Loading...
Agenda 12/11/2012 Item #11E12/11/2-012 Item 11. E. E C" 1VE SUMMARY Recommendation to approve and authorize the expenditure of Tourist Development Category "A" tax funds for a Peer Review of the Collier County Beaches volume design by Atkins North American, Inc. under Contract No. 09- 5262 -CZ for a lump sum amount of $33,365. OBJECTIVE: To move forward with the Peer Review for the renourishment volumes of the Collier County Beaches. CONSIDERATIONS: The intention of this Peer Review is to provide design methodology and proposed renourishment volume review of the upcoming beach nourishment project by Atkins North American, Inc. for a lump sum price of $33,365. Atkins will review design drawings, monitoring reports, calculations, modeling results and construction standards in this analysis. A written report will include the following deliverables: 1. Analysis addressing the adequateness of the design, the completeness of the design, probable outcome and recommendations, if any. 2. A detailed explanation of the total quantity of sand to be placed on the beach as part upcoming Collier County beach renourishment project. 3. Plots of the beach profiles at each of the surveyed monuments showing the 2006 design template and the computed quantity of sand necessary to restore the original 2006 design that is unmodified and not including inlet management projects. /1 4. A table identifying the amount of sand to be placed throughout the project at each profile for each beach segment. 5. Identify any and all assumptions used to explain how much sand is proposed and specifically where it is proposed to be placed as part of the 2006 design in each beach segment. 6. Confirm and show any differences if the new fill differs from the unmodified 2006 design template. Explain why there are differences, if any, based on the review of the reference documents. Atkins will be awarded this work under fixed term contract No.: 09- 5262 -CZ. This item was on the Board of County Commissioners November 13, 2012 meeting Item 16A25 and was requested to be moved to the December 11, 2012 meeting for review and approval. The Growth Management Administrator made modifications to the scope to provide a more detailed Peer Review which increased the cost to $33,365. The increase in scope will allow the Peer Review consultant to develop their own sand volume analysis plots to confirm the total quantity as compared to the 2006 design template. Sand volume represents the largest cost component variable of the project. FISCAL IMPACT: Funding for this project will be from Tourist Development Tax Category "A" funding within Tourist Development Council (TDC) Beach Renourishment Fund 195. Funding is available in Project 80096. Packet Page -1782- 12/11/2012 Item 11. E. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. ADVISORY COMMITTEE RECOMMENDATIONS: This item was presented for approval to the Coastal Advisory Committee and the Tourist Development Council in the amount of $17,000. At the October 11, 2012 Coastal Advisory Committee (CAC) meeting, the Collier County Beach Volume Peer Review was recommended for approval by a 5 to 1 vote. At the October 22, 2012 Tourist Development Council (TDC) meeting, the Collier County Beach Volume Peer Review was not recommended for approval by a 7 to 0 vote. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's Office, requires majority vote, and is legally sufficient for Board action. — CMG RECOMMENDATION: To approve and authorize the expenditure of Tourist Development Category "A" tax funds for the Peer Review of Collier County Beach volume design by Atkins North American, Inc. in the amount of $33,365. Prepared by: J. Gary McAlpin, P.E., Coastal Zone Management, Natural Resources Department, Growth Management Division. Attachments: Atkins Peer Review proposal Packet Page -1783- 12/11/2012 Item 11.E. COLLIER COUNTY Board of County Commissioners Item Number: 11.E. Item Summary: Recommendation to approve and authorize the expenditure of Tourist Development Category "A" tax funds for a Peer Review of the Collier County Beaches volume design by Atkins North American, Inc. under Contract No. 09- 5262 -CZ for a lump sum amount of $15,905. (Gary McAlpin, P.E., Coastal Zone Management, Natural Resources Department, Growth Management Division) Meeting Date: 12/11/2012 Prepared By Name: HambrightGail Title: Accountant,Coastal Zone Management 11/14/2012 2:09:47 PM n Approved By Name: JohnsonScott Title: Purchasing Agent,Purchasing & General Services Date: 11/16/2012 8:04:38 AM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Date: 11/16/2012 9:26:35 AM Name: WardKelsey Title: Manager - Contracts Administration,Purchasing & Ge Date: 11/16/2012 9:36:50 AM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 11/16/2012 11:41:29 AM Name: McAlpinGary Title: Director - Coastal Management Programs,Coastal Zon Date: 11/20/2012 9:33:42 AM Name: GreeneColleen Packet Page -1784- Title: Assistant County Attorney,County Attorney Date: 11/21/2012 11:55:15 AM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 11/29/2012 3:57:49 PM Name: KlatzkowJeff Title: County Attorney Date: 11/30/2012 1:33:19 PM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 11/30/2012 4:55:27 PM Name: OchsLeo Title: County Manager Date: 12/1/2012 3:22:28 PM Packet Page -1785- 12/11/2012 Item 11. E. 12/11/2012 Item 11.E. ,^ Professional Engineering Services for Peer Review Services of Collier County Beaches for Coastal Management Contract Number 09- 5262 -CZ December 4, 2012 ATKINS is pleased to provide a scope of work for Collier County Coastal Zone Management Department. The intention of this Work Assignment is to provide peer review of the beach nourishment design methodology prepared for the County by Coastal Planning and Engineering. In accordance with Collier County Contract Number 09- 5262 -CZ the following scope of work is presented herein. SCOPE OF SERVICES Atkins will review the beach design template for Vanderbilt, Park Shore, and Naples Beach. Vanderbilt Beach will include range monuments R -25 through R -31, Park Shore will cover R -43 though U -55, and the Naples Beach fill template will address R -58A to R -73. Atkins will review documentation prepared by Coastal Planning and Engineering (CP &E) in support of the design process. Documents include: Collier County Conceptual Renouishment Project Analysis October 2011, Design Calculation Tables October 2012, and other design information that is relevant. Atkins will also use the results of the recently completed 2012 County Coastal Monitoring Report and Post - Tropical Storm Debby Impacts Report to evaluate the predicted design life of the planned beach renourishment events. Atkins will review design drawings, calculations, modeling results and construction standards and write a memorandum that details the methods used and provides a review of our findings. The analysis will look at the currently proposed project in comparison to the last large -scale beach nourishment project that was completed in 2006 using a 6 year design template. The analysis will look at each R- monument in the three project areas in detail showing comparisons in beach widths and volumes in plan and profile views and tabular form. Figures will be developed illustrating the comparisons to the 2006 - 6 year design template project at each profile. Calculations will be verified using MATLAB and Civil 3D software. The above analyses will provide a review of the proposed design project and the memorandum will be submitted as a bound printed document and on a disk in electronic .pdf format. Atkins will prepare for, travel to and attend one (1) Board of County Commissioners Meeting to present our findings. One Atkins senior engineer will attend this meeting. Deliverables will include: 1) A detailed explanation of the total quantity of sand to be placed on the beach as part of the renourishment project. 2) This will include plots of the beach profiles at each of the surveyed monuments showing the 2006 - 6 year design template and the computed quantity of sand necessary to restore the original 2006 — 6 year design template. (unmodified not including any inlet management projects) 3) A table will be provided indentifying the amount of sand to be placed throughout the project at n each profile, for each of the 3 areas. Packet Page -1786- 12/11/2012 Item 11. E. 4) Any and all assumptions shall be listed to explain how much sand is proposed and specifically where it is proposed to be placed as part of the 2006 - 6 year design template in each of the project areas. 5) Figures will confirm and show any differences on the profile if the new project fill differs from the unmodified 2006 — 6 year design template. The memorandum will explain why there are differences, if any, based on the review of the reference documents. Budget Estimate Work for this assignment will be performed for the lump sum amount of $33,365. Work will be billed to the County on a monthly basis based on the percentage of work completed for the preceding month. The budget breakdown per project area is as follows: Task 1— Collier County Beach Design Template Peer - Review Analysis & Memorandum ........... $33,365 Total........................................................ ............................... ........................$33,365 Schedule Estimate The following schedule of completion is anticipated. 1. Submit draft reports within 30 calendar days following the Notice -to- Proceed and receipt of all required data (surveys) to complete analysis. Assumptions 1. All existing information /documentation including, but not limited to, survey data, project permits, environmental information, previous studies, CAD drawings and volume tables, etc. will be provided to Atkins by the County /CP &E. 2. This quote is based on conversations with County Staff on October 9, and November 28, 2012. 3. No model 1 ` sis, design or bi rre will be generated from this peer - review, however Atkins wikprg e exhi nsistent with the deliverables section. JeffreR. Tabar Project Director Atkins North America, Inc. December 4, 2012 Packet Page -1787- Date 12/11/2012 Item 11.E. PROJECT BUDGET WORKSHEET Client: coliv cot Labor Multiplier: 3.05 Project: lCollier Coo Peer�evi% Reimbursable Multiplier: 1.00 Project No: C TBD Prepared By: BDF Labor Costs Task Rate Task 1 Monitoring Reports Total Manhours Raw Labor Cost Multiplied Labor Cost Task No. 1 Personnel Classification Project Manager $58.85 24 24 $1,412 $4,308 Senior Engineer $42.92 40 40 $1,717 $5,236 Project Engineer $35.50 60 60 $2,130 $6,497 Engineer EIT $30.00 75 75 $2,250 $6,863 CAD Technician $30.00 85 85 $2,550 $7,778 Administrative $18.70 12 12 $224 $684 Total Hours 296 296 $10 284 ,'i $31,365 $31,365 Raw Labor Cost` x Mult. Labor Cost FE Total Project Budget $2,000 $33,365 M Packet Page -1788- Reimbursable Multiplied Reimbursable Costs Task No. 1 u Costs Costs Travel $0 Tr'7 N a ?Fo-4+�' �1 Y � $0 $0 Lodging 0 $0 $0 Misc. $0 . $0 $0 Geotechnical Analysis $0� $0 $0 Beach Survey $0� _ $o $0 $2,000 $2,000 $2,000 $2,000 Gra hics/Re roduction $2,000 k Total Reimbursables $2,000 Total Mult. Reimbursables $2,000. ri $2,000 $2,000 FE Total Project Budget $2,000 $33,365 M Packet Page -1788-