Loading...
Agenda 07/24/2012 Item #11G7/24/2012 Item 11.G. EXECUTIVE SUMMARY Recommendation to approve Category "A" Tourist Development Council Grant applications from the City of Naples, the City of Marco Island and Collier County for FY- 2012/2013 in the amount of $6,798,820 for Beach and Pass Maintenance projects; authorize the Chairman to sign grant agreements following County Attorney approval; and make a finding that these expenditures will promote tourism. OBJECTIVE: To obtain approval of Category "A" Tourist Development Fund 195 Grant Application requests for 2012/2013 in the amount of $6,798,820. CONSIDERATIONS: Received TDC Category "A" Grant Applications as follows: FY 2012/2013 PROJECT /DESCRIPTION: AMOUNT R1Wf)1JFQTPn 1. ReLyulatory and Permit Compliance Sea Turtle Protection Program - Collier County $160,000 Beach Tilling — Collier County — 80171 $ 15,000 Physical Beach & Pass Monitoring - 90536 $200,000 SUB -TOTAL $375,000 2. Projects Wiggins Pass Channel Straighten /Dikes /Renourish — 80210 $1,700,000 FY 12/13 Beach Design and Permit with HS Solutions — 80096 $ 490.000 MI Renourish Design & Permit with BW Solutions — 80166 $ 100,000 MI Renourishment and Erosion Control Structure $3.000,000 Laser Grading North Marco Beach (R133 -R141) - 80203 $ 35,000 SUB -TOTAL $5,325,000 3. Beach Maintenance Beach Maintenance — Collier County /Marco Island — 90533 $109,570 Beach Maintenance — City of Naples- 90527 $ 76,850 Vegetation Repairs /Exotic Removal — County Wide — 90044 $ 75,000 Naples Pier Annualized Repair & Maintenance — City Naples — 90096 of $ 80,000 SUB -TOTAL $341,420 4. Administration Project Management and Administration $487,500 Indirect Administration Costs $149,700 Tax Collector Fee's (2.5 %) $120,200 SUB -TOTAL $ 757,400 TOTAL GRANTS $6,798,820 Regulatory and Permit Compliance: All these items are required by FDEP permit, required by law or required to maintain critical programs between required pen-nit activities. Approval is recommended. Packet Page -936- 7/24/2012 Item 11.G. Planned Proiects: ➢ Wiggins Pass Cannel Straighten /Dikes Renourishment - $1,700.000: Straighten Wiggins Pass to prove a safe channel for boating; address /stop the erosion and environmental damage at Barefoot Beach; lengthen the dredge cycle time with the minimum environmental impact and economically effective. ➢ FY 12/13 Beach Design/Permit with Hot Spot Solutions — $490.000: It is estimated that planning, permitting and design including pre - construction task will cost approximately $1,090,000. In FY 2011/12 $600,000 was approved but not spent leaving a remaining balance of $490,000. See attached engineering cost breakdown. ➢ Engineering for Marco Island Renourish/Erosion Control Structure Rebuild - $100.000: The estimated cost for the design, permitting and pre - construction activities is $300,000. In FY 11/12 $200,000 was approved with $89,000 committed for the permitting of the beach renourishment. The remaining balance that is being requested is $100,000 ➢ Construction for Marco Island Renourishment and Erosion Control Structure Rebuild - $3,000,000: Beach Renourishment including system modeling to determine the optimum sand placement quantities to maximize the renourishment cycle. Modeling determined that 104,000 CY's will optimize the fill template to resist future erosion. 77,000 CY's is authorized under FEMA's disaster order. A new FDEP permit will be required. The existing USACE permit is good till 2021. However, the existing Biological Opinion does not authorize renourishment during turtle nesting season. The component of the project is expected to cost $1,800,000. Approximately $1,000,000 will be reimbursed from Tropical Storm Fay. The PW extension is granted till June 30, 2013. Refurbishment of existing erosion control structures is required. There are three breakwaters and two groins at the end of Marco Island to control erosion. Little to no maintenance has occurred over the years and these structures need to be rebuilt to the original design to perform as intended. This will require authorizations from the FDEP and USACE to restore the structures to their original design and function. Permitting is expected to take 6 to 8 months and this work is expected to cost $1,200,000 ➢ Laser Grading North Marco Beach - $35.000: Laser grade the beach from the south end of Sand Dollar Island in the vicinity of R135 south to approximately R143. Beach Maintenance - $341,420: Exceptional beach experience for our residents and visitors has been at the heart of our success in the past. These items are required to maintain that experience. Approval is recommended. Administration - $757,400: This item funds County staff to manage the projects, maintain the beaches, administer the program. It includes the Director; an Office Manager /Accountant; a Field Supervisor/Project Manager; and two equipment operators to clean and maintain the County and Marco Beaches ($487,500). It also includes Administrative Indirect Fees required for administrative functions like purchasing, information technology, motor pool and human resources ($149,700). Charges for the Tax Collector are also included ($120,200). Approval is recommended. Packet Page -937- 7/24/2012 Item 11.G. ADVISORY COMMITTEE RECOMMENDATIONS: The CAC recommended approval 8 to 0 of the grants detailed on Page 1 of this Executive Summary on May 11, 2012. Subsequent to approval by the CAC, grant totals were changed by the Office of Management and Budget as follows: • Fund 185 Administration — From $487,491 to $487,500 • Indirect Administration Costs — From $107,700 to $149,700 • Tax Collector Fees — from $109,700 to $120,200 All else remains the same as approved by the CAC. At the TDC June 25, 2012 meeting the 195 Grant Applications were unanimously approved by a 9 to 0 vote. FISCAL IMPACT: The Fiscal Year 2011/12 proposed Beach Renourishment Fund 195 budget appropriates funding for these grant applications. The source of funds is Category "A" Tourist Development Tax dollars. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's Office, requires majority vote, and is legally sufficient for Board action. — CMG RECOMMENDATION: To recommend approval of the attached Tourist Development Category "A" Grant Applications for FY- 2012/2013 in the amount of $6,798,820 and authorize Chairman to sign grant agreements after County Attorney's approval. PREPARED BY: J. Gary McAlpin, P.E., Director, Coastal Zone Management Department Packet Page -938- COLLIER COUNTY Board of County Commissioners Item Number: 11.G. 7/24/2012 Item 11.G. Item Summary: Recommendation to approve Category "A" Tourist Development Council Grant applications from the City of Naples, the City of Marco Island and Collier County for FY- 2012/2013 in the amount of $6,798,820 for Beach and Pass Maintenance projects; authorize the Chairman to sign grant agreements following County Attorney approval; and make a finding that these expenditures will promote tourism. Meeting Date: 7/24/2012 Prepared By Name: HambrightGail Title: Accountant,Coastal Zone Management 5/18/2012 12:37:25 PM Approved By Name: McAlpinGary r Title: Director - Coastal Management Programs,Coastal Zon Date: 6/25/2012 11:08:25 AM Name: AlonsoHailey Title: Operations Analyst, Public Service Division Date: 6/26/2012 8:29:46 AM Name: LorenzWilliam Title: Director - CDES Engineering Services,Comprehensive Date: 6/30/2012 8:27:45 AM Name: GreeneColleen Title: Assistant County Attorney,County Attorney Date: 7/5/2012 10:24:15 AM Name: CarnellSteve Title: Director - Purchasing /General Services,Purchasing Date: 7/7/2012 8:08:52 AM Name: KlatzkowJeff Packet Page -939- Mim Title: County Attorney Date: 7/9/2012 3:26:01 PM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 7/11/2012 5:00:22 PM Name: StanleyTherese Title: Management /Budget Analyst, Senior,Office of Management & Budget Date: 7/13/2012 10:59:38 AM Name: KlatzkowJeff Title: County Attorney Date: 7/13/2012 1:01:18 PM Name: OchsLeo Title: County Manager Date: 7/13/2012 9:22:37 PM Packet Page -940- 7/24/2012 Item 11.G. 7/24/2012 Item 11.G. (Revised) TOURIST DEVELOPMENT CATEGORY "A" FUNDING POLICY 1. Use of TDC Category A Fund: To finance beach park facilities of beach improvement, maintenance, renourishment, restoration and erosion control, including pass and inlet maintenance, shoreline protection, enhancement, cleanup or restoration of inland lakes and rivers to which there is public access, as these relate to the physical preservation of the beach, shoreline or inland lake or rive. (Cod or Ordnance, Division 3. Sec. 126 -83.) 2. Source of other funds: Federal or State funds are desirable and should be diligently pursued. 3. Mandatory annual budget allocation of funds and maintenance of reserves. a. Catastrophe reserves shall be accumulated in the budget with $1M in 2004 plus $0.5M per year thereafter (up to a maximum of $ l OM). In the event of a catastrophe requiring the expenditure of all or part of these reserves, $0.5M will continue to be set aside. b. Major renourishment reserves shall be accumulated in the budget with $2M per year after the completion of the major renourishment project currently in planning and permitting (as a November 2003; projected to start setting aside funds in FY 2006). c. Beach park facilities (including beach access property acquisition) shall be funded at an average of $2M per year. This funding allocation shall be adjusted annually in an amount equal to one -third of the TDC Category "A" revenues. d. Remaining funds may be used for eligible grant applications as outlined in the policy below. 4. Eli ig.bilffi : Eligible beach areas qualify for Category "A" funding. An "eligible beach area" is: a. Accessible to the public; and b. No more than one -half mile from a beach park facility, public access point, hotel or motel and if at least 80% of the entire beach area is classified as eligible, otherwise ineligible gaps will be deemed eligible. 5. Ineligible beach areas: a. Beach areas not meeting the criteria for eligibility of paragraph 4. above, are not eligible for Category "A" funding. Renourishment or maintenance of these beach areas are the responsibility of adjacent property owners and must be privately funded. Packet Page -941- 7/24/2012 Item 11.G. b. An area of an ineligible beach that is subject to high erosion, with the recommendation of the Coastal Advisory Committee and determination by the Board of County Commissioners as being in the public interest, may have erosion control structures installed, with Category "A" funding. 6. Inlet Sand Bypassing. The bypassing of sand across inlets may be funded by Tourist Development Tax Category "A" funding provided the Inlet Management Plan recommends the bypassing, the dredging of the pass or inlet is recommended by the Coastal Advisory Committee meets the inlet funding policy criteria and is approved by the Board of County Commissioners as being in the in the public interest. No TDC Category "A" funding will be approved for dredging non -beach compatible material except in situations where significant channel alignment and depth changes are required to correct and deviate from routine maintenance dredging past practices. 7. Shore protection structures and project sponsorsh�p. Projects, including construction and maintenance of shore protection structures (groins, jetties, breakwaters, etc.), may be funded by Category "A" funding for eligible beaches. However, `ownership' responsibilities must rest with an entity other than "Tourist Development Taxes" — i.e. there must be a project sponsor (private interest, taxing districts, municipalities or County Departments other than those funded with Tourist Development Taxes). Grant Application Review. The Coastal Advisory Committee and the Parks and Recreation Advisory Board will prepare and maintain a proposed prioritized annual spending plan for the use of Tourist Development Tax Category "A" funds, with a ten year projection. The proposed plans will be submitted to the Board of County Commissioners (BCC) for their consideration and approval, via the TDC. These submissions will coincide with the annual Collier county budget cycle. The Coastal Advisory Committee will review all requests for Tourist Development Tax Category "A" funds, with the exception of County maintained beach park facilities that will be handled by the Parks and Recreation Advisory Board. Both advisory boards will make recommendation for approval, denial or modification to the BCC, via the TDC, consistent with the BCC established policy for use of these funds. Packet Page -942- 7/24/2012 Item 11.G. Evaluation /Approval Guidelines for TDC Category A Yearly Grant Requests by the Coastal Advisory Committee Yearly grant requests to the Coastal Advisory Committee will be evaluated, prioritized and funded based on the following criteria. Grants associated with the completion of a previously approved project that are required to complete that project. 2. Grants required to meet Permit Regulatory Compliance. Examples of these grants would be Physical and Biological monitoring, turtle monitoring, shorebird monitoring and tilling. 3. Safety related activities and projects, which are the responsibility of the CAC. 4. Commitments covered by inter -local agreement and /or projects previously approved/identified in the 10 year plan. Examples would be the dredging of Clam, Wiggins, Doctors, Caxambas and Capri Passes and the 10 -year cycle of beach re- nourishment. 5. Projects or studies that improve or have a high probability of improving our beach efficiency, the preservation of CAC capital or save us money. These projects would have to have a undisputed payout. Items that would fall into this category would be engineering or studies that could lengthen times between dredge events or re- nourishments. 6. Grants associated with the maintenance and upkeep of our beaches. Examples of these activities that preserve the quality of the beach experience are beach cleaning, raking and grading. 7. Projects that outside funding or third party funding can be obtained on that offset the capital cost. Examples would be FDEP funding, FEMA funding or third parry grants. 8. Necessary or required projects would be next. Examples of this type of projects would be Doctors Pass Rip -Rap replacement. 9. New projects not required by law or consent decree would follow. Packet Page -943- 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Collier County Sea Turtle Protection Program/Environmental Compliance 1. Name and Address of Project Sponsor Organization: Collier County Parks and Recreation Department North Collier Regional Park 15000 Livingston Road Naples, FL 34109 2. Contact Person, Title and Phone Number: Name: Barry Williams, Director Address: 15000 Livingston Road City: Naples, FL, 34109 Phone: 239-252-4035 FAX: 239-514-8657 Other: 239-280-7035 3. * Organization's Chief Official and Title: Barry Williams, Director Collier County Parks and Recreation Department 4. Details of Project- Description and Location: The following activities require coastal construction permits from the State of Florida and thus a sea turtle monitoring program. 1. Beach nourishment; 2. Construction, excavation or maintenance of coastal inlet and related shoals-, 3. Beach cleaning and grooming activities landward of the mean high-water line. 4. Beach cleaning following a red tide or storm event. The following excerpts from current regulations (Chapter 16B41 Rules and Procedures for Application for Coastal Construction Permits, Florida Administrative Code), provides for the scope of the permitting process and protection of marine turtles as it relates to the aforementioned activities. 16B-41.001 Scope This chapter provides the requirements and procedures for the issuance, denial, transfer. renewal, modification, suspension and revocation of coastal construction. permits. In this Chapter Coastal Construction is defined as "any work- or activity on or encroaching upon Packet Page -944- 7/24/2012 Item 11.G. sovereignty lands of Florida, below the mean high -water line of any tidal water of the state, which is likely to have a material physical effect on existing coastal conditions or natural shore and inlet processes. ":. << 1613-41.0055 Protection of Marine Turtles (Florida Administrative Code) (1) In keeping with the Departments Authority to protect marine turtles pursuant to Section 370.12, Florida Statutes, any application for a permit under this Chapter for coastal construction that affects marine turtles shall be sul?ject to the conditions and requirements for marine turtle protection as part of the permitting process. (2) The Department shall require appropriate measures to protect marine turtles and their habitat, such as: nest surveys, nest relocation, nest marking, modification of coastal construction, measures to reduce sand compaction, and short and. long term monitoring to assess the impacts of the permitted coastal construction on marine turtles and their habitat. The Parks and Recreation Department, marine turtle permit holders for Collier County. monitor the following beaches for sea turtle activities as State and federal permit requirements for beach renourishment, beach raking, allowance for the use of vehicles on the beach for surveys, beach cleanup following a red tide or storm event and special events. Barefoot Beach: construction, excavation or maintenance of Wiggins Pass (only that area included within the area of influence of Wiggins Pass; 1 mile north of Pass south to Wiggins Pass); pass material disposal location (renourishment); beach cleaning following a storm event and red tide Vanderbilt Beach: beach nourishment; construction, excavation or maintenance of a coastal inlet and related shoals (Wiggins Pass and Clam Pass); beach cleaning and grooming, activities landward of the mean high -water line. Park Shore: beach nourishment; construction., excavation or maintenance of a coastal inlet and related shoals (Clam Pass and Doctors Pass). Upland sand temperature studies as required by the State. City of Naples: beach nourishment; construction, excavation or maintenance of a coastal inlet and related shoals (Doctors Pass and Gordon Pass) City of Marco Island: construction, excavation or maintenance of a coastal inlet and related shoals (Big Marco Pass and Caxambas Pass): Beach nourishment; Hideaway Beach. T- Grain; beach cleaning and grooming activities landward of the mean high -water line. The duties and associated costs of the program are as follows: 1. Administrative /permitting 2. Reconnaissance and beach zoning including installation and maintenance of DNR location reference monuments for CZM and Sheriff department 500 feet increments along 26 miles of beach 3. Daily monitoring (7 days /wkAeach -April O1 -May 01 depending on renourishment schedules through Oct.31) 4. Evaluation, mapping and data entry Packet Page -945- 7/24/2012 Item 11.G. 5. Responding to sea turtle disorientations (associated with renourishment and beach profile, as required by the State) 8. Reports (Sea Turtle Protection Plan- Annual Report; special reports per each beach nourishment and T-groin units, Index Nesting Beach Reports (Vanderbilt). State Productivity Reports, Beach Compaction Reports) 9. Mobilization/demobilization- 10. Vehicle maintenance- ATV's , penetrometers, data loggers 11. Supplies- acquisition. maintenance, inventory 12. Sand studies including beach compaction, sand temperature and ground/surface water studies and associated reporting requirements 13. Dune vegetation monitoring and exotic removal 14. Nest relocation in construction areas 15. Monitoring and reporting of escarpments 16. Additional studies required as required State/Federal permits (Florida Statute Chapter, 161-053 F.A.C. Chapter 62b -33 ) 17. Stranding reports and removal of injured. sick and dead sea turtles from all County beaches (average 50-1 00/yr). 18 Public awareness- news media and public speaking upon request. 19. State mandated beach lighting compliance inspections and follow-up 21. Assist with maintaining rope and posting along the dunes 22. Other duties as requested by CZM Department 23. Provide technical assistance and respond to data requests from coastal engineering consultants upon request. The purpose of this application is to obtain funds to perform the requirements of a sea turtle protection progarn in the specified locations. 5. Estimated project start date: October 1, 2012 6. Estimated project duration: One (1) Year 7. Total TDC Tax Funds Requested: S 160.000 8. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes ( ) No ( X ) Packet Page -946- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category "A" Grant Application Page 2 Collier County Sea Turtle Protection Program /Environmental Compliance PROTECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested $ 160.000 City/Taxing District Share $ State of Florida Share $ Federal Share $ TOTAL $ 160.000 PROJECT EXPENSES. (Engineering, Mobilization, Contractor, Monitoring etc) Personnel and Operating $ 160,000 TOTAL $ 160,000 I have read the Tourist Development Category "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. Signature of Sponsor Organization's Chief Official Date Packet Page -947- 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Beach Tillin 1. Name and Address of Project Sponsor Organization: ?!-.1 Coastal Zone Management Collier County Government 3299 Tamiami Trail East, Suite 103 Na Florida Maples, F 34112 1. Contact Person, Title and Phone Number: Name: CailHambriaht,Accountant Address: Collier County Government .1299 Tamiami Trail East, Suite 103 Citv Naples ST FL ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Organization's Chief Official and Title: Fred NK Coyle, Chairman Board of County Commissioners 4. Details of Project- Description and Location: Beach tilling is required by FDEP-permit and is Performed directly prior to turtle nesting Season. Tilling is raid on an acre basis for re nourished beaches. 5. Estimated project start date: October 1. 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: S15.000.00 8. if the full amount requested cannot he a-warded, can the program/project be restructured to accommodate a smaller award? Ves (X ) No ( ) Packet Page -948- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category. "A" Crant Application Page 2 Beach Tilling PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested S l i.000.00 Citv/Taxino District Share State of Florida Share Federal Share TOTAL S - 15.000-00 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) ContraclLyal Services S_15.000.00 TOTAL S J-5.000-fn - I have read the Tourist Development Category "A" Beach Funding Poliev covering organization beach renourishment and pass maintenance and agree that m` , 1z ation w ill Comply with all guidelines and criteria. nature o Sigf Sponsor Org'anization's Chief Official 2� Packet Page -949- Date 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Phvsical Beach and Pass Monitoring — Entire County 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier County Government 3299 Tamiami Trail East, Suite 103 Nanles, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hamhright, Accountant Address: Collier County Government 3299 Tamiami Trail East, Suite 103 Cite Naples ST FL ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Organization's Chief Official and Title: Fred W. Covic, Chairman Board Of Count Commissioners 4. Details of Project- Description and Location: This item is required b-.- FDEP ermit required by law or required to maintain critical Proarams between required permit activities. Approval is recommended. S. Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: 5200,000.00 S. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -950- Collier Counq, Tourist Development Council Category "A" Grant Application Page 2 Plivsical Beach and Pass Monitorine — Entire County PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested $ 200,000.00 City/Taxing District Share State of Florida Share $ - Federal Share S-- TOTAL $ 200.000.00 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) r., �'.l n EnLyineerhiL, Fees TOTAL $ 200,000.00 $ 200.0000.00 7/24/2012 Item 11.G. I have read the Tourist Development Category "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. L4 Signature of Sponsor Oroan ization's Chief Official r, : t' Packet Page -951- 14- Date W 60 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Wiggins Pass Channel Straighten/Dikes/Renourish 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier County Government 3299 Tamiami Trail East. Suite 103 Naples. Florida 34112 2. Contact Person, Title and Phone Number. Name.- Gail Hambri2ht. Accountant Address: Collier County Government 3299 Tamiami Trail East. Suite 103 Citv Naples ST FL ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Organization's Chief Official and Title: 2.) Fred W. Covle. Chairman Board of County Commissioners 4. Details of project- Description and Location: Straighten Wiggins Pass to prove a safe channel for boating. • address/stop the erosion and environmental damage at Barefoot Beach, lengthen the dredge cycle time with the minimum environmental impact and economically effective. Packet Page -952- 7/24/2012 Item 11.G. 5. Estimated project start date: October 1. 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: 51.700.000.00 S. If the full amount requested cannot be a-,varded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -953- Table 20 Wiggins Pass Straightening, Project — Initial Construction Cost Estimate Item Description unit Cont Unit Price 1 Total Qualitf Mobilization/Demobilization Lump I S410,000.00 i S41 0,000.00 Sum Ebb Dredge & Disposal C.Y. 1 41,000 57.50 5307,500.00 3 Flood Dredge & Disposal C.Y. 36,400 S9.00 S327,600.00 14 TemporarN Sheet Pile LF 225 51,000.00 S225,000.00 5 Unsuitable Material Dispose in Borrow C.Y. 7,500 i 515.00 5112,500.00 Pit I 6 Wiggins Pass Turbidih, Monitoring Lump I 530,000.00 530,000.00 7 Construction Suney — Wiggins Pass Sum Lump I S45,000.00 S45,000.00 Sum 8 Clean Up Dredging C.Y. 5,000 510.00 550.000.00 9 Ebb Shoal ContinueneN C.Y. 17,000 S8.25 5140,250.00 Total 51,647.850.00 Contin-enev 5% I S82,392.50 S1,730,242.50 Grand Total 5. Estimated project start date: October 1. 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: 51.700.000.00 S. If the full amount requested cannot be a-,varded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -953- Collier County Tourist Development Council Category "A" Grant Application Page 2 Wiggins Pass Channel Straighten /Dikes /Renourish PROTECT BUDGET PROGRAM ELEMENT TDC Funds Requested City/Taxing District Share State of Florida Share Federal Share TOTAL AMOUNT $ 1.700.000.00 S _ 1.700.000.00 PROJECT EXPENSES: (Enginccering, Mobilization, Contractor, Monitoring etc) C o tractual Set-�liees TOTAL S 1.700.000.00 S S 1.700.000.00 7/24/2012 Item 11.G. I have react the Tourist Development Category "A" Beach Funding Policy covering peach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. r> Signature of Sponsor Organization's Chief Official Packet Page -954- Date 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance FY 12/13 Reach Design and Permit with HS Solutions 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier Counh7 Government 3299 Tamiami Trail East, Suite 103 Naples, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambright, Accountant Address: Collier Countv Government 3299 Tamiami Trail East, Suite 103 City Naples ST Ff... ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Organization's Chief Official and Title: Fred W. Covie. Chairman Board of Countv Commissioners 4. Details of Project- Description and Location: It is estimated that Planning, permitting and design including pre-construction task will cost approximately 51.090,000. In FY 2011/12 5600.000 was approved but not spent leaving a remaining balance of 5490,000. 5. 6. 7. 8. Estimated project start date: October 1. 2012 Estimated project duration: 12 Months Total TDC Tax Funds Requested: 5490.000.00 If the full amount requested cannot he awarded, can the program/project rn be restructured to accommodate a smaller award? Yes ( X ) No ( ) Packet Page -955- W W 7/24/2012 Item 11.G. Collier Count%, Tourist Development Council Category. "A" Grant Application Page 2 FY 12/13 Beach Desi2n and Permit with HS Solutions PROJECT BUDGET PROGRAM ELEMENT AMOUNT TUC Funds Requested S 5490.000.00 City/Taxing District Share S State of Florida Share Federal Share TOTAL S 5490.000.00 PROTECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) —EnuineerinL, Fees S490.000.00 S- S S S 1­0TAL S S4()0.000.00 — I have read the Tourist Development Category "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will complyi.vith all guidelines and criteria. L� Signature of Sponsor Organization's Chief Official Date Packet Page -956- 0 t; to CL U. U, tU CC 0 Oi ZE cn in (u O 0— 0 C, Cc b cm as n A E m I m aj m co [L In -6 >m E cu w 0 0 C) M- 0 0 C, o - 000000 3 0 GOO 0000000 —M 0 0 " 0 t2 (� 0 C) 0 Go C" C) C--� 0) n .7 C3 �; -q m cn C'4 rl. C� C� tl� U� R ll� O'o Z; C� q q q 'Ari (n C9 (P C� q N (q CL 'n 00 U) 0) CD 0 0 0 w Ln kn C. 0 in tn CA CN M W In to 0 In C3 to to V) Ln 40 r- C'o w (t) U� 0) V) V), 4" 60 m to V) In 60 V) tom/) L) O. —C)— C> 0) cn 1* Co Lr) m -C a) N �r to .0 in to 'IT CD CD CD C) m 0 C) 0 0 CD C) CD o o C:) 0 b0- O OCR 00 000 0. m m m C) tr) un Lo I- M 00 Co- Lo' 0 LO - - V) N N " ca t- to (0 U) to 4A v? V) to 0 o C) 0 m C) 0 m 0 0 C M 0 0 = CD CD 0 c7k 0 n C) m 0 C� 0- OOOOCDO to 0 CD. V, C� C� C) q 0 . C'� CD tr) N Lo (D -r w 0 I- tn un CN to (A m Ln ko 1n m to to �f) (n tn c L44 t" CA V) 9 O O—C:5- C:) o o m o 0 CD CD C� CD CD c 0 C> n 00 0 m 0 0 CD "r m vi 0 0 O 0 43 C) 0 -C 0 CD C7 tpG 0QO0GD C> to, IR ID w Ci CV C) U') N. LC) M V� '20 05 "1 1-- U, 11) C) P. 0) " V) W U) "I = 'n s N. to .1 "1 2 tn V) t6 V) w cn (n In th 0 to (n 'I a U) r to in (U W cu uj 0) d) E 2 LU E 7D 0 c a m (U d) n E N E U 7 0 - 1.0 & > 0 ic s o co 7: CD o G o ('o C) w ur -6 D 't5 C) M ti m 0 0 Lo LU 0 U- v W 0 CL Z A U5 m n C: 12 CD cc L- -2 .2 tn 5 W >, 0 �l u U) CD co tr cr -2 Z' C) E 2 2 'L a 0 12 zm w Lo E iL -8 a' CD C: -0 lu E 'u -M On w UL Z) w 0 ' CL U) u -2 m z CL < 0 = rn d) U] r U) m > s 0 -- 0 = m -Q 0 (n m o :3 CL m C) z A'D 0 0 cn in < CL 11 Lu LLI 75 to a- M CL U) o to CL (y ul 47, co M < u w a < :L L G2 (D a CL w LL T 0- uj LO Er :D w co U (nim Oi ZE cn in (u O 0— 0 C, Cc b cm as n A E m I m aj m co [L In -6 >m E cu w 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Marco Island Renourish Design & Permit with BW Solutions 1. Name and Address of Project Sponsor Organization: L, Coastal Zone Management Collier County Government 3299 Tamiami Trail East. Suite 103 NaMes, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambright, Accountant Address: Collier County Government 3299 Tamiami Trail East, Suite 103 Cit,.vf Naples ST Ft.. ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Oroan"tion's Chief Official and Title: P,� Fred W. Cootie, Chairman Board of County Commissioners 4. Details of Project- Description and Location: The estimated costs for the design, vermittina and pre-construction activities is S300.000. In FY 11112 5200,000 was approved with S89,000 committed for the permitting of the beach renourishment.,- The remaining balance that is being requested is S100.000, 5. Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: S100.000.00 8. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -958- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category "A" Grant Application Page 2 el� � M Marco Island Renourish Design & Permit with BW Solutions PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested 100.000.00 Citv/Taxin- District Share S State of Florida Share S Federal Share IS TOTAL 100.000.00 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) Engineering, — Fees S 100.1100.00 S S S S TOTAL S loo.000.0o I have read the Tourist Development Category. "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. 71 Signature of Sponsor Organization's Chief Official Date Packet Page -959- 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COL.";NCIL CATEGORV'*A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Marco Island Renourishment and Erosion Control Structure 1. Name and'Address of Project Sponsor Organization: Coastal Zone Management Collier Countv Government 3299 Tamiami Trail East, Suite 103 Naples, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambri2ht, Accountant Address: Collier Countv. Government 3299 Tamiami Trail East, Suite 1.03 Cit-v Naples ST FL ZIP 34112 Phone: 252-2966 FAX: 252-29if) 3. Organization's Chief Official and Title: Fred W. Covic. Chairman Board of Countv Commissioners 4. Details of Project- Description and Location: Beach Renourishment including ,vstem modelin_Z to determine the optimum sand placement quantities to maximize the renourishment cycle. Modeling determined that 104.000 CY's will optimize the fill template to resist future erosion, 77,000 CY's is authorized under FEMA's disaster order. A new FDEP permit will he required. The existing USACE permit is good till 2021. However, the existing Biological Opinion does not authorize renourishment during turtle nestinj! season. The component of the Project is expected to cost 51.800,000. Approximately S1.000.000 will he reimbursed from Tropical Storm Fay. The PW extension is granted till June 30, 2013. 5. Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: S3.000,000.00 8. If the full amount requested cannot be awarded, can the program/project he restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -960- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category "A" Grant Application Page 2 Marco Island Renourishnient and Erosion Control Structure I have read the Tourist Development Category "A". Beach covering Funding Poliev �1, M beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. Signature of Sponsor Organization's Chief Official Z11 Date Packet Page -961- W PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested S 3,000 000.00 City/Taxing District Share State of Florida Share Federal Share TOTAL 3.000.000.00 PROJECT EXPENSES: (Engineering, M (Engineering, Mobilization, Contractor, Monitoring etc) Construction Serf -ices S 3.000,000.()0 S S TOTAL S 3,000.000.00 I have read the Tourist Development Category "A". Beach covering Funding Poliev �1, M beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. Signature of Sponsor Organization's Chief Official Z11 Date Packet Page -961- W 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST I)EVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Laser Grading North Marco (11133-11141) Permit/Work 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier Countv Government 3299 Tamiami Trail East, Suite 103 Naples, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambright. Accountant Address: Collier County Government 3299 Tamiami Trail East, Suite 103 City Naples ST FL ZIP' 34112 Phone: 252-29fi6 FAX: 2522950 3. Ora nization's Chief Official and Title: Fred W. Covic, Chairman Board of Count• Commissioners 4. Details of Project- Description and Location: Laser trade the beach from the south end of Sand Dollar Island in the vicinity of RI.35 south to approximately R143. S. Estimated project start date: October 1. 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: 535,000.00 8. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -962- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category "A" Grant Application Page 2 Laser Grading North Marco (11133-R141) Permit/Work PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested S 35.000.00 Citv/Taxino District Share State of Florida Share S Federal Share S, TOTAL S 15.000.00 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) Services S35.000.00 —Contractual S S S- S TOTAL, 15.000.00 I have read the Tourist Development Categon, "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. Signature of Sponsor Organization's Chief Official Packet Page -963- Date 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY' ".A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Beach Cleanin4_jr — Collier County /Marco Island 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier Counh, Government 3299 Tamiami Trail East, Suite 103 Naples, Florida 34112 2. Contact Person, Title and Phone Number: game: Gail Hambright, Accountant Address: 'Collier County Government 3299 Tamiami Trail East. Suite 103 City Naples ST FL, ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Organization's Chief Official and Title: Fred NV Covle Chairman Board of Countv Commissioner-, 4. Details of Project- Description and Location: This item is required to maintain the beaches and is recommended for approval, 5. Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: S109.-N70.00 K. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -964- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category "A" Grant Application Page 2 Beach Cleaning — Collier County /Mareo Island PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested $ 109.570.00 T City/Taxing District Share. State of Florida Share Federal Share 5 TOTAL 5 109.570.00 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) Labor and Materials S_ 109.570.00 S S TOTAL S _109.70.00 I have read the Tourist Development Category. "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. i Signature of Sponsor Organization's Chief' Official Date Packet Page -965- 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION 2013 Beach 11enourishnient and Pass Maintenance Naples Beach Maintenance (Proiect'ritle) I 'Name and Address of Project Sponsor Oreanization: City Of Naples 735 Eighth Street South Naples, Florida 34102 C on, R -- i Pers o i. T; *le and 0 11 C N UM., �h C 7 Narnc: David LYkins, CSI) Director Address,: 280 Riverside Circle City-: Naples State: FL 1111: 34102 Phone: 239/213-7110 FAX: 2391213-7130 Other: dlykinst�d�naplesLmvxom 3. Organization's ChiefElected Official and Title: flon. John F. Sorey III City Mayor 4. Details of Project- Description and t,ocation: Description: This is an on-going 'I"DC funded project for support of maintain on local beaches. The City in recent years has taken over the upkeep and grooming of TDC eligible beaches from the County. tJnder this project. the City removes litter. accumulation of algae. and rocks along public access beach portions of tile Gulf \,vithin the City'`sjurisdictional limits, This is a benefit to both residents and tourist populations, and is beneficial. to the presentation of the sand beach and shoreline. This year's request includes equipment operator's salary and benefits: equipment fuel and maintenance, contractor and equipment. Location: St'onification coordination of effort continues between the City and Collier County L concerning beach maintenance. The pr(ject boundary location is firoin southernmost State- permitted beach cleaning area. within the City's jurisdictional boundary to Clam Pass in Collier County. 5. Estimated project start date: October 1. 2012 6. Estimated project duration: 12 Months 7. Total TIC Tax Funds Pequested: 576.850 S. If the full amount requested cannot be awarded, can the prograrn/project be restructured to accommodate a. smaller award? Yes (X) No( ) Packet Page -966- Collier County` Tourist Developniew Council (,'ategory ­A " Grant Application - llckqe 2 Naples Beach Maintenance (Project Title) PROJECT BUDGE-I'l' PROGRAM EI,FMENJ* TDC Funds Requested City/Taxing District Share State of Florida Share Federal Share -T- , I Oj I '-1. L PRojEcr FXPFNSES: (Engineering. Mobilization.. Contractor, Monitoring etc) 7/24/2012 Item 11.G. AMOUNI' 76,850__.___. S­76,850 salaries S_48,000_ -Equipment Fuel and Maintenance S-7,000— -Additional Beach Cart - Gas w/ Manual Bed Lift, S11,850 -Additional Two Beach Trash Compactors at Pier TOTAL., I have read the Tourist Development Category '*A- Beach. Funding Policy covering beach renourishment and pass inaintenance and agree that my organization will comply with all guidelines and criteria. Z� x A . WiTliam Moss, City Manager Date Approvod as to form and WVWft Robert D. Prime Chy Aftontey Packet Page -967- 7/24/2012 Item 11.G. EXHIBIT A Ai}DITIONAL INFORMATION ELIGIBILITY: Beach Maintenance activities will take place on beach area tha are least 80% classified as eligible under the TDC guidelines. The project boundary location is from southerninost State - permitted beach cleaning area within the City's jurisdictional loundary to Clam Pass in Collier County. ORGANIZATIONAL CAPACITY: The City of Naples will be the prim ry recipient and lead agency for controlling and completing all aspects and activities proposed in this grant application. The City will remain the lead agency .for the duration of ffinding and will be the sole point of contact for all matters related to this proposal. The City has the ?nanaoerial --nd financial capab.;h'), to ensure -r(-,- -r pianning. rilanage ne-M and completion of the project described in this application. BUDGET ASSURANCES: Dual Compensation: If a City project staff member or consultant is involved simultaneously in two or more prgjects. the staff will not be compensated for more than 100Q10 of their time for any such dual involvement. PROJECT LOCATION MAP: Packet Page -968- 7/24/2012 Item 11.G COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Vegetation Repair /Exotic Removal County Wide 1. ,Name and Address of Project Sponsor Organization: Coastal. Zone Management Collier County Government 3299 Tamiami Trail East. Suite 103 Nanles, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambrirht, Accountant Address: Collier County Government 3299 Tamiami Trail East. Suite 1.03 City Naples ST FL ZIP 34112 Phone: 252 -2966 FAX: 252 -2930 3. Organization's Chief Official and Title: Fred W. Covie, Chairman Board of Count, Commissioners 4. Details of Project- Description and Location: Dune planting and exotic removal greatly contribute to a healthy_ beach environment Each year the county sets aside $75,000 to repair dune vegetation and remove exotics on all our county beaches. 5. Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TUC Tax Funds Requested: 575.000.00 8. If the full amount requested cannot he awarded, can the program /project be restructured to accommodate a smaller award? Yes (X ) No( ) Packet Page -969- 7/24/2012 Item 11.G. Collier County Tourist Development Council Category "A" Grant Application Page-') Vegetation Repair/Exotic Removal County Wide PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested $75.000.00 City/Taxing District Share $ State of Florida Share $ Federal Share $ TOTAL $75.000.00 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring-, etc) Plantina./Removal S 75.00.00 S TOTAL $ 75.000.00 1 have read the Tourist Development Category "A" Beach Funding Pt licy covering 114 rl� beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. Signature of Sponsor Organization's Chief Official Date Packet Page -970- 7/24/2012 Item 11.G COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION 2013 Beach Renourishment and Pass Maintenance Naples Pier Annualized lZenairand Nlaintenance (Project TWO Narne and Address of Project Sponsor Organization: City Or Naples 735, Eighth Street South Naples, Florida 34102 Contact Person, 'title and Phone Number: Name: David Lyking, CSI Director Address: 280 Riverside Circle City: Naples State: FL ZIP: 34102 Othen d1vkins(d�',nap!gE9-0,*1-c()m Phone, 239/213-71.10 FAX-, 239/213-7130 I icial and Title: -1, organization's Chief Elected Off Hon, John F. Sorey III City Mayor 4. Details of Project- Description and Location: Description: The activity description for this project includes labor and material for the upkeep and safety of the pier. The pier is a pubic access beach facility as a tourist attractor and destination. The pier structure litLs a shoreline erosion control and beach preservation effect. Additionally, the public safety through the continued maintain of the pier is of paramount importance. Repair and maintenance issues include responsibility and public safety of pier structure, wooden deck, Testroorns and storag=e facilities as well as water and electrical systems related to the pier's use as a fishing. tourist and beach preservation s tructure. Location: The project location is at the 12 Avenue - 'South terminus beach end. Please refer to Project Location Map found in Exhibit A. — Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TDC Ta% Funds 'Requested: 580,000 8. if the full amount. requested cannot be awarded. can the pro-p-rarn/pr(Iject be restructured to accommodate a smaller award' Yes M No () K, Packet Page -971- Collier Counly Tourist Development Council Category "A " Grant Application - Page 2 Naples Pier Annualized Repair and Maintenance (Project Title) PROJECT RUIDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested $80,000. City/Taxing District Share State of Florida Share S Federal Share S TOTAL SS80,000 PROJECT EXPENSES: (Engineering, Mobilization, Contractor. Monitoring etc) —Salaries and Material TOTAL S – S801000 S80,000 I have read the Tourist Development Category **A*' Beach Funding Policy renourishment and pass maintenance and agree that my organization witl ,guidelines and criteria. X !rte 3 Az & A. NIVilimn _N1 oss, City Managge_r Date APPr'Q_VGd 8Z to f5me and iaqafit��,, ffy N-Y Q Robert D. P9&,-, City Aftanw.�v, Packet Page -972- 7/24/2012 Item 11.G. a beach with all 7/24/2012 Item 11.G. EXHIBIT A ADDITIONAL INFORMATION ELIGIBILITY: The pier structure is no more than one -half mile from a public beach facility =, public access paint, and hotel or motel facilities acid is on a beach area classified as eligible. BUDGET ASSURANCES: Dual Compensation: if a City project staff member or consultant is involved simultaneously in two or more projects, the staff will not be compensated for more than 1001/6 of their time for any such dual involvement. PROJECT LOCATION MAP: Packet Page -973- 7/24/2012 Item 11.G. FNANCE DEPARTMENT 1 " TELEPHONE (239) 2' 3 -1820 a FACSVILE ?_'391213 -18A5 736 EIGHTH STREET SOUTH • NAPLES. FLORIDA 34102-6796 March23.2012 Gail Hambright, Accountant Coastal Zone Management Office W. Harmon Turner Building 3200 East Tamiami Trail — Suite 103 Naples FL 34112 RE: City of Naples - SSubmission of'FW0 Grant Froposaks; FY 2012-2013 TDC Category "A" Applications Dear Ms, HarribriQl1t: Enclosed please find an original signature copy for each oft,'vo applications. Tile two applications are respectiveiv submitted under the Collier County Coastal Advison Committee's Category '*A" grant program. The applications are formatted to capture all � the information suggested by the program guidelines. The applicarions'verc approved. by resolution for submission by the City Council at their March 211. 2012 ineeting. The approval resolution is available upon request. The two applications are for funding io support, 1) Naples Beach Maintenance project. and 2 ' ) Naples Pier Annualized Repair and Nlaintenance prqject. Our project leader. Joe Boseaciia, would be more that pleased to discuss any aspect of these applications. The City of Maples is concerned with sustainable economic growth for the region. These pr(.1ject applications are critical to that effort. Thank you for your consideration in this matter. .S inc ­ I Greg Givet �,. ;rant• Coordinator 1114" Packet Page -974- 7/24/2012 Item 11.G. COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY "A" GRANT APPLICATION Beach Renourishment and Pass Maintenance Fund 185 Administration 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier County Government 3299 Tamiami Trail East, Suite 103 Naples, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambright, Accountant Address: Collier Countv Government 3299 Tamiami Trail East, Suite 103 City Naples ST FL ZIP 34112 Phone: 252 -2966 FAX: 252 -2950 , 3. Organization's Chief Official and Title: Fred W. Coyle, Chairman Board of Countv Commissioners 4. Details of Project- Description and Location: This item funds County staff to manage the projects, maintain the beaches, administer the programs. It includes the Director; an Office Manager /Accountant; a field supervisorv/Proiect Manager; and two Equipment Operators to clean and maintain the County and Marco Beaches. It also includes Administrative Indirect Fees required for administrative functions like purchasing, information technology, motor pool and human resources. Tax collectors fees are also include in this item. Approval is recommended. 5. Estimated project start date: October 1, 2012 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: 5757,400 8. If the full amount requested cannot be awarded, can the program /project be restructured to accommodate a smaller award? Yes (X ) No ( ) Packet Page -975- Collier County Tourist Development Council Category "A" Grant Application Page 2 Fund 185 Administration PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested City/Taxing District Share State of Florida Share Federal Share TOTAL $ 757,400 $ $ 757,400 PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) Funding 195 and 183 Administration— Indirect Administration Cost Tax Collector Fee TOTAL $ 487,500 $ 149,700 $ 120.200 $ 757,400 7/24/2012 Item 11.G. I have read the Tourist Development Category "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. /v! Signat6re of Slionsor Or nization's Chief Official Packet Page -976- S/11//2- Date