Agenda 06/26/2012 Item #16C 2EXECUTIVE SUMMARY Recommendation to approve a work order under Request For Quotation 08- 5011 -62 in the amount of $258,218.13 to Quality Enterprises USA, Inc., for Underground Utility Contracting Services for the South County Regional Water Treatment Plant Reactor Tanks Rehabilitation Project No. 70034. OBJECTIVE: The public purpose of this project is to provide a reliable treatment process for the lime softening water treatment system at the South County Regional Water Treatment Plant (SCRWTP), which serves customers throughout the Collier County water service area. The work consists of structural, mechanical, and electrical improvements to the SCRWTP Reactor Tanks 2 and 3. CONSIDERATIONS: On June 24, 2008, as Agenda Item 10G, the Board of County Commissioners (Board) adopted the 2008 Water Master Plan Update that identified the requirement for reliability improvements. The proposed scope of work for Project 70034, "SCRWTP Reactor Tanks Rehabilitation," is consistent with the 2010 Wastewater CIP Update, page 3 of 4, line 77, as identified in the 2011 User Fee Rate Study. The original plant, built in 1983, was designed to produce 12 million gallons per day (MGD), of potable water utilizing a lime softening treatment process. The process at the SCRWTP utilizes three reactor tanks to mix lime and raw water. Reactor Tank No.l was the first of the three reactor tanks constructed at the facility. A few years later Reactor Tanks 2 and 3 were constructed to provide additional water treatment capacity at the plant. Extensive cracks were noticeable on the exterior face of the tank walls and leakage was observed through the cracks. The amount of surface cracks appears to have increased over the years. Repairs were previously implemented on Reactor Tank 1. A work order was issued to AECOM to provide design engineering services related to Reactor Tanks 2 and 3. A structural evaluation was performed by AECOM and recommendations made for repairs. The exterior cracks will be repaired by injection of a hydrophilic polyurethane grout, and the exterior surface of the tanks will be coated with a crystalline waterproof coating. It was also determined that the existing mixer and drive system for the reactors were in need of replacement. As part of the improvements, the existing impeller and drive system at Reactor Tank 3 will be replaced with a new impeller and drive system equipped with a more efficient variable speed motor. Request for Quotation (RFQ) 08- 5011 -62, SCRWTP Reactor Tanks 2 and 3, was electronically distributed on April 18, 2012, to the five vendors under the Fixed -Term Underground Utilities Contract 08 -5011. Two vendors submitted quotations by the May 11, 2012, deadline. The quotations are summarized in the table below: VENDOR SUB -TOTAL ALLOWANCE TOTAL PROJECT Quality Enterprises $ 224,537.50 $33,680.63 $258,218.13 Mitchell & Stark $ 286,972.00 $43,045.80 $330,017.80 Packet Page -1162- The engineers estimate of probable construction cos: was 5319,125.00. Staff reviewer: the quotations and determined Quality Enterprises USA, inc., to be the lowest qualified and responsive bidder at approximately 19 percent below the engineer's total cost estimate. The Purchasing Department concluded that bidding was competitive and representative of market conditions using the awarded vendors from contract 08 -5011. Staff reviewed the quotation, found it to be fair and reasonable, and also recommends the award. The quote tabulation and graph is attached (Attachments 1 and 2). Quality Enterprises USA, Inc., has a satisfactory performance and warranty record on other similar utility- related construction projects with Collier County. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The total project cost includes an allowance, in the amount of $33,680.63, for Owner Directed Work, which includes but is not limited to repairs due to structural deterioration, tank cleaning and painting, replacement of defective mechanical equipment and deficient electrical components. Staff will negotiate a price for any unforeseen conditions prior to start of any additional work. The project design professional, AECOM, recommends award of this work order to Quality Enterprises USA, Inc., in their letter dated May 30, 2012 (Attachments 3 and 4). Performance and Payment bonds shall be required from the awarded Contractor since the lowest responsive quote exceeds $200,000. FISCAL IMPACT: Funding is available in and is consistent with the FY12 Capital Budget approved by the Board on September 22, 2011. The source of funding is the Water User Fee Fund 412. Funds are available in Project 70034, SCWRF Reactor Tanks Rehabilitation. The above repair project is expected to be completed by February 2013. When the project is completed, the operating budget impact is reflected in the table below. The operating budget will not be impacted negatively. Elements FY 2012 FY 2013 FY 2014 - FY2032 Capital Outlay $258,218.13 $0 $0 Net Operating Effect* $0 $0 $0 *This reflects an estimate of the additional funds needed in the annual operating budget for each fiscal year. Costs are cumulative. LEGAL CONSIDERATIONS: This item is legally sufficient and requires a majority vote for Board action - JBW GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, as Ex- officio Governing Board of the Collier County Water -Sewer District, approve a work order for RFQ 08- 5011 -62 in the amount of $258,218.13, (which includes an allowance in the amount of $33,680.63 for unforeseen conditions) to Quality Enterprises USA, Inc.; and, authorize the Chairman to sign and execute the work order after approval by the County Attorney's Office. Prepared By: Alicia Abbott, Project Manager, Public Utilities Planning and Project Management. Attachments: Attachment 1 - Quote tabulation. Attachment 2 — Graph. Attachment 3 — Work Order Attachment 4 - Recommendation Letter. Attachment 5 — Mitchell & Stark Proposal Attachment 6 — Addendum 1 Packet Page -1163- COLLIER COUNTY Board of County Commissioners Item Number: 16.C.2. Item Summary: Recommendation to approve a work order under Request For Quotation 08- 5011 -62 in the amount of $258,218.13 to Quality Enterprises USA, Inc., for Underground Utility Contracting Services for the South County Regional Water Treatment Plant Reactor Tanks Rehabilitation Project No. 70034. Meeting Date: 6/26/2012 Prepared By Name: AbbottAlicia Title: Project Manager,Public Utilities Engineering 6/1/2012 11:59:48 AM Submitted by Title: Project Manager,Public Utilities Engineering Name: AbbottAlicia 6/1/2012 11:59:50 AM Approved By Name: HapkeMargie Title: Operations Analyst, Public Utilities Date: 6/1/2012 2:05:10 PM Name: Pam Libby Title: Manager - Operations - Water /WW,Water Date: 6/1/2012 3:08:43 PM Name: Paul Mattausch Title: Director - Water,Water Date: 6/1/2012 3:25:40 PM Name: WidesTom Title: Director - Operations Support - PUD,Utilities Fina Date: 6/1/20124 :36:08 PM Packet Page -1164- Name: WardKelsey Title: Manager - Contracts Administration,Purchasing & Ge Date: 6/4/2012 12:06:59 PM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Date: 6/4/2012 3:22:30 PM Name: ChmelikTom Title: Project Manager, Principal,Public Utilities Engine Date: 6/4/2012 4:58:54 PM Name: ParkerNicole Title: Contracts Specialist,Purchasing & General Services Date: 6/5/2012 10:47:14 AM Name: SunyakMark Title: Project Manager, Principal,Public Utilities Engine Date: 6/7/2012 4:24:57 PM Name: WhiteJennifer Title: Assistant County. Attomey,County Attorney Date: 6/8/2012 9:14:58 AM Name: YilmazGeorge Title: Administrator, Public Utilities Date: 6/13/2012 11:10:08 AM Name: KlatzkowJeff Title: County Attorney Date: 6/15/2012 11:29:20 AM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 6/18/2012 1:56:29 PM Name: OchsLeo Title: County Manager Date: 6/18/2012 3:04:41 PM Packet Page -1165- Z W 2 W O d N C 2 cfl O Co , N Z U? 0 Q o Cu N a) YO LL :3 Z R C'1 H O U Q W m Packet Page -1166- O O O O O O Cq ° O a) LO N°o O O I- O N L o D c o v _ LO o rn Q � � O r- � 00 � ° M W W x LL I 64 r 6cp N Efl EA M U :d O O O O O . •C N t` O IIT O 69 � O LO O ) O o Cli 1- CD e» � 1' w 64 EA z ° b, d LL LL Co Cn U) Z J J J J J D Efi I O O O O LO (0 a) N O N r N M Co 06 C M CC) M M O LO Co N X— r d N Ln !- �f 64 -,i N M CO LO W W 64 6j. N Lu; V—�, IL : C f tl1 N � N D :V L' a) 64 H} M M O z a u3' 64 H I- Z ti ° o .- Q Q N =; Cl) LL LL U) U) Z (09. L C L II II L O N LL NN LL O L 0 D Z O Y U Y U o C C Cu m d d N U Cu U a) x ° O o •� `o_ W M c 2 Ca > L O U U) °� c t a0i E c L °� ',.. W W j C 3 Lo ''. N Cl) CV to (+') o N O W Y C Y C Y C Y C Y C V fq 0 E — 2 (D a) L 0 L 0 L O 0C,0 L L a oa) Coo 0 L) U o N N a) m a) N C ,.'.. W z r N M V Cn Co Packet Page -1166- Packet Page -1167- Bid Results of RFQ 08- 5011 -62 (SCRWTP Reactor Tank 2 and 3 Improvements) $450,000 KEY. $400,000 ...................................................... ............................... Dashed Green - $350,000 AVERAGE BID Dashed black - $300,000 + / -1 std dev of avg bid $250,000 ............. ............................... .... Dotted red- - — — — — +/- 20% of eng $200,000 estimate for horizontal construction $150,000 $100,000 $50,000 $0 Eng Est Mitchell & Stark Quality Enterprises Packet Page -1167- WORF A_reement for Fixed "i erm Underground Utilities Contracr "10S -501 i Contract. Data. Marc;.::. 200'; FixeC Term Contract 'Expires Iv arcin I C, 201= (RFO #0-0-501 1 -62) Dated: June 26. 2012 This Work Order is for Underground Utility Construction services for work known as: Project Name: SCRWTP Reactor Tanks 2 and 3 Improvements Project No: 70034 'The work is specified in the Proposal Page, dated May 1 1, 2012, which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation #08- 5011 -62 dated April 18, 2012, as modified by Addendum 1, attached hereto a part of this Work Order #____ (please fill out once received) is assigned to: Quality Enterprises USA, Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I - Reactor Tank 2 Exterior Crack Repair * Task I - Reactor Tank 3 Exterior Crack Repair * Task III - Reactor "['auks 2 & 3 Exterior Waterproofing • Task IV - Reactor Tank 3 Mechanical and Electrical Improvements • Task V - Reactor Tank 2 Drain Valve Removal and Replacement • Task VI - 15% Allowance for Owner Directed Work including but not limited to repairs due to structural deterioration, tank cleaning and painting, replacement of defective mechanical equipment and deficient electrical components. Schedule of Work_ Complete work within 210 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Agreement #08 -501 1, the County will compensate the Firm in accordance with followin.- method(s): ®Negotiated Lump Sum; ❑Lump Sum Plus Reimbursable Costs; ❑Time & Material (established hourly rate Schedule A); ❑Cost Plus Fixed Fee, as provided in the attached proposal. 'Task L $ 4,312.50 Task 11 $ 11,500.00 Task III $ 29,325.00 Task IV $ 175.375.00 Task V $ 4,025.00 'Task VI $ 33,680_63 TOTAL PRICE FOR TASKS I - VI $ 258,218.13 (LS) PREPARED BY.� Alicia Abbott, Project Manager Panning & Pro ct Management Department APPROVED BY: Mark J. S a , P.E., Principal Project Manager Planning & Prom Management Department APPROVED BY: iandyZewis, lant Manager ter ent APPROVED BY: Parma ibby, Operations a ler .mater Det)artt nt /, . r APPROVED BY: Water Director Packet Page -1168- Date Date full � �tyt Date Date Date RFC #0tc --501 1-62- Pag- APPROVED BY: Toni Chmelik,?.E., Director Planning & Project Management Department APPROVED BY: Nicole Parker, Procurement Specialist OL-0 Purchasing Departin'en; APPROVED BY: George Yilmaz, Administrator Public tilitles ATTEST: Dwight E. Brock, Clerk By: __ _ Deputy Clerk ATTEST: By: (Print Namerritle) Approved as to Form and Legal Sufficiency: .lennifdr B. White Assistant County Attorney Date t Date Date. BOARD OF COUNTY COMMISSIONERS Collier County, Florida By: Fred W. Coyle, Chairman Quality Enterprises, USA, Inc. By' °�-- -- = -- -- (Print Name /Title) — ! Packet Page -1169- 1 May 30, 2012 kEcof, 4415 Metro Per; wa" Suite 4; 11-' Fort Mvers. F. 3391;; www.aecom.corr. Alicia Abbott Project Manager Collier County Public Utilities Planning & Project Management Department 3339 Tamiami Trail East, Suite 303 Naples, Florida 34112 SCRWTP Reactor Tanks 2 and 3 Improvements Collier County RFO #08- 5011 -62 Letter of Recommendation to Award Contract Dear Alicia: 239- 278 -7996 to 239 - 278 -0a18 rer Pursuant to your request, AECOM Technical Services, Inc. ( AECOM) is pleased to write you this Letter of Recommendation for Award on the above referenced project. Collier County received and opened two (2) bid proposals on May 11, 2012 for the South County Regional Water Treatment Plant ( SCRWTP) Reactor Tanks 2 and 3 Improvements project. A tabulation of the bids received is attached, and a summary of the bid totals is as follows: Bidder Total Bid Amount Quality Enterprises USA, Inc. $ 258,218.13 Mitchell & Stark Construction Company, Inc. $ 330,017.80 The apparent low bidder at the time of the bid opening was Quality Enterprises USA, Inc. (QE). QE submitted all of the required documents with their bid and is deemed responsive. QE has an annual contract for underground utilities and a successful work history for Collier County Public Utilities. Based on the above, AECOM considers QE qualified to perform the work. The Engineer's Estimate for the project is $319,125. Based on the information provided to the County with the bid, and evaluation of the bids, AECOM recommends award of this project to Quality Enterprises USA, Inc. in the amount of $258,218.13. Packet Page -1170- AMOM We appreciate the opportunity to assist the County on this important project. If you have any questions, or if you require any additional information please contact me. Very truly yours, AECOM Technical Services, Inc. r '& � . COL C44) Ronald R. Cavalieri, P.E., BCEE, PMP Principal Engineer Packet Page -1171- Adrr iniswAve Services CWsi©r Purmasing COLLIER COUNTY FLORIDA REQUEST FOR QUOTATION RFQ #08- 5011 -62 Reactor Tanks 2 and 3 PROPOSAL PAGE DUE DATE: May 11, 2012 at 3:00 om The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this, Proposal is accepted, to furnish same in full, according to the following: SOUTH COUNTY REGIONAL WATER TREATMENT PLANT REACTOR TANKS 2 AND 3 IMPROVEMENTS RFQ #08- 5011 -62 y �7 :.. PRI .. NO ITEM DESCRIPTION UNITS QUANTITY Per- Extended rf t 1 Reactor 2 Exterior Crack Repair LF 75 2 Reactor Tank 3 Exterior ck Repair LF 200 3 Reactor Tanks 2 and 3 Exterior LS 1 Waterproofing 4 Reactor Tank 3 Mechanical LS 1 Electrical Improvement SUBTOTAL= 5 AI ance for Owner directed work 15% f Items 1-4 TOTAL QUOTE _ See Attached IN WITNESS WHEREOF, WE have hereunto subscribed our names on thisl1th day of May , 2012 in the County of Cal I tar , in the state of F7lorida Quality Enterprises USA, Inc. Firm's Complete Legal Name 239 --435 -7200 Telephone Number RFQ_ContractDd ven_RevisedSeptember2D09 3 Packet Page -1172- 239-43-5-7202. FAX Number LGAUDIO @QE- USk.COL Email Address 3894 Mannix Drive, Suite 216 Address Naples City Florida State 34114 -5406 Zip F9500000255O Fl" ate o�uthority Document Number (www.sunbiz.orci/search/html) Signature Vice President Title Louis J. Gaudio 5 /11/12 Print Name Date RFQ_ContractDriven RevisedSeptember2009 4 Packet Page -1173- j SOUTH COUNTY REGIONAL WATER: TREATMENT PLANT REACTOR TANKS 2 AND 3 IMPROVEMENTS RFQ #08- 5011.62 QUOTE SCHEDULE PRICE ITEM NO. ITEM DESCRIPTION UNITS QUANTITY Per -Unit Extended 1 Reactor Tank 2 Exterior Crack LF 75 $57.50 $4,312.50 Re alr 2 Reactor Tank 3 Exterior Crack LF 200 $57.50 $11,500.00 Repair 3 Reactor Tanks 2 and 3 Exterior LS 1 $29,325.00 $29,325.00 Waterproofing 4 Reactor Tank 3 Mechanical and LS 1 $175,375.00 $175,375.00 Electrical Improvements 5 Reactor Tank 2 Drain Valve Removal LS 1 $4,025.00 $4,025.00 and Replacement SUBTOTAL= $224,537.50 6 Allowance for Owner directed work 115% $33,660.63 of Items 1 -5 TOTAL QUOTE _ $ 258,218.13 Quality Enterprises USA, Inc. May 11, 2012 Packet Page -1174- Memorandum Date: May 4, 2012 From: Nicole Parker Procurement Strategist To: Interested Bidders Email: Nicole.Parker @colliergov.net Telephone: (239) 252 -4270 FAX: (239) 252 -6549 ADDENDUM 1 Subject: Addendum # 1 RFQ 08- 5011 -62 Reactor Tanks 2 and 3 The following clarifications are issued as an addendum identifying the following change (s) for the referenced solicitation: 1. In Specification Section 01026 - Measurement and Payment, Paragraph 3.1, Page 3 of 3, following Bid Item 4, Add the following: " D. Bid Item 5: Reactor Tank 2 Drain Valve Removal and Replacement 1. Payment shall include the cost of: a. Removal of existing 8 -inch plug valve and appurtenances. b. Installation of new 8 -inch plug, including actuator, valve box and stem. c. Other appurtenant and incidental work required, including excavation and backfill, sidewalk repair, connection to existing piping, and restoration. 2. Measurement for Payment a. Measure as lump sum (I-S)" Addendum"remplate Revised: 4/15/10 1 Packet Page -1175- 2. in Specification Section 01026 - Measurement and Pavment, Daragraph 3.1, Page 3 of 3, Change Bid Item 5 to Bid Item 6. The amount bid for Item 6 shall be 15 % of the total on Bid Items 1 thru 5. 3. Technical Specifications, Add Collier County Utilities Standards Manual Technical Specification Section 333313 — Wastewater Valves and Appurtenances, attached hereto and made part of Addendum 1. 4. Drawings, Add Drawing D -104 — Reactor Tank 2 Removal and Modification Plan, attached hereto and made part of Addendum 1. 5. Revised Bid Schedule, attached hereto and made part of Addendum 1. Packet Page -1176-