Agenda 06/12/2012 Item #16A 96/12/2012 Item 16.A.9.
EXECUTIVE SUMMARY
Recommendation to approve final acceptance of the water utility facility for Naples
Mazda, 6381 Airport Road North, and to authorize the County Manager, or his
designee, to release any Utilities Performance Security to the Project Engineer or
the Developer's designated agent.
OBJECTIVE: The Board of County Commissioners, Ex- Officio the Governing Board of
the Collier County Water -Sewer District, to accept final and unconditional conveyance of
the water facility.
CONSIDERATIONS:
1) The Developer of Naples Mazda, 6381 Airport Road North, has constructed the water
facility within dedicated easements to serve this development. See attached location
map.
2) Preliminary acceptance of this water utility facility was approved by the Land
Development Services staff on April 19, 2011. At that time, the value of this utility
facility (assets) was $3,533.36 (see attachment[s]). Final Acceptance is in
accordance with Ordinance 2004 -31, as amended.
3) Staff has recorded all preliminary acceptance documents in the public records of
Collier County, which have been reviewed and approved by the County Attorney's
office as to form and legal sufficiency.
4) The water facility has been operated and maintained by the Collier County Water -
Sewer District during, not less than, the required one (1) year warranty period.
5) A final inspection to discover defects in materials and workmanship has been
conducted by the Land Development Services staff in coordination with Public Utilities
and this facility has been found to be satisfactory and acceptable.
6) The water utility infrastructure connected beyond the master meter is owned and
maintained by the owner.
FISCAL IMPACT: Approval of this Executive Summary will have no specific financial
impact. However, approval of this Executive Summary will result in the Collier County
Water -Sewer District receiving unconditional title to the utility facility, which at the time of
preliminary acceptance, had a total gross value of $3,533.36 (no depreciation applied).
GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no
growth management impact.
LEGAL CONSIDERATIONS: This item is legally sufficient and requires a majority
vote. — JBW
Packet Page -1104-
6/12/2012 Item 16.A.9.
RECOMMENDATION: That the Board of County Commissioners, Ex- Officio the
Governing Board of the Collier County Water -Sewer District, authorize final acceptance
of the water utility facility for Naples Mazda, 6381 Airport Road North, and authorize the
County Manager, or his designee, to release any Utilities Performance Security (UPS) to
the Project Engineer or the Developer's designated agent.
PREPARED BY: Jodi Hughes, Technician, Land Development Services /Engineering
Services, Growth Management Division, Planning and Regulation
Attached Documents:
1. Location Map
2. Asset Sheet
Packet Page -1105-
6/12/2012 Item 16.A.9.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.9.
Item Summary: Recommendation to approve final acceptance of the water utility facility
for Naples Mazda, 6381 Airport Road North, and to authorize the County Manager, or his
designee, to release any Utilities Performance Security to the Project Engineer or the
Developer's designated agent.
Meeting Date: 6/12/2012
Prepared By
Name: HughesJodi
Title: Technician,Engineering & Environmental Services
5/8/2012 11 :09:40 AM
Approved 13y -
Name: McKennaJack
Title: Manager - Engineering Review Services,Engineering & Environmental Services
Date: 5/8/2012 1:40:49 PM
Name: Pam Libby
Title: Manager - Operations - Water /WW,Water
Date: 5/9/2012 11:48:04 AM
Name: Paul Mattausch
Title: Director - Water,Water
Date: 5/10/2012 2:42:01 PM
Name: PuigJudy
Title: Operations Analyst, GMD P &R
Date: 5/11/2012 10:36:31 AM
Name: LorenzWilliam
Title: Director - CDES Engineering Services ,Comprehensive
Date: 5/11/2012 3:12:18 PM
Name: SunyakMark
Title: Project Manager, Principal,Public Utilities Engineering
Packet Page -1106-
Date: 5/16/2012 12:39:06 PM
6/12/2012 item 16.A:9.
Name: MarcellaJeanne
Title: Executive Secretary,Transportation Planning
Date: 5/21/2012 12:48:44 PM
Name: WhiteJennifer
Title: Assistant County Attorney,County Attorney
Date: 5/22/2012 3:01:04 PM
Name: FinnEd
Title: Senior Budget Analyst, OMB
Date: 5/25/2012 9:26:41 AM
Name: KlatzkowJeff
Title: County Attorney
Date: 5/25/2012 10:48:03 AM
Name: SheffieldMichael
Title: Manager - Business Operations, CMO
Date. 5/29/2012 10:07:28 AM --
Packet Page -1107-
Ill
Z
D
'o
r
m
D�
N
v
D
0
� I
D
0
Z
D
M
TD
L.7
6/12/2012 Item 16.A.9.
aor w =Aar
z
v
m
m
W �
N
�
S
TMIIAW TfW� N.Sa1)
TA TRNL Ns.at,
ac
m
� o
+ n
O
D
z
OOOOLERE4 —x ROOD
(C wl
A
m N
w
N n
~
y
rl
D
nw ro
N
< N
D
O
>
[�
PA
AIRPORT — PULLING ROAD (C.R. 31)
CANAL
N
W
�s
Ai
Y
. A
gi
EWAXMYRTLE
m
4
� CJYELL01
a\ _ Ly
� ■�
_Mi'" ��qq
AIFPOFTA.11) ROAD
� (CR. ]t,
�'i e
y fyJ
NRVOR1iLLlEa] POOR
(CAJiI
Packet Page -1108-
11VNWTON FOAD
•
O '�
OtlOa MO]EFHAN'1
ru� .,
£ Q
S"
' Z -i _
E 2 EuRiw
Q
-
- w
o
KCB
3?
u
NTERSTATE -16
o
M
aor w =Aar
z
v
m
m
W �
N
�
rC
ac
m
� o
+ n
O
D
z
m
u Z a
A
m N
w
N n
~
C
r
rl
D
nw ro
N
< N
D
O
>
AIRPORT — PULLING ROAD (C.R. 31)
CANAL
N
W
Y
EWAXMYRTLE
m
4
4
P
1
Packet Page -1108-
CER AT ON OF CONTRIBUTORY COSTS (W&R) 6/12/2012 Item 16.A.9.
PROJECT NAME: Naples Mazda
LOCATION: Section 11 Township 49 South Range 25 East
Collier County, Florida
NAME & ADDRESS OF OWNER: Naples Dodge, Inc,
6381 Airport Road N. I
Naples, FL 34109
TYPE OF UTILITY SYSTEM:
POTABLE WATER (MATERIALS ONLY)
C -900 CL 200 " °„ EA $2, 9 06.56 $2,106.56
Gate Valve 6�� 20 LF $4.06 $8.,20
6 2 EA $672.80 345 60
TOTAL COST $3,633.36
i do hereby certify that the quantities of material described above are true and an acc
of the as- installed system. urate representation
CERTIFYING:
NAME & TITLE OF ENGINEER CERTIFYING
OF:
it
Blair A. Foley, P.A., LLC
120 Edgemere Way South
Naples, FL 34105
i do hereby certify that the quantities of material described above are true and an accurate representation
of the as- installed cost of the system.
CERTIFYING:
Kevin Jensen, Pr ent
I
OF: JENSEN UNDERGROUND UTILITIES, INC.
5585 Taylor Road
Naples, Florida 34109
STATE OF FLORIDA )
SS:
COUNTY OF COLLIER)
The foregoing instrument was signed and acknowledged before me this 6 day of April, 2011 by
Kevin Jennen , who is personally known to me and who did not take an oath.
,S�RY�ie•. QONNALVENTRE
notary Public - Stato of Florida
X:ID0NNA- 11V0FCftples Mazda - County- Water.xis r t Ely Commissfon Expires Jun 1,2011
Commission N On 666671
Packet Page -1109-