Loading...
Agenda 09/11/2012 Item #16A 4Recommendation to approve final acceptance of the water and sewer utility facilities for Sandalwood /Secoya and to authorize the County Manager, or his designee, to release the Utilities Performance Security to the Project Engineer or the Developer's designated agent. OBJECTIVE: The Board of County Commissioners, Ex- Officio the Governing Board of the Collier County Water -Sewer District, to accept final and unconditional conveyance of these water and sewer facilities. CONSIDERATIONS: 1) The Developer of Sandalwood /Secoya, has constructed the water and sewer facilities within dedicated easements to serve this development. See attached location map. 2) Preliminary acceptance of these utility facilities was approved by the Engineering Services staff on March 16, 2011. At that time, the value of these utility facilities (assets) was $108,870.15 for the water facilities and $207,788 for the sewer facilities (see attachment[s]). This final acceptance is in accordance with Collier County Ordinance No. 2004 -31, as amended. 3) Staff recorded all preliminary acceptance documents in the public records of Collier County, which have been reviewed and approved by the County Attorney's office as to form and legal sufficiency. 4) The water and sewer facilities have been operated and maintained by the Collier County Water -Sewer District during, not less than, the required one (1) year warranty period. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $316,658.15 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. Packet Page -1689- 1201, 2 Item 1 E.4 LEGAL CONSIDERATIONS: This item is legally sufficient and requires a majority vote for Board approval. - JBW RECOMMENDATION: That the Board of County Commissioners, Ex- Officio the Governing Board of the Collier County Water -Sewer District, authorize final acceptance of these water and sewer utility facilities for Sandalwood /Secoya, and authorize the County Manager, or his designee, to release any Utilities Performance Security (UPS) in the amount of $4,000.00 to the Project Engineer or the Developer's designated agent. See attached Exhibit A. PREPARED BY: Jodi Hughes, Technician, Engineering Services, Growth Management Division, Planning and Regulation Attached Documents: 1. Location Map 2. Asset Sheet 3. Exhibit A Packet Page -1690- COLLIER COUNTY Board of County Commissioners Item Number: 16.A.4. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Sandalwood /Secoya and to authorize the County Manager, or his designee, to release any Utilities Performance Security to the Project Engineer or the Developer's designated agent. Meeting Date: 9/11/2012 Prepared By Name: HughesJodi Title: Technician,Engineering & Environmental Services 7/17/2012 1:45:52 PM Approved By Name: BeardLaurie Title: Planner,Transportation Plannin( Date: 7/17/2012 3:35:46 PM Name: McKennaJack Title: Manager - Engineering Review Services,Engineering & Environmental Services Date: 7/18/2012 8:01:19 AM Name: Steve Messner Title: Plant Manager,Water Date: 7/18/2012 9:47:34 AM Name: Pam Libby Title: Manager - Operations- Water/WW,Water Date: 7/19/2012 1:54:15 PM Name: NagySteve Title: Manager - Wastewater Collection, Wastewater Date: 7/20/2012 11:04:25 AM Name: SunyakMark Title: Project Manager, Principal,Public Utilities Engine Packet Page -1691- Date: 7/26/2012 10:07:47 AM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 7/27/2012 4:50:39 PM Name: Paul Mattausch Title: Director - Water,Water Date: 7/30/2012 4:30:48 PM 9/'r 112 C, Iier 16. A. 4, Name: ChmelikTom Title: Director, Public Utilities Engineering Date: 8/15/2012 10:51:01 AM Name: WhiteJennifer Title: Assistant County Attomey,County Attorney Date: 8/15/2012 3:06:52 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 8/23/2012 8:39:23 AM Name: WhiteJennifer Title: Assistant County Attorney.County Attorney Date: 8/23/2012 11:' )4:23 AM Name: KlatzkowJeff Title: County Attorney Date: 8/23/2012 2:58:29 PM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 8/23/2012 4:22:15 PM Name: SheffieldMichael Title: Manager- Business Operations, CMO Date: 8/29/2012 10:20:02 AM Packet Page -1692- a) Q a) 0 O ►i- c%1 0 CJ r- 0 0 JD 1 O Z D V m Z -v GC �� Fn i >'S: lIW1- IWVIWVl I �� 'c- �� v �^ ��� ��� A� ��� Yc I � Rai •� �� � �� � I app MA• E ppOO�fTTE -fFANK ROAO (G 0. a611 pp� i I ��� m"° vw I 4c I pig� I wRE- I IJRPORTVULI1Ntl ROID l's � ^ i S [ I p y e� '; I { 5 k 1 4VIN08TON ROA➢ PU1CAll YAR91 i Qwtl NO15`JNINI � r � O 1 j A4, p.pen g £ .Zl 1 m y 2 p 9.2 B6O pg p �Y�� ov�� �� m I Z�-1 � ��4 u £1PRL]S WTERSTATE -TS I y p� � C FOODS COV ! OpI1MA1Y QLB m � wllnacrtal MOT TO SCALE 9 41 9!` 1 i20 ; Itelr I k. . CERTIFICATION OF' C ONTRIBUTOR "i' ASSET'S - COUNTS PROJECT NAME: Sandalwood / Secova LOCATION: Section 13 Township 48 South, Range 25 East. NAME & ADDRESS OF OWNER: Livingston Road Development, LLC 25110 Bernwood Drive, Suite 101, Bonita Springs, FL 34235 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL PVC DR -14 12" 640 LF $24.63 $15,763.20 GATE VALVE 12" 3 EA $1,653.00 $4959.00 GATE VALVE 8" 5 EA $867.25 $4,336.25 TEMPORARY BLOW OFF 12" 1 EA $2,134.00 $2,134.00 FIRE HYDRANTS 41/2 9 EA $2,280.00 $20520.00 PVC DR -18 8" 2,210 LF $11.63 $25,702.30 PVC DR -14 8" 180 LF $12.78 $2.300.40 PERMANENT BACTEE SAMPLE POINT 3 EA $724.00 $2,172.00 AIR RELEASE VALVE 6 EA $758.00 $4,548.00 STEEL CASING 16" 20 LF $25.00 $500.00 DBL. WATER/ IRRIGATION SERVICE 57 EA $455.00 $25,935.00 TOTAL COST $108,870.15 I do hereby t rtify that the quantities of material described above are a true and accurate representation of the system being contribute Collier County Utilities, Inc. /^y J j� PRESIDENT SLUIVATER UNDERGROUND, INC. 4540 DOMESTIC AVENUE NAPLES, FL. 34104 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER) The foregoing instrument was signed and acknowledged before me this 26 day of february, 2009 by Thomas McKimm who is personally known to me and who did not take an oath "SLY p` ro 1 Nntarj Public State of Florida / Berita Pruitt t: "y Commission DD715988 or no cxnires09118/201, Packet Page -1694- 0 0 9 ,I '2C, Iter c CERTIFICATION OF CONTRIBUTOM' ASSETS - COUNTY PROJECT NAME: Sandalwood / Secova LOCATION: Section 13 Township 48 South, Range 25 East. NAME & ADDRESS OF OWNER: Livingston Road Development, LLC 25110 Bernwood Drive, Suite 101, Bonita Springs, FL 34235 TYPE OF UTILITY SYSTEM ARMATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL FORCE MAIN 12" 800 LF $27.66 $22,128.00 12 "X12" HOT TAP 12" 1 EA $4,295.00 $4,295.00 DIRECTIONAL BORE SDR -11 20" 120 LF $198.00 $23,760.00 CARRIER PIPE SDR -11 12" 120 LF $36.00 $4,320.00 PLUG VALVE 12" 1 EA $4,444.00 $4,444.00 PLUG VALVE 4" 1 EA $450.00 $450.00 FORCE MAIN 4" 340 LF $6.78 $2,305.20 PVC 3034 SDR 26 8" 2311 LF $3.80 $8,781.80 MANHOLE 4' 11 EA $3,503.00 $38,533.00 PVC LATERAL SDR 26 6" 1800 LF $2.70 $4,860.00 CLEANOUT ASSEMBLY 6" 57 EA $172.00 $9,804.00 LIFT STATION 8' 1 EA $84,107.00 $84,107.00 TOTAL COST 5207,788.0E I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier Cougiy Utilities, Inc. CERTIFYING: PRESIDENT OF: BLUEWATER UNDERGROUND, INC. 4540 DOMESTIC AVENUE NAPLES, FL. 34104 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER) The foregoing instrument was signed and acknowledged before me this 26 day of feb, 2009 by Thomas McKimm who is personally known to me and who did not take an oath �) Notary public Befits Arum State of Florida R M' Of f`O'�' aC 3 Dry/7sio?ODfl7'tS988 Packet Page -1695- 9!` 112012 Item 1 �E.�,.�:. Exhibit k Utilities Performance Security Bonds — Sandlewood /Secoya The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and is based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, is according with Utility Ordinance 2004 -31 Attachments: 1. Receipt of Payment Packet Page -1696- Amount Receipt Number 10% UPS Bond Incorporated with Plat Final Obligation Bond $4,000.00 2011030643 Total Amount $4,000.00 The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and is based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, is according with Utility Ordinance 2004 -31 Attachments: 1. Receipt of Payment Packet Page -1696- lier- Comrninit) Deveiopment b: Envilronrnentail Services er County, 2800 Horseshoe Drive N. �.�✓ vv Naples, FL 34104 239 - 252 -2400 RECEIPT OF PAYMENT Receipt Number: 2011030643 Transaction Number: 2011- 000803 Date Paid: 01/31/2011 Amount Due: $4,000.00 Payment Details: Payment Method Amount Paid Check Number Check $4,000.00 11 Amount Paid: $4,000.00 Change / Overage: $0.00 Contact: Secoya, LLC, Address:2647 Professional Cir # 1201 FEE DETAILS: Fee Description Reference Number Oriainal Fee Amount Paid GL Account Refundable Bonds PL20110000181 $4,000.00 $4,000.00 670 - 000000 - 220113 Cashier Name: Corza_m Batch Number: 1863 Sandalwood Utility Conveyance PL - 2011 -181 Packet Page -1697-