Agenda 01/11/2011 Item #16A 3 Agenda Item No. 16A3 January 11, 2011 Page 1 of 15 EXECUTIVE SUMMARY Recommendation to grant final approval of the roadway (private) and drainage improvements for the final plat of 3500 Corporate Plaza with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security. OBJECTIVE: To grant final approval of the infrastructure improvements associated with that subdivision known as 3500 Corporate Plaza. CONSIDERA TIONS: 1. On December 13, 2006, the Land Development Services Department granted preliminary acceptance of the roadway and drainage improvements in 3500 Corporate Plaza. 2. The roadway and drainage improvements will be maintained by the project's homeowners association. 3. The required improvements have been constructed in accordance with the Land Development Code. The Land Development Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4. A resolution for final acceptance has been prepared and approved by the County Attorney's Office. A copy of the document is attached. 5. This PUD (The Pine Ridge Center P.U.D.) has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of $68,118.95 will be released upon Board approval. The original security in the amount of 619,332.45 has been reduced to the current amount of $68,118.95 based on the previous work performed and completed. GROWTH MANAGEMENT IMPACT: There is no growth management impact. ,l\genda Item r\!o. 16A3 January 11, 2011 Page 2 of 15 LEGAL CONSIDERATIONS: The County Attorney's Office has reviewed and approved the Resolution for legal sufficiency. This item requires a majority vote. This item is ready for Board consideration and approval. STW RECOMMENDATION: Grant final acceptance of the roadway and drainage improvements in 3500 Corporate Plaza and release the maintenance security. 1. Authorize the Chairman to execute the attached resolution authorizing final acceptance. 2. Authorize the release of the maintenance security. PREPARED BY: John Houldsworth, Senior Site Plans Reviewer, Land Development Services/Engineering Review, Growth Management Division, Planning and Regulation Attachments: 1 ) Location Map, 2) Bond Basis, 3) Resolution Item Number: Item Summary: Meeting Date: Agenda Item No. 16A3 January 11, 2011 Page 3 of 15 COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS 16A3 Recommendation to grant final approval of the roadway (private) and drainage improvements for the final plat of 3500 Corporate Plaza with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security. 1/11/2011 9:00:00 AM Prepared By John Houldsworth Community Development & Environmental Services Site Plans Reviewer, Senior Date Engineering & Environmental Services 12/9/20102:17:35 PM Approved By Lauren Beard Transportation Planner Date Transportation Planning 12/10/20102:26 PM Approved By Norm E. Feder, AICP Transportation Division Administrator - Transportation Date Transportation Administration 12/14/20106:44 AM Approved By Judy Puig Community Development & Environmental Services Operations Analyst Community Development & Environmental Services Date 12/14/20109:50 AM Approved By William D. Lorenz, Jr., P.E. Community Development & Environmental Services Director - CDES Engineering Services Date Engineering & Environmental Services 12/14/201011:45 AM Approved By Steven Williams County Attorney Assistant County Attorney Date County Attorney 12/14/20102:57 PM Approved By Nick Casalanguida Transportation Division Director - Transportation Planning Date Transportation Planning 12115/2010 2:23 PM Approved By Jeff Klatzkow County Attorney Date Approved By 12/21/2010 1 :48 PM Therese Stanley Manager - Operations Support - Trans Date Agenda Item No. 16A3 January 11, 2011 Page 4 of 15 Office of Management & Budget Office of Management & Budget 1/4/20119:06 AM Approved By Michael Sheffield Assistant to the County Manager Date County Managers Office 1/4/2011 9:14 AM C0...-Uj <:(...-...- (00_ ...-N 0 -"Uj a.l en .' CO 2~0- c: COCO ""0 ...., c: a.l en <:( A'tM NQSM'tl - '" ~ ~ ~ ~ ~ ii: -~ ~ ~ ~ :; ~ ~ ~ b ~ l '" g 0 -- -~ i5 ~ 0 ~ 0 ~ 0. i5 Z ~ 0. " i Q Ii ~ i w ..... I;( - - 8 rn 0 3N"" llWoI:lOOddlHNl -< 0 '" ..J \ '" ~ w ,. , z '" ii: w ~ ~ '" 5 " g "' < " '" 8 ~ z ~ g~ ::; ::> ~ oi !l: i -< u w ~ z :g~ CI ~ Q ... o I!! CI < ~ Q ~.~ . 0 l!/ ~ "'0 '" 0.,-, W ~ '" 5 3ft... H.\.WIUUI.J:J g " II I I II II I z ~ 'VM "'" - - f--- \;- = - - - ll'~ - - ~ - - - i:~ - - i- -'" -~ - '" -' ~= -~ - 0. =~ -~ - :5 ~- =~ 11 -~ w ili- = ~ _ili " - 0 - '" 0: - ~ CD - :I _ili -< - - ~ '" ~ - - - 1 3l't:lS Ol.l.QN / - ~ ~ ~ ~ ! ~ ~ ~ ~ :; Q ~ . ~ ~ ~~ ::J~ '" '" ~l3~ ~~ z ~ ~~ ~" ~tnN ~ ~1Il. ~ ~3: i ~ ~~: ~ m i ~~~ ~ ~::J~ ~ ~ ~ .. OWl\31noo N't'OO1 ..... Z 0 0 .- w ~~ -, '< ~!!5 U) 0 ~< ~! ~ ~- a: 0 ON IL 0 ~~ ..J ~ w < C> ~~~ owo QZ- ~ ~ ~~ . <. 5~ N ~ ~ Ll) ~ ~ SOULEV- Si.L-1IJ.VJ.SH3J.N1 ii.l. - 3LV.1mf3lHl .~ ~~ -. " 1'-1 ~ r-I o .- ~~ :" g ,- ~e 0YQl NOJ.S9NINl ~ .'" <0 Z 0 O~ ~~~ ~ ~ ~~ ~ ~ > ~ ~ <- O. ,0 ~- :G ~ ~ (~t~'O) CJ'IfmlEINrTIl"ld'".L~ ~-~ B~~ I Ub~ .~g~ ......a: 10 SQ~ ,.., ~i~ ~ Oriel OYOtl J..U.310000 3~... COf 0.. <{ ~ UJ ~ CI) ~ e( ...J Q.. W l- e( Q: 9 ii:: o u o o on It) ~~ ; N ~ 0.. <{ ~ ~ ~ z o ~ <{ U o .....J m Agenda Item No. 16A3 January 11, 2011 Page 6 of 15 Prepared by: Q. Grady Minor & Associates, P.A. Civil Engineers # Land Surveyors # Planners 3800 Via Del Rey Bonita Springs, Florida 34134 (239) 947-1144 (239) 947-0375 (F) AUGUST, 2004 FEB., 2007 (for bond reduction) . ~\'\1 . - ~j - . /1; f. ~ ll>~/v 1 Michiiel Delate, P.E No. 49442 Agenda Item No. 16A3 January 11, 2011 Page 7 of 15 3500 CORPORATE PLAZA ENGINEER'S OPINION OF PROBABLE COST SCHEDULE "A" EARTHWORK & SITE PREP Clearing, grubbing and preparation of roadway rights-of-way, and easements areas as designated by the Engineer in the field including chipping and grinding of all materials on the Owner's property and then disposal of all residue off the Owner's property, all as specified, per acre complete. All work in right-of-way is subject to inspection by the owner, Collier County DOT and FDOT contingent on final acceptance of improvements as shown and specified on the contract documents. UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE A-I Clearing and Grubbing*** AC 0 $2,500.00 $0.00 A-2 Off-site Fill (Truck Measure) CY 0 $8.75 $0.00 A-3 Erosion Control-Silt Fence LF 0 $1.00 $0.00 A-4 Pine Ridge Road Demolition LS 0 $5,900.00 $0.00 1'T'r\'T" A. T il'1'\ ^^ IVIJ-\.L .}V.VV ***Hand Clearing of Exotics in Conservation Areas by Others QTY = 0 means items complete Agenda Item No. 16A3 January 11, 2011 Page 8 of 15 3500 CORPORATE PLAZA ENGINEER'S OPINION OF PROBABLE COST SCHEDULE "B" PAVING Roadway construction complete per the plans and Collier County specifications including stabilized sub grade, stabilized shoulder, limerock base, tack coat, asphaltic concrete, required testing by an independent laboratory, roadside fill and grading for full width ofright-of-way and easements, finish grading, seeding and mulch. UNIT ITEM DESCRIPTION ln~IT QTY PRICE TOTAL PRICE B-1 Valley Gutter--2 ft LF 0 $4.50 $0.00 B-2 Valley Gutter--3 ft LF 0 $6.50 $0.00 B-3 1.5" Aphaltic Concrete (Type S-ill)(2 lifts) SY 2,350 $4.20 $9,870.00 B-4 8" Limerock Base (compacted and primed) SY 0 $5.50 $0.00 B-5 12" Stabilized Subgrade . SY 0 $8.00 $0.00 B-6 6"ABC SY 0 $8.00 $0.00 B-7 Type "F" Curb LF 0 $6.50 $0.00 B-8 Temporary Turnaround LS 0 $3,000.00 $0.00 B-9 5' Concrete Sidewalk SY 0 $15.00 $0.00 01" Signing & Pavement Markings LS 1 $1,250.00 $1,250.00 .u- 1 v 1 B-ll Sodding (back of curb) SY 0 $1.30 $0.00 TOTAL $11,120.00 QTY = 0 means items complete Agenda Item No. 16A3 January 11, 2011 Page 9 of 15 3500 CORPORATE PLAZA ENGINEER'S OPINION OF PROBALE COST SCHEDULE "C" WASTEWATER COLLECTION Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DEP and Collier County with a complete working wastewater collection system as shown on the drawings and specified in these contract documents. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE C-1 8" PVC Sanitary Sewer (0-6' Cut) LF 0 $16.00 $0.00 C-2 8" PVC Sanitary Sewer (6-8' Cut) LF 0 $1 7.50 $0.00 C-3 Manhole 4' Diameter (0-6') EA 0 $1,250.00 $0.00 C-4 Manhole 4' Diameter (6-8') EA 0 $1,500.00 $0.00 C-5 Pump Station EA 0 $85,000.00 $0.00 C-6 Television Inspection (Prelimi11llI)' & Final) LF 580 $1.20 $696.00 C-7 4" Force Main LF 0 $10.00 $0.00 C-8 Tapping Sleeve and Valve LS 0 $3,500.00 $0.00 TOTAL $696.00 QTY = 0 means items complete Agenda Item No. 16A3 January 11, 2011 Page 1 0 of 15 3500 CORPORATE PLAZA ENGINEER'S OPINION OF PROBABLE COST SCHEDULE liD" POTABLE WATER DISTRIBUTION Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in .,. 'roadway areas, pressure testing; disinfecting pipelines, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DEP and Collier County with a complete working water distribution system as shown on the drawings and specified in these contract documents. UNIT TOTAL ITEM DESCRIPTION UNIT QTY PRICE PRICE D-l 10" PVC Water Main LF 0 $18.00 $0.00 D-2 10" Gate Valve w/Box EA 0 $1,100.00 $0.00 D-3 Fire Hydrant (Complete Assembly) EA 0 $2,370.00 $0.00 D-4 Permanent Bacterial Sample Point EA 0 $990.00 $0.00 T"\~ Temp. Blow-Off EA 0 $370.00 $0.00 '-J- .J D-6 Tapping Sleeve and Valve EA 0 $5,500.00 $0.00 TOTAL $0.00 QTY = 0 means items complete 3500 CORPORATE PLAZA ENGINEER'S BID TAB SCHEDULE "E" STORM DRAINAGE Agenda Item No. 16A3 January 11, 2011 Page 11 of 15 Includes furnishing and handling of all required materials, dewatering, bedding material (if necessary), rock removal and disposal off-site (if necessary), installation, backfilling, compaction, compaction testing in road- way areas, final grading, coordinating with other contractors and utility companies, flushing, clean-up, seeding, sodding of all areas disturbed by construction, repair of any damage caused by construction and other items necessary to complete the system and provide the owner, Collier County DOT and FOOT with a complete working drainage system as shown on the drawings and specified on these contract documents. Pipe measurement is to the outside ofthe structures. lTt.M l~-':f 'I<' ."'11UN UNlT... .. .. (,lTY NI PKlCl: 'lUl.'AL .I:'..K1t;.t',. E-l 15" RCP LF 0 $18.00 $0.00 B-2 18" RCP LF 0 $20.00 $0.00 E-3 24" RCP LF 0 $22.00 $0.00 E-4 18" Precast Headwall EA 0 $970.00 $0.00 E-5 Retaining Wall LF 0 $75.00 $0.00 E-6 Dry Detention Area Grading LS 0 $32,000.00 $0.00 E-7 Valley Gutter Inlet EA 0 $2,000.00 $0.00 E-8 Water Control Structure EA 0 $2,800.00 $0.00 TOTAL $0.00 QTY = 0 means items complete Agenda Item No. 16A3 January 11, 2011 Page 12 of 15 3500 CORPORATE PLAZA ENGINEER'S OPINION OF PROBABLE COST SCHEDULE "F" EARTHWORK & SITE PREP Clearing, grubbing and preparation of roadway rights-of-way, and easements areas as designated by the Engineer in the field including chipping and grinding of all materials on the Owner's property and then disposal of all residue off the Owner's property, all as specified, per acre complete. All work in right-of-way is subject to inspection by the owner, Collier County DOT and FDOT contingent on final acceptance of improvements as shown and specified on the contract documents. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE F-I Street Lights EA 4 $0.00 $0.00 F-2 Re-p1anting of Preserve Areas LS 1 $0.00 $0.00 TOTAL $0.00 QTY = 0 means items complete Agenda Item No. 16A3 January 11, 2011 Page 13 of 15 3500 CORPORATE PLAZA ENGINEER'S OPINION OF PROBABLE COST UPDATED: 9/9/2003 BID SCHEDULE SUMMARY SCHEDULE DESCRIPTION TOTAL PRICE A Earthwork $0.00 B Paving $11,120.00 C Wastewater Collection $696.00 D Potable Water Distribution $0.00 E Storm Drainage $0.00 F Misc. $0.00 TOTAL .tl J .816.00 QTY = 0 means items complete Underground Utility Total $696.00 Earthwork, Paving and Misc.Total $11 ,120.00 Agenda Item No. 16A3 January 11, 2011 Page 14 of 15 RESOLUTION NO. 11-_ A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN 3500 CORPORATE PLAZA, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 44, PAGES 23 THROUGH 24; RELEASE OF THE NUUNTENANCE SECURITY; AND ACCEPTANCE OF THE MAINTENANCE RESPONSIBILITY FOR THE ROADWAY AND DRAINAGE IMPROVEMENTS THAT ARE NOT REQUIRED TO BE MAINTAINED BY THE 3500 CORPORATE PLAZA PROPERTY-OWNERS' ASSOCIATION,INC. WHEREAS, the Board of County Commissioners of Collier County, Florida, on September 27,2005, approved the plat of 3500 Corporate Plaza for recording; and WHEREAS. the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Engineering and Environmental Services Department of the Community Development and Environmental Services Division has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in 3500 Corporate Plaza, pursuant to the plat thereof recorded in Plat Book 44, pages 23 through 24, and the Clerk is hereby authorized to release the maintenance security. Agenda Item No. 16A3 January 11, 2011 Page 15 of 15 BE IT FURTHER RESOLVED AND ORDERED that the County accept the future maintenance and other attendant costs for those roadway and drainage improvements that are not required to be maintained by the 3500 Corporate Plaza Property-owners' Association, Inc This Resolution adopted after motion, second and majority vote favoring same, this day of , 2011. DATE: ATTEST: D~GHTE.BROCK,CLERK BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORlDA By: , Deputy Clerk , CHAIRMAN Approved as to form and legal sufficiency: J~ 7.wJl . Steven T. Williams Assistant Collier County Attorney