 window I door 80 x 82 $ 27,045.00 $ 15,244.0Q 1 L1 - .7) Total of All Items $ 46,720.00 $ 26,206 Alternate 1 .1 !nstal! manual ro!! down shutters in Building 1 - 1 window 120 Ix 82 . $ 2,357.00 $ 1,853.00 Alternate 1.2 Install manual roll down shutters in Building 1 - 2 doors 76 x 108 $ 4,990.00 $ 2,759.00 Alternate 1.3 Install manual roll down shutters in Building 1 - 1 window 74 x 38 $ 943.00 $ 542.00 Alternate 1.4 Install manual roll down shutters in Building 1 - 1 vent 24 x 24 $ 425.00 $ 289.00 Alternate 1.5 Install manual roll down shutters in Building 1 - 2 windows 79 x 82 $ 3,360.00 $ 1,768.00 Alternate 1.6 Install manual roll down shutters in Building 1 - 1 door 75 x 82 $ 1,614.00 $ 839.00 Alternate 1.7 Install manual roll down shutters in Building 1 - 10 window I door 80 x 82 $ 17,294.00 $ 8,844.00 Alternate (.1 - Total of All Alternate Items $ 30,983.00 $ 16,894.00 2 Install hurricane fabric on roof louvers at 4 locations $ 48,000.00 $ 20,240.00 3 BuildinQ #1: Approximatelv 390 L. F. Waterproffing Entire Buidling Exterior Perimeter: install waterproof membrane 1/2 inch Durak Panel and 3/4 inch stucco to be installed one (1) foot below and shall extend two (2) feet above grade around the entire perimeter of the two buidlings exterior finish grade. Color of stucco above the grade shall match existing wall. Bidders shall submit a detailed drawing on waterproofing the walls $ 87,750.00 $ 58,739.00 Project Manager: Vicky Ahmad Vendor Price Sheet 11-5611 East Naples Community Center Roll Down Shutters Aoenda Item No. 16DH ~ January 11~W~I~ Sent: 88 SolicitatiomgeGWJflEiaded: 38 Bids Received: 2 No Bids: 1 BuildinQ #2: Approximatelv 250 L. F. Waterproffing Entire Buidling Exterior Perimeter: install waterproof membrane 1/2 inch Durak Panel and 3/4 inch stucco to be installed one (1) foot below and shall extend two (2) feet above grade around the entire perimeter of the two buidlings exterior finish grade. Color of stucco above the grade shall match existing wall. Bidders shall submit a detailed drawing on waterproofing the walls $ 56,250.00 $ 44,063.00 5 Buildina #1 Install a neoprene at all jams and sills of doors and windows of both buildings. Waterproofing shall be no less than two (2) feet from bottom of doors and window sills. Bidders to submit with their bid a detailed drawing on waterproofing the doors and sills. $ 7,000.00 $ 10.049.00 6 BuildinQ #2 Install a neoprene at all jams and sills of doors and windows of both buildings. Waterproofing shall be no less than two (2) feet from bottom of doors and window sills. Bidders to submit with their bid a detailed drawing on waterproofing the doors and sills. $ 13,000.00 $ 7,657.00 TOTAL PRICE (No Alternate\ $ 258,720.00 $ 166,954.00 TOTAL PRICE (Alternate) $ 242,983.00 $ 157,642.00 Addendum 1 Sioned Yes Yes Addendum 2 Sioned Yes Yes Addendum 3 Sioned Certificates Provided Yes Attachment 1: Vendor Checklist Yes Yes Attachment 2: Bid Response Form Yes Yes CCR# 3GYT9 66M87 Florida Document # P93000041620 N/A FriO 650425028 202612334 EPLS Yes/JM Yes/JM Attachment 3: Insurance Yes Yes Attachment 4: Immioration Affidavit Yes Yes E-Verify profile page or memorandum of understanding Yes Yes Grant Form: EPLS (vendor provided) No Yes Grant Form: Debarment (Separate File) Yes Yes Grant Form: Lobbying Form (Separate File) Yes Yes No Bids: Garage Doors of Naples Opened by: Brenda Reaves Witnessed by: Joanne Markiewicz, 11/18/10