Agenda 06/12/2012 Item #16A 76/12/2012 Item 16.A.7. EXECUTIVE SUMMARY Recommendation to grant final approval of the public roadway and drainage improvements for the final plat of Horse Creek Estates AR Number 4797, with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. OBJECTIVE: To grant final approval of the infrastructure improvements associated with that subdivision known as Horse Creek Estates. CONSIDERATIONS: On December 29, 2005, the Land Development Services Department granted preliminary acceptance of the roadway and drainage improvements in Horse Creek Estates. 2. The roadway and drainage improvements will be maintained by the project's homeowners association. Although the roadways are dedicated as Public road rights -of -way on the plat, Saddlebrook Lane is a loop road which only serves the residents within this subdivision. Therefore, the improvements will be maintained by the homeowner's association. 3. The required improvements have been constructed in accordance with the Land Development Code. The Land Development Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4. A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.3 of the Land Development Code. A copy of the document is attached. 5. This project is not within a PUD. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of $217,212.00 will be released upon Board approval. The original security in the amount of $1,332,815.00 has been reduced to the current amount based on the previous work performed and completed and pursuant to the terms of the Construction and Maintenance Agreement dated September 22, 2004. Packet Page -1076- 6/12/2012 Item 16.A.7. GROWTH MANAGEMENT IMPACT: There is no growth management impact. LEGAL CONSIDERATIONS: The County Attorney's Office has reviewed and approved the Resolution for legal sufficiency. This item requires a majority vote. This item is ready for Board consideration and approval. STW RECOMMENDATION: That the Board of County Commissioners grant final acceptance of the roadway and drainage improvements in Horse Creek Estates, AR Number 4797, release the maintenance security and authorize; 1. The Chairman to execute the attached resolution authorizing final acceptance of the improvements and acceptance of the plat dedications. 2. The release of the maintenance security. PREPARED BY: John Houldsworth, Senior Site Plans Reviewer, Land Development Services /Engineering Review, Growth Management Division, Planning and Regulation Attachments: 1) Location Map 2) Bond Basis 3) Resolution Packet Page -1077- COLLIER COUNTY Board of County Commissioners Item Number: 16.A.7. 6/12/2012 Item 16.A.7. Item Summary: Recommendation to grant final approval of the public roadway and drainage improvements for the final plat of Horse Creek Estates with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. Meeting Date: 6/12/2012 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Engineering & Environm 5/7/2012 1:24:43 PM Submitted by Title: Site Plans Reviewer, Senior,Engineering & Environm Name: HouldsworthJohn 5/7/2012 1:24:45 PM Approved By Name: McKennaJack Title: Manager - Engineering Review Services,Engineering & Environmental Services Date: 5/8/2012 1:38:06 PM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 5/11/2012 10:27:56 AM Name: LorenzWilliam Title: Director - CDES Engineering Services,Comprehensive Date: 5/11/2012 3:08:46 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 5/21/2012 12:46:19 PM Packet Page -1078- 6/12/2012 Item 16.A.7. Name: WilliamsSteven Title: Assistant County Attorney,County Attorney Date: 5/22/2012 10:36:06 AM Name: KlatzkowJeff Title: County Attorney Date: 5/25/2012 8:50:35 AM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 5/25/2012 5:16:54 PM Name: SheffieldMichael Title: Manager- Business Operations, CMO Date: 5/29/2012 10:09:39 AM Packet Page -1079- 6/12/2012 Item 16.A.7. ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS FOR SUBDIVISION IMPROVEMENTS AT HORSE CREEK ESTATES Prepared by: Q. Grady Minor & Associates, P.A. Civil Engineers # Land Surveyors # Planners 3800 Via Del Rey Bonita Springs, Florida 34134 (239) 947 -1144 (239) 947 -0375 (F) SEPT., 2003 rev. Oct., 2003 6z�' Packet Page -1081- 6/12/2012 Item 16.A.7. SCHEDULE "A" CLEARING AND EARTHWORK A -1. Clearing, grubbing and preparation of berm areas, roadway rights -of -way, easements and building areas as designated by the Engineer in the field including chipping and grinding of all materials on the Owner's property and then disposal of all residue off the Owner's property, all as specified, per acre complete. UNIT QUANTITY UNIT PRICE TOTAL PRICE Acre 27 $3,200.00 $86,400.00 A -2. Excavation of lakes, roadways and easement areas including placement and compaction of excavated material to construct roadways, lake banks, berms, home sites and other areas as designated in the field by the engineer. Compaction testing required in roadway areas. Per cubic yard of in place material excavated. Includes removal of ledge around existing lake. This item is handled by the excavation permit. A -3 Blasting of underlying rock lense in excavation area. This item is handled by the excavation permit. A-4 Construct silt fence prior to the start of construction and maintain in place until completion of construction per plan and details per lineal foot installed. UNIT QUANTITY UNIT PRICE TOTAL PRICE L.F. 15,000 $1.60 $24,000.00 Total Schedule "A" $ 110,400.00 F:UOB \L=LE PALM ISLAND \LPIENG \Mjd \OPNCST.DOC Packet Page -1082- 6/12/2012 Item 16.A.7. • SCHEDULE "B" DRAINAGE IMPROVEMENTS Furnishing and handling of all required materials, dewatering, bedding material (if necessary), rock removal and disposal off -site (if necessary), installation, backfilling, compaction, compaction testing in roadway areas, final grading, coordinating with other contractors and utility companies, flushing, clean-up, seeding of all areas disturbed by construction, repair of any damage caused by construction and other items necessary to complete the system and provide the owner with a complete working drainage system as shown on the drawings and specified on these contract documents. Pipe measurement is to outside of structures. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE B -1 12" PVC L.F. 396 $17.00 $ 6,700.00 B -2 15" RCP L.F. 389 $24.00 $ 9,300.00 B -3 18" RCP L.F. 509 $27.00 $13,700.00 B-4 24" RCP L.F. 1,383 $33.00 $45,600.00 B -5 30" RCP L.F. 1,765 $45.00 $79,400.00 13-6 36" RCP L.F. 618 $50.00 $30,900.00 B -8 Yard Drain EA. 5 $200.00 $ 1,000.00 B -8 Inlet Type'C' &'E' EA. 12 $1,200.00 $14,400.00 Modified B -9 Valley gutter inlets EA. 24 $1,500.00 $36,000.00 B -10 Junction Box EA. 6 $1,300.00 $ 7,800.00 B -11 18" Headwall EA. 1 $900.00 $ 900.00 B -12 30" Headwall EA. 4 $1,000.00 $ 4,000.00 B -13 36" Headwall EA. 2 $1,300.00 $ 2,600.00 B-1 I Site grading L.S. 1 $6,000.00 $ 6,000.00 Total Schedule "B" $ 258.300.00 F:VOB \LITTLE PALM ISLAND \LPIENG \Mjd \OPNCST.DOC Packet Page -1083- 6/12/2012 Item 16.A.7. SCHEDULE 'C' SANITARY SEWAGE COLLECTION SYSTEM Includes famishing and handling of all required materials, connection to other pipelines, all excavation (including rock and over - excavation if necessary), de- watering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, televised tape, infiltration and exfiltration testing, flushing, grouting, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as -built drawings and other items necessary to complete the system and provide Owner, DEP and Collier County with a complete working sewage collection system as shown on the drawings and specified in these contract documents. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE C -1 8" Gravity Sewer L.F. 2,460 $19.00 $46,700.00 0' -6' Cut C -2 8" Gravity Sewer L.F. 1,800 $24.00 $43,200.00 6' -8' Cut C -3 8" Gravity Sewer L.F. 790 $27.00 $21,300.00 8' -10' Cut C-4 Manhole 0' -6' Cut EA. 9 $1,800.00 $16,200.00 C -5 Manhole 6' -8' Cut EA. 6 $2,000.00 $12,000.00 C -6 Manhole 8' -10' Cut EA. 3 $2,500.00 $7,500.00 C -7 Service laterals including main line wye, 6" service line, bends, fittings, double wyes (if required), plugs, clean -outs, locators, etc. per details Single Services EA. 4 $500.00 $2,000.00 Double Services EA. 56 $550.00 $30,800.00 C -8 Sanitary sewer EA. 1 $60,000.00 $60,000.00 Pump station Complete per pump station detail sheet and Collier Count y requirements C -9 4" C900, CL200 L.F. 30 $15.00 $450.00 PVC force main C -10 4" C900, CL150 L.F. 1,050 $17.00 $17,900.00 PVC force main Total Schedule 'C' $ 258.050.00 F:UOB \LITTLE PALM ISLAND \LPIENG \Mjd \OPNCST.DOC Packet Page -1084- 6/12/2012 Item 16.A.7. SCHEDULE 'D' WATER DISTRIBUTION SYSTEM Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connection to other pipelines, all excavation (including rock and over - excavation if necessary), dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, disinfecting pipelines, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as -built drawings and other items necessary to complete the system and provide the Owner and Collier County with a complete working water distribution system as shown on the drawings and specified in these contract documents. ITEM DESCRIPTION UNI QUANTITY UNIT PRICE TOTAL PRICE D -1 8" PVC water main L.F. 4,800 $20.00 $96,000.00 D -2 8" Gate valve EA. 7 $800.00 $5,600.00 D -3 Permanent sample point EA. 2 $1,500.00 $3,000.00 D-4 Fire hydrant assemblies EA. 12 $2,500.00 $30,000.00 D -5 Single service assemblies EA. 1 $300.00 $300.00 D -6 Double service assemblies EA. 54 $300.00 $16.200.00 Total ScheduIe'D' $ 151,100.00 F:1JOB \LITTLE PALM 1SLAND \LPIENG\Mjd \0PNCST.D0C Packet Page -1085- 6/12/2012 Item 16.A.7. SCHEDULE 'E' ROADWAY CONSTRUCTION Roadway construction complete per the plans and Collier County specifications including stabilized subgrade, stabilized shoulder, limerock base, tack coat, asphaltic concrete, required testing by an independent laboratory, roadside fill and grading for full width of right -of -way and easements, finish grading, seeding and mulch. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE E -1 3/4 "Asphalt Type S -3 S.Y. 14,000 $2.50 $35,000.00 1 lift on] E -lA 3/4 "Asphalt Type S -3 S.Y. 14,000 $2.50 $35,000.00 Q lift only) E -2 6" Limerock Base S.Y. 14,000 $6.00 $84,000.00 E -3 12" Stabilized Sub grade 1 S.Y. 14,600 $3.00 $43,800.00 E-4 2' Concrete valley L.F. 10,200 $5.00 $51,000.00 gutter and H/C curb cuts E -5 5' Wide concrete sidewalk L.F. 10,200 $7.00 $71,400.00 E -6 Stop sign w /street sign EA. 1 $400.00 $400.00 on top including 24" wide stop bar E -7 Seed limit sign EA. 2 $400.00 $800.00 E -8 Regulatory signs EA. 2 $400.00 $800.00 E -9 2" PVC conduit (w /cap EA. 20 $350.00 $7,000.00 and locator typical) (70 LF E -10 2" PVC conduit 50 LF) EA. 60 $250.00 $15,000.00 E -11 4" PVC conduit (70 LF ) EA. 20 $450.00 $9,000.00 E -12 4" PVC conduit (50 LF ) EA. 60 $300.00 $18,000.00 E -13 Bahia Sod S.F. 15,000 $0.20 $9,600.00 E -14 Final grading L.S. 1 1 $7,500.00 $7,500.00 Total Schedule IF $ 388,300.00 F:VOB \LITTLE PALM ISLAND \LPIENG\Mjd \OPNCST.DOC Packet Page -1086- 6/12/2012 Item 16.A.7. SCHEDULE 'F' STREET LIGHTING Provide street lighting at one fixture per 200 linear feet of roadway. ITEM DES£RIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE F -1 Street Lighting EA. 29 $1,500.00 $43,500.00 Total Schedule 'F' $ 43,500.00 F:UOB\LrrTLE PALM ISLAND\LPIENG\Mjd10PNCST.D0C Packet Page -1087- 6/12/2012 Item 16.A.7. SCHEDULE 'G' PLAT MONUMENTATION Setting of permanent control points per plat. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE G -1 Plat Monumentation L.S. 1 $2,000.00 $2,000.00 Total Schedule 'G' S 2.000.00 F:UOB\LrrTLE PALM ISLAND \LPIENG\Mjd \OPNCST.DOC Packet Page -1088- 6/12/2012 Item 16.A.7. BID SCHEDULE SUMMARY SCHEDULE 'A' Clearing and Earthwork $110,400.00 SCHEDULE 'B' Drainage Improvements $258,300.00 SCHEDULE 'C' Sanitary Sewage Collection System $258,050.00 SCHEDULED' Water Distribution System $151,100.00 SCHEDULE'E' Roadway Construction $388,300.00 SCHEDULE'F' Street Ligh#g $ 43,500.00 SCHEDULE'G' Plat Monumentation $ 2,000.00 TOTAL $1,211,650.00 f �ZI , IBS Q►�-... t F:VOB \LITTLE PALM ISLAND\LPIENG \Mjd \OPNCST.DOC • Packet Page -1089- 6/12/2012 Item 16.A.7. RESOLUTION NO. 12- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN HORSE CREEK ESTATES, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 41, PAGES 74 THROUGH 81; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WHEREAS, the Board of County Commissioners of Collier County, Florida, on April 13, 2004, approved the plat of Horse Creek Estates for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04 -41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Land Development Services Department has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Horse Creek Estates, pursuant to the plat thereof recorded in Plat Book 41, pages 74 through 81, and the Clerk is hereby authorized to release the maintenance security. Packet Page -1090- 6/12/2012 Item 16.A.7. BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage improvements within Horse Creek Estates will be maintained privately in the future and will not be the responsibility of Collier County; and acceptance of the plat dedications. Although the streets are dedicated to the public, the plat identifies the Horse Creek Homeowner's Association, Inc. as the responsible maintenance entity. This Resolution adopted after motion, second and majority vote favoring same, this day of , 2012. DATE: BOARD OF COUNTY COMMISSIONERS ATTEST: COLLIER COUNTY, FLORIDA DWIGHTE. BROCK, CLERK By: Deputy Clerk FRED W. COYLE, CHAIRMAN Approved as to form and legal sufficiency: {� . L J,X Steven T. Williams Assistant Collier County Attorney Packet Page -1091-