Agenda 01/11/2011 Item #16A 3
Agenda Item No. 16A3
January 11, 2011
Page 1 of 15
EXECUTIVE SUMMARY
Recommendation to grant final approval of the roadway (private) and
drainage improvements for the final plat of 3500 Corporate Plaza with the
roadway and drainage improvements being privately maintained and
authorizing the release of the maintenance security.
OBJECTIVE:
To grant final approval of the infrastructure improvements associated with that
subdivision known as 3500 Corporate Plaza.
CONSIDERA TIONS:
1. On December 13, 2006, the Land Development Services Department
granted preliminary acceptance of the roadway and drainage
improvements in 3500 Corporate Plaza.
2. The roadway and drainage improvements will be maintained by the
project's homeowners association.
3. The required improvements have been constructed in accordance with the
Land Development Code. The Land Development Services Department
has inspected the improvements and is recommending final acceptance of
the improvements.
4. A resolution for final acceptance has been prepared and approved by the
County Attorney's Office. A copy of the document is attached.
5. This PUD (The Pine Ridge Center P.U.D.) has been found to be in
substantial compliance.
FISCAL IMPACT:
The roadway and drainage improvements will be maintained by the project's
homeowners association. The existing security in the amount of $68,118.95 will
be released upon Board approval. The original security in the amount of
619,332.45 has been reduced to the current amount of $68,118.95 based on the
previous work performed and completed.
GROWTH MANAGEMENT IMPACT: There is no growth management impact.
,l\genda Item r\!o. 16A3
January 11, 2011
Page 2 of 15
LEGAL CONSIDERATIONS:
The County Attorney's Office has reviewed and approved the Resolution for legal
sufficiency. This item requires a majority vote. This item is ready for Board
consideration and approval. STW
RECOMMENDATION:
Grant final acceptance of the roadway and drainage improvements in 3500
Corporate Plaza and release the maintenance security.
1. Authorize the Chairman to execute the attached resolution authorizing
final acceptance.
2. Authorize the release of the maintenance security.
PREPARED BY: John Houldsworth, Senior Site Plans Reviewer, Land
Development Services/Engineering Review, Growth Management Division,
Planning and Regulation
Attachments: 1 ) Location Map, 2) Bond Basis, 3) Resolution
Item Number:
Item Summary:
Meeting Date:
Agenda Item No. 16A3
January 11, 2011
Page 3 of 15
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
16A3
Recommendation to grant final approval of the roadway (private) and drainage improvements
for the final plat of 3500 Corporate Plaza with the roadway and drainage improvements being
privately maintained and authorizing the release of the maintenance security.
1/11/2011 9:00:00 AM
Prepared By
John Houldsworth
Community Development &
Environmental Services
Site Plans Reviewer, Senior
Date
Engineering & Environmental Services
12/9/20102:17:35 PM
Approved By
Lauren Beard
Transportation
Planner
Date
Transportation Planning
12/10/20102:26 PM
Approved By
Norm E. Feder, AICP
Transportation Division
Administrator - Transportation
Date
Transportation Administration
12/14/20106:44 AM
Approved By
Judy Puig
Community Development &
Environmental Services
Operations Analyst
Community Development &
Environmental Services
Date
12/14/20109:50 AM
Approved By
William D. Lorenz, Jr., P.E.
Community Development &
Environmental Services
Director - CDES Engineering Services
Date
Engineering & Environmental Services
12/14/201011:45 AM
Approved By
Steven Williams
County Attorney
Assistant County Attorney
Date
County Attorney
12/14/20102:57 PM
Approved By
Nick Casalanguida
Transportation Division
Director - Transportation Planning
Date
Transportation Planning
12115/2010 2:23 PM
Approved By
Jeff Klatzkow
County Attorney
Date
Approved By
12/21/2010 1 :48 PM
Therese Stanley
Manager - Operations Support - Trans
Date
Agenda Item No. 16A3
January 11, 2011
Page 4 of 15
Office of Management &
Budget
Office of Management & Budget
1/4/20119:06 AM
Approved By
Michael Sheffield
Assistant to the County Manager
Date
County Managers Office
1/4/2011 9:14 AM
C0...-Uj
<:(...-...-
(00_
...-N 0
-"Uj
a.l
en
.' CO
2~0-
c:
COCO
""0 ....,
c:
a.l
en
<:(
A'tM NQSM'tl
- '" ~
~ ~ ~ ~ ii:
-~ ~ ~ ~
:; ~ ~
~ b ~ l
'" g 0
-- -~ i5 ~ 0 ~
0
~ 0. i5
Z ~ 0. " i
Q Ii ~ i
w
..... I;( - -
8 rn 0 3N"" llWoI:lOOddlHNl
-< 0
'" ..J
\ '"
~
w
,. , z '"
ii: w
~ ~ '"
5
" g
"' < "
'" 8 ~ z
~ g~ ::;
::> ~ oi !l:
i -< u
w ~ z :g~
CI ~ Q ... o I!!
CI <
~ Q ~.~
.
0 l!/
~ "'0 '"
0.,-, W
~ '"
5
3ft... H.\.WIUUI.J:J g
"
II I I II II I z
~
'VM "'"
- - f--- \;-
= - - -
ll'~ - - ~ -
- -
i:~ - -
i- -'" -~
- '" -'
~= -~ - 0. =~
-~ - :5
~- =~ 11 -~
w ili- = ~ _ili
" -
0 - '"
0: - ~ CD -
:I _ili
-< - - ~
'" ~ - -
-
1
3l't:lS Ol.l.QN /
-
~
~ ~
~
! ~ ~
~
~ :;
Q ~
. ~
~
~~
::J~ '"
'" ~l3~
~~
z
~
~~
~"
~tnN ~ ~1Il. ~
~3: i ~ ~~: ~
m i ~~~ ~
~::J~ ~
~ ~ ..
OWl\31noo N't'OO1
..... Z
0 0
.- w ~~
-, '<
~!!5 U) 0 ~< ~! ~
~- a: 0 ON
IL 0 ~~
..J ~
w
<
C>
~~~
owo
QZ-
~
~
~~
. <.
5~
N
~
~ Ll)
~
~
SOULEV-
Si.L-1IJ.VJ.SH3J.N1
ii.l. - 3LV.1mf3lHl
.~
~~
-. "
1'-1 ~ r-I
o
.-
~~
:"
g
,-
~e
0YQl NOJ.S9NINl
~ .'"
<0
Z 0 O~
~~~ ~ ~ ~~
~ ~ >
~
~
<-
O.
,0
~-
:G
~
~
(~t~'O)
CJ'IfmlEINrTIl"ld'".L~
~-~
B~~ I
Ub~
.~g~
......a: 10
SQ~ ,..,
~i~ ~
Oriel OYOtl J..U.310000 3~... COf
0..
<{
~
UJ
~
CI)
~
e(
...J
Q..
W
l-
e(
Q:
9
ii::
o
u
o
o
on
It)
~~
;
N
~
0..
<{
~
~
~
z
o
~
<{
U
o
.....J
m
Agenda Item No. 16A3
January 11, 2011
Page 6 of 15
Prepared by:
Q. Grady Minor & Associates, P.A.
Civil Engineers # Land Surveyors # Planners
3800 Via Del Rey
Bonita Springs, Florida 34134
(239) 947-1144
(239) 947-0375 (F)
AUGUST, 2004
FEB., 2007 (for bond reduction)
. ~\'\1
. - ~j -
. /1; f. ~ ll>~/v 1
Michiiel Delate, P.E
No. 49442
Agenda Item No. 16A3
January 11, 2011
Page 7 of 15
3500 CORPORATE PLAZA
ENGINEER'S OPINION OF PROBABLE COST
SCHEDULE "A"
EARTHWORK & SITE PREP
Clearing, grubbing and preparation of roadway rights-of-way, and easements areas as designated
by the Engineer in the field including chipping and grinding of all materials on the Owner's
property and then disposal of all residue off the Owner's property, all as specified, per acre
complete. All work in right-of-way is subject to inspection by the owner, Collier County DOT
and FDOT contingent on final acceptance of improvements as shown and specified on the contract
documents.
UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE
A-I Clearing and Grubbing*** AC 0 $2,500.00 $0.00
A-2 Off-site Fill (Truck Measure) CY 0 $8.75 $0.00
A-3 Erosion Control-Silt Fence LF 0 $1.00 $0.00
A-4 Pine Ridge Road Demolition LS 0 $5,900.00 $0.00
1'T'r\'T" A. T il'1'\ ^^
IVIJ-\.L .}V.VV
***Hand Clearing of Exotics in Conservation Areas by Others
QTY = 0 means items complete
Agenda Item No. 16A3
January 11, 2011
Page 8 of 15
3500 CORPORATE PLAZA
ENGINEER'S OPINION OF PROBABLE COST
SCHEDULE "B"
PAVING
Roadway construction complete per the plans and Collier County specifications including stabilized
sub grade, stabilized shoulder, limerock base, tack coat, asphaltic concrete, required testing by an
independent laboratory, roadside fill and grading for full width ofright-of-way and easements,
finish grading, seeding and mulch.
UNIT
ITEM DESCRIPTION ln~IT QTY PRICE TOTAL PRICE
B-1 Valley Gutter--2 ft LF 0 $4.50 $0.00
B-2 Valley Gutter--3 ft LF 0 $6.50 $0.00
B-3 1.5" Aphaltic Concrete (Type S-ill)(2 lifts) SY 2,350 $4.20 $9,870.00
B-4 8" Limerock Base (compacted and primed) SY 0 $5.50 $0.00
B-5 12" Stabilized Subgrade . SY 0 $8.00 $0.00
B-6 6"ABC SY 0 $8.00 $0.00
B-7 Type "F" Curb LF 0 $6.50 $0.00
B-8 Temporary Turnaround LS 0 $3,000.00 $0.00
B-9 5' Concrete Sidewalk SY 0 $15.00 $0.00
01" Signing & Pavement Markings LS 1 $1,250.00 $1,250.00
.u- 1 v 1
B-ll Sodding (back of curb) SY 0 $1.30 $0.00
TOTAL $11,120.00
QTY = 0 means items complete
Agenda Item No. 16A3
January 11, 2011
Page 9 of 15
3500 CORPORATE PLAZA
ENGINEER'S OPINION OF PROBALE COST
SCHEDULE "C"
WASTEWATER COLLECTION
Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other
pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if
necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in
roadway areas, pressure testing, flushing, clean-up including resodding areas previously sodded, seeding
all areas disturbed by construction, providing complete as-built drawings and other items necessary to
complete the system and provide the Owner, DEP and Collier County with a complete working wastewater
collection system as shown on the drawings and specified in these contract documents.
ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
C-1 8" PVC Sanitary Sewer (0-6' Cut) LF 0 $16.00 $0.00
C-2 8" PVC Sanitary Sewer (6-8' Cut) LF 0 $1 7.50 $0.00
C-3 Manhole 4' Diameter (0-6') EA 0 $1,250.00 $0.00
C-4 Manhole 4' Diameter (6-8') EA 0 $1,500.00 $0.00
C-5 Pump Station EA 0 $85,000.00 $0.00
C-6 Television Inspection (Prelimi11llI)' & Final) LF 580 $1.20 $696.00
C-7 4" Force Main LF 0 $10.00 $0.00
C-8 Tapping Sleeve and Valve LS 0 $3,500.00 $0.00
TOTAL $696.00
QTY = 0 means items complete
Agenda Item No. 16A3
January 11, 2011
Page 1 0 of 15
3500 CORPORATE PLAZA
ENGINEER'S OPINION OF PROBABLE COST
SCHEDULE liD"
POTABLE WATER DISTRIBUTION
Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other
pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if
necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in
.,. 'roadway areas, pressure testing; disinfecting pipelines, flushing, clean-up including resodding areas previously
sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items
necessary to complete the system and provide the Owner, DEP and Collier County with a complete working
water distribution system as shown on the drawings and specified in these contract documents.
UNIT TOTAL
ITEM DESCRIPTION UNIT QTY PRICE PRICE
D-l 10" PVC Water Main LF 0 $18.00 $0.00
D-2 10" Gate Valve w/Box EA 0 $1,100.00 $0.00
D-3 Fire Hydrant (Complete Assembly) EA 0 $2,370.00 $0.00
D-4 Permanent Bacterial Sample Point EA 0 $990.00 $0.00
T"\~ Temp. Blow-Off EA 0 $370.00 $0.00
'-J- .J
D-6 Tapping Sleeve and Valve EA 0 $5,500.00 $0.00
TOTAL $0.00
QTY = 0 means items complete
3500 CORPORATE PLAZA
ENGINEER'S BID TAB
SCHEDULE "E"
STORM DRAINAGE
Agenda Item No. 16A3
January 11, 2011
Page 11 of 15
Includes furnishing and handling of all required materials, dewatering, bedding material (if necessary), rock
removal and disposal off-site (if necessary), installation, backfilling, compaction, compaction testing in road-
way areas, final grading, coordinating with other contractors and utility companies, flushing, clean-up,
seeding, sodding of all areas disturbed by construction, repair of any damage caused by construction and
other items necessary to complete the system and provide the owner, Collier County DOT and FOOT
with a complete working drainage system as shown on the drawings and specified on these contract
documents. Pipe measurement is to the outside ofthe structures.
lTt.M l~-':f 'I<' ."'11UN UNlT... .. .. (,lTY NI PKlCl: 'lUl.'AL .I:'..K1t;.t',.
E-l 15" RCP LF 0 $18.00 $0.00
B-2 18" RCP LF 0 $20.00 $0.00
E-3 24" RCP LF 0 $22.00 $0.00
E-4 18" Precast Headwall EA 0 $970.00 $0.00
E-5 Retaining Wall LF 0 $75.00 $0.00
E-6 Dry Detention Area Grading LS 0 $32,000.00 $0.00
E-7 Valley Gutter Inlet EA 0 $2,000.00 $0.00
E-8 Water Control Structure EA 0 $2,800.00 $0.00
TOTAL $0.00
QTY = 0 means items complete
Agenda Item No. 16A3
January 11, 2011
Page 12 of 15
3500 CORPORATE PLAZA
ENGINEER'S OPINION OF PROBABLE COST
SCHEDULE "F"
EARTHWORK & SITE PREP
Clearing, grubbing and preparation of roadway rights-of-way, and easements areas as designated
by the Engineer in the field including chipping and grinding of all materials on the Owner's
property and then disposal of all residue off the Owner's property, all as specified, per acre
complete. All work in right-of-way is subject to inspection by the owner, Collier County DOT
and FDOT contingent on final acceptance of improvements as shown and specified on the contract
documents.
ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
F-I Street Lights EA 4 $0.00 $0.00
F-2 Re-p1anting of Preserve Areas LS 1 $0.00 $0.00
TOTAL $0.00
QTY = 0 means items complete
Agenda Item No. 16A3
January 11, 2011
Page 13 of 15
3500 CORPORATE PLAZA
ENGINEER'S OPINION OF PROBABLE COST
UPDATED: 9/9/2003
BID SCHEDULE SUMMARY
SCHEDULE DESCRIPTION TOTAL PRICE
A Earthwork $0.00
B Paving $11,120.00
C Wastewater Collection $696.00
D Potable Water Distribution $0.00
E Storm Drainage $0.00
F Misc. $0.00
TOTAL .tl J .816.00
QTY = 0 means items complete
Underground
Utility Total $696.00
Earthwork,
Paving and
Misc.Total $11 ,120.00
Agenda Item No. 16A3
January 11, 2011
Page 14 of 15
RESOLUTION NO. 11-_
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY,
FLORIDA AUTHORIZING FINAL
ACCEPTANCE OF CERTAIN ROADWAY AND
DRAINAGE IMPROVEMENTS IN 3500
CORPORATE PLAZA, ACCORDING TO THE
PLAT THEREOF RECORDED IN PLAT BOOK
44, PAGES 23 THROUGH 24; RELEASE OF THE
NUUNTENANCE SECURITY; AND
ACCEPTANCE OF THE MAINTENANCE
RESPONSIBILITY FOR THE ROADWAY AND
DRAINAGE IMPROVEMENTS THAT ARE NOT
REQUIRED TO BE MAINTAINED BY THE 3500
CORPORATE PLAZA PROPERTY-OWNERS'
ASSOCIATION,INC.
WHEREAS, the Board of County Commissioners of Collier County, Florida, on
September 27,2005, approved the plat of 3500 Corporate Plaza for recording; and
WHEREAS. the Developer has constructed and maintained the roadway and
drainage improvements in accordance with the approved plans and specifications as
required by the Land Development Code (Collier County Ordinance No. 04-41, as
amended); and
WHEREAS, the Developer is requesting final acceptance of the roadway and
drainage improvements and release of his maintenance security; and
WHEREAS, the Engineering and Environmental Services Department of the
Community Development and Environmental Services Division has inspected the
roadway and drainage improvements, and is recommending acceptance of said facilities.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby
granted for those roadway and drainage improvements in 3500 Corporate Plaza, pursuant
to the plat thereof recorded in Plat Book 44, pages 23 through 24, and the Clerk is hereby
authorized to release the maintenance security.
Agenda Item No. 16A3
January 11, 2011
Page 15 of 15
BE IT FURTHER RESOLVED AND ORDERED that the County accept the
future maintenance and other attendant costs for those roadway and drainage
improvements that are not required to be maintained by the 3500 Corporate Plaza
Property-owners' Association, Inc
This Resolution adopted after motion, second and majority vote favoring same,
this day of , 2011.
DATE:
ATTEST:
D~GHTE.BROCK,CLERK
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORlDA
By:
, Deputy Clerk
, CHAIRMAN
Approved as to form and legal
sufficiency:
J~ 7.wJl .
Steven T. Williams