Agenda 11/13/2012 Item #16A1711/13/2012 Item 16.A.17. EXECUTIVE SUMMARY Recommendation to approve a Resolution implementing Board direction to exempt Lane Rental Fees on County sponsored Projects located within or adjacent to the Right - of -Way and to eliminate permit charges for services previously provided by the County on behalf of the Florida Department of Transportation. OBJECTIVE: To obtain approval of a Resolution superseding Resolution No. 2007 -162 to implement previous Board direction to exempt Lane Rental Fees on County sponsored projects located within or adjacent to the Right -of -Way and to eliminate permit charges for services previously provided by the county on behalf of the Florida Department of Transportation (FDOT). CONSIDERATIONS: On May 8, 2012 (Agenda Item H), the Board waived the daily lane rental fees for the Radio Road East Municipal Service Taxing Unit and directed the County Manager to amend the Lane Rental Fee (per day) Incentive Program to exempt all future Collier County projects from such fees when the project is a County sponsored enhancement project located within or adjacent to county right -of -way. The basic premise for the imposition of a lane rental fee is that the motoring public is deprived of a portion of the available roadway capacity when a contractor blocks off a lane for the benefit of an adjoining property undergoing some sort of construction. At its May 8, 2012, meeting the Board determined that work performed on County projects located within or adjacent to the Right -of -Way should be exempt from the payment of lane rental fees since it is deemed in the public interest to maintain and preserve the public infrastructure. The attached Right of Way Fee will supersede Resolution No. 2007 -162 by exempting the payment of lane rental fees on County projects located adjacent or within the Right of Way and also removes two charges related to work the County previously performed on behalf of FDOT. In June 2002, the Collier County Board of County Commissioners approved a maintenance agreement with the State to handle the approximately 145 miles of State roadways. At that time FDOT scaled back its maintenance services handled by its in -house staff and the county approved adding the maintenance of State roads for approximately $16.4 million over the ten year tenn of the agreement. That agreement ended on September 30, 2012. Under the maintenance agreement, the County previous provided and charged permit fees for the following tasks: • County Engineering review on behalf of FDOT Drainage Permits (no discharge into State system); and • County Engineering review on behalf of FDOT Drainage Pen-nit (with discharge into State system). As a result of the State's decision not to renew the maintenance agreement with the County, County staff will no longer be providing those review services; therefore, those fees are recommended for elimination as well. Packet Page -1618- 11/13/2012 Item 16.A.17. The change proposed by the attached Resolution will not eliminate standard review and inspection fees for all public and private projects currently in place per Ordinance 2009 -19, "Construction Standards Handbook for Work within the Public Right -of- way." FISCAL IMPACT: The Lane Rental Fees charged for County sponsored projects has averaged approximately $1,000.00 annually with the revenue deposited into ROW Permitting Fund (102). The proposed action would eliminate this small source of revenue as well as the charges made to various County department budgets. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval —SRT. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this Executive Summary. RECOMMENDATION: Recommendation to approve a Resolution, superseding Resolution No. 2007 -162, to exempt Lane Rental Fees on County sponsored projects located within or adjacent to County Right -of -Way and to eliminate fee categories for services previously provided by the county on behalf of the Florida Department of Transportation. Prepared By: Pamela Lulich, Landscape Operations Manager, Road and Bridge Department, GMD Mark Burtchin, Project Manager, Road and Bridge Department, GMD John Vliet, Director, Road and Bridge Department, GMD Attachment: Superseding Resolution with attachments; Strikethrough /underscored version of attachments showing proposed revisions. Packet Page -1619- 11/13/2012 Item 16.A.17. COLLIER COUNTY Board of County Commissioners Item Number: 16.A.17. Item Summary: Redommendation to approve a Resolution implementing Board direction to exempt Lane Rental Fees on County sponsored Projects located within or adjacent to the Right -of -Way and to eliminate Permit charges for services previously provided by the County on behalf of the Florida Department of Transportation. Meeting Date: 11/13/2012 Prepared By Name: LulichPamela Title: Manager - Landscape Operations,Altemative Transpo 10/18/2012 8:19:47 AM Submitted by Title: Manager - Landscape Operations,Alternative Transpo Name: LulichPamela 10/18/2012 8:19:51 AM Approved By Name: HerreraGloria Title: Management/Budget Analyst,Transportation Administr Date: 10/18/2012 10:19:07 AM Name: Vlietlohn Title: Director - Road Maintenance,Transportation Enginee Date: 10/18/2012 2:11:35 PM Name: ShueGene Date: 10/22/2012 4:22:04 PM Name: LynchDiane Title: Administrative Assistant Date: 10/24/2012 11:16:02 AM Packet Page -1620- Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 10/25/2012 8:12:39 AM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 10/26/2012 5:12:35 PM Name: KlatzkowJeff Title: County Attorney Date: 10/30/2012 11:40:32 AM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 11/1/2012 4:01:52 PM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 11/1/2012 4:15:06 PM Name: OchsLeo Title: County Manager Date: 11/4/2012 11:39:50 AM Packet Page -1621- 11/13/2012 Item 16.A.17. 11/13/2012 Item 16.A.17. Exhibit "A" Right-of-way Permits Type Residential Non- residential Small Large Right-of-way Construction $ 200.00 $ 1000.00 (June -Nov) $2000.00 (June -Nov) $ 2000.00 (Dec -May) $4000.00 (Dec -May) Work in the ROW (Without Lane $ 50.00 (June -Nov) $ 100.00 (June -Nov) Closures), Cost Per Day $ 100.00 (Dec -May) $ 200.00 (Dec -May) Miscellaneous Events $ 200.00 PSC Regulated Franchise Utility $100.00 Application Fee + $50/Day inspection fee Renewal/Modification of unexpired or *$ 100.00 $ 500.00 $1000.00 incomplete Permit Re- inspection - First $ 100.00 $ 100.00 $ 100.00 Second $ 150.00 $ 150.00 $ 150.00 Third $ 200.00 $ 200.00 $ 200.00 All subsequent inspections $ 250.00 $ 250.00 $ 250.00 Jack - and- Bore/Directional Bore $ 500.00 $ 1000.00 $2000.00 Open -cut Construction $2000.00 $4000.00 $6000.00 Sprinkler Head Placement in R/W $ 50.00 $ 200.00 $ 400.00 Turn Lane Construction $ 500.00 $ 1500.00 $3000.00 After- the -Fact Permit 4 X Normal Fee ($24000.00 max) * If the Renewal/Modification does not require additional staff time and field check (unexpired permit only), there will not be any fees charged. * *Development two (2) acres or less are considered small. Page 1 of 4 Packet Page -1622- Exhibit "A" Right -of -way Permit Notes: 11 /13/2012 Item 16.A.17. 1. Unjustified delays meeting permitted deadlines shall require additional fees as authorized. 2. Small Commercial Development shall be defined as a non - residential (single- family or duplex) project generating 600 vehicles trips per day or less. 3. Large Commercial Development shall be defined as a non - residential (single- family or duplex) project generating greater than 600 trips per day. 4. A right- of-way use fee (chart attached) per day shall apply to all non - residential projects requiring a lane closure on a major roadway or sidewalk closure on any roadway (chart attached). A major roadway is defined herein as being one of the following Collier County maintained roadways: Roadway Name From To Immokalee Road Tamiami Trail North (US 41) SR 29 (Immokalee) Vanderbilt Beach Road Tamiami Trail North (US 41 ) Collier Boulevard Pine Ride Road Tamiami Trail North US 41 Collier Boulevard Golden Gate Parkway Tamiami Trail North (US 41 ) Collier Boulevard Radio Road Airport Road Davis Boulevard Rattlesnake Hammock Road Tamiami Trail East (US 41) Collier Boulevard Goodlette -Prank Road Tamiami Trail East (US 41) Immokalee Road Airoort Road Tamiami Trail East (US 41) Immokalee Road Livingston Road Radio Road Lee County Line Santa Barbara Boulevard _<, Pine Ridge Rd Logan Boulevard Pine Ridge Road Lee County Line Collier Boulevard i;, +!3 .- .. .. - Immokalee Road CR 29 Ever lades City SR 90 (US 41) Ba shore Drive U.S. 41 Thomasson Drive Golden Gate Boulevard C.R. 951 Desoto Boulevard Vanderbilt Drive VBR Lee County Line Gulfshore Boulevard VBR Bluebill Ave. Oil Well Rd Immokalee Rd S.R. 29 Randall Boulevard Immokalee Rd Desoto Boulevard Everglades Boulevard Golden Gate Boulevard Immokalee Rd Na les Boulevard Pine Ridge Road Airport Road County Bam Road Davis Boulevard Rattlesnake Hammock Road 5. No refunds of unused fees shall be allowed. 6. Lane use fees shall be calculated by Collier County and shall be due and payable at the time of permit application if a permit is issued. If a Notice of Intent to Issue a permit is provided by the County in lieu of a permit, then the lane use fee shall be due and payable at the time of issuance of the actual permit. 7. If work continues beyond the originally estimated lane use period, then additional lane use fees shall be due and payable within two working days of notice to the Permittee of such additional fees. Failure to provide the additional fees to the County within three working days of such notice shall be cause for the project to be "red - tagged" and shut down. Lane use fees shall continue to accrue during any period of shutdown and shall be added to the additional lane use fees calculated by Collier County. 8. Any deviation from the above must be approved by the ROW Permitting and Inspection manager or designee prior to implementation. Page 2 of 4 Packet Page -1623- 11/13/2012 Item 16.A.17. Exhibit "A" LANE RENTAL FEE (PER DAY) INCENTIVE PROGRAM Sep Oct Nov Dec 3 $60( .Jan Feb Mar Apr May Jun Jul Aug Page 3 of 4 Packet Page -1624- 11 /13/2012 Item 16.A.17. Exhibit "A" SIDEWALK RENTAL FEE (PER DAY) INCENTIVE PROGRAM $100 $100 $10C Aug Sep Oct ryov Uec Jan Feb Mar Apr Page 4 of 4 Packet Page -1625- $100 $100 $100 May June July iw 11/13/2012 Item 16.A.17. RESOLUTION NO. 2012- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, SUPERSEDING RESOLUTION 2007 -162, WHICH ESTABLISHED A REVISED SCHEDULE OF FEES FOR RIGHT -OF -WAY PERMITS, TO MEMORIALIZE A WAIVER OF DAILY CHARGES FOR LANE RENTAL FEES ON COUNTY PROJECTS ADJACENT TO OR WITHIN COUNTY RIGHT OF WAY. WHEREAS, Collier County Resolution No. 2000 -455 established a schedule of development - related review and processing fees; and WHEREAS, the fees established in Resolution Number 2000 -455 were subsequently amended and revised pursuant to Resolution Number 2002479, Resolution Number 2003 -170 and Resolution Number 2007 -162 and the established fees are reflective of the actual cost of processing, reviewing, inspecting and evaluating Collier County Right -of -Way permits as set forth in attached Exhibit "A;" and WHEREAS, at the Board of Collier County Commissioners' regular meeting on May 8, 2012, the Board gave direction to exempt all future Collier County Projects within or adjacent to County Right- of-Way from being subject to Lane Rental Fees. WHEREAS, as a result of the termination of maintenance agreement with the Florida Department of Transportation On September 30, 2012, two permit charges previously performed by the County on behalf of the State no longer need to be included in the Right of Way Permit fee schedule. NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: 1. The Board of County Commissioners hereby declares and approves the fees set forth in the Schedule of Fees for Right -of -Way Permits, attached hereto and incorporated herein as "Exhibit A" as reasonable sums to be assessed to those who receive the benefits of those services, reviews, and inspections required by the Land Development Code and the County permitting process. 2. That all County Projects within or adjacent to the County Right -of -Way shall be exempt from the Lane Rental Fee as noted on Exhibit "A." Packet Page -1626- 11 /13/2012 Item 16.A.17. BE IT FURTHER RESOLVED that this Resolution relating to Right -of -Way permit fees in the Land Development Code is recorded in the minutes of this Board and that Resolution No. 2007 -162 is hereby superseded by the adoption of this Resolution. THIS RESOLUTION is adopted after motion, second, and majority vote favoring adoption this _'b day of 2012. ATTEST DWIGHT E. BROCK, Clerk Deputy Clerk Approved as to form and legal sufficiency: Scott R- Teach. Deputy County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA Fred W. Coyle, Chairman 2 Packet Page -1627- 11 /13/2012 Item 16.A.17. Exhibit "A" Right -of -way Permits Tore Residential Non - residential Small Lame Right -of -way Construction $ 200.00 $ 1000.00 (June -Nov) $2000.00 (June -Nov) $ 2000.00 (Dec -May) $4000.00 (Dec -May) Work in the ROW (Without Lane $ 50.00 (June -Nov) $ 100.00 (June -Nov) Closures), Cost Per Day $ 100.00 (Dec -May) $ 200.00 (Dec -May) Miscellaneous Events $ 200.00 PSC Regulated Franchise Utility $100.00 Application Fee + $50/Day inspection fee Renewal/Modification of unexpired or *$ 100.00 $ 500.00 $ 1000.00 incomplete Permit Re- inspection - First $ 100.00 $ 100.00 $ 100.00 Second $ 150.00 $ 150.00 $ 150.00 Third $ 200.00 $ 200.00 $ 200.00 All subsequent inspections $ 250.00 $ 250.00 $ 250.00 Jack- and- Bore/Directional Bore $ 500.00 $ 1000.00 $2000.00 Open -cut Construction $2000.00 $4000.00 $6000.00 Sprinkler Head Placement in R/W $ 50.00 $ 200.00 $ 400.00 Turn Lane Construction $ 500.00 $ 1500.00 $3000.00 After- the -Fact Permit 4 X Normal Fee ($24000.00 max) * If the Renewal/Modification does not require additional staff time and field check (unexpired permit only), there will not be any fees charged. * *Development two (2) acres or less are considered small. Page 1 of 4 Packet Page -1628- Exhibit "A" Right -of -way Permit Notes: 11/13/2012 Item 16.A.17. 1. Unjustified delays meeting permitted deadlines shall require additional fees as authorized. 2. Small Commercial Development shall be defined as a non - residential (single- family or duplex) project generating 6D0 vehicles trips per day or less. 3. Large Commercial Development shall be defined as a non - residential (single- family or duplex) project generating greater than 600 trips per day. 4. A right -of -way use fee (chart attached) per day shall apply to all non - residential projects requiring a lane closure on a major roadway or sidewalk closure on any roadway (chart attached). A major roadway is defined herein as being one of the following Collier County maintained roadways: Roadway Name From To Immokalee Road Tamiami Trail North (US 41 SR 29 tmmokatee Vanderbilt Beach Road Tamiami Trail North (US 41 ) Collier Boulevard Pine Ridoe Road Tamiami Trail North US 41 Collier Boulevard Golden Gate Parkway Tamiami Trail North US 41 Collier Boulevard Radio Road Rattlesnake Hammock Road Airport Road Tamiami TSEW 1 Davis Boulevard Goodlette -Frank Road Tamiami T1t Collier Boulevard immokalead Airport Road Tamiami T1) Immokalee Road Livin ston Road Santa Barbara Boulevard Ra Rattlesnakd Lee Coun Line _L Nan Boulevard Pine Ridoe Road Pine Rid a Rd Lee County Line Collier Boulevard CR 29 US 41 Immokalee Road Ba hove Dave Everglades City SR 90 (US 41 Golden Gate Boulevard U.S. 41 C.R. 951 Thomasson Drive Vanderbilt Drive VBR Desoto Boulevard Gultshore Boulevard VBR Lee County Line Oil Well Rd Immokalee Rd Bluebill Ave. S. R. 29 Randall Boulevard Immokalee Rd Desoto Boulevard Eve lades Boulevard Golden Gate Boulevard Immokalee Rd Na les Boulevard Pine Ride Road Airport Road County Barn Road I Davis Boulevard Rattlesnake Hammock Road 5. No refunds of unused fees shall be allowed. 6. Lane use fees shall be calculated by Collier County and shall be due and payable at the time of permit application if a permit is issued. If a Notice of Intent to Issue a permit is provided by the County in lieu of a permit, then the lane use fee shall be due and payable at the time of issuance of the actual permit. 7. if work continues beyond the originally estimated lane use period, then additional lane use fees shall be due and payable within two working days of notice to the Permittee of such additional fees. Failure to provide the additional fees to the County within three working days of such notice shall be cause for the project to be `red - tagged" and shut down. Lane use fees shall continue to accrue during any period of shutdown and shall be added to the additional lane use fees calculated by Collier County, 8. Any deviation from the above must be approved by the ROW Permitting and Inspection manager or designee prior to implementation. 9. All County Projects shall be exempt from the Lane Rental Fee Incentive Program. Page 2 of 4 Packet Page -1629- 11/13/2012 Item 16.A.17. Exhibit "A" LANE RENTAL FEE (PER DAY) INCENTIVE PROGRAM Sep fact Nov Dec $6 Jan Feb Mar Page 3 of 4 Packet Page -1630- $600 Apr May Jun Jul Aug 11/13/2012 Item 16.A.17. Exhibit "A" SIDEWALK RENTAL FEE (PER DAY) INCENTIVE PROGRAM $100 $100 $10C Aug Sep Oct Nov uec .pan Feb Mar Apr Page 4 of 4 Packet Page -1631- $100 ,$100 $100 May June July