Loading...
Backup Documents 09/27/2016 Item #16D 8 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1U THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNA6 �,J 8 Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Routed by Procurement Services to the Office Initials Date Following Addressee(s) (In routing order) 1. County Attorney Office County Attorney Office C'-VYICs- lo. l2 -/jo 2. BCC Office Board of County Commissioners \1/S> 3. Minutes and Records Clerk of Court's Office qrA to(i3116 q Zai 7rr 4. Return to Procurement Services Facilities Management Division Contact: Margaret Bishop PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Lissett De La Rosa for Margaret Bishop, Phone Number 239-252-5857 Procurement Staff 10/4/16 Contact and Date Agenda Date Item was 9/27/16 ty. Agenda Item Number 16.D.8 Approved by the BCC Type of Document Work Order Number of Original Attached Documents Attached PO number or account N/A Solicitation/Contract 13-6164 AECOM number if document is Number/Company Technical Services,Inc. to be recorded Name t/ INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? LD 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency; Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be LD signed by the Chairman,with the exception of most letters,must be reviewed and signed 96 by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the N/A document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's LD signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip J..D should be provided to the County Attorney Office at the time the item is input into SIRE. . Some documents are time sensitive and require forwarding to Tallahassee within a certain f�7 time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on the date above and all changes made XXX during the meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes,if applicable. 9. Initials of attorney verifying that the attached document is the version approved by the BCC, all changes directed by the BCC have been made,and the document is ready for the Chairman's signature. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16D8 MEMORANDUM Date: October 14, 2016 To: Margaret Bishop, Project Manager Facilities Management Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re A Work Order under Contract #13-6164 for Engineering and Architectural Professional Services Contractor: AECOM Technical Services, Inc. Attached for your records is a copy of the document referenced above, (Item #16D8) approved by the Board of County Commissioners on Tuesday September 27, 2016. The second copy will be held in the Minutes and Records Department for the Board's Official Record. If you have any questions, please contact me at 252-8406. Thank you. Attachment 1608 AECOM TECHNICAL SERVICES, INC. CERTIFICATE OF ASSISTANT SECRETARY EXTRACT of resolutions adopted by unanimous written consent of the Board of Directors of AECOM Technical Services, Inc., a California corporation (the"Corporation"), dated as of May 4, 2016: k k k k k k k Appointment of Ronald R. Cavaliers, Principal Engineer as an Authorized Signatory WHEREAS, the conduct of the business of the Corporation is subject to the provisions of the AECOM Subsidiaries Policies and Procedures Manual, as amended from time to time(the"P and P"), which includes provisions concerning persons who may execute and deliver documents on behalf of the Corporation; and WHEREAS, the Board of Directors wishes to clarify any confusion that may arise between the provisions of the P and P and the provisions of the By-Laws of the Corporation or statutes concerning persons who may execute and deliver documents on behalf of the Corporation; it is NOW, THEREFORE, RESOLVED, that, in conjunction with the P and P, the following person (an employee of the Corporation or an affiliate and an officer of the Corporation) be and he is hereby is authorized, directed and empowered to execute and deliver any and all documents on behalf of the Corporation: Ronald R. Cavalier' RESOLVED FURTHER, that Mr. Cavalieri's authority shall continue at the pleasure of the Board or until his employment with the Corporation or an affiliate shall cease. I, Carol F. Brandenburg-Smith, the undersigned, do hereby certify that I am the Assistant Secretary of AECOM Technical Services, Inc. ("ATS") and that the foregoing is a true and correct copy of the resolutions adopted by the Board of Directors of the Corporation by written consent dated as of May 4, 2016. I further certify that said resolutions are in conformity with the Certificate of Incorporation and the bylaws of the Corporation. They have not been modified, amended or revoked and are in full force and effect as of the date hereof. Dated this 23f0 day of June 2016 7 //'; .✓ — Carol F. Brandenburg-Smith Associate Vice President i.," Assistant Secretary of AECOM Technical Services, Inc. 5 C 16O8 -, WORK ORDER/PURCHASE ORDER Contract 13-6164"Professional Services for Engineers and Architects—CE" Contract Expiration Date:March 8,2019 This Work Order is for professional engineering services for work known as: Project Name: Clam Pass Beach Park Electrical Upgrades Project No: 80345 The work is specified in the proposal dated August 18, 2016 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to: AECOM Technical Services,Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I Project Management * Task II Collier County Growth Management Permitting * Task III Bid Phase Services * Task IV Construction Phase Services * Schedule of Work: Complete work within 365 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement##13-6164 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above,the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) Lump Sum Plus Reimbursable Costs (LS+RC) Time & Material (T&M) (established hourly rate—Schedule A) ❑ Cost Plus Fixed Fee(CPFF),as provided in the attached proposal. Task I $ 3,216.00 LS • Task II $11,122.00 LS Task III $ 4,085.00 LS Task IV $15,536.00 T&M TOTAL FEE $33,959.00 Page 1 of 2 16D8 PREPARED BY: TA Y� 6/ 5) l b Kirby, � Mana Felicia Project er Datc g Facilities Management Division REVIEWED BY: g'Z /G Mara t l3isho P.B, r,Project Manager Date Marge Po J 8 Facilities m agement Division REVIEWED BY: hard __ 2-6 ,/&, Ha r on Principal Project Manager Date Facilities a; eat Division APPROVED BY: ,. e/.2.1 /6 Barry Williams,Director Date Parks&Recreation Division //4").4... lam beniv /f k.�- lJ (1 ani r " By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief,all relevant facts concerning past,present,or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY:AECOM Technical Services,Inc. (0410-40 CtiPAtil ___010 Rona•R. •willed,P.E.,BCEE Dale Project Director • Page 2 of 2 16118 IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIE: COUNTY,FLORIDA By: i '.!4111-C' ® ''' -C • By: 14240 Do a Fiala,Chairman Dated, II"- (A e as to C.hattZltan'S AECOM Technical Services,Inc. signature only. ;, ��• NV By: a/V541Z--;•••• First Witness Signature Cherie C.Wolter Ronald R. Cavalieri,P.E. Project Manager 2 k4 CL9 Second Witness Christian Colarusso App a ved to Form and Legality: Assistant County Attorney Cbl I&n oeeh 6 Print Name • Page 1 of 1 16D8 STAFFING and COST PROPOSAL to AGREEMENT for PROFESSIONAL SERVICES between Collier County and AECOM Technical Services,Inc. for Clam Pass Beach Park Electrical Upgrade August 18,2016 THIS DOCUMENT is a STAFFING and COST PROPOSAL to Contract 13-6164 Professional Services:Architect and Engineering,executed between Collier County Board of County Commissioners(COUNTY)and AECOM Technical Services,Inc.(CONSULTANT),dated March 9, 2014(hereafter called"Agreement"). • A. BACKGROUND The COUNTY and CONSULTANT have entered into an Agreement to provide professional engineering services for the following engineering disciplines: • CFI,Project Management,and Value Engineering(CEI) • Environmental Study,Planning and/or Design(EN) • Instrumentation and Controls(SCADA and Low Voltage)(SCA) • Modeling and Simulation(MS) • Solid Waste Study,Planning and/or Design(SW) • Public Utilities Facilities(PU) • Wellfeld Study,Planning and/or Design(WEL) • Electrical Study,Planning and/or Design(EL) The Agreement provides for specific services to be performed on the basis of a Work Order supported by a proposal prepared by the CONSULTANT and approved by the COUNTY. Professional services arc authorized on receipt of an executed Work Order and Notice-to-Proceed. The COUNTY wishes to implement electrical service upgrades at the beachside concession building for Clam Pass Beack Park located near the Naples Grande resort. The electrical upgrades include increasing the feeder conduit and conductor size from the FPL service point to the concession building,replacing the existing transformer and panelboard at the concession building with larger equipment,and providing the panelboard with sufficient circuit breaker quantities and ratings to serve existing and future electrical loads at the concession building. The COUNTY plans to competitively bid the project in an open solicitation to qualified contractors. Under a previous assignment,the CONSULTANT provided plans and specifications for competitively bidding the work. 16 08 B. DESCRIPTION OF ASSIGNMENT CONSULTANT will prepare and submit the required building permit applications and necessary copies of signed and sealed drawings to secure the building permit through Collier County Growth Management. CONSULTANT will assist the COUNTY during the bidding phase of the project. During construction,CONSULTANT will monitor performance of the work by the construction contractor,including attendance of project progress meetings,shop drawing review,periodic site visits, and certification of the completed work. C. SCOPE OF SERVICES CONSULTANT will perform the following services: TASK No.1—Project Management 1. Coordinate project activities—CONSULTANT will perform project coordination and management functions for the duration of the project. TASK No.2--Assist in Securing Collier County Growth Management Building Permit 1. Prepare required sets of signed and sealed plans and specifications for Collier County Growth Management's review in granting the contractor a building permit. Coordinate with Growth Management during their review process and respond to inquiries and requests for clarifications from Growth Management. TASK No.3--Bid Phase Services 1. Attend pre-bid meeting and prepare meeting minutes. 2. Respond to Contractor questions in writing. Assist COUNTY in preparing one addendum to the Contract Documents, 3. Assist COUNTY with review of bids and tabulate bids received.Prepare Letter of Recommendation for award of contract. 4. Prepare conformed documents incorporating addendum items. TASK No.4—Construction Phase Services 1. Attend pre-construction meeting and assist COUNTY with the preparation of meeting minutes. 2. Receive,review,and process submittals from Contractor specified for such review in the contract documents(up to 4 submittals and 2 re-submittals).Prepare and maintain a log of submittals to include submittal number,subject,and date received,reviewer,action taken and date returned. 3. Prepare responses to Contractor's Requests-for-Information(up to 2 RFIs). 2 160 $ 4. During construction of the project perform one site visit to meet with representatives of the Contractor and COUNTY and to observe the general progress of the work, 5. Assist COUNTY with management of proposed Changes to the Work by preparing Request-for- Proposed-Changes(I RPC included in this scope),evaluating and responding to Contractor claims and preparing contract change order. 6. Provide consultation and advice to the County's Project Manager during construction. 7. Assist the County with review of progress payments(up to 2 progress payments). 8. Assist COUNTY with the following services related to Contract Closeout: a. Perform Substantial Completion walk through and develop final punch list in conjunction with COUNTY staff. b. Prepare a"Certification of Construction Completion". c. Perform Final Completion walk through in conjunction with COUNTY staff. d. Assist with review of final pay request. e. Prepare signed and sealed"As-Constructed"(record)plans from information provided by the Contractor required for project certifications. D. DELIVERABLES The following deliverables are anticipated: 1. Six(6)full-size sets of signed and sealed design drawings and permit applications to be submitted to Collier County Growth Management for the contractor's Building Permit. 2. One pdf file and four(4)sets of original record drawings to be submitted to COUNTY. E. SCHEDULE The services described herein will commence upon receipt by the CONSULTANT of a Notice-to- Proceed and executed Work Order from the COUNTY, The estimated time required to complete the tasks described above is as follows: It is anticipated that the services for the project will be performed within a time limit not to exceed 365 days from the date of Notice-to-Proceed. If the services have not been completed within the above time limit due to delays caused by COUNTY, COUNTY will consider request by CONSULTANT for additional compensation if CONSULTANT's costs have increased due to the delay. CONSULTANT will observe the time limitations as set forth herein. CONSULTANT will not be responsible for delays beyond CONSULTANT's control,including delays caused by: (1)delays in receiving information from others except CONSULTANT"s subconsultants;and(2)delays in obtaining subsequent authorization,approvals and review comments from COUNTY and other governmental 3 160r. agencies. If such a delay should occur,the schedule will be updated and adjusted as mutually agreed upon by CONSULTANT and COUNTY. F.COUNTY RESPONSIBILITIES 1. COUNTY will designate a Project Representative,as COUNTY's representative and primary contact for CONSULTANT. CONSULTANT will rely on COUNTY's designated Project Representative for instructions and approval of CONSULTANT's services. 2. COUNTY will pay all permitting fees and associated expenses. 3. COUNTY will perform onsite construction observation and inspection. 4. COUNTY will advertise for bids or quotations,reproduce and distribute documents to contractors and vendors. 5. COUNTY agrees that in accordance with generally accepted construction practices,any Contractor employed by COUNTY to perform work in connection with the Project,will be required to assume sole and complete responsibility for job site conditions during the course of construction of the Project, including safety of all persons and property,and that this requirement shall be made to apply continuously and not be limited to normal working hours. CONSULTANT shall not have control over or charge of,and shall not be responsible for,construction means,methods,techniques, sequences or procedures,es these are solely the responsibility of the Contractor. CONSULTANT will represent COUNTY in accordance with the responsibilities of the CONSULTANT described in and Standard General Conditions of the Construction Contract and any mutually agreeable Special Conditions specific to the Project. C. COMPENSATION For the professional services as set forth in this Staffing and Cost Proposal(proposal),the COUNTY shall compensate the CONSULTANT as provided for in Article 5 of the Agreement and as follows: Table No.1--Fee Summary Task Fee Type TASK No. 1—Project Management $3,216 Lump Sum TASK No.2—Collier County Growth Management $11,122 Lump Sum Permitting TASK No.3—Bid Phase Services $4,085 Lump Sum TASK No.4—Construction Phase Services $15,536 T&M TOTAL FEE $33,959 Compensation for the services provided shall be due and payable in accordance with the Agreement. The total fee is calculated based on the Rate Schedule,effective March 9,2014,which is included in Attachment B to the Agreement. 4 16 0 8 Certain assumptions have been made in developing the fee for service.To the extent possible,they are stated in this proposal.If changes to the work result in changes on the level of effort presented in this proposal the scope of services and fee budget will be revised by mutual agreement. Attachment No.1.to this proposal provides a breakdown of the fee calculation. H. OTHER PROVISIONS All provisions contained in the Agreement not specifically modified herein,or in the associated Work Order authorizing this work,shall remain in full force and effect and arc incorporated by reference herein. PROPOSED BY: AECOM Technical Services, Inc. By: ., Qm„1::„„ Ronald R.Cavalieri,P.E.,BCRI3 Project Director By; ►i do,I Donovan S. 'amlett,P.E. Project Manager Date: August 18,2016 5 1 6 0 8 Project Budget Clam Pass Beath Park Electrical Upgrade Collier County Facilities Division Revised 8118/2016 Prrsonnrl Hours Badtet I 21 u .1Task Description �, 4 w , SEi 3 .76 z a` ii w` y I i 0 I. H Project hta na IMMOnt P9 644 64669densa4 12 _ 13 24 1 2,216 S • S 1.116 S4L30h1 12 - . - 12 14 5 3,210 S f 3 f 1,514 Colter County Permitting Cather Canny G'°441,64atus,ori0islb.%Pant 3 16 24 24 32 IDL S 16421 S 70 1 7(0 1 11,132 =boat __. __ .. .. .... __.... ....... s I6 x 14 2: Ito f 19.412 s 700 s • s 7611 s 11,122 Old Phas3 SeryiSetk 'u wean; f 2 11 1.192 S 200 f 300 5 3,692 314491411114111�4 nv,rtu1 2 2 1 3t4 f S 331 1 1 1 2 S 4 tib S - S tib 9t•• [uf6ramf00cvmv.1 1 1 1 2- I 7 a 641. S - 4 U) ..... . 2 I) 4 4 5 34.5 2,754 1 2.134 / 200 5 61115 Construction Phaco Seryaces Muni '4 4 4 13 S 2,040 S 300 3 )00 1 1117 I-ln�_n�rjrep44 kw*op ennuis aemAtcaw1 euli ted nm rctt sS 24 1 2,716 S - s 3,736` �e�qMYp M1.4.maWer Arlt 4 2 4 44 3 1.122 S $ 1.131 94gnrr6eedr+a4e4efrr ' 1 4 1 9 s I.Ok s IA>a int tnredame (.p fol) r 16 4 20 4 1,201 4 600 $ 3161 40$21�1�to�lC4r�Wa ^417.164°'414Md P 54 2 12 2 1,694 4 )00 s 300 $ 1,091 F eetaedha 2k 6 I 0"S 1.211 S 260• S 300 S 1,111 1KaVan2 2 4 10 1 I?36 1 4 1196 sYDroW P 0' 45 16 4 30 sees 14.9)6 f IMO s I,402'4 13,44 Lama/ r 26,, r N.' u 14I CO 266 s 31.444 4 2.500 S - S 1.500 1 23.49 ►4 .194172LY $ 99e9frel 417600 sea.or Ei.,•,.ecr 513740 E61.96.6 4123 06 I Cold T-t ti.,�,..a: 21300 Adorn Arlt $6200 salt% )p.t d1 MOM 1 3