Agenda 09/25/2012 Item #16A5 9/25/2012 Item 16.A.5. EXECUTIVE SUMMARY Recommendation to grant final approval of the private roadway and drainage improvements for the final plat of Valencia Lakes — Phase 4-A, PPL-AR3124 with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. OBJECTIVE: To grant final approval of the infrastructure improvements associated with that subdivision known as Valencia Lakes — Phase 4-A, release the developer's maintenance security, and accept the plat dedications. CONSIDERATIONS: 1. On December 3, 2004, the Engineering Services Department granted preliminary acceptance of the roadway and drainage improvements in Valencia Lakes —Phase 4-A. 2. The roadway and drainage improvements will be maintained by the project's homeowners association. 3. The required improvements have been constructed in accordance with the Land Development Code. The Engineering Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4. A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.3 of the Land Development Code. A copy of the document is attached. 5. This PUD has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The original security in the amount of $276,830.84 has been reduced to the current amount based on the previous work performed and completed and pursuant to the terms of the Construction and Maintenance Agreement dated July 29, 2003. The existing security in the amount of $52,074.99 will be released upon Board approval. GROWTH MANAGEMENT IMPACT: There is no growth management impact. Packet Page -2126- 9/25/2012 Item 16.A.5. LEGAL CONSIDERATIONS: The County Attorney's Office has reviewed and approved the Resolution for legal sufficiency. This item requires a majority vote. This item is ready for Board consideration and approval. ERP RECOMMENDATION: Recommendation to grant final acceptance of the roadway and drainage improvements in Valencia Lakes—Phase 4-A, PPL-AR3124 and: 1. Authorize the Chairman to execute the attached resolution authorizing final acceptance of the improvements and acceptance of the plat dedications. 2. Authorize the release of the maintenance security in the amount of$52,074.99. PREPARED BY: John Houldsworth, Senior Site Plans Reviewer, Engineering Services Department, Growth Management Division, Planning and Regulation Attachments: 1) Location Map 2)Bond Basis 3) Resolution Packet Page -2127- 9/25/2012 Item 16.A.5. COLLIER COUNTY Board of County Commissioners Item Number: 16.A.5. Item Summary: Recommendation to grant final approval of the private roadway and drainage improvements for the final plat of Valencia Lakes—Phase 4-A, PPL-AR3124 with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. Meeting Date: 9/25/2012 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Engineering&Environm 8/29/2012 12:44:29 PM Approved By Name: BeardLaurie Title: Planner,Transportation Planning Date: 8/29/2012 1:39:07 PM Name: PuigJudy Title: Operations Analyst,GMD P&R Date: 8/29/2012 2:02:45 PM Name: McKennaJack Title: Manager-Engineering Review Services,Engineering&Environmental Services Date: 8/29/2012 4:59:30 PM Name: KovenskyKenneth Title:Management/Budget Analyst, Senior,Operations &Regulatory Management Date: 9/4/2012 8:46:13 AM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 9/13/2012 10:29:32 AM Name: PepinEmily Title: Assistant County Attorney, CAO Litigation Packet Page -2128- 9/25/2012 Item 16.A.5. Date: 9/14/2012 4:44:26 PM Name: KlatzkowJeff Title: County Attorney Date: 9/17/2012 9:05:06 AM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 9/17/2012 9:48:41 AM Name: KlatzkowJeff Title: County Attorney Date: 9/17/2012 10:57:31 AM Name: SheffieldMichael Title: Manager-Business Operations, CMO Date: 9/17/2012 2:28:15 PM tow Packet Page-2129- i I ►% , 111111 a iiii ' 11 - — H*IVIIE — —tfigill IX CI BM i 444 iiiii a 'MN 03S1S MS 441 IFF i elre-it nimilav)t. La a cn TWOS Oi.1.0N Y a z , Z W ffi` �I � " 3S ^ 3 " b„�3 •,3i " � LL ISIB'a'3) 0009 aslYNOWWI-sa IJVN - ,' c 2 k w w - IY 3 I - n w,- OU 009031105 NOSIIM 909031109 NOS1IM a O J 6.4 gF _gin mna ELI' rA, N gg 0 IV _ 1 -J I j no D F, ■ i nvi l 1 t1U)MAK I d CUU4 10:3U/J I. l 0:ZY/N t �l variason Cnyineef Ing U. OSLOOIytSby t' 7 9/25/2012 Item 16.A.5. Valencia Lakes Phase 4-A Constuction Costs Prepared by Richard Joudrny,P.E. Davidson Engineering,Inc. Project Cost Summary Deserlr,tlon Site Fill $ - Roadway Construction $ 190,749.90 Drainage $ - Water/Sewer Construction Costs $ Total $ 190,749.90 plus 10% of overall $ •86,080.94 Improvements • Total Bond Amount $ 276,830.84 Askik • • • • Allow 11DavidsonserverlcompanylActive ProjectsW Valencia Lakes\Beazer Homes 01-00491Valencia Lakes Phase 4 A1Services During Construct onlUt llty Dedication\Opinion of Probable Cost for bond amount Page 1 Packet Page-2131- rnvri vaviason Cnsineer in9 llrlOrflAK 16 LUU4 10:3U/ 1. I0 :n/NU. b3Ztiblyt5by N 3 9/25/2012 Item 16.A.5. Valencia Lakes Phase 4A Constuction Costs Prospered by (COMPLETED) Richard Joudrsy,P.E. Davidson Engineering,Inc. Site Fill ga COST TOTAL Fill 50500 CY 4.50 • Subtotal $ _ • Contingency 10% $ TOTAL $ • • • • Packet Page -2132- u. rttum uav1ason CnglneerIns krr11.1)M n I6LUU4 10.SU/JI. lo.t /NU. OSL001e6o r 4 9/25/2012 Item 16.A.5. Valencia Lakes Phase 4-A Constuction Costs Prepared Richard Joudrey, P.E. Davidson Engineering,Inc. QTY 1,1err COST TOTAL Roadway Construction 1 1/2"Asphalt 13400 SY 4.76 $ 63,784.00 (2-3/4'Type S-3 Lifts) 8" Limerock Base 13400 SY 4.20 $ 56,280.00 12" Stabilized Subgrade 15500 SY 1.60 24"Valley Gutter 9650. LF 4.90 Type"F"Mod. Curb 100 LF 7.00 Type "A"Mod. Curb 1100 LF 7.00 $ 7,700.00 Sidewalk 10750 SF 1.50 $ 16,125.00 1' Sod 8850 SF 0.20 S. 1,770.00 Seed & Mulch 1 LS 500.00 $ 500.00 Signing &Marking 1 LS 750.00 $ 750.00 Temp. turn around 0 EA 1,500.00 $ . Connect to existing 2 LS 500.00 $ 1,000.00 Street Light 15 EA 1,500.00 $ 22,500.00 PCP's 1 LS 3,000.00 $ 3,000.00 ow Conduit 1 LS. 750.00 Grub roadway 11.6 AC . 500.00 Subtotal $ 173,409.00 Contingency 10% S 17,340.90 TOTAL $ 190,749.90 Packet Page-2133- 1 nVRI v:r I U u l GIIy I IICCI In? u nU/mRIS 10 LUU4 I0.5U/J I, I0. /NU. b3Lbb1M)V I' b 9/25/2012 Item 16.A.5. Valencia Lakes Phase 4-A Conetuction Costs Prepared by: • (COMPLETED) Richard Joudrey,P.E. . Davidson Engineering,Inc. Drainage ImarovementsY UST COST TOTAL Dascriotion 15" Reinforced Concrete Pipe 400 LF 19.00 18" Reinforced Concrete Pipe 1600 LF 23.00 24" Reinforced Concrete Pipe 225 EA 30.00 30' Reinforced Concrete Pipe 0 EA 35.00 $ - 36" Reinforced Concrete Pipe 0 EA 40.00 $ - 42" Reinforced Concrete Pipe 0 EA 45.00 $ - Catch Basin Valley Gutter Inlet 20 EA 960.00 Junction Box . 0 EA 1,000.00 $ - FDOT Type C '1 EA 1,200.00 Control Stucture 0 • EA 2,500.00 $ - 18" Flared End 9 EA 600.00 24" Flared End 1 EA 800.00 42" Flared End 0 EA 1,250.00 $ - Subtotal $ - Contingency 10% $ - TOTAL $ - Packet Page-2134- MCA Davidson tngineering (IMU)MAK 13 ZUU4 1b:3U/51. 16:Z9/N0. 6326619669 P 6 9/25/2012 Item 16.A.5. Valencia Lakes Phase 4-A Constuction Costs Prepared by: (COMPLETED) Richard Joudrey,P.E. Davidson Engineering,inc. QTY UNIT CM TOTAL Potable/Fire Water System 10"WM 3300 LF 14.00 8"WM 1080 LF 12.00 6"WM 0 LF 10.00 $ - Fire Hydrant Assembly 19 EA 2,500.00 10"gate valve 4 EA 1,200.00 . 8" gate valve 2 EA 900.00 6" gate valve 0 EA 750.00 $ - Air release Valve 0 EA 1,300.00 '$ - Water Service Double 5 EA 350.00 Water Service Single , 3 EA 300.00 Water Subtotal $ - Sanitary Sewer Svavtem . 12" FM 0 LF 16.50 $ 10" FM 0 LF 15.00 $ - 8" FM 0 LF 13.50 $ 6" FM 0 LF 12.00 $ - • 4" FM 0 LF 10.00 $ - 6" Gravity Main >10' Deep 3375 LF 18.00 6" Gravity Main <10' Deep 0 LF 40,00 $ - Manhole<10' Deep 13 EA 3,500.00 Manhole >10' Deep 0 EA 4,500.00 $ - 8" plug valve 0 EA 1,200.00 $ - 6" Plug valve 0 EA 900.00 $ - Sewer Service Double 5 EA 350.00 Sewer Service Single 3 EA 300.00 4" Plug valve 0 EA 750.00 $ - Lift Station 8' 5HP 0 EA 55,000.00 $ - Sanitary Subtotal $ _ Subtotal $ - Contingency 10% $ _ TOTAL $ Packet Page -2135- 9/25/2012 Item 16.A.5. RESOLUTION NO. 12- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN VALENCIA LAKES — PHASE 4-A, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 41, PAGES 32 THROUGH 36, RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WHEREAS, the Board of County Commissioners of Collier County. Florida. on July 29. 2003 approved the plat of Valencia Lakes — Phase 4-A for recording: and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41. as amended): and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security: and WHEREAS, the Land Development Services Department has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE Fl RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Valencia Lakes — Phase 4-A, pursuant to the plat thereof recorded in Plat Book 41, Pages 32 through 36, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage improvements within Valencia Lakes — Phase 4-A will be maintained privately in the future and will not be the responsibility of Collier County: and Collier County hereby accepts the dedications of easements made on the final plat. This Resolution adopted after motion. second and majority vote Favoring same. this day of . 2012. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, CLERK COLLIER COUNTY. FLORIDA By: Deputy Clerk FRED W. COYLE. Chairman Valendia Lakes Phase 4A I o12 Rev.9/13112 Packet Page -2136- 9/25/2012 Item 16.A.5. Approved as to form and legal sufficiency: Emily R. Pepin Assistant County Attorney CP1 2-EIS-02277\5 .010* Valendia Lakes—•Phase 4A 2 of 2 Rev.9/1:3!12 Packet Page-2137-